STUDI KELAYAKAN
PEMBANGUNAN PLTN DI
KALIMANTAN BARAT
2020
LAPORAN AKHIR
DAFTAR ISI
JUDUL .................................................................................................................................................... i
DAFTAR ISI ............................................................................................................................................ ii
DAFTAR GAMBAR ................................................................................................................................. v
DAFTAR TABEL ...................................................................................................................................... ix
DAFTAR SINGKATAN ............................................................................................................................ xii
BAB I PENDAHULUAN .......................................................................................................................... 1
1.1. Latar Belakang ....................................................................................................................... 1
1.1.1. Dasar Hukum ....................................................................................................................... 2
1.1.2. Gambaran Umum Singkat ................................................................................................... 3
1.2. Maksud dan Tujuan ............................................................................................................... 5
1.3. Ruang Lingkup ....................................................................................................................... 5
1.3.1. Studi Sistem Kelistrikan ....................................................................................................... 5
1.3.2. Analisis Keuangan ............................................................................................................... 6
1.3.3. Analisis Ekonomi ................................................................................................................. 6
1.4. Tempat Pelaksanaan Kegiatan ............................................................................................... 7
BAB II TINJAUAN UMUM....................................................................................................................... 8
2.1. Gambaran Umum Teknologi PLTN ......................................................................................... 8
2.2. Teknologi Reaktor Berpendingin Air Ringan ......................................................................... 10
2.2.1. Teknologi Boiling Water Reactor (BWR)............................................................................ 10
2.2.2. Teknologi Pressure Water Reactor (PWR) ......................................................................... 11
2.2.3. Teknologi PLTN Small Modular Reactor (SMR).................................................................. 13
2.3. Tinjauan Studi Kelistrikan .................................................................................................... 14
2.4. Tinjauan Studi Keuangan ..................................................................................................... 17
2.5. Studi Kelayakan Ekonomi..................................................................................................... 20
BAB III METODOLOGI DAN DATA ........................................................................................................ 22
3.1. Metodologi Umum .............................................................................................................. 22
3.2. Pengumpulan Data dan Studi Literatur ............................................................................... 23
3.3. Inventarisasi Data dan Kunjungan Lapangan ....................................................................... 23
3.3.1. Sumber Data ..................................................................................................................... 23
3.3.2. Teknik Pengambilan Data .................................................................................................. 23
DAFTAR GAMBAR
Gambar 43. Proyeksi kWh Perkapita Kalimantan Barat Mengacu Target KEN .................................. 114
Gambar 44. Hasil Proyeksi Kebutuhan Tenaga Listrik Skenario Prosperity ....................................... 115
Gambar 45. Perbandingan Skenario Demand Forecasting ................................................................ 116
Gambar 46. Skenario Penambahan Pembangkit Per-tahun (2026-2030) ......................................... 118
Gambar 47. Skenario Penambahan Pembangkit Per-tahun (2031-2035) ......................................... 119
Gambar 48. Skenario Penambahan Pembangkit Per-tahun (2036-2040) ......................................... 120
Gambar 49. Skenario Penambahan Pembangkit Par-tahun (2041-2045) ......................................... 120
Gambar 50. Skenario Penambahan Pembangkit Par-tahun (2046-2050) ......................................... 121
Gambar 51. Proyeksi Tambahan Pembangkit Skenario BaU_X (Per Tahun)...................................... 122
Gambar 52. Proyeksi Tambahan Pembangkit Skenario Industrialisasi (Per Tahun) .......................... 122
Gambar 53. Proyeksi Tambahan Pembangkit Skenario Industrialisasi_X (Per Tahun) ...................... 123
Gambar 54. Proyeksi Tambahan Pembangkit Skenario Prosperity (Per Tahun) ................................ 123
Gambar 55. Proyeksi Tambahan Pembangkit Skenario Prosperity_X (Per Tahun) ............................ 124
Gambar 56. Proyeksi BPP Pembangkitan Rata-Rata (dalam cent US$) ............................................. 125
Gambar 57. Proyeksi Emisi CO2 (dalam Juta Ton) ............................................................................. 125
Gambar 58. Proyeksi Emisi SO2 (dalam Ton) ..................................................................................... 126
Gambar 59. Proyeksi Emisi NOx (dalam Ton) .................................................................................... 126
Gambar 60. Proyeksi Emisi PM2,5 (dalam Ton) .................................................................................. 127
Gambar 61. Proyeksi Bauran Energi Pembangkitan Tenaga Listrik ................................................... 127
Gambar 62. Perbandingan Proyeksi Tambahan Pembangkit Skenario BaU RUKN ............................ 129
Gambar 63. Perbandingan Proyeksi Tambahan Pembangkit Skenario BaU RUKN ............................ 130
Gambar 64. Perbandingan Proyeksi Tambahan Pembangkit Skenario BaU_X RUKN ........................ 130
Gambar 65 .Perbandingan Proyeksi Tambahan Pembangkit Skenario BaU_X RUKN ....................... 131
Gambar 66. Perbandingan Proyeksi Tambahan Pembangkit Skenario Industrialisasi RUKN............. 131
Gambar 67. Perbandingan Proyeksi Tambahan Pembangkit Skenario Industrialisasi RUKN............. 132
Gambar 68. Perbandingan Proyeksi Tambahan Pembangkit Skenario Industrialisasi_X RUKN ........ 132
Gambar 69. Perbandingan Proyeksi Tambahan Pembangkit Skenario Industrialisasi_X RUKN ........ 133
Gambar 70. Perbandingan Proyeksi Tambahan Pembangkit Skenario Prosperity Dengan Skenario
RUKN (Per Tahun 2021-2035) .......................................................................................................... 133
Gambar 71. Perbandingan Proyeksi Tambahan Pembangkit Skenario Prosperity ............................ 134
Gambar 72. Perbandingan Proyeksi Tambahan Pembangkit Skenario Prosperity_X Dengan Skenario
RUKN (Per Tahun 2021-2035) .......................................................................................................... 134
Gambar 73. Perbandingan Proyeksi Tambahan Pembangkit Skenario Prosperity ............................ 135
Gambar 74. Proyeksi BPP Pembangkitan Rata-Rata (dalam cent US$/kWh) .................................... 135
Gambar 75. Perbandingan Proyeksi Emisi CO2 kenario BaU, BaU_X dan Industrialisasi dengan
Skenario RUKN (dalam Juta Ton) ...................................................................................................... 136
Gambar 76. Perbandingan Proyeksi Emisi CO2 Skenario Industrialisasi_X, Prosperity dan Prosperity_X
dengan Skenario RUKN (dalam Juta Ton) .......................................................................................... 137
Gambar 77. Perbandingan Proyeksi Emisi SO2 Skenario BaU, BaU_X dan Industrialisasi dengan
Skenario RUKN (dalam Ton) .............................................................................................................. 137
Gambar 78. Perbandingan Proyeksi Emisi SO2 Skenario Industrialisasi_X, Prosperity dan Prosperity_X
dengan Skenario RUKN (dalam Ton) ................................................................................................. 138
Gambar 79. Perbandingan Proyeksi Emisi NOx Skenario BaU, BaU_X dan Industrialisasi dengan
Skenario RUKN (dalam Ton) .............................................................................................................. 138
Gambar 80. Perbandingan Proyeksi Emisi NOx Skenario Industrialisasi_X, Prosperity dan Prosperity_X
dengan Skenario RUKN (dalam Ton) ................................................................................................. 139
Gambar 81. Perbandingan Proyeksi Emisi PM 2.5 Skenario BaU, BaU_X dan Industrialisasi dengan
Skenario RUKN (dalam Ton) .............................................................................................................. 139
Gambar 82. Perbandingan Proyeksi Emisi PM 2.5 Skenario Industrialisasi_X, Prosperity dan
Prosperity_X dengan Skenario RUKN (dalam Ton) ............................................................................ 140
Gambar 83. Perbandingan Proyeksi Bauran Energi Skenario BaU, BaU_X dan Industrialisasi dengan
Skenario RUKN .................................................................................................................................. 140
Gambar 84. Perbandingan Proyeksi Bauran Energi Skenario Industrialisasi_X, Prosperity dan
Prosperity_X dengan Skenario RUKN ................................................................................................ 141
Gambar 85. Neraca Daya Skenario BaU ............................................................................................ 145
Gambar 86. Neraca Daya Skenario BaU_NC ..................................................................................... 149
Gambar 87. Neraca Daya Skenario BaU_X ........................................................................................ 153
Gambar 88. Neraca Daya Skenario BaU_X_NC ................................................................................. 157
Gambar 89. Neraca Daya Skenario Industrialisasi ............................................................................. 161
Gambar 90. Neraca Daya Skenario Industrialisasi_NC ...................................................................... 165
Gambar 91. Neraca Daya Skenario Industrialisasi_X......................................................................... 169
Gambar 92. Neraca Daya Skenario Industrialisasi_X_NC .................................................................. 173
Gambar 93. Neraca Daya Skenario Prosperity .................................................................................. 177
Gambar 94. Neraca Daya Skenario Proseperity_NC.......................................................................... 181
Gambar 95 Neraca Daya Skenario Prosperity_X ............................................................................... 185
Gambar 96. Neraca Daya Skenario Prosperity_X_NC ........................................................................ 189
Gambar 97. Contoh Penyederhaan Sistem pada Simulasi Hubung Singkat. ..................................... 192
Gambar 98. Pemodelan SUTT 2 Sirkit pada ETAP.............................................................................. 193
Gambar 99. Pemodelan Sistem Kelistrikan Kalimantan Barat (Sistem Khatulistiwa) ........................ 194
Gambar 100. Simulasi Aliran Daya Sistem Khatulistiwa dengan ....................................................... 197
Gambar 101. Simulasi Aliran Daya Sistem Interkoneksi Khatulistiwa-Barito-Mahakam-Serawak
(Skenario Balmorel-BaU) ................................................................................................................... 201
Gambar 102. Simulasi Aliran Daya Sistem Barito (Skenario Balmorel-BaU) ...................................... 202
Gambar 103. Simulasi Aliran Daya Sistem Mahakam (Skenario Balmorel-BaU) ............................... 203
Gambar 104. Kontribusi Arus Hubung Singkat Pada PLTN (Skenario Balmorel-BaU) ........................ 205
Gambar 105. Kontribusi Arus Hubung Singkat Pada Gardu Induk Singkawang ................................. 205
Gambar 106. Kontribusi Arus Hubung Singkat Pada Gardu Induk Mempawah ................................ 206
Gambar 107. Kontribusi Arus Hubung Singkat Pada Setiap Gardu Induk (Skenario Balmorel-BaU).. 206
Gambar 108. Simulasi Stabilitas Frekuensi Sistem Interkoneksi Khatulistiwa-Barito-Mahakam-
Serawak Dengan Pelepasan PLTN (Skenario Balmorel-BaU) ............................................................. 208
Gambar 109. Simulasi Stabilitas Sistem Interkoneksi Khatulistiwa-Barito-Mahakam-Serawak Dengan
Pelepasan PLTN (Skenario Balmorel-BaU) ........................................................................................ 208
Gambar 110. Simulasi Aliran Daya Sistem Interkoneksi Khatulistiwa-Barito-Mahakam-Serawak
(Skenario Balmorel-Industrialisasi) ................................................................................................... 211
Gambar 111. Simulasi Aliran daya Sistem Barito (Skenario Balmorel-Industrialisasi) ....................... 213
Gambar 112. Simulasi Aliran Daya Sistem Mahakam (Skenario Balmorel-Industrialisasi) ................ 214
Gambar 113. Simulasi Aliran Daya Sistem Khatulistiwa-Serawak Dengan Pembangkitan 100%
(Skenario Balmorel-Prosperity) ......................................................................................................... 218
Gambar 114. Simulasi Aliran Daya Sistem Khatulistiwa-Serawak Dengan Pembangkitan 80% (Skenario
Balmorel-Prosperity) ......................................................................................................................... 219
Gambar 115. Grafik Perbandingan Levelized Tariff Antar PLTN Hasil Simulasi. ................................ 233
Gambar 116. Grafik Porsi Komponen Pada Levelized Tariff Antar PLTN Hasil Simulasi..................... 234
Gambar 117 Model Deterministik dan Stokastik [105] ..................................................................... 236
Gambar 118. Hasil Simulasi Levelized Tariff SMR 1 100 MW ............................................................ 239
Gambar 119. Hasil Simulasi IRR On Equity SMR 1 100 MW .............................................................. 240
Gambar 120. Hasil Simulasi IRR On Project PLTN SMR 1 100 MW .................................................... 241
Gambar 121. Hasil Simulasi NPV On Equity PLTN SMR 1 100 MW .................................................... 242
Gambar 122. Hasil Simulasi NPV On Project PLTN SMR 1 100 MW ................................................... 243
Gambar 123. Hasil Simulasi Overall Project Cost PLTN SMR 1 100 MW ............................................ 244
Gambar 124. Hasil Analisis Sensitivitas IRR On Equity....................................................................... 245
Gambar 125. Hasil Analisis Sensitivitas IRR On Project Untuk PLTN SMR 1 100 MW ........................ 246
Gambar 126. Hasil Analisis Sensitivitas LCOE Untuk PLTN SMR 1 100 MW ...................................... 247
Gambar 127. Hasil Simulasi Levelized Tariff PLTN LR 2 2x1200 MW ................................................. 249
Gambar 128. Hasil Simulasi IRR On Equity PLTN LR 2 2x1200 MW ................................................... 250
Gambar 129. Hasil Simulasi IRR On Project Untuk PLTN LR 2 ............................................................ 251
Gambar 130. Hasil Simulasi NPV On Equity Untuk PLTN LR 2 ........................................................... 252
Gambar 131. Hasil Simulasi NPV On Project Untuk PLTN LR 2 .......................................................... 253
Gambar 132. Hasil Simulasi Overall Project Costs PLTN LR 2 ............................................................ 254
Gambar 133. Hasil Analisis Sensitivitas NPV On Project PLTN LR 2 ................................................... 255
Gambar 134. Hasil Analisis Sensitivitas NPV On Equity PLTN LR 2 .................................................... 256
Gambar 135. Hasil Analisis Sensitivitas Levelized Tariff Untuk PLTN LR 2 ......................................... 257
Gambar 136. Hasil Analisis Sensitivitas Overall Project Cost Untuk PLTN LR 2 .................................. 258
Gambar 137. BPP Skenario B_NC (¢US$ /kWh) ................................................................................ 263
Gambar 138. BPP Skenario I_NC (¢US$ /kWh).................................................................................. 264
Gambar 139. BPP Skenario P_NC (¢US$ /kWh)................................................................................. 264
Gambar 140. Emisi CO2 Skenario B_NC (Juta Ton) ............................................................................ 265
Gambar 141. Emisi CO2 Skenario I_NC (Juta Ton) ............................................................................. 266
Gambar 142. Emisi CO2 Skenario P_NC (Juta Ton) ............................................................................ 266
Gambar 143. Tren Produksi Listrik Dari PLTA Secara Nasional.......................................................... 268
DAFTAR TABEL
DAFTAR SINGKATAN
BAB I
PENDAHULUAN
Air bersih, makanan, dan energi merupakan kebutuhan dasar untuk manusia. Ketiga
kebutuhan mendasar ini merupakan nexus energy yang saling berhubungan antar satu
dengan yang lainnya. Semua aktivitas manusia membutuhkan energi, apabila dikategorikan
berdasarkan jenis bahan bakar maka yang paling sering dipakai setelah bahan bakar minyak
adalah energi listrik.
- Pembangkit dari PLN adalah pembangkit PLTD sebesar 59 MW, PLTG 29 MW, PLTU
Batubara 21 MW.
- Pembangkit dari IPP Indonesian Power adalah pembangkit PLTMG sebesar 100 MW
dan PLTBM (Biomassa) sebesar 10 MW.
Dilihat dari kapasitas pembangkit pada tahun 2019 tersebut, Kalimantan Barat
memerlukan penambahan kapasitas pembangkit untuk memenuhi beban puncak tanpa
impor energi dari SESco. Opsi pembangkit listrik tenaga nuklir (PLTN) untuk pembangkit baru
di Kalimantan Barat mempunyai 2 manfaat. Pertama, PLTN akan mendorong potensi
pertumbuhan ekonomi. Kedua, PLTN dapat berkontribusi untuk menjaga kestabilan suplai
listrik pada jaringan di wilayah Provinsi Kalimantan lainnya sehingga mengurangi
ketergantungan listrik impor.
Kalimantan Barat memiliki kondisi geografis yang cocok untuk pembangunan PLTN.
Kalimantan Barat tidak masuk dalam ring of fire di kepulauan Indonesia sehingga potensi
terjadinya gempa dan tsunami sangat kecil. Salah satu alasan mengapa PLTN di Kalimantan
Barat menarik adalah karena kondisi tersebut. PLTN juga memiliki stabilitas yang tinggi untuk
Sebagian besar kebutuhan energi listrik nasional saat ini dipenuhi oleh energi fosil
seperti batubara, minyak dan gas bumi. Kapasitas pembangkit yang terpasang pada tahun 2018
masih didominasi oleh batubara (50%) kemudian diikuti gas bumi (29%), bahan bakar minyak
(7%) dan energi terbarukan (1,4%) [3]. Ketergantungan terhadap energi fosil berdampak pada
keamanan energi nasional akibat cadangan bahan bakar fosil yang terbatas, kenaikan harga
energi fosil, dan emisi gas rumah kaca (GRK). Untuk itu, pemerintah menerapkan kebijakan
diversifikasi energi untuk menjamin ketersediaan pasokan energi yang terjangkau dan ramah
ingkungan. Salah satu energi yang dapat digunakan dalam kebijakan diversifikasi energi adalah
energi nuklir. U.S Energy Information Administration (EIA) mencatat bahwa PLTN memiliki
faktor kapasitas tertinggi dibandingkan pembangkit listrik lainnya sebagaimana pada Gambar
1 [4]. Tingginya faktor kapasitas PLTN mengindikasikan PLTN sebagai pembangkit listirk yang
handal dan juga memiliki biaya operasional termurah.
Indonesia sudah mempersiapkan pembangunan PLTN sejak lama. Sejauh ini, Indonesia
telah membangun dan mengoperasikan tiga reaktor riset. Reaktor riset pertama adalah reaktor
TRIGA Mark III kapasitas 250 kWt yang dikomisioning pada tahun 1964 dan berlokasi di
Bandung. Reaktor kedua adalah reaktor Kartini kapasitas 100kW yang dikomisioning pada
tahun 1979 dan berlokasi di Yogyakarta. Reaktor terakhir adalah reaktor MPR RSG-GA
Siwabessy kapasitas 30 MW yang dikomisioning pada tahun 1987 dan berlokasi di Serpong,
Banten.
Lingkup kegiatan PRN pada fase awal merupakan kegiatan pra proyek yang salah
satunya adalah studi kelayakan PLTN. Kegiatan studi kelayakan ini bertujuan untuk menilai
kelayakan proyek PLTN di Kalimantan Barat. Lingkup kegiatan studi kelayakan meliputi analisis
aspek kelistrikan, aspek ekonomi, dan aspek keuangan.
Kegiatan ini dilakukan bersama dengan BATAN untuk menilai kelayakan pembangunan
PLTN skala komersial di Kalimantan Barat yang meliputi kajian untuk menentukan nilai
kelayakan rencana pembangunan ditinjau dari aspek kelistrikan, ekonomi, dan keuangan.
Lokasi studi kelayakan ini adalah kawasan Pantai Gosong dan Pulau Semesa, desa Sungai
Raya, Kecamatan Sungai Raya Kepulauan, Kabupaten Bengkayang, Provinsi Kalimantan Barat
dengan luas 500 hektar. Secara geografi, lokasi studi berada di posisi koordinat 108051’30”BB -
10805’23”BT dan 0043’50”LU - 0041’15”LS sebagaimana pada Gambar 1.2.
Gambar 2. Lokasi Titik Nol di Pulau Semesa dan di Daratan Pantai Gosong
BAB II
TINJAUAN UMUM
Prinsip kerja PLTN hampir sama dengan cara kerja PLTU. Jika PLTU
menggunakan steam generator untuk menghasilkan energi panasnya, PLTN menggunakan
reaktor nuklir fisi. Reaktor nuklir adalah suatu tempat terjadinya reaksi pembelahan inti.
Reaksi nuklir fisi dari bahan bakar nuklir tersebut menghasilkan panas untuk memanaskan air
di dalam steam generator sehingga menghasilkan uap. Uap tersebut kemudian digunakan
untuk memutar turbin generator dan menghasilkan listrik. Listrik yang dihasilkan diteruskan
ke jaringan transmisi sedangkan uap yang telah dimanfaatkan memutar turbin kemudian
dikondensasikan menjadi air dan dipompakan kembali ke steam generator.
Data International Atomic Energy Agency (IAEA) menunjukkan bahwa ada 5 tipe PLTN
di dunia, yaitu:
1. Reaktor Air Ringan (Light Water Reactor, LWR), yang terbagi menjadi:
2. Reaktor Air Berat Bertekanan (Pressurized Heavy Water Moderated and Cooled
Reactor, PHWR).
Sejak PLTN komersial pertama dioperasikan pada tahun 50-an, teknologi PLTN
mengalami perkembangan yang cukup pesat. Jumlah PLTN yang telah dioperasikan di seluruh
dunia mencapai 446 unit dengan total kapasitas 392 GW sebagaimana pada Gambar 3. 446
PLTN tersebut tersebar di 35 negara di seluruh dunia dengan jumlah PLTN terbanyak di dunia
adalah Amerika Serikat memiliki (94 unit) disusul dengan Perancis (56), Tiongkok (49), Rusia
(38), dan Jepang (33) [8]. Negara dengan kontribusi energi nuklir terbesar dalam sistem
bauran energi adalah Perancis (71,1%,), Slovakia (55%), Ukraina (53%), dan Hongaria (50,6%).
Negara pengguna lainnya mempunyai kontribusi nuklir kurang dari 50% [8].
Gambar 4 menunjukkan bahwa 82% dari 446 unit PLTN yang beroperasi saat ini adalah
PLTN teknologi LWR yang terbagi lagi menjadi PWR (66%) dan BWR (16%) [8]. Reaktor ini pada
awalnya dirancang untuk tenaga penggerak kapal selam angkatan laut Amerika [9]. Kedua
tipe reaktor ini menggunakan air ringan sebagai bahan pendingin dan moderator. Selain itu,
reaktor LWR menggunakan Uranium dengan pengayaan rendah sekitar 2 – 4 % (bukan
Uranium alam karena sifat air yang menyerap neutron). Kemampuan air dalam memoderasi
neutron (menurunkan kecepatan/ energi neutron) sangat baik. Oleh karena itu, ukuran teras
reaktor menjadi lebih kecil (kompak) bila dibandingkan dengan reaktor nuklir tipe reaktor gas
dan reaktor air berat.
Pada tahun 1981, perusahaan Toshiba, General Electric, dan Hitachi melakukan kerja
sama dengan perusahaan Tokyo Electric Power Co. Inc. untuk memulai suatu proyek
pengembangan patungan dalam rangka meningkatkan unjuk kerja sistim Reaktor Air Didih
dengan memperkenalkan Reaktor Air Didih Tingkat Lanjut atau A-BWR (Advanced Boiling
Water Reactor). Kapasitas A-BWR dirancang lebih besar untuk mempertinggi keuntungan
ekonomis. Di samping itu, beberapa komponen reaktor juga mengalami peningkatan, seperti
peningkatan dalam fraksi bakar, penyempurnaan sistim pompa sirkulasi pendingin,
mekanisme penggerak batang kendali dan lain-lain.
Teknologi PWR atau Pressurized Water Reactor juga menggunakan H2O sebagai
pendingin sekaligus moderator. Berbeda dengan BWR, PWR menggunakan dua macam
pendingin yaitu pendingin primer dan sekunder [10]. Panas yang dihasilkan dari reaksi fisi
dipakai untuk memanaskan air pendingin primer. Teknologi PWR mempunyai alat pengontrol
tekanan (pessurizer) yang dipakai untuk mempertahankan tekanan sistem pendingin primer.
Sistem pressurizer terdiri atas sebuah tangki yang dilengkapi dengan pemanas listrik dan
penyemprot air. Jika tekanan dalam teras reaktor berkurang, pemanas listrik akan
memanaskan air yang terdapat di dalam tangki pressurizer sehingga terbentuk uap tambahan
yang akan menaikkan tekanan dalam sistem pendingin primer. Sebaliknya apabila tekanan
dalam sistem pendingin primer bertambah, sistem penyemprot air akan mengembunkan
sebagian uap sehingga tekanan uap berkurang dan sistem pendingin primer akan kembali ke
keadaan semula. Tekanan pada sistem pendingin primer dipertahankan pada posisi 150 atm
untuk mencegah agar air pendingin primer tidak mendidih pada suhu sekitar 300 oC. Pada
tekanan udara normal, air akan mendidih dan menguap pada suhu 100 oC.
Dalam proses kerjanya sebagaimana pada Gambar 6, air pendingin primer dialirkan ke
sistim pembangkit uap sehingga terjadi pertukaran panas antara sistem pendingin primer dan
sistem pendingin sekunder. Dalam kedua pendingin, proses yang terjadi hanya pertukaran
panas tanpa terjadi kontak atau percampuran karena adanya sistem pipa yang memisahkan
kedua pendingin tersebut. Pertukaran panas menyebabkan air pendingin sekunder menguap.
Tekanan pada sistim pendingin sekunder dipertahankan pada tekanan udara normal sehingga
air menguap pada suhu 100 oC. Uap yang terbentuk di dalam sistem pembangkit uap ini
selanjutnya dialirkan untuk memutar turbin.
Sistem kerja PWR lebih rumit dibandingkan dengan sistem BWR [10]. Akan tetapi,
teknologi PWR mempunyai tingkat keamanan yang lebih tinggi karena perputaran sistem
pendingin primernya yang lebih tertutup. Akibatnya, kebocoran bahan radioaktif di dalam
teras reaktor tidak akan menyebabkan kontaminasi pada turbin. Sebaliknya, kebocoran
bahan radioaktif yang terlarut dalam air pendingin primer pada teknologi BWR dapat
menyebabkan terjadinya kontaminasi pada turbin. Kelebihan PWR lainnya adalah koefisien
reaktivitas negatif sehingga apabila terjadi kenaikan suhu dalam teras reaktor secara
mendadak, maka daya reaktor akan segera turun dengan sendirinya. Namun karena
menggunakan dua sistim pendingin, maka efisiensi termal PWR lebih rendah dibandingkan
dengan BWR [10].
Teknologi PWR memiliki beberapa jenis variasi desain teknologi yang dikembangkan
oleh perusahaan yang berbeda. Beberapa perusahaan pengembang PLTN-PWR adalah
Westinghouse (Amerika Serikat), Mistubishi (Jepang), KHNP (Korea Selatan), Gidropress
(Rusia), dan AREVA (Perancis). Negara Tiongkok juga sedang mengembangkan desain PLTN-
PWR hasil alih teknologi dari PWR Westinghouse dan AREVA. Walaupun begitu, teknologi
PWR yang dikembangkan berbagai tersebut mempunyai persamaan berupa penggunaan
sistem pendingin primer dan sistem pendingin sekunder, tekanan sistem pendingin primer
sebesar 15,1 MPa, dan penggunaan pressurizer untuk menjaga kestabilan tekanan sistem
pendingin primer.
Small modular reactors (SMRs) merupakan salah satu teknologi nuklir yang sedang
dikembangkan. Menurut IAEA, SMR adalah PLTN yang memiliki kapasitas dibawah 300 MW.
Umumnya, SMR didesain dengan teknologi moduler yang dipabrikasi langsung dari pabrik
untuk mempercepat waktu konstruksi [12]. Karakteristik utama SMR adalah reaktor dapat
diproduksi langsung di pabrik dan kemudian dikirim ke lokasi PLTN menggunakan truk
sebagaimana ilustrasi pada Gambar 7. Karakteristik ini memberikan keuntungan berupa
kualitas manufaktur lebih baik, dan standarisasi lebih mudah. Kelebihan teknologi SMR
selengkapnya adalah [13] :
• Daya yang rendah dan karakteristik modular sehingga reaktor dapat dibuat di lingkungan
pabrik yang terkontrol dan kemudian dipasang langsung pada lokasi tersebut.
Pemasangan dapat dilakukan per modul sehingga kualitas dan efisiensi proyek
meningkat.
• Daya yang fleksibel dan mudah diadaptasi terhadap lokasi dengan beban listrik yang
rendah.
• Pemeliharaan tiap modul dapat dikelola secara mandiri. Sebagai contoh, refueling pada
suatu modul dapat dilakukan ketika modul lain sedang beroperasi.
• Kemungkinan untuk mengubur seluruh atau sebagian modul dibawah tanah untuk
meningkatkan keamanan, khususnya jika terjadi serangan udara.
• Dapat digunakan sebagai desalinasi jika dipasang pada lokasi terpencil.
Sistem kelistrikan Kalimantan Barat dikelola oleh PLN Wilayah Kalimantan Barat.
Sistem kelistrikan tersebut terdiri atas satu sistem interkoneksi 150 kV dan beberapa sistem
isolated. Sistem interkoneksi meliputi sekitar Pontianak hingga Singkawang. Sistem isolated
terdiri atas sistem Sambas, Bengkayang, Ngabang, Sanggau, Sekadau, Sintang, Nanga Pinoh,
Putussibau, Ketapang, Sukadana, dan sistem tersebar. Kapasitas terpasang pembangkit listrik
pada tahun 2019 sebesar 519 Mwe dengan daya mampu 444 MWe yang didominasi oleh PLTD
untuk memenuhi kebutuhan yaitu beban puncak 440 MWe [1]. Sebagian kapasitas tersebut
merupakan pembelian listrik dari Serawak Malaysia dengan tarif sekitar 7-8 ¢US$/kWh (230
MWe yang terdiri dari 130 MWe sebagai peaker, 100 MWe sebagai baseload) dengan kontrak
sampai dengan tahun 2021.
1. Kawasan industri Tayan yang membutuhkan pasokan listrik sebesar 800 MWe untuk
pengembangan industri Bauksit/ alumina.
2. Kawasan industri Toho yang membutuhkan pasokan listrik sebesar 600 MWe untuk
pengembangan industri bauksit/ alumina.
3. Kawasan industri Semparuk yang membutuhkan pasokan listrik sebesar 400 MWe
untuk pengembangan perkebunan dan industri lainnya.
4. Kawasan industri Mandor yang membutuhkan pasokan listrik sebesar 350 MWe untuk
pengembangan industri pengolahan dan perkebunan karet.
5. Kawasan ekonomi perbatasan yang membutuhkan pasokan listrik sebesar 200 MWe.
Elastisitas yang didapat dari pendekatan ekonomi tersebut kemudian digunakan untuk
proyeksi permintaan energi [24, 25]. Model proyeksi permintaan energi yang paling umum
digunakan adalah Long-range Energy Alternatives Planning System (LEAP) [26, 27]. Kelebihan
LEAP adalah metode perhitungan yang sederhana yaitu perkalian antara, misal, skenario
proyeksi pertumbuhan ekonomi dengan elastisitas pendapatan ke permintaan energi [28].
Oleh karena itu, banyak studi yang menggunakan LEAP untuk analisis pemenuhan kebutuhan
listrik di Indonesia ataupun suatu sistem ketenagalistrikan [29-35]. LEAP sendiri telah
digunakan oleh Kementerian ESDM dan pemerintah daerah dalam penyusunan Rencana
Umum Energi Nasional (RUEN) dan Rencana Umum Energi Daerah (RUED).
• Jumlah penduduk;
• Pertumbuhan penduduk;
• Pertumbuhan pendapatan domestik regional bruto (PDRB);
• Inflasi;
• Penjualan tenaga listrik per sektor;
• Jumlah pelanggan listrik per sektor;
Akan tetapi, PLN [28] hanya melakukan proyeksi hingga tahun 2028. Oleh karena itu,
kajian baru diperlukan untuk proyeksi hingga 2050 dengan mempertimbangkan pertumbuhan
ekonomi dan penduduk.
60
Proyeksi permintaan listrik (GWh)
RUED
50
PLN
40
30
20
10
-
2015
2020
2025
2030
2035
2040
2045
2050
Tahun
beberapa negara. Sebaliknya, pada tingkat diskonto 10%, biaya pembangkitan PLTN
umumnya lebih mahal dibandingkan PLTU dan PLTGU kecuali di Korea Selatan.
Dalam beberapa tahun terakhir, minat terhadap SMR meningkat karena kemampuan
SMR untuk memenuhi pasokan energi listrik pada wilayah terpencil dan waktu konstruksi
yang relatif lebih cepat dibandingkan dengan PLTN besar. Teknologi SMR mempunyai
kapasitas kurang dari 300 MWe dan dapat dibangun secara modular. Pembangunan SMR
lebih cepat sehingga lebih cepat juga mendapatkan pendapatan dari penjualan listrik.
Penghematan biaya dari teknologi SMR lainnya adalah:
• Biaya bunga selama konstruksi (Interest During Construction, IDC) lebih rendah karena
konstruksi yang lebih cepat.
• Biaya konstruksi, perizinan, dan risiko operasi lebih rendah karena pengendalian mutu
yang lebih baik.
Dengan keunggulan tersebut, SMR diharapkan memiliki biaya konstruksi per kWe yang
lebih rendah daripada PLTN besar. Namun, biaya SMR akan lebih mahal apabila dibangun
dalam satuan unit kecil. Jika SMR diproduksi secara seri dalam kondisi modular, biaya
pembangkitan SMR cenderung lebih murah meskipun SMR akan memiliki biaya operasional
yang lebih tinggi. Secara umum, biaya SMR terletak di antara PLTU dan PLTN kapasitas besar.
Sebagaimana pada PLTN kapasitas besar, biaya modal SMR meliputi biaya rekayasa,
pengadaan dan konstruksi (EPC), biaya pemilik (owner cost), dan biaya perizinan. Total biaya
modal adalah biaya sesaat ditambah kontinjensi dan biaya finansial. Pembangunan unit SMR
membutuhkan waktu konstruksi yang lebih pendek sehingga mengurangi biaya konstruksi per
kWe. Perkiraan Nuclear Energy Agency-NEA menunjukkan bahwa kombinasi faktor-faktor ini
akan menurunkan total biaya dan biaya per kWe dari SMR sehingga [47]. Produksi listrik dari
kapasitas SMR awal akan memudahkan kondisi pembiayaan investasi kapasitas berikutnya.
Peningkatan kapasitas yang bertahap seperti itu memungkinkan pengelolaan risiko keuangan
yang lebih baik yang terkait dengan proyek padat modal berjangka waktu lama [48].
Faktor lain yang menekan biaya investasi SMR adalah struktur dan manajemen proyek.
Biaya investasi PLTN skala besar terus meningkat dalam satu decade terakhir karena pengaruh
perjanjian vendor/ pemasok dan manajemen risiko (meningkatkan biaya sebesar 70 %),
kenaikan harga komoditas (menaikkan biaya sebesar 25%), dan meningkatnya biaya pemilik
(sekitar 17,5%). Akumulasi faktor-faktor ini berdampak pada peningkatan biaya PLTN skala
besar hingga lebih dari dua kali selama periode 2004 hingga 2011. Sebaliknya, SMR memiliki
rantai pasokan yang lebih terintegrasi dan mengurangi jumlah subkontraktor untuk bagian
nuklir (nuclear island). Jumlah subkontraktor yang sedikit akan mengurangi risiko dan
penggandaan biaya kontinjensi. Sebagai contoh, biaya konstruksi untuk NuScale 684 MWe
(net) pertama diperkirakan sekitar US$ 3 miliar dengan jadwal pembangunan sekitar 54 bulan.
Contoh lain adalah PLTN SMART 100 MWe pertama di Arab Saudi diperkirakan akan
membutuhkan biaya investasi sebesar US$ 1 miliar. Untuk reaktor berpendingin gas suhu
tinggi (HTGR) Tiongkok, World Nuclear Association, Feb 2019 memperkirakan biaya investasi
HTGR 655 MWe sekitar 15 - 20% lebih tinggi daripada biaya 600 MWe PWR konvensional atau
sekitar US$ 6.000 /kWe. Dibandingkan PLTN skala besar, biaya variabel (O&M dan biaya
bahan bakar) untuk SMR akan lebih tinggi karena persyaratan kepegawaian yang besar, biaya
bahan bakar yang tinggi, dan sumber daya yang dibutuhkan untuk mempertahankan
tongkang dan infrastruktur pantai. Biaya bahan bakar SMR lebih tinggi karena SMR
mempunyai ukuran teras yang lebih kecil dan penggunaan bahan bakar yang kurang efisien.
NEA [49] memperkirakan biaya listrik yang dihasilkan oleh PLTN SMR mencapai 20 ¢US$
/kWh.
CBA juga umum digunakan untuk analisis teknologi nuklir. Kennedy [51]
membandingkan manfaat dan biaya beberapa opsi pembangkit listrik baru untuk Inggris yaitu
PLTN, Pembangkit Listrik Tenaga Gas (PLTG), Pembangkit Listrik Tenaga Bayu (PLTB) on-shore
dan off-shore, PLTU dengan carbon capture storage (CCS), dan teknologi energi laut Severn
Barrage. Kennedy [51] menggunakan asumsi 3 harga karbon yaitu €15/ton-CO2e, €25/ton-
CO2e, dan €36/ton-CO2e. Ketiga skenario ini menghasilkan manfaat pengurangan karbon
masing-masing sebesar £25,2 juta/GW, £42,8 juta/GW, dan £61,9 juta/GW. Hasil analisis
adalah PLTN mempunyai manfaat ketahanan nasional terhadap kenaikan harga gas. Salah satu
studi lain terkait CBA PLTN adalah Leurent, et al. [52] yang mengevaluasi kelayakan sistem
pemanas distrik menggunakan teknologi nuclear combined heat and power plants (NCHP) di
Eropa.
Studi CBA juga telah banyak diterapkan pada berbagai sektor di Indonesia. Atabani, et
al. [53] dan Safrudin, et al. [54] menghitung manfaat dan biaya dari penerapan standar fuel
economy di Indonesia. Salah satu perbedaan kedua studi tersebut adalah Atabani, et al. [53]
hanya menghitung manfaat penurunan emisi tanpa mengkonversi emisi tersebut ke nilai
uang. Sebaliknya, Safrudin, et al. [54] mengkonversi penurunan emisi menjadi penurunan
biaya pengobatan sakit pernapasan. Safrudin, et al. [54] menggunakan data dampak
kesehatan sebesar Rp3/ton-CO, Rp 19.331/ton-NOx, Rp870/ton-HC, dan Rp147.429/ton-PM.
Pada sektor pembangkit listrik, Prajogo [55] melakukan analisis biaya manfaat sosial pada
pembangkit listrik tenaga sampah Gede Bage. Dalam analisisnya, Prajogo [55] menggunakan
berbagai skenario efisiensi penurunan polusi terhadap biaya pengobatan masyarakat sekitar
yang terpapar 10 polutan (yaitu Cr, Cd, As, CDD/CDF, Hg, Pb, SO2, HCl, PM dan NOx).
Beberapa studi juga telah melakukan CBA PLTN di Indonesia. Al Irsyad [20]
membandingkan rasio manfaat dan biaya dari PLTU, Pembangkit Listrik Tenaga Air (PLTA), dan
PLTN 4 x 1.000 MW yang sebelumnya diusulkan di Muria dan Bangka. Al Irsyad [20]
merekomendasikan PLTN untuk melayani beban dasar sistem ketenagalistrikan. Untuk studi
kasus di Kalimantan Barat, Raditya and Hiendro [56] menyimpulkan bahwa PLTN ThorCon
Molten Salt Reactor akan menurunkan biaya pokok penyediaan (BPP) tenaga listrik diantara
Rp238/kWh hingga Rp316/kWh. Beberapa studi lain hanya menggunakan penjualan listrik
dalam analisis manfaat [57, 58]. Birmano and Bastori [58] menyimpulkan rasio manfaat/ biaya
PLTN lebih baik daripada PLTU. Sementara itu, Nuryanti, et al. [57] mengestimasi biaya
produksi listrik PLTN diantara 5 – 9 ¢US$/kWh.
BAB III
Pengumpulan data primer dan sekunder pada prospek lokasi pembangunan PLTN
dilakukan melalui survei ke lapangan. Lokasi prospek adalah kawasan pulau Semesa dan Pantai
Gosong, yang secara geografis, terletak pada posisi 108051’30”BB - 10805’23”BT dan
0043’50”LU - 0041’15”LS. Lokasi berada di Kabupaten Bengkayang yang terdiri dari 17
kecamatan, 2 kelurahan dan 122 desa [59] dengan jumlah penduduk sebesar 288.589 jiwa
pada tahun 2019. Sebagian wilayah lokasi prospek berbukit dan dekat dengan pesisir pantai.
Calon lokasi tapak juga dekat dengan Sungai Raya. Jumlah penduduk kecamatan Sungai Raya
Kepulauan pada tahun 2019 adalah sebesar 29.495 jiwa [60].
Data yang dikumpulkan terkait dengan data untuk analisis kelistrikan, analisis ekonomi
dan analisis keuangan. Data tersebut antara lain adalah status lahan, luas lahan, harga lahan,
jarak lokasi ke jaringan listrik, ketersediaan jaringan listrik, rencana pembangunan kelistrikan,
rencana pengembangan kawasan industri, dan harga-harga terkait dengan pembangunan
PLTN. Survei lain yang akan dilakukan adalah survei ke vendor teknologi PLTN untuk
memperoleh biaya pembangunan PLTN yang akurat.
Analisis karakteristik sistem ketenagalistrikan meliputi analisis aliran daya (load flow).
Analisis meliputi pengaruh variasi beban dan rugi-rugi transmisi pada aliran daya dan juga
untuk mengetahui tegangan jatuh disisi beban baik akibat adanya perubahan beban ataupun
perubahan besar dan jenis pembangkit. Aliran daya pada suatu sistem tenaga listrik secara
garis besar adalah aliran daya aktif (P) dan daya reaktif (Q) dari suatu sistem pembangkit (sisi
pengirim) melalui suatu saluran atau jaringan transmisi hingga sampai ke sisi beban (sisi
penerima). Pada kondisi ideal, daya yang dikirim akan sama dengan daya yang diterima
beban. Namun pada kenyataannya, daya yang dikirim tidak sama dengan yang diterima beban
akibat impedansi di saluran transmisi, serta tipe beban resistif, induktif dan kapasitif yang
tersambung di busbar. Tiga metode yang umum digunakan untuk analisis aliran daya listrik
adalahmetode Accelerated Gauss-Seidel, metoda Newton Raphson, dan metoda Fast
Decoupled.
Dalam melakukan simulasi dan analisa sistem kelistrikan, salah satu tool yang sangat
membantu adalah ETAP (Enterprise Solution for Electrical Power Systems). Modul analisis
aliran beban ETAP dapat digunakan untuk simulasi tegangan bus, faktor daya, arus, dan aliran
daya di seluruh sistem listrik. Analisis ETAP dapat mempertimbangkan efek dari pembangkit
yang bersifat swing, pengatur tegangan, dan pembangkit unregulated dengan beberapa
jaringan listrik dan koneksi generator. ETAP mampu melakukan analisis pada sistem radial dan
loop. Selain itu, analisis aliran arus listrik di ETAP dapat menggunakan satu dari tiga metode
berbeda (Gauss-Seidel, Newton-Raphson dan Fast Decoupled) untuk mencapai efisiensi
perhitungan terbaik. Selanjutnya, ETAP dapat melakukan perhitungan dengan cepat,
melakukan analisa dan pengambilan keputusan.
Analisis ketenagalistrikan pada studi ini meliputi berbagai simulasi skenario seperti
tingkat permintaan energi, potensi sumber energi baru terbarukan, luas area tanah, dan
tingkat kompleksitas dari sistem pembangkit listrik (seperti jaringan transmisi). Tahap awal
analisis memerlukan data dan informasi mengenai kondisi sosial kependudukan diperlukan
untuk mengestimasi fluktuasi permintaan listrik (beban tahunan) serta kondisi transmisi dan
koneksi ke gardu induk besar. Data utama yang dibutuhkan adalah profil data permintaan
listrik per jam termasuk biaya per unit dari setiap jenis pembangkit listrik. Data tersebut akan
digunakan untuk analisis perbandingan tingkat kelayakan finansial PLTN dengan PLTU dan
pembangkit EBT. Analisis perbandingan juga meliputi analisis emisi gas rumah kaca dari setiap
pembangkit.
sektor rumah tangga), dan tarif listrik. Hasil proyeksi tersebut adalah
skenario business as usual (BAU). Untuk mempertimbangkan permintaan
listrik tambahan dari industrialisasi, hasil proyeksi skenario BAU tersebut
kemudian disesuaikan kembali.
Biaya O&M adalah biaya yang dibutuhkan untuk menjalankan operasi rutin PLTN.
Nilai biaya O&M dipengaruhi oleh teknologi dan kapasitas PLTN. Biaya O&M
dibedakan menjadi dua, yaitu:
• Biaya O&M tetap, diantaranya adalah untuk GA, tenaga kerja, pajak, asuransi,
limbah bahan bakar, dan contingency.
• Biaya O&M variabel, diantaranya adalah untuk bahan kimia, pelumas, dan air.
− Biaya Dekomisioning.
Biaya dekomisioning dimasukkan ke dalam biaya pembangkitan di awal tahap
operasi dan dialokasikan setiap tahunnya.
− Biaya Liabilitas.
Biaya liabilitas merupakan tanggung jawab operator terhadap kecelakaan.
− Skema Pendanaan.
Analisis sumber dana untuk menentukan biaya bunga bank, dan rekomendasi
skema pendanaan terbaik.
− Analisis finansial berdasarkan target keuntungan dan Biaya Pokok Penyediaan
listrik setempat.
Analisis finansial dilakukan untuk menghitung net present value (NPV), tingkat
pengembalian internal (IRR), pay-back period (PBP) dan rasio benefit-cost (BCR),
serta debt service coverage ratio (DSCR).
− Analisis Sensitivitas.
Analisis sensitivitas mengevaluasi efek ketidakpastian di setiap tahap
pengembangan proyek terhadap kelayakan finansial. Analisis sensitivitas dilakukan
secara deterministik dan probabilistik menggunakan metode Monte Carlo. Simulasi
Monte Carlo merupakan metode analitik yang bertujuan untuk membuat tiruan
atau imitasi dari sebuah sistem yang bersifat random atau tidak pasti.
Pembangunan model simulasi monte Carlo didasarkan pada probabilitas yang
diperoleh dari data historis sebuah kejadian dan frekuensinya. Ide dasar simulasi
Monte Carlo adalah untuk membuat nilai acak pada variabel model yang sedang
diuji. Dalam sistem dunia nyata, sebagian besar variabel memiliki probabilitas
alami.
(3.1)
pada data SMR 2, asumsi yang digunakan untuk faktor kapasitas dan plant heat rate adalah
95% dan 2.457 kCal/kWh. Sebagai perbandingan, plant heat rate rata-rata PLTN di Amerika
Serikat adalah 10.452 Btu/hr atau setara 2.635,62 kCal/kWh [61]. Pada Persamaan 3.7,
nuclear heating value dihitung berdasarkan nilai burn-up yaitu jumlah energi yang dihasilkan
per ton uranium. Asumsi burn-up yang digunakan adalah 60.000 MWdays/ton [62-64].
(3.5)
𝐷𝑎𝑦 𝑘𝐶𝑎𝑙
𝐴𝑛𝑛𝑢𝑎𝑙 𝑇ℎ𝑒𝑟𝑚𝑎𝑙 (𝑇𝑐𝑎𝑙) = (24ℎ𝑟 ∗ 𝑂𝑝𝑒𝑟𝑎𝑡𝑖𝑜𝑛 ) ∗ (𝐶𝑓 ∗ 𝐺𝑟𝑜𝑠𝑠 𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 (𝑀𝑊)) ∗ 𝑃𝑙𝑎𝑛𝑡 𝐻𝑒𝑎𝑡 𝑟𝑎𝑡𝑒( )/108
𝑦𝑒𝑎𝑟 𝑘𝑊ℎ
(3.6)
(3.7)
𝑐𝑈𝑆𝐷
𝐿𝑒𝑣𝑒𝑙𝑖𝑧𝑒𝑑 𝑃𝑜𝑤𝑒𝑟 𝑃𝑟𝑖𝑐𝑒 𝑇𝑎𝑟𝑖𝑓𝑓 ( )=𝐴+𝐵+𝐶+𝐷+𝐸
𝑘𝑊ℎ
(3.8)
(3.9)
(3.10)
Dimana 𝐶𝑛 adalah biaya proyek PLTN; 𝑋 adalah proyeksi produksi listrik per tahun; 𝑂𝑃𝐸𝑋𝑛
adalah biaya operasional PLTN; 𝛼𝜃 adalah efisiensi PLTN; 𝑟 adalah discount rate; t adalah
umur pembangkitan PLTN (asumsi 40 tahun); dan 𝐷𝐶𝑡 adalah biaya dekomposisi per unit dari
PLTN.
Indikator kelayakan lain yang digunakan adalah net present value (NPV), tingkat
pengembalian internal (IRR), dan pay-back period (PBP). NPV adalah indikator tingkat
keuntungan secara sederhana sebagaimana pada Persamaan 3.11 dimana r adalah tingkat
diskonto yang diasumsikan sebesar 7%. Nilai NPV > 0 mengindikasikan bahwa PLTN layak
secara finansial yaitu PLTN akan memulihkan biaya investasi serta mendapatkan tambahan
laba. Sebaliknya, NPV < 0 mengindikasikan PLTN tidak layak dibangun. Analisis sensitivitas
terhadap NPV diperlukan untuk estimasi ketidakpastian data biaya investasi.
(3.11)
Analisis ekonomi bertujuan untuk menganalisa manfaat dari keberadaan PLTN dan
kemudian melakukan estimasi rasio biaya-manfaat (cost-benefit analysis/ CBA). CBA dapat
membandingkan manfaat dan biaya secara komprehensif pada dua skenario sistem
ketenagalistrikan yaitu (1) PLTN, dan (2) Tanpa PLTN. Ruang lingkup CBA meliputi manfaat
langsung dan tidak langsung dari pengembangan PLTN di Kalimantan Barat.
Manfaat langsung terdiri atas manfaat finansial yaitu penghematan biaya penyediaan
(BPP) listrik dari skenario PLTN terhadap skenario tanpa PLN. BPP diestimasi menggunakan
model energi Balmorel yaitu model optimasi ekspansi pembangkit listrik yang digunakan
secara resmi oleh Direktorat Jenderal Ketenagalistrikan (DJK), Kementerian ESDM.
Keberadaan PLTN ataupun pembangkit listrik lainnya mempunyai manfaat yang sama terkait
peningkatan produksi listrik, dan pendapatan penjualan listrik. Oleh karena itu, manfaat dari
sisi ini tidak perlu dianalisis. Manfaat tidak langsung terdiri dari penurunan emisi dari skenario
PLTN dan tanpa PLTN.
Model Balmorel mempunyai prinsip kerja sebagaimana pada Gambar 12. Pertama,
Balmorel akan membuka semua data yaitu proyeksi permintaan listrik, kapasitas pembangkit
dan transmisi eksisting, database teknologi pembangkit dan transmisi yang dapat dipilih
untuk penyediaan listrik masa depan, kebijakan pemerintah, harga energi, pajak, biaya emisi
CO2e, dan sebagainya. Kedua, Balmorel secara simultan akan mencari biaya produksi listrik
dan biaya investasi termurah sehingga didapat total biaya termurah.
FGD dilakukan untuk mengumpulkan data kualitatif dan untuk evaluasi hasil
sementara studi ini. Instansi yang diundang untuk setiap FGD antara lain PT PLN (Persero), PT.
Indonesia Power, Pemerintah Daerah, Dewan Energi Nasional (DEN), Direktorat Jenderal
Ketenagalistrikan (DJK), Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi
(DJEBTKE), dan Batan.
BAB IV
ASPEK KELISTRIKAN
Rencana Umum Energi Nasional (RUEN) mempunyai target penggunaan EBT sebesar
23% dari total bauran energi di 2025 [66]. Kalimantan Barat baru memiliki 10 MW PLTBM
(Biomassa) di 2019, oleh karena itu PLTN sebagai salah satu pembangkit bersih dari emisi gas
rumah kaca dapat menjadi pilihan untuk memenuhi target EBT tersebut.
Sementara itu di pasal lain, dalam pengelolaannya, penyediaan tenaga listrik dikuasai
oleh negara yang penyelenggaraannya dilakukan oleh Pemerintah dan pemerintah daerah.
Perwujudan penguasaan tersebut antara lain kewenangan dalam pembuatan regulasi,
kebijakan dan standar. Selain itu, perencanaan umum ketenagalistrikan berupa Rencana
Umum Ketenagalistrikan Nasional (RUKN) dan Rencana Umum Ketenagalistrikan Daerah
(RUKD) disusun oleh Pemerintah dan pemerintah daerah sesuai kewenangannya, yang
menjadi rujukan bagi pemegang izin usaha penyediaan tenaga listrik dalam menyusun
Rencana Usaha Penyediaan Tenaga Listrik (RUPTL). Sesuai pembagian kewenangannya,
Pemerintah dan pemerintah daerah mempunyai wewenanguntuk pemberian perizinan
berusaha dalam penyediaan tenaga listrik baik untuk kepentingan umum maupun untuk
kepentingan sendiri, penetapan tarif tenaga listrik, penetapan wilayah usaha dan pengesahan
RUPTL.
Pelaksanaan usaha penyediaan tenaga listrik oleh Pemerintah dan pemerintah daerah
dilakukan oleh badan usaha milik negara dan badan usaha milik daerah. Namun demikian,
badan usaha swasta, koperasi dan swadaya masyarakat dapat berpartisipasi dalam usaha
penyediaan tenaga listrik. Dalam penyediaan tenaga listrik tersebut, Pemerintah dan
pemerintah daerah menyediakan dana untuk kelompok masyarakat tidak mampu,
pembangunan sarana penyediaan tenaga listrik di daerah yang belum berkembang,
pembangunan tenaga listrik di daerah terpencil dan perbatasan, dan pembangunan listrik
perdesaan. Selain itu, Pemerintah dan pemerintah daerah memberikan perhatian lebih untuk
memenuhi kebutuhan tenaga listrik di pulau-pulau terluar melalui implementasi nyata
sehingga seluruh lapisan masyarakat mendapat akses listrik.
Usaha penyediaan tenaga listrik untuk kepentingan umum meliputi jenis usaha
pembangkitan tenaga listrik, transmisi tenaga listrik, distribusi tenaga listrik dan/atau
penjualan tenaga listrik. Setiap usaha penyediaan tenaga listrik tersebut diselenggarakan
berdasarkan IUPTL yang diterbitkan oleh Menteri/gubernur sesuai kewenangannya.
Disamping itu, usaha penyediaan tenaga listrik untuk kepentingan umum dapat dilakukan
secara terintegrasi oleh satu badan usaha dalam satu wilayah usaha. Pembatasan wilayah
usaha juga diberlakukan untuk usaha penyediaan tenaga listrik untuk kepentingan umum
yang hanya meliputi distribusi tenaga listrik dan/atau penjualan tenaga listrik.
Guna menghindari tumpang tindih penetapan wilayah usaha penyediaan tenaga listrik
antar badan usaha, kebijakan penetapan wilayah usaha diterapkan dengan prinsip kehati-
hatian, transparansi, dan akuntabilitas. Wilayah usaha penyediaan tenaga listrik bukan
merupakan wilayah administrasi pemerintahan sehingga penetapan wilayah usaha
memerlukan koordinasi dengan instansi terkait termasuk pemerintah daerah sebagai
pemberi rekomendasi. Sampai saat ini, Pemerintah telah menerbitkan 53 wilayah usaha
termasuk wilayah usaha PT PLN (Persero) sebagaimana terlihat pada Gambar 14.
Daerah (RUKD) ditetapkan oleh Gubernur. Pada tahun 2019, Menteri ESDM telah
menetapkan RUKN 2019-2038 melalui Keputusan Menteri ESDM Nomor 143
K/20/MEM/2019 tentang RUKN 2019 – 2038. RUKN dan RUKD sifatnya adalah indikatif dan
tidak berisikan daftar proyek, dokumen perencanaan yang berisikan detail rencana proyek
infrastruktur penyediaan tenaga listrik adalah RUPTL.
RUKN tersebut menjadi rujukan dalam penyusunan RUPTL oleh Pemegang IUPTL yang
memiliki Wilayah Usaha penyediaan tenaga listrik sebagaimana ditetapkan dalam Peraturan
Pemerintah Nomor 14 Tahun 2012 tentang Kegiatan Usaha Penyediaan Tenaga Listrik
sebagaimana telah diubah dengan Peraturan Pemerintah Nomor 23 Tahun 2014. Jumlah
badan usaha pemegang wilayah usaha yang memasok kebutuhan listrik mencapai 53 badan
usaha di 2020. Masing-masing badan usaha pemegang wilayah usaha ketenagalistrikan
tersebut wajib menyusun dokumen RUPTL.
Pemanfaatan energi primer untuk pembangkit tenaga listrik diatur dalam Pasal 6
Undang-Undang Nomor 30 Tahun 2009 tentang Ketenagalistrikan yang dilaksanakan sesuai
dengan KEN dan dituangkan di dalam Peraturan Pemerintah Nomor 79 Tahun 2014 tentang
Kebijakan Energi Nasional. Pemerintah menargetkan porsi energi baru dan energi terbarukan
terus meningkat menjadi setidaknya 23% pada tahun 2025 sepanjang nilai keekonomiannya
terpenuhi. Sementara itu, porsi gas sekitar 22%, BBM paling besar 0,4%, dan sisanya batubara
paling besar 55%. Kemudian pada tahun 2038 diharapkan porsi energi baru dan energi
terbarukan meningkat menjadi sekitar 28%, gas sekitar 25%, BBM paling besar 0,1%, dan
sisanya batubara paling besar 47%. Pencapaian target pemanfaatan energi baru dan energi
terbarukan tersebut memerlukan regulasi dan insentif yang lebih menarik.
Sementara itu, realisasi porsi batubara dalam bauran energi pembangkitan tenaga
listrik semakin meningkat dan tahun 2019 telah melebihi batas maksimal RUKN. Peningkatan
porsi batubara tersebut diprediksi akan terus berlanjut karena dalam waktu dekat sejumlah
PLTU skala besar unit size 1.000 MW akan beroperasi di Jawa. Dengan demikian untuk
pengendalian agar target RUKN dapat dicapai, penambahan PLTU baru perlu dihentikan.
Detail realisasi dan target bauran energi pembangkitan tenaga listrik sesuai RUKN 2019-2038
diuraikan pada Gambar 16.
Target bauran energi tersebut berlaku baik bagi PT PLN (Persero) maupun pemegang
wilayah usaha lainnya. Upaya pencapaian target dapat dilakukan melalui kerjasama antar
pemegang wilayah usaha. Dalam hal wilayah usaha mempunyai porsi bauran energi
terbarukan lebih tinggi dari target nasional, kelebihan porsi tersebut dapat menjadi
pengurang porsi bauran energi fosil. Sedangkan bagi wilayah usaha yang mempunyai porsi
bauran energi terbarukan 100% maka tidak perlu memenuhi target bauran energi fosil.
Dalam rangka peningkatan pemenuhan kebutuhan tenaga listrik secara adil dan
merata serta mendorong pertumbuhan ekonomi, Pemerintah melakukan percepatan
pembangunan infrastruktur ketenagalistrikan termasuk pembangunan pembangkit 35.000
MW dengan mengutamakan penggunaan energi baru dan terbarukan. Pemerintah
menerbitkan Peraturan Presiden Nomor 4 Tahun 2016 sebagaimana telah diubah oleh
Peraturan Presiden Nomor 14 Tahun 2017 tentang Percepatan Pembangunan Infrastruktur
Ketenagalistrikan. Peraturan Presiden tersebut menugaskan PT PLN (Persero) untuk
menyelenggarakan Pembangunan Infrastruktur Ketenagalistrikan (PIK) dimana pelaksanaan
PIK tersebut dilakukan berdasarkan RUPTL. Pelaksanaan PIK oleh PT PLN (Persero) tersebut
dilakukan melalui 2 skema yaitu swakelola dan kerja sama penyediaan tenaga listrik.
Pelaksanaan PIK melalui swakelola adalah proyek dikembangkan sendiri oleh PT PLN
(Persero) melalui kontrak Engineering-Procurement-Construction (EPC) bersama kontraktor.
Aset pembangkit menjadi milik PT PLN (Persero). Dalam PIK melalui kerja sama penyediaan
tenaga listrik, proyek dikembangkan pihak lain sekaligus menjadi pemilik asetdan kemudian
listriknya dijual ke PT PLN (Persero) melalui penandatanganan perjanjian jual beli/sewa
jaringan tenaga listrik atau dikenal dengan Power Purchase Agreement (PPA).
Pihak lain yang dimaksud terdiri dari anak perusahaan PT PLN (Persero) dan
Pengembang Pembangkit Listrik (PPL). Anak perusahaan PT PLN (Persero) merupakan anak
perusahaan PT PLN (Persero) yang sahamnya dimiliki oleh PT PLN (Persero) paling kurang 51%
baik secara langsung dan/atau melalui anak perusahaan PT PLN (Persero) lainnya yang
kemudian bekerja sama dengan PT PLN (Persero) melalui penandatanganan PPA. Sementara
itu, PPL adalah badan usaha penyediaan tenaga listrik berupa BUMN, BUMD, koperasi dan
swasta yang bekerja sama dengan PT PLN (Persero) melalui penandatanganan PPA. Skema
penyelenggaraan pembangunan infrastruktur ketenagalistrikan adalah sebagaimana terlihat
pada Gambar 17.
a. PT PLN (Persero) memiliki kemampuan pendanaan untuk ekuitas dan sumber pendanaan
murah;
b. risiko konstruksi yang rendah;
c. tersedianya pasokan bahan bakar;
d. pembangkit pemikul beban puncak (peaker) yang berfungsi mengontrol keandalan
operasi; dan/atau
e. pengembangan sistem isolated.
a. pembangkit;
b. transmisi;
c. distribusi;
d. gardu induk; dan/atau
e. sarana pendukung lainnya.
Pelaksanaan PIK melalui kerja sama penyediaan tenaga listrik dengan anak
perusahaan PT PLN (Persero) dilakukan dalam hal adanya kerja sama antara PT PLN (Persero)
dengan badan usaha dalam negeri dan/atau badan usaha asing. Kerja dilakukan dalam hal
badan usaha tersebut memiliki nilai yang strategis bagi PT PLN (Persero) dalam PIK yang terdiri
atas:
Kerja sama dengan badan usaha asing diutamakan dengan badan usaha asing yang sahamnya
dimiliki oleh negara bersangkutan (badan usaha milik negara asing).
Pelaksanaan PIK melalui kerja sama penyediaan tenaga listrik dengan PPL dilakukan dalam
hal:
Dalam penyediaan tenaga listrik, PT PLN (Persero) tidak memiliki cukup kemampuan
untuk membangun semua pembangkit tenaga listrik, untuk itu diperlukan kerja sama dengan
badan usaha lainnya sebagaimana telah diuraikan di atas. Kerja sama penyediaan tenaga
listrik dengan badan usaha lain dilakukan melalui PPA jangka panjang. Ketentuan PPA diatur
dalam Peraturan Menteri ESDM Nomor 10 tahun 2017 tentang Pokok-Pokok Dalam Perjanjian
Jual Beli Tenaga Listrik sebagaimana telah diubah 2 kali terakhir dengan Peraturan Menteri
ESDM Nomo 10 tahun 2018. Pokok-pokok yang diatur dalam PPA tersebut meliputi aspek
komersial untuk seluruh jenis pembangkit, termasuk pembangkit listrik tenaga panas bumi,
pembangkit listrik tenaga air, dan pembangkit listrik tenaga biomassa. PPA antara PT PLN
(Persero) dengan Badan Usaha paling sedikit memuat antara lain ketentuan mengenai:
PPA dilaksanakan untuk jangka waktu paling lama 30 tahun terhitung sejak
terlaksananya Commercial Operating Date (COD). Jangka waktu tersebut ditentukan dengan
mempertimbangkan jenis pembangkit yang digunakan. PPA tersebut menggunakan pola kerja
sama “Membangun, Memiliki, Mengoperasikan dan Mengalihkan” (Build, Own, Operate and
Transfer/BOOT). Pada PPA tersebut, biaya kapasitas (komponen A) pada harga jual tenaga
listrik dihitung berdasarkan nilai investasi yang didepresiasi paling sedikit selama 20 tahun.
Para pihak dalam PPA mempunyai hak dan kewajiban masing-masing.
a. memperoleh penyaluran tenaga listrik yang andal dan berkelanjutan dari pembangkit
tenaga listrik; dan
b. mendapatkan setiap persetujuan yang diperlukan sehubungan dengan PPA.
Badan Usaha wajib menyediakan tenaga listrik sesuai dengan PPA. Dalam hal Badan
Usaha selaku penjual tidak dapat mengirimkan tenaga listrik sesuai dengan PPA yang
disebabkan kegagalan dan/atau kelalaian Badan Usaha, Badan Usaha wajib membayar penalti
kepada PT PLN (Persero). Dalam hal PT PLN (Persero) tidak dapat menyerap tenaga listrik
sesuai PPA disebabkan kesalahan PT PLN (Persero), PT PLN (Persero) wajib membayar penalti
kepada Badan Usaha selama periode tertentu. Penalti tersebut ditetapkan secara
proporsional sesuai dengan komponen investasi.
Pembayaran atas transaksi pembelian tenaga listrik menggunakan mata uang rupiah,
kecuali mendapat pengecualian dari Bank Indonesia. Dalam hal transaksi tersebut
menggunakan mata uang Dollar Amerika Serikat (USD), nilai tukar yang digunakan untuk
pembayaran dalam mata uang rupiah menggunakan nilai tukar Jakarta Interbank Spot Dollar
Rate (JISDOR).
Kriteria kinerja pembangkit tenaga listrik dapat dinyatakan dengan nilai aktual dari AF
atau CF, heat rate, maupun ketentuan teknis lainnya yang disepakati dalam PPA. Jika nilai
aktual tersebut tidak sesuai dengan nilai yang telah disetujui bersama antara PT PLN (Persero)
dan Badan Usaha dikarenakan kesalahan Badan Usaha, Badan Usaha dapat dikenakan penalti.
Penalti tersebut meliputi:
Liquidated damaged (LD) merupakan penalti akibat keterlambatan mencapai COD sesuai
dengan PPA yang besarnya proporsional dengan biaya yang dikeluarkan oleh PT PLN
(Persero), dikarenakan ketiadaan energi yang dijanjikan.
Penalti AF atau CF dan penalti outage factor (OF) ditetapkan sebesar biaya yang harus
dikeluarkan oleh PT PLN (Persero) dikarenakan ketiadaan energi yang dijanjikan.
Penalti tara kalor (heat rate) diberlakukan khusus untuk pembangkit berbahan bakar gas
yang gasnya disiapkan oleh PT PLN (Persero) dan pembangkit berbahan bakar batubara.
Nilai penalti tara kalor (heat rate) untuk pembangkit berbahan bakar gas ditetapkan
sebesar harga gas dikalikan selisih tara kalor (heat rate) yang diperjanjikan dengan tara
kalor (heat rate) aktual. Nilai penalti tara kalor (heat rate) untuk pembangkit batubara
berupa pembeli membayar komponen bahan bakar (komponen C) sesuai dengan tara
kalor (heat rate) yang diperjanjikan.
Penalti kegagalan memikul mega volt ampere reactive (MVAR) merupakan penalti yang
diakibatkan karena pembangkit tenaga listrik milik Badan Usaha gagal untuk memikul
mega volt ampere reactive (MVAR) di sistem interkoneksi PT PLN (Persero). Penalti
kegagalan memikul mega volt ampere reactive (MVAR) tidak berlaku apabila atas
permintaan Pengendali Operasi Sistem (Dispatcher).
Penalti kecepatan naik turun beban (ramp rate) dikenakan terhadap pembangkit tenaga
listrik milik Badan Usaha yang tidak mampu mencapai jumlah dan waktu perubahan
pembebanan memenuhi operasi sistem (dispatch).
Pengakhiran PPA oleh salah satu pihak dapat dilakukan sebelum masa berakhir PPA, antara
lain dikarenakan:
Pengaturan lebih lanjut mengenai mekanisme dan konsekuensi atas pengakhiran PPA
dituangkan dalam PPA. Pengakhiran PPA harus dilaporkan kepada Menteri ESDM melalui
Direktur Jenderal Ketenagalistrikan.
Sebaran kapasitas pembangkit tenaga listrik terlihat pada Gambar 19. Total kapasitas
pembangkit terbesar ada di Jawa kemudian diikuti oleh Sumatera, Sulawesi, Kalimantan dan
Maluku-Papua. Pembangkit tenaga lisrtik yang bersumber dari EBT mencapai sekitar 15%.
Berdasarkan kepemilikannya, PLN memiliki porsi kepemilikan terbesar yaitu sekitar 60,7%,
IPP 26,5%, PP 5%, IO 7,7% dan Pemerintah 0,1%.
Sistem tenaga listrik di Kalimantan Barat masih terpisah dari provinsi lainnya di
Kalimantan. Sebaliknya, Kalimantan Tengah, Kalimantan Selatan dan Kalimantan Timur telah
terinterkoneksi melalui jaringan transmisi 150 kV yang disebut dengan Sistem Interkoneksi
Kalimantan. Ke depan, sistem tenaga listrik di Kalimantan Barat akan tersambung dengan
Sistem Interkoneksi Kalimantan melalui jaringan transmisi 150 kV sebagaimana terlihat pada
Gambar 20.
Kebutuhan tenaga listrik di Kalimantan Barat saat ini disuplai oleh pembangkit tenaga
listrik yang berada di Kalimantan Barat sendiri dan impor dari Malaysia. Pasokan tenaga listrik
domestik disuplai melalui sistem interkoneksi 150 kV yang dikenal dengan nama Sistem
Khatulistiwa dan beberapa sistem isolated seperti sistem Ketapang, Nanga Pinoh, Putussibau,
Sintang, dan lain-lain. Sistem-sistem isolated tersebut ke depan akan terhubung dengan
Sistem Khatulistiwa secara bertahap. Sementara itu, pasokan tenaga listrik impor disalurkan
dari Serawak Malaysia ke Bengkayang melalui jaringan transmisi 275 kV, dan 3 titik impor lain
melalui sistem distribusi. Gambar 21memperlihatkan peta sistem dan kondisi tenaga listrik di
Kalimantan Barat.
Gambar 21. Peta Sistem dan Kondisi Tenaga Listrik di Kalimantan Barat 2020
(Sumber: PLN)
Pasokan tenaga listrik dengan basis Daya Mampu Netto (DMN) Sistem Khatulistiwa
saat ini berjumlah sekitar 455 MW. Sebagian besar pasokan tersebut berasal dari impor Sesco
Serawak - Malaysia melalui jaringan transmisi 275 kV dengan kapasitas sekitar 230 MW (N-1)
sebagaimana pada Gambar 22. Kajian ini mengasumsikan bahwa impor tersebut akan
berakhir pada tahun 2030 karena sistem Kalimantan diasumsikan telah terinterkoneksi
sempurna melalui backbone 500 kV di 2031. Asumsi tersebut didasarkan pada masterplan
PLN seperti Gambar 23 terkait sistem tenaga listrik Kalimantan yang telah tercantum dalam
RUPTL.
230
100
80
30
10 5
b. Sistem Barito yang merupakan sistem kelistrikan Kalimantan Tengah dan Selatan.
c. Sistem Mahakam yang merupakan sistem kelistrikan Kalimantan Timur dan Utara.
Saat ini, sistem Barito dan Mahakam sudah terinterkoneksi pada sistem jaringan
150kV di 2 titik yaitu pada GI Bangkanai – GI Melak dan GI Tanjung – GI Komam. Sistem
Khatulistiwa masih berdiri sendiri namun ke depannya akan terinterkoneksi dengan sistem
Barito di 2 titik yaitu GI Air Upas – GI Sukamara dan GI Kota Baru 2 – GI Kasongan.
Sistem lain yang ada di Kalimantan adalah beberapa sistem isolated yang masih
menggunakan PLTD seperti banyak ditemukan di Kalimantan Utara. Ke depannya, sistem
isolated tersebut akan terhubung melalui jaringan 150kV sehingga penggunaan PLTD dapat
dihentikan dan digantikan dengan pembangkit baru yang memiliki BPP yang lebih rendah.
Sistem tenaga listrik di Kalimantan Barat terdiri atas satu sistem interkoneksi 150 kV
dan beberapa sistem isolated yaitu:
1. Sistem interkoneksi yang juga dikenal dengan Sistem Khatulistiwa untuk memenuhi
kebutuhan listrik di:
a. Kota Pontianak.
b. Kota Singkawang.
c. Kota Sambas.
d. Kota Bengkayang.
e. Kota Ngabang.
f. Kota Tayan.
a. Kota Sanggau.
b. Kota Sekadau.
c. Kota Sintang.
e. Kota Putussibau.
Neraca daya Provinsi Kalimantan Barat pda tahun 2019 dapat dilihat pada Gambar 24.
Sebagian besar pasokan listrik di Kalimantan Barat masih bersumber dari pembangkit
berbahan bakar minyak (PLTD). Kecukupan dan keandalan pasokan masih relatif rendah
karena umur beberapa mesin diesel sudah tua dan cadangan pembangkitan tidak memadai.
Tabel 2 menunjukkan komposisi pembangkit eksisting di Kalimantan Barat.
Daya
Total DMP Tertinggi 1
Jumlah Mampu
No Pembangkit Sistem Kapasitas Tahun Terakhir
Unit Netto
(MW) (MW)
(MW)
PLN
1 Khatulistiwa 19 93,7 69,3 69,7
2 Sanggau 5 4,8 4,8 4,8
3 Sekadau 4 1,7 1,7 1,7
4 Sintang 11 9,2 9,2 9,2
5 Putussibau 11 9,4 9,4 9,4
6 Ketapang 14 15,8 15,8 15,8
7 Balai Karangan 6 4 4 4
PLTD
8 Nanga tayap 4 0,3 0,3 0,3
9 Air Upas 1 0,4 0,4 0,4
10 Kota Baru 1 0,3 0,3 0,3
11 Semintau 5 3,1 3,1 3,1
12 Tepuai 3 3 3 3
13 Badau 3 1,5 1,5 1,5
14 Padang Tikar 6 2,5 2,5 2,5
15 PLTG Khatulistiwa 1 34 28,9 30,1
16 Khatulistiwa 1 50 50 49,6
17 PLTU Sanggau 1 14 14 14
18 Sintang 1 7 7 7
Jumlah PLN 97 254,7 225,2 226,4
IPP
1 Khatulistiwa 1 5 5 4,4
PLTBm
2 Khatulistiwa 1 10 10 10
3 PLTG Khatulistiwa 4 100 100 97,1
Jumlah IPP 6 115 115 111,5
Excess Power
1 Balai Karangan 1 1,5 1,5 1,5
2 PLTM Badau 1 0,4 0,4 0,4
Jumlah Excess 2 1,9 1,9 1,9
Import
1 PLTA Khatulistiwa 1 230 230 228
Jumlah Import 1 230 230 228
Sewa
1 Sanggau 4 14 14 14
2 Sekadau 1 8 8 8
3 PLTD Sintang 3 16 16 16
4 Nangapinoh 2 8 8 8
5 Ketapang 3,9 10 10 10
6 Balai Karangan 1 2 2 2
7 Air Upas 1 2 2 2
8 Kota Baru 1 1 1 1
Jumlah Sewa 16,9 61 61 61
Sumber: [69]
Sumber: [69]
Data operasi PLN UIKL Kalimantan menunjukkan bahwa beban puncak Sistem
Kalimantan barat pada waktu malam adalah sekitar 350MW (Gambar 26) dan pada waktu
siang sekitar 300MW (Gambar 27). Beban puncak di sistem Kalimantan Barat tersebut
tergolong kecil jika dibandingkan dengan beban puncak sistem kelistrikan Serawak yang
berkisar pada 4.000-5.000 MW pada 2020.
1.000,00
800,00
600,00
400,00 293,13 299,20 317,20 302,73 302,30 303,60 293,46 317,20
200,00
200
150
MW
100
50
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time
Base Load (Take or Pay) Off Peak (Take and Pay) Peak (Take and Pay)
Impor tenaga listrik tersebut digunakan untuk memenuhi kebutuhan beban dasar
sebesar 100 MW dan kebutuhan beban puncak hingga 230 MW dalam kurun waktu 5 tahun
(2016-2021). Kontrak ini dapat diperpanjang berdasarkan kesepakatan kedua belah pihak.
Rencana impor adalah untuk mengantisipasi ketidakpastian penyediaan pembangkit
baseload di Sistem Kalimantan Barat. Impor listrik tersebut juga digunakan untuk memenuhi
beban puncak sebesar 230 MW sehingga dapat menggantikan pemakaian BBM saat beban
puncak di Sistem Kalimantan Barat. Sistem kelistrikan serawak sebagian besar dipasok dari
PLTA dan beberapa unit pembangkit lain seperti PLTU dan PLTGU seperti terlihat pada Tabel
5. Dengan demikian dapat diasumsikan pada tahun 2030, Serawak akan memiliki sistem
dengan DMN sebesar 6GW. Pembangkit-pembangkit tersebut saling terhubung melalui
sistem transmisi 275 kV yang sama dengan jaringan yang digunakan dalam interkoneksi
Kalimantan Barat (Bengkayang) dengan konfigurasi seperti terlihat pada Gambar 31.
Sistem Barito merupakan sistem interkoneksi dengan jaringan transmisi 150 kV dan
70 kV, dipasok dari beberapa jenis pembangkit meliputi PLTA, PLTU, PLTD dan PLTG termasuk
excess power. Pada tahun 2018, sistem 150 kV Barito telah terinterkoneksi dengan Sistem
Mahakam di Kaltim. Sistem 150 kV Barito telah mendapatkan pasokan pembangkit baru PLTU
Pulang Pisau 2x60 MW dan PLTMG Bangkanai tahap pertama 155 MW.
Sistem tenaga listrik di Provinsi Kalimantan Tengah dipasok dari sistem interkoneksi
150 kV Kalimantan Tengah, Selatan, Timur dan Utara (interkoneksi sistem 150 kV Barito dan
sistem 150 kV Mahakam). Gardu induk yang beroperasi di Kalimantan Tengah yaitu GI Selat,
GI Pulang Pisau, GIS Mintin, GI Palangkaraya, GI Kasongan, GI Sampit sampai ke Pangkalan
Bun. GI Selat memasok beban di Kabupaten Kuala Kapuas dan sekitarnya. GI Pulang Pisau dan
GIS Mintin memasok beban di Kabupaten Pulang Pisau. GI Palangkaraya memasok beban Kota
Palangkaraya. GI Kasongan memasok Kabupaten Katingan. GI Sampit memasok sebagian
daerah Kabupaten Kotawaringin Timur dan Kabupaten Seruyan.
Sistem tenaga listrik lainnya merupakan sistem isolated dengan daya mampu
pembangkitan rata-rata dalam kondisi cukup namun tanpa cadangan yang memadahi. Peta
sistem tenaga listrik Provinsi Kalimantan Tengah dan rencana pengembangannya
sebagaimana diperlihatkan pada Gambar 32.
Jumlah Total
Tegangan
No Nama GI Trafo Kapasitas
(kV)
(Unit) (MVA)
1 Palangkaraya 150/20 2 90
New
2 150/20 1 60
Palangkaraya
3 Pulang Pisau 150/20 1 10
4 Sampit 150/20 2 60
5 PLTU Sampit 150/20 1 20
6 Kasongan 150/20 1 30
7 Buntok/Ampah 150/20 1 30
8 Muara Teweh 150/20 1 30
9 Pangkalan Bun 150/20 2 120
Total 12 450
Sumber: .[69]
Sistem tenaga listrik Provinsi Kalimantan Selatan sebagian besar dipasok dari Sistem
Barito, sedangkan sistem-sistem isolated tersebar antara lain Kotabaru serta Unit Listrik Desa
(ULD) dipasok dari PLTD setempat. Sistem Barito merupakan sistem interkoneksi tenaga listrik
terbesar di Kalimantan Selatan, membentang dari Batu Licin hingga ke Pangkalan Bun di
Kalimantan Tengah. Konfigurasi sistem tenaga listrik interkoneksi di Kalimantan Selatan saat
ini dan rencana kedepan dapat dilihat pada Gambar 33. Pada tahun 2018 sistem 150 kV Barito
juga telah terinterkoneksi dengan sistem 150 kV Mahakam di Kaltim, sehingga kelebihan
pasokan daya di Sistem Mahakam dapat digunakan untuk memenuhi kebutuhan pasokan
daya di sistem 150 kV Barito.
Daya terpasang dan beban puncak sistem sistem tenaga listrik di ProvinsiKalimantan
Selatan dapat dilihat pada Tabel 7.
DMP
Daya
Total Tertinggi
Jumlah Mampu
No Pembangkit Sistem Kapasitas 1 Tahun
Unit Netto
(MW) Terakhir
(MW)
(MW)
PLN
1 PLTA Barito 3,0 30,0 28,5 29,4
2 Barito 14,0 70,6 47,2 43,9
PLTD
3 Kotabaru 16,0 10,8 10,8 10,8
4 PLTG Barito 1,0 21,0 16,5 16,5
5 PLTU Barito 4,0 260,0 223,1 222,0
Jumlah PLN 38,0 392,4 326,1 322,6
Excess
1 PLTD Barito 1,0 12,0 0,7 0,7
2 PLTU Barito 3,0 67,8 65,4 64,8
Jumlah Excess 4,0 79,8 66,1 65,5
Sewa
1 PLTD Kotabaru 1,0 5,0 5,0 5,0
Jumlah Sewa 1,0 5,0 5,0 5,0
Jumlah 43,0 477,2 397,2 393,1
Sumber: [69]
Jumlah Total
Tegangan
No Nama GI Trafo Kapasitas
(kV)
(Unit) (MVA)
1 Cempaka 150/20 3 150
2 Cempaka 70/20 2 20
Riam
3 Kanan/Aranio 70/20 1 6
4 Banjarmasin 70/20 4 100
5 Trisakti 70/20 5 47
6 Trisakti 150/20 2 120
7 Mantuil 150/20 3 110
8 Seberang Barito 150/20 2 40
9 Selat 150/20 2 50
10 Barikin 150/20 2 60
11 Tanjung 150/20 2 120
12 Amuntai 150/20 1 30
13 Asam-Asam 150/20 2 40
14 Pelaihari 150/20 2 60
15 Rantau/Binuang 150/20 2 60
16 Batulicin 150/20 2 60
17 Kayu Tangi 150/20 1 30
18 Bandara 150/20 1 60
19 Satui 150/20 1 30
Total 40 1,193
Sumber: [69]
Sistem tenaga listrik yang paling berkembang di Kalimantan adalah sistem 150 kV
Mahakam, yaitu sebuah sistem interkoneksi tegangan tinggi 150 kV yang melayani kota
Balikpapan, Samarinda, Tenggarong dan Bontang. Selain itu, pada tahun 2018 Sistem 150 kV
Mahakam telah terinterkoneksi dengan Sistem 150 kV Barito sehingga menjadi satu Sistem
interkoneksi 150 kV Kalseltengtim. Dengan tersambungnya dua sistem besar tersebut maka
pasokan daya di Sistem Kalimantan Timur yang semula berlebih dapat disalurkan ke Sistem
Kalimantan Selatan dan Tengah sehingga berdampak pada penurunan biaya pokok produksi
yang disebabkan oleh pembangkit berbahan bakar minyak. Peta sistem tenaga listrik Provinsi
Kalimantan Timur ditunjukkan pada Gambar 34.
Sistem Mahakam dipasok dari beberapa jenis pembangkit yaitu PLTU, PLTGU, PLTG,
PLTMG dan PLTD, baik milik PLN maupun IPP serta mesin sewa dan excess power. Saat ini
Sistem Mahakam memiliki cadangan daya yang cukup besar sehingga sangat memungkinkan
untuk penambahan pelanggan baru yang memerlukan daya besar. Kondisi pembangkit tenaga
listrik di Provinsi Kalimantan Timur diberikan pada Tabel 9.
Sistem Kalimantan Utara saat ini masih berupa sistem-sistem isolated yang tersebar
dan disuplai dari PLTD melalui jaringan 20kV dengan cadangan daya yang rendah sehingga
biaya pokok produksi masih tinggi. Ke depannnya sistem-sistem isolated tersebut akan
digantikan oleh sistem interkoneksi 150kV dari sistem Mahakam. Sistem interkoneksi 150kV
akan menjangkau terutama di kota-kota besar yaitu Tanjung Selor sebagai ibukota provinsi
dan ibukota Kabupaten yaitu Tana Tidung, Malinau dan Nunukan. Peta sistem tenaga listrik
Kalimantan Utara ditunjukan pada Gambar 35.
Kondisi pembangkit tenaga listrik di Provinsi Kalimantan Timur diberikan pada Tabel
11.
Untuk memenuhi kebutuhan listrik Indonesia yang terus meningkat, yang terlihat dari
Gambar 36, diperlukan peningkatan produksi listrik melalui kegiatan konversi dan konservasi
energi.
Kegiatan konversi energi di Indonesia saat ini menitikberatkan pada sektor energi baru
terbarukan (EBT) di mana potensi EBT di Indonesia saat ini belum dimanfaatkan secara
maksimal. Untuk itu, pemerintah menetapkan Perpres No. 5 tahun 2006 tentang Kebijakan
Energi Nasional (KEN) untuk meningkatkan porsi EBT dalam perencanaan komposisi
pembangkit nasional seperti terlihat pada Gambar 37. Atas dasar itulah, Undang Undang (UU)
No. 30 tahun 2007 tentang Energi mengamanatkan penyusunan KEN sebagai pedoman dalam
pengelolaan energi nasional.
Di dalam KEN yang telah direvisi dalam PP nomor 79 tahun 2014, Pemerintah
menargetkan untuk meningkatkan penggunaan EBT hingga 23% pada tahun 2025 dan 31%
pada 2050. PLTN sebagai salah satu bentuk Energi Baru memiliki keunggulan dibanding
bentuk EBT lainnya seperti PLTB dan PLTS yaitu pada stabilitas keluaran daya yang dihasilkan
sehingga diharapkan tidak akan mengganggu kestabilan jaringan sistem kelistrikan
Kalimantan yang memiliki beban puncak yang masih relatif rendah dibandingkan sistem
kelistrikan Jawa-Madura-Bali (Jamali).
2013 2025
EBT
8% EBT Minyak
23% 25%
Batubara
30% Minyak
44%
Gas
Gas Alam Batubara Alam
18% 30% 22%
2030 2050
Minyak Minyak
EBT
22% 20%
25% EBT
31%
Gas
Gas Alam
Alam Batubara
25% 24%
Batubara 23%
30%
150kV direncanakan dapat beroperasi pada tahun 2020. Dalam jangka panjang, Sistem tenaga
listrik se-Kalimantan direncanakan akan terhubung menjadi satu yaitu Grid Borneo sebagai
backbone interkoneksi Sistem Kalimantan seperti terlihat pada Gambar 38. Beberapa proyek
transmisi strategis di Sistem Kalimantan antara alain:
2. Transmisi 150 kV Muara Teweh – Puruk Cahu – Kuala Kurun – Kasongan dan uprating
transmisi 150kV Palangkaraya – Selat – Seberang Barito untuk mendukung evakuasi
daya dari PLTU IPP Kalselteng 1 (2x100MW) ke pusat beban.
4. Transmisi 150 kV Tanjung Redep – Tanjung Selur – Tidang Pale – Malinau untuk
meningkatkan keandalan pasokan ke ibukota Provinsi dan Kabupaten serta Kota di
Kalimantan Utara.
5. Selain itu juga direncanakan pembangunan Transmisi 150 kV Maloi – talisayan pada
2020 untuk menigkatkan keandalan pasokan dari Provinsi Kaltim ke Kaltara.
1. Proyek pembangkit FTP1 yaitu PLTU Parit Baru (2x50MW) (Kalbar 1) dan PLTU Pantai
Kura-Kura (Kalbar 2) (2x27,5 MW) serta proyek pembangkit PLTU Parit Baru FTP2
(Kalbar 3) (2x50 MW) yang berfungsi untuk mensuplai kebutuhan listrik dibeban dasar
Sistem Kalimantan Barat.
2. Pembangkit beban puncak yaitu Kalbar/Pontianak 100 MW yang akan mensuplai
kebutuhan beban puncak langsung ke pusat beban di Pontianak.
3. Proyek pembangkit PLTU yang akan dibangun oleh IPP antara lain PLTU Kalbar 1
(2x100MW) serta PLTU Kalbar 2 (2x100MW)
Selain pembangkit tersebut di atas, data keseluruhan pembangkit yang sudah direncanakan
pada RUPTL PLN 2019 adalah seperti terihat pada Tabel 13 di bawah.
4. Smelter Bauksit di Ketapang, Kalimantan Barat, COD 2021, Kapasitas 140 MW,
berjarak 25 km dari GI 150 kV Sandai (COD 2020).
7. Kawasan Industri LANDAK, Terletak di Landak, Kalimantan Barat, di mana pihak PLN
akan membangun gardu induk jika terdapat investor, berjarak 6 km dari GI 150 kV
Ngabang.
4.3.2. Perencanaan Pengembangan Sistem Tenaga Listrik Kalimantan Tengah dan Selatan
(Sistem Barito)
Untuk memenuhi kebutuhan beban sampai dengan Tahun 2028 termasuk memenuhi
daftar tunggu, rincian pengembangan pembangkit di Kalimantan Tengah ditampilkan pada
Tabel 15.
Selama periode 2019-2028, akan dibangun gardu induk baru dan dilakukan
perluasan untuk beberapa gardu induk. Rencana pengembangan gardu induk
ditunjukkan pada Tabel 17.
Kapasitas
No Nama GI Tegangan Keterangan COD
(MVA)
1 Kasongan (Arah Kuala Kurun) 150 kV Ext LB 2 LB 2019
2 Muara Teweh (arah Purukcahu) 150 kV Ext LB 2 LB 2019
3 PLTU Sampit (arah K. Pambuang) 150 kV Ext LB 2 LB 2019
4 Sampit 150 kV Ext 60 2019
5 Kuala Kurun 150 kV New 30 2019
6 Kuala Pambuang 150 kV New 30 2019
7 Pangkalan Banteng 150 kV New 30 2019
8 Parenggean 150 kV New 30 2019
9 TF PLTU Kalselteng I 150 kV New 10 2019
10 Puruk Cahu 150 kV New 30 2019
11 Nangabulik 150 kV New 30 2020
12 Sukamara 150 kV New 30 2020
13 Tamiang Layang 150 kV New 30 2020
14 Buntok (arah Tamiang) 150 kV Ext LB 2 LB 2020
15 Sukamara (arah Pangkalan Bun) 150 kV Ext LB 2 LB 2020
16 Mintin (PLTU P. Pisang) 150 kV Upr 30 2020
17 New Palangkaraya 150 kV Ext 60 2021
18 Pulang Pisau 150 kV Ext 30 2022
19 Tamiang Layang 150 kV Ext 30 2023
20 Buntok 150 kV Ext 30 2024
21 Selat 150 kV Ext 60 2025
Tamiang Layang (arah PLTU Kalselteng
22 4) 150 kV Ext LB 2 LB 2026
23 Pangkalan Bun 150 kV Ext 60 2026
24 Palangkaraya 150 kV Ext 60 2027
25 TF PLTU Kalselteng I 150 kV Ext 30 2028
Jumlah 700
(Sumber: PLN, 2019)
Kebutuhan tenaga listrik sampai dengan tahun 2028 di Kalimantan Selatan dapat
dipenuhi dengan pengembangan pembangkit di Provinsi Kalimantan Selatan ditampilkan
pada Tabel 18.
Kapasitas
No Nama GI Tegangan Keterangan COD
(MVA)
1 Amuntai 150/20 kV Ext 60 2019
2 Asam-Asam 150/20 kV Upr 60 2019
3 Banjarmasin/Ulin (GIS) 150/20 kV New 60 2019
4 Barikin 150/20 kV Ext 60 2019
5 Kayutangi 150/20 kV Ext 60 2019
6 Sei Tabuk 150/20 kV New 60 2019
7 Batulicin (Arah Kotabaru) 150 kV Ext LB 2LB 2019
8 Kayutangi (arah Sei Tabuk) 150 kV Ext LB 2LB 2019
9 Mantuil (arah Sei Tabuk) 150 kV Ext LB 2LB 2019
10 Sei Tabuk (arah Mantuil) 150 kV Ext LB 2LB 2019
11 Tanjung Ext LB (PLTU Kalsel (FTP2)) 150 kV Ext LB 2LB 2019
12 Bati-Bati 150/20 kV New 30 2019
13 Marabahan 150/20 kV New 30 2019
14 Paringin 150/20 kV New 30 2019
15 Bati-Bati 150/20 kV Ext 60 2020
16 Rantau 150/20 kV Ext 60 2020
17 Pelaihari 150/20 kV Ext 30 2020
18 Amuntai (arah Tamiang Layang) 150 kV Ext LB 2LB 2020
19 Kandangan 150/20 kV New 30 2020
20 Seberang Barito (arah Kalsel Peaker) 150 kV Ext LB 2LB 2021
21 Kotabaru 150/20 kV Ext 60 2021
22 Asam-Asam 150/20 kV Upr 60 2023
23 Trisakti 150/20 kV Ext 60 2023
24 Banjarmasin/Ulin (GIS) 150/20 kV Ext 60 2024
25 Batulicin 150/20 kV Ext 60 2024
26 Kandangan 150/20 kV Ext 30 2024
27 Sei Durian 150/20 kV New 30 2024
28 Paringin 150/20 kV Ext 30 2025
29 Cempaka 150/20 kV Ext 60 2026
Jumlah 1080
(Sumber: PLN, 2019)
4.2.3. Perencanaan Pengembangan Sistem Tenaga Listrik Kalimantan Timur dan Utara
(Sistem Mahakam)
Sepaso dan Muara Wahau. Selama periode, 2019-2028 direncanakan pengembangan jaringan
transmisi 150 kV seperti ditampilkan dalam Tabel 22 di atas.
Kapasitas
No Nama GI Tegangan Keterangan COD
(MVA)
1 New Balikpapan 150 kV New 60 2019
2 Embalut 150 kV Ext LB 2 LB 2019
3 Kotabangun 150 kV Ext LB 2 LB 2019
PLTU Teluk
4 Balikpapan (arah New Balikpapan) 150 kV Ext LB 2 LB 2019
5 Maloy 150 kV New 30 2019
6 Samboja 150 kV New 30 2019
7 Sanga-Sanga (Relokasi ke PLTU Kaltim) 150 kV Ext 30 2019
8 Sepaso 150 kV New 30 2019
9 Bontang Koala 150 kV New 60 2020
10 Kembang Janggut 150 kV New 30 2020
11 Muara Wahau 150 kV New 30 2020
12 Sepaso (arah Muara Wahau) 150 kV Ext LB 2 LB 2020
13 Tanjung Redeb (arah Muara Wahau) 150 kV Ext LB 2 LB 2020
14 Tanjung Redeb (arah Talisayan) 150 kV Ext LB 2 LB 2020
15 Bontang Koala 150 kV Ext 60 2021
16 Semoi-Sepaku 150 kV New 30 2021
17 Talisayan 150 kV New 30 2021
18 Kariangau (arah Sepaku) 150 kV Ext LB 2 LB 2021
19 Tenggarong (arah Sepaku) 150 kV Ext LB 2 LB 2021
20 Mahakam Ulu/ Ujoh Bilang 150 kV New 30 2023
21 Muara Bengkal 150 kV New 30 2023
22 Tanjung Batu/ Derawan 150 kV New 30 2024
23 Berau/Tj Redep 150 kV Ext 60 2025
24 Balikpapan (Eks. GIS) 150 kV New 60 2025
25 Samarinda (Eks.GIS ) 150 kV New 60 2025
26 Balikpapan (Fits. GIS) 150 kV Ext 60 2027
27 Samarinda 150 kV Ext 60 2028
Jumlah 810
(Sumber: PLN, 2019)
Khusus untuk KIPI Tanah Kuning, kebutuhan akan dipenuhi melalui Sistem
interkoneksi 150 kV Kalsetengtim, dan jika masih dibutuhkan akan ditambah dengan
pengembangan potensi pembangkit hydro PLTA Kaltara 2 sebesar 300 MW.
Memperhatikan beban sistem tenaga listrik di Kalimantan Utara masih rendah, maka
rencana proyek transmisi akan dibangun secara bertahap. Pada tahap pertama akan dibangun
transmisi 150 kV Tanjung SelorTanjung Redep, kemudian dikembangkan ke arah Tidang Pale,
Malinau, Nunukan dan Tarakan sekaligus untuk pemanfaatan potensi gas di lapangan Sei
1 Tanjung Redep Tanjung Selor 150 kV 2 cct, ACSR 2xHawk 160 2019
2 Tanjung Selor Tidang Pale 150 kV 2 cct, ACSR 2xHawk 204 2019
3 Tidang Pale Malinau 150 kV 2 cct, ACSR 2xHawk 52 2019
4 Sekatak Juata 150 kV 2 cct, ACSR 1xHawk 120 2021
5 Juata Tarakan 150 kV 2 cct, ACSR 1xHawk 28 2021
6 Malinau Sebuku 150 kV 2 cct, ACSR 1xHawk 150 2021
7 Sebuku Nunukan 150 kV 2 cct, ACSR 1xHawk 156 2021
8 Sei Menggaris Tidang Pale 150 kV 2 cct, ACSR 1xHawk 160 2021
9 PLTA Kaltara 1 Tj.Selor 150 kV 2 cct, ACSR 2xZebra 80 2025
Jumlah 1110
(Sumber: PLN, 2019)
Jumlah Gardu Induk 150 kV yang akan dibangun dalam periode 2019-2028 dapat
dilihat pada Tabel 26 berikut.
Neraca daya tahunan berdasarkan RUPTL PLN 2019 yang terlihat pada Tabel 27
menunjukkan penambahan DMN yang berkesinambungan setiap tahunnya baik berasal dari
PLTU maupun PLT EBT seperti PLTBG dan PLTBM. Sampai Dengan Tahun 2028, diperkirakan
sistem Kalimantan Barat memiliki beban puncak sistem sebesar 845 MW dan DMN sebesar
1152 MW.
Satuan/
No Uraian 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
Jenis
KEBUTUHAN
1 Penjualan GWh 2174 2590 2857 3135 3317 3504 3713 3916 4112 4320
2 Pertumbuhan Penjualan % 20,7 19,1 10,3 9,7 5,8 5,6 6 5,5 5 5,1
3 Produksi GWh 2582 3083 3381 3708 3901 4095 4319 4532 4737 4949
4 Faktor Beban % 67 66 66 66 66 66 67 67 67 67
5 Beban puncak MW 440 530 582 639 671 704 741 776 810 845
PASOKAN EKSISTING
1 Total Kapasitas Terpasang MW 519 564 346 346 346 346 346 346 346 346
2 Total Daya Mampu Netto MW 444 406 127 136 136 136 136 136 136 136
3 Pembangkit Eksisting
a PLN (Total) MW 104 55 55 55 55 55 55 55 55 55
PLTG MW 29 - - - - - - - - -
PLTD MW 54 - - - - - - - - -
PLTU MW 21 55 55 55 55 55 55 55 55 55
b IPP (Total) MW 110 121 72 81 81 81 81 81 81 81
PLTMG MW 100 100 50 50 50 50 50 50 50 50
PLTBM MW 10 10 11 20 20 20 20 20 20 20
PLTU MW - 11 11 11 11 11 11 11 11 11
c Power Purchase (Total) MW 230 230
Power Purchase SESCO
(Peaking) MW 130 130 - - - - - - - -
Power Purchase SESCO
(Peaking) MW 100 100 - - - - - - - -
2 Rencana Tambahan
a PLN (Total) MW 100 2,5 10,9 107,3 100
Kalbar/Pontianak Peaker PLTG - - 100 - - - - - - -
REKAPITULASI
1 Total Pasokan Eksisting (DMN) MW 444 406 127 136 136 136 136 136 136 136
Total Tambahan Pasokan
2
(DMN) MW 178 242 158 100 102 10 97 90 13
3 Total DMN Sistem MW 649 852 732 841 943 953 1049 1139 1139 1152
4 Reserve Margin MW 209 322 150 202 272 249 308 363 329 307
5 Reserve Margin % 48% 61% 26% 32% 41% 35% 42% 47% 41% 36%
(Sumber: PLN, 2019)
GI SEKAYAM
22 150/20 30 0,0 15,5 30 18,6
(ENTIKONG)
23 GI KENDAWANGAN 150/20 30 3,8 4,1 30 4,5
24 GI RASAU 150/20 30 13,6 15,3 30 17,7
25 GI AIR UPAS 150/20 30 0,0 3,6 30 4,8
GI PLTU 3 KALBAR
26 150/20 30 7,5 9,7 30 13
(PBSB)
27 GI AMBAWANG 150/20 30 15,9 2027 30 20,6 2 60 27,6
28 GI BADAU 150/20 30 0,0 10,0 30 9,8
150/20 30
29 GI KIJING 0,0 20,0 2 60 22,7
150/20 30
150/20 60
30 GI SMELTER TOBA 150/20 60 20,0 60,0 3 150 60
150/20 30
Total 39 2130 977
(Sumber: PLN UIKL, 2020)
Sampai Dengan Tahun 2028, diperkirakan interkoneksi sistem Barito dan Mahakam
akan memiliki beban puncak sistem sebesar 2967 MW dan DMN sebesar 4258 MW. Dengan
tambahan interkoneksi dengan sistem Khatulistiwa, maka sistem Kalimantan pada tahun
2028 akan memiliki beban puncak 3812 MW dan total DMN sebesar 5410 MW.
Peningkatan beban sistem yang ke depannya juga akan terinterkoneksi dengan sistem
Kalimantan secara keseluruhan akan memungkinkan sistem Kalimantan untuk menerima unit
pembangkit dengan kapasitas yang lebih besar yaitu sekitar 5-10% dari beban puncak sistem.
Berdasarkan perhitungan praktis tersebut, sistem Kalimantan pada tahun 2028 akan mampu
menerima unit pembangkit dengan kapasitas 160 – 380 MW.
Tabel 29. Neraca Daya Tahunan Sistem Barito dan Mahakam periode 2019-2028
Satuan/
No Uraian 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
Jenis
KEBUTUHAN
1 Penjualan GWh 7270 8553 9807 10647 11639 12.661 13737 14744 11861 17074
2 Pertumbuhan Penjualan % 16,3 17,6 14,7 8,6 9,3 8,8 8,5 7,3 7,6 7,6
3 Produksi GWh 8632 10179 11605 12692 13689 14797 15977 17063 18275 19559
4 Faktor Beban % 74 75 75 75 75 75 75 75 75 75
5 Beban puncak MW 1326 1549 1763 1911 2079 2249 2429 2592 2775 2967
PASOKAN EKSISTING
1 Total Kapasitas Terpasang MW 1734 1480 1615 1615 1615 1575 1575 1575 1575 1575
2 Total Daya Mampu Netto MW 1324 1187 1322 1340 1358 1318 1318 1318 1318 1318
3 Pembangkit Eksisting
a PLN (Total) MW 890 590 1025 1043 1061 1061 1061 1061 1061 1061
PLTA MW 29 29 29 29 29 29 29 29 29 29
PLTG MW 134 134 134 134 134 134 134 134 134 134
PLTGU MW 54 54 54 54 54 54 54 54 54 54
PLTMG MW 197 197 302 320 338 338 338 338 338 338
PLTU Batubara MW 476 476 507 507 607 507 507 507 507 507
b IPP (Total) MW 282 297 297 297 297 257 257 257 267 257
PLTG MW 82 82 82 82 82 82 82 82 82 82
PLTD MW 40 40 40 40 40
PLTU Batubara MW 160 175 175 175 175 175 175 175 175 175
c Pembelian Excess Power MW 153
PLTBio MW 4
PLTMG MW 4
PLTU Batubara MW 145
d Impor MW - - - - - - - -
e Retired & Mothballed MW 231 - - - - - - - -
PLTD BBM/Gas MW 231
c Unallocated MW 100
Kalsel 1 PLTGU - - - - - - - - 100 -
REKAPITULASI
Total Pasokan Eksisting
1
(DMN) MW 1324 1187 1322 1340 1358 1318 1318 1318 1318 1318
Total Tambahan Pasokan
2
(DMN) MW 548 540 295 135 140 103,7 435 280 300 214
3 Total DMN Sistem MW 1853 2325 2719 2858 2966 3026 3438 3746 4046 4258
4 Reserve Margin MW 527 776 956 947 887 777 1009 1154 1271 1291
5 Reserve Margin % 40% 50% 54% 50% 43% 35% 42% 45% 46% 44%
(Sumber: PLN, 2019)
Penambahan
Trafo Eksisting Beban Beban Total 2030
(Pengurangan)
Puncak Puncak
No. Gardu Induk
2020 2025
Beban
Teg. Kap. (MW) Kap. (MW) Kap.
Tahun Jumlah Puncak
(kV) (MVA) (MVA) (MVA)
(MW)
150/20 60 2026 60
1 GI CEMPAKA 150/20 30 60,6 88 4 210 123,3
150/20 60
70/20 10
2 GI CEMPAKA 8 7,5 2 20 6,9
70/20 10
GI RIAM
3 70/20 6 2,5 2020 20 (6) 2,7 1 20 2,8
KANAN/ARANIO
70/20 20 2020 -20
70/20 20
4 GI BANJARMASIN 15,4 14,5 3 80 13,2
70/20 30
70/20 30
70/20 6
70/20 6
5 GI TRISAKTI 15,7 14,8 5 47 13,5
70/20 10
70/20 10
70/20 15
150/20 60 2023 60
6 GI TRISAKTI 61,4 89,2 4 240 124,9
150/20 60 2030 60
150/20 20 2029 60
7 GI MANTUIL 150/20 30 36,4 52,8 4 170 74
150/20 60
GI SEBERANG 150/20 20
8 6,7 9,1 2 40 11,8
BARITO 150/20 20
150/20 20 2025 60
9 GI SELAT 23,3 31,5 3 110 41,2
150/20 30
150/20 30 2027 60
10 GI PALANGKARAYA 34,1 49,5 3 150 69,3
150/20 60
150/20 30
11 GI BARIKIN 150/20 30 21,6 28,5 3 120 36,4
150/20 60
150/20 60
12 GI TANJUNG 35,1 49,8 2 120 68,2
150/20 60
150/20 30
13 GI AMUNTAI 23,9 33,2 2 90 44,4
150/20 60
60
150/20 60 2023
14 GI ASAM-ASAM 27,6 (30) 38,3 2 120 51,2
150/20 30
15 GI PELAIHARI 150/20 30 23,5 2020 30 33,4 2 60 45,7
GI 150/20 30 2020 60
16 41,8 56,6 2 120 74
RANTAU/BINUANG 150/20 30
30
17 GI MINTIN 150/20 10 2,6 2020 3,6 1 30 4,8
(10)
150/20 30 2024 60
18 GI BATULICIN 31,7 44,9 2 120 61,5
150/20 30
19 GI KAYU TANGI 150/20 30
14,7 20,9 2 90 28,6
150/20 60
150/20 30 2030 60
20 GI SAMPIT 150/20 30 38,6 57,3 4 180 82,2
150/20 60
150/20 20
21 GI TF PLTU SAMPIT 6,4 9,2 2 50 12,9
150/20 30
150/20 30
22 GI KASONGAN 14,3 19,8 2 90 26,5
150/20 60
150/20 60 2026 60
23 GI PANGKALAN BUN 49 71,2 2 120 99,7
150/20 60
24 GI BUNTOK 150/20 30 15,1 2024 30 20 2 60 25,5
25 GI MUARA TEWEH 150/20 30 11,7 2030 30 15,4 2 60 19,7
GI NEW
26 150/20 60 36,1 2021 60 52,28 2 120 70,5
PALANGKARAYA
Penambahan
Trafo Eksisting Beban Beban Total 2030
(Pengurangan)
Puncak Puncak
No. Gardu Induk
2020 2025 Beban
Teg. Kap. (MW) Kap. (MW) Kap.
Tahun Jumlah Puncak
(kV) (MVA) (MVA) (MVA)
(MW)
150/20 60
1 GI Gn Malang / Industri 150/20 60 68,9 79,9 3 150 99,6
150/20 30
150/20 20
150/20 60
2 GI Batakan/Manggar Sari 66,9 78,7 4 170 97,7
150/20 30
150/20 60
150/20 60
3 GI Karang Joang/Giri Rejo 23,4 26,8 2 90 38,4
150/20 30
150/20 30
4 GI Sei Keledang/Harapan Baru 24,9 28,0 2 60 40,3
150/20 30
150/20 30
150/20 30
5 GI Tengkawang 87,4 95,5 4 180 120,1
150/20 60
150/20 60
150/20 30
6 GI Embalut 19,3 25,4 2 60 32,1
150/20 30
7 GI Bukuan/Bukuan 150/20 30 6,9 9,1 1 30 11,1
150/20 30 26,8
8 GI Tenggarong / Bukit Biru 20,3 2 60 46,5
150/20 30
150/20 30
9 GI Sambutan 26,2 34,5 2 90 45,3
150/20 60
150/20 30
10 GI Sambera 20,8 27,4 2 60 36
150/20 30
150/20 30
11 GI Bontang 150/20 20 26,8 35,3 3 110 46,4
150/20 60
12 GI Kuaro / Tanah Grogot 150/20 20 3,2 4,2 1 20 4,5
150/20 30
13 GI Petung 20,8 37,7 2 90 44,3
150/20 60
14 GI NEW BALIKPAPAN 150/20 60 27,6 20,0 1 60 45,3
15 GIS BALIKPAPAN 150/20 60 0,0 2027 60 40,8 2 120 64,1
4.5. Perencanaan Sistem Tenaga Listrik Kalimantan Barat Jangka Panjang dengan Balmorel
Pengelolaan dan pemanfaatan energi termasuk energi listrik harus dilakukan secara
seimbang di antara 3 aspek tersebut, yaitu Energy Security, Energy Equity, dan Environment
Sustainability, tanpa ada salah satu yang lebih diutamakan, hal tersebut terlohat pada
Gambar 39.
Keberlanjutan
Ketenagalistrika
n
Penambaha Peningkatkan
n Kapasitas aksesibilitas/
Metodologi yang digunakan dalam perencanaan sistem tenaga listrik jangka panjang
menganut konsep tersebut di atas dimana perencanaan dilakukan dengan prinsip least cost
namun tetap memperhatikan lingkungan. Metodologi dimaksud adalah sebagaimana terlihat
pada Gambar 40, tahap pertama dilakukan proyeksi kebutuhan jangka panjang (2021-2050)
menggunakan software Simple-e dari Jepang kemudian dilakukan optimasi supply
menggunakan software Balmorel dari Denmark untuk mendapatkan kombinasi
pembangkitan tenaga listrik yang optimal dengan tujuan menurunkan BPP tenaga listrik.
1. Skenario Dasar (BaU): menggunakan metode ekonometric regression analysis dengan tools
Simple-E;
2. Skenario Industrialisasi: Skenario Dasar (BaU) ditambahkan dengan rencana
pengembangan industri di Kalimantan Barat;
3. Skenario Prosperity: Memperhitungkan target konsumsi listrik per kapita dalam Kebijakan
Energi Nasional (KEN).
Kebutuhan energi listrik pada 2021 diperkirakan akan mencapai sekitar 3,02 TWh dan
diproyeksikan akan terus meningkat menjadi sekitar 15 TWh pada 2050. Pada 2021,
komposisi kebutuhan energi listrik berdasarkan sektor penggunanya meliputi sektor rumah
tangga sekitar 64,9%, diikuti oleh bisnis sekitar 19,9%, publik sekitar 8,3%, dan industri sekitar
6,8%. Komposisi tersebut mengalami perubahan mulai tahun 2044, sektor bisnis menjadi
sektor yang paling banyak membutuhkan energi listrik yaitu sekitar 49,8%, melewati sektor
rumah tangga sekitar 40,7%, publik sekitar 9,5% dan industri sekitar 7,9%. Hasil proyeksi
kebutuhan tenaga listrik dengan skenario BaU adalah sebagaimana terlihat pada Gambar 41.
Berdasarkan hasil proyeksi tersebut terlihat bahwa tanpa adanya interfensi kebijakan,
sektor industri tidak terlalu tumbuh secara signifikan, hal tersebut diindikasikan oleh proyeksi
konsumsi tenaga listrik sektor industri 2050 masih lebih sedikit porsinya dibandingkan dengan
sektor lain.
2. Skenario Industrialisasi
Pada skenario industrialisasi, hasil proyeksi skenario dasar (BaU) diinjeksikan atau
ditambahkan dengan kebutuhan tenaga listrik dari sektor industri dan bisnis yang
direncanakan akan dikembangkan di Kalimantan Barat. Beberapa industri tersebut meliputi
kawasan industri, pelabuhan, dan industri pertambangan sebagaimana Tabel 32 berikut:
Kebutuhan tenaga listrik pada 2021 yang diperkirakan mencapai sekitar 3,02 TWh
diproyeksikan akan terus meningkat menjadi sekitar 18,7 TWh pada 2050. Komposisi
kebutuhan energi listrik yang pada 2021 didominasi oleh sektor rumah tangga sekitar 64,9%,
sektor bisnis sekitar 19,9%, sektor publik sekitar 8,3%, dan sektor industri sekitar 6,8%. Pada
2023, sektor industri menjadi sektor yang membutuhkan energi listrik paling banyak yaitu
sekitar 40,5%. Namun, komposisi tersebut hanya akan bertahan hingga 2044. Pada 2045,
kebutuhan energi listrik di sektor bisnis menjadi yang terbesar yaitu sekitar 32,2%, diikuti
industri sekitar 31,3%, rumah tangga sekitar 29,8%, dan publik sekitar 6,7%.
3. Skenario Prosperity
Skenario ini mempertimbangkan target konsumsi listrik per kapita yang ada dalam
Kebijakan Energi Nasional (KEN). KEN mengamanatkan target konsumsi listrik per kapita
untuk Indonesia sebesar 2.500 kWh/kapita pada 2025 dan 7.000 kWh/kapita pada 2050. KWh
perkapita Kalimantan Barat dihitung menggunakan proporsionalitas terhadap Nasional,
sebagaimana terlihat pada Gambar 43.
Gambar 43. Proyeksi kWh Perkapita Kalimantan Barat Mengacu Target KEN
melampaui sektor publik yaitu sekitar 7,4%. Hasil proyeksi kebutuhan tenaga listrik dengan
skenario industrialisasi adalah sebagaimana terlihat pada Gambar 44.
4. Perbandingan 3 Skenario
Penjelasan hasil per-skenario akan diuraikan terlebih dahulu yang tanpa skenario
energy mix RUKN. Untuk memudahkan penjelasan, hasil optimasi yang memberikan opsi
PLTN akan ditampilkan dalam rentang setiap 5 tahun.
2049 dan 2050. Skenario Prosperity masing-masing 1 unit di tahun 2046, 2048 dan 2049,
sementara itu skenario Prosperity_X muncul 1 unit setiap tahunnya.
Dari 6 skenario optimasi tanpa skenario energy mix RUKN, terdapat 5 skenario yang
memberikan opsi penambahan PLTN. Hasil optimasi untuk setiap skenario yang memberikan
opsi penambahan PLTN adalah sebagaimana terlihat pada Gambar 51 sampai dengan Gambar
55.
Skenario BaU_X pada Gambar 51 memperlihatkan terdapat rencana penambahan PLTN total
200 MW dengan tahun Commercial Operating Date (COD) tahun 2030 dan tahun 2049.
Perbandingan skenario BaU dan BaU_NC sebagaimana terlihat pada Gambar 62 dan
Gambar 63. Dengan intervensi kebijakan RUKN dalam model maka pada tahun 2030 PLTU dan
BESS serta sebagian PLTBm akan digantikan oleh SMR_NPP, kemudian pada tahun 2049 akan
digantikan oleh SMR_NPP dan tahun 2050 oleh PLTA.
Perbandingan emisi yang dihasilkan antara skenario RUKN dengan skenario lain
sebagaimana terlihat pada Gambar 75 s.d. Gambar 82. Jika dibandingkan skenario BaU,
Industrialisasi, dan Prosperity tanpa eksternalitas dengan skenario RUKN, maka skenario
RUKN akan menurunkan emisi secara signifikan. Sedangkan apabila dibandingkan dengan
skenario BaU, Industrialisasi dan Prosperity dengan eksternalitas, maka skenario RUKN dapat
menurunkan emisi pada skenario Industrialisasi dan Prosperity dengan eksternalitas karena
pada skenario tersebut masih terdapat pembangunan PLTU dengan teknologi FGD.
Sedangkan pada skenario BaU dengan eksternalitas emisi yang dihasilkan skenario RUKN
relatif tidak berubah secara signifikan karena tidak terdapat PLTU dengan teknologi FGD pada
skenario tersebut.
Gambar 75. Perbandingan Proyeksi Emisi CO2 kenario BaU, BaU_X dan Industrialisasi dengan
Skenario RUKN (dalam Juta Ton)
Gambar 76. Perbandingan Proyeksi Emisi CO2 Skenario Industrialisasi_X, Prosperity dan
Prosperity_X dengan Skenario RUKN (dalam Juta Ton)
Gambar 77. Perbandingan Proyeksi Emisi SO2 Skenario BaU, BaU_X dan Industrialisasi
dengan Skenario RUKN (dalam Ton)
Gambar 78. Perbandingan Proyeksi Emisi SO2 Skenario Industrialisasi_X, Prosperity dan
Prosperity_X dengan Skenario RUKN (dalam Ton)
Gambar 79. Perbandingan Proyeksi Emisi NOx Skenario BaU, BaU_X dan Industrialisasi
dengan Skenario RUKN (dalam Ton)
Gambar 80. Perbandingan Proyeksi Emisi NOx Skenario Industrialisasi_X, Prosperity dan
Prosperity_X dengan Skenario RUKN (dalam Ton)
Gambar 81. Perbandingan Proyeksi Emisi PM 2.5 Skenario BaU, BaU_X dan Industrialisasi
dengan Skenario RUKN (dalam Ton)
Gambar 82. Perbandingan Proyeksi Emisi PM 2.5 Skenario Industrialisasi_X, Prosperity dan
Prosperity_X dengan Skenario RUKN (dalam Ton)
Gambar 83. Perbandingan Proyeksi Bauran Energi Skenario BaU, BaU_X dan Industrialisasi dengan
Skenario RUKN
Gambar 84. Perbandingan Proyeksi Bauran Energi Skenario Industrialisasi_X, Prosperity dan
Prosperity_X dengan Skenario RUKN
Berdasarkan hasil dari proyeksi demand dan optimasi supply sebagaimana telah
diuraikan di atas, maka dapat digambarkan neraca daya dari masing-masing skenario sebagai
berikut.
1. Skenario BaU
Terdapat 4 skenario optimasi supply dengan menggunakan demand BaU yang meliputi
BaU, BaU_NC, BaU_X, dan BaU_X_NC. Neraca daya masing-masing skenario tersebut adalah
sebagaimana terlihat pada Tabel 33 sampai dengan Tabel 44 berikut :
Uraian Satuan/ Jenis 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
1. DEMAND
Konsumsi Listrik GWh 5.141 5.447 5.774 6.126 6.502 6.789 7.132 7.500 7.897 8.323
Pertumbuhan Konsumsi Listrik % 5,87 5,94 6,01 6,09 6,14 4,42 5,05 5,17 5,29 5,40
Produksi (Netto) GWh 5.593 5.903 6.235 6.591 6.972 7.256 7.598 7.965 8.382 8.830
Beban Puncak (Netto) MW 756 796 839 885 934 971 1.016 1.064 1.118 1.176
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 261 261 261 261 261 261 261 261 261 261
PLN: MW 129 129 129 129 129 129 129 129 129 129
PLTG MW - - - - - - - - - -
PLTG Siantan MW
PLTU MW 129 129 129 129 129 129 129 129 129 129
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 80 80
PLTU Sanggau MW 12 12 12 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 18 18 18 18 18
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 19 19 19
IPP MW 132 132 132 132 132 132 132 132 132 132
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 12 12
PLTU Ketapang MW 12 12 12 12 12 12 12 12 12 12
Excess Power MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 30 30 30 30 30 30 30 30 30 30
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - - - - - - - -
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - - -
PLTU Sanggau MW - - - - - - - - - -
PLTU Sukabangun/Ketapang MW - - - - - - - - - -
PLTU Sei Ringin/Sintang MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Ketapang MW
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 218 55 55 52 51 56 54 56 55 55
PLTU MW 50 - - - - - - - - -
PLTU-SubC MW 50 - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW 20 - - - - - - - - -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW 100 *100 *1 - - - - - - -
PLTGU MW - - - - - - - - - -
PLTG MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - - - -
BESS MWh *80 - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 48 55 55 52 51 56 54 56 55 55
4. SUMMARY
Existing Supply (DMN) MW 261 261 261 261 261 261 261 261 261 261
Additional Supply (DMN) MW 218 55 55 52 51 56 54 56 55 55
Daya Mampu Sistem (DMN) MW 1.130 1.185 1.240 1.292 1.343 1.398 1.453 1.509 1.564 1.618
Uraian Satuan/ Jenis 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050
1. DEMAND
Konsumsi Listrik GWh 8.783 9.280 9.815 10.394 11.020 11.695 12.427 13.219 14.077 15.008
Pertumbuhan Konsumsi Listrik % 5,53 5,65 5,77 5,90 6,02 6,13 6,25 6,37 6,49 6,61
Produksi (Netto) GWh 9.313 9.834 10.396 11.003 11.659 12.368 13.134 13.964 14.863 15.837
Beban Puncak (Netto) MW 1.239 1.307 1.380 1.459 1.544 1.635 1.735 1.842 1.958 2.084
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 161 161 161 149 149 131 131 112 20 20
PLN: MW 129 129 129 117 117 99 99 80 - -
PLTG MW - - - - - - - - - -
PLTG Siantan MW
PLTU MW 129 129 129 117 117 99 99 80 - -
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80
PLTU Sanggau MW 12 12 12
PLTU Sukabangun/Ketapang MW 18 18 18 18 18
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 - - -
IPP MW 32 32 32 32 32 32 32 32 20 20
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 - -
PLTU Ketapang MW 12 12 12 12 12 12 12 12 - -
Excess Power MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 130 130 130 142 142 160 160 179 259 259
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - 12 12 30 30 49 129 129
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - 80 80
PLTU Sanggau MW - - - 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW - - - - - 18 18 18 18 18
PLTU Sei Ringin/Sintang MW - - - - - - - 19 19 19
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTU MW - - - - - - - - - -
PLTU Ketapang MW
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 51 63 116 155 139 204 193 159 234 169
PLTU MW - - - - - - - - 100 50
PLTU-SubC MW - - - - - - - - 100 50
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - - -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW - 1 63 84 59 100 100 *92 *94 100
PLTGU MW - - - - - 30 30 - - -
PLTG MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - - - -
BESS MWh *360 *40 *120 *120 *40 *400 *120 - - *400
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 51 62 53 71 80 74 63 9 134 19
4. SUMMARY
Existing Supply (DMN) MW 161 161 161 149 149 131 131 112 20 20
Additional Supply (DMN) MW 51 63 116 155 139 204 193 159 234 169
Daya Mampu Sistem (DMN) MW 1.570 1.633 1.749 1.891 2.030 2.216 2.409 2.549 2.691 2.860
Uraian Satuan/ Jenis 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
1. DEMAND
Konsumsi Listrik GWh 5.141 5.447 5.774 6.126 6.502 6.789 7.132 7.500 7.897 8.323
Pertumbuhan Konsumsi Listrik % 5,87 5,94 6,01 6,09 6,14 4,42 5,05 5,17 5,29 5,40
Produksi (Netto) GWh 5.593 5.903 6.235 6.591 6.972 7.256 7.598 7.965 8.382 8.830
Beban Puncak (Netto) MW 756 796 839 885 934 971 1.016 1.064 1.118 1.176
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 261 261 261 261 261 261 261 261 261 261
PLN: MW 129 129 129 129 129 129 129 129 129 129
PLTG MW - - - - - - - - - -
PLTG Siantan MW
PLTU MW 129 129 129 129 129 129 129 129 129 129
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 80 80
PLTU Sanggau MW 12 12 12 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 18 18 18 18 18
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 19 19 19
IPP MW 132 132 132 132 132 132 132 132 132 132
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 12 12
PLTU Ketapang MW 12 12 12 12 12 12 12 12 12 12
Excess Power MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 30 30 30 30 30 30 30 30 30 30
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - - - - - - - -
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - - -
PLTU Sanggau MW - - - - - - - - - -
PLTU Sukabangun/Ketapang MW - - - - - - - - - -
PLTU Sei Ringin/Sintang MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Ketapang MW - - - - - - - - - -
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 197 55 59 51 49 55 54 55 55 54
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW 10 - - - - - - - - -
PLTM MW - - - - - - - - - -
PLTBm MW 40 - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW 100 *64 - - - - - - - -
PLTGU MW - - - - - - - - - -
PLTG MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - - - -
BESS MWh *160 - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 47 55 59 51 49 55 54 55 55 54
4. SUMMARY
Existing Supply (DMN) MW 261 261 261 261 261 261 261 261 261 261
Additional Supply (DMN) MW 197 55 59 51 49 55 54 55 55 54
Daya Mampu Sistem (DMN) MW 994 1.049 1.108 1.159 1.208 1.263 1.317 1.372 1.427 1.482
Uraian Satuan/ Jenis 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050
1. DEMAND
Konsumsi Listrik GWh 8.783 9.280 9.815 10.394 11.020 11.695 12.427 13.219 14.077 15.008
Pertumbuhan Konsumsi Listrik % 5,53 5,65 5,77 5,90 6,02 6,13 6,25 6,37 6,49 6,61
Produksi (Netto) GWh 9.313 9.834 10.396 11.003 11.659 12.368 13.134 13.964 14.863 15.837
Beban Puncak (Netto) MW 1.239 1.307 1.380 1.459 1.544 1.635 1.735 1.842 1.958 2.084
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 161 161 161 149 149 131 131 112 20 20
PLN: MW 129 129 129 117 117 99 99 80 - -
PLTG MW - - - - - - - - - -
PLTG Siantan MW
PLTU MW 129 129 129 117 117 99 99 80 - -
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80
PLTU Sanggau MW 12 12 12 - - - - - - -
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 - - - - -
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 - - -
IPP MW 32 32 32 32 32 32 32 32 20 20
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 - -
PLTU Ketapang MW 12 12 12 12 12 12 12 12 - -
Excess Power MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 130 130 130 142 142 160 160 179 271 271
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - 12 12 30 30 49 129 129
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - 80 80
PLTU Sanggau MW - - - 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW - - - - - 18 18 18 18 18
PLTU Sei Ringin/Sintang MW - - - - - - - 19 19 19
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTU MW - - - - - - - - 12 12
PLTU Ketapang MW - - - - - - - - 12 12
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 52 72 92 145 143 204 193 151 226 201
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - - 50
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW - 17 32 67 63 100 100 *93 *67 100
PLTGU MW - - - - - - - 150 - -
PLTG MW - - - - - 30 30 - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - - 100 -
BESS MWh *400 *80 *80 *80 *40 *440 *160 - - *360
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 52 55 60 78 80 74 63 1 126 51
4. SUMMARY
Existing Supply (DMN) MW 161 161 161 149 149 131 131 112 20 20
Additional Supply (DMN) MW 52 72 92 145 143 204 193 151 226 201
Daya Mampu Sistem (DMN) MW 1.434 1.506 1.598 1.731 1.874 2.060 2.253 2.385 2.520 2.720
Uraian Satuan/ Jenis 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
1. DEMAND
Konsumsi Listrik GWh 5.141 5.447 5.774 6.126 6.502 6.789 7.132 7.500 7.897 8.323
Pertumbuhan Konsumsi Listrik % 5,87 5,94 6,01 6,09 6,14 4,42 5,05 5,17 5,29 5,40
Produksi (Netto) GWh 5.593 5.903 6.235 6.591 6.972 7.256 7.598 7.965 8.382 8.830
Beban Puncak (Netto) MW 756 796 839 885 934 971 1.016 1.064 1.118 1.176
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 261 261 261 261 261 261 261 261 261 261
PLN: MW 129 129 129 129 129 129 129 129 129 129
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 129 129 129 129 129 129 129
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 80 80
PLTU Sanggau MW 12 12 12 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 18 18 18 18 18
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 19 19 19
IPP MW 132 132 132 132 132 132 132 132 132 132
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 12 12
PLTU Ketapang MW 12 12 12 12 12 12 12 12 12 12
Excess Power MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 30 30 30 30 30 30 30 30 30 30
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - - - - - - - -
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - - -
PLTU Sanggau MW - - - - - - - - - -
PLTU Sukabangun/Ketapang MW - - - - - - - - - -
PLTU Sei Ringin/Sintang MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Ketapang MW - - - - - - - - - -
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 217 56 61 54 47 52 54 56 55 55
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW 20 - - - - - - - - -
PLTM MW - - - - - - - - - -
PLTBm MW 50 - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW 100 - - - - - - - - -
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - - - -
PLTG MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - - - -
BESS MWh *80 - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 47 56 61 54 47 52 54 56 55 55
4. SUMMARY
Existing Supply (DMN) MW 261 261 261 261 261 261 261 261 261 261
Additional Supply (DMN) MW 217 56 61 54 47 52 54 56 55 55
Daya Mampu Sistem (DMN) MW 1.016 1.072 1.133 1.187 1.233 1.285 1.339 1.395 1.450 1.505
Uraian Satuan/ Jenis 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050
1. DEMAND
Konsumsi Listrik GWh 8.783 9.280 9.815 10.394 11.020 11.695 12.427 13.219 14.077 15.008
Pertumbuhan Konsumsi Listrik % 5,53 5,65 5,77 5,90 6,02 6,13 6,25 6,37 6,49 6,61
Produksi (Netto) GWh 9.313 9.834 10.396 11.003 11.659 12.368 13.134 13.964 14.863 15.837
Beban Puncak (Netto) MW 1.239 1.307 1.380 1.459 1.544 1.635 1.735 1.842 1.958 2.084
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 161 161 161 149 149 131 131 112 20 20
PLN: MW 129 129 129 117 117 99 99 80 - -
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 117 117 99 99 80 - -
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 - -
PLTU Sanggau MW 12 12 12 - - - - - - -
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 - - - - -
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 - - -
IPP MW 32 32 32 32 32 32 32 32 20 20
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 - -
PLTU Ketapang MW 12 12 12 12 12 12 12 12 - -
Excess Power MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 130 130 130 142 142 160 160 179 271 271
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - 12 12 30 30 49 129 129
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - 80 80
PLTU Sanggau MW - - - 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW - - - - - 18 18 18 18 18
PLTU Sei Ringin/Sintang MW - - - - - - - 19 19 19
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTU MW - - - - - - - - 12 12
PLTU Ketapang MW - - - - - - - - 12 12
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 51 54 67 156 141 204 197 159 230 189
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - - 50
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW - 7 - 92 61 100 100 *100 *83 100
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - 150 - -
PLTG MW - - - - - 30 30 - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - - 100 -
BESS MWh *320 *120 *40 *160 *40 *360 *160 - - *400
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 51 47 67 64 80 74 67 9 130 39
4. SUMMARY
Existing Supply (DMN) MW 161 161 161 149 149 131 131 112 20 20
Additional Supply (DMN) MW 51 54 67 156 141 204 197 159 230 189
Daya Mampu Sistem (DMN) MW 1.456 1.510 1.578 1.722 1.862 2.048 2.245 2.385 2.523 2.712
SMR1
Uraian Satuan/ Jenis 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
1. DEMAND
Konsumsi Listrik GWh 5.141 5.447 5.774 6.126 6.502 6.789 7.132 7.500 7.897 8.323
Pertumbuhan Konsumsi Listrik % 5,87 5,94 6,01 6,09 6,14 4,42 5,05 5,17 5,29 5,40
Produksi (Netto) GWh 5.593 5.903 6.235 6.591 6.972 7.256 7.598 7.965 8.382 8.830
Beban Puncak (Netto) MW 756 796 839 885 934 971 1.016 1.064 1.118 1.176
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 261 261 261 261 261 261 261 261 261 261
PLN: MW 129 129 129 129 129 129 129 129 129 129
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 129 129 129 129 129 129 129
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 80 80
PLTU Sanggau MW 12 12 12 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 18 18 18 18 18
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 19 19 19
IPP MW 132 132 132 132 132 132 132 132 132 132
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 12 12
PLTU Ketapang MW 12 12 12 12 12 12 12 12 12 12
Excess Power MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 30 30 30 30 30 30 30 30 30 30
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - - - - - - - -
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - - -
PLTU Sanggau MW - - - - - - - - - -
PLTU Sukabangun/Ketapang MW - - - - - - - - - -
PLTU Sei Ringin/Sintang MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Ketapang MW - - - - - - - - - -
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 217 56 61 54 47 52 54 56 55 55
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW 20 - - - - - - - - -
PLTM MW - - - - - - - - - -
PLTBm MW 50 - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW 100 - - - - - - - - -
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - - - -
PLTG MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - - - -
BESS MWh *80 - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 47 56 61 54 47 52 54 56 55 55
4. SUMMARY
Existing Supply (DMN) MW 261 261 261 261 261 261 261 261 261 261
Additional Supply (DMN) MW 217 56 61 54 47 52 54 56 55 55
Daya Mampu Sistem (DMN) MW 1.016 1.072 1.133 1.187 1.233 1.285 1.339 1.395 1.450 1.505
Uraian Satuan/ Jenis 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050
1. DEMAND
Konsumsi Listrik GWh 8.783 9.280 9.815 10.394 11.020 11.695 12.427 13.219 14.077 15.008
Pertumbuhan Konsumsi Listrik % 5,53 5,65 5,77 5,90 6,02 6,13 6,25 6,37 6,49 6,61
Produksi (Netto) GWh 9.313 9.834 10.396 11.003 11.659 12.368 13.134 13.964 14.863 15.837
Beban Puncak (Netto) MW 1.239 1.307 1.380 1.459 1.544 1.635 1.735 1.842 1.958 2.084
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 161 161 161 149 149 131 131 112 20 20
PLN: MW 129 129 129 117 117 99 99 80 - -
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 117 117 99 99 80 - -
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 - -
PLTU Sanggau MW 12 12 12 - - - - - - -
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 - - - - -
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 - - -
IPP MW 32 32 32 32 32 32 32 32 20 20
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 - -
PLTU Ketapang MW 12 12 12 12 12 12 12 12 - -
Excess Power MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 130 130 130 142 142 160 160 179 271 271
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - 12 12 30 30 49 129 129
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - 80 80
PLTU Sanggau MW - - - 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW - - - - - 18 18 18 18 18
PLTU Sei Ringin/Sintang MW - - - - - - - 19 19 19
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTU MW - - - - - - - - 12 12
PLTU Ketapang MW - - - - - - - - 12 12
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 51 54 67 156 141 204 197 159 230 189
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - - 50
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW - 7 - 92 61 100 100 *100 *83 100
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - 150 - -
PLTG MW - - - - - 30 30 - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - - 100 -
BESS MWh *320 *120 *40 *160 *40 *360 *160 - - *400
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 51 47 67 64 80 74 67 9 130 39
4. SUMMARY
Existing Supply (DMN) MW 161 161 161 149 149 131 131 112 20 20
Additional Supply (DMN) MW 51 54 67 156 141 204 197 159 230 189
Daya Mampu Sistem (DMN) MW 1.456 1.510 1.578 1.722 1.862 2.048 2.245 2.385 2.523 2.712
2. Skenario Industrialisasi
Uraian Satuan/ Jenis 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
1. DEMAND
Konsumsi Listrik GWh 8.917 9.222 9.550 9.901 10.277 10.564 10.907 11.276 11.672 12.099
Pertumbuhan Konsumsi Listrik % 5,87 5,94 6,01 6,09 6,14 4,42 5,05 3,62 3,68 3,73
Produksi (Netto) GWh 9.699 9.994 10.311 10.653 11.020 11.291 11.620 11.975 12.389 12.835
Beban Puncak (Netto) MW 1.199 1.237 1.278 1.323 1.371 1.406 1.449 1.496 1.550 1.608
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 261 261 261 261 261 261 261 261 261 261
PLN: MW 129 129 129 129 129 129 129 129 129 129
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 129 129 129 129 129 129 129
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 80 80
PLTU Sanggau MW 12 12 12 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 18 18 18 18 18
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 19 19 19
IPP: MW 132 132 132 132 132 132 132 132 132 132
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 12 12
PLTU Ketapang MW 12 12 12 12 12 12 12 12 12 12
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 30 30 30 30 30 30 30 30 30 30
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - - - - - - - -
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - - -
PLTU Sanggau MW - - - - - - - - - -
PLTU Sukabangun/Ketapang MW - - - - - - - - - -
PLTU Sei Ringin/Sintang MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Ketapang MW - - - - - - - - - -
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 247 59 59 47 54 58 58 59 59 49
PLTU MW 200 - - - - - - - - -
PLTU-SubC MW 200 - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - - -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW *100 *100 *100 - *100 *100 * - - -
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - - - -
PLTG MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - - - -
BESS MWh - - - - - - - - - *40
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 47 59 59 47 54 58 58 59 59 49
4. SUMMARY
Existing Supply (DMN) MW 261 261 261 261 261 261 261 261 261 261
Additional Supply (DMN) MW 247 59 59 47 54 58 58 59 59 49
Daya Mampu Sistem (DMN) MW 1.655 1.715 1.774 1.820 1.874 1.932 1.990 2.050 2.109 2.158
Uraian Satuan/ Jenis 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050
1. DEMAND
Konsumsi Listrik GWh 12.559 13.055 13.591 14.169 14.795 15.471 16.202 16.994 17.853 18.784
Pertumbuhan Konsumsi Listrik % 3,79 3,85 3,92 3,99 4,06 4,10 4,16 4,22 4,28 4,35
Produksi (Netto) GWh 13.316 13.835 14.395 15.000 15.654 16.360 17.125 17.952 18.849 19.821
Beban Puncak (Netto) MW 1.671 1.738 1.811 1.889 1.974 2.066 2.165 2.272 2.388 2.513
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 161 161 161 149 149 131 131 112 20 20
PLN: MW 129 129 129 117 117 99 99 80 - -
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 117 117 99 99 80 - -
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 - -
PLTU Sanggau MW 12 12 12 - - - - - - -
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 - - - - -
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 - - -
IPP: MW 32 32 32 32 32 32 32 32 20 20
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 - -
PLTU Ketapang MW 12 12 12 12 12 12 12 12 - -
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 130 130 130 142 142 160 160 179 271 271
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - 12 12 30 30 49 129 129
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - 80 80
PLTU Sanggau MW - - - 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW - - - - - 18 18 18 18 18
PLTU Sei Ringin/Sintang MW - - - - - - - 19 19 19
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTU MW - - - - - - - - 12 12
PLTU Ketapang MW - - - - - - - - 12 12
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 45 56 63 55 52 106 158 321 368 209
PLTU MW - - - - - - - - - 50
PLTU-SubC MW - - - - - - - - - 50
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - - -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW *2 *17 *30 *45 *27 *100 100 100 *100 100
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - 150 150 -
PLTG MW - - - - - - - - 60 -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - - 100 -
BESS MWh - - - - - - *240 *800 - *160
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 45 56 63 55 52 106 58 71 58 59
4. SUMMARY
Existing Supply (DMN) MW 161 161 161 149 149 131 131 112 20 20
Additional Supply (DMN) MW 45 56 63 55 52 106 158 321 368 209
Daya Mampu Sistem (DMN) MW 2.103 2.159 2.222 2.265 2.317 2.405 2.563 2.866 3.141 3.350
SMR1
Uraian Satuan/ Jenis 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
1. DEMAND
Konsumsi Listrik GWh 8.917 9.222 9.550 9.901 10.277 10.564 10.907 11.276 11.672 12.099
Pertumbuhan Konsumsi Listrik % 5,87 5,94 6,01 6,09 6,14 4,42 5,05 3,62 3,68 3,73
Produksi (Netto) GWh 9.699 9.994 10.311 10.653 11.020 11.291 11.620 11.975 12.389 12.835
Beban Puncak (Netto) MW 1.199 1.237 1.278 1.323 1.371 1.406 1.449 1.496 1.550 1.608
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 261 261 261 261 261 261 261 261 261 261
PLN: MW 129 129 129 129 129 129 129 129 129 129
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 129 129 129 129 129 129 129
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 80 80
PLTU Sanggau MW 12 12 12 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 18 18 18 18 18
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 19 19 19
IPP: MW 132 132 132 132 132 132 132 132 132 132
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 12 12
PLTU Ketapang MW 12 12 12 12 12 12 12 12 12 12
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 30 30 30 30 30 30 30 30 30 30
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - - - - - - - -
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - - -
PLTU Sanggau MW - - - - - - - - - -
PLTU Sukabangun/Ketapang MW - - - - - - - - - -
PLTU Sei Ringin/Sintang MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Ketapang MW - - - - - - - - - -
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 46 59 60 59 56 58 59 59 59 58
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - - -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW *100 *100 *100 - *98 - - - - -
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - - - -
PLTG MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - - - -
BESS MWh - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 46 59 60 59 56 58 59 59 59 58
4. SUMMARY
Existing Supply (DMN) MW 261 261 261 261 261 261 261 261 261 261
Additional Supply (DMN) MW 46 59 60 59 56 58 59 59 59 58
Daya Mampu Sistem (DMN) MW 9.775 9.833 9.893 9.952 10.008 10.066 10.125 10.184 10.243 10.301
Uraian Satuan/ Jenis 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050
1. DEMAND
Konsumsi Listrik GWh 12.559 13.055 13.591 14.169 14.795 15.471 16.202 16.994 17.853 18.784
Pertumbuhan Konsumsi Listrik % 3,79 3,85 3,92 3,99 4,06 4,10 4,16 4,22 4,28 4,35
Produksi (Netto) GWh 13.316 13.835 14.395 15.000 15.654 16.360 17.125 17.952 18.849 19.821
Beban Puncak (Netto) MW 1.671 1.738 1.811 1.889 1.974 2.066 2.165 2.272 2.388 2.513
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 161 161 161 149 149 131 131 112 20 20
PLN: MW 129 129 129 117 117 99 99 80 - -
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 117 117 99 99 80 - -
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 - -
PLTU Sanggau MW 12 12 12 - - - - - - -
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 - - - - -
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 - - -
IPP: MW 32 32 32 32 32 32 32 32 20 20
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 - -
PLTU Ketapang MW 12 12 12 12 12 12 12 12 - -
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 130 130 130 142 142 160 160 179 271 271
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - 12 12 30 30 49 129 129
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - 80 80
PLTU Sanggau MW - - - 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW - - - - - 18 18 18 18 18
PLTU Sei Ringin/Sintang MW - - - - - - - 19 19 19
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTU MW - - - - - - - - 12 12
PLTU Ketapang MW - - - - - - - - 12 12
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 58 57 57 58 58 158 165 341 380 368
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - 30 30 -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW - - *15 *49 *45 97 100 100 *100 100
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - - 150 150
PLTG MW - - - - - - - 30 30 -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - 100 100 100
BESS MWh - - - - - *80 *200 *760 - *120
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 58 57 57 58 58 61 65 81 70 18
4. SUMMARY
Existing Supply (DMN) MW 161 161 161 149 149 131 131 112 20 20
Additional Supply (DMN) MW 58 57 57 58 58 158 165 341 380 368
Daya Mampu Sistem (DMN) MW 10.259 10.316 10.373 10.419 10.478 10.618 10.783 11.106 11.393 11.762
Uraian Satuan/ Jenis 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
1. DEMAND
Konsumsi Listrik GWh 8.917 9.222 9.550 9.901 10.277 10.564 10.907 11.276 11.672 12.099
Pertumbuhan Konsumsi Listrik % 5,87 5,94 6,01 6,09 6,14 4,42 5,05 3,62 3,68 3,73
Produksi (Netto) GWh 9.699 9.994 10.311 10.653 11.020 11.291 11.620 11.975 12.389 12.835
Beban Puncak (Netto) MW 1.199 1.237 1.278 1.323 1.371 1.406 1.449 1.496 1.550 1.608
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 261 261 261 261 261 261 261 261 261 261
PLN: MW 129 129 129 129 129 129 129 129 129 129
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 129 129 129 129 129 129 129
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 80 80
PLTU Sanggau MW 12 12 12 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 18 18 18 18 18
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 19 19 19
IPP: MW 132 132 132 132 132 132 132 132 132 132
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 12 12
PLTU Ketapang MW 12 12 12 12 12 12 12 12 12 12
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 30 30 30 30 30 30 30 30 30 30
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - - - - - - - -
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - - -
PLTU Sanggau MW - - - - - - - - - -
PLTU Sukabangun/Ketapang MW - - - - - - - - - -
PLTU Sei Ringin/Sintang MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Ketapang MW - - - - - - - - - -
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 147 59 58 59 59 51 48 59 59 53
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - - -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW *100 *100 *82 - - - - - - -
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - - - -
PLTG MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW 100 - - - - - - - - -
BESS MWh - - - - - - - - - *80
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 47 59 58 59 59 51 48 59 59 53
4. SUMMARY
Existing Supply (DMN) MW 261 261 261 261 261 261 261 261 261 261
Additional Supply (DMN) MW 147 59 58 59 59 51 48 59 59 53
Daya Mampu Sistem (DMN) MW 1.655 1.715 1.773 1.832 1.891 1.942 1.990 2.049 2.108 2.160
Uraian Satuan/ Jenis 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050
1. DEMAND
Konsumsi Listrik GWh 12.559 13.055 13.591 14.169 14.795 15.471 16.202 16.994 17.853 18.784
Pertumbuhan Konsumsi Listrik % 3,79 3,85 3,92 3,99 4,06 4,10 4,16 4,22 4,28 4,35
Produksi (Netto) GWh 13.316 13.835 14.395 15.000 15.654 16.360 17.125 17.952 18.849 19.821
Beban Puncak (Netto) MW 1.671 1.738 1.811 1.889 1.974 2.066 2.165 2.272 2.388 2.513
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 161 161 161 149 149 131 131 112 20 20
PLN: MW 129 129 129 117 117 99 99 80 - -
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 117 117 99 99 80 - -
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 - -
PLTU Sanggau MW 12 12 12 - - - - - - -
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 - - - - -
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 - - -
IPP: MW 32 32 32 32 32 32 32 32 20 20
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 - -
PLTU Ketapang MW 12 12 12 12 12 12 12 12 - -
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 130 130 130 142 142 160 160 179 271 271
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - 12 12 30 30 49 129 129
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - 80 80
PLTU Sanggau MW - - - 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW - - - - - 18 18 18 18 18
PLTU Sei Ringin/Sintang MW - - - - - - - 19 19 19
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTU MW - - - - - - - - 12 12
PLTU Ketapang MW - - - - - - - - 12 12
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 56 57 52 50 68 92 165 322 380 217
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - 30 -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW - - - *27 *27 *100 100 100 *100 100
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - - 150 -
PLTG MW - - - - - - - 60 30 -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - 100 100 100
BESS MWh - - - - - - *200 *800 - *120
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 56 57 52 50 68 92 65 62 70 17
4. SUMMARY
Existing Supply (DMN) MW 161 161 161 149 149 131 131 112 20 20
Additional Supply (DMN) MW 56 57 52 50 68 92 165 322 380 217
Daya Mampu Sistem (DMN) MW 2.116 2.173 2.225 2.263 2.331 2.405 2.571 2.874 3.161 3.379
SMR1
Uraian Satuan/ Jenis 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
1. DEMAND
Konsumsi Listrik GWh 8.917 9.222 9.550 9.901 10.277 10.564 10.907 11.276 11.672 12.099
Pertumbuhan Konsumsi Listrik % 5,87 5,94 6,01 6,09 6,14 4,42 5,05 3,62 3,68 3,73
Produksi (Netto) GWh 9.699 9.994 10.311 10.653 11.020 11.291 11.620 11.975 12.389 12.835
Beban Puncak (Netto) MW 1.199 1.237 1.278 1.323 1.371 1.406 1.449 1.496 1.550 1.608
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 261 261 261 261 261 261 261 261 261 261
PLN: MW 129 129 129 129 129 129 129 129 129 129
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 129 129 129 129 129 129 129
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 80 80
PLTU Sanggau MW 12 12 12 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 18 18 18 18 18
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 19 19 19
IPP: MW 132 132 132 132 132 132 132 132 132 132
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 12 12
PLTU Ketapang MW 12 12 12 12 12 12 12 12 12 12
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 30 30 30 30 30 30 30 30 30 30
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - - - - - - - -
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - - -
PLTU Sanggau MW - - - - - - - - - -
PLTU Sukabangun/Ketapang MW - - - - - - - - - -
PLTU Sei Ringin/Sintang MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Ketapang MW - - - - - - - - - -
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 147 53 57 58 60 65 59 44 46 52
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - - -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW *100 *100 *44 - - - - - - -
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - - - -
PLTG MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW 100 - - - - - - - - -
BESS MWh - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 47 53 57 58 60 65 59 44 46 52
4. SUMMARY
Existing Supply (DMN) MW 261 261 261 261 261 261 261 261 261 261
Additional Supply (DMN) MW 147 53 57 58 60 65 59 44 46 52
Daya Mampu Sistem (DMN) MW 1.775 1.829 1.885 1.943 2.003 2.068 2.127 2.171 2.218 2.270
Uraian Satuan/ Jenis 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050
1. DEMAND
Konsumsi Listrik GWh 12.559 13.055 13.591 14.169 14.795 15.471 16.202 16.994 17.853 18.784
Pertumbuhan Konsumsi Listrik % 3,79 3,85 3,92 3,99 4,06 4,10 4,16 4,22 4,28 4,35
Produksi (Netto) GWh 13.316 13.835 14.395 15.000 15.654 16.360 17.125 17.952 18.849 19.821
Beban Puncak (Netto) MW 1.671 1.738 1.811 1.889 1.974 2.066 2.165 2.272 2.388 2.513
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 161 161 161 149 149 131 131 112 20 20
PLN: MW 129 129 129 117 117 99 99 80 - -
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 117 117 99 99 80 - -
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 - -
PLTU Sanggau MW 12 12 12 - - - - - - -
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 - - - - -
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 - - -
IPP: MW 32 32 32 32 32 32 32 32 20 20
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 - -
PLTU Ketapang MW 12 12 12 12 12 12 12 12 - -
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 130 130 130 142 142 160 160 179 271 271
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - 12 12 30 30 49 129 129
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - 80 80
PLTU Sanggau MW - - - 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW - - - - - 18 18 18 18 18
PLTU Sei Ringin/Sintang MW - - - - - - - 19 19 19
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTU MW - - - - - - - - 12 12
PLTU Ketapang MW - - - - - - - - 12 12
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 55 56 64 63 65 71 60 288 368 335
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - - 40
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW - - - - *59 *100 *77 100 *100 100
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - - 150 -
PLTG MW - - - - - - - - 60 30
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - - 100 100 100
BESS MWh - - - - - - - *800 - *360
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 55 56 64 63 65 71 60 88 58 65
4. SUMMARY
Existing Supply (DMN) MW 161 161 161 149 149 131 131 112 20 20
Additional Supply (DMN) MW 55 56 64 63 65 71 60 288 368 335
Daya Mampu Sistem (DMN) MW 2.225 2.281 2.345 2.396 2.462 2.515 2.575 2.844 3.120 3.454
3. Skenario Prosperity
Uraian Satuan/ Jenis 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
1. DEMAND
Konsumsi Listrik GWh 11.180 11.982 12.806 13.652 14.519 15.408 16.318 17.249 18.199 19.170
Pertumbuhan Konsumsi Listrik % 5,87 5,94 6,01 6,09 6,14 4,42 5,05 3,62 3,68 3,73
Produksi (Netto) GWh 12.161 12.985 13.827 14.689 15.569 16.467 17.384 18.318 19.317 20.337
Beban Puncak (Netto) MW 1.644 1.751 1.861 1.972 2.086 2.205 2.325 2.447 2.577 2.710
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 261 261 261 261 261 261 261 261 261 261
PLN: MW 129 129 129 129 129 129 129 129 129 129
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 129 129 129 129 129 129 129
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 80 80
PLTU Sanggau MW 12 12 12 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 18 18 18 18 18
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 19 19 19
IPP: MW 132 132 132 132 132 132 132 132 132 132
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 12 12
PLTU Ketapang MW 12 12 12 12 12 12 12 12 12 12
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 30 30 30 30 30 30 30 30 30 30
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - - - - - - - -
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - - -
PLTU Sanggau MW - - - - - - - - - -
PLTU Sukabangun/Ketapang MW - - - - - - - - - -
PLTU Sei Ringin/Sintang MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Ketapang MW - - - - - - - - - -
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 197 59 109 109 8.219 220 152 108 158 204
PLTU MW 150 - 50 50 50 50 - 50 50 50
PLTU-SubC MW 150 - 50 50 50 50 - 50 50 50
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - 10 10 - - 40 -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW *100 *100 *100 - 8.100 100 *100 *100 - 100
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - - - -
PLTG MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW - - - - - - 100 - - -
BESS MWh - - - - - *40 - - - *200
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 47 59 59 59 59 60 52 58 68 54
4. SUMMARY
Existing Supply (DMN) MW 261 261 261 261 261 261 261 261 261 261
Additional Supply (DMN) MW 197 59 109 109 8.219 220 152 108 158 204
Daya Mampu Sistem (DMN) MW 1.971 2.030 2.139 2.248 10.467 10.687 10.839 10.947 11.105 11.309
Uraian Satuan/ Jenis 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050
1. DEMAND
Konsumsi Listrik GWh 20.160 21.169 22.197 23.243 24.306 25.423 26.564 27.731 28.923 30.141
Pertumbuhan Konsumsi Listrik % 3,79 3,85 3,92 3,99 4,06 4,10 4,16 4,22 4,28 4,35
Produksi (Netto) GWh 21.376 22.434 23.510 24.605 25.717 26.884 28.076 29.294 30.538 31.807
Beban Puncak (Netto) MW 2.844 2.981 3.121 3.262 3.405 3.555 3.708 3.864 4.023 4.185
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 161 161 161 149 149 131 131 112 20 20
PLN: MW 129 129 129 117 117 99 99 80 - -
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 117 117 99 99 80 - -
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 - -
PLTU Sanggau MW 12 12 12 - - - - - - -
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 - - - - -
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 - - -
IPP: MW 32 32 32 32 32 32 32 32 20 20
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 - -
PLTU Ketapang MW 12 12 12 12 12 12 12 12 - -
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 130 130 130 142 142 160 160 179 271 271
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - 12 12 30 30 49 129 129
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - 80 80
PLTU Sanggau MW - - - 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW - - - - - 18 18 18 18 18
PLTU Sei Ringin/Sintang MW - - - - - - - 19 19 19
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTU MW - - - - - - - - 12 12
PLTU Ketapang MW - - - - - - - - 12 12
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 258 209 212 260 209 257 209 474 527 240
PLTU MW - 50 50 - 50 - - - 50 50
PLTU-SubC MW - 50 50 - 50 - - - 50 50
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - - -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW 100 100 100 100 100 100 *100 100 100 100
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - 150 150 - -
PLTG MW - - - - - - - 60 120 30
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW 100 - - 100 - 100 - 100 200 -
BESS MWh *480 *200 *200 *40 *440 *600 - *600 - *640
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 58 59 62 60 59 57 59 64 57 60
4. SUMMARY
Existing Supply (DMN) MW 161 161 161 149 149 131 131 112 20 20
Additional Supply (DMN) MW 258 209 212 260 209 257 209 474 527 240
Daya Mampu Sistem (DMN) MW 11.467 11.677 11.888 12.136 12.345 12.584 12.793 13.249 13.683 13.923
SMR1
Uraian Satuan/ Jenis 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
1. DEMAND
Konsumsi Listrik GWh 11.180 11.982 12.806 13.652 14.519 15.408 16.318 17.249 18.199 19.170
Pertumbuhan Konsumsi Listrik % 5,87 5,94 6,01 6,09 6,14 4,42 5,05 3,62 3,68 3,73
Produksi (Netto) GWh 12.161 12.985 13.827 14.689 15.569 16.467 17.384 18.318 19.317 20.337
Beban Puncak (Netto) MW 1.644 1.751 1.861 1.972 2.086 2.205 2.325 2.447 2.577 2.710
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 261 261 261 261 261 261 261 261 261 261
PLN: MW 129 129 129 129 129 129 129 129 129 129
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 129 129 129 129 129 129 129
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 80 80
PLTU Sanggau MW 12 12 12 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 18 18 18 18 18
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 19 19 19
IPP: MW 132 132 132 132 132 132 132 132 132 132
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 12 12
PLTU Ketapang MW 12 12 12 12 12 12 12 12 12 12
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 30 30 30 30 30 30 30 30 30 30
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - - - - - - - -
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - - -
PLTU Sanggau MW - - - - - - - - - -
PLTU Sukabangun/Ketapang MW - - - - - - - - - -
PLTU Sei Ringin/Sintang MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Ketapang MW - - - - - - - - - -
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 146 160 58 61 157 185 149 171 151 169
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - 20 - - - -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW *100 *100 *100 - *100 100 *100 100 - 100
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - - - -
PLTG MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW 100 100 - - 100 - 100 - 100 -
BESS MWh - - - - - *80 - *200 - *320
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 46 60 58 61 57 65 49 71 51 69
4. SUMMARY
Existing Supply (DMN) MW 261 261 261 261 261 261 261 261 261 261
Additional Supply (DMN) MW 146 160 58 61 157 185 149 171 151 169
Daya Mampu Sistem (DMN) MW 1.989 2.149 2.207 2.269 2.425 2.610 2.759 2.929 3.080 3.249
Uraian Satuan/ Jenis 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050
1. DEMAND
Konsumsi Listrik GWh 20.160 21.169 22.197 23.243 24.306 25.423 26.564 27.731 28.923 30.141
Pertumbuhan Konsumsi Listrik % 3,79 3,85 3,92 3,99 4,06 4,10 4,16 4,22 4,28 4,35
Produksi (Netto) GWh 21.376 22.434 23.510 24.605 25.717 26.884 28.076 29.294 30.538 31.807
Beban Puncak (Netto) MW 2.844 2.981 3.121 3.262 3.405 3.555 3.708 3.864 4.023 4.185
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 161 161 161 149 149 131 131 112 20 20
PLN: MW 129 129 129 117 117 99 99 80 - -
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 117 117 99 99 80 - -
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 - -
PLTU Sanggau MW 12 12 12 - - - - - - -
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 - - - - -
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 - - -
IPP: MW 32 32 32 32 32 32 32 32 20 20
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 - -
PLTU Ketapang MW 12 12 12 12 12 12 12 12 - -
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 130 130 130 142 142 160 160 179 271 271
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - 12 12 30 30 49 129 129
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - 80 80
PLTU Sanggau MW - - - 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW - - - - - 18 18 18 18 18
PLTU Sei Ringin/Sintang MW - - - - - - - 19 19 19
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTU MW - - - - - - - - 12 12
PLTU Ketapang MW - - - - - - - - 12 12
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 258 150 195 160 175 265 254 545 425 225
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - - -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW 100 *100 42 - 100 100 100 100 *83 100
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - 150 150 -
PLTG MW - - - - - - - 120 - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW 100 100 100 100 - 100 100 100 200 100
BESS MWh *520 - *200 *40 *720 *600 *80 *240 - *1200
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 58 50 53 60 75 65 54 75 75 25
4. SUMMARY
Existing Supply (DMN) MW 161 161 161 149 149 131 131 112 20 20
Additional Supply (DMN) MW 258 150 195 160 175 265 254 545 425 225
Daya Mampu Sistem (DMN) MW 3.408 3.558 3.753 3.900 4.075 4.322 4.576 5.102 5.434 5.659
Uraian Satuan/ Jenis 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
1. DEMAND
Konsumsi Listrik GWh 11.180 11.982 12.806 13.652 14.519 15.408 16.318 17.249 18.199 19.170
Pertumbuhan Konsumsi Listrik % 5,87 5,94 6,01 6,09 6,14 4,42 5,05 3,62 3,68 3,73
Produksi (Netto) GWh 12.161 12.985 13.827 14.689 15.569 16.467 17.384 18.318 19.317 20.337
Beban Puncak (Netto) MW 1.644 1.751 1.861 1.972 2.086 2.205 2.325 2.447 2.577 2.710
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 261 261 261 261 261 261 261 261 261 261
PLN: MW 129 129 129 129 129 129 129 129 129 129
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 129 129 129 129 129 129 129
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 80 80
PLTU Sanggau MW 12 12 12 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 18 18 18 18 18
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 19 19 19
IPP: MW 132 132 132 132 132 132 132 132 132 132
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 12 12
PLTU Ketapang MW 12 12 12 12 12 12 12 12 12 12
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 30 30 30 30 30 30 30 30 30 30
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - - - - - - - -
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - - -
PLTU Sanggau MW - - - - - - - - - -
PLTU Sukabangun/Ketapang MW - - - - - - - - - -
PLTU Sei Ringin/Sintang MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Ketapang MW - - - - - - - - - -
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 247 59 59 158 71 157 175 153 164 162
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - 10 - 10 - 100 -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW *100 *100 *100 - *100 *55 100 - - 11
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - - - -
PLTG MW - - - - - - - - - -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW 200 - - 100 - 100 - 100 - 100
BESS MWh - - - - - - *120 - - *80
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 47 59 59 58 61 57 65 53 64 51
4. SUMMARY
Existing Supply (DMN) MW 261 261 261 261 261 261 261 261 261 261
Additional Supply (DMN) MW 247 59 59 158 71 157 175 153 164 162
Daya Mampu Sistem (DMN) MW 2.021 2.080 2.139 2.296 2.368 2.524 2.699 2.852 3.016 3.178
Uraian Satuan/ Jenis 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050
1. DEMAND
Konsumsi Listrik GWh 20.160 21.169 22.197 23.243 24.306 25.423 26.564 27.731 28.923 30.141
Pertumbuhan Konsumsi Listrik % 3,79 3,85 3,92 3,99 4,06 4,10 4,16 4,22 4,28 4,35
Produksi (Netto) GWh 21.376 22.434 23.510 24.605 25.717 26.884 28.076 29.294 30.538 31.807
Beban Puncak (Netto) MW 2.844 2.981 3.121 3.262 3.405 3.555 3.708 3.864 4.023 4.185
2. EXISTING SUPPLY (DMN)
Total Daya Mampu Netto (DMN): MW 161 161 161 149 149 131 131 112 20 20
PLN: MW 129 129 129 117 117 99 99 80 - -
PLTG MW - - - - - - - - - -
PLTG Siantan MW - - - - - - - - - -
PLTU MW 129 129 129 117 117 99 99 80 - -
PLTU Parit Baru FTP 2 Site Bengkayang MW 80 80 80 80 80 80 80 80 - -
PLTU Sanggau MW 12 12 12 - - - - - - -
PLTU Sukabangun/Ketapang MW 18 18 18 18 18 - - - - -
PLTU Sei Ringin/Sintang MW 19 19 19 19 19 19 19 - - -
IPP: MW 32 32 32 32 32 32 32 32 20 20
PLTMG MW - - - - - - - - - -
MPP Pontianak MW - - - - - - - - - -
PLTBm MW 20 20 20 20 20 20 20 20 20 20
PLTBm Mempawah MW 10 10 10 10 10 10 10 10 10 10
PLTBm Putussibau MW 10 10 10 10 10 10 10 10 10 10
PLTU MW 12 12 12 12 12 12 12 12 - -
PLTU Ketapang MW 12 12 12 12 12 12 12 12 - -
Excess Power : MW - - - - - - - - - -
PTBM Alas Kusuma MW - - - - - - - - - -
Impor: MW - - - - - - - - - -
SESCo MW - - - - - - - - - -
Retired: MW 130 130 130 142 142 160 160 179 271 271
PLTG MW 30 30 30 30 30 30 30 30 30 30
PLTG Siantan MW 30 30 30 30 30 30 30 30 30 30
PLTU MW - - - 12 12 30 30 49 129 129
PLTU Parit Batu FTP 2 Site Bengkayang MW - - - - - - - - 80 80
PLTU Sanggau MW - - - 12 12 12 12 12 12 12
PLTU Sukabangun/Ketapang MW - - - - - 18 18 18 18 18
PLTU Sei Ringin/Sintang MW - - - - - - - 19 19 19
PLTMG MW 100 100 100 100 100 100 100 100 100 100
MPP Pontianak MW 100 100 100 100 100 100 100 100 100 100
PLTU MW - - - - - - - - 12 12
PLTU Ketapang MW - - - - - - - - 12 12
3. ADDITIONAL SUPPLY (DMN)
Pipeline Project: MW - - - - - - - - - -
1) PLN MW - - - - - - - - - -
2) IPP: MW - - - - - - - - - -
PLTU MW - - - - - - - - - -
PLTU Kalbar-1 MW - - - - - - - - - -
Kebutuhan Tambahan: MW 232 168 153 203 175 257 254 538 446 236
PLTU MW - - - - - - - - - -
PLTU-SubC MW - - - - - - - - - -
PLTU-SubC-FGD MW - - - - - - - - - -
PLTA MW - - - - - - - - 30 -
PLTM MW - - - - - - - - - -
PLTBm MW - - - - - - - - - -
PLTBg MW - - - - - - - - - -
PLTS MW 73 100 *100 51 100 100 100 100 *100 100
PLTB MW - - - - - - - - - -
PLTGU MW - - - - - - - 150 150 -
PLTG MW - - - - - - - 120 90 -
PLTMG MW - - - - - - - - - -
PLTN SMR1 MW 100 - 100 100 - 100 100 100 100 100
BESS MWh *320 *520 - *80 *480 *440 *600 *80 - *720
Impor dari Sistem Interkoneksi Kalimantan (150 kV) MW - - - - - - - - - -
Impor dari Sistem Interkoneksi Kalimantan (500 kV) MW 59 68 53 52 75 57 54 68 76 36
4. SUMMARY
Existing Supply (DMN) MW 161 161 161 149 149 131 131 112 20 20
Additional Supply (DMN) MW 232 168 153 203 175 257 254 538 446 236
Daya Mampu Sistem (DMN) MW 3.310 3.479 3.631 3.823 3.998 4.237 4.491 5.010 5.364 5.600
SMR1
PLTN SMR direncanakan akan tersambung pada sistem transmisi 150kV Kalimantan
Barat seperti PLTU dan pembangkit eksisting lainnya. Jika PLTN mengunakan lokasi tapak di
Pulau Semesa, maka diperlukan koneksi melalui menuju landing point di daratan Kalimantan
Barat sepanjang ± 1 km yang dapat dilakukan dengan menggunakan:
1. Kabel tegangan tinggi yang diletakkan di bawah jembatan akses menuju Pulau
Semesa.
2. SUTT dengan tower yang dibangun di atas permukaan laut.
3. Kabel bawah laut.
Beberapa opsi titik sambung di daratan Kalimantan Barat adalah sebagai berikut:
No Parameter Nilai
1 Impedansi & Rugi Daya Trafo Tipikal ETAP
2 Pembumian sisi 150kV Langsung
3 Pembumian sisi 20kV Tahanan
4 Impedansi & Model Dinamik Generator Tipikal ETAP
5 Pembumian Generator Tahanan
6 Faktor Daya Generator 0,85 Lagging
7 Sistem Governor Turbin
PLTU & PLTGU Steam Turbine Tipikal ETAP
PLTA General Purpose Governor-Turbine Sistem
Droop 5%
DC Commutator Exciter dengan Pengaturan
8 AVR Generator
Tegangan
9 Mode Operasi Generator
PLTU; PLTA Voltage Control
PLTD; PLTG; PLTGU Swing
10 Pembangkitan 80% kapasitas nominal
Beban Internal Pembangkit 12% kapasitas Nominal
11 Konstanta Inersia Turbin-Generator[77, 78]
PLTU 4,5 MW.s/MVA
PLTG & PLTGU 6,5 MW.s/MVA
PLTA 3 MW.s/MVA
PLTN 6 MW.s/MVA
12 Pembebanan 100% Kapasitas Beban (Beban Puncak)
13 Faktor Daya Beban 0,85 Lagging
Sedangkan Tabel 71 merupakan data laju peningkatan beban untuk beberapa jenis
pembangkit [79-81].
Sistem transmisi dua sirkit dimodelkan dengan sistem paralel yang sudah tersedia
pada ETAP untuk mendapatkan perhitungan nilai kapasitansi dan induktansi saluran transmisi
yang lebih baik seperti ditunjukkan pada Gambar 97. Jaringan transmisi 150kV dimodelkan
sesuai dengan data perancangan PLN yang menggunakan saluran udara ACSR Hawk (280mm2)
& ACSR Zebra (480mm2) dengan panjang sirkuit yang sesuai dengan jarak aktual dan jarak
pada perencanaan.
Pada setiap composite network, setiap gardu dimodelkan dengan jumlah dan
kapasitas trafo distribusi sesuai dengan data aktual dan perencanaan PLN. Sedangkan data
nameplate trafo lainnya seperti impedansi, load loss menggunakan data tipikal ETAP.
Pemodelan pembangkit akan ditampilkan juga pada composite network gardu induk
di mana pembangkit akan terhubung pada bus 150kV atau 20kV. Sedangkan untuk
pembebanan setiap trafo distribusi akan disederhanakan menjadi sebuah/beberapa beban
tegangan menengah (20kV) pada setiap penyulang.
Studi aliran daya dibatasi pada sistem Khatulistiwa karena belum adanya interkoneksi
dengan sistem Kaltengsel dan Kaltimra.
Besarnya beban pada setiap gardu mengacu pada besarnya beban puncak yang
didapat dari Evaluasi Operasi Bulanan (EOB) PLN UIKL s.d. Bulan Agustus 2020 yang
menunjukkan beban puncak Kalimantan Barat sebesar 367 MW.
GI Mambong pada
sistem Serawak
Aliran Daya
Kalimantan - Serawak
Dari Aliran daya pada Gambar 99, terlihat bahwa Sistem Kalimantan Barat pada tahun
2020 disuplai sebagian besar dari:
1. Impor daya dari Serawak sebesar ±200MW untuk menyuplai GI Bengkayang, Ngabang
dan Singkawang
3. PLTU Parit Baru 2x50MW yang menyuplai GI Parit Baru, Siantan dan Kotabaru.
4. PLTG Pontianak Peaker 80MW menyuplai GI Parit Baru, Siantan dan Kotabaru.
Ringkasan untuk hasil simulasi dari Gambar 99 tersebut dapat dilihat pada Tabel 71
dibawah.
Tabel 71. RIngkasan Hasil Simulasi Aliran Daya (Sistem Kalbar 2025)
Mismatch-MW 0
Mismatch-Mvar 0
Studi hubung singkat dilakukan untuk mengidentifikasi besarnya arus hubung singkat
maksimum pada GI Singkawang dan GI Mempawah pada tahun 2020 (sebelum penambahan
PLTN pada 2030).
Untuk mengidentifikasi arus gangguan terbesar maka jenis gangguan yang digunakan
adalah gangguan 3 fasa simetris dengan pada sisi 150kV pada GI Singkawang & GI
Mempawah.
Besarnya arus hubung singkat sebelum penambahan PLTN pada GI Singkawang dan GI
Mempawah pada skenario pembebanan RUPTL tahun 2020 ditunjukkan pada Tabel 72.
Tabel 72. Rekapitulasi Arus Hubung Singkat Maksimum Sistem Kalbar Tahun 2020
Studi aliran daya pada sistem Khatulistiwa pada tahun 2025 sudah memperhitungkan
adanya interkoneksi dengan sistem Kaltengsel dan Kaltimra yang akan terinterkoneksi pada
tahun 2024 berdasarkan RUPTL 2019-2028. Beberapa pembangkit yang direncanakan dalam
RUPTL 2019 yang belum beroperasi pada 2025 ditunjukkan pada Tabel 73.
Tabel 73. Pembangkit Pada RUPTL 2019 dengan Target COD setelah 2025
No Sistem Lokasi Pembangkit Kapasitas (MW) COD
1 Khatulistiwa Ketapang PLTU Ketapang 2x7 2028
2 Seb. Barito PLTGU Kalsel 1 100 2027
3 Barito Batulicin PLTU MT KSKT5 100 2028
4 Tamiyang Layang PLTU KSKT4 2x100 2026
5 Embalut PLTGU Add on Blok 2 80 2026
6 Berau PLTU Berau 2x7 2028
Mahakam
7 Sambera PLTU MT Kaltim 5 2x100 2027/28
8 Sei Menggaris PLTG Sei Menggaris 2x20 2026
Besarnya beban pada setiap gardu mengacu pada neraca daya RUPTL 2019-2028 yang
menunjukkan beban puncak Kalimantan Barat sebesar 741MW. Ringkasan aliran daya
ditunjukkan pada Tabel 74 di mana total pembebanan adalah sebesar 5794 MW dengan
beban sistem Serawak sebesar 2841 MW, Beban Kaltengsel sebesar 1208 MW dan Beban
Kaltimra sebesar 1022 MW.
Tabel 74. Ringkasan Hasil Simulasi Aliran Daya (Sistem Kalbar 2020)
Mismatch-MW 0
Mismatch-Mvar 0
GI Mambong pada
sistem Serawak
Aliran Daya
Kalimantan - Serawak
Aliran daya
dari
Kaltengsel
Dari aliran daya pada Gambar 100, dengan pembangkitan sebesar 80% kapasitas
nominal, terlihat terjadi ekspor daya sebesar 68 MW menuju Serawak. Sedangkan kebutuhan
daya pada bagian timur Kalimantan Barat dipenuhi dari sistem Kaltengsel melalui impor
sebesar 80MW dari PLTU Kaltengsel 3 2x100 MW dan impor 34MW dari PLTMG Kalteng 100
MW Pada GI Pangkalan Bun.
Besarnya arus hubung singkat sebelum penambahan PLTN pada GI Singkawang dan GI
Mempawah pada skenario pembebanan RUPTL tahun 2025 ditunjukkan pada tabel Tabel 75.
Tabel 75. Rekapitulasi Arus Hubung Singkat Maksimum Sistem Kalbar Tahun 2020
No Lokasi Gangguan Arus Hubung singkat Maksimum
1 GI Singkawang (150kV) 14,2 kA
2 GI Mempawah (150kV) 12,3 kA
Terjadi peningkatan yang signifikan pada arus hubung singkat maksimum pada GI Singkawang
dan GI Mempawah dibandingkan tahun 2020 karena peningkatan beban yang tinggi pada
sistem, tetapi masih berada dalam batas aman di bawah kapasitas nominal peralatan yang
memiliki kapasitas hubung singkat 31,5kA.
No Parameter Nilai
1 Mode Operasi Generator
PLTU; PLTA Voltage Control
PLTD; PLTG; PLTGU Swing
2 Pembangkitan 80% kapasitas nominal
Beban Internal Pembangkit 5% kapasitas Nominal
3 Pembebanan 75% Kapasitas Beban (Beban Puncak)
Besarnya beban pada setiap gardu mengacu pada hasil simulasi Balmorel dengan skema BaU
dengan kapasitas gardu induk tetap mengacu pada capacity balance gardu induk yang
diusulkan oleh PLN UIKL Kalimantan dapat dilihat ringkasannya pada Tabel 77.
Pembebanan pada sistem Kaltengsel dan Kaltimra diasumsikan memiliki faktor pengali
yang sama dengan nilai beban sistem Kalimantan Barat antara skema RUPTL dan Skema
Balmorel sehingga dengan Diversity Factor 75 % pada pemodelan aliran daya, dihasilkan total
beban total sistem sebesar 7363MW.
Mismatch-MW 0
Mismatch-Mvar 0
Pada skenario ini, kebutuhan beban sistem Kalimantan masih dapat dipenuhi oleh
pembangkit yang sesuai perencanaan RUPTL. Dengan demikian, sistem Serawak dimodelkan
dengan besar daya pembangkitan ≈ besar pembebanan sistem sehingga ekspor/impor daya
antara kedua sistem minimum seperti terlihat pada Gambar 101.
GI Mambong pada
PLTU Kalbar 1
sistem Serawak
2x100MW
Aliran Daya
Kalimantan - Serawak
PLTN SMR
1x100MW
Aliran daya
Kalbar -
Kaltengsel
Pada studi aliran daya ini, pembangkit eksisting dan rencana sesuai RUPTL 2019
beroperasi pada pembebanan 80% kapasitas nominal dengan beberapa area mengalami
oversupply sehingga beberapa pembangkit pada area tersebut harus beroperasi dengan daya
yang lebih rendah dari 80% yaitu:
1. PLTU Kaltim 4 2 x100MW pada GI Embalut dengan pembebanan 50%
2. PLTU Kaltim 2 2 x100MW pada GI Bontang dengan pembebanan 35%
3. PLTU Kaltim 3 2 x100MW dengan pembebanan 35%
4. PLTU Kalbar 1 2 x100MW dengan pembebanan 50%
Pembebanan rendah dari beberapa PLTU di atas hanya untuk menunjukkan terjadinya
oversupply pada area tersebut. Sedangkan untuk komposisi dispatch yang optimum sesuai
dengan keekonomian pembangkit, harus dilakukan pemodelan yang terpisah dengan
perangkat lunak lainnya.
PLTU Kalsel
2x100MW
PLTU Kaltengsel 3
2x100MW
GI Pangkalan Bun
PLTU Kaltim 2
2x100MW
PLTU Kaltim 4
2x100MW
PLTU Kaltim 3
2x100MW
2. Aliran daya dari GI PLTU Melak (Kaltim) menuju GI Bangkanai (Kalteng) sebesar
16 MW yang merupakan keluaran daya dari PLTU Kaltim 3 2x100 MW.
Studi hubung singkat dilakukan untuk mengidentifikasi besarnya arus hubung singkat
maksimum yang dapat terjadi dan kesesuaiannya dengan kapasitas nominal peralatan yang
terpasang pada Gardu Induk yang biasanya memiliki batas 25-63 kA.
Untuk mengidentifikasi arus gangguan terbesar maka jenis gangguan yang digunakan
adalah gangguan 3 fasa simetris pada beberapa titik yaitu:
Arus hubung singkat maksimum pada PLTN adalah sebesar 13,7 kA dengan besar
kontribusi arus hubung singkat dari setiap node seperti terlihat pada Gambar 104.
Gambar 104. Kontribusi Arus Hubung Singkat Pada PLTN (Skenario Balmorel-BaU)
Gambar 105. Kontribusi Arus Hubung Singkat Pada Gardu Induk Singkawang
(Skenario Balmorel-BaU)
Arus hubung singkat maksimum pada GI Singkawang adalah sebesar 15,3 kA dengan
besar kontribusi arus hubung singkat dari setiap node seperti terlihat pada Gambar 105.
Gambar 106. Kontribusi Arus Hubung Singkat Pada Gardu Induk Mempawah
(Skenario Balmorel-BaU)
Sedangkan arus hubung singkat maksimum pada GI Mempawah adalah sebesar 13,9
kA dengan besar kontribusi arus hubung singkat dari setiap node seperti terlihat pada Gambar
106.
Gambar 107. Kontribusi Arus Hubung Singkat Pada Setiap Gardu Induk (Skenario Balmorel-
BaU)
Dengan diketahuinya arus gangguan maksimum, maka kontribusi arus hubung singkat
(SCCR) dari PLTN dapat dihitung sebagai berikut berdasarkan Gambar 107:
Arus Hubung singkat maksimum yang mungkin terjadi pada PLTN dan gardu yang
berhubungan pada skenario Balmorel-BaU masih berada dalam batas aman di bawah
kapasitas nominal peralatan yang terpasang pada Gardu Induk yang biasanya memiliki batas
25-63 kA.
Besarnya arus hubung singkat pada PLTN, GI Singkawang, dan GI Mempawah pada
skenario pembebanan Balmorel-BaU ditunjukkan pada Tabel 78 di bawah:
Tabel 78. Rekapitulasi Arus Hubung Singkat Maksimum Skenario Pembebanan Balmorel-BaU
Arus Hubung Kontribusi Arus Hubung
No Lokasi Gangguan
singkat Maksimum Singkat PLTN
1 PLTN (150kV) 13,7 kA
2 GI Singkawang (150kV) 15,3 kA 5 kA
3 GI Mempawah (150kV) 13,9 kA 6,35 kA
Studi stabilitas sistem dilakukan untuk melihat dampak dari hilangnya daya yang
disuplai PLTN (lepasnya PLTN dari sistem) akibat gangguan atau kerusakan yang mungkin
terjadi. Simulasi dilakukan dengan kemungkinan terburuk yaitu PLTN 1x100MW kehilangan
daya total/100% dalam beroperasi.
Pelepasan PLTN yang beroperasi dengan beban sebesar 1x80 MW dari sistem
Interkoneksi Khatulistiwa-Barito-Mahakam-Serawak memperlihatkan respon frekuensi pada
sisi bus 150kV PLTN seperti pada Gambar 108. Terlihat penurunan frekuensi sistem hanya
mencapai 49,95Hz (99,9% dari nominal).
Lepasnya generator dari jaringan akan diikuti sekuens proses lainnya di PLTN maka
turbin akan mengalami peningkatan kecepatan (load rejection) sehingga governor akan
mengurangi daya mekanik ke turbin seperti terlihat pada Gambar 109.
Tabel 79. Asumsi Pemodelan Sistem Dengan Skenario Pembebanan Balmorel -Industrialisasi
No Parameter Nilai
1 Mode Operasi Generator
PLTU; PLTA Voltage Control
PLTD; PLTG; PLTGU Swing
2 Pembangkitan 90% kapasitas nominal
Beban Internal Pembangkit 6% kapasitas Nominal
3 Pembebanan 120% Kapasitas Beban (Beban Puncak)
Analisis transien tidak dapat dilakukan pada skenario BaU-Industrialisasi ini karena
ditemui kondisi tidak ideal pada simulasi aliran daya steady state.
Studi aliran daya dilakukan dengan asumsi sistem kelistrikan Kalimantan Barat (Sistem
Khatulistiwa) memiliki interkoneksi dengan sistem lain yang berdekatan yaitu Sistem barito,
Mahakam dan Sistem Serawak.
Besarnya beban pada setiap gardu mengacu pada hasil simulasi Balmorel dengan
skema Industrialisasi dengan kapasitas gardu induk tetap mengacu pada capacity balance
gardu induk yang diusulkan oleh PLN UIKL Kalimantan dapat dilihat ringkasannya pada Tabel
80 di bawah ini.
Mismatch-MW 0
Mismatch-Mvar 0
Pembebanan pada sistem Kaltengsel dan Kaltimra diasumsikan memiliki faktor pengali
yang sama dengan nilai beban sistem Kalimantan Barat antara skema RUPTL dan Skema
Balmorel sehingga dengan Diversity Factor 120 % pada pemodelan aliran daya, dihasilkan
total beban total sistem sebesar 8895 MW.
Pada skenario ini, kebutuhan beban sistem Kalimantan tidak dapat dipenuhi oleh
pembangkit sesuai perencanaan RUPTL 2019. Dengan demikian, sistem Serawak membantu
memenuhi kebutuhan daya sistem Kalimantan sebesar 95 MW seperti Gambar 110.
GI Mambong pada
PLTN SMR sistem Serawak
3x100MW
Aliran Daya
Kalimantan - Serawak
Aliran
daya
Kaltengsel
- Kaltimra
Aliran daya
Kalbar -
Kaltengsel
Terdapat beberapa area dengan penurunan level tegangan >10% akibat kebutuhan
beban reaktif yang tidak terpenuhi yang ditampilkan dalam Tabel 81 di bawah.
Tabel 81. Bus Dengan Level Tegangan di Bawah Toleransi (Skenario Balmorel-Industrialisasi)
1. Aliran daya dari GI Air Upas (Kalbar) menuju GI Sukamara (Kalteng) sebesar 3,7
MW yang merupakan keluaran daya dari PLTU Ketapang.
2. Aliran daya dari GI PLTU Kaltengsel 3 (Kalteng) menuju GI Kota Baru 2 (Kalbar)
sebesar 56 MW yang merupakan keluaran daya dari PLTU Kaltengsel 3 2x100 MW.
3. Pembangkit-pembangkit beban puncak yang terdapat di Kaltengsel beroperasi
dengan pembebanan antara 50-90%.
4. Terdapat beberapa pembangkit yang beroperasi pada limit eksitasi untuk
memenuhi kebutuhan daya reaktif pada jaringan seperti PLTA Kusan, Riam Kanan,
PLTGU Kalsel dan PLTU Kotabaru.
PLTU Kalsel
2x100MW
PLTU Kaltengsel 3
2x100MW
GI Pangkalan Bun
PLTU Kaltim 2
PLTU Kaltim 4 2x100MW
2x100MW
PLTU Kaltim 3
2x100MW
2. Aliran daya dari GI PLTU Melak (Kaltim) menuju GI Bangkanai (Kalteng) sebesar 70
MW yang merupakan keluaran daya dari PLTU Kaltim 3 2x100 MW.
3. Pembangkit-pembangkit beban puncak yang terdapat di Kaltimra beroperasi
dengan pembebanan antara 50-90%.
4. Terdapat beberapa pembangkit yang beroperasi pada limit eksitasi untuk
memenuhi kebutuhan daya reaktif pada jaringan seperti PLTG Senipah. PLTU MT
Kaltim, Tanah Grogot dan Teluk Balikpapan.
Besarnya arus hubung singkat pada PLTN, GI Singkawang dan GI Mempawah pada
skenario pembebanan Balmorel-Industrialisasi ditunjukkan pada Tabel 82
Dengan diketahuinya arus gangguan maksimum, maka kontribusi arus hubung singkat
(SCCR) dari PLTN dapat dihitung sebagai berikut:
Arus Hubung singkat maksimum yang mungkin terjadi pada PLTN dan gardu yang
berhubungan pada skenario Balmorel-Industrialisasi masih berada dalam batas aman di
bawah kapasitas nominal peralatan yang terpasang pada Gardu Induk Singkawang dan
Mempawah yang memiliki kapasitas hubung singkat 31,5kA.
Studi aliran daya dibatasi pada sistem Khatulistiwa karena keterbatasan pembangkit
pada sistem Kaltengsel dan Kaltimra seperti yang sudah dijelaskan sebelumnya.
Besarnya beban pada setiap gardu mengacu pada hasil simulasi Balmorel dengan
skema Prosperity dengan kapasitas gardu induk tetap mengacu pada capacity balance gardu
induk yang diusulkan oleh PLN UIKL Kalimantan, ringkasan dapat dilihat pada Tabel 84 di
bawah ini.
Mismatch-MW 0
Mismatch-Mvar 0
Pembebanan pada sistem Kaltengsel dan Kaltimra diasumsikan memiliki faktor pengali
yang sama dengan nilai beban sistem Kalimantan Barat antara skema RUPTL dan Skema
Balmorel sehingga dengan Diversity Factor 150 % pada pemodelan aliran daya, dihasilkan
total beban total sistem Kalbar sebesar 1583 MW.
Pada skenario ini, walaupun dengan adanya penambahan PLTN 5x100MW, kebutuhan
beban sistem Kalimantan Barat tidak dapat dipenuhi oleh pembangkit sesuai perencanaan
RUPTL 2019. Hal ini diakibatkan ketidak seimbangan antara permintaan beban dan
pembangkitan, di mana terjadi surplus daya pada sisi barat (pesisir) Kalimantan Barat dan
terjadi kekurangan daya pada daerah timur Kalimantan Barat. Model aliran daya pada
Gambar 113 dan Gambar 114 adalah model dengan sitem Serawak dan Kaltengsel
dimodelkan sebagai swing grid.
Gambar 113. Simulasi Aliran Daya Sistem Khatulistiwa-Serawak Dengan Pembangkitan 100%
(Skenario Balmorel-Prosperity)
GI Mambong pada
sistem Serawak
PLTN 5x100MW
Gambar 114. Simulasi Aliran Daya Sistem Khatulistiwa-Serawak Dengan Pembangkitan 80%
(Skenario Balmorel-Prosperity)
Pada pembangkitan 100%, daya dari daerah barat (pesisir) Kalimantan Barat terserap
seluruhnya pada Area Kalbar bagian barat dan tengah dan dibantu dengan impor daya dari
Serawak sebesar 27MW dan kebutuhan daya Kalbar bagian timur dipenuhi dari sistem
Kaltengsel.
Sedangkan ketika pembangkitan pada level 80%, dibutuhkan impor daya yang lebih
besar yaitu sebesar 228MW dari Serawak dengan kebutuhan daya Kalbar bagian timur
dipenuhi dari sistem Kaltengsel.
Besarnya arus hubung singkat pada PLTN, GI Singkawang dan GI Mempawah pada
skenario pembebanan Balmorel-Prosperity ditunjukkan pada Tabel 85:
Dengan diketahuinya arus gangguan maksimum, maka kontribusi arus hubung singkat
(SCCR) dari PLTN dapat dihitung sebagai berikut:
Arus Hubung singkat maksimum yang mungkin terjadi pada PLTN dan gardu yang
berhubungan pada skenario Balmorel-Prosperity masih berada dalam batas aman di bawah
kapasitas nominal peralatan yang terpasang pada Gardu Induk Singkawang dan Mempawah
yang memiliki kapasitas hubung singkat 31,5kA.
BAB V
ASPEK KEUANGAN
Tabel 86. Neraca Parameter PLTN Yang Digunakan Sebagai Asumsi Dasar
Auxiliary Faktor Kapasitas Biaya Biaya
Lifetime
PLTN Consumption kapasitas listrik Kapital Kapital
% % years MWe USD/kWe Juta USD
PLTN LR 1 (1400 MW) 5 93 40 1.455 4.175[84] 5.794,6
PLTN LR 2 (2x1200 MW) 5 93 40 2.400 4.334[85] 9.863,8
PLTN LR 3 (2x1170 MW) 5 93 40 2.340 5.000[86] 11.700
SMR 1 (1x100 MW) 5 93 40 100 5.000[87] 500
SMR 2 (12x60 MW) 5 93 40 720 3.600[88] 2.458,7
SMR 3 (2x55 MW) 5 93 40 110 8.600* 946
Keterangan:
Biaya kapital belum termasuk owner cost dan pajak serta transportasi. Total biaya proyek akan dihitung pada
model keuangan pada analisis finansial.
*Data SMR 3 berasal dari data vendor
Biaya kapital yang ada pada Tabel 86 adalah biaya kapital sesaat (overnight capital
cost) apabila pembangkit tersebut dibangun dalam satu malam. Biaya ini terdiri dari
pembelian peralatan seperti perlengkapan reaktor, turbin, perlengkapan pembangkitan
listrik, dll. Dari biaya overnight capital cost tersebut akan dijumlahkan dengan biaya owner
cost, pajak serta transportasi yang akan menghasilkan biaya EPC (Engineering, Procurement,
and Construction) atau bisa disebut biaya capital expenditure (CAPEX) yang ada pada Tabel
87.
Offshore cost pada Tabel 87 adalah biaya pembelian alat terkait teknologi PLTN yang
akan digunakan. Biaya offshore ini adalah overnight capital cost karena diasumsikan seluruh
pembelian alat teknologi PLTN berasal dari luar negeri, kemudian asumsi biaya transportasi
untuk pembelian alat tersebut adalah sebesar 2% dari biaya kapital sesaat (overnight capital
cost). Asumsi tersebut diambil dari referensi World Nuclear Agency [89].
Tabel 89 merupakan persentase distribusi biaya overnight cost pada PLTN dengan
menggunakan referensi [90]:
Biaya pengembangan pada Tabel 89 merupakan asumsi yang didapatkan dari data
vendor langsung. Kemudian Tabel 90, seperti yang dijelaskan pada Bab III pada parameter
asumsi. Biaya upfront financing diasumsikan sebesar 5%. Biaya ini sangat bervariatif dan
tergantung terhadap apakah bank ingin menerima angka tersebut atau tidak. Pada OECD
tahun 2015 disebutkan bahwa premium minimum rates yang harus dibayar up-front untuk
negara kategori 2 dan 3 adalah 10,44% dan 11,03% [91]. Adapun untuk biaya pendanaan dan
interest during construction merupakan data yang berasal dari perhitungan pada persamaan
6.1 dan 6.2.
𝑃𝑜𝑟𝑠𝑖 𝐻𝑢𝑡𝑎𝑛𝑔
𝐵𝑖𝑎𝑦𝑎 𝑃𝑒𝑛𝑑𝑎𝑛𝑎𝑎𝑛(𝑈𝑝𝑓𝑟𝑜𝑛𝑡 𝐹𝑖𝑛𝑎𝑛𝑐𝑖𝑛𝑔) = 5% ∗ ∗ 𝐵𝑖𝑎𝑦𝑎 𝑘𝑎𝑝𝑖𝑡𝑎𝑙(𝐸𝑃𝐶)
100
(6.1)
Biaya front-end bahan bakar nuklir adalah biaya pabrikasi bahan bakar uranium yang
siap dipakai oleh reaktor. Tabel 91 menunjukkan struktur biaya front-end bahan bakar nuklir.
1 kg bahan bakar uranium siap pakai membutuhkan 8,9 kg uranium alam [89]. Harga uranium
alam didapat dari harga pasar global [92]. Biaya yang dibutuhkan untuk mengubah U3O8
menjadi UF6 adalah sebesar 8% total biaya front-end. Biaya separative work unit (SWU) atau
biaya pekerjaan pengayaan uranium adalah biaya untuk menaikkan kandungan isotop U-235
yang bersifat fisil. Besaran SWU bergantung pada jenis proses yang digunakan seperti proses
difusi gas, sentrifuge dan pemisahan isotop dengan laser, skala instalasi dan biaya proyek.
Biaya back-end tidak termasuk dalam biaya front-end bahan bakar. Biaya back-end
nantinya akan dihitung pada perhitungan total biaya bahan bakar pada komponen C simulasi
model keuangan dimana asumsi yang digunakan untuk biaya back-end adalah 2,33 USD/MWh
yang digunakan untuk penanganan limbah dan biaya ini berbeda dengan biaya dekomisioning
[65].
Tabel 91, biaya pengayaan setara dengan 23% dari total pembuatan 1 kg bahan bakar
nuklir. Biaya pabrikasi adalah untuk mengubah bahan bakar nuklir menjadi bentuk pelet
keramik yang dibuat dengan proses sinter pada suhu tinggi. Material yang digunakan untuk
pelet tersebut adalah Uranium oksida. Pelet bahan bakar tersebut kemudian dibungkus
dalam selongsong logam yang akan disusun menjadi fuel assembly yang akan digunakan pada
reaktor. Proporsi biaya pabrikasi terhadap pembuatan 1 kg bahan bakar nuklir sama seperti
biaya pengayaan yaitu sekitar 23% sebagaimana pada Tabel 91.
Tabel 93 menunjukkan data biaya dekomisioning yang digunakan untuk tiap teknologi
PLTN. Asumsi yang digunakan untuk biaya dekomisioning adalah sebesar 15% dari overnight
cost atau biaya kapital berdasarkan referensi dari Nuclear Energy Agency.
Biaya liabilitas PLTN adalah biaya yang dibayar apabila terjadi kecelakaan pada suatu
PLTN. Berdasarkan data dari American Nuclear Insurers, rerata tahunan asuransi yang dibayar
oleh 1 unit reaktor PLTN di Amerika adalah sebesar 1 juta USD pada tahun 2019 [90]. Asumsi
yang digunakan pada model keuangan untuk biaya asuransi adalah sebesar 1 juta USD per
tahun berdasarkan data tersebut. Biaya asuransi sudah termasuk dalam total biaya fixed O&M
yang dapat dilihat pada Tabel 92.
Investasi dalam proyek PLTN secara umum memiliki banyak kesamaan dengan proyek
investasi infrastruktur penting lainnya seperti intensitas modal yang tinggi, waktu tunggu
yang lama, dan periode pengembalian modal yang lama. Namun demikian investasi PLTN
memiliki ciri khas yaitu terkait dengan siklus bahan bakar seperti keamanan pasokan, bahan
bakar bekas dan pengelolaan limbah serta non-proliferasi dan dekomisioning. Selain itu
proyek PLTN memiliki risiko tinggi sehingga operator PLTN wajib bertanggungjawab dan
memastikan keselamatan jika terjadi peristiwa nuklir yang luar biasa [93].
Paramater yang digunakan untuk perhitungan model keuangan dapat dilihat pada
Tabel 94.
Untuk jadwal pembangunan proyek dapat dilihat pada Tabel 95. PLTN dengan skala
besar diasumsikan memiliki masa konstruksi selama 72 bulan, asumsi ini diambil dari referensi
World Nuclear Association dimana pada tahun 2018 median untuk pembangunan PLTN PWR
berkapasitas besar adalah 58 bulan [100]. PLTN SMR diasumsikan dapat dibangun dengan
masa konstruksi selama 4 tahun berdasarkan referensi Nuclear Energy Agency [101]. Seluruh
pembangunan PLTN diasumsikan akan selesai pada Desember 2030 pada model simulasi
perhitungan keuangan.
Berdasarkan data kapital, biaya bahan bakar, dan biaya O&M, hasil analisis keuangan
dari tiap teknologi PLTN ditunjukkan pada Tabel 96. Suatu proyek layak secara finansial jika:
a. Internal Rate of Return (IRR) lebih besar daripada Weight Average Cost of Capital
(WACC).
b. Net Present Value (NPV) > 0.
Tabel 97. Harga Komponen A Tiap Teknologi Beserta IRR dan NPV Total Proyek.
Teknologi Komponen A IRR Total Proyek NPV Total Proyek
cUSD/kWh %
PLTN LR 1 7,34 6,39 682,72
PLTN LR 2 7,97 6,43 1.272,86
PLTN LR 3 8,44 5,88 454,04
SMR 1 10,28 7,74 162,39
SMR 2 6,75 8,04 856,07
SMR 3 13,95 6,39 95,43
Dari Tabel 96, WACC untuk tiap teknologi PLTN yang digunakan memiliki rata-rata
5,60% dan dapat dilihat untuk PLTN SMR 3 memiliki Overall Project Cost dan levelized tariff
tertinggi yaitu 13.058 USD/kW dan 19,45 cUSD/kWh. Ini disebabkan kapasitas SMR 3 relatif
kecil yaitu 110 MW sehingga produksi per tahun yang dapat dilihat pada Tabel 93 hanya
sebesar 896.150 MWh.
Harga tiap komponen A yang dihasilkan agar NPV>0 dan IRR>WACC dapat dilihat pada
Tabel 97. Untuk harga komponen A apabila dilihat harga PLTN SMR 1 sebenarnya akan
semakin kecil apabila kapasitas SMR yang ditambahkan semakin besar, bila PLTN SMR 1 dan
SMR 3 diasumsikan akan dibangun 3 sampai 4 unit maka harga komponen A akan semakin
kecil sehingga hasil levelized tariff akan semakin bersaing dengan PLTN lainnya. Harga
levelized tariff PLTN SMR kurang lebih akan berkisar seperti PLTN SMR 2.
Harga komponen A untuk SMR 3 juga sangat besar sebesar 13,95 cUSD/kWh ini juga
dikarenakan kapasitas untuk SMR 3 hanya 110 MW dan memiliki overnight cost sebesar 8.600
USD/kW. Yang mengakibatkan harga overall project untuk SMR 3 menjadi 13.058 USD/kW
setelah perhitungan model keuangan yang sudah termasuk pajak, interest during construction
dan financing cost.
Gambar 115. Grafik Perbandingan Levelized Tariff Antar PLTN Hasil Simulasi.
Gambar 115 menunjukkan grafik perbandingan levelized tariff antar teknologi PLTN
yang digunakan. BPP yang digunakan adalah BPP Kalimantan Barat yaitu sebesar 10,70
cUSD/kWh [103]. Teknologi PLTN yang masuk adalah PLTN LR 1, PLTN LR 2, PLTN LR 3 dan
SMR 2. Namun seperti penjelasan sebelumnya bahwa PLTN SMR 1 dan SMR 3 dapat masuk
dalam sistem apabila banyaknya SMR yang dibangun bertambah sehingga daya yang
dihasilkan akan semakin besar yang akan membuat harga pada komponen A semakin
berkurang.
Komponen E memiliki nilai yang berbeda pada tiap levelized tariff antar PLTN
dikarenakan komponen tersebut diubah menjadi cUSD/kWh. Pada dasarnya harga komponen
E dalam USD memiliki nilai yang sama dengan asumsi yaitu 823.000 USD/mil untuk biaya
pemasangan jaringan transmisi dengan jarak terdekat dengan jaringan 150 kV PLN 10 km.
Untuk Komponen D yaitu variable O&M memiliki nilai yang sama sebesar 0,257 cUSD/kWh
karena asumsi yang digunakan adalah 1,87 USD/MWh untuk teknologi PLTN LR 1-3, PLTN SMR
1 dan SMR 3.
Gambar 116. Grafik Porsi Komponen Pada Levelized Tariff Antar PLTN Hasil Simulasi
Pada Gambar 116, komponen A yaitu capacity charge atau biaya kapasitas yang
memiliki kontribusi paling besar dalam penentuan levelized tariff. Komponen yang paling
berpengaruh kedua adalah komponen B yaitu fixed cost O&M karena komponen ini terkena
eskalasi pada cash flow di model keuangan. Pada Gambar 116, SMR 2 memiliki fuel cost
komponen C paling tinggi dikarenakan burn-up yang ada pada PLTN SMR 2 hanya sebesar
45.000 MWd/ton sedangkan PLTN lainnya menggunakan sesuai data referensi yang ada
sebesar 60.000 MWd/ton dan 90.000 MWd/ton untuk SMR 3 berdasarkan data dari vendor.
Pada SMR 1 dan SMR 3, porsi komponen B yaitu biaya fixed O&M memiliki porsi yang paling
besar bila dibandingkan dengan PLTN lainnya. Ini dikarenakan SMR 1 dan SMR 3 memiliki
kapasitas yang kecil sebesar 100 MW dan 110 MW dan harga O&M terus bereskalasi sebesar
2% per tahunnya sehingga harga tersebut semakin mahal.
Tujuan utama dari analisis risiko adalah untuk membangun landasan rasional dalam
pengambilan keputusan untuk meminimalkan risiko[104]. Risiko adalah masalah (situasi dll)
yang belum muncul, tetapi mungkin terjadi di masa mendatang sehingga hasil yang
ditetapkan sebelumnya menjadi terancam atau meningkat melebihi target tersebut. Risiko
merupakan ketidakpastian dalam mencapai hasil yang diinginkan dan harus dianggap sebagai
kombinasi kemungkinan dan dampak. Untuk proyek-proyek besar, risiko dihitung dalam
memperkirakan biaya sehingga dapat meminimalkan dan mencegah risiko terhadap target
yang ditentukan[105].
Metode simulasi Monte Carlo merupakan metode analisis risiko kuantitatif yang
secara luas digunakan untuk menghitung risiko, termasuk risiko dalam proyek investasi [105-
109]. Simulasi Monte Carlo adalah sebuah metode analisis dengan teknik stokastik artinya
dibangun berdasarkan nilai data random yang melahirkan sebuah statistik probabilitas atau
simulasi statistik, untuk selanjutnya digunakan untuk memahami dampak dari sebuah
ketidakpastian (risiko). Penggunaannya sudah sangat berkembang dalam bidang keuangan,
evaluasi proyek, biaya, investasi, dan bidang manejemen proyek serta bidang lainnya. Dalam
sebuah simulasi, model proyek dihitung dalam beberapa kali iterasi, dengan nilai input yang
diacak dari sebuah fungsi distribusi probabilitas [110].
Metode simulasi Monte Carlo pertama kali muncul sekitar tahun 1944 dengan
berbagai interprestasi dan definisi yang kemudian mengalami proses evolusi dan
perkembangan yang panjang hingga saat ini. Pada awalnya isu penting dari metode ini adalah
membangkitkan serangkaian besar bilangan acak. Pada tahap pertama digunakan bilangan
pseudo-random, kemudian seiring dengan perkembangan teknologi komputer, simulasi
Monte Carlo semakin efisien dalam menggenerasikan bilangan acak secara cepat. Metode
Monte Carlo menghasilkan nilai artifisial dari variabel probabilistik dengan menggunakan
generator bilangan terdistribusi secara acak pada interval (0,1) dan juga dengan
menggunakan fungsi distribusi kumulatif[105].
Karena simulasi Monte Carlo dapat menghasilkan bilangan acak maka simulasi
keputusan ekonomi dapat diterapkan dengan metode Monte carlo pada semua tingkatan
masalah yang mencakup aturan operasi, kebijakan dan prosedur, seperti yang berkaitan
dengan adaptasi keputusan, pengendalian keputusan dan kebijakan harga untuk menentukan
probabilitas ketidakpastian dari model masalah tersebut. Tindakan teknik simulasi
sebenarnya bukanlah proses optimasi keputusan. Memecahkan masalah menggunakan
teknik simulasi melibatkan penggunaan algoritma interaktif dan adanya langkah-langkah yang
ditentukan dengan baik untuk mencapai tujuan. Data masukan biasanya variabel acak yang
dihasilkan oleh generator nomor acak [105].
Pada tulisan ini, metode simulasi Monte Carlo dijalankan melalui software Crystal Ball
yaitu software yang bekerja pada Microsoft Excel. Dengan simulasi ini pengguna dapat
menduga atau memperkirakan area kemungkinan yang akan terjadi terhadap variabel yang
menjadi perhatiannya berdasarkan kemungkinan-kemungkinan yang diperkirakan.
Langkah-langkah dalam menjalankan simulasi Monte Carlo adalah sebagai berikut [111] :
Proyek pembangunan PLTN merupakan proyek yang padat teknologi dan padat modal
serta dengan persyaratan tingkat keselamatan dan keamanan yang tinggi. Oleh karena itu
pengambilan keputusan perlu berhati-hati dengan mempertimbangkan berbagai risiko.
Beberapa variabel ketidakpastian seperti biaya modal, harga bahan bakar, faktor kapasitas
dapat memunculkan risiko dalam proyek PLTN. Analisis risiko kelayakan finansial dengan
menggunakan metode Monte Carlo diharapkan dapat mengakomodasi kemungkinan adanya
variabel-variabel ketidakpastian tersebut.
Analisis risiko proyek investasi yang disimulasikan dengan menggunakan Monte Carlo
dalam tulisan ini adalah rencana proyek pembangunan PLTN SMR 1 100MW yang mewakili
PLTN Skala Kecil (SMR) dan PLTN LR 2 yang mewakili jenis PLTN Skala Besar (Large).
Variabel ketidakpastian yang disimulasikan sebagai input simulasi Monte Carlo pada
proyek PLTN SMR 1 100 MW ditunjukkan dalam Tabel 98 berikut:
Parameter output dalam analisis risiko ini merupakan indikator kelayakan proyek yang
meliputi levelized tariff, IRR on equity, IRR on Project, NPP on equity, NPP on project, dan
overall Project Cost. Nilai parameter tersebut dievaluasi dengan memasukkan variabel
ketidakpastian yang merupakan input simulasi sesuai Tabel 98. Sensitivitas juga akan
dilakukan secara bersamaan untuk melihat variabel yang paling berpengaruh terhadap
parameter output yang sudah ditentukan sebelumnya.
Hasil simulasi Monte Carlo untuk proyek PLTN SMR 1 100MW ditampilkan pada
Gambar 118 sampai dengan Gambar 123. Hasil simulasi untuk nilai levelized tariff ditunjukkan
oleh Gambar 118 berikut ini.
Berdasarkan hasil simulasi, nilai levelized tariff minimum adalah sebesar 14,871
cUSD/kWh sedangkan nilai maksimum adalah 15,618 cUSD/kWh dan rata-rata sebesar 15,226
cUSD/kWh dengan standar error 0,005. Range nilai levelized tariff tersebut dibawah hasil
perhitungan base case sebesar 15,907 cUSD/kWh. Nilai levelized tariff merupakan biaya listrik
rata-rata selama masa pakai pembangkit, semakin rendah maka semakin besar kemungkinan
untuk dibeli oleh PLN. Hasil simulasi menunjukkan bahwa nilai terendah levelized tariff yang
mungkin terjadi adalah 15,226 cUSD/kWh, nilai tersebut diatas nilai BPP Kalimantan Barat
yaitu sebesar 10,7 cUSD/kWh. Dengan demikian biaya listrik dari PLTN SMR 1 berdasarkan
hasil tersebut masih relatif mahal.
Adapun untuk IRR on equity PLTN SMR 1 ditunjukkan pada Gambar 119. IRR on equity
adalah tingkat pengembalian dari sudut pandang investor itu sendiri.
Hasil simulasi nilai IRR on equity untuk PLTN SMR 1 100 MW menunjukkan bahwa nilai
IRR terendah adalah 10,09%, maksimum adalah 16,99% dan rata-rata adalah 13,37% dengan
standar error 0,04%. Dibandingkan nilai base case 9,84% maka hasil simulasi menunjukkan
nilai yang tinggi. Nilai IRR yang tinggi menunjukkan bahwa nilai kelayakan finansial yang lebih
baik. Nilai IRR rata-rata yang dihasilkan dari simulasi lebih besar dari nilai cost equity yaitu
sebesar 8%. Dengan demikian berdasarkan hasil simulasi menunjukkan bahwa proyek PLTN
SMR 1 dilihat dari nilai IRR equitynya sudah layak.
Hasil simulasi nilai IRR on project PLTN SMR 1 100 MW ditampilkan pada Gambar 120.
Nilai IRR on project adalah tingkat pengembalian dari sudut pandang bersama, yaitu pihak
investor dan sekaligus pihak bank.
Hasil simulasi nilai IRR on project seperti ditunjukkan oleh Gambar 120, nilai IRR
minimum adalah 3,43%, nilai maksimum 6,16%, nilai rata-rata 4,83% dengan standar error
0,01%. Dibandingkan dengan nilai base case yang sebesar 5,45%, hasil simulasi menunjukkan
nilai yang lebih kecil. Dibandingkan nilai WACC yaitu 5,4% nilai IRR on project nilainya masih
dibawah. Sehingga dapat dikatakan investasi PLTN SMR 1 belum menarik untuk investor.
Parameter kelayakan finansial yang berikutnya dalah nilai NPV yaitu selisih antara
pengeluaran dan pemasukan yang telah didiskon dengan social opportunity cost of capital
sebagai diskon faktor. Hasil simulasi nilai NPV on equity dapat ditunjukkan oleh Gambar 121.
Berdasarkan hasil simulasi NPV on equity SMR 1 100 MW, nilai NPV minimum adalah
185,42, nilai maksimum 440,44, dan rata-rata sebesar 306,57, dengan standar error 1,45.
Kemungkinan nilai yang muncul untuk NPV on equity adalah 306,57. Kemudian hasil NPV>0
menunjukkan bahwa investasi untuk PLTN SMR 1 masih layak berdasarkan hasil simulasi
Monte Carlo.
Berdasarkan hasil simulasi NPV on project PLTN SMR 1 100 MW ditunjukkan pada
Gambar 122. Nilai NPV on project memiliki base case dengan nilai 62,30 dengan nilai minimum
67,13, nilai maksimum 336,42, dan standar error 1,50. Nilai hasil simulasi ada diantar nilai
minimum dan maksimum dan menunjukkan bahwa investasi dalam sudut pandang investor
dan bank masih layak secara finansial karena NPV>0.
Kemudian untuk nilai overall project costs dapat dilihat pada Gambar 123. Hasil
simulasi menunjukkan minimum overall project cost adalah sebesar 838,95 juta dollar,
maksimum 993,12 juta dollar, rata-rata 914,07 juta dollar dengan standar error sebesar 0,93
juta dollar. Nilai base case yaitu 895,49 juta dollar. Kemungkinan biaya proyek total ada pada
nilai 914,07 juta USD untuk PLTN SMR 1.
Gambar 123. Hasil Simulasi Overall Project Cost PLTN SMR 1 100 MW
Analisis sensitivitas dengan Monte Carlo untuk IRR on equity, IRR on project, dan
levelized tariff dapat dilihat pada Gambar 124 sampai dengan Gambar 126.
Hasil simulasi menunjukkan bahwa nilai IRR on equity paling tinggi dipengaruhi oleh
besarnya kapasitas PLTN, pembelian alat, dan bunga pinjaman bank. Semakin besar daya dari
PLTN maka hasil IRR juga akan semakin besar. Persentase pada hasil analisis menunjukkan
seberapa besar pengaruh apabila nilai tersebut semakin besar/semakin kecil. Positif pada
analisis sensitivitas Gambar 124 diatas artinya bila nilai tersebut semakin kecil efeknya IRR
akan semakin kecil dan apabila nilai semakin besar IRR akan naik juga. Untuk nilai persentase
negatif pada Gambar 124 seperti equipment purchase apabila nilai semakin kecil maka nilai
IRR akan semakin besar, sebaliknya apabila nilai tersebut makin besar paka IRR akan semakin
kecil.
Hasil simulasi pada Gambar 125 menunjukkan analisis sensitivitas untuk IRR on
project. Yang paling berpengaruh pada IRR on project adalah kapasitas pembangkit,
pembelian alat, dan pajak korporasi. Dengan kapasitas pembangkit memiliki sensitivitas
positif yang artinya semakin besar nilai kapasitas pembangkit maka semakin besar pula nilai
dari IRR on total project. Pengaruh terbesar kedua adalah equipment purchase yang bernilai
negatif yang artinya apabila nilai pembelian alat tersebut semakin kecil maka nilai IRR on total
project semakin besar, sebaliknya apabila nilai pembelian alat semakin besar maka IRR on
total project semakin kecil.
Gambar 125. Hasil Analisis Sensitivitas IRR On Project Untuk PLTN SMR 1 100 MW
Hasil simulasi untuk Gambar 126 menunjukkan analisis sensitivitas untuk levelized
tariff PLTN SMR 1 100 MW. Dari hasil analisis sensitivitas tersebut yang paling berpengaruh
untuk levelized tariff pada PLTN SMR 1 adalah kapasitas pembangkit. Dapat dilihat pada
gambar bahwa analisis sensitivitas untuk nilai kapasitas pembangkit bernilai negatif yang
berarti semakin kecil daya dari sebuah PLTN maka akan semakin besar nilai levelized tariff,
sebaliknya apabila kapasitas semakin besar maka nilai levelized tariff akan semakin kecil.
Gambar 126. Hasil Analisis Sensitivitas LCOE Untuk PLTN SMR 1 100 MW
Variabel ketidakpastian yang disimulasikan sebagai input simulasi Monte Carlo pada
proyek PLTN LR 2 2x1200MW ditunjukkan oleh Tabel 99 berikut:
Hasil simulasi Monte Carlo untuk proyek PLTN LR 2 2x1200 MW ditampilkan pada
Gambar 127 sampai dengan Gambar 132. Hasil simulasi untuk nilai levelized tariff ditunjukkan
oleh Gambar 127 berikut ini.
Berdasarkan hasil simulasi, nilai levelized tariff minimum adalah sebesar 9,624
cUSD/kWh sedangkan nilai maksimum adalah 9,883 cUSD/kWh dan rata-rata sebesar 9,750
cUS$/kWh dengan standar error 0,001. Range nilai levelized tariff tersebut dibawah hasil
perhitungan base case 9,493 cUSD/kWh. Nilai levelized tariff merupakan biaya listrik rata-rata
selama masa pakai pembangkit, semakin rendah biaya listrik maka semakin besar
kemungkinan untuk dibeli PLN.
Hasil simulasi menunjukkan bahwa nilai levelized tariff yang mungkin terjadi adalah
9,493 cUS$/kWh dibawah nilai BPP Kalimantan Barat yaitu sebesar 10,7 cUS$/kWh. Dengan
demikian biaya listrik dari PLTN LR 2 berdasarkan hasil simulasi nilai levelized tariff realtif lebih
murah dibandingkan nilai BPP.
Hasil simulasi nilai IRR on equity PLTN LR 2 2x1200 MW ditunjukkan oleh Gambar 128.
IRR on equity adalah tingkat pengembalian dari sudut pandang investor itu sendiri.
Base case untuk nilai IRR on equity adalah 10,47% dimana nilai tersebut diatas nilai
rata-rata hasil analisis Monte Carlo yang berarti kemungkinan untuk nilai IRR ada pada nilai
6,89% dan nilai tersebut dibawah nilai cost equity sebesar 8%. Hal ini menunjukkan bahwa
proyek PLTN LR 2 2x1200 MW masih belum layak.
Hasil simulasi nilai IRR on project untuk PLTN LR 2 2x1200 MW ditampilkan oleh
Gambar 129. Nilai IRR on project adalah tingkat pengembalian dari sudut pandang bersama,
yaitu dari investor dan pihak bank.
Berdasarkan hasil simulasi pada Gambar 129, nilai minimum IRR on project untuk LR 2
adalah 3,67%, nilai maksimum 6,03%, nilai rata-rata 4,82% dengan standar error 0,01%. Base
case untuk LR 2 adalah 6,42%. Nilai rata-rata dari hasil simulasi lebih kecil dari base case dan
nilai tersebut juga lebih kecil dari nilai WACC yaitu 5,60%. Hal ini menunjukkan bahwa proyek
PLTN LR 2 berdasarkan analisis Monte Carlo masih belum layak karena nilai IRR<WACC.
Parameter kelayakan finansial berikutnya adalah nilai NPV yaitu selisih antara
pengeluaran dan pemasukan yang telah didiskon dengan social opportunity cost of capital
sebagai faktor diskon. Hasil simulasi nilai NPV on equity dapat dilihat pada Gambar 130.
Berdasarkan hasil analisis simulasi, nilai minimum untuk NPV on equity untuk PLTN LR
2 adalah -539,96, nilai maksimum 1783,30, nilai rata-rata 522,58 dengan standar error 12,28.
Base case untuk nilai LR 2 adalah 3040,89. Dari simulasi Monte Carlo menunjukkan bahwa
nilai kemungkinan yang muncul untuk NPV on equity adalah 522,58 dan NPV tersebut bernilai
positif yang berarti PLTN LR2 masih layak.
Hasil simulasi untuk Monte Carlo untuk NPV on project untuk PLTN LR 2 dapat dilihat
pada Gambar 131. Berdasarkan hasil simulasi, nilai minimum untuk NPV on project adalah
sebesar -1426,70, nilai maksimum 822,83, nilai rata-rata -473,09, nilai base case 1254,20
dengan standar error 12,12. Dari hasil simulasi menunjukkan kemungkinan nilai yang muncul
untuk NPV on project adalah -473,09 dimana nilai tersebut masih bernilai negatif yang berarti
proyek PLTN LR 2 masih tidak menarik dan layak untuk dibangun.
Kemudian untuk overall project costs dari PLTN LR 2 dapat dilihat pada Gambar 132.
Berdasarkan hasil simulasi, nilai minimum untuk overall project cost PLTN LR 2 adalah sebesar
8.205,88 juta USD, nilai maksimum 10.004,19 juta USD, nilai rata-rata 9.066,89 juta USD, nilai
base case 15.962,40 juta USD dengan standar error 10,83 juta USD. Dari hasil simulasi
kemungkinan nilai yang keluar untuk overall project cost PLTN LR 2 adalah 9.066,89 juta USD.
Berikutnya adalah analisis sensitivitas Monte Carlo untuk IRR on project, NPV on
project, dan levelized tariff yang ditunjukkan pada Gambar 133 sampai dengan Gambar 135.
Gambar 133 menunjukkan hasil sensitivitas NPV on project pada proyek LR 2 2 x 1200
MW. Berdasarkan analisis sensitivitas tersebut, yang paling berpengaruh terhadap nilai NPV
on project adalah kapasitas pembangkit bruto, bunga pinjaman bank, dan pembelian alat.
Karena nilai sensitivitas positif pada kapasitas pembangkit berarti semakin besar nilai
kapasitas dari pembangkit PLTN maka akan semakin besar pula nilai NPV, sebaliknya apabila
nilai kapasitas semakin kecil maka nilai NPV akan juga semakin mengecil. Untuk nilai
sensitivitas pembelian alat bernilai negatif yang berarti semakin besar nilai pembelian alat
maka akan semakin kecil nilai NPV on project PLTN LR 2, sebaliknya bila nilai pembelian alat
semakin murah maka akan semakin besar pula nilai IRR.
Selanjutnya untuk hasil analisis sensitivitas NPV on equity dapat dilihat pada Gambar
134. Berdasarkan hasil analis sensitivitas Monte Carlo untuk PLTN LR 2, yang paling
berpengaruh pada nilai NPV on equity adalah kapasitas pembangkit bruto, bunga pinjaman
bank atau loan interest, dan pembelian alat. Dimana untuk sensitivitas kapasitas pembangkit
bernilai positif, pembelian alat bernilai negatif, dan bunga pinjaman bank bernilai negatif juga.
Karena yang paling berpengaruh besar adalah sensitivitas positif kapasitas pembangkit berarti
apabila nilai pembangkit PLTN semakin besar, maka akan semakin besar pula nilai NPV on
equity untuk PLTN LR 2. Sedangkan bila kapasitas semakin mengecil maka nilai NPV akan
semakin berkurang juga.
Berikutnya adalah hasil analisis sensitivitas Monte Carlo untuk levelized tariff PLTN LR
2 dapat dilihat pada Gambar 135. Berdasarkan hasil analisis sensitivitas, yang paling
berpengaruh adalah nilai kapasitas pembangkit bruto, dan efisiensi pembangkit. Dimana
untuk nilai kapasitas pembangkit dan efisiensi pembangkit bernilai negatif. Kapasitas
pembangkit bernilai negatif yang artinya apabila kapasitas semakin kecil maka harga levelized
tariff akan semakin besar untuk PLTN LR 2. Sama juga dengan efisiensi pembangkit memiliki
sensitivitas negatif walaupun pengaruhnya tidak sebesar dibandingkan kapasitas pembangkit,
apabila nilai efisiensi pembangkit semakin kecil maka nilai levelized tariff semakin besar.
Kemudian yang terakhir adalah hasil analisis sensitivitas untuk overall project costs
dari PLTN LR 2 yang dapat dilihat pada Gambar 136. Berdasarkan hasil analisis sensitivitas
tersebut, yang paling berpengaruh untuk overall project costs adalah pembelian alat dan
bunga pinjaman bank. Sisa parameter sensitivitas lainnya ada dibawah 0,5% sehingga nilai
tersebut tidak signifikan. Dari nilai yang paling berpengaruh yaitu pembelian alat yang bernilai
positif yang berarti apabila pembelian alat semakin mahal maka harga biaya proyek juga akan
semakin besar, sebaliknya apabila harga pembelian alat semakin murah maka semakin murah
juga harga biaya proyek PLTN LR 2 tersebut.
Gambar 136. Hasil Analisis Sensitivitas Overall Project Cost Untuk PLTN LR 2
Berdasarkan hasil analisis sensitivitas dari Monte Carlo, dua variabel yang paling
berpengaruh adalah besarnya kapasitas pembangkit dan pembelian alat (equipment purchase
– offshore cost). Dari kedua variabel tersebut dilakukan sensitivitas dengan merubah nilai
variabel sebesar ±15% agar dapat dilihat pengaruhnya kepada nilai IRR, NPV, levelized tariff,
dan overall project cost. Tabel 100 dan Tabel 101 dibawah ini adalah nilai sensitivitas kapasitas
pembangkit untuk PLTN SMR 1.
Sensitivitas
IRR (%) NPV (Juta USD) Levelized Overall
Pembelian Alat
Tariff cost (Juta
Nilai On On (cUSD/kWh) USD)
Persentase On equity On project
(Juta USD) equity project
15% 575 8,27 5,61 119,54 -0,7 15,995 996,41
10% 550 8,97 5,91 142,82 25,04 15,965 962,77
5% 525 9,72 6,22 164,81 50,77 15,936 929,13
Base 500 10,52 6,55 186,79 76,5 15,907 895,49
-5% 475 11,38 6,9 208,76 102,22 15,877 861,85
-10% 450 12,29 7,28 230,72 127,93 15,848 828,21
-15% 425 13,26 7,68 252,67 153,63 15,819 794,58
Dari Tabel 100 dan Tabel 101 dapat dilihat efek perubahan nilai kapasitas pembangkit
dan pembelian alat. Yang memiliki efek paling besar apabila nilai tersebut diubah adalah
variabel kapasitas pembangkit, namun untuk variabel kapasitas pembangkit tidak
mempengaruhi harga total biaya proyek dikarenakan untuk menghitung biaya tersebut tidak
dibutuhkan data dari kapasitas pembangkit.
Selanjutnya untuk sensitivitas PLTN LR 2 dapat dilihat di Tabel 102 dan Tabel 103 :
Sensitivitas
IRR (%) NPV (Juta USD) Levelized Overall
Kapasitas Pembangkit
Tariff cost (Juta
Nilai On On (cUSD/kWh) USD)
Persentase On equity On project
(MW) equity project
Sensitivitas
IRR (%) NPV (Juta USD) Levelized Overall
Pembelian Alat
Tariff cost (Juta
Nilai On On (cUSD/kWh) USD)
Persentase On equity On project
(Juta USD) equity project
15% 11.343,43 8,09 5,44 1.726,28 -275,27 9,563 17.953,24
10% 10.850,24 8,83 5,75 2.167,99 233,63 9,539 17.289,63
5% 10.357,04 9,62 6,07 2.603,05 742,54 9,515 16.626,01
Base 9.863,85 10,46 6,42 3.038,12 1.251,43 9,491 15.962,40
-5% 9.370,66 11,36 6,78 3.473,17 1.760,32 9,467 15.298,79
-10% 8.877,47 12,32 7,17 3.908,23 2.269,20 9,443 14.635,18
-15% 8.384,27 13,34 7,59 4.343,26 2.778,08 9,419 13.971,56
Tabel 102 dan Tabel 103 menunjukkan efek perubahan variabel kapasitas pembangkit
dan pembelian alat untuk PLTN LR 2 terhadap IRR, NPV, levelized tariff, dan overall cost. Dapat
dilihat bahwa yang memiliki pengaruh terbesar apabila variabel tersebut diubah adalah
kapasitas pembangkit yang memiliki levelized tariff terendah di 9,397 cUSD/kWh, sedangkan
untuk variabel pembelian alat levelized tariff terendah ada di -15% dari base yaitu 9,419
cUSD/kWh. Seperti PLTN SMR sebelumnya bahwa variabel kapasitas pembangkit tidak
mempengaruhi nilai total biaya proyek PLTN LR 2 karena untuk menghitung biaya tersebut
tidak dibutuhkan data dari variabel kapasitas pembangkit.
BAB VI
ASPEK EKONOMI
Metode analisis ekonomi yang digunakan adalah analisis biaya manfaat atau cost-
benefit analysis (CBA) dari sisi pemerintah dalam penyediaan listrik untuk masyarakat.
Analisis keekonomian meliputi analisis kelayakan PLTN dari sisi dampak PLTN terhadap
biaya/manfaat langsung dan tidak langsung. Biaya langsung adalah biaya pokok penyediaan
(BPP) listrik sedangkan manfaat tidak langsung adalah penurunan emisi dan kehandalan
262 elati. Perubahan BPP juga termasuk dalam dampak tangible (berwujud) sedangkan
penurunan emisi dan kehandalan sistem termasuk dampak intangible (tidak berwujud).
Analisis biaya-manfaat tersebut dilakukan pada 2 opsi yaitu opsi dengan PLTN dan tanpa PLTN
pada skenario BaU, Industrialisasi, dan Prosperity tanpa ada opsi PLTU baru.
11,5
11,0
10,5
BPP (cUS$/kWh)
10,0
9,5
9,0
8,5
PLTN No PLTN
8,0
7,5
2021
2023
2025
2027
2029
2031
2033
2035
2037
2039
2041
2043
2045
2047
2049
Tahun
Gambar 137. BPP Skenario B_NC (¢US$ /kWh)
Permintaan listrik yang lebih tinggi pada skenario Industrialisasi dan Prosperity
membuat PLTN semakin efektif menggantikan PLTU sebagaimana pada Gambar 148 dan 149.
Tanpa PLTU dan PLTN, kedua skenario tersebut akan memaksimalkan penggunaan potensi
PLTA sehingga kapasitas PLTA meningkat dari 70 MW di 2027 menjadi 300 MW di 2030.
Sebagai perbandingan jika ada PLTN, perkembangan kapasitas PLTA di kedua skenario adalah
130 MW (skenario Industrialisasi) dan 90 MW (skenario Prosperity) di 2050. Pembangkit lain
yang akan berkembang untuk menggantikan peran PLTN adalah PLTS yaitu sebesar 1.732 MW
(skenario Industrialisasi) dan 2.200 MW (skenario Prosperity) di 2050. Keberadaan PLTA dan
PLTS tersebut mampu menurunkan BPP dari 11,1 ¢US$ /kWh di 2021 menjadi 10 ¢US$ /kWh
di 2030 dan 9,6 – 9,7 ¢US$ /kWh di 2050. Pembangkit lain yang berkembang adalah PLTGU.
Keberadaan PLTN berdampak pada penurunan BPP. Sebagai contoh pada 263elative
Industrialisasi tanpa PLTU (I_NC), PLTN 100 MW pertama di 2028 akan menurunkan BPP
sebesar 0,1 ¢US$ /kWh dibandingkan dengan 263elative tanpa PLTN (I_NC_NN). Tambahan
kapasitas PLTN 200 MW di 2030 dan 3x100 MW di 2048, 2049, dan 2050 semakin menurunkan
BPP sehingga total penyediaan listrik 263elative I_NC selama 2021 – 2050 adalah US$ 46,8
miliar dengan BPP rata-rata 9,29 ¢US$ /kWh. Sebagai perbandingan, 263elative I_NC_NPP
mempunyai total biaya penyediaan listrik sebesar US$ 47,3 miliar dengan BPP rata-rata 9,39
¢US$ /kWh selama 2021 – 2050. Skenario Prosperity mempunyai kapasitas PLTN lebih besar
yaitu 200 MW di 2028 yang akan terus meningkat hingga 2.000 MW di 2050. Total biaya
penyediaan listrik selama 2021 – 2050 adalah US$ 44,9 miliar dengan BPP rata-rata sebesar
8,90 ¢US$ /kWh sebagaimana pada Gambar 150. Tanpa ada opsi PLTN, 264elative P_NC_NN
mempunyai total biaya penyediaan listrik sebesar US$ 47,9 miliar dengan BPP rata-rata
sebesar 9,49 ¢US$ /kWh selama 2021 – 2050.
11,5
11,0
10,5
BPP (cUS$/kWh)
10,0
9,5
9,0
8,5
PLTN No PLTN
8,0
7,5
2021
2023
2025
2027
2029
2031
2033
2035
2037
2039
2041
2043
2045
2047
2049
Tahun
Gambar 138. BPP Skenario I_NC (¢US$ /kWh)
11,5
11,0
10,5
BPP (cUS$/kWh)
10,0
9,5
9,0
8,5
PLTN No PLTN
8,0
7,5
2021
2023
2025
2027
2029
2031
2033
2035
2037
2039
2041
2043
2045
2047
2049
Tahun
Gambar 139. BPP Skenario P_NC (¢US$ /kWh)
4,5
4,0
3,5
Emisi CO2 (juta ton)
3,0
2,5
2,0
1,5
1,0
PLTN No PLTN
0,5
0,0
2021
2023
2025
2027
2029
2031
2033
2035
2037
2039
2041
2043
2045
2047
2049
Tahun
Skenario Industrialisasi dan Prosperity akan mempunyai emisi yang lebih besar akibat
permintaan listrik yang lebih besar juga. Tanpa adanya opsi PLTN dan PLTU, emisi dikedua
265elative tersebut akan meningkat dari 1,7 juta ton CO2 di 2021 menjadi 3,3 juta ton CO2
(Skenario I_NC_NN) dan 7,3 juta ton CO2 (skenario P_NC_NN) di 2050 sebagaimana pada
Gambar 151 dan 152. Total emisi kedua skenario tersebut selama 2021 – 2050 adalah 120
juta ton CO2 (Skenario I_NC_NN) dan 174,6 juta ton CO2 (skenario P_NC_NN). Tingginya emisi
tersebut disebabkan naiknya produksi listrik dari PLTGU yang kapasitasnya bertambah 750
MW (Skenario I_NC_NN) dan 2.400 MW (skenario P_NC_NN) selama 2021 – 2050. Opsi PLTN
akan menurunkan total kapasitas PLTGU menjadi 300 MW (Skenario I_NC_NN) dan 450 MW
(skenario P_NC_NN). Akibatnya, total emisi dengan adanya opsi PLTN adalah 107,9 juta ton
CO2 (Skenario I_NC_NN) dan 112,5 juta ton CO2 (skenario P_NC_NN).
6,0
5,0
Emisi CO2 (juta ton)
4,0
3,0
2,0
0,0
2021
2023
2025
2027
2029
2031
2033
2035
2037
2039
2041
2043
2045
2047
2049
Tahun
8,0
7,0
6,0
Emisi CO2 (juta ton)
5,0
4,0
3,0
2,0
PLTN No PLTN
1,0
0,0
2021
2023
2025
2027
2029
2031
2033
2035
2037
2039
2041
2043
2045
2047
2049
Tahun
Kennedy [51] melakukan analisis biaya-manfaat PLTN baru di Inggris. Salah satu
manfaat yang dipertimbangkan adalah ketahanan suplai listrik dari PLTN. Motivasi analisis
manfaat ketahanan suplai ini adalah mengurangi risiko krisis suplai listrik akibat adanya
gangguan besar pada suplai bahan bakar untuk pembangkit listrik [51]. Contoh gangguan
tersebut adalah musim dingin dan faktor politik. Kennedy [51] kemudian menggunakan biaya
investasi sebesar £100 juta/GW untuk fasilitas distilasi minyak sebagai cadangan energi jika
ada gangguan suplai gas untuk PLTG. Pada akhirnya, Kennedy [51] menyimpulkan nilai
manfaat dari ketahanan suplai listrik ini sangat kecil sehingga analisis biaya-manfaat perlu
mempertimbangkan manfaat lain yang lebih signifikan. Berdasarkan hasil studi Kennedy [51]
tersebut analisis manfaat ketahanan suplai listrik dari PLTN tidak perlu dilakukan untuk studi
kasus di Indonesia. Valuasi manfaat menggunakan biaya investasi fasilitas cadangan untuk
PLTG tidak relevan untuk studi kasus di Indonesia.
Hasil simulasi Balmorel menunjukkan bahwa substitusi untuk PLTN adalah PLTA dan
PLTU yang memiliki biaya energi rendah. Kedua pembangkit tersebut mempunyai ketahanan
suplai listrik yang baik. Banyak PLTA di Indonesia mempunyai umur lebih dari 40 tahun namun
masih dapat beroperasi dengan baik. Walaupun begitu, produksi listrik PLTA dapat terganggu
di musim kemarau. Gambar 143 menunjukkan kapasitas terpasang, daya mampu, dan
produksi listrik dari 243 unit PLTA yang ada di Indonesia. Kapasitas PLTA terpasang bertambah
sebesar 73 MW selama 2011 – 2019 namun produksi listrik PLTA turun 438 GWh [113].
Produksi listrik PLTA berfluktuatif setiap tahun yaitu lebih dari 13.000 GWh di 2013 dan 2016
sebelumnya akhirnya turun menjadi 9.877 GWh di 2019. Biaya dari fluktuasi produksi listrik
PLTA tidak perlu di-valuasi lebih lanjut karena model Balmorel sudah menggunakan data
empiris 267 elati kapasitas PLTA. Oleh karena itu, analisis biaya – manfaat cukup
menggunakan hasil simulasi Balmorel yang memproyeksikan kapasitas PLTA cukup untuk
memenuhi permintaan listrik di masa depan. PLTU juga mempunyai ketahanan suplai listrik
yang baik karena tidak dipengaruhi musim dan ketersediaan batubara di dalam negeri yang
berlimpah. Pertumbuhan konsumsi batubara dunia akan melambat seiring dengan makin
banyaknya negara yang mengurangi emisi di 267elati energi. Walaupun jika permintaan
batubara meningkat, pemerintah masih dapat menerapkan kebijakan domestic market
obligation (DMO) untuk menjamin ketersediaan batubara untuk PLTU. Oleh karena itu, PLTN
tidak mempunyai manfaat ketahanan suplai listrik yang lebih baik daripada PLTA dan PLTU.
16.000
13.886
14.000 13.010
12.425
12.000 11.164 10.729
10.316 10.525 10.004 9.877
10.000
8.000
6.000
4.000 3.511 3.516 3.519 3.527 3.566 3.568 3.583 3.583 3.584
2.000
-
2011 2012 2013 2014 2015 2016 2017 2018 2019
Kapasitas terpasang (MW) Daya mampu (MW) Produksi Energi (GWh)
Sebaliknya, PLTN mempunyai ketahanan suplai listrik yang lebih rendah dibandingkan
dengan PLTA dan PLTN. Indonesia tidak mempunyai fasilitas pembuatan bahan bakar untuk
PLTN sehingga Indonesia harus impor bahan bakar uranium dari negara lain. Perdagangan
bahan bakar uranium umumnya sangat dipengaruhi oleh hubungan politik yang baik dengan
negara produsen [114, 115]. Risiko terburuk dari ketergantungan impor tersebut adalah
embargo dari negara produsen [116]. Selain itu, Indonesia pun akan bersaing dengan negara
maju yang telah memiliki PLTN terlebih dahulu dalam mendapatkan bahan bakar uranium
yang semakin langka. Upaya untuk mendaur ulang bahan bakar uranium (yaitu konversi
uranium 238 menjadi plutonium) sangat sulit untuk dilakukan [117]. Jika jaminan suplai bahan
bakar uranium tidak ada, maka pembangunan PLTN menjadi tidak layak untuk semua
skenario. Oleh karena itu, analisis biaya-manfaat mengasumsikan bahwa Indonesia bisa
mendapatkan jaminan suplai bahan bakar uranium dari negara sahabat. Dengan asumsi
tersebut, analisis biaya-manfaat tidak memperhitungkan aspek ketahanan suplai listrik.
Semakin rendah rasio di Tabel 104 maka semakin baik skenario tersebut. Opsi PLTN
pada ketiga skenario tersebut (B_NC, I_NC, dan P_NC) mempunyai rasio yang lebih rendah
daripada opsi tanpa PLTN (B_NC_NN, I_NC_NN, dan P_NC_NN). Sebagai contoh, rasio biaya-
manfaat skenario B_NC adalah 0,11 sedangkan rasio biaya-manfaat skenario B_NC_NN
adalah 0,13. Skenario dengan permintaan listrik lebih besar mempunyai rasio yang lebih
rendah. Rasio biaya-manfaat untuk skenario P_NC adalah 0,01 lebih rendah daripada rasio di
skenario B_NC dan I_NC yaitu 0,11 dan 0,13. Dalam hal ini, PLTN akan sangat bermanfaat
untuk mengantisipasi pertumbuhan listrik yang tinggi sebagaimana dalam skenario
Prosperity.
Tabel 104. Analisis Biaya – Manfaat Terhadap Opsi Dengan PLTU Tanpa PLTN
BAB VII
PENUTUP
7.1. Kesimpulan
Kajian ini menyimpulkan PLTN sebagai pembangkit listrik yang dapat secara efektif
menurunkan emisi sektor ketenagalistrikan di Kalimantan Barat khususnya jika permintaan
listrik meningkat signifikan akibat industrialisasi dan peningkatan daya beli masyarakat
(Prosperity). Evakuasi daya PLTN dapat dilakukan melalui interkoneksi dengan GI baru yang
ditempatkan berdekatan landing point atau berdekatan dengan transmisi 150kV eksisting dan
kemudian saling terinterkoneksi dengan GI eksisting (GI Singkawang dan GI Mempawah)
dengan konfigurasi double phi.
c. Studi stabilitas sistem menunjukkan pelepasan PLTN 1 x 80MW dari sistem Interkoneksi
Khatulistiwa-Barito-Mahakam-Serawak mengakibatkan penurunan frekuensi hingga
49,95 Hz.
a. Sistem Kalimantan Barat diperkirakan memiliki beban puncak sebesar 1.163MW sehingga
masih membutuhkan impor dari Serawak. Evakuasi daya PLTN sebesar 250 MW
umumnya disalurkan ke arah selatan menuju GI dengan beban besar yaitu GI Sei Raya.
b. Studi hubung singkat menunjukkan arus gangguan hubung singkat maksimum masih
tergolong rendah (<31,5kA) yaitu 17,2 kA di sisi 150kV PLTN, 16,2 kA di sisi 150kV GI
Singkawang, dan 16 kA di sisi 150kV GI Mempawah .
a. Sistem Kalimantan Barat diperkirakan memiliki beban puncak sebesar 1.539 MW. Studi
aliran daya menunjukkan kekurangan suplai pada sistem Kalimantan Barat sehingga
harus impor daya dari sistem Serawak dan Kaltengsel.
b. Studi hubung singkat menunjukkan arus gangguan hubung singkat maksimum masih
tergolong rendah (<31,5kA) yaitu 22kA di sisi 150kV PLTN, 20,2kA di sisi 150kV GI
Singkawang, dan 18,7kA di sisi 150kV GI Mempawah .
Skenario Industrialisasi dan Prosperity menghasilkan beban puncak yang tinggi dan
tidak dapat dilayani dengan rencana pengembangan pembangkitan di RUPTL 2019 - 2028.
Fakta ini membuka peluang penggunaan PLTN di Kalimantan Barat. LCOE atau levelized tariff
pada model simulasi keuangan untuk PLTN LR berkisar antara 8,93 - 10,05 ¢US$/kWh dan
untuk SMR berkisar antara 8,52 - 19,45 ¢US$/kWh. Semakin besar kapasitas PLTN yang
dibangun akan lebih kecil nilai LCOE/levelized tariff sehingga lebih kompetitif. Hasil simulasi
juga menunjukkan bahwa bentuk paket SMR-2 (12 unit x 60 MW) mempunyai nilai
LCOE/levelized tariff yang lebih rendah dan lebih kompetitif dibandingkan dengan SMR-1 (1
unit x 100 MW) dan SMR-3 (2 unit x 55 MW).
Oleh karena itu, hasil analisis keuangan menunjukkan bahwa PLTN yang layak
dibangun secara finansial adalah PLTN LR dan PLTN SMR 2, dengan nilai LCOE/levelized tariff
dibawah BPP (sebesar 10,7 ¢US$/kWh). Khusus untuk PLTN SMR, semakin banyak unit yang
dibangun maka semakin rendah biaya pembangunannya. Total kapasitas pembangkit yang
lebih besar akan menghasilkan energi yang besar sehingga pada akhirnya akan menurunkan
nilai LCOE atau levelized tariff. Analisis sensitivitas menunjukkan bahwa faktor yang paling
besar mempengaruhi LCOE/ levelized tariff adalah kapasitas pembangkit dan pembelian
peralatan PLTN dari luar negeri atau offshore cost.
PLTN-SMR merupakan salah satu teknologi nuklir yang terus dikembangkan, dengan
kapasitas dibawah 300 MW. PLTN-SMR ini direkomendasikan untuk dapat dibangun di
Kalimantan Barat, dengan beberapa pertimbangan, antara lain reaktor didesain dengan
teknologi modular dan dipabrikasi langsung di pabrik dan kemudian dikirim ke lokasi PLTN
untuk mempercepat waktu konstruksi (WNA, 2020). Dengan sistem modular, PLTN-SMR ini
memberikan keuntungan berupa kualitas manufaktur lebih baik, standarisasi lebih mudah,
dan efisiensi proyek meningkat. Disamping itu, PLTN-SMR mempunyai kapasitas daya yang
fleksibel dan mudah diadaptasi terhadap lokasi dengan beban listrik yang rendah, serta
pemeliharaan tiap modul dapat dikelola secara mandiri, untuk meningkatkan performa
pembangkit.
Tindak lanjut pertama yang perlu dilakukan adalah studi perbandingan tingkat
keselamatan berbagai teknologi PLTN secara mendalam. Batan dapat mengundang berbagai
vendor PLTN untuk memaparkan sistem keselamatan yang kemudian di review bersama
dengan Kementerian ESDM, pemerintah daerah, PT. PLN (Persero), akademisi, dan tenaga
ahli baik dari dalam maupun luar negeri. Output dari kajian tersebut adalah estimasi
kemungkinan terburuk dari kecelakaan yang mungkin terjadi serta strategi mitigasi dan
pencegahan yang diperlukan. Kegiatan tersebut juga perlu mencakup pemberian edukasi
kepada masyarakat sekitar dan kemudian mengukur persepsi akhir masyarakat (setelah
edukasi) mengenai tingkat keselamatan PLTN. Hasil kajian tersebut akan menjadi bahan
pengambilan keputusan pemerintah dan Dewan Perwakilan Rakyat (DPR). Bila masyarakat
dan pemerintah telah menyetujui penggunaan PLTN, langkah selanjutnya adalah melakukan
studi kelayakan dan detailed engineering design (DED) dari teknologi PLTN terpilih serta
memasukkan PLTN tersebut ke dalam Rencana Umum Penyediaan Tenaga Listrik (RUPTL) PT.
PLN (Persero). Tahap selanjutnya adalah proses open tender di PT. PLN (Persero) sebagaimana
diatur dalam Peraturan Menteri ESDM Nomor 4 Tahun 2007 tentang Perubahaan Atas
Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 01 Tahun 2006 tentang Prosedur
Pembelian Tenaga Listrik dan Atau Sewa Menyewa Jaringan Dalam Usaha Penyediaan Tenaga
Listrik Untuk Kepentingan Umum.
Daftar Pustaka
[22] Y. Rachmawati, "Analisis permintaan listrik pelanggan rumah tangga, industri dan komersial
di Indonesia," Master Thesis, Economic, University of Padjajaran, Bandung, Indonesia, 2007.
[23] M. I. Al Irsyad, A. Halog, and R. Nepal, "Exploring Drivers of Sectoral Electricity Demand in
Indonesia," Energy Sources, Part B: Economics, Planning, and Policy, vol. 13, no. 9-10, pp. 383-
391, 2018.
[24] S. Jebaraj and S. Iniyan, "A review of energy models," Renewable and Sustainable Energy
Reviews, vol. 10, no. 4, pp. 281-311, 2006.
[25] L. Suganthi and A. A. Samuel, "Energy models for demand forecasting—A review," Renewable
and Sustainable Energy Reviews, vol. 16, no. 2, pp. 1223-1240, 2012.
[26] S. C. Bhattacharyya and G. R. Timilsina, "Modelling energy demand of developing countries:
Are the specific features adequately captured?," Energy policy, vol. 38, no. 4, pp. 1979-1990,
2010.
[27] S. C. Bhattacharyya and G. R. Timilsina, "A review of energy system models," International
Journal of Energy Sector Management, vol. 4, no. 4, pp. 494-518, 2010.
[28] R. Nepal, B. Sharma, and M. I. al Irsyad, "Scarce data and energy research: Estimating regional
energy consumption in complex economies," Econ. Anal. Pol., vol. 65, pp. 139-152,
2020/03/01/ 2020, doi: https://doi.org/10.1016/j.eap.2019.12.002.
[29] R. A. Al Hasibi, S. P. Hadi, and A. N. Widiastuti, "Optimizing Geothermal Energy and Hydro
Power in Capacity Expansion at the Electrical System of Java-Madura-Bali," International
Journal of Engineering & Computer Science, vol. 13, no. 01, p. 8, 2013.
[30] K. Handayani, Y. Krozer, and T. Filatova, "Trade-offs between electrification and climate
change mitigation: An analysis of the Java-Bali power system in Indonesia," Applied energy,
vol. 208, pp. 1020-1037, 2017.
[31] S. Kumar, "Assessment of renewables for energy security and carbon mitigation in Southeast
Asia: The case of Indonesia and Thailand," Applied Energy, vol. 163, pp. 63-70, 2016.
[32] Y. Tanoto and M. E. Wijaya, "Economic and environmental emissions analysis in Indonesian
electricity expansion planning: low-rank coal and geothermal energy utilization scenarios," in
Clean Energy and Technology (CET), 2011 IEEE First Conference on, 2011: IEEE, pp. 177-181.
[33] N. A. Utama, K. N. Ishihara, and T. Tezuka, "Power generation optimization in ASEAN by 2030,"
Energy and Power Engineering, vol. 4, no. 04, p. 226, 2012.
[34] M. E. Wijaya and B. Limmeechokchai, "Supply Security Improvement of long term electricity
expansion planning of Java-Madura-Bali system in Indonesia," Thammasat Int. J. Sc. Tech, vol.
14, no. 4, pp. 1-14, 2009.
[35] M. E. Wijaya and B. Limmeechokchai, "The hidden costs of fossil power generation in
Indonesia: A reduction approach through low carbon society," Songklanakarin Journal of
Science & Technology, vol. 32, no. 1, 2010.
[36] PPKB, "Rencana Umum Energi Daerah Provinsi Kalimantan Barat," Pemerintah Provinsi
Kalimantan Barat (PPKB), Pontianak, Indonesia, 2019.
[37] PLN, "Rencana Usaha Penyediaan Tenaga Listrik PT PLN (Persero) 2016 - 2025," PT Perusahaan
Listrik Negara (PLN), Jakarta, 2016.
[38] M. I. Al Irsyad, A. Halog, R. Nepal, and D. P. Koesrindartoto, "Economical and environmental
impacts of decarbonisation of Indonesian power sector," Journal of Environmental
Management, vol. 259, p. 109669, 2020/04/01/ 2020, doi:
https://doi.org/10.1016/j.jenvman.2019.109669.
[39] A. Hasim, "Prakiraan Beban Listrik Kota Pontianak Dengan Jaringan Syaraf Tiruan," Master
Theses, Sekolah Pasca Sarjana, Institut Pertanian Bogor, Bogor, Indonesia, 2008.
[40] M. S. Soleha, J. Sampurno, and B. P. Lapanporo, "Pemodelan Kebutuhan Daya Listrik Di PT.
PLN (Persero) Area Pontianak dengan Menggunakan Metode Gauss-Newton," Prisma Fisika,
vol. III, no. 3, p. 8, 2015.
[41] V. A. N. Aji, S. Martha, and N. Imro’ah, "Model peramalan beban listrik di kalimantan barat
dengan metode fuzzy linear regression," Buletin Ilmiah Math. Stat. dan Terapannya
(Bimaster), vol. 08, no. 1, p. 6, 2019.
[42] PLN, "Rencana Usaha Penyediaan Tenaga Listrik PT PLN (Persero) 2019 - 2028," PT Perusahaan
Listrik Negara (PLN), Jakarta, 2019.
[43] C. Wang et al., "Assessing the environmental externalities for biomass-and coal-fired
electricity generation in China: A supply chain perspective," Journal of environmental
management, vol. 246, pp. 758-767, 2019.
[44] P. Tüfekci, "Prediction of full load electrical power output of a base load operated combined
cycle power plant using machine learning methods," International Journal of Electrical Power
& Energy Systems, vol. 60, pp. 126-140, 2014.
[45] G. Rothwell, Economics of nuclear power. Routledge, 2018.
[46] WNA, "The Economics of Nuclear Power," World Nuclear Association (WNA), London - UK,
2019.
[47] B. Vegel and J. C. Quinn, "Economic evaluation of small modular nuclear reactors and the
complications of regulatory fee structures," Energy Policy, vol. 104, pp. 395-403, 2017.
[48] WNA, "Nuclear Power Economics and Project Structuring," World Nuclear Association (WNA),
London - UK, 2017.
[49] NEA, "Small Modular Reactors: Nuclear Energy Market Potential for Near-term Deployment,"
Nuclear Energy Agency (NEA), Boulogne-Billancourt, France, 2016.
[50] W. Li, P. Wei, and X. Zhou, "A cost-benefit analysis of power generation from commercial
reinforced concrete solar chimney power plant," Energy Conversion and Management, vol.
79, pp. 104-113, 2014/03/01/ 2014, doi: https://doi.org/10.1016/j.enconman.2013.11.046.
[51] D. Kennedy, "New nuclear power generation in the UK: Cost benefit analysis," Energy Policy,
vol. 35, no. 7, pp. 3701-3716, 2007/07/01/ 2007, doi:
https://doi.org/10.1016/j.enpol.2007.01.010.
[52] M. Leurent, P. Da Costa, M. Rämä, U. Persson, and F. Jasserand, "Cost-benefit analysis of
district heating systems using heat from nuclear plants in seven European countries," Energy,
vol. 149, pp. 454-472, 2018/04/15/ 2018, doi: https://doi.org/10.1016/j.energy.2018.01.149.
[53] A. E. Atabani, A. S. Silitonga, and T. M. I. Mahlia, "Cost benefit analysis and environmental
impact of fuel economy standards for passenger cars in Indonesia," Renewable and
Sustainable Energy Reviews, vol. 16, no. 5, pp. 3547-3558, 2012/06/01/ 2012, doi:
https://doi.org/10.1016/j.rser.2012.01.001.
[54] A. Safrudin et al., "Cost-Benefit Analysis Fuels Economy: Final Report-PHASE 1 OF SSFA
Improving Fuel Quality and Fuel Economy in Indonesia," Global Fuel Economy Initiative, 2017.
[55] S. Prajogo, "Analisis Biaya Manfaat Sosial pada Pembangkit Listrik Tenaga Sampah Gede Bage
dengan Menggunakan berbagai Skenario Efisiensi Air Pollution Control," UNS (Sebelas Maret
University), 2019.
[56] Z. Raditya and A. Hiendro, "Studi Ekonomis Pembangkit Listrik Tenaga Nuklir ThorCon Molten
Salt Reactor (Studi Kasus: Dibangun di Kalimantan Barat)," Jurnal Teknik Elektro Universitas
Tanjungpura, vol. 2, no. 1, 2020.
[57] Nuryanti, E. S. Amitayani, and R. F. S. Budi, "Analisis Kelayakan Finansial: Implementasi Proyek
PLTN Teknologi APR 1400 di Indonesia," in Pertemuan dan Presentasi Ilmiah Penelitian Dasar
Ilmu Pengetahuan dan Teknologi Nuklir, Yogyakarta, 24 July 2018: BATAN, p. 8.
[58] M. D. Birmano and I. Bastori, "Perhitungan Ekonomi dan Pendanaan PLTN dan Pembangkit
Konvensional menggunakan Spreadsheet Inovasi," Jurnal Pengembangan Energi Nuklir, vol.
10, no. 2, 2008.
[59] Pejabat Pengelola Informasi dan Dokumentasi (PPID) Kalimantan Barat. "Gambaran Umum
Aspek Geografis Kalimantan Barat." https://ppid.kalbarprov.go.id/?public=profil-daerah
(accessed 17 Nov, 2020).
[60] Dinas Kependudukan dan Pencacatan Sipil Kabupaten Bengkayang. "Data Penduduk Semester
II 2019." http://disdukcapil.bengkayangkab.go.id/informasi/data-penduduk (accessed 17
Nov, 2020).
[61] Statista. "Average operating heat rate for nuclear power in United States from 2002 to 2019."
https://www.statista.com/statistics/186418/average-operating-heat-rate-for-nuclear-
power-in-the-us-since-
2002/#:~:text=Operating%20heat%20rate%20for%20nuclear%20power%20in%20the%20U.S
.&text=In%20order%20to%20create%20one,British%20thermal%20units%20of%20energy.
(accessed 1 December, 2020).
[62] IAEA, "Status report 81 - Advanced Passive PWR (AP 1000)."
[63] IAEA, "Status Report 83 - Advanced Power Reactor 1400 (APR1400)."
[64] IAEA, "Status report 108 - VVER-1200 (V-491) (VVER-1200 (V-491))."
[65] Nuclear Energy Agency (NEA), "Projected Costs of Generating Electricity - 2015 Edition,"
International Energy Agency, France, 2015.
[66] ESDM, "Rencana Umum Energi Nasional," 2017.
[67] IKPLN, "Kontribusi Pemikiran bagi PLN," 2018. [Online]. Available:
https://ikpln.com/2018/11/02/kontribusi-pemikiran-bagi-pln/.
[68] "Statistik PLN 2018," PLN Indonesia, Jakarta, 2019.
[69] "RUPTL 2019-2028," PLN Indonesia, Jakarta, 2019.
[70] "Overview of PLN Grid," PLN, Banjar Baru, 2020.
[71] "EOT PLN UIKL Kalimantan," PLN Indonesia, Banjar Baru, 2020.
[72] R. Pacudan, "Road Map for Power Market Integration in the Brunei-Indonesia-Malaysia-
Philippines (BIMP) Region," Economic Research Institute for ASEAN and East Asia, Jakarta,
2016.
[73] H. M. Bakara, S. Turnip, L. K. P. Chai, T. H. Lo, and J. H. Kueh, "The Sarawak-West Kalimantan
275kV Interconnection," AORC-CIGRÉ Technical Meeting, 2015.
[74] S. Hasnie, "The Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area
(BIMP-EAGA)," Asian Development Bank, Mandaluyong, 2015.
[75] "Sarawak Energy Berhad," ed, 2020.
[76] Y. Z. Arief, N. I. Roslan, M. H. I. Saad, L. Gurusamy, and N. A. Muhamad, "Transient Overvoltage
Simulation in 500 kV Transmission Line Plan of Sarawak, Malaysia using PSCAD," International
Journal of Innovative Technology and Exploring Engineering (IJITEE), vol. 9, no. 4, p. 2481,
2020.
[77] D. G. Chown, J. Wright, R. van Heerden, and M. Coker, "System inertia and Rate of Change of
Frequency (RoCoF) with increasing nonsynchronous renewable energy penetration," in Cigré
8th Southern Africa Regional Conference, Paris, 2017.
[78] B. Nesje, The need for Inertia in the Nordic Power System. Trondheim: Norwegian University
of Science and Technology, 2015.
[79] Y. Guo, Q. Wu, and Q. Zeng, "Flexibility and Ramping Requirements," DTU: Department of
Electrical Engineering, Lyngby, 2018.
[80] "Innovation landscape brief: Flexibility in conventional power plants," International
Renewable Energy Agency, Abu Dhabi, 2019.
[81] "Assessing the flexibility of coal-fired power plants for the integration of renewable energy in
Germany," Deloitte, London, 2019.
[82] Office of Nuclear Energy. "What's the Lifespan for a Nuclear Reactor? Much Longer Than You
Might Think." Office of Nuclear Energy. https://www.energy.gov/ne/articles/whats-lifespan-
nuclear-reactor-much-longer-you-might-think (accessed 16 December, 2020).
[83] IAEA. "ELECTRIC GRID RELIABILITY AND INTERFACE WITH NUCLEAR POWER PLANTS." IAEA.
(accessed 16 December, 2020).
[84] W.-J. Choi, M.-S. Roh, and C.-L. Kim, "Innovative Nuclear Power Plant Building Arrangement in
Consideration of Decommissioning," Nuclear Engineering and Technology, vol. 49, no. 3, pp.
525-533, 2017, doi: 10.1016/j.net.2016.09.003.
[85] U.S. Energy Information Administration, "Capital Cost and Performance Characteristic
Estimates for Utility Scale Electric Power Generating Technologies," 2020.
[86] T. H. B. Islam Md. Shafiqul, "Assessment of costs of nuclear power in Bangladesh," 2020.
[Online]. Available: https://nucet.pensoft.net/article/54003/.
[87] A. Lokhov, R. O. N. Cameron, and V. Sozoniuk, "Oecd/Nea Study on the Economics and Market
of Small Reactors," Nuclear Engineering and Technology, vol. 45, no. 6, pp. 701-706, 2013, doi:
10.5516/net.02.2013.517.
[88] NuScale, "NuScale Power : The Road Ahead," 2020.
[89] World Nuclear Association (WNA). "Economics of Nuclear Power." https://www.world-
nuclear.org/information-library/economic-aspects/economics-of-nuclear-power.aspx
(accessed 18 Nov, 2020).
[90] U.S. Nuclear Regulatory Commission. "Backgrounder on Nuclear Insurance and Disaster
Relief." https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/nuclear-
insurance.html#:~:text=Over%20time%2C%20the%20%E2%80%9Climit%20of,site%20(not%
20per%20reactor). (accessed 2 December, 2020).
[91] OECD, "ARRANGEMENT ON OFFICIALLY SUPPORTED EXPORT CREDITS," 2015.
[92] Cameco. "Uranium Price." https://www.cameco.com/invest/markets/uranium-price
(accessed 2 December, 2020).
[93] P. Terlikowski, J. Paska, K. Pawlak, J. Kaliński, and D. Urbanek, "Modern financial models of
nuclear power plants," Progress in Nuclear Energy, vol. 110, pp. 30-33, 2019, doi:
10.1016/j.pnucene.2018.09.010.
[94] N. Barkatullah, "Existing and Emerging Financing Models and Multilateral Nuclear Projects,"
IAEA, Vienna, 2010.
[95] PPh Pasal 22.
[96] IAEA, "Financing Arrangements for Nuclear Power Projects in Developing Countries," in
"Technical Report Series No. 353," IAEA, Vienna.
[97] Hendra Kusuma, "Tok! Pajak Perusahaan Turun Jadi 22% Mulai April," in detikFinance, ed.
Jakarta: Detik, 2020.
[98] Bank Indonesia. "Kurs Jual BI." Bank Indonesia. https://www.bi.go.id/id/moneter/informasi-
kurs/transaksi-bi/Default.aspx (accessed 2020).
[99] M. H. Goedhart, T. M. Koller, and K. D. Williams. "The real cost of equity."
McKinsey&Company. https://www.mckinsey.com/business-functions/strategy-and-
corporate-finance/our-insights/the-real-cost-of-equity# (accessed 16 December, 2020).
[100] World Nuclear Association (WNA), "World Nuclear Performance Report 2018," 2018.
[101] Overview of SMR Projects Worldwide, Market Potential for Near Term Deployment, Antonio
Vaya Soler, Vienna, 2018.
[102] J. Andrade and R. Baldick, "Estimation of Transmission Costs for New Generation," The Full
Cost of Electricity (FCe-), 2016.
[103] KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA NOMOR:
55 K/20/MEM/2019 TENTANG BESARAN BIAYA POKOK PENYEDIAAN PEMBANGKITAN PT
PERUSAHAAN LISTRIK NEGARA (PERSERO) TAHUN 2018, 55 K/20/MEM/2019, 2019.
[104] P. Friis-Hansen, "Risk Analysis of Marine Structures," Lecture Notes. Technical University of
Denmark, 2002.
[105] V. Platon and A. Constantinescu, "Monte Carlo Method in Risk Analysis for Investment
Projects," Procedia Economics and Finance, vol. 15, pp. 393-400, 2014/01/01/ 2014, doi:
https://doi.org/10.1016/S2212-5671(14)00463-8.
[106] D. C. Rode, P. S. Fischbeck, and S. R. Dean, "Monte Carlo methods for appraisal and valuation:
a case study of a nuclear power plant," The Journal of Structured Finance, vol. 7, no. 3, pp. 38-
48, 2001.
[107] B. L. Sjenitzer and J. E. Hoogenboom, "A Monte Carlo method for calculation of the dynamic
behaviour of nuclear reactors," Progress in Nuclear Science and Technology, vol. 2, pp. 716-
721, 2011.
[108] K. B. Salling, "Risk analysis and Monte Carlo simulation within transport appraisal," Centre for
Traffic and Transport, CTT-DTU, Build, vol. 115, pp. 1-25, 2007.
[109] N. Heck, C. Smith, and E. Hittinger, "A Monte Carlo approach to integrating uncertainty into
the levelized cost of electricity," The Electricity Journal, vol. 29, no. 3, pp. 21-30, 2016/04/01/
2016, doi: https://doi.org/10.1016/j.tej.2016.04.001.
[110] I. Bastori and Nurlaila, "Analisis Risiko Proyek Pltn Dengan Pendekatan Monte Carlo," 10
October 2019.
[111] B. Sridadi, Pemodelan dan Simulasi Sistem: Teori, Aplikasi dan Contoh Program dalam Bahasa
C. Jakarta: Penerbit Informatika, 2009
[112] W. E. Stein and M. F. Keblis, "A new method to simulate the triangular distribution,"
Mathematical and Computer Modelling, vol. 49, no. 5, pp. 1143-1147, 2009/03/01/ 2009, doi:
https://doi.org/10.1016/j.mcm.2008.06.013.
[113] PLN, "Statistik PLN 2019," PT Perusahaan Listrik Negara (PLN), Jakarta, 2020.
[114] T. Munden, "Nuclear Fuel," The Energy Journal, vol. 9, no. 4, pp. 131-134, 1988.
[115] A. Åberg and M. Fjӕstad, "Chasing uranium: Securing nuclear fuel on a transnational arena in
Sweden 1971–1984," The Extractive Industries and Society, vol. 7, no. 1, pp. 29-38,
2020/01/01/ 2020, doi: https://doi.org/10.1016/j.exis.2019.07.003.
[116] B. Roth and J. Virole, "Guarantees in uranium supply contracts: force majeure and embargo
provisions," in Uranium and nuclear energy: 1981. London: Uranium Institute, 1982, ch. 5, pp.
350 - 356.
[117] K. T. Mayumi, "Scarcity, Promethean Technology, and Future Perspectives for Fossil Fuels and
Uranium," in Sustainable Energy and Economics in an Aging Population: Lessons from Japan.
Cham: Springer International Publishing, 2020, pp. 21-49.
[118] B. Bakhtyar et al., "Review of CO2 price in Europe using feed-in tariff rates," Renewable and
Sustainable Energy Reviews, vol. 69, pp. 685-691, 2017/03/01/ 2017, doi:
https://doi.org/10.1016/j.rser.2016.11.146.