Anda di halaman 1dari 8

Project : No Offer :

Jembatan Dinamunan 2 -
Subject : Sheet no :
PD 8 SHORING Static Calculation 1 of 8
Area : Date : Rev :
PIER HEAD 19 JANUARI 2017 0

I. TECHNICAL DATA

Concrete Forms Specialist in Indonesia since 1985


Project : No Offer :

Jembatan Dinamunan 2 -
Subject : Sheet no :
PD 8 SHORING Static Calculation 2 of 8
Area : Date : Rev :
PIER HEAD 19 JANUARI 2017 0

II. MATERIAL PROPERTIES

PLYWOOD 18 mm :

b 100 cm
Ax 180 cm2
Ix 48.60 cm4
100 Wx 54.00 cm3
18 Sx 40.50 cm3
Δ max L/400
E 100,000 kg/cm2
σ ijin 100 kg/cm2
τ ijin 12 kg/cm2

GIRDER GT 24 :

b 8 cm
Ax 24 cm2
Ix 8000 cm4
Wx 700 cm3
Sx 525 cm3
Δ max L/500
E 100,000 kg/cm2
σ ijin 100 kg/cm2
τ ijin 12 kg/cm2

STEEL WALER SRZ :

b 15.2 cm
Ax 23 cm2
Ix 372 cm4
Wx 74 cm3
Sx 43.38 cm3
Δ max L/400
E 2,100,000 kg/cm2
σ ijin 1,600 kg/cm2
τ ijin 928 kg/cm2

III. LOAD CALCULATION

Beban yang bekerja pada pier head adalah sebagai berikut:

- Concrete Density = 2500 kg/m3


- Fomwork Load = 100 kg/m2
- Live load (man power & tools) = 100 kg/m2
- Mountain loads = 7.5 %

Concrete Forms Specialist in Indonesia since 1985


Project : No Offer :

Jembatan Dinamunan 2 -
Subject : Sheet no :
PD 8 SHORING Static Calculation 3 of 8
Area : Date : Rev :
PIER HEAD 19 JANUARI 2017 0

Pengecoran pier head dilakukan dalam tiga tahap. Dimana kekuatan beton pada saat pengecoran pertama kekuatannya
harus sudah mencapai 40% baru boleh dilakukan pengecoran kedua, 60% berat beton masih membebani shoring.
Pengecoran ketiga boleh dilakukan apabila beton pengecoran kedua kekuatannya sudah mencapai 40 %, 60% berat
beton dari pengecoran kedua dan 20 % berat beton dari pengecoran pertama masih membebani shoring.

CONCRETE LOAD

Pengecoran 1

Concrete Stage 1 : 2500 kg/m3 x 1 m × 107.50% = 2687.5 kg/m2


Live Load : 100 kg/m2 = 100 kg/m2
Formwork : 100 kg/m2 = 100 kg/m2
Beban Kejut : 100 kg/m2 = 100 kg/m2 +
Total = 2987.5 kg/m2

Pengecoran 2

Concrete Stage 1 : 2500 kg/m3 x 1 m × 60% = 1500 kg/m2


Concrete Stage 2 : 2500 kg/m3 x 1.225 m × 107.50% = 3292.1875 kg/m2
Live Load : 100 kg/m2 = 100 kg/m2
Formwork : 100 kg/m2 = 100 kg/m2
Beban Kejut : 100 kg/m2 = 100 kg/m2 +
Total = 5092.1875 kg/m2

Concrete Forms Specialist in Indonesia since 1985


Project : No Offer :

Jembatan Dinamunan 2 -
Subject : Sheet no :
PD 8 SHORING Static Calculation 4 of 8
Area : Date : Rev :
PIER HEAD 19 JANUARI 2017 0

Pengecoran 3

Concrete Stage 1 : 2500 kg/m3 x 1 m × 20% = 500 kg/m2


Concrete Stage 2 : 2500 kg/m3 x 1.225 m × 60% = 1837.5 kg/m2
Concrete Stage 3 : 2500 kg/m3 x 1.225 m × 107.50% = 3292.1875 kg/m2
Live Load : 100 kg/m2 = 100 kg/m2
Formwork : 100 kg/m2 = 100 kg/m2
Beban Kejut : 100 kg/m2 = 100 kg/m2 +
Total = 5929.6875 kg/m2

IV. STRUCTURE ANALYSIS

BEAM

KONTROL PLYWOOD :

Properties of Plywood 18 mm (per m),


q = 2987.5 kg/m2 x 1.00 m = 2987.5 kg/m’

Based on STAAD.Pro 2004 calculation :

LOAD & SUPP. REACTION

BENDING MOMENT

SHEAR FORCE

Concrete Forms Specialist in Indonesia since 1985


Project : No Offer :

Jembatan Dinamunan 2 -
Subject : Sheet no :
PD 8 SHORING Static Calculation 5 of 8
Area : Date : Rev :
PIER HEAD 19 JANUARI 2017 0

DISPLACEMENT

Plywood 18mm
Mmax = 2240.6 kg.cm Dmax = 448.125 kg Δmax = 0.126 mm

Mmax 2240.6 kg.cm


σ max = = = 41.49 kg/cm² < 100 kg/cm² … Ok
W 54 cm³
Dmax x S 448.125 kg x 40.5 cm ²
τ max = = = 3.73 kg/cm² < 12 kg/cm² … Ok
Ixb 48.6 cm 4 x 100 cm

Δ max = = 0.126 mm < 0.75 mm … Ok

KONTROL GIRDER:

Properties of Girder,
q = 5929.7 kg/m2 x 0.3 m = 1778.9 kg/m’

Based on STAAD.Pro 2004 calculation :

LOAD & SUPP. REACTION

BENDING MOMENT

Concrete Forms Specialist in Indonesia since 1985


Project : No Offer :

Jembatan Dinamunan 2 -
Subject : Sheet no :
PD 8 SHORING Static Calculation 6 of 8
Area : Date : Rev :
PIER HEAD 19 JANUARI 2017 0

SHEAR FORCE

DISPLACEMENT

Girder
Mmax = 26459.8 kg.cm Dmax = 1334.18 kg Δmax = 0.527 mm

Mmax = 26459.8 kg.cm < 70000 kg.cm … Ok


Dmax = 1334.175 kg < 2000 kg … Ok
Δmax = 0.527 mm < 3 mm … Ok

KONTROL STEEL WALE :

P = 2000 kg
Based on STAAD.Pro 2004 calculation :

LOAD & SUPP. REACTION

Concrete Forms Specialist in Indonesia since 1985


Project : No Offer :

Jembatan Dinamunan 2 -
Subject : Sheet no :
PD 8 SHORING Static Calculation 7 of 8
Area : Date : Rev :
PIER HEAD 19 JANUARI 2017 0

BENDING MOMENT

SHEAR FORCE

DISPLACEMENT
Steel waler
Mmax = 41200 kg.cm Dmax = 3062.6 kg Δmax = 0.248 mm

Mmax 41200 kg.cm


σ max = = = 556.76 kg/cm² < 1600 kg/cm² … Ok
W 74 cm³
Dmax x S 3062.6 kg x 43.38 cm ²
τ max = = = 396.82 kg/cm² < 928 kg/cm² … Ok
I x tb 372 cm 4 x 0.9 cm

Δ max = = 0.248 mm < 1.88 mm … Ok

Concrete Forms Specialist in Indonesia since 1985


Project : No Offer :

Jembatan Dinamunan 2 -
Subject : Sheet no :
PD 8 SHORING Static Calculation 8 of 8
Area : Date : Rev :
PIER HEAD 19 JANUARI 2017 0

KONTROL PD 8 SHORING:

Based on STAAD.Pro 2004 calculation :

P max = 5063 kg < allowable PD 8/leg, H = 20 m = 5360 kg/leg …… OK

Approved By : Check By : Made By :

Signature :
Name : MIS ZFN MOR
Date : 19 Januari 2017

Concrete Forms Specialist in Indonesia since 1985