Pekerjaan :

DETAIL DESAIN PENATAAN WADUK


BUNDER
No. KONTRAK :
HK0203-An.02/2020-04

Tanggal :
5 Mei 2020

Tahun Anggaran: 2020


PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 2/38
No. Rev :1 8 Mei 2020 Paraf :

DAFTAR ISI
Halaman

DAFTAR ISI ........................................................................................................................... 2


BAB I. INFORMASI PEKERJAAN .......................................................................................... 3
1. INFORMASI KEGIATAN ............................................................................................... 3
BAB II. ORGANISASI PEKERJAAN ....................................................................................... 7
2. ORGANISASI PEKERJAAN.......................................................................................... 7
2.1. Penyedia Jasa .............................................................................................................. 7
2.2. Tugas, Tanggung Jawab, dan Wewenang .................................................................... 8
BAB III. JADWAL PELAKSANAAN ...................................................................................... 17
3. JADWAL PELAKSANAAN KEGIATAN ....................................................................... 17
4. METODE PELAKSANAAN.......................................................................................... 19
4.1. Bagan Alir Pekerjaan .................................................................................................. 19
4.2. Rencana Kerja ............................................................................................................ 21
5. PENGENDALIAN PEKERJAAN .................................................................................. 27
5.1. Jadwal Personil ........................................................................................................... 27
5.2. Checklist Kegiatan Konsultan...................................................................................... 27
6. PELAPORAN .............................................................................................................. 38
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 3/38
No. Rev :1 8 Mei 2020 Paraf :

BAB I. INFORMASI PEKERJAAN

1. INFORMASI KEGIATAN

Informasi Kegiatan yang akan dilaksanakan adalah :

 Nama Kegiatan : DD Penataan Waduk Bunder

 Lokasi Kegiatan : Desa Bunder, Kecamatan Kebomas, Kabupaten Gresik

 Nomor Kontrak : HK0203-An.02/2020-04

 Tanggal Kontrak : 5 Mei 2020

 Pengguna Jasa : Balai Besar Wilayah Sungai Bengawan Solo

 Satuan Kerja : Satker BBWS Bengawan Solo

 PPK : PPK Perencanaan dan Program

 Alamat : Jl. Solo-Kartasura km.7 Pabelan, Kartasura

 Penyedia Jasa : PT Candi Kencana Sabda Wisesa KSO CV Emtiga

Konsultan

 Alamat : Jl. Jemursari Regency Blok B No. 38 Tenggilis. Surabaya

Jl. Toddopuli Raya Timur Komp. Villa Surya Mas Blok C/3,

Kota Makassar

 Nilai Kontrak : Rp 1.735.211.000,-

 Sistem Kontrak : Lump Sump

 Waktu Pelaksanaan : 240 Hari Kalender

 Lingkup Kegiatan :

Pekerjaan yang tercakup dalam kegiatan penyusunan adalah :

 Persiapan melakukan pengumpulan data dan dikompilasikan, dikaitkan dengan hasil


studi terdahulu, yang mencakup keseluruhan data teknis, data sosial dan
perekonomian di wilayah studi antara lain :
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 4/38
No. Rev :1 8 Mei 2020 Paraf :

 Pengadaan peta topografi skala 1 : 50.000 atau 1 : 25.000;

 Data-data ; hidrologi, topografi, geologi, tata guna lahan, sosial ekonomi, laporan
dan informasi aktual dari Dinas/Instansi yang berwenang yang berkaitan dengan
survey investigasi

 Data daerah genangan banjir, penyebab banjir dan kerugian-kerugian akibat banjir
dari kejadian banjir yang pernah terjadi

 Identifikasi kondisi dan permasalahan yang ada disesuaikan dengan Rencana Tata
Ruang yang ada

 Membuat form desain survey, fakta analisa dan permasalahan dengan formula
penanganannya

 Membuat dan menyusun rencana penanganan permasalahan Waduk Bunder


dengan diagram bagan alir dan tabel-tabel pola pikir yang diperlukan.

 Pekerjaan pengukuran

 Referensi koordinat

 Referensi ketinggian

 Pemasangan patok

 Pengukuran polygon

 Pengukuran situasi

 Pengukuran waterpass

 Pengukuran penampang memanjang dan melintan

 Hasil pekerjaan pengukuran dan perhitungan (hasil ukur)

 Pengecekan dan pemasangan patok batas BMN untuk area waduk termasuk
inventarisasi asset kepemilihan lahan

 Pembuatan gambar ukur

 Pekerjaan penyelidikan geologi dan mekanika tanah pekerjaan ini dilakukan dilapangan
dan Laboratorium, dibukukan dalam bentuk sistematika pelaporan yang rapi, digambar
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 5/38
No. Rev :1 8 Mei 2020 Paraf :

dipeta dan dilengkapi foto dokumen, jenis penyelidikan sebagai berikut :

 Boring dengan volume 200 m

 Penyelidikan di Laboratorium

 Pengujuan contoh benda uji/tanah harus dilakukan di Laboratorium dengan alat-


alat uji yang sudah dikalibrasi oleh Instansi yang berwenang dan berpedoman
sesuai Standar Nasional Indonesia (SNI).

 Kajian dan identifikasi

 Melakukan Analisa sedimentasi waduk yang meliputi sumber sedimentasi waduk


dan bagaimana konsep penanganannya

 Melakukan identifikasi kerusakan

 Melakukan identifikasi sumber air waduk, berapa jumlah tampungan waduk, debit
inflow dan outflow waduk, termasuk drainase baik yang masuk maupun keluar dari
waduk;

 Melakukan analisa necara air

 Melakukan kajian terhadap spillway waduk

 Melakukan analisa/running kondisi eksisting waduk sampai Q PMF ditambah 0,75


tinggi jagaan waduk termasuk running analisa kondisi saat ini dengan rencana
perubahan desain (apabila ada)

 Identifikasi termasuk pengukuran terhadap alih fungsi lahan yang semula


merupakan catchment area digunakan untuk pemanfaatan pembangunan tol
Surabaya-Gresik

 Melakukan tinjauan dan analisa penataan Kawasan Waduk Bunder, termasuk


desain rumah jaga petugas waduk.

 Melakukan analisa menyeluruh termasuk kemungkinan adanya pengerukan waduk

 Melakukan identifikasi, pengecekan terhadap pola operasi waduk termasuk


instrumentasi yang ada
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 6/38
No. Rev :1 8 Mei 2020 Paraf :

 Penyelidikan geologi dan tes lab

 Pemboran inti (Bor mesin) : 200 m

 Hasil pemboran harus disimpan dalam core box dan ditempatkan pada tempat
yang disetujui Direksi

 Pengukuran piezometer secara vertikal untuk melihat tekanan atau gaya statis
yang dihasilkan tinggi muka air tanah, selain untuk mengukur tekanan

 Melakukan uji echosounding (sonar) di area genangan untuk mengetahui


sedimentasi waduk.

 Diskusi

 Diskusi PMK

 Diskusi Konsep Laporan Pendahuluan

 Diskusi Konsep Laporan Antara

 Diskusi ke Direktorat Pembina

 Diskusi Konsep Laporan Akhir

 Pertemuan Konsultasi Masyarakat (2 kali);

 Pekerjaan perencanaan

Konsultan wajib menganalisa data yang didapat untuk formulasi penataan kawasan
Waduk Bunder untuk irigasi, rehabilitasi, menghitung neraca air, menganalisa pola
operasi waduk dan melakukan analisa terkait sedimentasi waduk guna penanganan
Waduk Bunder secara menyeluruh.

 Pelaporan
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 7/38
No. Rev :1 8 Mei 2020 Paraf :

BAB II. ORGANISASI PEKERJAAN

2. ORGANISASI PEKERJAAN

2.1. Penyedia Jasa

Penyedia jasa yang dimaksud adalah PT. Candi Kencana Sabda Wisesa KSO CV. Emtiga
Konsultan. Berikut adalah struktur organisasinya.

KONSULTAN
PT. CANDIKENCANA SABDAWISESA
KSO
CV. EMTIGA KONSULTAN

Ketua Tim/ Ahli Bendungan


PENANGGUNG JAWAB K3
Ir. Djoko Santosa

Emergensi/ Kedaruratan

Ahli Hidrolika Ahli Hidrologi


Prasetyo Agung Pamuji, ST Arinto Murti Legawa, ST

P3K
Ahli Arsitektur/Landscape Ahli Cost Estimator & Dok.
Baritoadi Buldan Tender
Rayaganda Rito, ST, M.A. Mirawaty, ST

Kebakaran

Ahli Mekanika Tanah Ahli OP


Ir. Syaiful Anas Ary Kurniawaty, ST

Ahli Geodesi
Ahli Sosial Ekonomi
L.P. Ivouranus
Olviaty Sudarno, S.Sos
Tampubolon. ST

Surveyor Pengukuran

Juru Bor / Bor Master Surveyor Sosial Ekonomi Hero Tarunajaya, A.Md;
Darsito Oki Winata, ST;
Shabirin, ST; Yusran Hidayat, SE; Danang Puji Sryanto, A.Md;
Muhyiddin, ST Muh. Ridwan, A.Md Yusuf Anwari, ST,
Sulfikran, ST

Tenaga Lokal
To Be Name (9 orang)

Juru Gambar (AutoCAD Operator)


Avisha Gita Prawitasiwi, ST

Operator Komputer
Aris Widayati

Driver
Mudatsir
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 8/38
No. Rev :1 8 Mei 2020 Paraf :

2.2. Tugas, Tanggung Jawab, dan Wewenang

Secara garis besar tugas dan tanggung jawab masing-masing Personil Tenaga Ahli dan Tenaga
Pendukung yang akan melaksanakan kegiatan DD Penataan Waduk Bunder adalah sebagai
berikut :

1. Ketua Tim/Ahli Bendungan

Tugas :

a. Mengkoordinir pelaksanaan seluruh kegiatan tim konsultan di proyek.

b. Melaksanakan pekerjaan persiapan koordinasi dengan direksi pekerjaan.

c. Menyusun Laporan PMK.

d. Mengadakan hubungan dengan pihak pemberi kerja dan instansi lain yang terkait
guna menunjang kegiatan proyek.

e. Menyusun jadwal realisasi pelaksanaan dan mengevaluasi berdasarkan rencana


jadwal pelaksanaan.

f. Bersama anggota tim lain menyusun keseluruhan produk pelaporan.

g. Melaksanakan serah terima hasil pekerjaan dengan pihak Direksi.

Tanggung Jawab :

a. Bertanggung jawab langsung kepada pihak Direksi dan Direktur Perusahaan atas
jalannya pekerjaan dari awal sampai selesai dan seluruh hasil pekerjaannya sesuai
dengan syarat-syarat yang ditetapkan dalam kontrak.

b. Bertanggung jawab terhadap keseluruhan proses dan hasil pekerjaan

c. Bertanggung jawab terhadap kelengkapan administratif yang diperlukan untuk


setiap tahap pelaporan dan penyerahan pekerjaan

d. Bertanggung jawab atas kelancaran dan kemajuan pelaksanaan pekerjaan

e. Bertanggung jawab terhadap semua hasil pekerjaan dan kinerja tim konsultan
serta laporan-laporan yang diminta dalam KAK
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 9/38
No. Rev :1 8 Mei 2020 Paraf :

Wewenang :

a. Mewakili pihak perusahaan jika harus berhubungan dengan pihak-pihak terkait baik
instansi pemerintah maupun swasta selama dalam pelaksanaan pekerjaan ini.

b. Memerintahkan mobilisasi dan demobilisasi tenaga ahli dan tenaga pendukung.

c. Menciptakan koridor disiplin tim dan koridor pembiayaan kegiatan lapangan.

d. Mengatur jadwal perjalanan dinas tenaga ahli dan asisten ahli.

e. Mengatur penggunaan peralatan survey dan peralatan kantor.

f. Menandatangani absensi seluruh karyawan yang terkait dengan kegiatan.

g. Memutuskan pemilihan alternatif-alternatif hasil analisis dan seluruh perhitungan


yang dilakukan oleh para tenaga ahli.

2. Ahli Hidrologi

Tugas :

a. Mengumpulkan informasi dan data hidrologi waduk.

b. Menganalisa data hidrologi.

c. Melaksanakan investigasi tambahan pada waduk yang mencakup aspek


hidrologi.

d. Memberikan rekomendasi alternative perbaikan/rehabilitasi waduk dari aspek


hidrologi.

e. Membuat dan membantu pembuatan laporan yang diperlukan Ketua Tim


bersama anggota tim lainnya.

Tanggung Jawab :

a. Bertanggung jawab langsung kepada Ketua Tim atas pekerjaan survey dan
interpretasi serta analisa hidrologi.

b. Menganalisa dan menyusun Laporan Hidrologi, sedimentasi, hasil pengukuran


echosounding dan membantu dalam pembuatan Draft dan Laporan Akhir, serta
membantu pembuatan laporan-laporan lainnya
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 10/38
No. Rev :1 8 Mei 2020 Paraf :

c. Melakukan analisis hidrologi sedimentasi dan Analisa kondisi eksisiting untuk


Q100 dan PMF waduk

Wewenang :

a. Mengkoordinir dalam inventarisasi data hidologi, dan data pendukung lainnya

b. Menetapkan lokasi survey dan pengukuran topografi.

c. Menetapkan jadwal survey dan tim yang harus melaksanakan survey.

d. Menetapkan jenis data yang akan diambil ketika pelaksanaan survey.

3. Ahli Geodesi

Tugas :

a. Melakukan perhitungan dan penggambaran topografi bersama tim topografi.

b. Melakukan pemetaan dasar waduk sampai elevasi muka air maksimum.

c. Menyusun laporan hasil survey pengukuran topografi.

d. Membuat dan membantu pembuatan laporan yang diperlukan Ketua Tim


bersama anggota tim lainnya.

Tanggung Jawab :

a. Memimpin dan bertanggung jawab sepenuhnya terhadap pekerjaan survey


pengukuran topografi.

b. Bertanggung jawab langsung kepada Ketua Tim atas pekerjaan survey


pengukuran topografi.

c. Melaksanakan diskusi horisontal dengan anggota Tim lainnya yang terkait


dengan bidangnya untuk menjamin agar hasil pekerjaan menjadi komprehensif
dan terpadu.

d. Membantu membuat/menyusun laporan dan berperan aktif dalam penyusunan


produk laporan lainnya
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 11/38
No. Rev :1 8 Mei 2020 Paraf :

Wewenang :

b. Menetapkan lokasi survey dan pengukuran topografi.

c. Menetapkan jadwal survey dan tim yang harus melaksanakan survey.


d. Menetapkan jenis data yang akan diambil ketika pelaksanaan survey.

4. Ahli Mekanika Tanah

Tugas :

a. Bersama TA yang lain melakukan identifikasi lapangan dan investigasi


tambahan.

b. Bersama tim survey melakukan pengeboran pada titik-titik di lokasi survey.

c. Melakukan uji laboratorium terhadap hasil pengeboran.

d. Membuat analisa terhadap data lapangan dan hasil tes laboratorium.

e. Membuat rekomendasi mengenai data-data yang digunakan untuk


perencanaan.

f. Melaksanakan dan membantu pembuatan Laporan Akhir serta pembuatan


laporan-laporan lainnya.

g. Ikut melaksanakan diskusi-diskusi dan presentasi dengan pihak Direksi.

Tanggung Jawab :

a. Bertanggung jawab langsung kepada Ketua Tim atas pelaksanaan pengeboran


dan ujimekanika tanah dan uji echosounding (sonar).

b. Melaksanakan diskusi horisontal dengan anggota Tim lainnya yang terkait


dengan bidangnya untuk menjamin agar hasil pekerjaan menjadi komprehensif
dan terpadu.

c. Membantu membuat / menyusun Laporan dan berperan aktif dalam penyusunan


produk laporan lainnya.
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 12/38
No. Rev :1 8 Mei 2020 Paraf :

d. Mempertanggungjawabkan semua hasil pekerjaannya, baik hasil perhitungan


maupun gambar kepada Ketua Tim, untuk dipertanggung jawabkan kepada
Direksi maupun Perusahaan.

Wewenang :

a. Bersama Ketua tim menentukan titik-titik pengeboran.

b. Menetapkan lokasi pengukuran.

c. Menetapkan jadwal survey dan tim yang harus melaksanakan survey.

5. Ahli Sosial Ekonomi

Tugas :

a. Mempersiapkan kuisioner yang akan digunakan saat survei.

b. Melakukan inventarisasi catchment area waduk termasuk perubahan


kepemilikan lahan (apabila ada lahan yg beralih fungsi)

c. Analisis hasil survei.

Tanggung Jawab :

a. Bertanggung jawab langsung kepada Ketua Tim atas pelaksanaan kegiatan


survei dan PKM

b. Membantu membuat / menyusun Laporan dan berperan aktif dalam penyusunan


produk laporan lainnya.

c. Mempertanggungjawabkan semua hasil pekerjaannya

Wewenang :

d. Bersama Ketua tim melakukan suvei

e. Menetapkan jadwal survey dan tim yang harus melaksanakan survey.


PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 13/38
No. Rev :1 8 Mei 2020 Paraf :

6. Ahli Cost Estimator/Dokumen Tender

Tugas :

a. Bersama TA melakukan identifikasi lapangan dan melakukan investigasi


tambahan.

b. Melakukan survey lapangan terdiri dari pengumpulan data Harga Satuan


Pekerjaan serta Harga Satuan Bahan dan Upah yang berada di Kabupaten
Pacitan.

c. Membuat Analisa Harga Satuan Pekerjaan (AHSP) dan menghitung volume


pekerjaan.

d. Mempelajari gambar dan spesifikasi teknik, kemudian membandingkan


spesifikasi teknik dengan gambar.

e. Ikut melaksanakan diskusi-diskusi dan presentasi dengan pihak Direksi.

Tanggung Jawab :

a. Bertanggung jawab langsung kepada Ketua Tim atas pada hasil akhir
perhitungan Rencana Anggaran Biaya (RAB).

b. Melaksanakan diskusi horisontal dengan anggota Tim lainnya yang terkait


dengan bidangnya untuk menjamin agar hasil pekerjaan menjadi komprehensif
dan terpadu.

c. Membantu membuat / menyusun Laporan dan berperan aktif dalam penyusunan


produk laporan lainnya.

d. Bertanggungjawab atas semua hasil pekerjaannya kepada Direksi maupun


Perusahaan.

Wewenang :

a. Menetapkan biaya pekerjaan secara rinci berdasarkan gambar dan spesifikasi


teknis.

b. Menetapkan volumen pada setiap ítem pekerjaan.

c. Menetapkan biaya total untuk dipertanggung jawabkan kepada Direksi maupun


Perusahaan
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 14/38
No. Rev :1 8 Mei 2020 Paraf :

7. Ahli OP

Tugas :

a. Mengumpulkan dan mempelajari data riwayat OP termasuk data pemantauan,


laporan investigasi sebelumnya, dan sistem OP.

b. Melaksanakan investigasi tambahan yang mencakup aspek sistem operasi


berdasar hasil kegiatan.

c. Menghitung Pola Operasi Waduk Bunder sekaligus menyusun Laporan Manual


OP Waduk , serta membantu mbantu pembuatan laporan-laporan lainnya.

d. Membuat dan membantu pembuatan laporan yang diperlukan Ketua Tim


bersama anggota tim lainnya.

Tanggung Jawab :

a. Mengidentifikasi permasalahan sistem OP yang ada.

b. Menetapkan rencana perbaikan dan atau penyempurnaan sistem OP yang


diperlukan.

c. Melaksanakan diskusi horisontal dengan anggota Tim lainnya yang terkait


dengan bidangnya untuk menjamin agar hasil pekerjaan menjadi komprehensif
dan terpadu.

d. Membantu membuat/menyusun Laporan dan berperan aktif dalam penyusunan


produk laporan lainnya.

Wewenang :

a. Menetapkan metode kerja yang digunakan.

b. Menetapkan titik atau bagian dari waduk yang akan dilakukan perbaikan atau
penyempurnaan sistem OP.
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 15/38
No. Rev :1 8 Mei 2020 Paraf :

8. Ahli Hidrolika/Struktur Bangunan Air

Tugas :

a. Bersama dengan ketua tim dan tenaga ahli yang lain melakukan investigasi
tambahan.

b. Memberikan rekomendasi alternatif desain rinci perbaikan/rehabilitasi waduk dari


aspek hidrolika.

c. Membuat dan membantu pembuatan laporan yang diperlukan Ketua Tim


bersama anggota tim lainnya.

d. Membantu pembuatan Laporan Akhir, dan juga membantu pembuatan laporan-


laporan lainnya.

e. Ikut melaksanakan diskusi-diskusi dan presentasi dengan pihak Direksi.

Tanggung Jawab :

a. Melaksanakan diskusi horisontal dengan anggota Tim lainnya yang terkait


dengan bidangnya untuk menjamin agar hasil pekerjaan menjadi komprehensif
dan terpadu.

b. Membantu membuat / menyusun Laporan dan berperan aktif dalam penyusunan


produk laporan lainnya.

c. Mempertanggungjawabkan semua hasil pekerjaannya, baik hasil perhitungan


maupun gambar kepada Ketua Tim, untuk dipertanggung jawabkan kepada
Direksi maupun Perusahaan.

Wewenang :

a. Menetapkan jenis data, lokasi data, dan volume data yang harus diambil dalam
rangka survey hidraulika

b. Menetapkan jadwal survey dan tim yang harus melaksanakan survey.

c. Menetapkan lokasi dilakukan survey.


PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 16/38
No. Rev :1 8 Mei 2020 Paraf :

9. Ahli Arsitektur/Lansekap

Tugas :

a. Melakukan kajian konsep, pra rancangan, dan tahap pengembangan rancangan

b. Membuat video animasi kondisi eksisting dan rencana rehab.

c. Memberikan rekomendasi pengembangan pemanfaatan waduk pada tahap pra


rancangan/skematik desain Kawasan.

Tanggung Jawab :

a. Melaksanakan diskusi horisontal dengan anggota Tim lainnya yang terkait


dengan bidangnya untuk menjamin agar hasil pekerjaan menjadi komprehensif
dan terpadu.

b. Membantu membuat / menyusun Laporan dan berperan aktif dalam penyusunan


produk laporan lainnya.

c. Mempertanggungjawabkan semua hasil pekerjaannya, baik hasil perhitungan


maupun gambar kepada Ketua Tim, untuk dipertanggung jawabkan kepada
Direksi maupun Perusahaan.

Wewenang :

d. Menetapkan jenis data, lokasi data, dan volume data yang harus diambil

e. Menetapkan jadwal survey dan tim yang harus melaksanakan survey.

f. Menetapkan lokasi dilakukan survey.


PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 17/38
No. Rev :1 8 Mei 2020 Paraf :

BAB III. JADWAL PELAKSANAAN

3. JADWAL PELAKSANAAN KEGIATAN

Keberhasilan suatu pekerjaan di samping ditentukan oleh masing-masing personil yang


terlibat dalam pekerjaan tersebut juga sangat bergantung kepada pengaturan manajemen
waktu pelaksanaan. Oleh karena itu, sebelum suatu pekerjaan dilaksanakan Konsultan harus
menuangkan rencana kerja ke dalam suatu jadwal pelaksanaan pekerjaan sehingga
nantinya tahap demi tahap pelaksanaan pekerjaan dapat berpedoman atau berpatokan
kepada rencana jadwal pelaksanaan yang telah dibuat.

Jadwal pelaksanaan pekerjaan juga berfungsi sebagai penyeimbang kerja, dalam arti apabila
kerja yang dilaksanakan senantiasa berpedoman kepada rencana kerja maka akan dapat
diketahui kapan suatu pekerjaan dinyatakan terlambat, sehingga pada tahap berikutnya
dapat dipercepat sehingga schedule yang ada dapat diseimbangkan lagi.

Jadwal pelaksanaan kegiatan disusun oleh penyedia jasa berdasarkan pada bagan alir
pelaksanaan pekerjaan yang memuat informasi tentang urutan proses kerja, waktu
pelaksanaan maupun informasi lama kegiatan pada masing-masing item pekerjaan. Masing-
masing item pekerjaan merupakan penjabaran kegiatan yang akan dilaksanakan guna
memenuhi lingkup pekerjaan maupun persyaratan teknis yang ditetapkan oleh pengguna
jasa.

Jadwal pelaksanaan kegiatan untuk pekerjaan DD Penataan Waduk Bunder adalah


sebagai berikut :
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 18/38
No. Rev :1 8 Mei 2020 Paraf :

JADWAL PELAKSANAAN PEKERJAAN


DETAIL DESAIN PENATAAN WADUK BUNDER
PT. CANDIKENCANA SABDAWISESA
KSO CV. EMTIGA KONSULTAN
Bulan Ke - Minggu Ke-
Bobot (%)
No. Uraian Pekerjaan Mei-Juni Juni-Juli Juli-Agustus Agustus-September September Oktober Nopember Desember Ket (bln)
Renc. Real. 5-11 12-19 20-26 27-3 4-10 11-18 19-25 26-3 4-10 11-18 19-25 26-2 3-9 10-17 18-24 25-1 2-8 9-16 17-23 24-1 2-8 9-16 17-23 24-31 1-7 8-15 16-22 23-30 1-7 8-15 16-22 23-30

I Pekerjaan Persiapan & Pendahuluan


100%
1 Persiapan Administrasi dan Fasilitas Kerja 0.30% 0.30%
0.00%
2 Penempatan, Mobilisasi dan Koordinasi Tim Pelaksana 0.31% 0.31%
0.00%
3 Pemantapan Program Kerja dan Pendalaman KAK 0.31% 0.31%
0.00%
4 Penyusunan RMK 0.16% 0.09% 0.07%
0.00%

II
Pengumpulan Data & Review Study Terdahulu

1 Pengumpulan Data Awal (Data Sekunder) dan Study Terdahulu 0.42% 0.42%
0.00%
2 Kunjungan Lapangan Pendahuluan 1.67% 1.67%
0.00%
3 Kajian awal lokasi pekerjaan 1.47% 1.47% 90%
0.00%
4 Penyusunan Laporan Pendahuluan 0.22% 0.05% 0.17%
0.00%

III Survey, Investigasi dan Analisis


1 Survey Topografi dan Pemetaan Rupa Bumi
a Persiapan dan Kalibrasi Peralatan Survey 1.40% 1.40%
0.00%
b Pemasangan BM dan Patok Pengukuran 0.98% 0.40% 0.58%
0.00%
c Pelaksanaan Pengukuran (Long-Cross Section dan Situasi) 18.80% 1.00% 1.00% 2.00% 1.70% 2.00% 2.00% 3.30% 2.10% 3.70%
0.00%
d Analisa Data 6.00% 0.50% 1.10% 0.90% 0.60% 1.50% 1.40%
0.00%
e Penggambaran Hasil Pengukuran dan Pelaporan 3.35% 0.40% 0.50% 1.40% 1.05%
0.00%
80%

2 Investigasi Geoteknik dan Mekanika Tanah


a Persiapan dan Mobilisasi Peralatan 0.31% 0.31%
0.00%
b Pelaksanaan Investigasi Lapangan 7.73% 1.00% 1.00% 1.30% 1.50% 1.40% 1.22% 0.31%
0.00%
c Uji Laboratorium 1.13% 0.20% 0.20% 0.40% 0.33%
0.00%
d Analisa Data 0.92% 0.20% 0.10% 0.40% 0.22%
0.00%
e Pelaporan dan Rekomendasi 0.39% 0.20% 0.20%
0.00%

3 Analisa Hidroklimatologi dan Neraca Air


a Analisa Data Curah Hujan, AWLR, dan Klimatologi 1.61% 0.20% 0.30% 0.30% 0.81%
0.00%
70%
b Analisa Debit Banjir dan Sedimentasi 2.45% 0.40% 0.40% 0.30% 0.40% 0.70% 0.25%
0.00%
c Analisa Inflow Waduk 2.24% 0.40% 0.40% 0.30% 0.40% 0.70% 0.04%
0.00%
d Analisa Outflow/ Pemanfaatan Waduk (irigasi, Air Baku, dll,) 2.14% 0.30% 0.30% 0.30% 0.40% 0.70% 0.14%
0.00%
e Analisa Water Balance dan Analisa Tampungan Waduk
1.93% 0.30% 0.30% 0.50% 0.30% 0.40% 0.13%
(simulasi - optimasi)
0.00%

4 Survey & Analisa Sosial Ekonomi, Pertanian dan Lingkungan


a Survey & Analisa Sosial Ekonomi 4.61% 0.40% 0.40% 0.40% 0.60% 0.80% 0.90% 0.80% 0.31%
0.00%
b Survey & Analisa Tanah/ Pertanian 4.91% 0.40% 0.40% 0.50% 0.60% 0.90% 0.90% 0.80% 0.41%
0.00% 60%
c Survey & Analisa Lingkungan 1.52% 0.30% 0.40% 0.40% 0.42%
0.00%
d Survey Harga dan Upah Lokasi Pekerjaan 0.82% 0.20% 0.30% 0.30% 0.02%
0.00%

IV Pekerjaan Planning dan Pradesain


1 Penetapan Lokasi & Rumusan Pengambangan SDA 2.30% 0.70% 0.40% 0.70% 0.50%
0.00%
2 Pradesain Bendungan dan Bangunan Pelengkap 2.53% 0.45% 0.45% 0.45% 0.45% 0.45% 0.26%
0.00%
3 Pradesain Jaringan Pemanfaatan Bendungan 2.42% 0.60% 0.70% 0.70% 0.42%
0.00%
4 Penggambaran Hasil Desain 2.79% 0.60% 0.80% 0.40% 0.30% 0.40% 0.29%
0.00%

Axis Title
V EVALUASI DAN ANALISA DATA 50%
1 Perhitungan Volume Pekerjaan (BOQ) 0.55% 0.15% 0.15% 0.15% 0.10%
0.00%
2 Analisa Harga Satuan dan Penyusunan RAB 1.60% 0.60% 0.40% 0.30% 0.30%
0.00%

3 Penyusunan Rencana Kegiatan Selanjutnya (DD dan Konstruksi) 0.91% 0.30% 0.61%

0.00%
4 Analisa Kelayakan Proyek 1.23% 0.20% 0.30% 0.45% 0.28%
0.00%

VI PENATAAN KAWASAN WADUK


1 Pemetaan & Inventarisasi Kawasan 2.63% 1.50% 1.13%
0.00%
2 Analisa Data Kawasan 2.82% 1.80% 1.02%
0.00% 40%
3 Perumusan Penataan Kawasan 2.66% 1.40% 1.26%
0.00%
4 Penataan Kawasan 2.66% 1.60% 1.06%
0.00%

VII PENYUSUNAN LAPORAN DAN DISKUSI


A Laporan
1 Laporan Rencana Mutu Kontrak (RMK) 0.06% 0.06%
0.00%
2 Laporan Pendahuluan (Inception) 0.09% 0.09%
0.00%
3 Laporan Bulanan 0.14% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
0.00%
4 Laporan Antara 0.11% 0.06% 0.06%
0.00%
5 Laporan Akhir Sementara (Draf Final) 0.19% 0.10% 0.10%
30%
0.00%
6 Laporan Akhir (Final) 0.12% 0.06% 0.06%
0.00%
7 Laporan Ringkas 0.11% 0.11%
0.00%
8 Laporan Penunjang :
- Laporan Pengukuran Topografi 0.08% 0.08%
0.00%
- Laporan Sosial Ekonomi 0.08% 0.08%
0.00%
- Diskripsi BM & CP 0.09% 0.09%
0.00%
- Lap. Mekanika Tanah 0.08% 0.08%
0.00%
- Lap. Hidrologi 0.08% 0.08%
0.00%
- Lap Survey Inventarisasi trmsk Buku Ukur 0.08% 0.08% 20%
0.00%
- Lap Nota Desain dan Dokumen Desain 0.08% 0.08%
0.00%
- Lap Spektek dan Dokumen Tender 0.08% 0.08%
0.00%
- Lap PKM 0.08% 0.04% 0.04%
0.00%
- Lap RAB & BOQ 0.08% 0.08%
0.00%
- Lap. OP 0.08% 0.08%
0.00%
- Album foto dokumentasi 0.09% 0.09%
0.00%
9 Album Gambar
- Album Gambar Pengukuran 0.52% 0.26% 0.26%
0.00%
10%
- Album Gambar Desain A3 1.71% 1.10% 0.61%
0.00%
10 Soft copy Laporan (eksternal Hardisk) 0.19% 0.19%
0.00%

B Diskusi/Presentase/Sosialisasi/Alih Pengetahuan
1 Pertemuan Konsultasi Masyarakat (PKM) 0.48% 0.24% 0.24%
0.00%
2 Diskusi Laporan Pendahuluan 0.34% 0.34%
0.00%
3 Diskusi Laporan Antara 0.54% 0.54%
0.00%
4 Diskusi Laporan Akhir 0.54% 0.54%
0.00%
5 Diskusi dengan Direktorat Pembina 0.68% 0.68%
0.00% 0%

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
RENCANA 100.000% 0.00% # 1.07% 2.16% 1.52% 0.62% 3.21% 4.20% 4.72% 5.81% 6.00% 6.30% 6.22% 6.65% 6.00% 5.73% 4.70% 4.19% 2.01% 1.30% 0.65% 0.67% 1.05% 0.96% 1.30% 1.24% 3.14% 3.78% 4.01% 3.55% 3.51% 2.21% 0.74% 0.79%
KUMULATIF RENCANA # 1.07% 3.23% 4.75% 5.37% 8.58% 12.78% 17.50% 23.31% 29.31% 35.61% 41.83% 48.47% 54.47% 60.20% 64.90% 69.10% 71.10% 72.41% 73.06% 73.72% 74.77% 75.74% 77.04% 78.28% 81.42% 85.20% 89.21% 92.76% 96.26% 98.47% 99.21% 100.00%
REALISASI

KUMULATIF REALISASI

DEVIASI
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 19/38
No. Rev :1 8 Mei 2020 Paraf :

BAB IV. METODE PELAKSANAAN

4. METODE PELAKSANAAN

4.1. Bagan Alir Pekerjaan

Bagan alir pelaksanaan pekerjaan akan memudahkan pihak-pihak yang terlibat dalam suatu
pekerjaan baik itu pengguna jasa maupun penyedia jasa untuk menentukan urutan langkah
demi langkah yang akan dilaksanakan sehingga pola kerja akan benar-benar terarah,
terpadu dan teratur dengan harapan hasil pekerjaan yang didapatkan juga akan maksimal.

Dengan adanya bagan alir pelaksanaan pekerjaan diharapkan juga akan terjadi sinkronisasi
hubungan kerja antar personil dalam konsultan sebagai penyedia jasa maupun hubungan
antara penyedia jasa dengan pengguna jasa.

Dalam pelaksanaan kegiatan DD Penataan Waduk Bunder disusun suatu bagan alir
pelaksanaan kegiatan. Berikut adalah bagan alir utama pelaksanaan kegiatan.
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 20/38
No. Rev :1 8 Mei 2020 Paraf :

Mulai

A1.a.SP-02-05

Pekerjaan Persiapan dan Pendahuluan


- Persiapan administrasi
- Penempatan dan mobilisasi
- Pemantapan program kerja
- Penyusunan RMK

Perbaikan Laporan
Diskusi RMK

G1.a.SP-01

Laporan RMK

B.SP.-01-04

Pengumpulan Data dan Review Studi Terdahulu


- Data sekunder dan studi terdahulu
- Survei pendahuluan
- Kajian awal lokasi
- Penyusunan lapdal

G2.b.1.SP-28-31

Diskusi Laporan Perbaikan Laporan


Pendahuluan

G1.b.SP-02

Laporan
Pendahuluan

G2.a.1.SP-24-27

Kegiatan PKM 1

C1.SP-01 C2.SP-07 C4.SP-19

Survei Topografi Investigasi Geologi Survei Sosial


dan Pemetaan dan Mekanika Ekonomi dan
Rupa Bumi Tanah Lingkungan

A
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 21/38
No. Rev :1 8 Mei 2020 Paraf :

Kegiatan
Analisis Hasil Survei

C1.d.SP-05

Analisis
Hidrologi dan Neraca Air

C3.SP-13

Kegiatan PKM 2

G2.a.1.SP-24-27

Penyusunan Laporan
antara

G1.d.SP-04

Diskusi Laporan
Perbaikan Laporan
Antara

G2.c.1.SP-32-35

Laporan
Antara

G1.d.SP-04

Penataan
Kawasan Waduk

F.SP--04

Perhitungan
Volume dan RAB

E.SP.01-02

Penyusunan
Laporan Akhir

G1.f.SP-06

Perbaikan Laporan
Diskusi Laporan
Akhir

G2.d.1.SP-36-39

Laporan Akhir

G1.f.SP-06

- Laporan Penunjang
- Album Gambar
- Soft Copyr
G1.fh.1.SP-08-19
G1.i.SP-20
G1.j.SP-23

Selesai

4.2. Rencana Kerja

Rencana kerja berisikan metode serta strategi konsultan dalam melaksanakan kegiatan yang
mengacu kepada bagan alir. Biasanya strategi ini digunakan untuk mengetahui target
pekerjaan.
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 22/38
No. Rev :1 8 Mei 2020 Paraf :

Output Durasi
No AKTIVITAS Metode Tenaga Ahli
Pekerjaan Pekerjaan
Cek Persipan
Dokumen Ketua Tim/Ahli
1 Administrasi dan Observasi 1 minggu
kontrak, SPMK Bendungan
Fasilitas Kerja
Cek Penempatan,
Mobilisasi dan Dokumen Ketua Tim/Ahli
2 Observasi 1 minggu
Koordinasi Tim kontrak, SPMK Bendungan
Pelaksana
Cek Pemantapan
Kurva s, jadwal- Ketua Tim/Ahli
3 Program Kerja dan Observasi 1 minggu
jadwal Bendungan
Pendalaman KAK
Cek Penyusunan Ketua Tim/Ahli
4 Observasi Dokumen PMK 2 minggu
PMK Bendungan
Cek Pengumpulan
Data Awal (Data Ketua Tim/Ahli
5 Observasi Studi terdahulu 1 minggu
Sekunder) dan Study Bendungan
Terdahulu
Cek Kunjungan
Gambaran lokasi Ketua Tim/Ahli
6 Lapangan Observasi 1 minggu
pekerjaan Bendungan
Pendahuluan
Penyusunan
Cek Kajian awal Ketua Tim/Ahli
7 Observasi laporan 1 minggu
lokasi pekerjaan Bendungan
pendahuluan
Cek Penyusunan
Laporan Ketua Tim/Ahli
8 Laporan Observasi 2 minggu
pendahuluan Bendungan
Pendahuluan
Cek Survey
Ketua Tim/Ahli
Topografi dan Pemasangan BM
9 Observasi 3 bulan Bendungan dan Ahli
Pemetaan Rupa CP
Geodesi
Bumi
Cek Persiapan dan Ketua Tim/Ahli
10 Kalibrasi Peralatan Observasi Survei 1 minggu Bendungan dan Ahli
Survey Geodesi
Cek Pemasangan Ketua Tim/Ahli
11 BM dan Patok Observasi Kagiatan analisis 2 minggu Bendungan dan Ahli
Pengukuran Geodesi
Cek Pelaksanaan
Potongan Ketua Tim/Ahli
Pengukuran (Long-
12 Observasi melintang dan 9 minggu Bendungan dan Ahli
Cross Section dan
memanjang Geodesi
Situasi)
Ketua Tim/Ahli
13 Cek Analisa Data Observasi Kegiatan analisis 6 minggu Bendungan dan Ahli
Geodesi
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 23/38
No. Rev :1 8 Mei 2020 Paraf :

Output Durasi
No AKTIVITAS Metode Tenaga Ahli
Pekerjaan Pekerjaan
Cek Penggambaran Ketua Tim/Ahli
Gambar hasil
14 Hasil Pengukuran Observasi 4 minggu Bendungan dan Ahli
pengukuran
dan Pelaporan Geodesi
Cek Investigasi Sampel tanah Ketua Tim/Ahli
15 Geoteknik dan Observasi dan data hasil 4 bulan Bendungan dan Ahli
Mekanika Tanah survei Mekanika Tanah
Ketua Tim/Ahli
Cek Persiapan dan Siap melakukan
16 Observasi 1 minggu Bendungan dan Ahli
Mobilisasi Peralatan survei
Mekanika Tanah
Ketua Tim/Ahli
Cek Pelaksanaan
17 Observasi Hasil survei 6 minggu Bendungan dan Ahli
Investigasi Lapangan
Mekanika Tanah
Ketua Tim/Ahli
Hasil uji
18 Cek Uji Laboratorium Observasi 4 minggu Bendungan dan Ahli
laboratorium
Mekanika Tanah
Ketua Tim/Ahli
19 Cek Analisa Data Observasi Kegiatan analisis 4 minggu Bendungan dan Ahli
Mekanika Tanah
Ketua Tim/Ahli
Cek Pelaporan dan Laporan
20 Observasi 2 minggu Bendungan dan Ahli
Rekomendasi mekanika tanah
Mekanika Tanah
Cek Analisa Ketua Tim/Ahli
Perhitungan
21 Hidroklimatologi dan Observasi 4 bulan Bendungan dan Ahli
neraca air
Neraca Air Hidrologi
Cek Analisa Data Ketua Tim/Ahli
Hasil perhitungan
22 Curah Hujan, AWLR, Observasi 4 minggu Bendungan dan Ahli
curah hujan
dan Klimatologi Hidrologi
Cek Analisa Debit Ketua Tim/Ahli
23 Banjir dan Observasi Running aplikasi 6 minggu Bendungan dan Ahli
Sedimentasi Hidrologi
Ketua Tim/Ahli
Cek Analisa Inflow
24 Observasi Running aplikasi 6 minggu Bendungan dan Ahli
Waduk
Hidrologi
Cek Analisa Outflow/ Ketua Tim/Ahli
25 Pemanfaatan Waduk Observasi Running aplikasi 6 minggu Bendungan dan Ahli
(irigasi, Air Baku, dll,) Hidrologi
Cek Analisa Water
Ketua Tim/Ahli
Balance dan Analisa
26 Observasi Running aplikasi 6 minggu Bendungan dan Ahli
Tampungan Waduk
Hidrologi
(simulasi - optimasi)
Cek Survey &
Ketua Tim/Ahli
Analisa Sosial
28 Observasi Data hasil survei 2 bulan Bendungan dan Ahli
Ekonomi, Pertanian
Sosial Ekonomi
dan Lingkungan
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 24/38
No. Rev :1 8 Mei 2020 Paraf :

Output Durasi
No AKTIVITAS Metode Tenaga Ahli
Pekerjaan Pekerjaan
Cek Survey & Ketua Tim/Ahli
Data kondisi
29 Analisa Sosial Observasi 8 minggu Bendungan dan Ahli
sosial ekonomi
Ekonomi Sosial Ekonomi
Cek Survey & Ketua Tim/Ahli
Data kondisi
30 Analisa Tanah/ Observasi 8 minggu Bendungan dan Ahli
tanah
Pertanian Sosial Ekonomi
Ketua Tim/Ahli
Cek Survey & Data kondisi
31 Observasi 4 minggu Bendungan dan Ahli
Analisa Lingkungan lingkungan
Sosial Ekonomi
Cek Survey Harga Ketua Tim/Ahli
Data harga
32 dan Upah Lokasi Observasi 4 minggu Bendungan dan Ahli
satuan
Pekerjaan Sosial Ekonomi
Cek Penetapan Ketua Tim/Ahli
Titik lokasi
33 Lokasi & Rumusan Observasi 4 minggu Bendungan dan Ahli
pekerjaan
Pengambangan SDA Hidrolika
Cek Pradesain Ketua Tim/Ahli
34 Bendungan dan Observasi Hasil desain awal 6 minggu Bendungan dan Ahli
Bangunan Pelengkap Hidrolika
Cek Pradesain
Ketua Tim/Ahli
Jaringan
35 Observasi Hasil desain awal 4 minggu Bendungan dan Ahli
Pemanfaatan
Hidrolika
Bendungan
Ketua Tim/Ahli
Cek Penggambaran Hasil
36 Observasi 6 minggu Bendungan dan Ahli
Hasil Desain penggambaran
Hidrolika
Ketua Tim/Ahli
Cek Perhitungan Hasil analisis
Bendungan dan Ahli
37 Volume Pekerjaan Observasi volume 4 minggu
Cost Estimator&Dok.
(BOQ) pekerjaan
Tender
Ketua Tim/Ahli
Cek Analisa Harga
Hasil hitungan Bendungan dan Ahli
38 Satuan dan Observasi 4 minggu
RAB Cost Estimator&Dok.
Penyusunan RAB
Tender
Cek Penyusunan
Rencana Kegiatan Analisis Ketua Tim/Ahli
39 Observasi 2 minggu
Selanjutnya (DD dan konstruksi Bendungan
Konstruksi)
Cek Analisa Hasil perhitungan Ketua Tim/Ahli
40 Observasi 4 minggu
Kelayakan Proyek kelayakan proyek Bendungan dan Ahli OP
Ketua Tim/Ahli
Cek Pemetaan &
Lokasi Bendungan, Ahli OP,
41 Inventarisasi Observasi 2 minggu
terinventarisasi dan Ahli
Kawasan
Arsitektur/Landscape
Ketua Tim/Ahli
Cek Analisa Data Hasil data
42 Observasi 2 minggu Bendungan dan Ahli
Kawasan kawasan
Arsitektur/Landscape
Cek Perumusan Rencana Ketua Tim/Ahli
43 Observasi 2 minggu
Penataan Kawasan penataan Bendungan dan Ahli
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 25/38
No. Rev :1 8 Mei 2020 Paraf :

Output Durasi
No AKTIVITAS Metode Tenaga Ahli
Pekerjaan Pekerjaan
kawasan Arsitektur/Landscape

Ketua Tim/Ahli
Cek Penataan Hasil penataan
44 Observasi 2 minggu Bendungan dan Ahli
Kawasan kawasan
Arsitektur/Landscape
Cek Laporan
Ketua Tim/Ahli
45 Program Mutu Observasi Laporan PMK 1 minggu
Bendungan
Kegiatan (PMK)
Cek Laporan
Laporan Ketua Tim/Ahli
46 Pendahuluan Observasi 1 minggu
pendahuluan Bendungan
(Inception)
Cek Laporan laporan bulanan Ketua Tim/Ahli
47 Observasi 8 minggu
Bulanan 1-8 Bendungan
Ketua Tim/Ahli
48 Cek Laporan Antara Observasi Laporan antara 2 minggu
Bendungan
Cek Laporan Akhir
Laporan akhir Ketua Tim/Ahli
49 Sementara (Draf Observasi 2 minggu
sementara Bendungan
Final)
Cek Laporan Akhir Ketua Tim/Ahli
50 Observasi Laporan akhir 2 minggu
(Final) Bendungan
Cek Laporan Ketua Tim/Ahli
51 Observasi Laporan ringkas 1 minggu
Ringkas Bendungan
Cek Laporan Laporan
52 Pengukuran Observasi pengukuran 1 minggu Ahli Geodesi
Topografi topografi
Cek Laporan Sosial Laporan sosial
53 Observasi 1 minggu Ahli Sosial Ekonomi
Ekonomi ekonomi
Cek Diskripsi BM & Deskripsi
54 Observasi 1 minggu Ahli Geodesi
CP BM&CP
Cek Lap. Mekanika Laporan
55 Observasi 1 minggu Ahli Mekanika Tanah
Tanah mekanika tanah
56 Cek Lap. Hidrologi Observasi Laporan hidrologi 1 minggu Ahli Hidrologi
Cek Lap Survey Laporan survei
57 Inventarisasi trmsk Observasi inventarisasi dan 1 minggu Ahli Geodesi
Buku Ukur buku ukur
Cek Lap Nota Desain Laporan nota
Ahli Cost Estimator &
58 dan Dokumen Observasi desain dan 1 minggu
Dok. Tender
Desain dokumen desain
Laporan spektek
Cek Lap Spektek dan Ahli Cost Estimator &
59 Observasi dan dokumen 1 minggu
Dokumen Tender Dok. Tender
tender
60 Cek Lap PKM Observasi Laporan PKM 1 minggu Ahli Sosial Ekonomi
Laporan Ahli Cost Estimator &
61 Cek Lap RAB & BOQ Observasi 1 minggu
RAB&BOQ Dok. Tender
62 Cek Lap. OP Observasi Laporan OP 1 minggu Ahli OP
Cek Album foto Album foto
63 Observasi 1 minggu Ahli Geodesi
dokumentasi dokumentasi
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 26/38
No. Rev :1 8 Mei 2020 Paraf :

Output Durasi
No AKTIVITAS Metode Tenaga Ahli
Pekerjaan Pekerjaan
Cek Album Gambar
64 Observasi Album gambar 2 minggu Ahli Geodesi
Pengukuran
Cek Album Gambar
65 Observasi Album gambar 2 minggu Ahli Geodesi
Desain A3
Cek Soft copy
Ketua Tim/Ahli
66 Laporan (eksternal Observasi Soft copy laporan 1 minggu
Bendungan
Hardisk)
Cek Pertemuan
67 Konsultasi Observasi PKM 2 minggu Ahli Sosial Ekonomi
Masyarakat (PKM)
Cek Diskusi Laporan Diskusi laporan Ketua Tim/Ahli
68 Observasi 1 minggu
Pendahuluan pendahuluan Bendungan
Cek Diskusi Laporan Diskusi laporan Ketua Tim/Ahli
69 Observasi 1 minggu
Antara antara Bendungan
Cek Diskusi Laporan Diskusi laporan Ketua Tim/Ahli
70 Observasi 1 minggu
Akhir akhir Bendungan
Cek Diskusi dengan Diskusi dengan Ketua Tim/Ahli
71 Observasi 1 minggu
Direktorat Pembina Direktorat Bendungan
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 27/38
No. Rev :1 8 Mei 2020 Paraf :

BAB V. PENGENDALIAN PEKERJAAN

5. PENGENDALIAN PEKERJAAN

5.1. Jadwal Personil

Personil yang terlibat terbagi menjadi 2 sub, yaitu tenaga ahli dan tenaga pendukung. Jadwal
penugasan personil dapat dilihat pada tabel berikut ini.

Bulan Ke -, Monggu Ke -
Orang
No. Nama Personil Posisi I II III IV V VI VII VIII
Bulan
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

A TENAGA AHLI

1 Ir. Djoko Santosa Ketua Tim/Ahli Bendungan 8.00


2 Arinto Murti Legawa, ST Ahli Hidrologi 6.00

3 L.P. Ivouranus Tampubolon. ST Ahli Geodesi 3.00

4 Ir. Syaiful Anas Ahli Mekanika Tanah 3.00

5 Olviaty Sudarno, S.Sos Ahli Sosial Ekonomi 2.00


Ahli Cost Estimator & Dok.
6 Mirawaty, ST 2.00
Tender
7 Ary Kurniawati, ST Ahli O & P 4.00

8 Prasetyo Agung Pamuji, ST Ahli Hidrolika 3.00


Baritoadi Buldan Rayaganda Rito,
9 Ahli Arsitektur/Landscape 2.00
ST, M.A.
B TENAGA PENDUKUNG

1 Hero Tarunajaya, A.Md Surveyor Pengukuran 1 3.00

2 Darsito Oki Winata, ST Surveyor Pengukuran 1 3.00

3 Danang Puji Sryanto, A.Md Surveyor Pengukuran 2 3.00

4 Yusuf Anwari, ST Surveyor Pengukuran 3 3.00

5 Sulfikran, ST Surveyor Pengukuran 4 3.00

6 Yusran Hidayat, SE Surveyor Sosial Ekonomi 1 2.00

7 Muh. Ridwan, A.Md Surveyor Sosial Ekonomi 2 2.00

8 Shabirin, ST Bor Master 1 3.00

9 Muhyiddin, ST Bor Master 2 3.00

10 Avisha Gita Prawitasiwi, ST Draftman/CAD Operator 4.00

11 Aris Widayati Operator Komputer 8.00

12 Mudatsir Driver 8.00

13 To be Name (9 Orang) Tenaga Lokal 18.00

5.2. Checklist Kegiatan Konsultan

Kegiatan checklist berfungsi untuk memastikan bahwa seluruh lingkup pekerjaan telah
dilaksanakan sesuai dengan persyaratan dalam kontrak.
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 28/38
No. Rev :1 8 Mei 2020 Paraf :

STANDARD
DESAIN
No. KEGIATAN YA TIDAK KETERANGAN
KRITERIA
PENERIMAAN
A
PEKERJAAN PENDAHULUAN
1 Pekerjaan Persiapan & Pendahuluan

1 Dokumen kontrak
2 Dokumen SPMK
3 Surat izin /
Pengantar
4 Personil
5 Program Kerja
sudah sesuai
6 Kurva S sudah
sesuai
7 Standart mutu
telah sesuai
8 Daftar Simak
pekerjaan telah
sesuai

B Pengumpulan Data & Review Study


Terdahulu

1 Pengumpulan Data Awal (Data


Sekunder) dan Study Terdahulu

Pengumpulan
Data Sekunder
dan Studi
Terdahulu telah
sesuai
2 Kunjungan Lapangan Pendahuluan

Kunjungan
Lapangan
Pendahuluan
telah sesuai
3 Kajian awal lokasi pekerjaan

Kajian awal lokasi


pekerjaan telah
sesuai
4 Penyusunan Laporan Pendahuluan
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 29/38
No. Rev :1 8 Mei 2020 Paraf :

STANDARD
DESAIN
No. KEGIATAN YA TIDAK KETERANGAN
KRITERIA
PENERIMAAN
Penyusunan
Laporan
Pendahuluan
telah sesuai

C Survey, Investigasi dan Analisis


1 Survey Topografi dan Pemetaan Rupa
Bumi

Survei
Pengukuran
topografi telah
sesuai
a Persiapan dan
Kalibrasi
Peralatan Survey
telah sesuai
b Pemasangan BM
dan Patok
Pengukuran telah
sesuai
c Pelaksanaan
Pengukuran
(Long-Cross
Section dan
Situasi) telah
sesuai
d Analisa Data
telah sesuai
e Penggambaran
Hasil Pengukuran
dan Pelaporan
telah sesuai
2 Investigasi Geoteknik dan Mekanika
Tanah

Investigasi
Geologi dan Lab
telah sesuai
a Persiapan dan
Mobilisasi
Peralatan telah
sesuai
b Pelaksanaan
Investigasi
Lapangan telah
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 30/38
No. Rev :1 8 Mei 2020 Paraf :

STANDARD
DESAIN
No. KEGIATAN YA TIDAK KETERANGAN
KRITERIA
PENERIMAAN
sesuai

c Uji Laboratorium
telah sesuai
d Analisa Data
telah sesuai
e Pelaporan dan
Rekomendasi
telah sesuai
3 Analisa Hidroklimatologi dan Neraca
Air

Analisa
Hidroklimatologi
dan Neraca Air
telah sesuai
a Analisa Data
Curah Hujan,
AWLR, dan
Klimatologi telah
sesuai
b Analisa Debit
Banjir dan
Sedimentasi telah
sesuai
c Analisa Inflow
Waduk telah
sesuai
d Analisa Outflow/
Pemanfaatan
Waduk (irigasi,
Air Baku, dll,)
telah sesuai
e Analisa Water
Balance dan
Analisa
Tampungan
Waduk (simulasi -
optimasi) telah
sesuai

4 Survey & Analisa Sosial Ekonomi,


Pertanian dan Lingkungan
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 31/38
No. Rev :1 8 Mei 2020 Paraf :

STANDARD
DESAIN
No. KEGIATAN YA TIDAK KETERANGAN
KRITERIA
PENERIMAAN
Survey & Analisa
Sosial Ekonomi,
Pertanian dan
Lingkungan telah
sesuai
a Survey & Analisa
Sosial Ekonomi
telah sesuai
b Survey & Analisa
Tanah/ Pertanian
telah sesuai
c Survey & Analisa
Lingkungan telah
sesuai
d Survey Harga dan
Upah Lokasi
Pekerjaan telah
sesuai
D Pekerjaan Planning dan Pradesain

Penetapan Lokasi & Rumusan


1
Pengambangan SDA

Penetapan Lokasi
& Rumusan
Pengambangan
SDA telah sesuai
2
Pradesain Bendungan dan Bangunan
Pelengkap
Pradesain
Bendungan dan
Bangunan
Pelengkap telah
sesuai
Pradesain Jaringan Pemanfaatan
3
Bendungan
Pradesain
Jaringan
Pemanfaatan
Bendungan telah
sesuai
4 Penggambaran Hasil Desain
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 32/38
No. Rev :1 8 Mei 2020 Paraf :

STANDARD
DESAIN
No. KEGIATAN YA TIDAK KETERANGAN
KRITERIA
PENERIMAAN
Penggambaran
Hasil Desain telah
sesuai

E
EVALUASI DAN ANALISA DATA

1 Perhitungan Volume Pekerjaan (BOQ)

Perhitungan
Volume
Pekerjaan (BOQ)
telah sesuai
Analisa Harga Satuan dan
2
Penyusunan RAB
Analisa Harga
Satuan dan
Penyusunan RAB
telah sesuai
Penyusunan Rencana Kegiatan
3
Selanjutnya (DD dan Konstruksi)
Penyusunan
Rencana
Kegiatan
Selanjutnya (DD
dan Konstruksi)
telah sesuai
4
Analisa Kelayakan Proyek
Analisa
Kelayakan Proyek
telah sesuai

F
PENATAAN KAWASAN WADUK

1 Pemetaan & Inventarisasi Kawasan

Pemetaan &
Inventarisasi
Kawasan telah
sesuai
2 Analisa Data Kawasan
Analisa Data
Kawasan telah
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 33/38
No. Rev :1 8 Mei 2020 Paraf :

STANDARD
DESAIN
No. KEGIATAN YA TIDAK KETERANGAN
KRITERIA
PENERIMAAN
sesuai

3 Perumusan Penataan Kawasan

Perumusan
Penataan
Kawasan telah
sesuai
4 Penataan Kawasan
Penataan
Kawasan telah
sesuai

G PENYUSUNAN LAPORAN DAN DISKUSI


1 Laporan
a Laporan Rencana Mutu Kontrak
(RMK)
Laporan Rencana
Mutu Kontrak
(RMK) telah
sesuai
b Laporan Pendahuluan (Inception)

Laporan
Pendahuluan
(Inception) telah
sesuai; 5 Copy
c Laporan Bulanan
Laporan Bulanan
telah sesuai; 5
Copy
d Laporan Antara
Laporan Antara
telah sesuai; 5
Copy
e Laporan Akhir Sementara (Draf Final)

Laporan Akhir
Sementara (Draf
Final) telah
sesuai; 10 Copy
f Laporan Akhir (Final)
Laporan Akhir
(Final) telah
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 34/38
No. Rev :1 8 Mei 2020 Paraf :

STANDARD
DESAIN
No. KEGIATAN YA TIDAK KETERANGAN
KRITERIA
PENERIMAAN
sesuai; 10 Copy

g Laporan Ringkas
Laporan Ringkas
telah sesuai; 10
Copy
h Laporan Penunjang :
- Laporan Pengukuran Topografi

- Laporan
Pengukuran
Topografi telah
sesuai; 5 Copy
- Laporan Sosial Ekonomi
- Laporan Sosial
Ekonomi telah
sesuai; 5 Copy
- Diskripsi BM & CP
- Diskripsi BM &
CP telah sesuai;
5 Copy
- Lap. Mekanika Tanah
- Lap. Mekanika
Tanah telah
sesuai; 5 Copy
- Lap. Hidrologi
- Lap. Hidrologi
telah sesuai; 5
Copy
- Lap Survey Inventarisasi trmsk Buku
Ukur
- Lap Survey
Inventarisasi
trmsk Buku Ukur
telah sesuai; 5
Copy
- Lap Nota Desain dan Dokumen
Desain

- Lap Nota Desain


dan Dokumen
Desain telah
sesuai; 5 Copy
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 35/38
No. Rev :1 8 Mei 2020 Paraf :

STANDARD
DESAIN
No. KEGIATAN YA TIDAK KETERANGAN
KRITERIA
PENERIMAAN
- Lap Spektek dan Dokumen Tender

- Lap Spektek
dan Dokumen
Tender telah
sesuai; 5 Copy
- Lap PKM
- Lap PKM telah
sesuai; 5 Copy
- Lap RAB & BOQ
- Lap RAB & BOQ
telah sesuai; 5
Copy
- Lap. OP
- Lap. OP telah
sesuai; 5 Copy
- Album foto dokumentasi
- Album foto
dokumentasi
telah sesuai; 5
Copy
i Album Gambar
- Album Gambar Pengukuran

- Album Gambar
Pengukuran telah
sesuai; 5 Copy
- Album Gambar Desain A3

- Album Gambar
Desain A3 telah
sesuai; 10 Copy
j Soft copy Laporan (eksternal Hardisk)

Soft copy
Laporan
(eksternal
Hardisk) telah
sesuai; 1 Buah
2 Diskusi/Presentase/Sosialisasi/Alih
Pengetahuan
a Pertemuan Konsultasi Masyarakat
(PKM)
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 36/38
No. Rev :1 8 Mei 2020 Paraf :

STANDARD
DESAIN
No. KEGIATAN YA TIDAK KETERANGAN
KRITERIA
PENERIMAAN
1 Notulen
Pertemuan
Konsultasi
Masyarakat
(PKM) telah
sesuai
2 Daftar hadir
Pertemuan
Konsultasi
Masyarakat
(PKM) telah
sesuai
3 Dokumentasi
Pertemuan
Konsultasi
Masyarakat
(PKM) telah
sesuai

b Diskusi Laporan Pendahuluan

1 Notulen diskusi
laporan
pendahuluan
telah sesuai
2 Daftar hadir
diskusi laporan
pendahuluan
telah sesuai
3 Dokumentasi
diskusi laporan
pendahuluan
telah sesuai

c Diskusi Laporan Antara

1 Notulen diskusi
Draft laporan
Antara telah
sesuai
2 Daftar hadir
diskusi Draft
laporan Antara
telah sesuai
3 Dokumentasi
diskusi Draft
laporan Antara
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 37/38
No. Rev :1 8 Mei 2020 Paraf :

STANDARD
DESAIN
No. KEGIATAN YA TIDAK KETERANGAN
KRITERIA
PENERIMAAN
telah sesuai

d Diskusi Laporan Akhir

1 Notulen diskusi
laporan akhir
telah sesuai
2 Daftar hadir
diskusi laporan
akhir telah sesuai
3 Dokumentasi
diskusi laporan
akhir telah sesuai

e Diskusi dengan Direktorat Pembina

1 Notulen diskusi
dengan Direktorat
Pembina telah
sesuai
2 Daftar hadir
diskusi dengan
Direktorat
Pembina telah
sesuai
3 Dokumentasi
diskusi dengan
Direktorat
Pembina telah
sesuai
PROGRAM MUTU KEGIATAN
Pekerjaa : Detail Desain Penataan Waduk Bunder
No. Dok :01/PMK/CKSW-EK/2020 Tanggal diterbitkan : Hal. : 38/38
No. Rev :1 8 Mei 2020 Paraf :

BAB VI. PELAPORAN

6. PELAPORAN

RENCANA
NO JENIS LAPORAN RENCANA ISI LAPORAN
PENYERAHAN
1 Laporan Pendahuluan - Rencana kerja dan struktur organisasi Bulan ke-1 minggu ke-4
- Kajian hasil survei pendahuluan dan hasil survei
- Identifikasi lokasi

2 Laporan Bulanan - Progres pekerjaan yang berlangsung Setiap bulan


- Kendala dan solusi yang diberikan
- Rencana kerja di bulan berikutnya

3 Laporan Antara - Identifikasi lingkup kegiatan lebih detail Bulan ke-5 minggu ke-1
- Penetapan lokasi desain
- Hasil survei sosial ekonomi
- Analisis awal

4 Laporan Akhir Sementara - Kajian final secara keselurahan Bulan ke-8 minggu ke-1
- Penataan kawasan
- Produk gambar

5 Laporan Akhir (Final) - Hasil revisi dari laporan akhir sementara Bulan ke-8 minggu ke-4