SKC - JL.2 - Kerja Saliran.K6
SKC - JL.2 - Kerja Saliran.K6
2
PROSEDUR No. Keluaran : 06
PEMBINAAN DAN No. Pindaan : 00
PENYELIAAN TAPAK BINA Tarikh : 19 Sept 2019
JKR MALAYSIA Muka Surat :1/5
Nota: SSRW : Standard Specifications for Road Works (JKR SPJ/1988 – JKR 20401 – 0017 - 88)
Nota: SSRW : Standard Specifications for Road Works (JKR SPJ/1988 – JKR 20401 – 0017 - 88)