Anda di halaman 1dari 20

TUGAS BESAR

MANAJEMEN SUPERVISI DAN METODE PELAKSANAAN


KONSTRUKSI

OLEH :

DWI RANTY RAMADHANI


412 20 030
3A D4 MANAJEMEN JASA KONSTRUKSI

D4 MANAJEMEN JASA KONSTRUKSi


JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI UJUNG PANDANG
2021/2022
DAFTAR DOKUMEN

1. STRUKTUR ORGANISASI KONSULTAN SUPERVISI DAN


JOB DESCRIPTION
2. BERITA ACARA HASIL PCM
3. DOKUMENTASI KONDISI 0%, 50%, DAN 100%
4. SHOP DRAWING
5. CONTRACT CHANGE ORDER ( CCO )
6. AMANDEMEN KONTRAK
7. ADENDUM KONTRAK
8. JUSTIFIKASI TEKNIS
9. LAPORAN HARIAN
10. LAPORAN MINGGUAN
11. LAPORAN CUACA
12. BERITA ACARA SHOW SHOUS MEETING (SCM)
13. BACK UP DATA QUALITY
14. BACK UP DATA QUANTITY
15. MONTHLY CERTIFICATE (MC)
16. AS BUILT DRAWING
17. PROVISIONAL HAND OVER (PHO)
18. FINAL HAND OVER (FHO)
TUGAS 1
STRUKTUR ORGANISASI
KONSULTAN SUPERVISI
DAN JOB DESCRIPTION
TUGAS 2
BERITA ACARA PRE
CONSTRUCTION
MEETING (PCM)
TUGAS 3
DOKUMENTASI KONDISI
0% 50% DAN 100%
TUGAS 4
SHOP DRAWING
TUGAS 5
CONTRACT CHANGE
ORDER (CCO)
TUGAS 6
AMANDEMEN KONTRAK
TUGAS 7
ADENDUM KONTRAK
TUGAS 8
JUSTIFIKASI TEKNIS
TUGAS 9
LAPORAN HARIAN
TUGAS 10
LAPORAN MINGGUAN
TUGAS 11
LAPORAN CUACA
TUGAS 12
BERITA ACARA SHOW
CHOUS MEETING (SCM)
TUGAS 13
BACK UP DATA QUALITY
TUGAS 14
BACK UP DATA
QUANTITY
TUGAS 15
MONTHLY CERTIFICATE
(MC)
TUGAS 16
AS BUILT DRAWING
TUGAS 17
PROVISIONAL HAND
OVER (PHO)
TUGAS 18
FINAL HAND OVER (FHO)

Anda mungkin juga menyukai