LAPORAN KEGIATAN HARIAN TAMBANG

DATE Kamis, Tanggal 12 Januari 2023 Shift : SIANG & MALAM

DAILY REPORT
PRODUKSI DARI TAMBANG ( TRUCK COUNT )
PRODUKSI ESTIMASI Hari Ini MONTH TO DAY YEAR TO DAY
Over Burden (OB) 259 Rit = 1,320.9 Bcm 1,251 Rit = 6,837.4 Bcm 1,251 Rit = 6,837.4 Bcm
Coal Getting - Rit = - Ton 750 Rit = 9,860.1 Ton 750 Rit = 9,860.1 Ton
STOCKPILE 01 ( Penerimaan dari Tambang dan Pengiriman ke STOCK PILE 02 )
Stock Awal Stockpile 01 Hauling dari PIT Barge Loading to Stockpile 02 Stock Akhir Stockpile 01
15,923.2 Ton - Rit - Ton 40 Rit 588.0 Ton 15,335.2 Ton
DATA PENJUALAN BATU BARA & STOCK AKHIR DI STOCK PILE 02
Stock Awal Stockpile 02 Barge Loading From Stockpile 01 Penjualan (timbangan) / Hari Stock Akhir Stockpile 02
14,984.70 Ton 588.00 Ton - Ton 15,572.70 Ton
Sisa Volume Batubara Stockpile 01 & 02 + Penjualan
Volume Stockpile 01 Volume Stockpile 02 Jumlah Penjualan (Bulan ini ) Jumlah Volume Akhir bulan ini
15,335.20 Ton 15,572.70 Ton 493.04 Ton 30,907.90 Ton
FUEL/BBM ( Pemakaian Fuel Produksi dan Support Produksi )
Stock Awal Hari Ini Penerimaan Hari Ini Pemakaian Hari Ini Stock Akhir Hari Ini
48,431 Liter - Liter - Liter 48,431 Liter
Jumlah Penerimaan ( Year to Day ) Jumlah pemakaian januari 2023 Jumlah Pemakaian ( Bulan Ini ) Jumlah Pemakaian ( Year to Day )
10,000 Liter 27,747 Liter 27,747 Liter 55,494 Liter
WORK HOUR ( Pakai Jam dunia 1 hari 18 jam kerja / 1 shift 9 jam kerja )
Jam Kerja Hari Ini Hujan/Slippery Hari Ini Loss Time Hari Ini Jam Kerja Efektif Hari Ini
18 Jam 0 Jam - Jam 18 Jam
Jam Kerja ( Year to Day ) Hujan/Slippery (Year to Day) Loss Time (Year to Day ) Jam Kerja Efektif (Year to Day )
198 Jam 42 Jam 54 Jam 102 Jam

Shift 1 - 1 Fleet OB + 5 DT dengan muatan 3 Bucket / rit Sany 02

Shift II - 1 Fleet OB + 4 DT Mercy dengan muatan 3 bucket / Kobelco 04


REMARKS Lampiran Kegiatan
Keterangan Tanggal 12 Januari 2023
SHIFT I AREA TAMBANG
- Sany 02 Loading OB dengan 4 DT Mercy + 1 Genjo
- Kobelco General tambang pembenahan front loading
- Dozer 01 Break down
- Dozer 02 Repai jalan Pront Loading
- Compac Pemadatan jalan tambang s/d disposal
- Grader Scrap jalan tambang s/d stock pile 1
- Sany 01 BD Cylinder Bucket
- Kobelco 03 BD Low Power
- 6 Dump Truck di Workshop kondisi Break down
SHIFT I AREA STOCK PILE I & II
- Hitachi 02 Coal Hauling out
- Hitachi 11 Merapikan batubara di Stock pile 1
- Das 05 Muat dan bongkar batubara di tongkang
SHIFT II AREA TAMBANG
Pengisian BBM
- Kobelco 04 Loading OB dengan 4 DT Mercy
- Sany 02 Standby No job
- Dozer 02 Dorong OB didisposal
- Grader perawatan jalan tambang dari front loading s/d Disposal
- Compac pemadatan jalan dari front loading ke disposal
- Sany 01 BD Cylinder Bucket
- Kobelco 03 BD Low Power
- 6 Dump Truck di Workshop kondisi Break down
SHIFT II AREA STOCK PILE I & II
- Hitachi 02 Coal Hauling out
- Hitachi 11 Merapikan batubara di Stock pile 1
- Das 05 Muat dan bongkar batubara di tongkang
- DT 10 dan Azka 10 B0ngkar dan muat batu di Area Stock pile

Page 1 of 8
UNIT PRODUCTION AKTIVITY (HM) FUEL COMSUMTION (Liter)
Januari Month To Januari
Aktivitas Unit HARI INI Year To Day Fuel Record HARI INI Month To Day Year To Day
2023 Day 2023
Hitachi Zaxis 210 Exc - 11 - 13.4 113.1 113.1 Hitachi Zaxis 210 Exc - 11 - 241 1,666 1,666

Hitachi Zaxis 210 Exc - 02 - 13.5 107.3 107.3 Hitachi Zaxis 210 Exc - 02 - 187 1,992 1,992

Exca Sany 365 Mag - 01 - - - - Exca Sany 365 Mag - 01 - - - -


Exca Sany 365 Mag - 02 - 10.6 94.6 94.6 Exca Sany 365 Mag - 02 - 663 3,137 3,137

Kobelco SK 330 Mag - 04 - 18.3 115.8 115.8 Kobelco SK 330 Mag - 04 - 410 2,880 2,880

Kobelco SK 330 Mag - 03 - - 2.2 2.2 Kobelco SK 330 Mag - 03 - - - -

Exca Cat 330 GC Das - 05 - 12.6 146.8 146.8 Exca Cat 330 GC Das - 05 - 270 2,613 2,613

GRADER CAT 120 JPL - 03 - 14.8 103.7 103.7 GRADER CAT 120 JPL - 03 - 185 1,526 1,526
Compactor Vibro JPL - 02 - 13.6 86.4 86.4 Compactor Vibro JPL - 02 - 69 623 623

DOZER ( D 85 SS ) D- 01 - - 111.4 111.4 DOZER ( D 85 SS ) D- 01 - - 1,971 1,971

DOZER ( D 85 SS ) D- 02 - 16.7 82.5 82.5 DOZER ( D 85 SS ) D- 02 - 364 1,887 1,887


JUMLAH : 0.0 113.5 963.8 963.8 JUMLAH : - 2,389 18,295 18,295

DT - Mitsibishi Fuso PMA - 01 - - 63.0 63.0 DT - Mitsibishi Fuso PMA - 01 - - 997 997
DT - Mitsibishi Fuso PMA - 02 - - 56.0 56.0 DT - Mitsibishi Fuso PMA - 02 - - 949 949

DT - Mitsibishi Fuso PMA - 03 - - 40.0 40.0 DT - Mitsibishi Fuso PMA - 03 - - 654 654
DT - Mitsibishi Fuso PMA - 04 - - 69.0 69.0 DT - Mitsibishi Fuso PMA - 04 - - 1,406 1,406
DT - Mitsibishi Fuso PMA - 05 - - 51.0 51.0 DT - Mitsibishi Fuso PMA - 05 - - 729 729

DT - Mitsibishi Fuso PMA - 06 - - 17.0 17.0 DT - Mitsibishi Fuso PMA - 06 - - 357 357

DT - Mitsibishi Fuso PMA - 07 - - 20.0 20.0 DT - Mitsibishi Fuso PMA - 07 - - 486 486

DT - Mitsibishi Fuso PMA - 08 - - 21.0 21.0 DT - Mitsibishi Fuso PMA - 08 - - 394 394
DT - Mitsibishi Fuso PMA - 09 - - 29.0 29.0 DT - Mitsibishi Fuso PMA - 09 - - 504 504

DT - Mitsibishi Fuso PMA - 10 - - 29.0 29.0 DT - Mitsibishi Fuso PMA - 10 - - 562 562

Dump Truck Genjo BSM - 06 - - - - Dump Truck Genjo BSM - 06 - - - -

Dump Truck Genjo BSM - 07 - - 54.0 54.0 Dump Truck Genjo BSM - 07 - - 661 661

Dump Truck Genjo BSM - 08 - - - - Dump Truck Genjo BSM - 08 - - 37 37


Dump Truck Genjo BSM - 09 - 6.0 44.0 44.0 Dump Truck Genjo BSM - 09 - 133 614 614

Dump Truck Genjo BSM - 10 - 8.0 91.0 91.0 Dump Truck Genjo BSM - 10 - 149 1,018 1,018
Dump Truck Mercy MBP - 107 - 14.0 82.0 82.0 Dump Truck Mercy MBP - 107 - 148 967 967

Dump Truck Mercy MBP - 109 - - - - Dump Truck Mercy MBP - 109 - - - -

Dump Truck Mercy MBP - 114 - 14.0 69.0 69.0 Dump Truck Mercy MBP - 114 - 196 945 945
Dump Truck Mercy MBP - 116 - 12.0 56.0 56.0 Dump Truck Mercy MBP - 116 - 196 896 896

Dump Truck Fuso MBP - 120 - 15.0 79.0 79.0 Dump Truck Fuso MBP - 120 - 215 1,088 1,088
Dump Truck Fuso AZKA - 10 - - 34.0 34.0 Dump Truck Fuso AZKA - 10 - - 158 158

Dump Truck Fuso AZKA - 12 - - - - Dump Truck Fuso AZKA - 12 - - - -

Dump Truck Fuso AZKA - 20 - - - - Dump Truck Fuso AZKA - 20 - - - -


Dump Truck Fuso AZKA - 50 - - - - Dump Truck Fuso AZKA - 50 - - - -

Dump Truck Fuso AZKA - 60 - - - - Dump Truck Fuso AZKA - 60 - - 31 31


Dump Truck IPI Iveco 208 - 9.0 57.0 - Dump Truck IPI Iveco 208 - 205 611 611
JUMLAH : 0.0 78.0 961.0 904.0 JUMLAH : - 1,242 14,064 14,064

UNIT PRODUCTION SUPPORT (HM) FUEL UNIT SUPPORT (Liter)


Januari Month To Januari
Aktivitas Unit HARI INI Year To Day Fuel Record HARI INI Month To Day Year To Day
2023 Day 2023
Tower Lamp 0 1 - 12.0 84.0 84.0 Tower Lamp 0 1 - - 251 251
Tower Lamp 0 2 - 12.0 84.0 84.0 Tower Lamp 0 2 - - 250 250
Tower Lamp 0 3 - 12.0 84.0 84.0 Tower Lamp 0 3 - 60 201 201
Tower Lamp 0 4 - 12.0 84.0 84.0 Tower Lamp 0 4 - - 260 260
Tower Lamp 0 5 - 12.0 70.0 70.0 Tower Lamp 0 5 - - 73 73
Pompa Tambang 1 - - 17.5 17.5 Pompa Tambang 1 - - 368 368
Pompa Tambang 2 - - 23.0 23.0 Pompa Tambang 2 - - 116 116
Water Truck - BH 8773 GJ - - - - Water Truck - BH 8773 GJ - - - -
Fuel Truck ( Tangki Fuel ) - - - - Fuel Truck ( Tangki Fuel ) - 46 106 106
TONGKANG - - - - TONGKANG - - 686 686
Hilux B 9008 JBA - LV - 001 - - - - Hilux B 9008 JBA - LV - 001 - - 50 50
Triton B 9876 CRL - LV - 002 - - - - Triton B 9876 CRL - LV - 002 - 51 346 346
Triton BH 8707 MN - LV - 003 - - - - Triton BH 8707 MN - LV - 003 - 39 130 130
Hilux B 9306 JAA - LV - 004 - - - - Hilux B 9306 JAA - LV - 004 - 45 205 205
Triton BG 8176 BI - LV - 005 - - - - Triton BG 8176 BI - LV - 005 - - 71 71
Triton BH 8254 GM - LV - 006 - - - - Triton BH 8254 GM - LV - 006 - - 38 38
Triton BH 8339 KO - LV - 007 - - - - Triton BH 8339 KO - LV - 007 - - - -
BH 8066 GA - LV.. - - - - BH 8066 GA - LV.. - - - -
BH 8491 MJ - LV.. - - - - BH 8491 MJ - LV.. - - 81 81

- - - - - - - -
Page 2 of 8
Pemakaian IPI - - - - Pemakaian IPI - - 64 64
Pemakaian RBA - - - - Pemakaian RBA - - 31 31
Pemakaian SAM - - - - Pemakaian SAM - - - -
JUMLAH : 0 60 447 447 JUMLAH : 0 241 3,327 3,327

Page 3 of 8
REMARKS Lampiran Kegiatan
Keterangan Tanggal 11 Januari 2023
SHIFT I AREA TAMBANG
- Sany 02 Coal getting dengan 9 Dump truck
- Kobelco - 04 Loading OB dengan 4 Dump truck
- Dozer 01 Dorong OB di disposal
- Dozer 02 Repai jalan Pront Loading
- Grader Scrap jalan tambang s/d stock pile 1
- Sany 01 BD Cylinder Bucket
- Kobelco 03 BD Low Power
- 6 Dump Truck di Workshop kondisi Break down
SHIFT I AREA STOCK PILE I & II
- Compac Pemadatan jalan di Stock pile 2
- Hitachi 02 Coal Hauling out
Repair jalan Dari front Loading ke Disposal
- Hitachi 11 Merapikan batubara di Stock pile 1
- Das 05 Muat dan bongkar batubara di tongkang
SHIFT II AREA TAMBANG
Pengisian BBM
- Kobelco 04 Loading OB dengan 4 DT Mercy
- Sany 02 Standby No job
- Dozer 02 Dorong OB didisposal
- Grader perawatan jalan tambang dari front loading s/d Disposal
- Compac pemadatan jalan dari front loading ke disposal
- Sany 01 BD Cylinder Bucket
- Kobelco 03 BD Low Power
- 6 Dump Truck di Workshop kondisi Break down
SHIFT II AREA STOCK PILE I & II
- Hitachi 02 Coal Hauling out
- Hitachi 11 Merapikan batubara di Stock pile 1
- Das 05 Muat dan bongkar batubara di tongkang
- DT 10 dan Azka 10 B0ngkar dan muat batu di Area Stock pile
Keterangan Tanggal 10 Januari 2023
SHIFT I AREA TAMBANG
- Sany 02 Coal getting dengan 9 Dump truck
- Kobelco - 04 Loading OB dengan 4 Dump truck
- Dozer 01 Dorong OB di disposal
- Dozer 02 Repai jalan Pront Loading
- Grader Scrap jalan tambang s/d stock pile 1
- Sany 01 BD Cylinder Bucket
- Kobelco 03 BD Low Power
- 6 Dump Truck di Workshop kondisi Break down
SHIFT I AREA STOCK PILE I & II
- Compac Pemadatan jalan di Stock pile 2
- Hitachi 02 Coal Hauling out
- Hitachi 11 Merapikan batubara di Stock pile 1
- Das 05 Muat dan bongkar batubara di tongkang
SHIFT II AREA TAMBANG
Pengisian BBM
- Sany 02 Coal getting dengan 9 Dump truck
- Kobelco - 04 Loading OB dengan 4 Dump truck
- Dozer 01 Dorong OB di disposal
- Dozer 02 Repai jalan Pront Loading
- Grader Scrap jalan tambang s/d stock pile 1
- Sany 01 BD Cylinder Bucket
- Kobelco 03 BD Low Power
- 6 Dump Truck di Workshop kondisi Break down
SHIFT II AREA STOCK PILE I & II
- Compac Pemadatan jalan di Stock pile 2
- Hitachi 02 Coal Hauling out
- Hitachi 11 Merapikan batubara di Stock pile 1
- Das 05 Muat dan bongkar batubara di tongkang
Keterangan Tanggal 9 Januari 2023
SHIFT I AREA TAMBANG
- Sany 02 Coal getting dengan 9 Dump truck
- Kobelco - 04 Loading OB dengan 4 Dump truck
- Dozer 01 Dorong OB di disposal
- Dozer 02 Repai jalan Pront Loading
Page 4 of 8
- Grader Scrap jalan tambang s/d stock pile 1
- Sany 01 BD Cylinder Bucket
- Kobelco 03 BD Low Power
- 6 Dump Truck di Workshop kondisi Break down
SHIFT I AREA STOCK PILE I & II
- Compac Pemadatan jalan di Stock pile 2
- Hitachi 02 Coal Hauling out
- Hitachi 11 Merapikan batubara di Stock pile 1
- Das 05 Muat dan bongkar batubara di tongkang
SHIFT II AREA TAMBANG
Pengisian BBM
- Excavator Sany 02 Loading OB + 4 Dump truck
- Excavtor Kobelco 04 Coal getting + 10 Dump truck
- Dozer 01 Repair jalan Front Loading
- Dozer 02 Dorong OB di disposal
- Grader Perbaikan dan perawatan jalan coal getting s/d Stock pile 1
- Compac Pemadatan jalan tambang dan jalan coal getting
- Sany 01 dan Kobelco 03 Masih Breakdown ( Tunggu Mekanik )

SHIFT II AREA STOCK PILE I & II


- Hitachi 11 Merapikan tumpukan batubara
- hitachi 02 Merapikan tumpukan batubara
- Das 05 + 2 DT Muat dan bongkar batubara di Tongkang

Keterangan Tanggal 8 Januari 2023


SHIFT I AREA TAMBANG
- 1 Fleet Coal getting + 7 Dump truck ( Muatan 7 Bucket kobelco - 04
- 1 Fleet Sany 02 Coal getting + 6 Dump truck Muatan 7 bucket
- Dozer 01 Repai jalan di front Loading
- Grader perbaikan jalan dari tambang - Stock pile 1
- Sany 01 & Kobelco 03 Kondisi Breakdown
- 5 DT di workshop Masih dalam perbaikan

SHIFT I AREA STOCK PILE I & II


- Dozer 02 Repai jalan di stock pile 1 - Das 05 Muat dan bongkar di tongkang
- Compac pemadatan jalan di area stock pile 2
- Hitachi 02 Merapikan batu di Stock pile 2
- Hitachi 11 Merapikan batubara di Stock pile 1
SHIFT II AREA TAMBANG
Pengisian BBM
- 1 Fleet Coal getting + 7 Dump truck ( Muatan 7 Bucket kobelco - 04
- 1 Fleet Sany 02 Coal getting + 6 Dump truck Muatan 7 bucket
- Dozer 01 Repai jalan di front Loading
- Grader perbaikan jalan dari tambang - Stock pile 1
- Sany 01 & Kobelco 03 Kondisi Breakdown
- 5 DT di workshop Masih dalam perbaikan

SHIFT II AREA STOCK PILE I & II


- Dozer 02 Repai jalan di stock pile 1
- Compac pemadatan jalan di area stock pile 2
- Hitachi 02 Merapikan batu di Stock pile 2
- Hitachi 11 Merapikan batubara di Stock pile 1
Keterangan Tanggal 7 Januari 2023
SHIFT I AREA TAMBANG
- Excavator Sany 365 - 02 Loading OB + 4 DT Mercy
- Pompa Tambang Standby Air kering
- Excavator kobelco - 04 Coal Getting + 7 DT PMA
- 2 Unit Dozer 01 + 02 Dorong OB didisposal
- Sany 01 dan kobelco 08 Kondisi Break down
- 5 Dump truck Kondisi brek down

SHIFT I AREA STOCK PILE I & II


- Exca Das
- Tidak
05 + DT
ada010
kegiatan
dan DTtambang
09 Muat( Batubara
Libur Nasional
dari SP
Tahun
1 ke Baru
Tongkang
)
- Hitachi E - 11 Lambung Batubara di tongkang

Page 5 of 8
- Hitachi E - 02 Merapikan batu bara di SP 2
- Grader dan Compac rental IPI perawatan jalan Stock pile 2
SHIFT II AREA TAMBANG
Pengisian BBM
- 1 Fleet OB + 3 DT dengan muatan 4 Bucket/rit Kobelco
- Sany 02 Coal Getting dengan 6 Dump Truck
- kobelco 04 Buang parting dan loading OB + 3 Dump truck
- Dozer repair jalan di front loading batubara
- Grader perbaikan jalan dari tambang ke stock pile 1
- Kobelco 03 & Sany 02 Masih dalam kondisi Breakdown

SHIFT II AREA STOCK PILE I & II


- Dozer 02 Dorong Jalan di Area stock pile 1 dan area tongkang
- Hitachi 11 Merapikan batubara
- Hitachi 02 Merapikan batubara di tongkang
- DAS 05 Muat dan bongkar batubara ke tongkang
KETERANGAN TANGGAL 6 Januari 2023
SHIFT I AREA TAMBANG
- 1 Fleet OB Exca Sany 365 - MAG 02 Loading OB dengan 4 Dump Truck
- 1 Fleet OB Kobelco - 04 loading OB dengan 4 Dump truck
- 2 Unit Dozer 01 + 02 Dorong OB di disposal
- Grader Perawatan jalan dari tambang ke disposal
- Copac pemadatan jalan dari jalan tambang ke disposal
- 3 DT AZKA + 2 Mercy dan 2 DT Genjo Break down
- Sany 01 dan kobelco 330 - 03 masih Break down

SHIFT I AREA STOCK PILE I & II


- Hitachi 02 Lambung batubara di Sp 2
- Das 05 Muat batubara di sp 1 + 2 Dump Truck
- Hitachi 11 Coal hauling out

SHIFT II AREA TAMBANG


Pengisian BBM
- Excavator Kobelco 04 Coal Getting + 10 DT
- Ex Sany 02 Estapet Batu bara
- Dozer 01 Repair Jalan dari Front Loading s/d Stock pile 1
- Grader standby No operator
- Exca Kobelco 08 dan Sany 01 Break down
- 6 Dump Truck kondisi Break down
- AZKA 010 di standbykan

SHIFT II AREA STOCK PILE I & II


- Hitachi 02 Lambung Batu
- Hitachi 01 General
- Exca DAS 05 + 2 DT Muat batu bara ke tongkang

Keterangan tanggal 5 Januari 2023


SHIFT I AREA TAMBANG
- Exca Sany 02 loading OB + 4 Dump truck
- Exca Kobelco 04 3 Jam Loading Ob dan 4 Jam Coal Getting
- 3 Mercy + 4 DT PMA Muat ob dan batubara di Front Kobelco - 04
- Dozer 01 Repai jalan front Loading
- Compac memadatkan jalan antara front loading s/d jalan hauling
- Grader standby operator sakit
- Kobelco dan Sany 01 kondisi masih Break down
- 1 unit dozer 02 Break down
SHIFT I AREA STOCK PILE I & II
- Hitachi 02 Lambung batubara di Sp 2
- Das 05 Muat batubara di sp 1 + 2 Dump Truck
- Hitachi 11 Coal hauling out

SHIFT II AREA TAMBANG


Pengisian BBM
- Excavator Kobelco 04 Coal Getting + 10 DT
- Ex Sany 02 Estapet Batu bara
- Dozer 01 Repair Jalan dari Front Loading s/d Stock pile 1
- Grader standby No operator
- Exca Kobelco 08 dan Sany 01 Break down
Page 6 of 8
- 6 Dump Truck kondisi Break down
- AZKA 010 di standbykan

SHIFT II AREA STOCK PILE I & II


- Hitachi 02 Lambung Batu
- Hitachi 01 General
- Exca DAS 05 + 2 DT Muat batu bara ke tongkang

KETERANGAN TANGGAL 4 Januari 2023


SHIFT I AREA TAMBANG
- 1 Fleet OB Exca Sany 365 - MAG 02 Loading OB dengan 4 Dump Truck
- 1 Fleet OB Kobelco - 04 loading OB dengan 4 Dump truck
- 2 Unit Dozer 01 + 02 Dorong OB di disposal
- Grader Perawatan jalan dari tambang ke disposal
- Copac pemadatan jalan dari jalan tambang ke disposal
- 3 DT AZKA + 2 Mercy dan 2 DT Genjo Break down
- Sany 01 dan kobelco 330 - 03 masih Break down

SHIFT I AREA STOCK PILE I & II


- Exca Das 05 + DT 07 dan DT 09 Muat Batubara dari SP 1 ke Tongkang
- Hitachi E - 11 Lambung Batubara di tongkang
- Hitachi E - 02 Merapikan batu bara di SP 2

SHIFT I AREA TAMBANG


Pengisian BBM
- 1 Fleet Coal getting + 7 Dump truck dengan muatan 8 bucket exca - 04
- 2 Unit Dozer repai jalan tambang sampai ke disposal
- 1 Unit Grader perbaikan dan perawatan jalan tambang s/d stock pile 1
- Sany 01 BD Cylinder Bucket
- Hitachi 11 Cleaning batubara
- 3 DT AZKA + 2 Mercy dan 2 DT Genjo Break down
- Sany 01 dan kobelco 330 - 03 masih Break down

SHIFT II AREA STOCK PILE I & II


,- DT Iveco + DT 07 Exca Das 05 Bongkar batu bara dari tongkang ke SP 2
Hitachi 02 Merapikan batu bara di SP 2

KETERANGAN TANGGAL 3 Januari 2023 Pengisian BBM


SHIFT I AREA TAMBANG
- Exca Sany 02 loading OB + 4 Dump truck
- Exca Kobelco 04 3 Jam Loading Ob dan 4 Jam Coal Getting
- 3 Mercy + 4 DT PMA Muat ob dan batubara di Front Kobelco - 04
- Dozer 01 Repai jalan front Loading
- Compac memadatkan jalan antara front loading s/d jalan hauling
- Grader standby operator sakit
- Kobelco dan Sany 01 kondisi masih Break down
- 1 unit dozer 02 Break down
SHIFT I AREA STOCK PILE I & II
- Hitachi 02 Lambung batubara di Sp 2
- Das 05 Muat batubara di sp 1 + 2 Dump Truck
- Hitachi 11 Coal hauling out

SHIFT II AREA TAMBANG


Pengisian BBM

SHIFT II AREA STOCK PILE I & II

Page 7 of 8
KETERANGAN TANGGAL 2 Januari 2023
SHIFT I AREA TAMBANG

SHIFT I AREA STOCK PILE I & II

SHIFT II AREA TAMBANG


Pengisian BBM

SHIFT II AREA STOCK PILE I & II

KETERANGAN TANGGAL 1 Januari 2023


SHIFT I AREA TAMBANG
- Tidak ada kegiatan tambang ( Libur Nasional Tahun Baru )

SHIFT I AREA STOCK PILE I & II


- Tidak ada kegiatan tambang ( Libur Nasional Tahun Baru )

SHIFT II AREA TAMBANG


Pengisian BBM
- Kobelco - 04 Loading OB + 3 DT
- Sany 02 Kerok Material yang lengket di Dump
- Grader scrap jalan tambang
- Dozer 01 Repair jalan tambang

SHIFT II AREA STOCK PILE I & II


- Hitachi 02 Standby jalan licin
- Hitachi 11 Standby jalan licin
- Das 05 Standby kondisi masih hujan

Clearing di Area disposal Pemasukan


Perbaikan
Safety
ContohMeetin
BBM
BBM
Jalanuntuk
masuk
didiArea
Area
Stock
Disposal
SP 2 Perbaikan
Merapikan
Merapikan
BBM
batuJalan
Pemotongan
Pengisian batu kayu
bara
bara

Page 8 of 8