TUGAS AOT DAY-6 (Jawaban)
TUGAS AOT DAY-6 (Jawaban)
- Sounding tape
-Ullage
Tablereadout
calibration
point zero ullage
Correction
Ullage
- UllageTemperature
TemperatureInterface
Interface(UTI)
4. Ullage readout point zero ullage
5. Correction
Ullage
5.table temperature
calibration interface (UTI)
3. Sounding tape
4. Termometer
ULLAGE TEMPERATUR INTERFACE
4.Ullage Readout.
5.Correction
ODME, UTI dll
ULLAGE TEMPERATURE
*Ullage readout INTERFACE
point zero Ullage
*correction