NAMA PROYEK : PEMBANGUNAN GEDUNG RA NURUL HIKHMAH

PEMILIK : YAYASAN BIRRUL MUNADI


LOKASI : DESA KEPONGPONGAN KEC. TALUN KAB. CIREBON
ANGGARAN : Rp 2.856.940.061
WAKTU PELAKSANAAN : 36 Minggu/+ 252 Hari

NO ITEM PEKERJAAN
HARGA PEK. (RP) PERSEN BOBOT PEK.(%)
I.1 Pengukuran dan pemasangan bouwplank 6049780,589 0,211757351
I.2 Pembuatan steiger dari bambu 5129280 0,179537543
I.3 Membongkar Bangunan (Mushola, WC, Tembok ) 4200000 0,147010435
PEKERJAAN LANTAI 1
II PEKERJAAN PONDASI TAPAK
II.1 Galian Tanah 1928445,3 0,067500377
II.2 Urugan Pasir 1927920 0,06748199
Membuat Pondasi Tapak
Pembesian 155736525 5,45116529
Bekisting 9.463.860,00 0,331258612
Beton AD. 1:2:3 9473906,506 0,331610265
II.3 Pasangan Batu AD 1:5 2656583,923 0,092987037
II.4 Urugan kembali bekas galian 6088549,564 0,213114361
III PEKERJAAN BETON/PEMBESIAN
III.1 SLOOF (S1 & S2)
III.1.1 Pembesian 183225939,6 6,413363097
III.1.2 Bekisting 3321325,35 0,116254639
III.1.3 Beton AD. 1:2:3 10639523,69 0,372409762
III.2 KOLOM (K1)
III.2.1 Pembesian 274280194,4 9,600488231
III.2.2 Bekisting 42323916,23 1,481442219
III.4.3 Beton AD. 1:2:3 74161,92 0,002595851
III.3 KOLOM (K2)
III.3.1 Pembesian 9873542,25 0,345598509
III.3.2 Bekisting 4062871,8 0,142210607
III.3.3 Beton AD. 1:2:3 87156,81 0,003050705
III.4 KOLOM (K3)
III.4.1 Pembesian 8647666,667 0,302689818
III.4.2 Bekisting 2992829,2 0,104756457
III.4.3 Beton AD. 1:2:3 74161,92 0,002595851
IV PEKERJAAN PASANGAN DINDING BATA
IV.1 Pasangan Dinding Bata AD. 1:5 26956901,13 0,943558512
IV.2 Plesteran Dinding Bata AD. 1:5 25414945,78 0,889586244
IV.3 Pasang Roster / Bata terawang 4186170 0,14652635
V PLAT BETON/CANOPY
V.4.1 Pembesian 494633520 17,31340208
V.4.2 Bekisting 115260213 4,034393809
V.4.3 Beton AD. 1:2:3 28722271,04 1,005350845
III.8 TANGGA
III.8.1 Pembesian 37131270 1,2996867
III.8.2 Bekisting 5097102,013 0,178411234
III.8.3 Beton AD. 1:2:3 2156130,446 0,075469922
V PEKERJAAN KUSEN PINTU DAN JENDELA
V.1 P1 1462611,86 0,051195049
V.2 P2 10386251,12 0,363544593
V.3 P3 3420000 0,119708497
V.4 J1 1117298,28 0,039108216
V.5 J2 1245698,28 0,043602535
V.6 B1 2166750 0,075841633
VII PEKERJAAN LANTAI
VII.1 Urugan tanah (t = 40 cm) 25284869,38 0,885033246
VII.2 Urugan Pasir (t = 5 cm) 1537350 0,053811069
VII.3 Beton tumbuk lantai AD. 1:3:6 4325312,5 0,151396683
VII.4 Pasangan lantai Keramik 40 x 40 cm 18733840 0,655730943
VIII PEKERJAAN KAMAR MANDI
VIII.1 Pasangan closet duduk INA 1.408.050,00 0,049285248
VIII.2 Pasangan keramik lantai KM 20x20 cm 1638851 0,057363857
VIII.3 Pasangan keramik Dinding KM 20x25 cm 5490015 0,192164165
VIII.4 Instalasi air bersih 1200000 0,042002981
VIII.5 Instalasi air kotor 1600000 0,056003975
VIII.6 Pasangan kran air Dia. 1/2" 498000 0,017431237
VIII.7 Pembuatan septictank dan rembesan 1647368,732 0,057661998
VIII.8 Pengadaan pompa air listrik 500000 0,017501242
VIII.9 Pengadaan reservoir/tandon air 650000 0,022751615
PEKERJAAN LANTAI 2
III.2.1 KOLOM (K1)
III.2.1.1 Pembesian 144357997 5,052888543
III.2.2.1 Bekisting 22275745,39 0,779706431
III.2.3.1 Beton AD. 1:2:3 1274292,67 0,044603409
III.3.1 KOLOM (K2)
III.3.1.1 Pembesian 3949416,9 0,138239404
III.3.2.1 Bekisting 1625148,72 0,056884243
III.3.3.1 Beton AD. 1:2:3 34862,724 0,001220282
III.4.1 KOLOM (K3)
III.4.1.1 Pembesian 17295333,33 0,605379636
III.4.2.1 Bekisting 5985658,4 0,209512915
III.4.3.1 Beton AD. 1:2:3 148323,84 0,005191703
III. 5 BALOK (B1)
III.5.1 Pembesian 458402270 16,04521832
III.5.2 Bekisting 91298707,24 3,195681578
III.5.3 Beton AD. 1:2:3 26618410,42 0,931710496
III.6 BALOK (B2)
III.6.1 Pembesian 118685041,2 4,154271306
III.6.2 Bekisting 29009323,08 1,015398379
III.6.3 Beton AD. 1:2:3 6891776,954 0,241229315
IV.1 PEKERJAAN PASANGAN DINDING BATA
IV.1.1 Pasangan Dinding Bata AD. 1:5 26956901,13 0,943558512
IV.2.1 Plesteran Dinding Bata AD. 1:5 25414945,78 0,889586244
IV.3.1 Pasang Roster / Bata terawang 4186170 0,14652635
V.1 PEKERJAAN KUSEN PINTU DAN JENDELA
V.1.1 P1 1462611,86 0,051195049
V.2.1 P2 10386251,12 0,363544593
V.3.1 P3 3420000 0,119708497
V.4.1 J1 5586491,4 0,195541078
V.5.1 J2 5605642,26 0,196211406
V.6.1 B1 2166750 0,075841633
PEKERJAAN KUDA-KUDA/ATAP
VI.1 Pasang Rangka Atap Baja Ringan 49976064 1,749286402
VI.2 Pasang Genteng Press Beton 51624262,68 1,80697745
VI.3 Pasang Nok Genteng 3609082,1 0,12632684
VI.4 Pasangan langit-langit rangka Plafond holo 2/4 (GRC) 50676199,11 1,77379287
VI.5 Pasangan list keliling gypsum 8988278,675 0,314612084
VII.1 PEKERJAAN LANTAI
VII.1.1 Urugan tanah (t = 40 cm) 25284869,38 0,885033246
VII.2.1 Urugan Pasir (t = 5 cm) 1537350 0,053811069
VII.3.1 Beton tumbuk lantai AD. 1:3:6 4325312,5 0,151396683
VII.4.1 Pasangan lantai Keramik 40 x 40 cm 18733840 0,655730943
VIII.1 PEKERJAAN KAMAR MANDI
VIII.1.1 Pasangan closet duduk INA 1.408.050,00 0,049285248
VIII.2.1 Pasangan keramik lantai KM 20x20 cm 1638851 0,057363857
VIII.3.1 Pasangan keramik Dinding KM 20x25 cm 5490015 0,192164165
VIII.4.1 Instalasi air bersih 1200000 0,042002981
VIII.5.1 Instalasi air kotor 1600000 0,056003975
VIII.6.1 Pasangan kran air Dia. 1/2" 498000 0,017431237
VIII.7.1 Pembuatan septictank dan rembesan 1647368,732 0,057661998
VIII.8.1 Pengadaan pompa air listrik 500000 0,017501242
VIII.9.1 Pengadaan reservoir/tandon air 650000 0,022751615
IX PEKERJAAN MENGECAT
IX.1 Pengecatan tembok dan langit-langit 20076937,25 0,702742683
X PEKERJAAN LISTRIK
X.1 Pemasangan listrik baru 1300 Watt 2000000 0,070004969
X.2 Pemasangan titik saklar 362120 0,0126751
X.2 Pemasangan titik saklar ganda 1810600 0,063375498
X.3 Pemasangan titik stop kontak 1458880 0,051064424
X.4 Pemasangan lampu downlight (lengkap) 18476760 0,646732504
XI PEKERJAAN LAIN
XII.1 Pemasangan Pagar besi 9450000 0,330773478
XII.2 Pembersihan Pekerjaan 800000 0,028001988
TOTAL 2856940061 100