DAFTAR ISI
BAB I PENDAHULUAN
Conduit ................................................................................................................................. 23
1
Conduit ................................................................................................................................. 26
2
3.2.2 Tinggi Jagaan (Free Board).............................................................................................134
BAB IV PENUTUP........................................................................................................................183
4.2. Saran..................................................................................................................................185
DAFTAR PUSTAKA......................................................................................................................187
3
BAB III
TEORI DAN PERHITUNGAN PERENCANAAN
Diketahui:
Leff = (n . Kp + Ka) He
= 35 – 2 (0 . Kp + 0,1) He
= 35 – 0,2 He
Hd = Q / (C . Leff)2/3
= (558,002) / (C . (35 – 0,2 Hd)) 2/3
Asumsi C mula-mula: 2
= (558,002) / (2 . (35 – 0,2 Hd)) 2/3
Hd = 4,053
Saat h = Hd
P = 5 m (Perencanaan Tinggi Pelimpah)
a = [ 0,6 – 0,0416 . ( Hd / P )0,99 ] / [ 1 + 0,0416 . ( Hd / P ) 0,99 ]
= [ 0,6 – 0,0416 . ( 4,053 / 5 )0,99 ] / [ 1 + 0,0416 . ( 4,053 / 5 ) 0,99 ]
= 0,548
C = 1,6 . ( 1 + 2 . a . ( h / Hd )) / ( 1 + a . ( h / Hd ))
= 1,6 . ( 1 + 2 . 0,548 . ( 4,053 / 4,053 )) / ( 1 + 0,548 . ( 4,053 / 4,053))
= 2,166
(Karena hasil C asumsi ≠ C hitungan, maka dicari lagi dengan Cara Trial 2)
66
67
(Karena hasil C asumsi =C hitungan, maka C = 2,168 akan dipake pada perhitungan
penelusuran banjir)
Cara C asumsi Hd a C hitung
4,053
Trial 1 2,000 0,548 2,166
3,840
Trial 2 2,166 0,550 2,168
Trial 3 2,168 3,838 0,550 2,168
h = 0 ,2 m
h/Hd = 0,2 / 3,838 (dari Hd Trial 2)
= 0,052
Ka = 0,1
L = 35 – (2 . h . Ka)
= 35 – (2 . 0,2 . 0,1)
= 34,96 m
C asumsi = 1,6 . ( 1 + 2 . a . ( h / Hd )) / ( 1 + a . ( h / Hd ))
= 1,6 . ( 1 + 2 . 0,550 . (0,052)) / ( 1 + 0,550 . ( 0,052 ))
= 1,645
Q = C × L × H1,5
= 1,645 x 34,96 x 0,0521,5
= 5,143 m3/dt
69
Tabel 3.1
Hubungan C - L - Q di atas Pelimpah
Elevasi h Q
h/Hd Ka L C 3
(m) (m) m /det
[1] [2] [3] [4] [5] [6] [7]
183.00 0.000 0.000 0.100 35.000 1.600 0.000
183.20 0.200 0.052 0.100 34.960 1.645 5.143
183.40 0.400 0.104 0.100 34.920 1.687 14.901
183.60 0.600 0.156 0.100 34.880 1.727 27.992
183.80 0.800 0.208 0.100 34.840 1.765 43.992
184.00 1.000 0.261 0.100 34.800 1.801 62.663
184.20 1.200 0.313 0.100 34.760 1.835 83.842
184.40 1.400 0.365 0.100 34.720 1.867 107.406
184.60 1.600 0.417 0.100 34.680 1.899 133.256
184.80 1.800 0.469 0.100 34.640 1.928 161.304
185.00 2.000 0.521 0.100 34.600 1.957 191.478
185.20 2.200 0.573 0.100 34.560 1.984 223.707
185.40 2.400 0.625 0.100 34.520 2.010 257.932
185.60 2.600 0.677 0.100 34.480 2.035 294.093
185.80 2.800 0.729 0.100 34.440 2.058 332.138
186.00 3.000 0.782 0.100 34.400 2.081 372.017
186.20 3.200 0.834 0.100 34.360 2.103 413.681
186.40 3.400 0.886 0.100 34.320 2.124 457.085
186.60 3.600 0.938 0.100 34.280 2.145 502.187
186.80 3.800 0.990 0.100 34.240 2.164 548.945
187.00 4.000 1.042 0.100 34.200 2.183 597.319
187.200 4.200 1.094 0.100 34.160 2.201 647.273
187.400 4.400 1.146 0.100 34.120 2.219 698.770
187.600 4.600 1.198 0.100 34.080 2.236 751.775
187.800 4.800 1.251 0.100 34.040 2.252 806.255
188.000 5.000 1.303 0.100 34.000 2.268 862.177
188.200 5.200 1.355 0.100 33.960 2.283 919.511
188.400 5.400 1.407 0.100 33.920 2.298 978.226
188.600 5.600 1.459 0.100 33.880 2.313 1038.294
188.800 5.800 1.511 0.100 33.840 2.326 1099.686
189.000 6.000 1.563 0.100 33.800 2.340 1162.375
189.200 6.200 1.615 0.100 33.760 2.353 1226.335
189.400 6.400 1.667 0.100 33.720 2.366 1291.542
189.600 6.600 1.720 0.100 33.680 2.378 1357.969
189.800 6.800 1.772 0.100 33.640 2.390 1425.594
190.000 7.000 1.824 0.100 33.600 2.401 1494.392
Sumber: Hasil Perhitungan, 2021
70
H = 0,2 m
S (tampungan)= 23966400 m3
Tabel 3.2
Hubungan H-S-Q
Psi Phi
S
Elevasi H ΔS ΔS/Δt Q Q/2 y = S/∆t -
(tampungan) φ = S/∆t + Q/2
Q/2
(m) (m) (m3) (m3) (m3/detik) (m3/detik) (m3/detik) 3
(m /detik) (m3/detik)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
183.0 0.0 23814000 0.00 0.00 0.00 0.00 0.00 0.00
183.2 0.2 23966400 152400 42.33 5.14 2.57 39.76 44.90
183.4 0.4 24118800 304800 84.67 14.90 7.45 77.22 92.12
183.6 0.6 24271200 457200 127.00 27.99 14.00 113.00 141.00
183.8 0.8 24423600 609600 169.33 43.99 22.00 147.34 191.33
184.0 1.0 24576000 762000 211.67 62.66 31.33 180.34 243.00
184.2 1.2 24730800 916800 254.67 83.84 41.92 212.75 296.59
184.4 1.4 24885600 1071600 297.67 107.41 53.70 243.96 351.37
184.6 1.6 25040400 1226400 340.67 133.26 66.63 274.04 407.29
184.8 1.8 25195200 1381200 383.67 161.30 80.65 303.01 464.32
185.0 2.0 25350000 1536000 426.67 191.48 95.74 330.93 522.41
185.2 2.2 25507200 1693200 470.33 223.71 111.85 358.48 582.19
185.4 2.4 25664400 1850400 514.00 257.93 128.97 385.03 642.97
185.6 2.6 25821600 2007600 557.67 294.09 147.05 410.62 704.71
185.8 2.8 25978800 2164800 601.33 332.14 166.07 435.26 767.40
186.0 3.0 26136000 2322000 645.00 372.02 186.01 458.99 831.01
186.2 3.2 26295600 2481600 689.33 413.68 206.84 482.49 896.17
186.4 3.4 26455200 2641200 733.67 457.09 228.54 505.12 962.21
186.6 3.6 26614800 2800800 778.00 502.19 251.09 526.91 1029.09
186.8 3.8 26774400 2960400 822.33 548.94 274.47 547.86 1096.81
187.0 4.0 26934000 3120000 866.67 597.32 298.66 568.01 1165.33
187.2 4.2 27096000 3282000 911.67 647.27 323.64 588.03 1235.30
71
Psi Phi
S
Elevasi H ΔS ΔS/Δt Q Q/2 y = S/∆t -
(tampungan) φ = S/∆t + Q/2
Q/2
(m) (m) (m3) (m3) (m3/detik) (m3/detik) (m3/detik) 3
(m /detik) (m3/detik)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
187.4 4.4 27258000 3444000 956.67 698.77 349.39 607.28 1306.05
187.6 4.6 27420000 3606000 1001.67 751.78 375.89 625.78 1377.55
187.8 4.8 27582000 3768000 1046.67 806.25 403.13 643.54 1449.79
188.0 5.0 27744000 3930000 1091.67 862.18 431.09 660.58 1522.76
188.2 5.2 27908400 4094400 1137.33 919.51 459.76 677.58 1597.09
188.4 5.4 28072800 4258800 1183.00 978.23 489.11 693.89 1672.11
188.6 5.6 28237200 4423200 1228.67 1038.29 519.15 709.52 1747.81
188.8 5.8 28401600 4587600 1274.33 1099.69 549.84 724.49 1824.18
189.0 6.0 28566000 4752000 1320.00 1162.37 581.19 738.81 1901.19
189.2 6.2 28732800 4918800 1366.33 1226.34 613.17 753.17 1979.50
189.4 6.4 28899600 5085600 1412.67 1291.54 645.77 766.90 2058.44
189.6 6.6 29066400 5252400 1459.00 1357.97 678.98 780.02 2137.98
189.8 6.8 29233200 5419200 1505.33 1425.59 712.80 792.54 2218.13
190.0 7.0 29400000 5586000 1551.67 1494.39 747.20 804.47 2298.86
Sumber: Hasil Perhitungan, 2021
72
189
188
El. Muka Air (m)
187
186
185
184
183
0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500
Debit (m³/dt)
Gambar 3.1 Rating Curve Q100
Sumber: Hasil Perhitungan, 2021
Leff = 35 – 0,2 He
= 35 – 0,2 . 5,025
= 33,995 m
Qlewat= C . L .He1,5
= 2,131 . 33,995 . 5,0251,5
= 815,797 m3/dt (OK!)
73
Tabel 3.3
Hubungan C - L - Q di atas Pelimpah
Hubungan C - L - Q di atas Pelimpah
Elevasi h Q
h/Hd Ka L C 3
(m) (m) m /det
[1] [2] [3] [4] [5] [6] [7]
183,00 0,000 0,000 0,100 35,000 1,600 0,000
183,20 0,200 0,040 0,100 34,960 1,631 5,100
183,40 0,400 0,080 0,100 34,920 1,661 14,672
183,60 0,600 0,119 0,100 34,880 1,690 27,388
183,80 0,800 0,159 0,100 34,840 1,717 42,808
184,00 1,000 0,199 0,100 34,800 1,744 60,685
184,20 1,200 0,239 0,100 34,760 1,770 80,856
184,40 1,400 0,279 0,100 34,720 1,794 103,201
184,60 1,600 0,318 0,100 34,680 1,818 127,625
184,80 1,800 0,358 0,100 34,640 1,842 154,051
185,00 2,000 0,398 0,100 34,600 1,864 182,411
185,20 2,200 0,438 0,100 34,560 1,886 212,648
185,40 2,400 0,478 0,100 34,520 1,907 244,708
185,60 2,600 0,517 0,100 34,480 1,927 278,544
185,80 2,800 0,557 0,100 34,440 1,947 314,112
186,00 3,000 0,597 0,100 34,400 1,966 351,370
186,20 3,200 0,637 0,100 34,360 1,984 390,280
186,40 3,400 0,677 0,100 34,320 2,002 430,805
186,60 3,600 0,716 0,100 34,280 2,020 472,911
186,80 3,800 0,756 0,100 34,240 2,037 516,564
187,00 4,000 0,796 0,100 34,200 2,053 561,733
187,200 4,200 0,836 0,100 34,160 2,069 608,387
187,400 4,400 0,876 0,100 34,120 2,085 656,496
187,600 4,600 0,916 0,100 34,080 2,100 706,033
187,800 4,800 0,955 0,100 34,040 2,115 756,970
188,000 5,000 0,995 0,100 34,000 2,129 809,280
188,200 5,200 1,035 0,100 33,960 2,143 862,939
188,400 5,400 1,075 0,100 33,920 2,157 917,920
188,600 5,600 1,115 0,100 33,880 2,170 974,201
188,800 5,800 1,154 0,100 33,840 2,183 1031,757
189,000 6,000 1,194 0,100 33,800 2,195 1090,566
189,200 6,200 1,234 0,100 33,760 2,208 1150,605
189,400 6,400 1,274 0,100 33,720 2,220 1211,854
189,600 6,600 1,314 0,100 33,680 2,231 1274,290
189,800 6,800 1,353 0,100 33,640 2,243 1337,894
190,000 7,000 1,393 0,100 33,600 2,254 1402,645
Sumber: Hasil Perhitungan, 2021
S Psi Phi
Elevas
H (tampungan ΔS ΔS/Δt Q Q/2 y = S/∆t - φ = S/∆t +
i
) Q/2 Q/2
(m) (m) (m3) (m3) 3 3 3 3
(m /detik) (m /detik) (m /detik) (m /detik) 3
(m /detik)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
183,0 0,0 23814000 0,00 0,00 0,00 0,00 0,00 0,00
183,2 0,2 23966400 152400 42,33 5,10 2,55 39,78 44,88
183,4 0,4 24118800 304800 84,67 14,67 7,34 77,33 92,00
183,6 0,6 24271200 457200 127,00 27,39 13,69 113,31 140,69
183,8 0,8 24423600 609600 169,33 42,81 21,40 147,93 190,74
184,0 1,0 24576000 762000 211,67 60,69 30,34 181,32 242,01
184,2 1,2 24730800 916800 254,67 80,86 40,43 214,24 295,09
184,4 1,4 24885600 1071600 297,67 103,20 51,60 246,07 349,27
184,6 1,6 25040400 1226400 340,67 127,63 63,81 276,85 404,48
184,8 1,8 25195200 1381200 383,67 154,05 77,03 306,64 460,69
185,0 2,0 25350000 1536000 426,67 182,41 91,21 335,46 517,87
185,2 2,2 25507200 1693200 470,33 212,65 106,32 364,01 576,66
185,4 2,4 25664400 1850400 514,00 244,71 122,35 391,65 636,35
185,6 2,6 25821600 2007600 557,67 278,54 139,27 418,39 696,94
185,8 2,8 25978800 2164800 601,33 314,11 157,06 444,28 758,39
186,0 3,0 26136000 2322000 645,00 351,37 175,69 469,31 820,69
186,2 3,2 26295600 2481600 689,33 390,28 195,14 494,19 884,47
186,4 3,4 26455200 2641200 733,67 430,81 215,40 518,26 949,07
186,6 3,6 26614800 2800800 778,00 472,91 236,46 541,54 1014,46
186,8 3,8 26774400 2960400 822,33 516,56 258,28 564,05 1080,62
187,0 4,0 26934000 3120000 866,67 561,73 280,87 585,80 1147,53
187,2 4,2 27096000 3282000 911,67 608,39 304,19 607,47 1215,86
187,4 4,4 27258000 3444000 956,67 656,50 328,25 628,42 1284,91
187,6 4,6 27420000 3606000 1001,67 706,03 353,02 648,65 1354,68
187,8 4,8 27582000 3768000 1046,67 756,97 378,48 668,18 1425,15
188,0 5,0 27744000 3930000 1091,67 809,28 404,64 687,03 1496,31
188,2 5,2 27908400 4094400 1137,33 862,94 431,47 705,86 1568,80
188,4 5,4 28072800 4258800 1183,00 917,92 458,96 724,04 1641,96
188,6 5,6 28237200 4423200 1228,67 974,20 487,10 741,57 1715,77
188,8 5,8 28401600 4587600 1274,33 1031,76 515,88 758,45 1790,21
189,0 6,0 28566000 4752000 1320,00 1090,57 545,28 774,72 1865,28
189,2 6,2 28732800 4918800 1366,33 1150,61 575,30 791,03 1941,64
189,4 6,4 28899600 5085600 1412,67 1211,85 605,93 806,74 2018,59
189,6 6,6 29066400 5252400 1459,00 1274,29 637,14 821,86 2096,14
189,8 6,8 29233200 5419200 1505,33 1337,89 668,95 836,39 2174,28
190,0 7,0 29400000 5586000 1551,67 1402,65 701,32 850,34 2252,99
Sumber: Hasil Perhitungan, 2021
75
Leff = 20 – 0,2 He
= 20 – 0,2 . 6,942
= 33,612 m
Qlewat= C . Leff .He1,5
= 2,105 . 33,612 . 6,9421,5
= 1293,805 m3/dt (OK!)
76
Tabel 3.5
Hubungan C - L - Q di atas Pelimpah
Hubungan C - L - Q di atas Pelimpah
Elevasi h Q
h/Hd Ka L C 3
(m) (m) m /det
[1] [2] [3] [4] [5] [6] [7]
183,00 0,00 0,000 0,10 35,000 1,600 0,000
183,20 0,20 0,029 0,10 34,960 1,621 5,069
183,40 0,40 0,058 0,10 34,920 1,641 14,500
183,60 0,60 0,086 0,10 34,880 1,661 26,930
183,80 0,80 0,115 0,10 34,840 1,681 41,898
184,00 1,00 0,144 0,10 34,800 1,700 59,144
184,20 1,20 0,173 0,10 34,760 1,718 78,501
184,40 1,40 0,202 0,10 34,720 1,736 99,843
184,60 1,60 0,230 0,10 34,680 1,754 123,077
184,80 1,80 0,259 0,10 34,640 1,771 148,126
185,00 2,00 0,288 0,10 34,600 1,787 174,925
185,20 2,20 0,317 0,10 34,560 1,804 203,421
185,40 2,40 0,346 0,10 34,520 1,820 233,564
185,60 2,60 0,375 0,10 34,480 1,835 265,312
185,80 2,80 0,403 0,10 34,440 1,851 298,627
186,00 3,00 0,432 0,10 34,400 1,866 333,472
186,20 3,20 0,461 0,10 34,360 1,880 369,814
186,40 3,40 0,490 0,10 34,320 1,894 407,623
186,60 3,60 0,519 0,10 34,280 1,908 446,871
186,80 3,80 0,547 0,10 34,240 1,922 487,528
187,00 4,00 0,576 0,10 34,200 1,936 529,571
187,200 4,200 0,605 0,10 34,160 1,949 572,973
187,400 4,400 0,634 0,10 34,120 1,962 617,711
187,600 4,600 0,663 0,10 34,080 1,974 663,762
187,800 4,800 0,691 0,10 34,040 1,986 711,104
188,000 5,000 0,720 0,10 34,000 1,999 759,716
188,200 5,200 0,749 0,10 33,960 2,010 809,577
188,400 5,400 0,778 0,10 33,920 2,022 860,667
188,600 5,600 0,807 0,10 33,880 2,033 912,966
188,800 5,800 0,836 0,10 33,840 2,045 966,457
189,000 6,000 0,864 0,10 33,800 2,056 1021,120
189,200 6,200 0,893 0,10 33,760 2,066 1076,938
189,400 6,400 0,922 0,10 33,720 2,077 1133,892
189,600 6,600 0,951 0,10 33,680 2,087 1191,967
189,800 6,800 0,980 0,10 33,640 2,097 1251,145
190,000 7,000 1,008 0,10 33,600 2,107 1311,409
Sumber: Hasil Perhitungan, 2021
Tabel 3.6
77
Hubungan H – S -Q
S Psi Phi
Elevas
H (tampungan ΔS ΔS/Δt Q Q/2 y = S/∆t - φ = S/∆t +
i
) Q/2 Q/2
(m) (m) (m3) (m3) 3 3 3 3
(m /detik) (m /detik) (m /detik) (m /detik) 3
(m /detik)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
183,0 0,0 23814000 0,00 0,00 0,00 0,00 0,00 0,00
183,2 0,2 23966400 152400 42,33 5,07 2,53 39,80 44,87
183,4 0,4 24118800 304800 84,67 14,50 7,25 77,42 91,92
183,6 0,6 24271200 457200 127,00 26,93 13,47 113,53 140,47
183,8 0,8 24423600 609600 169,33 41,90 20,95 148,38 190,28
184,0 1,0 24576000 762000 211,67 59,14 29,57 182,09 241,24
184,2 1,2 24730800 916800 254,67 78,50 39,25 215,42 293,92
107160
184,4 1,4 24885600 297,67 99,84 49,92 247,75 347,59
0
122640
184,6 1,6 25040400 340,67 123,08 61,54 279,13 402,21
0
138120
184,8 1,8 25195200 383,67 148,13 74,06 309,60 457,73
0
153600
185,0 2,0 25350000 426,67 174,93 87,46 339,20 514,13
0
169320
185,2 2,2 25507200 470,33 203,42 101,71 368,62 572,04
0
185040
185,4 2,4 25664400 514,00 233,56 116,78 397,22 630,78
0
200760
185,6 2,6 25821600 557,67 265,31 132,66 425,01 690,32
0
216480
185,8 2,8 25978800 601,33 298,63 149,31 452,02 750,65
0
232200
186,0 3,0 26136000 645,00 333,47 166,74 478,26 811,74
0
248160
186,2 3,2 26295600 689,33 369,81 184,91 504,43 874,24
0
264120
186,4 3,4 26455200 733,67 407,62 203,81 529,85 937,48
0
280080
186,6 3,6 26614800 778,00 446,87 223,44 554,56 1001,44
0
296040
186,8 3,8 26774400 822,33 487,53 243,76 578,57 1066,10
0
312000
187,0 4,0 26934000 866,67 529,57 264,79 601,88 1131,45
0
328200
187,2 4,2 27096000 911,67 572,97 286,49 625,18 1198,15
0
344400
187,4 4,4 27258000 956,67 617,71 308,86 647,81 1265,52
0
360600
187,6 4,6 27420000 1001,67 663,76 331,88 669,79 1333,55
0
376800
187,8 4,8 27582000 1046,67 711,10 355,55 691,11 1402,22
0
393000
188,0 5,0 27744000 1091,67 759,72 379,86 711,81 1471,52
0
188,2 5,2 27908400 409440 1137,33 809,58 404,79 732,55 1542,12
78
S Psi Phi
Elevas
H (tampungan ΔS ΔS/Δt Q Q/2 y = S/∆t - φ = S/∆t +
i
) Q/2 Q/2
(m) (m) (m3) (m3) 3 3 3 3
(m /detik) (m /detik) (m /detik) (m /detik) 3
(m /detik)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
0
425880
188,4 5,4 28072800 1183,00 860,67 430,33 752,67 1613,33
0
442320
188,6 5,6 28237200 1228,67 912,97 456,48 772,18 1685,15
0
458760
188,8 5,8 28401600 1274,33 966,46 483,23 791,10 1757,56
0
475200
189,0 6,0 28566000 1320,00 1021,12 510,56 809,44 1830,56
0
491880
189,2 6,2 28732800 1366,33 1076,94 538,47 827,86 1904,80
0
508560
189,4 6,4 28899600 1412,67 1133,89 566,95 845,72 1979,61
0
525240
189,6 6,6 29066400 1459,00 1191,97 595,98 863,02 2054,98
0
541920
189,8 6,8 29233200 1505,33 1251,14 625,57 879,76 2130,91
0
558600
190,0 7,0 29400000 1551,67 1311,41 655,70 895,96 2207,37
0
Sumber: Hasil Perhitungan, 2021
79
Q = Cd × B × H
80
T = 1 jam
= 183 + 0,16
= 183,16 m
Tabel 3.7
Perhitungan Penelusuran Banjir di atas Pelimpah dengan Q100
Inflow Outflow
T (I1+I2)/2 ψ1 φ2 H Elevasi
(I) (Q)
3
(jam) (m /det) (m3/det) (m3/det) (m3/det) (m3/det) (m) (m)
(1) (2) (3) (4) (5) (6) (7) (8)
0 3.000 0.000 0.000 0.000 3.000 0.117 183.12
1 21.216 12.108 23.196 35.304 4.043 0.157 183.16
2 103.880 62.548 31.261 93.809 15.354 0.407 183.41
3 285.729 194.804 78.455 273.259 74.622 1.113 184.11
4 558.002 421.865 198.637 620.502 245.282 2.326 185.33
5 551.262 554.632 375.220 929.852 435.817 3.302 186.30
6 524.536 537.899 494.035 1031.934 504.148 3.608 186.61
7 486.925 505.730 527.785 1033.516 505.241 3.613 186.61
8 439.790 463.357 528.275 991.633 476.926 3.488 186.49
9 379.239 409.515 514.706 924.221 432.116 3.285 186.28
10 309.467 344.353 492.105 836.458 375.501 3.017 186.02
11 257.536 283.502 460.957 744.459 318.214 2.727 185.73
12 216.436 236.986 426.245 663.231 269.799 2.466 185.47
13 183.537 199.986 393.431 593.418 230.031 2.237 185.24
14 156.975 170.256 363.386 533.642 197.536 2.038 185.04
15 135.367 146.171 336.107 482.277 170.633 1.862 184.86
16 117.005 126.186 311.644 437.830 148.275 1.707 184.71
17 101.189 109.097 289.555 398.652 129.261 1.569 184.57
18 88.566 94.878 269.391 364.269 113.368 1.446 184.45
19 78.234 83.400 250.900 334.300 100.064 1.338 184.34
20 69.455 73.845 234.237 308.081 88.786 1.242 184.24
21 61.933 65.694 219.295 284.990 79.258 1.157 184.16
22 55.454 58.694 205.731 264.425 71.131 1.080 184.08
23 49.848 52.651 193.294 245.945 63.827 1.011 184.01
81
Inflow Outflow
T (I1+I2)/2 ψ1 φ2 H Elevasi
(I) (Q)
(jam) (m3/det) (m3/det) (m3/det) (m3/det) (m3/det) (m) (m)
(1) (2) (3) (4) (5) (6) (7) (8)
24 44.884 47.366 182.118 229.483 57.779 0.948 183.95
25 40.446 42.665 171.704 214.369 52.317 0.889 183.89
26 36.478 38.462 162.052 200.514 47.311 0.836 183.84
27 32.931 34.704 153.203 187.907 42.904 0.786 183.79
28 29.759 31.345 145.003 176.348 39.230 0.740 183.74
29 26.924 28.341 137.119 165.460 35.768 0.697 183.70
30 24.389 25.656 129.692 155.348 32.554 0.657 183.66
31 22.122 23.256 122.794 146.049 29.598 0.620 183.62
32 20.096 21.109 116.451 137.560 27.072 0.586 183.59
33 18.285 19.190 110.489 129.679 24.961 0.554 183.55
34 16.665 17.475 104.718 122.193 22.956 0.523 183.52
35 15.217 15.941 99.237 115.178 21.077 0.494 183.49
36 13.923 14.570 94.101 108.671 19.335 0.468 183.47
37 12.765 13.344 89.336 102.680 17.730 0.443 183.44
38 11.731 12.248 84.950 97.198 16.262 0.421 183.42
39 10.805 11.268 80.936 92.204 14.924 0.400 183.40
40 9.978 10.392 77.279 87.671 13.982 0.381 183.38
41 9.239 9.609 73.689 83.298 13.078 0.363 183.36
42 8.578 8.908 70.219 79.128 12.216 0.345 183.34
43 7.987 8.282 66.911 75.194 11.403 0.328 183.33
44 7.458 7.723 63.790 71.513 10.642 0.313 183.31
45 6.986 7.222 60.871 68.093 9.936 0.298 183.30
46 6.564 6.775 58.157 64.932 9.282 0.285 183.28
47 6.186 6.375 55.650 62.025 8.681 0.273 183.27
48 5.848 6.017 53.344 59.361 8.131 0.261 183.26
Max 558.002 554.632 528.275 1033.516 505.241 3.613 186.61
Outflo
Inflow
T (I1+I2)/2 ψ1 φ2 w H Elevasi
(I) (Q)
(m3/det (m3/det
(jam) (m3/det) (m3/det) (m3/det) (m) (m)
) )
37 17,301 18,148 109,220 127,369 23,908 0,545 183,55
38 15,785 16,543 103,460 120,004 21,985 0,515 183,52
39 14,431 15,108 98,019 113,127 20,189 0,487 183,49
40 13,220 13,825 92,938 106,763 18,527 0,461 183,46
41 12,137 12,678 88,237 100,915 16,999 0,437 183,44
42 11,169 11,653 83,915 95,568 15,603 0,415 183,41
43 10,303 10,736 79,965 90,701 14,407 0,394 183,39
44 9,529 9,916 76,293 86,209 13,495 0,375 183,38
45 8,837 9,183 72,714 81,898 12,619 0,357 183,36
46 8,219 8,528 69,279 77,807 11,788 0,340 183,34
47 7,666 7,942 66,019 73,961 11,007 0,323 183,32
48 7,171 7,419 62,954 70,373 10,278 0,308 183,31
1420,40
Max 815,772 810,838 666,867 753,541 4,787 187,79
8
84
Inflow Outflow
T (I1+I2)/2 ψ1 φ2 H Elevasi
(I) (Q)
(jam) (m3/det) (m3/det) (m3/det) (m3/det) (m3/det) (m) (m)
(1) (2) (3) (4) (5) (6) (7) (8)
0 3,000 0,000 0,000 0,000 3,000 0,118 183,118
1 45,364 24,182 23,556 47,739 5,644 0,212 183,212
2 237,612 141,488 42,094 183,583 39,885 0,773 183,773
3 660,531 449,072 143,698 592,770 214,057 2,271 185,271
4 1293,745 977,138 378,713 1355,851 679,138 4,665 187,665
5 1278,072 1285,908 676,713 1962,621 1120,956 6,355 189,355
6 1215,914 1246,993 841,665 2088,658 1218,215 6,689 189,689
7 1128,444 1172,179 870,443 2042,622 1182,443 6,567 189,567
8 1018,826 1073,635 860,180 1933,815 1099,026 6,278 189,278
9 878,005 948,415 834,789 1783,204 985,659 5,870 188,870
10 715,738 796,871 797,545 1594,417 847,095 5,347 188,347
11 594,964 655,351 747,322 1402,673 711,423 4,801 187,801
12 499,380 547,172 691,250 1238,422 599,715 4,320 187,320
13 422,867 461,123 638,708 1099,831 509,229 3,903 186,903
14 361,093 391,980 590,602 982,582 435,301 3,541 186,541
15 310,841 335,967 547,281 883,247 375,199 3,228 186,228
16 268,136 289,488 508,048 797,536 325,372 2,954 185,954
17 231,355 249,746 472,164 721,910 282,756 2,705 185,705
18 201,997 216,676 439,153 655,830 246,920 2,484 185,484
19 177,969 189,983 408,910 598,893 217,199 2,291 185,291
20 157,552 167,760 381,694 549,454 192,306 2,122 185,122
21 140,059 148,805 357,148 505,953 171,040 1,971 184,971
22 124,990 132,524 334,913 467,437 152,739 1,834 184,834
23 111,952 118,471 314,699 433,169 137,046 1,712 184,712
24 100,407 106,179 296,124 402,303 123,121 1,600 184,600
25 90,086 95,246 279,182 374,428 111,261 1,498 184,498
26 80,858 85,472 263,168 348,640 100,290 1,404 184,404
27 72,608 76,733 248,349 325,083 90,894 1,316 184,316
28 65,233 68,921 234,189 303,109 82,156 1,234 184,234
29 58,638 61,936 220,953 282,889 74,448 1,158 184,158
30 52,743 55,691 208,441 264,131 67,556 1,087 184,087
31 47,472 50,108 196,575 246,683 61,145 1,021 184,021
32 42,760 45,116 185,538 230,654 55,562 0,958 183,958
33 38,547 40,654 175,092 215,746 50,516 0,900 183,900
34 34,780 36,664 165,230 201,894 45,828 0,846 183,846
35 31,413 33,097 156,066 189,163 41,561 0,796 183,796
36 28,402 29,908 147,602 177,509 38,060 0,749 183,749
37 25,711 27,057 139,449 166,506 34,754 0,705 183,705
38 23,304 24,508 131,752 156,259 31,675 0,663 183,663
39 21,153 22,229 124,584 146,812 28,837 0,625 183,625
40 19,229 20,191 117,975 138,166 26,342 0,591 183,591
41 17,510 18,370 111,825 130,194 24,300 0,558 183,558
42 15,972 16,741 105,894 122,635 22,365 0,527 183,527
43 14,598 15,285 100,270 115,555 20,552 0,497 183,497
44 13,369 13,983 95,002 108,986 18,870 0,470 183,470
45 12,270 12,819 90,115 102,935 17,321 0,445 183,445
46 11,288 11,779 85,614 97,393 15,902 0,423 183,423
86
Inflow Outflow
T (I1+I2)/2 ψ1 φ2 H Elevasi
(I) (Q)
(jam) (m3/det) (m3/det) (m3/det) (m3/det) (m3/det) (m) (m)
(1) (2) (3) (4) (5) (6) (7) (8)
47 10,410 10,849 81,491 92,339 14,608 0,402 183,402
48 9,625 10,017 77,731 87,748 13,664 0,382 183,382
Max 1293,745 1285,908 870,443 2088,658 1218,215 6,689 189,689
Sumber: Hasil Perhitungan, 2021
Tabel 3.10
Rekapitulasi Penelusuran Banjir di Atas Pelimpah
Tinggi Lebar Outflow
Inflow Pelimpa Maksimu h Elevasi
Q Pelimpah
h m
(m³/dt) (m) (m) (m³/dt) (m) (mdpl)
Q 100 558,002 5 35 504,241 3,635 186,613
Q 1000 815,772 3 35 753,541 4,787 187,787
Q PMF 1293,745 3 35 1218,215 6,689 189,689
Sumber: Hasil Perhitungan, 2021
87
dengan:
v = kecepatan aliran (m/det)
g = percepatan gravitasi (9,81 m/det2)
h = kedalaman aliran (m)
Kedalaman aliran setelah loncatan (kedalaman konyugasi)
𝑑1
𝑑2 = √1 + 8𝐹 2 − 1
2 𝑟
Tinggi drempel (sill sebagai penahan energi yang di tempatkan di akhir peredam energi):
𝑑 (1+2.𝐹𝑟2).√1+8𝐹𝑟2−1−5.𝐹𝑟2 𝑔 2/3
ℎ1 = − [√ . 𝐹𝑟]
𝐶
1+4.𝐹𝑟2−√1+8𝐹𝑟2
dengan:
Gambar 3.7 Panjang Kolam Olakan Datar Tipe I, II, III, dan IV
∆𝐸 = 𝐸 −
𝐸 (𝑦2−𝑦1)3 (3-15)
1 2 = 𝑦2
4𝑦1
dengan:
∆E = kehilangan energi
E1 = energi spesifik sebelum loncatan
E2 = energi spesifik setelah loncatan
Y1 = kedalaman air sebelum loncatan
Y2 = kedalaman air setelah loncatan
Kehilangan relatif adalah besarnya rasio atau perbandingan antara kehilangan energi
dengan spesifik sebelum loncatan (∆E/E1). Efektifitas peredam adalah rasio antara
energi spesifik stelah loncatan dengan seblum loncatan didefinisikan sebagai efisiensi
loncatan, yang besarnya dapat dihitung dengan persamaan sebagai berikut:
𝐸2 (8𝐹12+1)3/2−4𝐹12+1
= 𝑦 (3-16)
𝐸1 2
8𝐹1 (2+𝐹1 ) 2 2
91
dengan:
Berikut adalah gambar kolam olakan datar tipe I, II, III dan IV.
Untuk meyakinkan kemampuan efektifitas dan keamanan peredam energi, maka perlu
dilakukan uji model test hidrolika di laboratium, dimana pada penelitian ini akan dilakukan
pengujian untuk debit banjir rancangan Q200th, Q1000th dan QPMF.
93
Diketahui:
L = 35 m
Leff = 34,23 m
H = 3,61 m
L = 35 m
Leff = 34,00 m
H = 4,79 m
L = 35 m
Leff = 33,61 m
95
H = 6,69 m
Bentuk dan Ukuran Crest Spillway dihitung berdasarkan Civil Engineering Department US
Army – US & DS Profile. Rumus yang digunakan adalah sebagai berikut:
96
X1,85 = 2 hd0,85 Y
Y = X1,85
2 hd0,85
Y = X1,85
2 x 3,610.85
Y = 0.168 X1,85
97
X1,85 = 2 hd0,85 Y
Y = X1,85
2 hd0,85
Y = X1,85
2 x 4,790.85
Y = 0,132 X1,85
X2 = 0,282 hd = 1,35 m
R1 = 0,5 hd = 2,39 m
R2 = 0,2 hd = 0,96 m
X1,85 = 2 hd0,85 Y
Y = X1,85
2 hd0,85
Y = X1,85
2 x 6,690.85
Y = 0,099 X1,85
(1
VZ 2 g (Z Hd
)
Q - )YZ)
(2 VZ YZ
)
(3) L VZ
FZ
g YZ
(4 Q
) 2 g (Z Hd
0 YZ L
- YZ)
102
Dimana :
Q = debit rencana (m3/dt)
L = lebar spillway
VZ = kecepatan pada titik sejauh Z (m/dt)
YZ = kedalaman air pada titik sejauh Z (m)
FZ = bilangan Froude pada titik sejauh Z
Cara perhitungannya :
1. Dengan mengambil harga Z
2. Dengan coba banding menentukan YZ; kedua harga tersebut dimasukkan dalam
persamaan (4)
3. Kemudian harga VZ dan FZ dicari
4. Elevasi lereng pulimpah = El puncak pelimpah - Z
5. El muka air = El lereng pelimpah + Yz
Tabel 3.11
Hubungan Kedalaman Air dan Elevasi Muka Air Q100 Th
El El
Z YZ VZ FZ Dasar Muka
(m) (m) (m/dt) Spillway Air
1.000 2.103 7.017 1.545 182.000 184.103
2.000 1.680 8.784 2.164 181.000 182.680
3.000 1.469 10.046 2.646 180.000 181.469
4.000 1.329 11.104 3.075 179.000 180.329
5.000 1.226 12.039 3.471 178.000 179.226
6.000 1.145 12.890 3.846 177.000 178.145
7.000 1.079 13.677 4.203 176.000 177.079
8.000 1.024 14.414 4.548 175.000 176.024
9.000 0.977 15.110 4.881 174.000 174.977
10.000 0.936 15.771 5.205 173.000 173.936
Sumber: Hasil Perhitungan, 2021
𝑑2
= 1 (√8 . (5,21)² + 1 − 1-> 𝑑2 = 6,88
𝑑1 2 𝑑1
d2 = d1 . 6,88
𝑑2
= 5,79
𝑑1
d2 = 7,91 m
Tabel 3.13
Hubungan Kedalaman Air dan Elevasi Muka Air QPMF
El El
Z YZ VZ FZ Dasar Muka
(m) (m) (m/dt) Spillway Air
1,000 4,897 7,400 1,068 182,000 186,897
2,000 3,642 9,950 1,665 181,000 184,642
3,000 3,216 11,269 2,006 180,000 183,216
4,000 2,939 12,331 2,296 179,000 181,939
5,000 2,734 13,255 2,559 178,000 180,734
6,000 2,573 14,088 2,804 177,000 179,573
7,000 2,440 14,856 3,037 176,000 178,440
8,000 2,327 15,573 3,259 175,000 177,327
9,000 2,230 16,250 3,474 174,000 176,230
10,000 2,146 16,892 3,682 173,000 175,146
Sumber: Hasil Perhitungan, 2021
𝑑2
= 4,73
𝑑1
d2 = 10,15 m
L : 11 m
b₁ : 20,54 m b₂ : 16 m
ø : 12.5 0
Y= 2,3 m
Diketahui:
Maka,
y = (b1 – b2)/2 = (20,54 – 16)/2 = 2,3 m
L = y / tg ø = 2,3 / tg 12,5 = 10,24 m ~ 11 m
S = ∆H /
L 0,1 =
∆H / 11
∆H = 1,1 m
L : 10 m
b₁ : 20,40 m b₂ : 16 m
ø : 12.5 0
Y= 2,2 m
Diketahui:
L : 10 m
b₁ : 20,17 m b₂ : 16 m
ø : 12.5 0
Y= 2,1 m
Diketahui:
Diketahui:
B2 : 16 m
110
n : 0,014
L : 100 m
Tabel 3.14
Perhitungan Muka Air Saluran
Transisi Q100 (Metode Tahapan
Standar)
Jarak ΔX B1 Z1 h1 A2 U1 h + Z + U²/ 2g P1 R1 S
El. MA Sf Sf-rata
m m m m m m m/det m m m
1 2 3 4 5 6 7 8 9 10 11 12 13
0,00 0,00 16,000 0,500 4,667 175,569 74,67 6,77 7,500 25,33 2,95 0,0021
10,00 10,00 20,127 0,000 7,245 177,647 145,83 3,46 7,857 34,62 4,21 0,0003 0,0012
20,00 10,00 20,540 0,000 7,282 177,685 149,58 3,38 7,864 35,10 4,26 0,0003 0,0003
30,00 10,00 20,540 0,000 7,294 177,696 149,82 3,37 7,874 35,13 4,26 0,0003 0,0003
40,00 10,00 20,540 0,000 7,309 177,711 150,13 3,37 7,887 35,16 4,27 0,0003 0,0003
50,00 10,00 20,540 0,000 7,328 177,731 150,52 3,36 7,903 35,20 4,28 0,0003 0,0003
60,00 10,00 20,540 0,000 7,351 177,753 150,99 3,35 7,922 35,24 4,28 0,0003 0,0003
70,00 10,00 20,540 0,000 7,377 177,779 151,52 3,33 7,944 35,29 4,29 0,0003 0,0003
80,00 10,00 20,540 0,000 7,406 177,809 152,13 3,32 7,969 35,35 4,30 0,0003 0,0003
90,00 10,00 20,540 0,000 7,439 177,841 152,80 3,31 7,996 35,42 4,31 0,0003 0,0003
100,00 10,00 20,540 0,000 7,475 177,877 153,53 3,29 8,027 35,49 4,33 0,0003 0,0003
Keterangan :
1. Jarak 5. Ketinggian Air 9. (5) + (4) +((8)^2)/19.62)
2. Jarak 1 - Jarak 2 6. El. Dasar + (4) +(5) 10. (2*(5))+(3)
3. Lebar Saluran 7. (3) x (5) 11.(7)/(8)
4. End Sill 8. Q/(7) 12. ((n^2)*((8)^2))(11)^1.33
111
B2 : 16 m
n : 0,014
L : 250 m
Tabel 3.15
Perhitungan Muka Air Saluran Peluncur Q100 (Metode Tahapan Stamdar)
Jarak ΔX B1 Z1 h1 A2 U1 h + Z + U²/ 2g P1 R1 Sfr. ΔX he h2 + Z2 + U²2 / 2g + hf +he
El. MA Sf Sf-rata Ket. Fr Keterangan Fr
No m m m m m m m/det m m m m m m
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 0,0 0,00 16,0 0,50 4,667 174,469 74,670 6,766 7,500 25,334 2,947 0,002 1,00 KRITIS
2 25,0 25,00 16,0 1,43 3,811 171,683 60,972 8,286 8,741 23,621 2,581 0,004 0,003 0,074 1,166 8,741 OK 1,36 SUPER KRITIS
3 50,0 25,00 16,0 2,86 2,579 169,021 41,261 12,245 13,081 21,158 1,950 0,012 0,008 0,198 4,142 13,081 OK 2,43 SUPER KRITIS
4 75,0 25,00 16,0 4,29 1,773 166,784 28,362 17,814 22,237 19,545 1,451 0,038 0,025 0,624 8,532 22,237 OK 4,27 SUPER KRITIS
5 100,0 25,00 16,0 5,72 1,543 165,124 24,688 20,465 28,610 19,086 1,294 0,058 0,048 1,201 5,173 28,611 OK 5,26 SUPER KRITIS
6 125,0 25,00 16,0 7,15 1,542 163,693 24,672 20,478 30,067 19,084 1,293 0,058 0,058 1,458 0,028 30,096 OK 5,27 SUPER KRITIS
7 150,0 25,00 16,0 8,58 1,540 162,261 24,640 20,505 31,551 19,080 1,291 0,059 0,058 1,462 0,056 31,585 OK 5,28 SUPER KRITIS
8 175,0 25,00 16,0 10,01 1,539 160,830 24,624 20,518 33,008 19,078 1,291 0,059 0,059 1,466 0,028 33,045 OK 5,28 SUPER KRITIS
9 200,0 25,00 16,0 11,44 1,538 159,398 24,608 20,532 34,465 19,076 1,290 0,059 0,059 1,469 0,028 34,505 OK 5,29 SUPER KRITIS
10 225,0 25,00 16,0 12,87 1,537 157,967 24,592 20,545 35,922 19,074 1,289 0,059 0,059 1,472 0,028 35,966 OK 5,29 SUPER KRITIS
11 250,0 25,00 16,0 14,30 1,536 156,536 24,576 20,558 37,380 19,072 1,289 0,059 0,059 1,475 0,028 37,426 OK 5,30 SUPER KRITIS
Diketahui:
B2 : 16 m
(𝑄100/𝐵)² 0,3
Yc (tinggi kritis) :[ ] = 6,092m
𝑔
n : 0,014
L : 100 m
Tabel 3.16
Perhitungan Muka Air Saluran Transisi Q1000 (Metode Tahapan Stamdar)
Jarak ΔX B1 Z1 h1 A2 U1 h + Z + U²/ 2g P1 R1 Sfr. ΔX h2he
+ Z2 + U²2 / 2g + hf +he
No El. MA Sf Sf-rata Ket. Fr Keterangan Fr
m m m m m m m/det m m m m m m
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 0.00 0.00 16.000 2.000 6.092 174.811 97.47 7.73 9.638 28.18 3.46 0.0022 1.0000 KRITIS
2 10.00 10.00 20.397 0.000 9.294 177.512 189.57 3.97 10.099 38.99 4.86 0.0004 0.0013 0.01 0.448 10.099 OK 0.4163 SUB KRITIS
3 20.00 10.00 20.397 0.000 9.303 177.522 189.76 3.97 10.107 39.00 4.87 0.0004 0.0004 0.01 0.000 10.107 OK 0.4157 SUB KRITIS
4 30.00 10.00 20.397 0.000 9.317 177.535 190.03 3.97 10.118 39.03 4.87 0.0004 0.0004 0.01 0.000 10.118 OK 0.4148 SUB KRITIS
5 40.00 10.00 20.397 0.000 9.335 177.553 190.40 3.96 10.133 39.07 4.87 0.0004 0.0004 0.01 0.000 10.133 OK 0.4136 SUB KRITIS
6 50.00 10.00 20.397 0.000 9.357 177.575 190.85 3.95 10.151 39.11 4.88 0.0004 0.0004 0.02 0.000 10.151 OK 0.4121 SUB KRITIS
7 60.00 10.00 20.397 0.000 9.383 177.602 191.39 3.94 10.173 39.16 4.89 0.0004 0.0004 0.02 0.000 10.173 OK 0.4104 SUB KRITIS
8 70.00 10.00 20.397 0.000 9.414 177.632 192.02 3.92 10.199 39.23 4.90 0.0004 0.0004 0.03 0.000 10.199 OK 0.4084 SUB KRITIS
9 80.00 10.00 20.397 0.000 9.449 177.667 192.72 3.91 10.228 39.29 4.90 0.0004 0.0004 0.03 0.000 10.228 OK 0.4061 SUB KRITIS
10 90.00 10.00 20.397 0.000 9.487 177.706 193.51 3.89 10.260 39.37 4.91 0.0004 0.0004 0.03 0.000 10.260 OK 0.4036 SUB KRITIS
11 100.00 10.00 20.397 0.000 9.529 177.748 194.37 3.88 10.295 39.46 4.93 0.0004 0.0004 0.04 0.000 10.295 OK 0.4010 SUB KRITIS
Sumber: Hasil Perhitungan, 2021
Keterangan :
1. Jarak 5. Ketinggian Air 9. (5) + (4) +((8)^2)/19.62) 13. (Sd.121+(12))/2
2. Jarak 1 - Jarak 2 6. El. Dasar + (4) +(5) 10. (2*(5))+(3) 14. (1) x (13)
3. Lebar Saluran 7. (3) x (5) 11.(7)/(8) 15. ABS(((8)1^2)-(8)2*^2))/19.62)
4. End Sill 8. Q/(7) 12. ((n^2)*((8)^2))(11)^1.333333 16. Sd. (9)1+(14)+(15)
115
B2 : 16 m
(𝑄100/𝐵)² 0,3
Yc (tinggi kritis) :[ ] = 6,09 m
𝑔
n : 0,014
L : 100 m
Tabel 3.17
Perhitungan Muka Air Saluran Peluncur Q1000 (Metode Tahapan Stamdar)
Jarak ΔX B1 Z1 h1 A2 U1 h + Z + U²/ 2g P1 R1 Sfr. ΔX he h2 + Z2 + U²2 / 2g + hf +he
El. MA Sf Sf-rata Ket. Fr Keterangan Fr
m m m m m m m/det m m m m m m
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0,0 0,00 16,0 0,50 6,092 175,994 97,474 7,731 9,638 28,184 3,458 0,002 1,00 KRITIS
25,0 25,00 16,0 1,43 5,233 173,205 83,722 9,001 10,792 26,465 3,163 0,003 0,003 0,071 1,083 10,792 OK 1,26 SUPER KRITIS
50,0 25,00 16,0 2,86 3,941 170,483 63,056 11,950 14,080 23,882 2,640 0,008 0,006 0,139 3,150 14,080 OK 1,92 SUPER KRITIS
75,0 25,00 16,0 4,29 2,854 167,965 45,662 16,503 21,025 21,708 2,103 0,020 0,014 0,343 6,602 21,025 OK 3,12 SUPER KRITIS
100,0 25,00 16,0 5,72 2,208 165,889 35,325 21,332 31,122 20,416 1,730 0,043 0,031 0,784 9,312 31,122 OK 4,58 SUPER KRITIS
125,0 25,00 16,0 7,15 2,019 164,270 32,308 23,324 36,897 20,038 1,612 0,056 0,050 1,242 4,534 36,897 OK 5,24 SUPER KRITIS
150,0 25,00 16,0 8,58 2,009 162,830 32,152 23,437 38,587 20,019 1,606 0,057 0,057 1,420 0,270 38,587 OK 5,28 SUPER KRITIS
175,0 25,00 16,0 10,01 2,009 161,400 32,152 23,437 40,018 20,019 1,606 0,057 0,057 1,431 0,001 40,019 OK 5,28 SUPER KRITIS
200,0 25,00 16,0 11,44 2,009 159,970 32,151 23,437 41,448 20,019 1,606 0,057 0,057 1,431 0,000 41,449 OK 5,28 SUPER KRITIS
225,0 25,00 16,0 12,87 2,009 158,540 32,151 23,437 42,879 20,019 1,606 0,057 0,057 1,431 0,000 42,880 OK 5,28 SUPER KRITIS
250,0 25,00 16,0 14,30 2,009 157,109 32,151 23,437 44,309 20,019 1,606 0,057 0,057 1,431 0,000 44,310 OK 5,28 SUPER KRITIS
Diketahui:
B2 : 16 m
(𝑄100/𝐵)² 0,3
Yc (tinggi kritis) :[ ] = 8,392 m
𝑔
n : 0,014
L : 100 m
Tabel 3.18
Perhitungan Muka Air Saluran Transisi QPMF (Metode Tahapan Standar)
Keterangan :
1. Jarak 5. Ketinggian Air 9. (5) + (4) +((8)^2)/19.62) 13. (Sd.121+(12))/2
2. Jarak 1 - Jarak 2 6. El. Dasar + (4) +(5) 10. (2*(5))+(3) 14. (1) x (13)
3. Lebar Saluran 7. (3) x (5) 11.(7)/(8) 15. ABS(((8)1^2)-(8)2*^2))/19.62)
4. End Sill 8. Q/(7) 12. ((n^2)*((8)^2))(11)^1.333333 16. Sd. (9)1+(14)+(15)
119
B2 : 16 m
(𝑄100/𝐵)² 0,3
Yc (tinggi kritis) :[ ] = 8,39 m
𝑔
n : 0,014
L : 100 m
Tabel 3.19
Perhitungan Muka Air Saluran Peluncur QPMF (Metode Tahapan Stamdar)
Jarak ΔX B1 Z1 h1 A2 U1 h + Z + U²/ 2g P1 R1 Sfr. ΔX he h2 + Z2 + U²2 / 2g + hf +he
El. MA Sf Sf-rata Ket. Fr Keterangan Fr
m m m m m m m/det m m m m m m
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0,0 0,00 16,0 0,50 8,392 178,294 134,266 9,073 13,087 32,783 4,096 0,002 1,00 KRITIS
25,0 25,00 16,0 1,43 7,533 175,505 120,531 10,107 14,170 31,066 3,880 0,003 0,003 0,072 1,011 14,170 OK 1,18 SUPER KRITIS
50,0 25,00 16,0 2,86 6,213 172,755 99,405 12,255 16,728 28,426 3,497 0,006 0,004 0,110 2,448 16,729 OK 1,57 SUPER KRITIS
75,0 25,00 16,0 4,29 4,980 170,092 79,683 15,288 21,184 25,960 3,069 0,010 0,008 0,198 4,258 21,184 OK 2,19 SUPER KRITIS
100,0 25,00 16,0 5,72 3,931 167,612 62,893 19,370 28,774 23,862 2,636 0,020 0,015 0,381 7,210 28,774 OK 3,12 SUPER KRITIS
125,0 25,00 16,0 7,15 3,210 165,461 51,354 23,722 39,042 22,419 2,291 0,037 0,028 0,709 9,559 39,042 OK 4,23 SUPER KRITIS
150,0 25,00 16,0 8,58 2,871 163,692 45,941 26,517 47,291 21,743 2,113 0,051 0,044 1,092 7,158 47,291 OK 5,00 SUPER KRITIS
175,0 25,00 16,0 10,01 2,778 162,168 44,445 27,410 51,081 21,556 2,062 0,056 0,053 1,337 2,453 51,081 OK 5,25 SUPER KRITIS
200,0 25,00 16,0 11,44 2,762 160,723 44,195 27,564 52,929 21,524 2,053 0,057 0,057 1,415 0,433 52,929 OK 5,30 SUPER KRITIS
225,0 25,00 16,0 12,87 2,760 159,290 44,162 27,585 54,416 21,520 2,052 0,057 0,057 1,428 0,058 54,416 OK 5,30 SUPER KRITIS
250,0 25,00 16,0 14,30 2,760 157,860 44,158 27,588 55,853 21,520 2,052 0,057 0,057 1,430 0,007 55,853 OK 5,30 SUPER KRITIS
Diketahui:
m =1
I = 0,0007
mn = 0,035
B pelimpah = 16 m
El M.A. : 156,6
H1 : 0,5 m
T : B + 2 . m . h1 = 16 + 2 . 1 . 0,5 = 17 m
D : A / T = 8,25 / 17 = 0,49 m
El. h1 A P R V Q T D
No Muka 2 3 Fr Keterangan
m m m m m/dt m /dt m m
Air
1 156,10 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 Sub Kritis
2 156,60 0,50 8,25 17,41 0,47 0,45 3,70 17,00 0,49 0,21 Sub Kritis
3 157,10 1,00 17,00 18,83 0,90 0,69 11,72 18,00 0,94 0,23 Sub Kritis
4 157,60 1,50 26,25 20,24 1,30 0,88 23,03 19,00 1,38 0,24 Sub Kritis
5 158,10 2,00 36,00 21,66 1,66 1,04 37,27 20,00 1,80 0,25 Sub Kritis
6 158,60 2,50 46,25 23,07 2,00 1,17 54,25 21,00 2,20 0,25 Sub Kritis
7 159,10 3,00 57,00 24,49 2,33 1,30 73,86 22,00 2,59 0,26 Sub Kritis
8 159,60 3,50 68,25 25,90 2,64 1,41 96,06 23,00 2,97 0,26 Sub Kritis
9 160,10 4,00 80,00 27,31 2,93 1,51 120,81 24,00 3,33 0,26 Sub Kritis
10 160,60 4,50 92,25 28,73 3,21 1,61 148,12 25,00 3,69 0,27 Sub Kritis
11 161,10 5,00 105,00 30,14 3,48 1,70 178,00 26,00 4,04 0,27 Sub Kritis
12 161,60 5,50 118,25 31,56 3,75 1,78 210,46 27,00 4,38 0,27 Sub Kritis
13 162,10 6,00 132,00 32,97 4,00 1,86 245,52 28,00 4,71 0,27 Sub Kritis
14 163,10 7,00 161,00 35,80 4,50 2,01 323,61 30,00 5,37 0,28 Sub Kritis
15 164,10 8,00 192,00 38,63 4,97 2,15 412,53 32,00 6,00 0,28 Sub Kritis
16 165,10 9,00 225,00 41,46 5,43 2,28 512,63 34,00 6,62 0,28 Sub Kritis
17 166,10 10,00 260,00 44,28 5,87 2,40 624,23 36,00 7,22 0,29 Sub Kritis
18 167,10 11,00 297,00 47,11 6,30 2,52 747,69 38,00 7,82 0,29 Sub Kritis
19 168,10 12,00 336,00 49,94 6,73 2,63 883,38 40,00 8,40 0,29 Sub Kritis
1031,6
20 169,10 13,00 377,00 52,77 7,14 2,74 42,00 8,98 0,29 Sub Kritis
5
1192,8
21 170,10 14,00 420,00 55,60 7,55 2,84 44,00 9,55 0,29 Sub Kritis
8
1367,4
22 171,10 15,00 465,00 58,43 7,96 2,94 46,00 10,11 0,30 Sub Kritis
2
1555,6
23 172,10 16,00 512,00 61,25 8,36 3,04 48,00 10,67 0,30 Sub Kritis
4
1757,9
24 173,10 17,00 561,00 64,08 8,75 3,13 50,00 11,22 0,30 Sub Kritis
0
1974,5
25 174,10 18,00 612,00 66,91 9,15 3,23 52,00 11,77 0,30 Sub Kritis
6
2205,9
26 175,10 19,00 665,00 69,74 9,54 3,32 54,00 12,31 0,30 Sub Kritis
8
Sumber: Hasil Perhitungan, 2021
123
124
Debit y3 El. A P R V T D
Kala Keteranga
Muka m/d Fr
Ulang m3/dt m m m m m m n
Air t
222,5 41,2
8,93 165,03 5,39 2,27 33,85 6,57 0,24
100 505,241 0 5 Sub Kritis
11,0 298,6 47,2
167,14 6,32 2,52 38,09 7,84 0,24
1000 753,541 4 4 3 Sub Kritis
1218,21 14,1 426,4 56,0
170,25 7,61 2,85 44,29 9,63 0,24
PMF 5 5 1 1 Sub Kritis
Sumber: Hasil Perhitungan, 2021
y1 2 1
(Y2) : 10,762 m
Kedalaman air di tail water (Y3) : 8,926 m (dari perhitungan TWL)
E2
48,54%
E1
Kedalaman air di akhir sal. p eluncur (Y1) : 2,009 m (perhitungan MA sal peluncur (h1))
Kecepatan aliran di akhir sal. peluncur (V1) : 3,877 m/dt (dari perhitungan MA sal peluncur (h1))
1
y1 2
(Y2) : 14,030 m
Kedalaman air di tail water (Y3) : 11,043 m (dari perhitungan TWL)
E2
48,67%
E1
Panjang loncatan hidrolik L = X : 5 (Y3 + DZ) =68,22 ~ 69 m
0.8 x y2 11,224
D z + y3 12,143
untuk Dz 2.5
1.2 x y2 16,836
kontrol OK
0.8 x y2 11,224
D z + y3 13,643
untuk Dz 4.5
1.2 x y2 16,836
kontrol OK
129
1
y1 2
(Y2) : 19,360 m
Kedalaman air di tail water (Y3) : 14,145 m (dari perhitungan TWL)
E2
48,49%
E1
Panjang loncatan hidrolik L = X : 5 (Y3 + DZ) = 93,23 ~ 94 m
Kedalaman air di akhir sal. p eluncur (Y1=D1=H1) : 1,536 m (perhitungan MA sal peluncur (h1))
Kecepatan aliran di akhir sal. peluncur (V1) : 20,558 m/dt (dari perhitungan MA sal
peluncur (h1))
Bilangan Froude di akhir sal. peluncur (F1) : 5,296
Lebar akhir saluran peluncur (B) : 16 m
Kedalaman konjugasi y2 1 1 8 . F 2 1
:
1
y1 2
(Y2) : 10,762 m
Kedalaman air di tail water (Y3) : 8,93 m (dari perhitungan TWL)
A : 24,576 m
q : Q/B = 505,241 / 16 : 31,578 m3/dt
d2 : (Y1 / 2 ) . ((((1 + (8 (Fr2)))0,5) – 1 = (1,536 / 2 ) . ((((1 + (8 (5,2962)))0,5) – 1 = 10,762 m
El dasar : +155 m
Z peluncur dan peredam : 15,4 m
Dengan demikian peredam energi yang digunakan adalah Kolam Olak USBR Tipe III.
L = 10,762 . 2,4
L = 25,829 m
i. y2 = 10,762 m
j. 0,82 y2 = 0,82. 10,762 = 8,825 m
k. 2,7 y2 = 2,7. 10,762 = 19,057 m
133
QPMF)
Hmax diatas pelimpah: 6,69 (m3/dt) (hasil penelusuran banjir diatas pelimpah
QPMF)
El MAB QPMF : El Crest Spillway + Hmaks diatas pelimpah
: 183 + 6,69
: 189,69 m
HPMF : El MAB QPMF – El Dasar Bendungan
: 189,69 – 120
: 69,69 m
Tabel 3.24 Perhitungan Elevasi MAB QPMF
Qinflow Qoutflow hmax Elevasi muka
H PMF
maksimum maksimum di atas pelimpah air banjir QPMF
3 3
(m /det) (m /det) (m) (m) (m)
1293,74 1218,21 6,69 189,69 69,69
Sumber : Hasil Perhitungan, 2021
B = 3,6 . H1/3 – 3
dengan:
B = (3.6 x 23 ) 1/3 – 3
Direncanakan:
FS hulu =
138
Direncanakan:
FS hilir = nk
. tg 1,1
1k.
dengan: n
FS hulu
= faktor keamanan lereng bagian hulu
FS hilir
= faktor keamanan lereng bagian hilir
139
Sehingga,
ɤsub = ɤsat - ɤw
= 1,912 – 1
= 0,912 ton/m3
ɤ’ = ɤsat
= 1,,912 = 2,10
ɤsub 0,912
mk.'
= . tg
FShulu 1k.'.
m
𝑚−0.2 𝑥 2,10
1,1 = 1+0.2 𝑥 2,10 𝑥 . 𝑡𝑔 43⁰
𝑚
𝑚−0.419
1,1 = 1+0.419 𝑚 . 0,933
1,1
0,933 𝑚−0.419
= 1+0.419 𝑚
𝑚−0.419
1,180 = 1+0.419 𝑚
1,180 + 0,495 m = 𝑚 − 0,419
1,599 = 0,505 m
m = 3,164 ≈ 3
140
nk
= . tg
FShilir 1k.
n
𝑛 +0.2
1,1 = 1+0.2 𝑥 . 𝑡𝑔 43⁰
𝑛
𝑛+0.2 . 0,933
1,1 = 1+0.2 𝑥
𝑛
L1 = 20,35 meter
L2 = 33,65 meter
142
d = 0,3L1 + L2
= 39,75 meter
𝑦0 = √ℎ2 + 𝑑2 − 𝑑
𝑌 = √2𝑌𝑜𝑋 + 𝑌𝑜2
= √2 (38,83𝑋) + 38,832
Y = √77,66𝑋 + 1507,706
atau
X = (Y2 – 𝑌𝑜2) / 2. Yo
X = (Y2 – 1507,706) / 4
Sehingga untuk berbagai nilai X dan Y didapatkan koordinat parabola pada tabel di bawah
ini dan dibuat pula grafiknya sebagai berikut.
Tabel 3.25
Koordinat Parabola Garis Depresi
No X Y
1 -19,415 0,00
2 -19,093 5,00
3 -18,127 10,00
4 -16,517 15,00
5 -14,264 20,00
6 -11,367 25,00
7 -7,825 30,00
8 -3,640 35,00
9 1,188 40,00
10 6,661 45,00
11 12,778 50,00
12 19,538 55,00
13 26,942 60,00
14 34,990 65,00
15 39,755 67,79
Sumber: Hasil perhitungan, 2021
143
Gamb
ar 3.16 Formasi Garis Depresi Maindam
Sumber: Hasil, Perhitungan 2021
Bentuk dari parabola yang didapat melalui perhitungan di atas merupakan garis
depresi teoritis sehingga harus disesuaikan dengan garis aliran yang sesungguhnya.
Penyesuaian titik-titik perpotongan dari parabola dasar ke garis aliran sesungguhnya
menurut Casagrande adalah sebagai berikut:
tg α = tg 73 = 3,27
144
a+ Δa = Yo / (1 – cos α)
= 54,49 meter
a = Yo – 0,5
Diketahui : Nd = 14
Nf = 8
k = 5 x 10-8 (Dari buku BTU)
H = 67,79 m (dari perhitungan Flood
Routing) L = 376,6 m (dari gambar)
Penyelesaian :
q = (Nf/Nd) . k. H. L
= (14/8) . 5 . 10-8 . 67,79 . 376,6
= 0,00000194 m3/det
Q =q.L
= 0,000729 m3/dt
= 63,019 m3/hari
Selain dengan dengan analisis diatas, perlu juga adanya control besarnya kecepatan
aliran rembesan yang melalui tubuh bendungan,
K = 5 . 10-8 m/dt
H2 = (H + Yo) / 2 = ( 67,79 + 38,83 ) / 2 = 53,31 m
I = (i1 + i2) / 2 (dari gambar autocad)
= (20,35 + 33,65) / 2
= 27 m
Maka, kecepatan rembesan dapat dihitung dengan menggunakan persamaan sebagai
h2 53,31
berikut: v =k.( ) = 5 . 10-8. ( ) = 9,87 x 10-8 m/det
I 27
Karena nilai V (9,87 x 10-8 m/det) < c (0,74 m/dt) maindam AMAN terhadap piping.
146
Sr = 0,650
Sr × e
Wc = Gs
147
0,650 × 0,700
Wc = 2,550
Wc = 0,178
Ws = γstone
Ws = 2,100 ton/m3
Ww = Wc x Ws
Ww = 0,178 x 2,100
Ww = 0,375
Vw = e x Sr
Vw = 0,700 x 0,650
Vw = 0,455
𝐺𝑠 × 𝛾𝑤 ( 𝛾𝑤 +𝑊𝑐)
𝛾𝑤𝑒𝑡 = 1+𝑒
2,550 × 1 ( 1 + 0,178)
𝛾𝑤𝑒𝑡 =
1 + 0,700
𝛾𝑤𝑒𝑡 = 1,768 𝑡𝑜𝑛/𝑚3
𝐺𝑠 × 𝛾𝑤
𝛾𝑑𝑟𝑦 =
1 +𝑒
2,550 × 1
𝛾𝑑𝑟𝑦 =
1 + 0,700
𝛾𝑑𝑟𝑦 = 1,500 𝑡𝑜𝑛/𝑚3
𝛾𝑤 (𝐺𝑠+1)
𝛾𝑠𝑎𝑡 = 1 +𝑒
1 (2,550 + 1)
𝛾𝑠𝑎𝑡 =
1 + 0,700
𝛾𝑠𝑎𝑡 = 1,912 𝑡𝑜𝑛/𝑚3
148
Tabel 3.26
Data Perhitungan Stabilitas Main Dam
y (kN/m³) c
Data Φ (kN/m³ e
(dry) (wet) (sat) water
)
Zona inti 14,72 17,34 18,75 9,81 19,00 19,62
Zona 0,20
20,60 43,00 0,00
Rockfill
Sumber: Hasil Perhitungan, 2021
149
3.3.3.1.1 Keadaan Normal Kondisi Muka Air Kosong (sesaat setelah dibangun)
35°
43°
I
19°
1° II
III
IV 22°
25°
75,00m
337,51m
35°
43°
19°
1°
22°
I
25° IV II
III
337,51m
Tabel 3.27
Perhitungan Stabilitas Keadaan Normal Kondisi Kosong
A W
b A (inti) c γ (inti) γ (rockfill) W (inti) W (total)
Irisan (rockfill) (rockfill)
(m) (m²) (m²) (kN/m³) (kN/m³) (kN/m³) (kN/m) (kN/m) (kN/m)
1 2 3 4 5 6 7 8 9 10
1 45,11 809,73 605,60 19,62 14,72 20,60 11915,18 12475,97 24391,14
2 45,11 0,00 2193,78 0,00 14,72 20,60 0,00 45194,06 45194,06
3 45,11 0,00 1840,67 0,00 14,72 20,60 0,00 37919,64 37919,64
4 45,11 0,00 750,85 0,00 14,72 20,60 0,00 15468,26 15468,26
Jumlah
(1) Irisan
(2) b = 45,11 m dari gambar
(3) Ainti (luas pias 1) = 809,73 m2 dari gambar
(4) A rockfill (luas pias 1) = 605,60 m2 dari gambar
(5) C = 19,62 kN/m3
(6) γ inti = 14,72 kN/m3
(7) γ rockfill = 20,60 kN/m3
(8) Winti = γinti x Ainti = 14,72 kN/m3 x 809,73 m2 = 11915,18 kN/m
(9) Wrockfill = γrockfill x Arockfill = 20,60 kN/m3 x 605,60 m2 = 12475,97
kN/m (10) W total = 11915,18 kN/m + 12475,97 kN/m = 24391,14 kN/m
(11) α = 43° untuk pias 1 dari gambar
(12) Sin α = sin 43° = 0,68
(13) Cos α = cos 43° = 0,73
(14) l = (b / Cos α) = (45,11 / 0,73) = 61,68 m
(15) T = W x Sin α = 24391,14 kN/m x 0,68= 16634,72 kN/m
(16) N = W x Cos α = 24391,14 kN/m x 0,73 = 17838,55 kN/m
(17) N e = e x T = 0,20 x 16634,72 = 3326,94 kN/m
(18) Tan ϕ = tan 37° = 0.75 dari data mekanika tanah
(19) N x Tan ϕ = 17838,55 x 0,75 = 4996,75 kN/m
(20) C x l = 39,24 kN/m x 21,52 m = 1210,16 kN dari data mekanika tanah
( 2 1 ) (N x Tan ϕ) + (C x l) = 4996,75 kN/m + 1210,16 kN = 6206,91kN/m
Σ [21] 93244,26
Fs = = = 1,96 > 1,2 (AMAN)
Σ T +(e × Σ N ) 24892,16+(0,2 x 112,826,17 )
Σ [21] 93244,26
Fs = = = 3,75 > 1,5 (AMAN)
ΣT 24892,16
152
35°
25°
337,51m
35°
42° 40°
13° 12°
IV I
25°
III II
337,51m
Tabel 3.28
Perhitungan Stabilitas Keadaan Normal Kondisi FWL
Awet Asat A ysat γwet Wwet Wsat
b hw hu Aw c γ (rock) γ (w)
(inti) (inti) (rockfill) (inti) (inti) (inti) (inti)
Irisan
(kN/m³
(m) (m) (m) (m²) (m²) (m²) (m²) (kN/m³) (kN/m³) (kN/m³) (kN/m³) (kN/m) (kN/m)
)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
185,0
1 55,62 0,00 40,11 624,66 1105,50 78,44 19,62 18,75 17,34 20,60 9,81 3209,23 11715,13
7
2 55,62 16,50 48,55 0,00 0,00 2640,35 917,92 0,00 18,75 17,34 20,60 9,81 0,00 0,00
3 55,62 35,04 29,33 0,00 0,00 1644,34 1949,24 0,00 18,75 17,34 20,60 9,81 0,00 0,00
4 55,62 35,42 0,00 0,00 0,00 0,00 1750,73 0,00 18,75 17,34 20,60 9,81 0,00 0,00
Jumla
h
W (rockfill) W (water) W (total) α u l T = W sin α N = W cos α Ne = eW sin α U=uxl tan ø (N-Ne-U) tan ø Cxl 29 + 30
sin α cos α
(kN/m) (kN/m) (kN/m) (°) (kN/m³) (m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
22774,41 769,50 38468,26 40,00 0,64 0,77 393,48 72,61 24726,92 29468,40 4945,38 28569,24 0,34 -1393,23 1424,54 31,32
54393,85 9004,80 63398,65 12,00 0,21 0,98 476,28 56,86 13181,32 62013,23 2636,26 27082,26 0,93 30115,31 0,00 30115,31
33875,05 19122,04 52997,09 -13,00 -0,22 0,97 287,73 57,08 -11921,75 51638,78 -2384,35 16424,35 0,93 35061,43 0,00 35061,43
0,00 17174,66 17174,66 -42,00 -0,67 0,74 0,00 74,84 -11492,09 12763,26 -2298,42 0,00 0,93 14045,24 0,00 14045,24
14494,40 155883,67 2898,88 79253,30
Sumber: Hasil Perhitungan, 2021
154
Contoh perhitungan keadaan normal kondisi FWL (misal pada pias 1):
(1) Irisan
(2) b = 55,62m dari gambar
(3) Hw = 0 m (dari gambar)
(4) Hu = 40,11 (dari gambar)
(5) Awet (inti) = 185,07 m2 (dari gambar)
(6) Asat (inti) = 624,66 (dari gambar)
(7) A rockfill (inti) = 1105,50 m2 dari gambar
(8) Aw =78,44m2 (dari gambar)
(9) C = 19,62 kN/m³
(10) γ sat (inti) = 18,75 kN/m³
(11) γ wet (inti) = 17,34kN/m3
(12) γ rockfill = 20,6 kN/m3
(13) γ w = 9,81 kN/m3
(14) W wet (inti) = γ wet (inti) x A wet (inti) = 17,34 kN/m3 x 185,07 m2 = 3209,23 kN/m
(15) W sat (inti) = γ sat (inti) x A sat (inti) = 18,75 kN/m3 x 624,66 m2 = 11715,13 kN/m
(16) W rockfill = γ rockfill x A rockfill = 20,6 kN/m3 x 1105,50 m2 = 22774,41 kN/m
(17) W water = γ wx A w = 9,81 kN/m3 x 78,44 m2 = 769,50 kN/m
(18) W total = Wwet + Wsat + Wrockfill + Wwater
= 3209,23 + 11715,13 + 22774,41 + 769,50
= 38468,26 kN/m
(19) α = 40° untuk pias 1 dari gambar
(20) Sin α = sin 40° = 0,64
(21) Cos α = cos 40° = 0,77
(22) u = hu x γ w = 40,11 x 9,81 = 393,48kN/m
(23) l = (b / Cos α) = (55,62 / 0,77) = 72,61m
(24) T = Wtotal x Sin α = 38468,26 kN/m x 0,64= 24726,92kN/m
(25) N = Wtotal x Cos α = 38468,26 kN/m x 0,77= 29468,40kN/m
(26) N e = e x T = 0 , 2 0 x 2 4 7 2 6 , 9 2 = 4 9 4 5 , 3 8 k N / m
(27) U = u x l = 393,48x 72,61= 28569,24kN/m
(28) Tan ϕ = tan 37° = 0.75 dari data mekanika tanah
(29) N - U x T a n ϕ = ( 2 9 4 6 8 , 4 0 – 2 8 5 6 9 , 2 4 k N / m ) x 0 , 7 5 = - 1 3 9 3 , 2 3 k N / m
(30) C x l = 0 kN/m x 42,29m = 1424,54 kN
(31) (N-U x Tan ϕ )+ (C x l) = -1393,23 kN/m + 1424,54 kN = 3 1 , 3 2 kN/m
155
Σ [31] 79253,30
Fs = = = 1,96 > 1,2 (AMAN)
Σ T +(e × Σ N ) 14494,40+(0,2 x 112826,17)
Σ [31] 79253,30
Fs = = = 3,75 > 1,5 (AMAN)
ΣT 14494,40
156
35°
I
43°
IV 2°
III II 19°
25° 23°
75,00m
337,51m
35°
43°
23° 19° I
2°
25° IV II
III
75,00m
337,51m
Tabel 3.29
Perhitungan Stabilitas Keadaan Normal Kondisi Rapid Draw Down
b hw hu Awet (inti) Asat (inti) A (rockfill) Aw c ysat (inti) γwet (inti) γ (rock) γ (w) Wwet (inti) Wsat (inti)
Irisan
(m) (m) (m) (m²) (m²) (m²) (m²) (kN/m³) (kN/m³) (kN/m³) (kN/m³) (kN/m³) (kN/m) (kN/m)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 45,56 0,00 0,00 809,73 15,10 153,45 0,00 19,62 18,75 17,34 20,60 9,81 14041,22 283,19
2 45,56 0,00 15,71 0,00 0,00 679,19 0,00 0,00 18,75 17,34 20,60 9,81 0,00 0,00
3 45,56 0,00 22,54 0,00 0,00 995,54 0,00 0,00 18,75 17,34 20,60 9,81 0,00 0,00
4 45,56 0,00 12,51 0,00 0,00 726,68 0,00 0,00 18,75 17,34 20,60 9,81 0,00 0,00
Jumlah
W (rockfill) W (water) W (total) α u l T = W sin α N = W cos α Ne = eW sin α U=uxl tan ø (N-Ne-U) tan ø Cxl 29 + 30
sin α cos α
(kN/m) (kN/m) (kN/m) (°) (kN/m³) (m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
3161,22 0,00 17485,63 43,00 0,68 0,73 0,00 62,30 11925,17 12788,18 2385,03 0,00 0,34 3582,09 1222,24 4804,33
13991,99 0,00 13991,99 19,00 0,33 0,95 154,12 48,19 4555,35 13229,69 911,07 7426,07 0,93 4562,38 0,00 4562,38
20509,12 0,00 20509,12 -2,00 -0,03 1,00 221,12 45,59 -715,76 20496,63 -143,15 10080,25 0,93 9846,92 0,00 9846,92
14970,33 0,00 14970,33 -23,00 -0,39 0,92 122,72 49,49 -5849,38 13780,27 -1169,88 6074,13 0,93 8277,02 0,00 8277,02
9915,39 60294,76 1983,08 27490,64
Contoh perhitungan keadaan normal kondisi Rapid Draw Down (misal pada pias 1):
(9) Irisan
(10)b = 45,56m dari gambar
(11) Hw = 0 m (dari gambar)
(12) Hu = 0 (dari gambar)
(13) Awet (inti) = 809,73 m2 (dari gambar)
(14) Asat (inti) = 15,10 (dari gambar)
(15) A rockfill (inti) = 153,45m2 dari gambar
(16) Aw =0m2 (dari gambar)
(9) C = 19,62 kN/m³
(13) γ sat (inti) = 18,75 kN/m³
(14) γ wet (inti) = 17,34kN/m3
(15) γ rockfill = 20,6 kN/m3
(13) γ w = 9,81 kN/m3
(20) W wet (inti) = γ wet (inti) x A wet (inti) = 17,34 kN/m3 x 809,73 m2 = 14041,22kN/m
(21) W sat (inti) = γ sat (inti) x A sat (inti) = 18,75 kN/m3 x 15,10 m2 = 283,19kN/m
(22) W rockfill = γ rockfill x A rockfill = 20,6 kN/m3 x 153,45 m2 = 3161,22kN/m
(23) W water = γ wx A w = 9,81 kN/m3 x 0 m2 = 0 kN/m
(24) W total = Wwet + Wsat + Wrockfill + Wwater
= 14041,22+ 283,19+ 3161,22+ 0
= 17485,63kN/m
(25) α = 43° untuk pias 1 dari gambar
(20) Sin α = sin 40° = 0,68
(21) Cos α = cos 40° = 0,73
(22) u = hu x γ w = 0 x 9,81 = 0 kN/m
(23) l = (b / Cos α) = (45,56 / 0,73) = 62,30m
(24) T = Wtotal x Sin α = 17485,63kN/m x 0,68= 11925,17kN/m
(25) N = Wtotal x Cos α = 17485,63kN/m x 0,73= 12788,18kN/m
(26) N e = e x T = 0 , 2 0 x 1 1 9 2 5 , 1 7 = 2 3 8 5 , 0 3 k N / m
(27) U = u x l = 393,48x 62,30= 0 kN/m
(28) Tan ϕ = tan 37° = 0.34 dari data mekanika tanah
(29) N - U x T a n ϕ = ( 1 2 7 8 8 , 1 8 – 0 k N / m ) x 0 , 3 4 = 3 5 8 2 , 0 9 k N / m
(30) C x l = 0 kN/m x 62,30m = 1222,24kN
(31) (N-U x Tan ϕ )+ (C x l) = 3582,09kN/m + 1222,24kN = 4 8 0 4 , 3 3 k N /m
159
Σ [31] 27490,64
Fs = =
Σ T +(e × Σ N ) 9915,39+( 0,2 x 60294,76)
Σ [31] 27490,64
Fs = = =
ΣT 9915,39
160
35°
IV I
40°
40°
II
III
12°
13°
25°
337,51m
35°
40°
40°
13° 12°
IV I
25°
III II
75,00m
337,51m
Tabel 3.30
Perhitungan Stabilitas Keadaan Normal Kondisi FSL
b hw hu Awet (inti) Asat (inti) A (rockfill) Aw c ysat (inti) γwet (inti) γ (rock) γ (w) Wwet (inti) Wsat (inti)
Irisan
(m) (m) (m) (m²) (m²) (m²) (m²) (kN/m³) (kN/m³) (kN/m³) (kN/m³) (kN/m³) (kN/m) (kN/m)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 54,95 0,00 0,00 198,54 610,33 1073,74 7,38 19,62 18,75 17,34 20,60 9,81 3442,81 11446,38
2 54,95 11,38 48,67 0,00 0,00 2616,24 625,23 0,00 18,75 17,34 20,60 9,81 0,00 0,00
3 54,95 29,98 29,98 0,00 0,00 1604,79 1631,86 0,00 18,75 17,34 20,60 9,81 0,00 0,00
4 54,95 32,67 0,00 0,00 0,00 96,13 1569,31 0,00 18,75 17,34 20,60 9,81 0,00 0,00
Jumlah
W (rockfill) W (water) W (total) α u l T = W sin α N = W cos α Ne = eW sin α U= ux l tan ø (N-Ne-U) tan ø Cxl 29 + 30
sin α cos α
(kN/m) (kN/m) (kN/m) (°) (kN/m³) (m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
22120,12 72,40 37081,70 40,00 0,64 0,77 0,00 71,73 23835,66 28406,23 4767,13 0,00 0,34 8139,59 1407,38 9546,98
53897,16 6133,51 60030,67 12,00 0,21 0,98 477,45 56,18 12481,08 58718,85 2496,22 26822,15 0,93 27416,39 0,00 27416,39
33060,28 16008,55 49068,83 -13,00 -0,22 0,97 294,10 56,40 -11038,08 47811,19 -2207,62 16586,10 0,93 31176,50 0,00 31176,50
1980,37 15394,93 17375,31 -40,00 -0,64 0,77 0,00 71,73 -11168,63 13310,26 -2233,73 0,00 0,93 14495,00 0,00 14495,00
14110,02 148246,53 2822,00 82634,87
(1) Irisan
(2) b = 54,95m dari gambar
(3) Hw = 0 m (dari gambar)
(4) Hu = 0 (dari gambar)
(5) Awet (inti) = 198,54m2 (dari gambar)
(6) Asat (inti) = 610,33 (dari gambar)
(7) A rockfill (inti) = 1073,74m2 dari gambar
(8) Aw = 7,38 m2 (dari gambar)
(9) C = 19,62 kN/m³
(16) γ sat (inti) = 18,75 kN/m³
(17) γ wet (inti) = 17,34kN/m3
(18) γ rockfill = 20,6 kN/m3
(13) γ w = 9,81 kN/m3
(26) W wet (inti) = γ wet (inti) x A wet (inti) = 17,34 kN/m3 x 198,54m2 = 3442,81kN/m
(27) W sat (inti) = γ sat (inti) x A sat (inti) = 18,75 kN/m3 x 610,33m2 = 11446,38kN/m
(28) W rockfill = γ rockfill x A rockfill = 20,6 kN/m3 x 1073,74m2 = 22120,12kN/m
(29) W water = γ wx A w = 9,81 kN/m3 x 7,38 m2 = 72,40kN/m
(30) W total = Wwet + Wsat + Wrockfill + Wwater
= 3442,81+ 11446,38+ 22120,12+ 72,40
= 37081,70kN/m
(31) α = 40° untuk pias 1 dari gambar
(20) Sin α = sin 40° = 0,64
(21) Cos α = cos 40° = 0,77
(22) u = hu x γ w = 0 x 9,81 = 0 kN/m
(23) l = (b / Cos α) = (54,95 / 0,77) = 71,73m
(24) T = Wtotal x Sin α = 37081,70kN/m x 0,64= 23835,66kN/m
(25) N = Wtotal x Cos α = 37081,70kN/m x 0,77= 28406,23kN/m
(26) N e = e x T = 0 , 2 0 x 2 3 8 3 5 , 6 6 = 4 7 6 7 , 1 3 k N / m
(27) U = u x l = 0 x 71,73= 0 kN/m
(28) Tan ϕ = tan 37° = 0.34 dari data mekanika tanah
(29) N - U x T a n ϕ = ( 2 8 4 0 6 , 2 3 – 0 k N / m ) x 0 , 3 4 = 8 1 3 9 , 5 9 k N / m
(30) C x l = 19,62 kN/m x 71,73m = 1407,38kN
(31) (N-U x Tan ϕ )+ (C x l) = 8139,59kN/m + 1407,38kN = 9 5 4 6 , 9 8 k N /m
163
Σ [31] 82634,87
Fs = =
Σ T +(e × Σ N ) 14110,02+(0,2 x 148246,53)
Σ [31] 82634,87
Fs = = =
ΣT 14110,02
164
KETERANGAN :
1 nomor irisan bidang luncur (data) 8 [3] x [6] 15 [10] x [12]
2 lebar tiap 9 [4] x [7] 16 [10] x [13]
pias (data)
3 luas tiap pias zona inti (data) 10 [8] + [9] 17 tan [Φ]
4 luas tiap pias zona rockfill (data) 11 sudut tiap pias (gambar) 18 {[16]} x [18]
5 koheisi material (data) 12 sin [11] 19 [5] x [14]
KETERANGAN:
1 nomor irisan bidang luncur (data) 12 berat jenis material rockfill (data) 23 [2]/[21]
2 lebar tiap pias berat jenis air
13 24 [18] x [20]
(data) (data)
3 tinggi air diatas timbunan (gambar) 14 [5] x [11] 25 [18] x [21]
4 tinggi air pori didalam timbunan (gambar) 15 [6] x [10] 26 [22] x [23]
5 luas basah tiap pias zona inti (data) 16 [10] x [13] 27 tan [Φ]
6 luas jenuh tiap pias zona inti (data) 17 [8] x [13] 28 {[25] - [26]} x [27]
7 luas tiap pias zona rockfill (data) 18 [14] + [15] + 29 [9] x [23]
[16] + [17]
8 luas tiap pias beban air (data) 19 sudut tiap pias (gambar) 30 [29] + [30]
9 koheisi material (data) 20 sin [19]
10 berat jenis jenuh material inti (data) 21 cos [19]
11 berat jenis basah material inti (data) 22 [4] x [13]
165
35°
IV
46° III
1° 25°
21°
II
I 20°
337,51m
35°
IV 46° 21° 1°
20°
25°
III I
II
337,51m
Tabel 3.31
Perhitungan Stabilitas Keadaan Gempa Kondisi Kosong
A γ
A W
b (rockfill c γ (inti) (rockfill W (inti) W (total)
(inti) (rockfill)
Irisan ) )
(kN/m³ (kN/m³
(m) (m²) (m²) (kN/m³) (kN/m) (kN/m) (kN/m)
) )
1 2 3 4 5 6 7 8 9 10
1 39,12 0,00 640,18 0,00 14,72 20,60 0,00 13188,35 13188,35
2 39,12 0,00 1599,20 0,00 14,72 20,60 0,00 32945,12 32945,12
3 39,12 596,60 1464,72 19,62 14,72 20,60 8778,97 30174,70 38953,67
10977,8
4 39,12 746,03 478,52 19,62 14,72 20,60 9857,99 20835,82
3
Jumla
h
Ne =
(N-Ne)
α l T = W sin α N = W cos α eW sin Cxl 19 + 20
sin α cos α tan ø tan ø
α
(°) (m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
11 12 13 14 15 16 17 18 19 20 21
-20,00 -0,34 0,94 41,63 -4510,68 12392,99 -902,14 0,93 12397,91 0,00 12397,91
-1,00 -0,02 1,00 39,13 -574,97 32940,10 -114,99 0,93 30824,38 0,00 30824,38
2791,9
21,00 0,36 0,93 41,90 13959,75 36366,38 0,34 11560,60 822,14 12382,74
5
2997,6 1104,9
46,00 0,72 0,69 56,32 14988,04 14473,78 0,34 3951,56 5056,47
1 1
4772,4
23862,13 96173,25 60661,50
3
Sumber : Hasil Perhitungan, 2020
167
Contoh perhitungan keadaan gempa kondisi kosong (misal pada pias 1):
(1) Irisan
(2) b = 39,12m dari gambar
(3) Ainti (luas pias 1) = 0 m2 dari gambar
(4) A rockfill (luas pias 1) = 640,18m2 dari gambar
(5) C = 0 kN/m3
(10) γ inti = 14,72 kN/m3
(11) γ rockfill = 20,60 kN/m3
(12) Winti = γinti x Ainti = 14,72 kN/m3 x 0 m2 = 0 kN/m
(13) Wrockfill = γrockfill x Arockfill = 20,60 kN/m3 x 640,18m2 = 13188,35kN/m
(10) W total = 0 kN/m + 12475,97 kN/m = 13188,35kN/m
(11) α = -20° untuk pias 1 dari gambar
(12) Sin α = sin -20° = -0,34
(13) Cos α = cos -20° = 0,94
(14) l = (b / Cos α) = (39,12 / 0,94) = 41,63m
(15) T = W x Sin α = 24391,14 kN/m x -0,34= -4510,68kN/m
(16) N = W x Cos α = 24391,14 kN/m x 0,94= 12392,99kN/m
(17) N e = e x T = 0,20 x -4510,68= -902,14kN/m
(18) Tan ϕ = tan 37° = 0.93 dari data mekanika tanah
(19) N x Tan ϕ = 12392,99 x 0,93 = 12397,91kN/m
(20) C x l = 0 kN/m x 41,63m = 0 kN dari data mekanika tanah
( 2 1 ) (N x Tan ϕ) + (C x l) = 12397,91kN/m + 0 kN = 12397,91kN/m
Σ [21] 60661,50
Fs = = = 1,41 > 1,2 (AMAN)
Σ T +(e × Σ N ) 23862,13+(0,2 x 96173,25)
Σ [21] 60661,50
Fs = = = 2,54 > 1,5 (AMAN)
ΣT 23862,13
168
35°
48°
IV
2°
23°
19° 25°
III I
II
75,00m
337,51m
35°
48°
IV
2°
23°
19° 25°
III I
II
75,00m
337,51m
Tabel 3.32
Perhitungan Stabilitas Keadaan Gempa Kondisi FWL
Awet Asat A γwet Wwet
b hw hu Aw c ysat (inti) γ (rock) γ (w) Wsat (inti)
(inti) (inti) (rockfill) (inti) (inti)
Irisan
(kN/m³ (kN/m³ (kN/m³
(m) (m) (m) (m²) (m²) (m²) (m²) (kN/m³) (kN/m³) (kN/m) (kN/m)
) ) )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 39,99 0,00 16,61 0,00 0,00 1166,68 0,00 0,00 18,75 17,34 20,60 9,81 0,00 0,00
2 39,99 0,00 42,13 0,00 0,00 1659,52 0,00 0,00 18,75 17,34 20,60 9,81 0,00 0,00
236,1 394,9 4095,5
3 39,99 0,00 33,64 577,32 0,00 19,62 18,75 17,34 20,60 9,81 7406,49
8 2 1
344,0 1170,3
4 39,99 1,87 14,30 67,49 378,52 74,79 19,62 18,75 17,34 20,60 9,81 6452,27
4 2
Jumla
h
W
W W T=W N=W Ne = eW (N-Ne-
(water α u l U=uxl tan ø Cxl 29 + 30
(rockfill) (total) sin α cos α sin α cos α sin α U) tan ø
)
(kN/m) (kN/m) (kN/m) (°) (kN/m³) (m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
24034,7 22725,3 16224,5
24034,77 0,00 -19,00 -0,33 0,95 162,94 42,29 -7824,96 -1564,99 6891,60 0,93 0,00 16224,57
7 3 7
34187,7 34166,9 16662,0
34187,77 0,00 -2,00 -0,03 1,00 413,30 40,01 -1193,14 -238,63 16537,75 0,93 0,00 16662,01
7 5 1
23395,3 21535,5
11893,37 0,00 23,00 0,39 0,92 330,01 43,44 9141,30 1828,26 14336,74 0,34 1849,23 852,36 2701,59
7 5
16154,1 10809,2 1172,5
7797,89 733,69 48,00 0,74 0,67 140,28 59,76 12004,89 2400,98 8383,89 0,34 8,39 1180,97
7 5 7
89237,0
12128,09 2425,62 36769,14
7
Contoh perhitungan keadaan normal kondisi FWL (misal pada pias 1):
(1) Irisan
(2) b = 39,99m dari gambar
(3) Hw = 0 m (dari gambar)
(4) Hu = 16,61 (dari gambar)
(5) Awet (inti) = 0 m2 (dari gambar)
(6) Asat (inti) = 0 (dari gambar)
(7) A rockfill (inti) = 1166,68 m2 dari gambar
(8) Aw = 0 m2 (dari gambar)
(9) C = 0 kN/m³
(19) γ sat (inti) = 18,75 kN/m³
(20) γ wet (inti) = 17,34 kN/m3
(21) γ rockfill = 20,6 kN/m3
(13) γ w = 9,81 kN/m3
(32) W wet (inti) = γ wet (inti) x A wet (inti) = 17,34 kN/m3 x 0 m2 = 0 kN/m
(33) W sat (inti) = γ sat (inti) x A sat (inti) = 18,75 kN/m3 x 0 m2 = 0 kN/m
(34) W rockfill = γ rockfill x A rockfill = 20,6 kN/m3 x 1166,68 m2 = 24034,77 kN/m
(35) W water = γ wx A w = 9,81 kN/m3 x 0 m2 = 0 kN/m
(36) W total = Wwet + Wsat + Wrockfill + Wwater
= 0 + 0 + 24034,77 + 0
= 24034,77 kN/m
(37) α = -19° untuk pias 1 dari gambar
(20) Sin α = sin -19° = -0,33
(21) Cos α = cos -19° = 0,95
(22) u = hu x γ w = 16,61 x 9,81 = 162,94 kN/m
(23) l = (b / Cos α) = (39,99 / 0,95) = 42,29m
(24) T = Wtotal x Sin α = 24034,77 kN/m x -0,33 = -7824,96 kN/m
(25) N = Wtotal x Cos α = 24034,77 kN/m x 0,95= 22725,33 kN/m
(26) N e = e x T = 0 , 2 0 x - 7824,96 = - 1 5 6 4 , 9 9 k N / m
(27) U = u x l = 162,94 x 42,29= 6891,60 kN/m
(28) Tan ϕ = tan 37° = 0.75 dari data mekanika tanah
(29) N - U x T a n ϕ = ( 6 8 9 1 , 6 0 – 6 8 9 1 , 6 0 k N / m ) x 0 , 7 5 = 1 6 2 2 4 , 5 7 k N / m
(30) C x l = 0 kN/m x 42,29m = 0 kN
(31) (N-U x Tan ϕ )+ (C x l) = 16224,57kN /m + 0 kN = 1 6 2 2 4 , 5 7 kN/m
171
Σ [31] 36769,14
Fs = = = 1,23 > 1,2 (AMAN)
Σ T +(e × Σ N ) 12128,09+(0,2 x 89237,07)
Σ [31] 36769,14
Fs = = = 3,03 > 1,5 (AMAN)
ΣT 12128,09
172
35°
IV
46°
III
25°
21° II 1°
I 20°
75,00m
337,51m
46°
35°
21°
1°
20°
IV
25°
III I
II
337,51m
Tabel 3.33
Perhitungan Stabilitas Keadaan Gempa Kondisi Rapid Draw Down
Contoh perhitungan keadaan gempa kondisi Rapid Draw Down (misal pada pias 1):
(1) Irisan
(2) b = 39,02m dari gambar
(3) Hw = 0 m (dari gambar)
(4) Hu = 16,00 (dari gambar)
(5) Awet (inti) = 0 m2 (dari gambar)
(6) Asat (inti) = 0 (dari gambar)
(7) A rockfill (inti) = 1237,04m2 dari gambar
(8) Aw = 0 m2 (dari gambar)
(9) C = 0 kN/m³
(22) γ sat (inti) = 18,75 kN/m³
(23) γ wet (inti) = 17,34 kN/m3
(24) γ rockfill = 20,6 kN/m3
(13) γ w = 9,81 kN/m3
(38) W wet (inti) = γ wet (inti) x A wet (inti) = 17,34 kN/m3 x 0 m2 = 0 kN/m
(39) W sat (inti) = γ sat (inti) x A sat (inti) = 18,75 kN/m3 x 0 m2 = 0 kN/m
(40) W rockfill = γ rockfill x A rockfill = 20,6 kN/m3 x 1237,04m2 = 25484,26kN/m
(41) W water = γ wx A w = 9,81 kN/m3 x 0 m2 = 0 kN/m
(42) W total = Wwet + Wsat + Wrockfill + Wwater
= 0 + 0 + 25484,26+ 0
= 25484,26kN/m
(43) α = -20° untuk pias 1 dari gambar
(20) Sin α = sin -19° = -0,34
(21) Cos α = cos -19° = 0,94
(22) u = hu x γ w = 16,00 x 9,81 = 156,96kN/m
(23) l = (b / Cos α) = (39,99 / 0,94) = 41,52m
(24) T = Wtotal x Sin α = 25484,26kN/m x -0,34 = -8716,13kN/m
(25) N = Wtotal x Cos α = 25484,26kN/m x 0,94= 23947,37kN/m
(26) N e = e x T = 0 , 2 0 x - 8 7 1 6 , 1 3 = - 1 7 4 3 , 2 3 k N / m
(27) U = u x l = 156,96x 41,52= 6517,64kN/m
(28) Tan ϕ = tan 37° = 0.93 dari data mekanika tanah
(29) N - U x T a n ϕ = ( 2 3 9 4 7 , 3 7 – 6 5 1 7 , 6 4 k N / m ) x 0 , 9 3 = 1 7 8 7 9 , 0 7 k N / m
(30) C x l = 0 kN/m x 42,29m = 0 kN
(31) (N-U x Tan ϕ )+ (C x l) = 17879,07kN /m + 0 kN = 1 7 8 7 9 , 0 7 kN/m
175
Σ [31] 32895,03
Fs = = = 1,24 > 1,2 (AMAN)
Σ T +(e × Σ N ) 8315,40+( 0,2 x 91156,65)
Σ [31] 32895,03
Fs = = = 3,96 > 1,5 (AMAN)
ΣT 8315,40
176
35°
IV
46°
22° 1°
III 25°
II
I 20°
75,00m
337,51m
46°
35°22°
1°
IV
20°25°
III I
II
75,00m
337,51m
Tabel 3.34
Perhitungan Stabilitas Keadaan Normal Kondisi FSL
Contoh perhitungan keadaan gempa kondisi FSL (misal pada pias 1):
(1) Irisan
(2) b = 39,29 m dari gambar
(3) Hw = 0 m (dari gambar)
(4) Hu = 16,58 (dari gambar)
(5) Awet (inti) = 0 m2 (dari gambar)
(6) Asat (inti) = 0 (dari gambar)
(7) A rockfill (inti) = 648,89 m2 dari gambar
(8) Aw = 0 m2 (dari gambar)
(9) C = 0 kN/m³
(25) γ sat (inti) = 18,75 kN/m³
(26) γ wet (inti) = 17,34 kN/m3
(27) γ rockfill = 20,6 kN/m3
(13) γ w = 9,81 kN/m3
(44) W wet (inti) = γ wet (inti) x A wet (inti) = 17,34 kN/m3 x 0 m2 = 0 kN/m
(45) W sat (inti) = γ sat (inti) x A sat (inti) = 18,75 kN/m3 x 0 m2 = 0 kN/m
(46) W rockfill = γ rockfill x A rockfill = 20,6 kN/m3 x 648,89 m2 = 13367,78kN/m
(47) W water = γ wx A w = 9,81 kN/m3 x 0 m2 = 0 kN/m
(48) W total = Wwet + Wsat + Wrockfill + Wwater
= 0 + 0 + 13367,78+ 0
= 13367,78kN/m
(49) α = -20° untuk pias 1 dari gambar
(20) Sin α = sin -19° = -0,34
(21) Cos α = cos -19° = 0,94
(22) u = hu x γ w = 16,58 x 9,81 = 162,65kN/m
(23) l = (b / Cos α) = (39,29 / 0,94) = 41,81m
(24) T = Wtotal x Sin α = 13367,78kN/m x -0,34 = -4572,05kN/m
(25) N = Wtotal x Cos α = 13367,78kN/m x 0,94= 12561,61kN/m
(26) N e = e x T = 0 , 2 0 x - 4 5 7 2 , 0 5 = - 9 1 4 , 4 1 k N / m
(27) U = u x l = 162,65x 41,81= 6800,64kN/m
(28) Tan ϕ = tan 37° = 0.93 dari data mekanika tanah
(29) N - U x T a n ϕ = ( 1 2 5 6 1 , 6 1 – 6 8 0 0 , 6 4 k N / m ) x 0 , 9 3 = 6 2 2 4 , 8 9 k N / m
(30) C x l = 0 kN/m x 42,29m = 0 kN
(31) (N-U x Tan ϕ )+ (C x l) = 6224,89kN /m + 0 kN = 6 2 2 4 , 8 9 kN/m
179
Σ [31] 38323,09
Fs = = = 1,20> 1,2 (AMAN)
Σ T +(e × Σ N ) 13391,48+(0,2 x 92197,03)
Σ [31] 38323,09
Fs = = = 2,86 >1,5 (AMAN)
ΣT 13391,48
180
Dari berbagai keadaan dan kondisi yang telah dianalisa sebelumnya, maka
rekapitulasi perhitungannya adalah sebagai berikut :
Tabel 3.43
Hasil Rekapitulasi Analisis Stabilitas Main Dam Bendungan
CATATAN :
*)Semua angka faktor keamanan (SF) menunjukkan nilai di atas 1.5 pada keadaan normal
dan di atas 1.2 pada keadaan gempa. Dengan demikian, maka lereng cofferdam dianggap
stabil terhadap bahaya gempa pada semua kondisi. Sumber parameter angka keamanan
1.20 SNI M-03-2002 (Metode analisis stabilitas lereng statik bendungan tipe urugan),
Tabel 1, hal.5.
181
Pada alternative ini grafik outflow yang dihasilkan lebih optimum dan juga
dengan bentuk yang persegi conduit lebih stabil terhadap bahaya guling.
Plug pada terowongan didesain dengan tinggi energi/ tekan yang tertinggi. Pada
batuan yang jelek biasanya dilengkapi dengan plug yang lebih baik yaitu yang disebut
Wedge Shaped Keys. Panjang dari plug ditentukan oleh besarnya tegangan geser yang
aman pada sekeliling bidang kontak batuan antara plug dan lining. Disebabkan pembagian
beban segitiga ketidak sempurnaan injeksi semen (grouting) dan sebagainya, harga rendah,
dan tegangan geser rata rata diperkenankan dapat diambil 1,4 kg/cm² untuk beton dan
batuan. Beton pada terowongan yang dilining menyumbangkan jaminan ikatan yang pantas
antara beton yang tua / lama dan yang baru. Kedalaman kunci pada batuan den beton
ditentukan dengan memperkirakan tegangan tekan rata rata pada daerah proyek dan kunci
(diambil 10 kg/cm2 untuk batuan dan 20 kg/cm2 untuk beton). Untuk injeksi semen
(grouting) pada bidang kontak antara beton plug dan lining terowongan bertujuan untuk
melekatkan dapat pula dilengkapi pada lining terowongan atau pada beton plug sebaik
mungkin.
Pipa baja berdiameter (12''-18'') ditanam pada beton plug untuk mengalirkan
bocoran dari portal atau balok sekat beton selama pembetonan. Setelah penempatan pipa
kemudian ditimbun dengan beton. Untuk membuat plug kedap air digunakan beton yang
didinginkan atau beton didinginkan setelah penempatan menggunakan gulungan pengikat.
Injeksi semen secara konstan biasanya dilakukan sampai tekanan 100 psi. Batuan disekitar
plug diinjeksi semen dengan tekanan sampai kedalaman sekitar 50 feet atau 15 meter
setelah selesai injeksi semen pada bidang kontak.
BAB IV
PENUTUP
4.1 Kesimpulan
Analisa yang telah dilakukan memberikan beberapa output penting terkait dengan
permasalahan perencanaan teknis bendungan yang mencakup dimensi bendungan, tampungan
waduk, dan stabilitas bendungan. Seluruh hasil yang telah dianalisa tersebut, secara ringkas
dapat dilihat pada beberapa poin dibawah ini:
1) Dari hasil analisi penelusuran banjir melalui pelimpah bendungan, diperoleh hasil:
Qoutflow untuk PMF : 1293,805 m3/detik
Hd : 6,942 m
Qoutflow untuk 1000 th : 815,797
m3/detik Hd : 5,025 m
Qoutflow untuk 100 th : 558,089 m3/detik
Hd : 3,838 m
2) Data Teknis Pelimpah – Peredam Energi:
a. Pelimpah
Tipe Pelimpah : Ogee Over Flow
Tinggi Pelimpah :3m
Elevasi puncak pelimpah : +183,00 m
b. Saluran Transisi
Panjang saluran transisi : 100 m
Elevasi hulu : +168,22 m
Elevasi hilir : +170,22 m
Lebar : 16 m
c. Saluran Peluncur
Panjang peluncur : 250 m
Elevasi hulu : +170,22 m
Elevasi hilir : +155,00 m
Lebar : 16 m
183
184
d. Peredam Energi
Dalam perencanaan bendungan ini menggunakan peredam energi USBR tipe III
dikarenakan dari hasil perhitungan, bilangan Froude yang didapat 5,296 debit yang
dialirkan sebesar 505,241 m3/detik dan memiliki tekanan hidrostatis yang rendah. Hal
ini menjadi pertimbangan untuk memilih peredam energi USBR tipe III dikarenakan
secara teoritis, peredam energi USBR tipe III cocok untuk aliran yang memiliki
bilangan Froude
> 4,5 Debit yang dialirkan > 45 m3/dt, dan memiliki tekanan hidrostatis yang rendah.
Berikut adalah data teknis peredam energi:
Tipe peredam energi : USBR Tipe III
Panjang peredam energi : 25,829 m
Elevasi dasar : +155,00 m
e. Tail Water Level pada saluran akhir:
Elevasi dasar : +156,1 m
Lebar saluran : 16,00 m
Kemiringan talud 1
Kemiringan dasar : 0,0007
Koefisien manning : 0,035
El. Muka air pada saluran akhir : +167,14 m
o Qf : 63,019 m3/hari
o Kemirinagan hidrolik (i): 27 m (Aman)
o Kecepatan rembesan (v) : 9,87 x 10-8 m/det
185
Karena nilai V (9,87 x 10-8 m/det) < c (0,74 m/dt) maindam AMAN terhadap piping
4.2. Saran
Dalam pengerjaan tugas ini ada beberapa hal yang menjadi rekomendasi kami demi menambah
kesempurnaan tugas dan diharapkan dapat mengurangi kesalahan-kesalahan yang ada, antara lain
:
1. Perlu adanya deadline atau batas waktu pengerjaan supaya rekan-rekan tidak terlalu
bersantai dan akhirnya tergesa-gesa di akhir semester hingga akhirnya laporan yang
dikerjakan kurang maksimal.
2. Perlu adanya asisten dosen agar pengerjaan lebih optimal dan efisien.
186
3. Rekan-rekan mahasiswa perlu membaca lebih tekun lagi buku-buku bendungan seperti
buku ”Bendungan Tipe Urugan” karya Bpk. Suyono, ”Teknik Bendungan” karya Bpk.
Soedibyo, atau bahkan ”Design of Small Dams” keluaran USBR mengingat buku-buku
tersebut menawarkan pembahasan yang kami rasa sangat komplit.
4. Sebaiknya data soal untuk pengerjaan laporan seperti data hidrologi dan data mekanika
tanah diberikan secara langsung sehingga rekan-rekan mahasiswa bisa langsung
mengerjakan Laporan Tugas Besar Konstruksi Bendungan II.
DAFTAR PUSTAKA
Fadhilah, Novi dkk. 2018. Tugas Besar Konstruksi Bendungan II. Tidak diterbitkan.
Malang : Jurusan Pengairan Fakultas Teknik Universitas Brawijaya.
Kensaku, Suyono Sosrodarsono. 1981. Bendungan Tipe Urugan. Jakarta: PT. Pradnya
Paramita
Limantara, Lily Montarcih. 2010. Hidrologi Praktis. Bandung: PT. Lubuk Agung
Supijanto, Heri. Diktat Kuliah Konstruksi Bendungan II. Diktat Kuliah Tidak Diterbitkan.
Malang: Jurusan Pengairan Fakultas Teknik Universitas Brawijaya.
187