VISI INDONESIA 2045
MEGATREN 2045
2.1 GW 23.9 GW
Detailed geology, Drilling 3 exploratory wells to Drilling a number of Construction of Power Steam production for
geochemistry and prove the existence of production wells and Plant and steam above electricity generation
geophysics to develop a economical amount of steam injection wells sufficient to ground system (SAGS) for ± 30 years
conceptual model generate the contracted MW
Geochemistry sampling Geophysical data acquisition Geophysical data acquisition Geological observation
GEODIPA dengan Perguruan Tinggi
Kebijakan Utama:
Prioritas kepada Universitas
Detailed geology, Drilling 3 exploratory wells to Drilling a number of Construction of Power Steam production for
geochemistry and prove the existence of production wells and Plant and steam above electricity generation
geophysics to develop a economical amount of steam injection wells sufficient to ground system (SAGS) for ± 30 years
conceptual model generate the contracted MW
• 3G survey (ITB, 2018, • UKL-UPL Candradimuka (Undip & • FEED PLTP Binary (ITB, • Kajian Isu Produksi
Arjuno Welirang) Unsoed 2017) 2015) (UGM, 2015)
• Pre-FS Arjuno Welirang • Tenaga ahli untuk FS ekspansi Dieng • FEED PLTP Small Scale • FEED Tie-in (ITB, 2015)
(ITB, 2017) & Patuha (ITB, 2019) 10 MW (ITB, 2017)
• Pre-FS Umbul • UKL-UPL Arjuno (Unibraw, 2020) • Update FEED Binary
Telomoyo (UGM, 2019) • Kajian Kehutanan Arjuno (UGM, (ITB, 2020)
2020)
• Kajian Sipil Arjuno dan Candi
(Unibraw, 2020)
• Geothermal Project
Management Training
(ITB, 2018- skrg)
• Tugas Akhir, KP
PENGEMBANGAN PANAS BUMI DAN SUMBER DAYA MANUSIA
Rencana Pengembangan Panas Bumi s.d Tahun 2025 berdasarkan RUEN (PerPres No. 22/2017)
2.1 GW 23.9 GW