Anda di halaman 1dari 24

TIKUNGAN 01 (PPV 01)

Alinemen Vertikal Cembung


1,926 % -3,31 %

Ø Dari gambar didapat :


STA = 0+600
Kecepatan ( V ) : 80.0 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt
1. Perbedaan Aljabar Landai ( A ) 2. Lengkung Vertikal Cembung
elv 2−elv 1 a. Berdasarakan Syarat Keamanan
gi= x 100 % A1. Berdasakan Jarak Pandang Henti
panjangelv
g1 = 1.93 % Jh < L L=
g2 = -3.310
L= 524.94 m
A = (g1-g2)
399
Jh > L L = 2𝑥 𝑗ℎ −
𝐴
A = 5.24 %
L = 323.800732 m

A2. Berdasarakan jarak Pandang mendahului

Jd < L L=

L = 3989.54 m

Jd > L L=

L = 1439.58 m

b. Berdasarkan Syarat Keluwesan bentuk

L = 0.6 x V
= 48 m

c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )

L = 50 x A EV =
= 261.8135 m
= 1.713658 m
d. Berdasarkan Syarat Kenyaman
X = 1/2 x L
L= = 130.906769 m

702833783.xls
= 3.222 m Y = EV = 1.713658 m
TIKUNGAN 03 (PPV 03)
Alinemen Vertikal Cembung

0%
-0,682 %
Ø Dari gambar didapat :
STA = 2+000
Kecepatan ( V ) : 80.0 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt
1. Perbedaan Aljabar Landai ( A ) 2. Lengkung Vertikal Cembung
elv 2−elv 1 a. Berdasarakan Syarat Keamanan
gi= x 100 % A1. Berdasakan Jarak Pandang Henti
panjangelv
g4 = -0.682 % Jh < L L=

L= 68.35 m
A = (g3-g4)
399
Jh > L L = 2𝑥 𝑗ℎ −
𝐴
A = 0.682 %
L= -185.2 m

A2. Berdasarakan jarak Pandang mendahului

Jd < L L=

L= 519.48 m

Jd > L L=

L = 368 m

b. Berdasarkan Syarat Keluwesan bentuk

L = 0.6 x V
= 48 m

c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )

L = 50 x A EV =
= 34.09091 m
= 0.029055 m
d. Berdasarkan Syarat Kenyaman

702833783.xls
X = 1/2 x L
L= = 17.0454545 m

= 0.420 m Y = EV = 0.029055 m
TIKUNGAN 06 (PPV 06)
Alinemen Vertikal Cembung
0,811 %

2,703 %

Ø Dari gambar didapat :


STA = 4+950
Kecepatan ( V ) : 80.0 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt
1. Perbedaan Aljabar Landai ( A ) 2. Lengkung Vertikal Cembung
elv 2−elv 1 a. Berdasarakan Syarat Keamanan
gi= x 100 % A1. Berdasakan Jarak Pandang Henti
panjangelv
g7 = 0.811 % Jh < L L=

L= 189.66 m
A = (g6-g7)
399
Jh > L L = 2𝑥 𝑗ℎ −
𝐴
A = 1.892 %
L= 189.1 m

A2. Berdasarakan jarak Pandang mendahului

Jd < L L=

L = 1441.44 m

Jd > L L=

L = 1156 m

b. Berdasarkan Syarat Keluwesan bentuk

L = 0.6 x V
= 48 m

c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )

L = 50 x A EV =
= 94.59459 m

702833783.xls
= 0.223703 m
d. Berdasarkan Syarat Kenyaman
X = 1/2 x L
L= = 47.2972973 m

= 1.164 m Y = EV = 0.223703 m
TIKUNGAN 07 (PPV 07)
Alinemen Vertikal Cembung
0,811 % -0,952 %

Ø Dari gambar didapat :


STA = 5+550
Kecepatan ( V ) : 800.0 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt
1. Perbedaan Aljabar Landai ( A ) 2. Lengkung Vertikal Cembung
elv 2−elv 1 a. Berdasarakan Syarat Keamanan
gi= x 100 % A1. Berdasakan Jarak Pandang Henti
panjangelv
g8 = -0.952 % Jh < L L=

L= 176.76 m
A = (g7-g8)
399
Jh > L L = 2𝑥 𝑗ℎ −
𝐴
A = 1.763 %
L = 173.705839 m

A2. Berdasarakan jarak Pandang mendahului

Jd < L L=

L = 1343.38 m

Jd > L L=

L = 1123.591 m

b. Berdasarkan Syarat Keluwesan bentuk

L = 0.6 x V
= 480 m

c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )

702833783.xls
L = 50 x A EV =
= 88.15959 m
= 0.194303 m
d. Berdasarkan Syarat Kenyaman
X = 1/2 x L
L= = 44.0797941 m

= 10.850 m Y = EV = 0.194303 m
TIKUNGAN 09 (PPV 09)
Alinemen Vertikal Cembung
2,312 % -4,274 %

Ø Dari gambar didapat :


STA = 9+000
Kecepatan ( V ) : 80.0 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt
1. Perbedaan Aljabar Landai ( A ) 2. Lengkung Vertikal Cembung
elv 2−elv 1 a. Berdasarakan Syarat Keamanan
gi= x 100 % A1. Berdasakan Jarak Pandang Henti
panjangelv
g10 = -4.274 % Jh < L L=

L= 660.21 m
A = (g9-g10)
399
Jh > L L = 2𝑥 𝑗ℎ −
𝐴
A = 6.586 %
L = 339.413661 m

A2. Berdasarakan jarak Pandang mendahului

Jd < L L=

L = 5017.63 m

Jd > L L=

L = 1472.45 m

b. Berdasarkan Syarat Keluwesan bentuk

L = 0.6 x V
= 48 m

702833783.xls
c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )

L = 50 x A EV =
= 329.2822 m
= 2.710668 m
d. Berdasarkan Syarat Kenyaman
X = 1/2 x L
L= = 164.641075 m

= 4.053 m Y = EV = 2.710668 m
TIKUNGAN 11 (PPV 11)
Alinemen Vertikal Cembung
1,161 % -3,671 %

Ø Dari gambar didapat :


STA = 14+600
Kecepatan ( V ) : 80.0 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt
1. Perbedaan Aljabar Landai ( A ) 2. Lengkung Vertikal Cembung
elv 2−elv 1 a. Berdasarakan Syarat Keamanan
gi= x 100 % A1. Berdasakan Jarak Pandang Henti
panjangelv
g12 = -3.671 % Jh < L L=

L= 484.43 m
A = (g11-g12)
399
Jh > L L = 2𝑥 𝑗ℎ −
𝐴
A = 4.832 %
L = 317.428511 m

A2. Berdasarakan jarak Pandang mendahului

Jd < L L=

L = 3681.66 m

Jd > L L=

L = 1426.165 m

b. Berdasarkan Syarat Keluwesan bentuk

L = 0.6 x V

702833783.xls
= 48 m

c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )

L = 50 x A EV =
= 241.6088 m
= 1.459371 m
d. Berdasarkan Syarat Kenyaman
X = 1/2 x L
L= = 120.80441 m

= 2.974 m Y = EV = 1.459371 m
TIKUNGAN 13 (PPV 13)
Alinemen Vertikal Cembung
-0,667 %
2,724 %

Ø Dari gambar didapat :


STA = 19+100
Kecepatan ( V ) : 80.0 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt
1. Perbedaan Aljabar Landai ( A ) 2. Lengkung Vertikal Cembung
elv 2−elv 1 a. Berdasarakan Syarat Keamanan
gi= x 100 % A1. Berdasakan Jarak Pandang Henti
panjangelv
g14 = -0.667 % Jh < L L=

L= 339.89 m
A = (g13-g14)
399
Jh > L L = 2𝑥 𝑗ℎ −
𝐴
A = 3.390 %
L = 282.314843 m

A2. Berdasarakan jarak Pandang mendahului

Jd < L L=

L = 2583.16 m

Jd > L L=

L = 1352.242 m

b. Berdasarkan Syarat Keluwesan bentuk

702833783.xls
L = 0.6 x V
= 48 m

c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )

L = 50 x A EV =
= 169.5201 m
= 0.718427 m
d. Berdasarkan Syarat Kenyaman
X = 1/2 x L
L= = 84.7600519 m

= 2.086 m Y = EV = 0.718427 m

702833783.xls
TIKUNGAN 02 (PPV 02)
Alinemen Vertikal Cekung

-3,31 %
0,00 %

Ø Dari gambar didapat :


STA = 1+400
Kecepatan ( V ) : 80.0 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt

1. Perbedaan Aljabar Landai ( A )


elv 2−elv 1
gi= x 100 %
panjangelv
g3 = 0.000 %

A = (g2-g3)

A = -3.31034 %

2. Lengkung Vertikal Cekung


a. Berdasarakan Syarat Keamanan
A1. Berdasakan Jarak Pandang Henti

Jh < L L=

L= -0.85 m

Jh > L L=

L = 688.49 m

b. Berdasarkan Syarat Keluwesan bentuk

L = 0.6 x V
= 48 m

c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )

L = 50 x A EV =
= -165.517 m
= 0.68490 m
d. Berdasarkan Syarat Kenyaman
X = 1/2 x L
L= = -82.758621 m
= -2.037 m Y = EV = 0.68490 m

TIKUNGAN 04 (PPV 04)


Alinemen Vertikal Cekung
1,191 %
-0,682 %

Ø Dari gambar didapat :


STA = 2+650
Kecepatan ( V ) : 80.0 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt

1. Perbedaan Aljabar Landai ( A )


elv 2−elv 1
gi= x 100 %
panjangelv
g5 = 1.191 %

A = (g3-g4)

A = -1.87304 %

2. Lengkung Vertikal Cekung


a. Berdasarakan Syarat Keamanan
A1. Berdasakan Jarak Pandang Henti

Jh < L L=

L= -0.48 m

Jh > L L=

L = 909.866 m

b. Berdasarkan Syarat Keluwesan bentuk

L = 0.6 x V
= 48 m

c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )

L = 50 x A EV =
= -93.652 m
= 0.21927 m
d. Berdasarkan Syarat Kenyaman
X = 1/2 x L
L= = -46.826019 m

= -1.153 m Y = EV = 0.21927 m

TIKUNGAN 05 (PPV 05)


Alinemen Vertikal Cekung
2,703 %

1,191 %

Ø Dari gambar didapat :


STA = 3+100
Kecepatan ( V ) : 80.0 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt

1. Perbedaan Aljabar Landai ( A )


elv 2−elv 1
gi= x 100 %
panjangelv
g6 = 2.703 %

A = (g4-g5)

A = -1.51148 %

2. Lengkung Vertikal Cekung


a. Berdasarakan Syarat Keamanan
A1. Berdasakan Jarak Pandang Henti

Jh < L L=

L= -0.39 m

Jh > L L=

L = 1031.83 m

b. Berdasarkan Syarat Keluwesan bentuk

L = 0.6 x V
= 48 m

c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )

L = 50 x A EV =
= -75.574 m
= 0.14279 m
d. Berdasarkan Syarat Kenyaman
X = 1/2 x L
L= = -37.787003 m

= -0.930 m Y = EV = 0.14279 m

TIKUNGAN 08 (PPV 08)


Alinemen Vertikal Cekung

-0,952 % 2,312 %
Ø Dari gambar didapat :
STA = 7+250
Kecepatan ( V ) : 80.0 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt

1. Perbedaan Aljabar Landai ( A )


elv 2−elv 1
gi= x 100 %
panjangelv
g9 = 2.312 %

A = (g8-g9)

A = -3.26452 %

2. Lengkung Vertikal Cekung


a. Berdasarakan Syarat Keamanan
A1. Berdasakan Jarak Pandang Henti

Jh < L L=

L= -0.84 m

Jh > L L=

L = 692.539 m

b. Berdasarkan Syarat Keluwesan bentuk

L = 0.6 x V
= 48 m

c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )

L = 50 x A EV =
= -163.226 m
= 0.66607 m
d. Berdasarkan Syarat Kenyaman
X = 1/2 x L
L= = -81.612992 m

= -2.009 m Y = EV = 0.66607 m

TIKUNGAN 10 (PPV 10)


Alinemen Vertikal Cekung

-4,274 % 1,161 %
Ø Dari gambar didapat :
STA = 12+050
Kecepatan ( V ) : 80.0 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt

1. Perbedaan Aljabar Landai ( A )


elv 2−elv 1
gi= x 100 %
panjangelv
g11 = 1.161 %

A = (g10-g11)

A = -5.43479 %

2. Lengkung Vertikal Cekung


a. Berdasarakan Syarat Keamanan
A1. Berdasakan Jarak Pandang Henti

Jh < L L=

L= -1.39 m

Jh > L L=

L = 575.72 m

b. Berdasarkan Syarat Keluwesan bentuk

L = 0.6 x V
= 48 m

c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )


L = 50 x A EV =
= -271.74 m
= 1.84606 m
d. Berdasarkan Syarat Kenyaman
X = 1/2 x L
L= = -135.86986 m

= -3.344 m Y = EV = 1.84606 m

TIKUNGAN 12 (PPV 12)


Alinemen Vertikal Cekung

-3,671 % 2,724 %

Ø Dari gambar didapat :


STA = 16+500
Kecepatan ( V ) : 80.0 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt

1. Perbedaan Aljabar Landai ( A )


elv 2−elv 1
gi= x 100 %
panjangelv
g13 = 2.724 %

A = (g12-g13)

A = -6.39462 %

2. Lengkung Vertikal Cekung


a. Berdasarakan Syarat Keamanan
A1. Berdasakan Jarak Pandang Henti

Jh < L L=

L= -1.64 m

Jh > L L=

L = 549.344 m

b. Berdasarkan Syarat Keluwesan bentuk

L = 0.6 x V
= 48 m
c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )

L = 50 x A EV =
= -319.731 m
= 2.55570 m
d. Berdasarkan Syarat Kenyaman
X = 1/2 x L
L= = -159.86554 m

= -3.935 m Y = EV = 2.55570 m

TIKUNGAN 14 (PPV 14)


Alinemen Vertikal Cekung

1,579 %
-0,667 %

Ø Dari gambar didapat :


STA = 21+500
Kecepatan ( V ) : 80 km/jam
Landai maksimun : 2 %
Jarak Pandang Henti (Jh) : 200 m
Gaya sentrifugal ( a ) : 0.1 m/dt

1. Perbedaan Aljabar Landai ( A )


elv 2−elv 1
gi= x 100 %
panjangelv
g15 = 1.579 %

A = (g14-g15)

A = -2.24561 %

2. Lengkung Vertikal Cekung


a. Berdasarakan Syarat Keamanan
A1. Berdasakan Jarak Pandang Henti

Jh < L L=

L= -0.58 m

Jh > L L=

L = 825.273 m

b. Berdasarkan Syarat Keluwesan bentuk


L = 0.6 x V
= 48 m

c. Berdasarkan Syarat Drainase e .Pergeseran Vertikal ( EV )

L = 50 x A EV =
= -112.281 m
= 0.31517 m
d. Berdasarkan Syarat Kenyaman
X = 1/2 x L
L= = -56.14035 m

= -1.382 m Y = EV = 0.31517 m
Galian Urugan
No Sta Galian Urugan rata-rata rata-rata Jarak Volume
(m3) (m3) Galian Urugan
1 0+300 225
0+500 300
0+950 400
1+300 625
Jumlah 387.5 650 251,875
2 1+750 90
45
Jumlah 67.5 100 6750
3 2+875 156.25
318.75
Jumlah 237.5 125 29687.5
4 `3+075 350
300
500
Jumlah 383.33 200 76666.67
5 4+250 306.25
350
525
Jumlah 393.75 175 68906.25
6 4+425 1050
100
112.5
Jumlah 420.83 175 73645.83
7 4+575 525.00
382.50
375.00
Jumlah 427.50 150 64125.00
8 4+675 400.00
150.00
250.00
Jumlah 266.67 100 26666.67
9 4+825 375.00
375.00
337.50
Jumlah 362.50 150 54375.00
10 4+950 125.00
100.00
50.00
75.00
Jumlah 87.50 125 10937.50
11 5+125 93.75
93.75
87.50
70.00
50.00
Jumlah 60.25 175 10543.75
Galian Urugan
No Sta Galian Urugan rata-rata rata-rata Jarak Volume
(m3) (m3) Galian Urugan
12 5+900 62.50
37.50
Jumlah 50.00 75 3750.00
6+375 500
300
120
56
37.5
Jumlah 202.7 175 35472.5
13 6+800 625
562.5
Jumlah 593.75 125 74218.75
14 7+200 750
375
200
120
60
Jumlah 301 300 90300
7+875 180
45
Jumlah 112.5 125 14062.5
8+500 615
165
512.5
Jumlah 225.83 625 141145.83333
9+100 65
65
160
120
67.5
45
35
Jumlah 79.64 600 47785.71
9+350 110
82.5
52.5
Jumlah 81.67 250 20416.67
9+750 120
90
97.5
97.5
90
150
Jumlah 107.50 400 43000.00
Galian Urugan
No Sta Galian Urugan rata-rata rata-rata Jarak Volume
(m3) (m3) Galian Urugan
10+300 150
112.5
75
30
25
Jumlah 78.50 450 35325.00
10+450 12.5
20
30
30
Jumlah 23.125 150 3468.75
10+550 22.50
37.50
62.50
Jumlah 40.83 100 4083.33
7+800 100.00
200.00
70.00
245.00
70.00
125.00
300.00
150.00
Jumlah 157.50 250 39375.00
11+000 500.00
200.00
500.00
Jumlah 400.00 200 80000.00
11+200 500.00
200.00
500.00
Jumlah 400.00 200 80000.00
11+520 690.00
172.50
52.50
Jumlah 305.00 320 97600.00
12+150 112.5
52.5
Jumlah 82.5 250 20625
12+425 56.25
112.50
375.00
Jumlah 181.25 275 49843.75
13+000 1437.50 1437.50 575 826562.50
13+425 850.00 850.00 425 361250.00
Galian Urugan
No Sta Galian Urugan rata-rata rata-rata Jarak Volume
(m3) (m3) Galian Urugan
13+775 343.75
550.00
225.00
37.50
37.50
Jumlah 238.75 350 83562.50
13+900 106.25
42.50
Jumlah 74.38 125 9296.88
14+150
320
120
45
Jumlah 161.67 250 40416.67
14+575 850 850 425 361250
14+975 45
52.5
70
40
Jumlah 51.875 400 20750
15+075 45.00
315.00
Jumlah 180.00 100 18000
15+440 1642.50 1642.50 365 599512.5
15+025 30.00
40.00
50.00
62.50
62.50
62.50
87.50
122.50
140.00
200.00
50.00
150.00
90.00
125.00
300.00
300.00
Jumlah 117.03 585 68463.28125
15+425 700
100
25
Jumlah 412.5 400 165000
Galian Urugan
No Sta Galian Urugan rata-rata rata-rata Jarak Volume
(m3) (m3) Galian Urugan
15+600 122.50
200.00
40.00
220.00
Jumlah 582.50 175 101937.5
15+850 700.00
50.00
175.00
200.00
75.00
60.00
50.00
Jumlah 187.14 250 46785.7
16+250 62.50
50.00
40.00
22.50
Jumlah 175.00 100 17500.0
16+425 250
250
312.5
281.25
175
45
40
Jumlah 193.39 375 72522.32
16+850 175
325
910
Jumlah 470 425 199750.00
17+350 250
200
135
Jumlah 195 100 19500.00
18+100 375
300
Jumlah 337.5 150 50625.00
18+230 160
80
40
30
Jumlah 77.5 130 10075.00
18+400 31.25
70.00
70.00
80.00
120.00
Jumlah 74.25 170 12622.5
Galian Urugan
No Sta Galian Urugan rata-rata rata-rata Jarak Volume
(m3) (m3) Galian Urugan
18+525 218.75
281.25
Jumlah 250.00 125 31250
18+875 348.75
193.75
125.00
75.00
50.00
Jumlah 396.25 350 138687.5
18+200 187.50
75.00
Jumlah 131.25 325 42656.25
18+625 156.25
300
Jumlah 228.125 425 96953.13
19+275 130.00
63.75
106.25
Jumlah 100.00 150 15000
19+925 187.50
375.00
Jumlah 281.25 150 42187.5
20+500 812.50 812.50 325 264062.5
21+174 393.75
140
60
Jumlah 197.92 325 64322.92
JUMLAH TOTAL 3,771,289.5 1,563,864.6
RENCANA ANGGARAN BIAYA

Nama Paket : Tugas Perancangan Jalan Raya 2017


Fakultas/Jurusan : Teknik / Teknik Sipil UWG Malang

NO Uraian Satuan Volume Harga Satuan Jumlah Harga


(Rp) (Rp)
1 2 3 4 5 6
DIVISI 1. PEKERJAAN PERSIAPAN
1 Mobilisasi LS 1 5,128,759,609 5,128,759,609
2 Pembersihan M2 631440 2,000 1,262,880,000
Jumlah Harga Pekerjaan DIVISI 1 6,391,639,609
DIVISI 2. DRAINASE
1 Galian untuk Selokan Drainase dan Saluran Air M3 7940 45,401.32 360,486,481
2 Pasangan Batu dengan Mortar M3 13974.4 50,000.00 698,720,000
Jumlah Harga Pekerjaan DIVISI 2 1,059,206,481
DIVISI 3. PEKERJAAN TANAH
1 Galian Tanah M3 3771289.5 10,000 37,712,895,015
2 Timbunan M3 1563864.61 15,000 23,457,969,196
Jumlah Harga Pekerjaan DIVISI 3 61,170,864,211
DIVISI 4. PEKERJAAN PERKERASAN JALAN
1 Persiapan sub grade M3 420960 2,000.00 841,920,000
2 Prime coat M3 131550 2,500.00 328,875,000
3 Tack coat M2 192940 1,750.00 337,645,000
4 Lapis permukaan M3 11910.9375 75,000.00 893,320,313
5 Lapis pondasi atas M3 19851.5625 9,421.67 187,034,817
6 Lapis pondasi bawah M3 23821.875 8,663.81 206,388,248
7 Median M3 21175 30,000.00 635,250,000
Jumlah Harga Pekerjaan DIVISI 4 3,430,433,377
DIVISI 5. PEMBEBASAN TANAH
1 Daerah Perumahan M3 219250 150,000 32,887,500,000
2 Daerah Perkebunan M3 219250 75,000 16,443,750,000
3 Daerah Pertanian M3 438500 50,000 21,925,000,000
Jumlah Harga Pekerjaan DIVISI 5 71,256,250,000
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

Nama Paket : : Tugas Perancangan Jalan Raya 2017


Fakultas/Jurusa : : Teknik / Teknik Sipil UWG Malang

NO. HARGA PEKERJAAN


URAIAN
DEVISI (Rp)
1 PEKERJAAN PERSIAPAN Rp 6,391,639,609.00
2 DRAINASE Rp 1,059,206,480.80
3 PEKERJAAN TANAH Rp 61,170,864,211.31
4 PEKERJAAN PERKERASAN JALAN Rp 3,430,433,376.74
5 PEMBEBASAN TANAH Rp 71,256,250,000.00

(A) JUMLAH HARGA ( TERMASUK KEUNTUNGAN ) Rp 143,308,393,677.85


(B) PAJAK PERTAMBAHAN NILAI ( PPn ) : 10% . ( A ) Rp 14,330,839,367.78
(C) JUMLAH TOTAL HARGA : ( A ) + ( B ) Rp 157,639,233,045.63
(D) DIBULATKAN Rp 198,245,380,000.00

Terbilang : Seratus Sembilan Puluh Delapan Milyar Dua Ratus Empat Puluh Lima Juta
Tiga Ratus Delapan Puluh Ribu Rupiah