DESAIN MICROGRID DENGAN SUMBER EBT UNTUK


MEMENUHI BEBAN KRITIS DI P.PRAMUKA
26 Agustus 2020

Danang Yogisworo*1, Hamzah Hilal2, Andriansyah Priyadi3,


Sudirman Palaloi4, M.M. Sarinanto5, Andhika Prastawa6
1,2,3,4,5B2TKE-BPPT, Gedung 620, Kawasan Puspiptek, Tangerang

Selatan, 15314, +62217560916.


6PPIMTE-BPPT, Gedung 720, Kawasan Puspiptek, Tangerang

Selatan, 15314, +622175791384.


1
>>> www.b2tke.bppt.go.id <<<
1. PENDAHULUAN
1.1. Pulau Pramuka
A. Kab. Adm. Kep. Seribu, DKI Jakarta
B. ± 44 km dari Dermaga Ancol
C. Luas ± 16,73 ha
D. populasi ± 2000 jiwa.

Sumber gambar: google maps


2
1. PENDAHULUAN
1.2. Sistem kelistrikan & kendala
P. Pramuka dipasok melalui jaringan
listrik kabel laut 20 kV yang ditarik dari
sistem di daratan.

Meskipun demikian terdapat beberapa


kendala kualitas daya seperti:
i. tegangan yang lebih rendah dari
seharusnya;
ii. tegangan yang merosot tajam tiba-
tiba dan berulang.

Sumber gambar: PT. PLN (PERSERO) UNIT DISTRIBUSI DISTRIBUSI


JAKARTA RAYA 3
1. PENDAHULUAN
1.3. Peran Strategis dan Beban Kritis
Sebagai pusat pemerintahan Kab. Adm.
Kepulauan Seribu, Pulau Pramuka memiliki
peran strategis dengan adanya objek-objek
vital dengan beban kritis seperti

Kantor Bupati RSUD Kepulauan Seribu SMAN 69


Sumber gambar: http://www.beritajakarta.id 4
1. PENDAHULUAN
1.4. Metodologi
i. Melakukan survey lokasi sekaligus melakukan pengukuran kelistrikan pada
titik-titik tertentu;
ii. Melakukan survei literatur terhadap metode-metode yang sudah diterapkan
sebelumnya untuk melistriki daerah terpencil;
iii. Analisis keseimbangan antara suplai dan kebutuhan energi listrik dengan
kriteria:
1) pemenuhan beban kritis
2) perbaikan kualitas daya
3) pengurangan konsumsi BBM
Dengan tetap memenuhi persyaratan:
1) ketersediaan lahan
2) kekuatan konstruksi
3) faktor keindahan
5
2. BAHAN DAN METODE
2.1. Sistem Kelistrikan P. Pramuka
SWGR 20 kV
LBS LBS LBS.F LBS.F LBS LBS

SPARE

SPARE
SPARE
TRANSFORMER 2 G
Y
630 KVA R 250 A
0-500 V
20 kV/380 V
Regent s Office Load
TR 4 x NYY 1 x 240 mm2 Vm

0-800 A

EPR Sea Cable 3x120 mm2 A 250 A


From Panggang Island G
Residential Load
Y

800 A
5A 250 A
MCCB 3P,
TR NFYGbY 4 x 120 mm2 800 A
Hospital Load

250 A
TM 3 x N2XSY 1x35 mm2 Public Street Lighting Load

COS 2 RAK TR 2

GENSET

TRANSFORMER 1
G
630 KVA Y

20 kV/380 V R 250 A
0-500 V
Residential Load 1
TR 4 x NYY 1 x 240 mm2 Vm

0-800 A

A 250 A
G
Residential Load 2
Y

800 A
5A 250 A
MCCB 3P,
TR NFYGbY 4 x 120 mm2 80 0 A
Residential Load 3

250 A
Residential Load 4

COS 1 RAK TR 1

GENSET 6
2. BAHAN DAN METODE
2.2. Teknologi Microgrid
Microgrid adalah sekelompok beban yang saling terkoneksi dengan
sumber daya energi terdistribusi yang dengan jelas mendefinisikan batas
listrik yang bertindak sebagai entitas tunggal yang dapat dikontrol terhadap
grid. Koneksi microgrid dapat terhubung dan terputus dari grid yang
memungkinkannya beroperasi dalam mode grid-connected atau island.
Sumber: The U.S. Department of Energy’s Microgrid Initiative

Sumber gambar: Michael Stadler


7
2. BAHAN DAN METODE
2.3. Sumber EBT dan Piranti HOMER
Sumber energi yang digunakan pada desain microgrid ini adalah sumber
energi baru terbarukan (EBT) dengan teknologi PV, maka diperlukan data:
a) data iradiasi sinar surya (IS),
b) clear sky insolation clearness indeks (CI),
c) temperatur udara (T).
Data yang tersedia kemudian disimulasikan
untuk menghasilkan desain microgrid dengan
target optimasi nilai LCOE yang paling ekonomis
menggunakan piranti lunak (software) HOMER
v2.86 beta.
8
Daya (W, Var, VA) Power (W, Var, VA)

0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
20,000.0
40,000.0
60,000.0
80,000.0

-
100,000.0
120,000.0
140,000.0
160,000.0
180,000.0
10:27:00
10:23:00
13:00:00
13:37:00
15:33:00 16:51:00

Saturday,
Saturday,
18:06:00

09/03/2019
20:05:00

09/03/2019
20:39:00 23:19:00
23:12:00 02:33:00
01:45:00 05:47:00
04:18:00 09:01:00

Sunday,
06:51:00 12:15:00

10/03/2019
09:24:00 15:29:00
18:43:00

Sunday,
11:57:00

P[W]
21:57:00

10/03/2019
14:30:00

Time
01:11:00
17:03:00 04:25:00
19:36:00 07:39:00
22:09:00 10:53:00

Q[var]
00:42:00 14:07:00
Monday,

Waktu
11/03/2019

03:15:00 17:21:00
09 - 12 March 2019

05:48:00 20:35:00
08:21:00 23:49:00

S[VA]
03:03:00

Profil Beban Trafo 2


10:54:00

Monday,
06:17:00

11/03/2019
13:27:00
Tuesday,

Load Profile Kantor Bupati Kepulauan 1000


09:31:00
12/03/2019

16:00:00
Load Profile Transformer #2 on Saturday - Tuesday

18:33:00
21:06:00

Profil Beban Kantor Bupati


3.1. Hasil Pengukuran

23:39:00
P[W]

S[VA]
Q[var]

02:12:00
Uave[V]

04:45:00
07:18:00
Tuesnday,

09:51:00
12/03/2019
3. HASIL DAN PEMBAHASAN

Power (W, Var, VA) Power (W, Var, VA)


40,000.0
50,000.0
60,000.0

-
10,000.0
20,000.0
30,000.0

-
5,000.0
10,000.0
15,000.0
20,000.0
25,000.0
30,000.0
35,000.0

10:37:01
09:05:00 12:52:01
09:20:00 15:07:01
Saturday,

09:35:00 17:22:01
09/03/2019

19:37:01
09:50:00
21:52:01
10:05:00 00:07:01
10:20:00 02:22:01
10:35:00 04:37:01
10:50:00 06:52:01
P[W]

09:07:01
11:05:00
Sunday,

11:22:01
11:20:00
10/03/2019

13:37:01
11:35:00 15:52:01
11:50:00 18:07:01
Q[var]

20:22:01
Time

12:05:00
12:20:00 22:37:01
11 March 2019
Time

00:52:01
09 - 12 March 2019

12:35:00
03:07:01
12:50:00 05:22:01
S[VA]

13:05:00 07:37:01
13:20:00 09:52:01
12:07:01
Monday,

13:35:00
Load Profile Hospital on Saturday - Tuesday

Load Profile Senior High School on Monday


11/03/2019

13:50:00 14:22:01
16:37:01
14:05:00
18:52:01
14:20:00 21:07:01
14:35:00
Profil Beban SMAN 69

23:22:01
Profil Beban RSUD

14:50:00 01:37:01
03:52:01
06:07:01
Tuesday,

08:22:01
12/03/2019

P[W]

S[VA]

10:37:01
Q[var]

9
3. HASIL DAN PEMBAHASAN
3.2. Simulasi profil beban kritis sepanjang tahun

10
3. HASIL DAN PEMBAHASAN
3.3. Simulasi dan hasil optimasi

11
3. HASIL DAN PEMBAHASAN
3.4. Simulasi Output PV dan Rata-Rata Pembangkitan

12
3. HASIL DAN PEMBAHASAN
3.5. Simulasi SOC Baterai

13
3. HASIL DAN PEMBAHASAN
3.6. Rangkuman Aliran Kas

Battery

Battery

14
3. HASIL DAN PEMBAHASAN
3.7. Analisis sensivitas

15
4. KESIMPULAN DAN SARAN
4.1. Kesimpulan
1. P. Pramuka sebagai pusat adm. & pemerintahan Kab. Kepulauan Seribu memiliki beberapa
fasilitas strategis seperti Kantor Bupati, RSUD, dan SMAN 69 memerlukan kelangsungan suplai
dan kualitas listrik untuk mengoperasikannya.
2. Persoalan keandalan dan kualitas energi listrik di P. Pramuka dapat diperbaiki dengan
menerapkan teknologi microgrid dengan suplai sumber EBT, sekaligus mengurangi konsumsi
BBM.
3. Sistem microgrid yang terdiri atas PV sebesar 200 kWp, penyimpan energi jenis lithium-ion
berkapasitas 180 kWh, dan genset ukuran 150 kWh serta sistem kontrol, didesain sedemikian
rupa berlokasi di sekitar beban kritis yang akan dilayani microgrid dan panel hubung jaringan
bawah laut PLN,
4. Optimasi dengan peranti lunak HOMER v2.86 beta memberikan hasil analisis ekonomi LCOE
sebesar 0,381 $/kWh dan NPC sebesar $4.859.241, dengan fraksi EBT sebesar 27%.
Pemanfaatan EBT ini berpotensi mengurangi penggunaan BBM sebanyak 123.158 liter/tahun
atau setara dengan pengurangan emisi gas CO2 sebanyak 324.318 kg/tahun.
16
4. KESIMPULAN DAN SARAN
4.2. Saran
Penerapan microgrid di P. Pramuka sebagaimana diusulkan pada
makalah ini perlu juga memperhatikan
1. faktor estetika untuk lebih menarik lagi wisatawan mengunjungi
pulau ini.
2. faktor konstruksi juga perlu diperhatikan untuk mengantisipasi
terjadinya angin kencang maupun korosi

17
5. DAFTAR PUSTAKA
1. https://id.wikipedia.org/wiki/Pulau_Pramuka, diakses 25 Juli 2020.
2. https://bit.ly/33DlXNE, diakses 25 Juli 2020.
3. Olivares DE, Mehrizi-Sani A, Etemadi AH, Canizares CA, Iravani R, Kazerani M, et al. Trends in microgrid
control. IEEE Trans Smart Grid 2014;5:1905–19. http:// dx.doi.org/10.1109/TSG.2013.2295514.
4. Dan T. Ton & Merrill A. Smith, The U.S. Department of Energy’s Microgrid Initiative,
http://dx.doi.org/10.1016/j.tej.2012.09.013, diakses 26 Juli 2020
5. Michael Stadler & Adib Naslé, Planning And Implementation Of Bankable Microgrids,
https://doi.org/10.1016/j.tej.2019.05.004, diakses 26 Juli 2020
6. https://power.larc.nasa.gov/data-access-viewer/, diakses 20 Maret 2020.
7. Eka Nurdiana, et al, Sistem PLTS Rooftop 10 Kwp Berbasis Smart Grid Untuk Implementasi Demand
Response, Prosiding Simposium Nasional Rekayasa Aplikasi Perancangan Dan IndustrI (RAPI) XVII, 17
Desember, Surakarta, Indonesia, 2018.
8. Hamzah Hilal, et al, Turning Renewable Energy be a Dispatchable Electric Generation through Energy
Management System Technology: Sumba Smart Micro Grid Case, Proceeding The 4th IEEE Conference on
Power Engineering and Renewable Energy, 4th ICPERE, 29-31 October 2018 , Solo, Indonesia
9. Jaeho Choi, Implementation of Grid-Connected Microgrid System For Pramuka Island, Jakarta, 2017.

18