Anda di halaman 1dari 2

AI/SHEV/FORM/014/00

CHECKLIST TOWER CRANE

Nama Proyek : Merk Alat :


Area Kerja : Type :
Tanggal/ Bln/ Thn : Tahun Pembuatan :
Beban Maksimal :

A.1 Bagian Trolley

Kondisi
No Item
Baik Rusak
1 Panel Trolley
2 Wairing Trolley
3 Terminal Trolley
4 Limit trolley
5 Drum Trolley
6 Selling Trolley
7 Poly Trolley
8 Break Trolley
9 Oil Gear Box
10 Bearing trolley Lory
11 Clamp Trolley
12 Handle Trolley
13 Motor Trolley

A.2 Bagian Slewing

Kondisi
No Item
Baik Rusak
1 Angkur Dynabolt
2 Per ( Kabin ) Spring
3 Limit Section Atas
4 Limit Section Bawah
5 Gear Motor
6 Gear Box Motor
7 Breake Motor
8 Oli Gear Box
9 Kabel Guide
10 Cage ( Keranjang ) PH
11 Tais
12 Dynabolt Tais
13 Baut Tais
14 Pintu Kabin
15 Terminal Kabin
A.3 Bagian Power

Kondisi
No Item
Baik Rusak
1 Power ON / OFF
2 Handle Kabin Up / Down
3 Handle Power
4 Limit Up / Down
5 Limit Pintu
6 Limit Beban

A.4 Bagian Hoist

Kondisi
No Item
Baik Rusak
1 Panel Hoist
2 Wairing Hoist
3 Terminal Hoist
4 Resistant Box Hoist
5 Motor Hoist
6 Break Hoist
7 Limit Beban
8 Limit Moment
9 Limit Naik dan Turun
10 Handle Hoist
11 Sling Hoist
12 Pooly Drum Hoist
13 OverLoad
14 Wairing
15 Terminal
16 Kontrol Beban
17 Relay
18 Time Delay
19 Safety Device
20 Bell
21 Lampu Kabin
22 Dioda
23 Travo

Diperiksa Oleh, Diketahui Oleh,

Mekanik/ Kepala Mekanik Operator / SHE Equipment Koordinator

Anda mungkin juga menyukai