Anda di halaman 1dari 4

LOGBOOK KERJA

AKTIVITAS HARIAN SELAMA BEKERJA DIKANTOR DAN DIRUMAH


Bulan : Maret 2020
Unit Kerja : DPS - Biro BIM
Perusahaan : WIKA
Nama Atasan : Romi Ramadhan

NO Nama NIP AKTIVITAS HARIAN / 18-03-2020


Adi Malik Negoro TK 18.1820 Design Drainage Palu CFS Power Plant
1 (2x50 MW)
2 Adi Pernadi ET184146 PPT pelatihan BIM Divisi 4
3 Aditya Putra Al Aziz KKWT PPT ISO 19650 / 36.1 C
Alfin Desmi Rizky TK.19.1896 Proses Data Kontur Jogja - Bawen / 65% /
4 36.2C
5 Amelia Wijaya TK 19.1900 Analisis Balongan , Tulangan / sehat
Andra Yusfa Ananda ET194384 Penulangan Tie Beam Station Karawang /
6 36.2 C
Baihaqi Al Faqih Magang SCF Reveron / 75% / 36,4 C
7
Bayu Anggoro Putro ET184180 Revisi Modelling HSR Walini/ 70% / 36.2 C
8
9 Billy Karuna Irawan ET184174 CC LRT Jakarta / 5% / 36.2°C sehat
Brian Adam ET194243 Pemodelan Plaxis untuk
10 Balongan/65%/36.6
Chandra Endara Sety ET184189 Analisis Girder Jembatan FO Bawen/36,3C
11
12 Devika Zulvia KKWT Analisis Model Atap walini / 8%/sehat
Dika Ananditya ET194340 Penulangan Slab Karawang / 30% / 36.1C
13
Eka Silitonga ET 163647 Pembuatan Skenario Palu 4/ 10 %/ 36.2 C
14
Eric Dwi Pamungkas TK.19.1897 Maintenance Server / 75% / 36.1C
15
16 Febry Hardyono TK 181820 pipeline patraniaga / 36.2 C
17 Feby Wucika Jasmin ET 204440 Pemodelan analisis karawang / 36.1 C
Iwan Kusumo ET173889 Analisis Girder Jembatan FO Bawen/36.2C
18
Jelita Desiyanti TK. 19. 1899 Modul Allplan/ 20 %, tulangan /10% /36.2C
19
20 Khalid Adil ET 184093 Pipe Route Study PLTU Palu
21 M. H. Hospris SAKIT
Mivta Huljannah TK.19.1894 Merapihkan data server, Mempelajari
Allplan, Selesai klasifikaasi kontur/36.2 C
22

23 Muhammad Firdaus AlfET184146 Silabus & lesson plan BIM lvl. 2 / 36.5 C
Nanda fadilah ade praKKWT Proses filtering data laser scanner LRT /
24 60% / 36,2 C
Octob Bhayu HanggorET194236 Revisi Pemodelan Borepile Stasiun HSR
25 Karawang/ 100%/ 36.6 C
Raihan Zakih KKWT Pembuatan IK Drone Phantom 4 Pro V.2 /
26 60% / 36.3C
27 Raju Firmansyah ET174018 Prepare aveva aset taging/36.5 C
28 Retna Iswandari KKWT
29 Rifki Maulana KKWT Bumper Video Corona Sekper / 36.1 C
Rizky Yusuf RamadhaET184115 Perhitungan volume HBR R14a/80%/36.4C
30
31 Rohimat SAKIT
Rusqi Librian KKWT Modul Autodesk Compile Data Reference
32 2 /3 Progress/ 36.1 C
Uki Satriana TK.19.1898 Konten Instagram Corona Virus -
33 Penanggulangan Digitalisasi
Windari Afrita Sonya ET 194405 Penulangan Shearwall Karawang 10 % /36
34 C
35 Romi Ramadhan ET042261 Monitoring/36.2
36
AKTIVITAS HARIAN / 19-03-2020 AKTIVITAS HARIAN / 20-03-2020
Design Drainage Palu CFS Power Plant (2x50
MW) / 25% / 36.3 C
Review Desain Jetty Balongan/sehat

Proses Data Kontur Jogja - Bawen / 80% /


36.2C
Analisis Balongan ,Tulangan / sehat
Penulangan Tie Beam Station Karawang /
36.2 C
Modul Asset Tagging BIM lv 3 / 5% / 36. 2 C

Revisi Modelling HSR Walini/ 85% / 36.1 C

LRT Jakarta YII / 36,5°C


Pemodelan Plaxis untuk Balongan/70%/36.6

Analisis Pier Jembatan FO Bawen/36,1C

Revisi Model Slab Karawang Lt 3 / 100% /


36.2C
Pembuatan Skenario Palu 4/ 10 %/ 36 C

Maintenance Server / 100% / CC LRT / 10% /


36.0 C
pipeline Petragas / 36.3 C
Pemodelan analisis karawang / 36.3 C
Analisis Girder Jembatan FO Bawen/sehat

Modul Allplan/ 40 %, tulangan /20% /36.0C

Pipe Route Study PLTU Palu


SAKIT
Membuat list GPS kit, merapihkan dokumen,
meneruskan wallkflow keuangan, meneruskan
mengulik allplan/36.4 C

Modul Navisworks / 36.3 C


Proses Filtering data laser scanner LRT

Penulangan Borpile 16.5 m & 37.5 m Stasiun


HSR Karawang/ 50%/ 36.1 C
Pembuatan IK Drone Phantom 4 Pro V.2 /
85% / 36.2C
Prepare aveva aset taging/36.5 C
Talkshow Team Survey / 36 C
Perhitungan volume HBR R14a/85%/36.2C

SAKIT
Modul Autodesk 2 /3 Progress 20% / 36.2 C

Video Modul Vtol

Penulangan Shearwall Karawang 20% /36.4


C
Monitoring/36.2