Anda di halaman 1dari 149

STRUCTUTURE CALCULATION REPORT

JANUARY 2022
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

DAFTAR ISI

1.1 Pendahuluan ................................................................................................................................ 5


1.2 Data Proyek.................................................................................................................................. 5
1.3 Design Preference ........................................................................................................................ 5
1.4 Mutu & Standar Material ............................................................................................................ 5
1.5 Pembebanan ................................................................................................................................ 5
1.6 Kombinasi Pembebanan .............................................................................................................. 7
1.7 Factor Reduksi Kekuatan (Strength Reduction Factor) Ø ......................................................... 11
1.8 Analisa & Modeling Struktur ..................................................................................................... 11
1.9 Analisa Beban Gempa................................................................................................................ 11
BAB II ARCHITECTURAL PLAN ................................................................................................................12
2.1 Denah Rencana Arsitektural...................................................................................................... 12
BAB III PERHITUNGAN STRUKTUR ATAS.................................................................................................16
3.1 Modelling .................................................................................................................................. 16
3.1.1 3D View model ................................................................................................................... 16
3.1.2 Column Plan........................................................................................................................ 16
3.1.3 Floor Plan............................................................................................................................ 17
3.1.4 Section Plan ........................................................................................................................ 23
3.2 Material Properties.................................................................................................................... 31
3.3 Frame Section Properties .......................................................................................................... 32
3.4 Shell Section Properties ............................................................................................................. 32
3.5 Analisa Pembebanan ................................................................................................................. 33
3.5.1 Beban Merata pada Pelat Lantai ........................................................................................ 33
3.5.2 Beban Dinding Terbagi Rata di Atas Balok Struktur ........................................................... 34
3.5.3 Beban Rangka Atap ............................................................................................................ 35
3.6.1 Beban Terbagi Rata pada Pelat Lantai (kgf/m2) ................................................................. 37
3.7 Analisa Beban Gempa................................................................................................................ 49
3.7.1 Penentuan Respon pektra Desain ...................................................................................... 49
3.7.2 Design Respon Spektra ....................................................................................................... 49
3.7.3 Penentuan KDS (Kategori Desain Seismik) ......................................................................... 50
3.7.4 Spectrum Diagram .............................................................................................................. 50
3.7.5 Center of Mass & Rigidity (Pusat Masa & Kekakuan) ......................................................... 51
3.7.6 Story Shear – Arah X (Dynamic Load Arah X) ..................................................................... 51
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.7.7 3Story Shear- Arah Y (Dynamic Load Arah X) .................................................................... 51
3.7.8 Static Load Analysis – Arah X .............................................................................................. 52
3.7.9 Static Load Analysis – Arah Y .............................................................................................. 53
3.7.10 Dynamic Load Distribution ................................................................................................. 54
3.7.11 Lateral Load Distribution - Arah X ...................................................................................... 54
3.7.12 Lateral Load Distribution - Arah Y ...................................................................................... 54
3.7.13 P-∆ Effect ............................................................................................................................ 55
3.8 Output Design ............................................................................................................................ 63
3.8.1 Column Reaction ................................................................................................................ 63
3.8.2 Frame Element Force Diagram (Diagram Gaya Dalam)...................................................... 68
3.8.3 Concrete Design Output - Kolom........................................................................................ 83
3.8.4 Concrete Design Output - Balok ......................................................................................... 87
3.8.5 Steel Design Output............................................................................................................ 97
3.9 Perhitungan Tulangan Kolom, Balok, Slab ................................................................................ 99
3.9.1 Rekapitulas Gaya Dalam Kolom.......................................................................................... 99
3.9.2 Perhitungan Tulangan Lentur Kolom................................................................................ 100
3.9.3 Perhitungan Tulangan Geser Kolom ................................................................................. 100
3.9.4 Perhitungan Tulangan Confinement Kolom ..................................................................... 102
3.9.5 Rekapitulasi Gaya Dalam Balok ........................................................................................ 103
3.9.6 Perrhitungan Tulangan Lentur Balok ................................................................................ 103
3.9.7 Perhitungan Tulangan Geser Balok .................................................................................. 110
3.9.8 Perhitungan Tulangan Pelat lantai ................................................................................... 112
3.9.9 Perhitungan Tulangan Pelat Drop Panel (Atap Canopy) .................................................. 113
3.9.10 Perhitungan Tulangan Tangga .......................................................................................... 115
3.9.11 Perhitungan Sambungan Baja .......................................................................................... 118
BAB IV PERHITUNGAN STRUKTUR BAWAH ..........................................................................................138
4.1 Perhitungan Daya Dukung Pondasi ......................................................................................... 138
4.1.1 Daya Dukung Pondasi DCPT-1 .......................................................................................... 138
4.1.2 Daya Dukung Pondasi DCPT-2 .......................................................................................... 140
4.1.3 Daya Dukung Pondasi DCPT-3 .......................................................................................... 142
4.1.4 Rekapitulasi Daya Dukung ................................................................................................ 143
4.2 Perhitungan Jumlah Pondasi ................................................................................................... 144
4.2.1 Jumlah Pondasi ................................................................................................................. 144
4.2.2 Denah Kolom .................................................................................................................... 149
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
BAB I KRITERIA DESAIN

1.1 Pendahuluan
Bab ini menjelaskan tentang kriteria desain serta keterangan umum perencanaan Struktur Proyek
Pemangunan “PUSKESMAS SIMPANG PEMATANG – MESUJI, LAMPUNG” sebagai acuan Perencana
Struktur dalam melakukan pekerjaan perencanaan struktur. Kriteria desain ini menjelaskan secara
singkat mengenai peraturan-peraturan, standar-standar yang digunakan, pembebanan, jenis dan
mutu bahan/material struktur, tipe/jenis , sistem struktur atas dan struktur bawah/pondasi,
analisa/modelisasi struktur, anggapan-anggapan yang digunakan dll

1.2 Data Proyek


Nama Proyek : PUSKESMAS SIMPANG PEMATANG – MESUJI, LAMPUNG
Lokasi Proyek : Mesuji - Lampung
Tinggi Bangunan : ± 12.2 m
Tipe Bangunan : Sistem Struktktur Rangka Beton Pemikul Momen Khusus

1.3 Design Preference


a. SNI 1726-2019 Tata Cara Perencanaan Ketahanan Gempa Untuk Struktur Bangunan Gedung
dan Non Gedung
b. SNI 1729-2015 Spesifikasi / Persyaratan Perencanaan Bangunan Gedung Baja Struktural
c. SNI 2847-2019 Persyaratan Beton Struktural Bangunan Gedung
d. SNI 1727-2018 Beban Minimum Untuk Perancangan Bangunan Gedung dan Struktur Lain
e. ASCE 7-16 Minimum Design Loads for Buildings and Other Structures
f. ACI 318-16 Building Code Requirements for Structural Concrete
g. AISC 360-16 Specification for Structural Steel Buildings

1.4 Mutu & Standar Material


- Beton
Kekuatan karakteristik silinder beton (f’c) yang didasarkan atas kekuatan beton pada umur 28
hari sebagai berikut:
• Kolom K-300 (24.9 MPa)
• Balok & Pelat K-300 (24.9 Mpa)
- Rebar (Baja Tulangan)
Jenis dan tegangan leleh (fy) baja tulangan yang digunakan :
• Baja polos : 280 Mpa untuk dia. < 10 (dia. 8 mm)
• Baja ulir : 420 Mpa untuk dia. ≥ 10 (dia. 10 mm, 13 mm, dst)
- Baja Structural: BJ37 (Fy = 240 Mpa & Fu = 370 Mpa)
- Mutu Las : E-70-xx (fy = 428 Mpa)

1.5 Pembebanan
a. Beban mati (DL), merupakan beban sendiri struktur bangunan
b. Beban mati tambahan (SDL), merupakan beban mati tambahan yang bukan merupakan
struktur utama bangunan seperti: beban finishing, beban MEP dsb.
c. Beban hidup (LL), beban fungsi ruangan yang diatur dalam SNI 1727, berikut besara beban
hidup:
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Beban Hidup Kumulatif untuk perencanaan elemen struktur vertikal, seperti kolom,
dinding dan pondasi, direduksi dengan mengalikan Koefisien Beban Hidup Kumulatif sesuai
dengan jumlah lantai yang dipikul oleh elemen struktur yang bersangkutan (lihat Tabel-3).

Reduksi benan hidup L tidak boleh kurang dari 0,50L˳ untuk komponen struktur yang
mendukung satu lantai dan L tidak boleh kurang dari 0,40L˳ untuk komponen struktur yang
mendukung dua lantai atau lebih. Dimana koefisien reduksi beban hidup dapat dihitung
dengan persamaan:

Dimana:
L = Beban hidup reduksi rencana per m2 dari luasana yang didukung oleh komponen
struktur
L˳ = Beban hidup rencana tanpa factor reduksi per m2 dari luasan yang didukung oleh
komponen struktur.
KLL = Faktor elemen beban hidup
AT = Luas tributary (m2)

Tabel 2. Faktor Elemen Beban Hidup KLL


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

d. Beban gempa (EQ)


Pada prinsipnya, beban horisontal gempa yang digunakan dihitung berdasarkan “Tata
Cara Perencanaan Ketahanan Gempa untuk Bangunan Gedung” SNI 03-1726-2012. Bangunan
ini termasuk pada Kategori Desain Seismik D dengan Kategori Risiko Bangunan Tipe II.
Perhitungan beban gempa secara lebih detail dijelaskan dalam Butir 8 “Perencanaan Gempa”.

1.6 Kombinasi Pembebanan


Kombinase pembebana yang digunakan untuk mendesain kekuatan struktur adalah:
1. Kombinasi Tegangan Izin

2. Kombinasi Beban Seismik

3. Kombinasi Beban seimik dengan factor kuat lebih Jika struktur kedalam KDS D

U = (1,2 + 0,2 SDS) (DL + SDL) + LL + ρ QE


U = (0,9 – 0,2 SDS) (DL + SDL) + ρ QE

Dimana pada kasus proyek ini diperoleh:


• SDS = 0.4916
• SD1 = 0,5376
• ρ = 1,3
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Analisa struktur dilakukan dengan mengecek kekuatan struktur dalam berbagai kondisi yaitu:
- Perencanaan Stuktur terhapa tegangan ijin
- Perencanaan Struktur terhadap beban Seismik (Dynamic Load vs Static Load) dengan
respon spektrum design

Kombinasi Beban Tegangan Izin (Steel Design):


STL1 = 1.4 DL + 1.4 SDL
STL2 = 1.2 DL + 1.2 SDL + 1.6 LL
STL3 = 1.2 DL + 1.2 SDL + 1.6 LL + 0.5 WL
STL4 = 1.2 DL + 1.2 SDL + 1.6 LL - 0.5 WL
STL5 = 1.2 DL + 1.2 SDL + 1.0 LL + 1.0 WL
STL6 = 1.2 DL + 1.2 SDL + 1.0 LL - 1.0 WL
STL7 = 0.9 DL + 0.9 SDL + 1.0 WL
STL8 = 0.9 DL + 0.9 SDL - 1.0 WL
STL9 = 1.2 DL + 1.2 SDL + 1.0 LL + (1.0 SPEC-x) + (0.30 SPEC-y)
STL10 = 1.2 DL + 1.2 SDL + 1.0 LL + (1.0 SPEC-x) - (0.30 SPEC-y)
STL11 = 1.2 DL + 1.2 SDL + 1.0 LL - (1.0 SPEC-x) + (0.30 SPEC-y)
STL12 = 1.2 DL + 1.2 SDL + 1.0 LL - (1.0 SPEC-x) - (0.30 SPEC-y)
STL13 = 1.2 DL + 1.2 SDL + 1.0 LL + (0.30 SPEC-x) + (1.0 SPEC-y)
STL14 = 1.2 DL + 1.2 SDL + 1.0 LL + (0.30 SPEC-x) - (1.0 SPEC-y)
STL15 = 1.2 DL + 1.2 SDL + 1.0 LL - (0.30 SPEC-x) + (1.0 SPEC-y)
STL16 = 1.2 DL + 1.2 SDL + 1.0 LL - (0.30 SPEC-x) - (1.0 SPEC-y)
STL17 = 0.9 DL + 0.9 SDL + (1.0 SPEC-x) + (0.30 SPEC-y)
STL18 = 0.9 DL + 0.9 SDL + (1.0 SPEC-x) - (0.30 SPEC-y)
STL19 = 0.9 DL + 0.9 SDL - (1.0 SPEC-x) + (0.30 SPEC-y)
STL20 = 0.9 DL + 0.9 SDL - (1.0 SPEC-x) - (0.30 SPEC-y)
STL21 = 0.9 DL + 0.9 SDL + (0.30 SPEC-x) + (1.0 SPEC-y)
STL22 = 0.9 DL + 0.9 SDL + (0.30 SPEC-x) - (1.0 SPEC-y)
STL23 = 0.9 DL + 0.9 SDL - (0.30 SPEC-x) + (1.0 SPEC-y)
STL24 = 0.9 DL + 0.9 SDL - (0.30 SPEC-x) - (1.0 SPEC-y)
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Kombinasi Beban Seismik dengan Beban Gempa Statik
COMB1 = DL + LL
COMB2 = 1.2 DL + 1.6 LL
COMB3 = (1.2 + 0.2 SDS) DL + LL + ρ.EQX1 + 30%.ρ.EQY1
COMB4 = (1.2 + 0.2 SDS) DL + LL + ρ.EQX1 - 30%.ρ.EQY1
COMB5 = (1.2 + 0.2 SDS) DL + LL - ρ.EQX1 + 30%.ρ.EQY1
COMB6 = (1.2 + 0.2 SDS) DL + LL - ρ.EQX1 - 30%.ρ.EQY1
COMB7 = (1.2 + 0.2 SDS) DL + LL + 30%.ρ.EQX1 + ρ.EQY1
COMB8 = (1.2 + 0.2 SDS) DL + LL + 30%.ρ.EQX1 - ρ.EQY1
COMB9 = (1.2 + 0.2 SDS) DL + LL - 30%.ρ.EQX1 + ρ.EQY1
COMB10 = (1.2 + 0.2 SDS) DL + LL - 30%.ρ.EQX1 - ρ.EQY1
COMB11 = (0.9-0.2 SDS) DL + ρ.EQX1 + 30%.ρ.EQY1
COMB12 = (0.9-0.2 SDS) DL + ρ.EQX1 - 30%.ρ.EQY1
COMB13 = (0.9-0.2 SDS) DL - ρ.EQX1 + 30%.ρ.EQY1
COMB14 = (0.9-0.2 SDS) DL - ρ.EQX1 - 30%.ρ.EQY1
COMB15 = (0.9-0.2 SDS) DL + 30%.ρ.EQX1 + ρ.EQY1
COMB16 = (0.9-0.2 SDS) DL + 30%.ρ.EQX1 - ρ.EQY1
COMB17 = (0.9-0.2 SDS) DL - 30%.ρ.EQX1 + ρ.EQY1
COMB18 = (0.9-0.2 SDS) DL - 30%.ρ.EQX1 - ρ.EQY1
COMB19 = (1.2 + 0.2 SDS) DL + LL + ρ.EQX2 + 30%.ρ.EQY1
COMB20 = (1.2 + 0.2 SDS) DL + LL + ρ.EQX2 - 30%.ρ.EQY1
COMB21 = (1.2 + 0.2 SDS) DL + LL - ρ.EQX2 + 30%.ρ.EQY1
COMB22 = (1.2 + 0.2 SDS) DL + LL - ρ.EQX2 - 30%.ρ.EQY1
COMB23 = (1.2 + 0.2 SDS) DL + LL + 30%.ρ.EQX2 + ρ.EQY1
COMB24 = (1.2 + 0.2 SDS) DL + LL + 30%.ρ.EQX2 - ρ.EQY1
COMB25 = (1.2 + 0.2 SDS) DL + LL - 30%.ρ.EQX2 + ρ.EQY1
COMB26 = (1.2 + 0.2 SDS) DL + LL - 30%.ρ.EQX2 - ρ.EQY1
COMB27 = (0.9-0.2 SDS) DL + ρ.EQX2 + 30%.ρ.EQY1
COMB28 = (0.9-0.2 SDS) DL + ρ.EQX2 - 30%.ρ.EQY1
COMB29 = (0.9-0.2 SDS) DL - ρ.EQX2 + 30%.ρ.EQY1
COMB30 = (0.9-0.2 SDS) DL - ρ.EQX2 - 30%.ρ.EQY1
COMB31 = (0.9-0.2 SDS) DL + 30%.ρ.EQX2 + ρ.EQY1
COMB32 = (0.9-0.2 SDS) DL + 30%.ρ.EQX2 - ρ.EQY1
COMB33 = (0.9-0.2 SDS) DL - 30%.ρ.EQX2 + ρ.EQY1
COMB34 = (0.9-0.2 SDS) DL - 30%.ρ.EQX2 - ρ.EQY1
COMB35 = (1.2 + 0.2 SDS) DL + LL + ρ.EQX1 + 30%.ρ.EQY2
COMB36 = (1.2 + 0.2 SDS) DL + LL + ρ.EQX1 - 30%.ρ.EQY2
COMB37 = (1.2 + 0.2 SDS) DL + LL - ρ.EQX1 + 30%.ρ.EQY2
COMB38 = (1.2 + 0.2 SDS) DL + LL - ρ.EQX1 - 30%.ρ.EQY2
COMB39 = (1.2 + 0.2 SDS) DL + LL + 30%.ρ.EQX1 + ρ.EQY2
COMB40 = (1.2 + 0.2 SDS) DL + LL + 30%.ρ.EQX1 - ρ.EQY2
COMB41 = (1.2 + 0.2 SDS) DL + LL - 30%.ρ.EQX1 + ρ.EQY2
COMB42 = (1.2 + 0.2 SDS) DL + LL - 30%.ρ.EQX1 - ρ.EQY2
COMB43 = (0.9-0.2 SDS) DL + ρ.EQX1 + 30%.ρ.EQY2
COMB44 = (0.9-0.2 SDS) DL + ρ.EQX1 - 30%.ρ.EQY2
COMB45 = (0.9-0.2 SDS) DL - ρ.EQX1 + 30%.ρ.EQY2
COMB46 = (0.9-0.2 SDS) DL - ρ.EQX1 - 30%.ρ.EQY2
COMB47 = (0.9-0.2 SDS) DL + 30%.ρ.EQX1 + ρ.EQY2
COMB48 = (0.9-0.2 SDS) DL + 30%.ρ.EQX1 - ρ.EQY2
COMB49 = (0.9-0.2 SDS) DL - 30%.ρ.EQX1 + ρ.EQY2
COMB50 = (0.9-0.2 SDS) DL - 30%.ρ.EQX1 - ρ.EQY2
COMB51 = (1.2 + 0.2 SDS) DL + LL + ρ.EQX2 + 30%.ρ.EQY2
COMB52 = (1.2 + 0.2 SDS) DL + LL + ρ.EQX2 - 30%.ρ.EQY2
COMB53 = (1.2 + 0.2 SDS) DL + LL - ρ.EQX2 + 30%.ρ.EQY2
COMB41 = (1.2 + 0.2 SDS) DL + LL - 30%.ρ.EQX1 + ρ.EQY2
COMB42 = (1.2 + 0.2 SDS) DL + LL - 30%.ρ.EQX1 - ρ.EQY2
COMB43 = (0.9-0.2 SDS) DL + ρ.EQX1 + 30%.ρ.EQY2
COMB44 = (0.9-0.2 SDS) DL + ρ.EQX1 - 30%.ρ.EQY2
COMB45 = (0.9-0.2 SDS) DL - ρ.EQX1 + 30%.ρ.EQY2
COMB46 = (0.9-0.2 SDS) DL - ρ.EQX1 Structure Calculation Report
- 30%.ρ.EQY2
COMB47 = (0.9-0.2 SDS) DL + 30%.ρ.EQX1 + ρ.EQY2Simpang Pematang, Mesuji
Puskesmas
COMB48 = (0.9-0.2 SDS) DL + 30%.ρ.EQX1 - ρ.EQY2
COMB49 = (0.9-0.2 SDS) DL - 30%.ρ.EQX1 + ρ.EQY2
COMB50 = (0.9-0.2 SDS) DL - 30%.ρ.EQX1 - ρ.EQY2
COMB51 = (1.2 + 0.2 SDS) DL + LL + ρ.EQX2 + 30%.ρ.EQY2
COMB52 = (1.2 + 0.2 SDS) DL + LL + ρ.EQX2 - 30%.ρ.EQY2
COMB53 = (1.2 + 0.2 SDS) DL + LL - ρ.EQX2 + 30%.ρ.EQY2
COMB54 = (1.2 + 0.2 SDS) DL + LL - ρ.EQX2 - 30%.ρ.EQY2
COMB55 = (1.2 + 0.2 SDS) DL + LL + 30%.ρ.EQX2 + ρ.EQY2
COMB56 = (1.2 + 0.2 SDS) DL + LL + 30%.ρ.EQX2 - ρ.EQY2
COMB57 = (1.2 + 0.2 SDS) DL + LL - 30%.ρ.EQX2 + ρ.EQY2
COMB58 = (1.2 + 0.2 SDS) DL + LL - 30%.ρ.EQX2 - ρ.EQY2
COMB59 = (0.9-0.2 SDS) DL + ρ.EQX2 + 30%.ρ.EQY2
COMB60 = (0.9-0.2 SDS) DL + ρ.EQX2 - 30%.ρ.EQY2
COMB61 = (0.9-0.2 SDS) DL - ρ.EQX2 + 30%.ρ.EQY2
COMB62 = (0.9-0.2 SDS) DL - ρ.EQX2 - 30%.ρ.EQY2
COMB63 = (0.9-0.2 SDS) DL + 30%.ρ.EQX2 + ρ.EQY2
COMB64 = (0.9-0.2 SDS) DL + 30%.ρ.EQX2 - ρ.EQY2
COMB65 = (0.9-0.2 SDS) DL - 30%.ρ.EQX2 + ρ.EQY2
COMB66 = (0.9-0.2 SDS) DL - 30%.ρ.EQX2 - ρ.EQY2

Kombinasi Beban Seismik dengan Beban Gempa Dynamic


COMB1 1,0.DL + 1,0.LL
COMB2 1,2.DL + 1,6.LL
COMB3 (1.2 + 0.2 SDS).DL + 1,0.LL + ρ.(SPEC-x) + 30%.ρ.(SPEC-y)
COMB4 (1.2 + 0.2 SDS).DL + 1,0.LL + ρ.(SPEC-x) - 30%.ρ.(SPEC-y)
COMB5 (1.2 + 0.2 SDS).DL + 1,0.LL - ρ.(SPEC-x) + 30%.ρ.(SPEC-y)
COMB6 (1.2 + 0.2 SDS).DL + 1,0.LL - ρ.(SPEC-x) - 30%.ρ.(SPEC-y)
COMB7 (1.2 + 0.2 SDS).DL + 1,0.LL + 30%ρ.(SPEC-x) + ρ.(SPEC-y)
COMB8 (1.2 + 0.2 SDS).DL + 1,0.LL + 30%ρ.(SPEC-x) - ρ.(SPEC-y)
COMB9 (1.2 + 0.2 SDS).DL + 1,0.LL - 30%ρ.(SPEC-x) + ρ.(SPEC-y)
COMB10 (1.2 + 0.2 SDS).DL + 1,0.LL - 30%ρ.(SPEC-x) - ρ.(SPEC-y)
COMB11 (0.9-0.2 SDS).DL + ρ.(SPEC-x) + 30%.ρ.(SPEC-y)
COMB12 (0.9-0.2 SDS).DL + ρ.(SPEC-x) - 30%.ρ.(SPEC-y)
COMB13 (0.9-0.2 SDS).DL - ρ.(SPEC-x) + 30%.ρ.(SPEC-y)
COMB14 (0.9-0.2 SDS).DL - ρ.(SPEC-x) - 30%.ρ.(SPEC-y)
COMB15 (0.9-0.2 SDS).DL + 30%.ρ.(SPEC-x) + ρ.(SPEC-y)
COMB16 (0.9-0.2 SDS).DL + 30%.ρ.(SPEC-x) - ρ.(SPEC-y)
COMB17 (0.9-0.2 SDS).DL - 30%.ρ.(SPEC-x) + ρ.(SPEC-y)
COMB18 (0.9-0.2 SDS).DL - 30%.ρ.(SPEC-x) - ρ.(SPEC-y)
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
1.7 Factor Reduksi Kekuatan (Strength Reduction Factor) Ø
Faktor reduksi kekuatan  pada struktur beton bertulang adalah sebagai berikut:
a. Terkendali Tarik : 0.90
b. Terkendali tekan
• Tulangan spiral : 0.75
• Lainnya : 0.65
c. Geser dan torsi : 0.75
d. Tumpuan beton : 0.6
Faktor reduksi kekuatan  pada struktur baja bertulang adalah sebagai berikut:
e. Terkendali Tarik : 0.90
f. Terkendali tekan
• Kondisi leleh : 0.90
• Kondisi Putus : 0.75
g. Geser dan torsi : 0.75

1.8 Analisa & Modeling Struktur


Struktur dianalisa secara 3 dimensi dengan bantuan program ETABS 2018 V18.1.1
Struktur Bangunan terdiri atas dua bagian dengan struktur atas terdiri dari tangka struktur baja
dikombinasi dengan struktur beton pada struktur bawah (tie Beam, pedestal, pondasi dan pilecap)
Taraf penjepitan struktur atas dianggap terjepit elevasi lantai dasar pondasi, sehingga analisis dapat
dilakuan dalam satu modeling dengan metoda analisis beban gempa sebagai beriku?
• Analisis beban gempa static equivalen
• Analisis gempa berdasarkan respon spectrum

1.9 Analisa Beban Gempa


Beban gempa yang digunakan adalah Respons Spektrum dari Tata Cara Perencanaan Ketahanan
Gempa untuk Bangunan Gedung SNI 03-1726-2019.
Dalam perencanaan struktur gedung terhadap pengaruh Gempa Rencana, pemodelan properti
kekakuan elemen beton harus memperhitungkan pengaruh penampang retak. Kekakuan efektif
elemen struktur berdasarkan SNI 2847 - 2013 pasal 10.10.4.1 adalah sebagai berikut:
Momen Inersia :
Balok (T Model) : 0,35 Ig
Balok (Rectangular Model) : 0,70 Ig
Kolom : 0,70 Ig
Pelat lantai : 0,25 Ig
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
BAB II ARCHITECTURAL PLAN
2.1 Denah Rencana Arsitektural

Denah Lantai 1
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Denah Lantai 2
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Denah Lantai Top Roof


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Denah Lantai Roof


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
BAB III PERHITUNGAN STRUKTUR ATAS
3.1 Modelling
3.1.1 3D View model

3D Modelling
3.1.2 Column Plan
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.1.3 Floor Plan

Denah Struktur Lantai 1


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Denah Struktur Lantai 2


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Denah Struktur Lantai Atap Elv. + 9.65


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Denah Struktur Lantai Atap Elv. + 11.20


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Denah Struktur Lantai Atap Elv. + 12.20


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Rencana Rangka Atap Baja


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.1.4 Section Plan

Section 1

Section 2
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Section 3

Section 4
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Section 5

Section 6
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Section 7

Section 8
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Section 9

Section 10
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Section 11

Section A
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Section B

Section D
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Section F

Section H
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Section I

3.2 Material Properties


TABLE: Material Properties - Concrete Data
Fc SFc SCap FinalSlope FAngle DAngle
Material LtWtConc SSCurveOpt SSHysType
MPa mm/mm mm/mm deg deg
K300 24.9 No Simple Takeda 0.002219 0.005 -0.1 0 0

TABLE: Material Properties - Rebar Data


Fy Fu Fye Fue SHard SCap FinalSlop
Material SSCurveOpt SSHysType
MPa MPa MPa MPa mm/mm mm/mm e
FY420 420 500 462 550 Simple Kinematic 0.01 0.09 -0.1

TABLE: Material Properties - Steel Data


Fy Fu Fye Fue SHard SMax SRup
Material SSCurveOpt SSHysType FinalSlope
MPa MPa MPa MPa mm/mm mm/mm mm/mm
BJ37 240 370 240 370 Simple Kinematic 0.015 0.11 0.17 -0.1
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.3 Frame Section Properties
TABLE: Frame Section Property Definitions - Summary
Name Material Shape Color Area J I33 I22 As2 As3 S33Pos S33Neg
mm² mm⁴ mm⁴ mm⁴ mm² mm² mm³ mm³
B12X40 K300 Concrete Rectangular Red 48000 186883793.3 640000000 57600000 40000 40000 3200000 3200000
B20X30 K300 Concrete Rectangular Gray8Dark 60000 469530864.2 450000000 200000000 50000 50000 3000000 3000000
B20X40 K300 Concrete Rectangular Blue 80000 732416666.7 1066666667 266666666.7 66666.7 66666.7 5333333.3 5333333.3
B25X50 K300 Concrete Rectangular Magenta 125000 1788126628 2604166667 651041666.7 104166.7 104166.7 10416666.7 10416666.7
B30X50 K300 Concrete Rectangular Red 150000 2817370800 3125000000 1125000000 125000 125000 12500000 12500000
B45X27.5 K300 Concrete Rectangular Magenta 123750 1932470566 779882812.5 2088281250 103125 103125 5671875 5671875
CNP150.50 BJ37 Steel Channel Red 779.5 2609.4 2513937.6 170348.9 468.1 286.6 33519.2 33519.2
K1 - 40X50 K300 Concrete Rectangular Magenta 200000 5474167467 4166666667 2666666667 166666.6 166666.6 16666666.7 16666666.7
K1.A - 50X50 K300 Concrete Rectangular Cyan 250000 8802083333 5208333333 5208333333 208333.3 208333.3 20833333.3 20833333.3
K1.A.P - 50X50 K300 Concrete Rectangular Green 250000 8802083333 5208333333 5208333333 208333.3 208333.3 20833333.3 20833333.3
K1.P - 40X50 K300 Concrete Rectangular Red 200000 5474167467 4166666667 2666666667 166666.6 166666.6 16666666.7 16666666.7
K2 - 40X40 K300 Concrete Rectangular Yellow 160000 3605333333 2133333333 2133333333 133333.3 133333.3 10666666.7 10666666.7
K2.P - 40X40 K300 Concrete Rectangular Green 160000 3605333333 2133333333 2133333333 133333.3 133333.3 10666666.7 10666666.7
K3 - 40X50 K300 Concrete Rectangular Green 200000 5474167467 4166666667 2666666667 166666.6 166666.6 16666666.7 16666666.7
K3.P - 40X50 K300 Concrete Rectangular Gray8Dark 200000 5474167467 4166666667 2666666667 166666.6 166666.6 16666666.7 16666666.7
TB25X50 K300 Concrete Rectangular Blue 125000 1788126628 2604166667 651041666.7 104166.7 104166.7 10416666.7 10416666.7
WF150.75 BJ37 Steel I/Wide Flange Magenta 1794 23108.3 6699630.8 495058.4 746.9 1094.6 89328.4 89328.4
WF300 BJ37 Steel I/Wide Flange Gray8Dark 4702 99538.6 72536893.3 5077218.4 1957.7 2693.2 483579.3 483579.3
WF350 BJ37 Steel I/Wide Flange Gray8Dark 6342 194042.3 136290710 9846012.6 2463.4 3710.6 778804.1 778804.1

S22Pos S22Neg Z33 Z22 R33 R22 Area Modifier As2 Modifier As3 Modifier J Modifier I33 Modifier I22 Modifier Mass Modifier Weight Modifier
mm³ mm³ mm³ mm³ mm mm
960000 960000 4800000 1440000 115.5 34.6 1 1 1 0.3 0.7 0.7 1 1
2000000 2000000 4500000 3000000 86.6 57.7 1 1 1 0.3 0.7 0.7 1 1
2666666.7 2666666.7 8000000 4000000 115.5 57.7 1 1 1 0.3 0.7 0.7 1 1
5208333.3 5208333.3 15625000 7812500 144.3 72.2 1 1 1 0.3 0.7 0.7 1 1
7500000 7500000 18750000 11250000 144.3 86.6 1 1 1 0.3 0.7 0.7 1 1
9281250 9281250 8507812.5 13921875 79.4 129.9 1 1 1 0.3 0.7 0.7 1 1
15201.7 4391.1 39984.8 7722.5 56.8 14.8 1 1 1 1 1 1 1 1
13333333.3 13333333.3 25000000 20000000 144.3 115.5 1 1 1 1 0.7 0.7 1 1
20833333.3 20833333.3 31250000 31250000 144.3 144.3 1 1 1 1 0.7 0.7 1 1
20833333.3 20833333.3 31250000 31250000 144.3 144.3 1 1 1 1 0.7 0.7 1 1
13333333.3 13333333.3 25000000 20000000 144.3 115.5 1 1 1 1 0.7 0.7 1 1
10666666.7 10666666.7 16000000 16000000 115.5 115.5 1 1 1 1 0.7 0.7 1 1
10666666.7 10666666.7 16000000 16000000 115.5 115.5 1 1 1 1 0.7 0.7 1 1
13333333.3 13333333.3 25000000 20000000 144.3 115.5 1 1 1 1 0.7 0.7 1 1
13333333.3 13333333.3 25000000 20000000 144.3 115.5 1 1 1 1 0.7 0.7 1 1
5208333.3 5208333.3 15625000 7812500 144.3 72.2 1 1 1 0.3 0.7 0.7 1 1
13201.6 13201.6 102422.1 20822.4 61.1 16.6 1 1 1 1 1 1 1 1
67696.2 67696.2 545369.4 105314 124.2 32.9 1 1 1 1 1 1 1 1
112525.9 112525.9 872321.4 173811.1 146.6 39.4 1 1 1 1 1 1 1 1

3.4 Shell Section Properties


TABLE: Slab Property Definitions
Modeling Property Slab Thickness Notional User Size f11 f22 f12 m11 m22 m12 v13 v23 Mass Weight Color
Name Material
Type Type mm mm Modifier Modifier Modifier Modifier Modifier Modifier Modifier Modifier Modifier Modifier
DP325 Shell-Thin Slab K300 325 100 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 Green
S100 Membrane Slab K300 100 100 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 Blue
S100S Shell-Thin Slab K300 100 100 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 DarkGreen
S120 Membrane Slab K300 120 100 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 4259584
S120DAK Membrane Slab K300 120 100 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 Yellow
S150 Shell-Thin Slab K300 150 100 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 Cyan
S275 Shell-Thin Slab K300 275 100 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 Blue
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.5 Analisa Pembebanan
3.5.1 Beban Merata pada Pelat Lantai
RSNI 1727:2018
Beban Lantai 1
Dead Load (SDL)
Finishing 0.05 mx 2200 Kg/m³ = 110 Kg/m²
Plafon + rangka = 20 Kg/m²
M/E = 20 Kg/m²
Super Dead Load (SDL) = 150 Kg/m²

Beban Hidup ( LL )
Beban Hidup ( LL ) - Lobby, Ruang Tunggu = 500 Kg/m²
Beban Hidup ( LL ) - Ruang Perawatan, R. Jenazah = 200 Kg/m²
Beban Hidup ( LL ) - Koridor = 500 Kg/m²
Beban Hidup ( LL ) - R. Observasi, Ru. Operasi, Toilet Umum = 300 Kg/m²
Beban Hidup ( LL ) - Ruang Dokter, R. Staff = 250 Kg/m²

Beban Lantai 2
Dead Load (SDL)
Finishing 0.05 mx 2200 Kg/m³ = 110 Kg/m²
Plafon + rangka = 20 Kg/m²
M/E = 20 Kg/m²
Super Dead Load (SDL) = 150 Kg/m²

Beban Hidup ( LL )
Beban Hidup ( LL ) - Koridor = 400 Kg/m²
Beban Hidup ( LL ) - R. Kantor, R. Dokter = 250 Kg/m²
Beban Hidup ( LL ) - Ruang Perawatan = 200 Kg/m²
Beban Hidup ( LL ) - R. Rapat/Auditorium = 500 Kg/m²

Beban Lantai Dak Atap


Dead Load (SDL)
Finishing 0.03 mx 2200 Kg/m³ = 66 Kg/m²
Plafon + rangka = 20 Kg/m²
M/E = 20 Kg/m²
Super Dead Load (SDL) = 106 Kg/m²

Beban Hidup ( LL )
Beban Hidup ( LL ) - Dak = 100 Kg/m²

Beban Lantai Tangga


Dead Load (SDL)
Finishing 0.05 mx 2200 Kg/m³ = 110 Kg/m²
Plafon + rangka = 0 Kg/m²
M/E = 0 Kg/m²
Super Dead Load (SDL) = 110 Kg/m²

Beban Hidup ( LL )
Beban Hidup ( LL ) - Tangga = 300 Kg/m²
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.5.2 Beban Dinding Terbagi Rata di Atas Balok Struktur
Beban Dinding terbagi rata di atas balok struktur
a. Lantai 1
Dinding Bata
Baban dinding bata = 200 kg/m²
Tinggi Lantai = 5.2 m
Tinggi Balok Rata-rata = 0.5 m
Baban dinding = 940 kg/m

Dinding ACP
Baban dinding bata = 50 kg/m²
Tinggi Lantai = 5.2 m
Baban dinding = 260 kg/m

b. Lantai 2
Dinding Bata
Baban dinding bata = 200 kg/m²
Tinggi Lantai = 4.45 m
Tinggi Balok Rata-rata = 0.5 m
Baban dinding = 790 kg/m

Beban dinding Parapet Balkon


Baban dinding bata = 200 kg/m²
Tinggi Lantai = 0.3 m
Baban dinding = 60 kg/m

Dinding ACP
Baban dinding bata = 50 kg/m²
Tinggi Lantai = 6.75 m
Baban dinding = 338 kg/m

Dinding ACP
Baban dinding bata = 50 kg/m²
Tinggi Lantai = 4.8 m
Baban dinding = 240 kg/m

c. Lantai Atap Elv. + 9.65


Dinding Bata
Baban dinding bata = 200 kg/m²
Tinggi Lantai = 1.55 m
Tinggi Balok Rata-rata = 0.5 m
Baban dinding = 210 kg/m

Dinding Bata
Baban dinding bata = 200 kg/m²
Tinggi Lantai = 2.55 m
Tinggi Balok Rata-rata = 0.5 m
Baban dinding = 410 kg/m

Dinding Bata
Baban dinding bata = 200 kg/m²
Tinggi Lantai = 1m
Baban dinding = 200 kg/m
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.5.3 Beban Rangka Atap
Dead Load ( DL )
Self weight frame ( calculated by program )
Weight of roof ( Kaca+Rangka ) 5.00 kg/m²
CEILING 10.00 kg/m²
ME 10.00 kg/m²
Steel Connection 5.00 kg/m²
30.00 kg/m²
Total Dead Load ( DL ) 30.00 kg/m²
Diambil = 50.00 kg/m²
Live Load( LL )
Total Live Load ( LL ) 100.00 kg/m²

Wind Load ( W )
Beban Angin ATAP 1
Tekanan Angin dasar ( qh ) = 77.00 kg/m² SNI 1727:2013, Pasal 30.2.2
Sudut Kemiringan Atap - 2 Δa = 10 ˚ kemiringan Atap Dua Sisi
Rasio Tinggi terhadap Lebar Bangunan h/L = 0.408

Arah Angi --> 0˚


Coef-1 (Coef Cp Angin Datang) = 0.826
Coef-2 (Coef Cp Angin Pergi) = 0.426
Faktor efek tiup angin, G = 0.85

0˚ 180˚

Distribusi beban angin

Tekanan angin pada pada semua sisi


PAT = qh.G.CP-AD = 54.08 kg/m²
PAH = qh.G.CP-AP = 27.90 kg/m²

Beban Angin ATAP 2


Tekanan Angin dasar ( qh ) = 77.00 kg/m² SNI 1727:2013, Pasal 30.2.2
Sudut Kemiringan Atap - 2 Δa = 10 ˚ kemiringan Atap Dua Sisi
Rasio Tinggi terhadap Lebar Bangunan h/L = 0.408

Arah Angi --> 0˚


Coef-1 (Coef Cp Angin Datang) = 0.826
Coef-2 (Coef Cp Angin Pergi) = 0.426
Faktor efek tiup angin, G = 0.85

0˚ 180˚

Distribusi beban angin


Sudut Kemiringan Atap - 2 Δa = 10 ˚ kemiringan Atap Dua Sisi
Rasio Tinggi terhadap Lebar Bangunan h/L = 0.408

Arah Angi --> 0˚


Coef-1 (Coef Cp Angin Datang) = 0.826
Coef-2 (Coef Cp Angin Pergi) = 0.426
Structure
Calculation Report
Faktor efek tiup angin, G = 0.85
Puskesmas Simpang Pematang, Mesuji

0˚ 180˚

Distribusi beban angin

Tekanan angin pada pada semua sisi


PAT = qh.G.CP-AD = 54.08 kg/m²
PAH = qh.G.CP-AP = 27.90 kg/m²
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.6 Input Pembebanan

3.6.1 Beban Terbagi Rata pada Pelat Lantai (kgf/m2)


1. Pembebanan Lantai 2

Super Imposed Dead Load (SDL)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Live Load (LL)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
2. Pembebanan Lanta Atap + 9.65

Super Imposed Dead Load (SDL)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Live Load (LL)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

3. Pembebanan Lantai Atap + 11.20

Super Imposed Dead Load (SDL)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Live Load (LL)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

4. Pembebanan Lantai Atap + 12.00

Super Imposed Dead Load (SDL)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Live Load (LL)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

5. Beban Dinding Terbagi Rata pada Balok Struktur (kgf/m)

Beban Dinding (SDL) Lantai 1

Beban Dinding (SDL) Lantai 2


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Beban Dinding (SDL) Lantai Atap + 9.65

Beban Dinding (SDL) Lantai Atap + 11.20


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
6. Pembebana Rangka Atap

Superimposed Dead Load (SDL)

Live Load (LL)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Wind Load (WL-1)

Wind Load (WL-2)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.7 Analisa Beban Gempa
3.7.1 Penentuan Respon pektra Desain
Respon Spektrum Design Dihitung dengan mengguanakan website Puskim dengan
mangimputkan data Koordinat atau Nama kota lokasi Proyek tersebut Sebagai safety
perhitungan klasifikasi tanah dikatogorikan dalam situs E (tanah Lunak). Dan dalam
perencanaan data respon Spektrum diinputkan pada software sebagai dasar perhitungan gaya
gempa (beban gempa) dynamic yang bekerja pada struktur.
3.7.2 Design Respon Spektra
Project : PUSKESMAS SIMPANG PEMATANG
Location : MESUJI - LAMPUNG

01. Penentuan Respon Spektra Desain

Lokasi = MESUJI - LAMPUNG


Kategori Resiko (KR) = II
Kelas Situs = Situs SE (Tanah Lunak)
SS = 0.346 (Percepatan Respon Spektral pada Periode Pendek (Dari Peta Gempa))
S1 = 0.192 (Percepatan Respon Spektral pada Periode 1 detik (Dari Peta Gempa))
Fa = 2.13 (Koefisien Situs untuk Periode Pendek (Tabel 6))
Fv = 4.20 (Koefisien Situs untuk Periode Panjang (Tabel 7))
SMS (SS x Fa) = 0.74 (Percepatan Respon Spektral Periode Pendek yang Telah Disesuaikan)
SM1 (S1 x Fv) = 0.81 (Percepatan Respon Spektral Periode 1 detik yang Telah Disesuaikan)

SDS (2/3 SMS ) = 0.4916 (Percepatan Respon Spektral Desain pada Periode Pendek)
SD1 (2/3 SM1) = 0.5376 (Percepatan Respon Spektral Desain pada Periode 1 detik)
T0 (0.2 SD1/SDS ) = 0.22
TS (SD1/SDS ) = 1.09

Tabel 1 Koefisien Situs Fa


Parameter Respon Spektral Percepatan Gempa (MCER) Terpetakan Pada
Kelas Situs Periode Pendek (SS )
SS ≤ 0,25 SS = 0,5 SS = 0,75 SS = 1,0 SS ≥ 1,25 SS ≥ 1,5
SA 0.8 0.8 0.8 0.8 0.8 0.8
SB 0.9 0.9 0.9 0.9 0.9 0.9
SC 1.3 1.3 1.2 1.2 1.2 1.2
SD 1.6 1.4 1.2 1.1 1.0 1.0
SE 2.4 1.7 1.3 1.1 0.9 0.8
SF SS*

Tabel 2 Koefisien Situs Fv


Parameter Respon Spektral Percepatan Gempa (MCER) Terpetakan Pada
Kelas Situs Periode 1 detik (S1)
S1 ≤ 0,1 S1 = 0,2 S1 = 0,3 S1 = 0,4 S1 ≥ 0,5 S1 ≥ 0,6
SA 0.8 0.8 0.8 0.8 0.8 0.8
SB 0.8 0.8 0.8 0.8 0.8 0.8
SC 1.5 1.5 1.5 1.5 1.5 1.4
SD 2.4 2.2 2.0 1.9 1.8 1.7
SE 4.2 3.3 2.8 2.4 2.2 2.0
SF SS*
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.7.3 Penentuan KDS (Kategori Desain Seismik)
Lokasi = MESUJI - LAMPUNG
Kategori Resiko (KR) = II A
SDS = 0.492
SD1 = 0.538

Tabel 6 - Kategori Desain Seismik Berdasarkan Parameter


Respons Percepatan Pada Perioda Pendek (SDS )
Kategori Resiko
Nilai SDS
I atau II atau III IV
SDS < 0.167 A A
0.167 ≤ SDS < 0.33 B C
0.33 ≤ SDS < 0.50 C D
SDS ≤ 0.5 D D
KDS : C 3

Tabel 7 - Kategori Desain Seismik Berdasarkan Parameter


Respons Percepatan Pada Perioda 1 Detik (S D1)
Kategori Resiko
Nilai SD1
I atau II atau III IV
SD1 < 0.167 A A
0.067 ≤ SD1 < 0.133 B C
0.133 ≤ SD1 < 0.20 C D
SD1 ≤ 0.20 D D
KDS : D 4

Untuk perencanaan diambil Kategori Desain Seismik (KDS): D

Code Tingkat Resiko Kegempaan


Rendah Menengah Tinggi
SNI 1726-2019 KDS A,B KDS C KDS D,E,F
Sistem Struktur SRPMB/M/K SRPMM/K SRPMK
SDSB/K SDSB/K SDSK

Sistem struktur bangunan ini ditentukan sebagai Sistem Rangka Beton Bertulang Khusus dengan (SRPMK)
Rangka Pemikul Momen Khusus
Dengan faktor - faktor sistem penahan gaya gempa R 8.0
Cd 5.5
Ω0 3.0

3.7.4 Spectrum Diagram


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

3.7.5 Center of Mass & Rigidity (Pusat Masa & Kekakuan)


Unit : Kg-M
1.0 DL
Story Diaphragm MassX MassY XCM YCM CumMassX CumMassY XCCM YCCM XCR YCR

Elv. 12.20 D1 23209.84 23209.84 10.2273 46.3217 23209.84 23209.84 10.2273 46.3217 9.8487 33.4383
Elv. 11.20 D1 2717.35 2717.35 20.8048 32.086 25927.19 25927.19 11.3358 44.8297 10.9862 32.4936
Elv, 9,65 D1 14638.17 14638.17 9.4852 33.7022 40565.36 40565.36 10.668 40.8143 9.2693 32.1401
2nd FL D1 60721.46 60721.46 10.3289 25.4548 101286.81 101286.81 10.4647 31.6063 9.3162 26.042

3.7.6 Story Shear – Arah X (Dynamic Load Arah X)


Output P VX VY T MX MY
Story Case Type Step Type Loc
Case Kgf Kgf Kgf Kgf-M Kgf-M Kgf-M
Elv. 12.20 SPEC-X LinRespSpec Max Bottom 185.71 14087.07 2884.12 752946.26 11082.57 17846.33
Elv. 11.20 SPEC-X LinRespSpec Max Bottom 359.13 17530.58 3425.2 887251.39 16982.7 50216.39
Elv, 9,65 SPEC-X LinRespSpec Max Bottom 354.63 26028.05 5200.39 1170780.59 36566.37 164899.04
2nd FL SPEC-X LinRespSpec Max Bottom 333.01 42784.67 8097.34 1582191.77 77531.34 376441.19

3.7.7 3Story Shear- Arah Y (Dynamic Load Arah X)


Output P VX VY T MX MY
Story Case Type Step Type Loc
Case Kgf Kgf Kgf Kgf-M Kgf-M Kgf-M
Elv. 12.20 SPEC-Y LinRespSpec Max Bottom 558.51 2844.66 19795.14 152741.14 43202.13 7774.35
Elv. 11.20 SPEC-Y LinRespSpec Max Bottom 578.49 3550.86 23700.74 195414.89 78628.87 13331.38
Elv, 9,65 SPEC-Y LinRespSpec Max Bottom 589.69 5215.38 35568.91 277353.1 236291.73 35722.74
2nd FL SPEC-Y LinRespSpec Max Bottom 666.52 8100.4 55509.48 430961.75 523088.34 78448.15
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.7.8 Static Load Analysis – Arah X
Project = PUSKESMAS SIMP. PEMATANG
Building = Rumah Sakit/Puskesmas
Kategori Desain Seismik = D Mesuji, Lampung
Height of Building ( Hn ) = 12.20 m
n ( number of story ) = 4
x (parameter perioda pendekatan Ct dan x) = 0.90 (SNI 1276-2019 Tabel 18)
Ct = 0.0466 (SNI 1276-2019 Tabel 18)
Ta = Ct hnx = 0.44 sec
Cu = 1.40 (SNI 1276-2019 Tabel 17)
Cu Ta = 0.62 sec
Tx ( Time Period for x direction ) = 0.799 sec (from dynamic analysis)
T used = 0.620 sec

k = 1.15
Total Weight ( Wt ) = 993,624 Kgf
Importance Factor ( I e ) = 1.00
Reduction Factor ( R ) = 8.00
SS = 0.346
S1 = 0.192
SDS (Percepatan Respon Spektral Desain pada Periode Pendek) = 0.49
SD1 (Percepatan Respon Spektral Desain pada Periode 1 detik) = 0.54
Cs max = SD1/T(R/Ie) = 0.11
Cs min ≥ 0.01 = 0.01
Cs min = 0.044SDSIe = 0.02
Cs min = 0.02
0.6.g = 5.89
Cs min = 0.5S1/(R/Ie) = 0.0120 If S1 ≥ 0.6g
Respons Seismic Coeficient Cs = SDS/(R/Ie) = 0.06

C used = 0.0614
Base Shear ( V = Cs Wt ) = 61,058 Kgf
Gravity ( g ) = 9.81 ( m / sec² )
Mass Source From Load :
DL ( Reduction Factor ) = 1.00
LL ( Reduction Factor ) = - ( Input Etabs )

Mass Wi Hi Wi Hik Lateral Load Story Shear


n Story
( Kg ) ( Kgf ) (m) ( Kgf m ) Fi-X ( Kgf ) Vi-X ( Kgf )

4 Elv. 12.20 23,210 227,689 12.2 4,037,493 23,763 23,763.26


3 Elv. 11.20 2,717 26,657 11.2 428,441 2,522 26,284.91
2 Elv, 9,65 14,638 143,600 9.7 1,944,778 11,446 37,731.19
1 2nd FL 60,721 595,678 5.2 3,963,301 23,327 61,057.78
0 1st Floor
Base Shear 993,624 10,374,012 61,058 61,058
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.7.9 Static Load Analysis – Arah Y
Project = PUSKESMAS SIMP. PEMATANG
Building = Rumah Sakit/Puskesmas
Kategori Desain Seismik = D Mesuji, Lampung
Height of Building ( Hn ) = 12.20 m
n ( number of story ) = 4
x (parameter perioda pendekatan Ct dan x) = 0.9 (SNI 1276-2019 Tabel 18)
Ct = 0.0466 (SNI 1276-2019 Tabel 18)
Ta = Ct hnx = 0.44 sec
Cu = 1.40 (SNI 1276-2019 Tabel 17)
Cu Ta = 0.62 sec
Tx ( Time Period for x direction ) = 0.651 sec (from dynamic analysis)
T used = 0.620 sec

k = 1.15
Total Weight ( Wt ) = 993,624 Kgf
Importance Factor ( I e ) = 1.00
Reduction Factor ( R ) = 8.00
SS = 0.35
S1 = 0.19
SDS (Percepatan Respon Spektral Desain pada Periode Pendek) = 0.49
SD1 (Percepatan Respon Spektral Desain pada Periode 1 detik) = 0.54
Cs max = SD1/T(R/Ie) = 0.11
Cs min ≥ 0.01 = 0.01
Cs min = 0.044SDSIe = 0.02
Cs min = 0.02
0.6.g = 5.89
Cs min = 0.5S1/(R/Ie) = 0.0120 If S1 ≥ 0.6g
Respons Seismic Coeficient Cs = SDS/(R/Ie) = 0.06

C used = 0.0614
Base Shear ( V = Cs Wt ) = 61,058 Kgf
Gravity ( g ) = 9.81 ( m / sec² )
Mass Source From Load :
DL ( Reduction Factor ) = 1.00
LL ( Reduction Factor ) = - ( Input Etabs )

Mass Wi Hi Wi Hik Lateral Load Story Shear


n Story ( Kgf ) ( Kgf ) (m) ( Kgf m ) Fi-X ( Kgf ) Vi-X ( Kgf )

4 Elv. 12.20 23,210 227,689 12.2 4,037,493 23,763 23,763


3 Elv. 11.20 2,717 26,657 11.2 428,441 2,522 26,285
2 Elv, 9,65 14,638 143,600 9.7 1,944,778 11,446 37,731
1 2nd FL 60,721 595,678 5.2 3,963,301 23,327 61,058
0 1st Floor -
Base Shear 993,624 10,374,012 61,058 61,058
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.7.10 Dynamic Load Distribution
Project = PUSKESMAS SIMP. PEMATANG
Building = Rumah Sakit/Puskesmas
KDS = D
Height of Building ( H ) = 12.20
Tx ( Time Period for x direction ) = 0.80
Ty ( Time Period for y direction ) = 0.65

Story Shear Story Shear


Lateral Load Lateral Load
n Story Total Total
Fi-X ( Kgf ) Vi-X ( Kgf ) Fi-Y ( Kgf ) Vi-Y ( Kgf )

4 Elv. 12.20 14,087 14,087 19,795 19,795


3 Elv. 11.20 3,444 17,531 3,906 23,701
2 Elv, 9,65 8,497 26,028 11,868 35,569
1 2nd FL 16,757 42,785 19,941 55,509
0 1st Floor - -

BASE SHEAR 42,785 42,785 55,509 55,509

3.7.11 Lateral Load Distribution - Arah X


Static Total Base Shear ( X - Direction ) = 61,058
Dynamic Total Base Shear ( X - Direction ) = 42,785
Scale Factor = 1.43 >1 Syarat > 1.0
Scale Factor = 1.43 OK

Dynamic Static Scaled Design


Story Story Dynamic Lateral Load Dibulatkan
Story
Shear Shear Story Shear ( Fi-X )
( Kgf ) ( Kgf ) ( Kgf ) ( Kgf ) ( Kgf )

Elv. 12.20 14,087 23,763 20,104 20,104 20,200


Elv. 11.20 17,531 26,285 25,018 4,914 5,000
Elv, 9,65 26,028 37,731 37,144 12,127 12,200
2nd FL 42,785 61,058 61,058 23,913 24,000
1st Floor
Base Shear 42,785 61,058 61,058 61,058 61,400

3.7.12 Lateral Load Distribution - Arah Y


Static Total Base Shear ( Y - Direction ) = 61,058
Dynamic Total Base Shear ( Y - Direction ) = 55,509
Scale Factor = 1.10 >1 Syarat > 1.0
Scale Factor = 1.10 OK

Dynamic Static Scaled Design


Story Story Dynamic Lateral Load Dibulatkan
Story
Shear Shear Story Shear ( Fi-Y )
( Kgf ) ( Kgf ) ( Kgf ) ( Kgf ) ( Kgf )

Elv. 12.20 19,795 23,763 21,774 21,774 21,800


Elv. 11.20 23,701 26,285 26,070 4,296 4,300
Elv, 9,65 35,569 37,731 39,124 13,054 13,100
2nd FL 55,509 61,058 61,058 21,934 22,000
1st Floor ( Taraf Penjepitan )
Base Shear 23,701 26,285 61,058 61,058 61,200
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.7.13 P-∆ Effect
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.8 Output Design
3.8.1 Column Reaction
Column Reaction Combinasi Pondasi 1 = 1.0DL + 1.0SDL + 1.0LL
Unique FX FY FZ MX MY MZ
Story Label Output Case Case Type
Name tonf tonf tonf tonf-m tonf-m tonf-m
BASE 1 20 COMBPOND1 Combination 0.8088 1.9401 13.4701 -0.0578 -0.0893 0.0103
BASE 2 27 COMBPOND1 Combination -0.4088 -0.2101 17.9184 -0.6199 -0.344 0.009
BASE 3 33 COMBPOND1 Combination -0.1719 -0.2703 17.2984 -0.5257 -0.2242 -0.0192
BASE 4 39 COMBPOND1 Combination -0.0349 1.7278 20.3819 -0.3813 -0.1331 -0.0168
BASE 5 45 COMBPOND1 Combination 0.4015 1.6972 20.2428 -0.3598 0.0557 -0.0119
BASE 6 51 COMBPOND1 Combination -1.2234 1.7193 17.46 -0.0382 -0.2492 -0.0153
BASE 14 57 COMBPOND1 Combination 0.7591 -0.7103 21.5982 0.3109 -0.026 -0.0037
BASE 15 63 COMBPOND1 Combination -0.2457 0.9851 27.0881 -0.4058 -0.2431 -0.0038
BASE 16 69 COMBPOND1 Combination -0.0549 0.8452 26.0631 -0.2852 -0.1381 -0.0088
BASE 17 75 COMBPOND1 Combination 0.0911 0.2334 32.2445 -0.0607 -0.0355 -0.0077
BASE 18 81 COMBPOND1 Combination 0.7337 0.2238 31.8388 -0.0296 0.2306 -0.0098
BASE 19 87 COMBPOND1 Combination -1.4396 -0.5178 29.499 0.3672 -0.1612 -0.0114
BASE 27 93 COMBPOND1 Combination 0.7656 -0.0506 20.4704 0.0405 -0.0041 -0.0056
BASE 28 99 COMBPOND1 Combination -0.2338 0.2284 25.6973 -0.14 -0.2203 -0.0068
BASE 29 105 COMBPOND1 Combination -0.0583 -0.1373 24.5464 0.077 -0.1213 -0.0041
BASE 30 111 COMBPOND1 Combination 0.0841 -1.8829 27.5028 0.2301 -0.0245 -0.0024
BASE 31 117 COMBPOND1 Combination 0.66 -1.9361 27.3209 0.2819 0.2153 -0.0113
BASE 32 123 COMBPOND1 Combination -1.3418 -0.0828 27.2959 0.1748 -0.1513 -0.0111
BASE 49 153 COMBPOND1 Combination 0.7403 -0.0204 45.5215 -0.071 -0.21 -0.0098
BASE 51 129 COMBPOND1 Combination -0.2306 -0.0744 44.7106 -0.0478 -0.2027 -0.0063
BASE 52 135 COMBPOND1 Combination -0.0789 1.627 53.4794 -0.1891 -0.1163 -0.0072
BASE 53 141 COMBPOND1 Combination 0.0311 2.2377 54.9814 -0.5126 -0.0421 -0.0041
BASE 54 147 COMBPOND1 Combination 0.3801 2.2197 49.4723 -0.4483 0.1132 -0.0061
BASE 56 159 COMBPOND1 Combination -1.0087 -0.3251 58.4939 0.1694 0.0103 -0.012
BASE 73 165 COMBPOND1 Combination 1.0531 -1.6797 51.224 0.3181 -0.1245 -0.0232
BASE 75 171 COMBPOND1 Combination -0.4475 0.2128 32.5693 -0.0339 -0.4089 -0.0648
BASE 77 177 COMBPOND1 Combination -0.3116 0.2482 53.8134 -0.0336 -0.2507 0.0008
BASE 78 183 COMBPOND1 Combination -0.0946 -2.0142 53.831 0.2752 -0.1 -0.0033
BASE 79 189 COMBPOND1 Combination 0.4381 -1.9924 40.3009 0.3345 0.1373 -0.011
BASE 81 195 COMBPOND1 Combination -1.2018 -0.0957 70.7618 0.1629 -0.16 -0.0108
BASE 90 201 COMBPOND1 Combination 3.5759 -0.3339 30.2023 0.1313 1.0518 0.0313
BASE 91 207 COMBPOND1 Combination -1.3052 0.93 22.3835 -0.1789 -0.1275 -0.0364
BASE 100 213 COMBPOND1 Combination 0.9438 1.1083 54.5236 -0.1546 0.0315 0.0065
BASE 104 219 COMBPOND1 Combination -0.4607 -1.3886 36.2111 0.1609 -0.2536 0.0153
BASE 106 225 COMBPOND1 Combination -0.1236 -2.4034 52.1876 0.3237 -0.1144 -0.012
BASE 107 231 COMBPOND1 Combination 0.0048 0.3271 50.7065 -0.0116 -0.0452 -0.0118
BASE 108 237 COMBPOND1 Combination 0.1693 0.6254 37.5696 -0.0508 0.0472 -0.0079
BASE 110 243 COMBPOND1 Combination -0.8468 0.3862 62.6947 0.1222 -0.1649 -0.008
BASE 128 220 COMBPOND1 Combination 0.9212 -0.0358 54.8583 0.1538 0.0889 -0.0095
BASE 130 255 COMBPOND1 Combination -0.4364 0.3743 38.4218 0.009 -0.1957 -0.0081
BASE 132 267 COMBPOND1 Combination 0.0231 0.1963 49.6148 0.1362 -0.0403 -0.0082
BASE 133 273 COMBPOND1 Combination 0.0115 -0.3709 47.6313 0.2979 -0.0044 -0.0049
BASE 134 279 COMBPOND1 Combination 0.2772 0.0031 34.3534 0.0659 0.1151 -0.0044
BASE 136 285 COMBPOND1 Combination -0.8668 -0.2714 61.637 0.1231 -0.121 -0.0076
BASE 150 291 COMBPOND1 Combination 0.0412 0.1652 52.6799 0.0822 0.0243 -0.0084
BASE 153 297 COMBPOND1 Combination 0.1652 0.1184 34.3452 0.1552 0.041 -0.0109
BASE 154 303 COMBPOND1 Combination 0.0095 -1.382 45.4542 0.8381 0.0164 -0.0101
BASE 155 309 COMBPOND1 Combination 0.0903 -1.0216 45.7586 0.6921 0.0534 -0.0001
BASE 156 315 COMBPOND1 Combination 0.3484 0.3176 29.9087 -0.0646 0.1541 -0.0013
BASE 158 321 COMBPOND1 Combination -0.3789 0.3163 67.0138 -0.0636 0.0288 -0.0086
BASE 181 351 COMBPOND1 Combination 0.8755 -1.2658 62.0211 0.2876 -0.0476 0.0036
BASE 188 327 COMBPOND1 Combination -0.2185 -0.509 52.6976 0.2714 -0.107 -0.0262
BASE 193 333 COMBPOND1 Combination -0.0055 0.178 54.926 1.1865 0.0109 -0.0184
BASE 201 339 COMBPOND1 Combination 0.1487 0.0577 57.7211 0.9511 0.1074 0.0135
BASE 207 345 COMBPOND1 Combination 0.5466 -0.5668 50.6637 -0.0227 0.2874 0.0104
BASE 214 357 COMBPOND1 Combination -0.9724 0.4282 67.2579 -0.2966 0.3038 -0.0339
BASE 527 363 COMBPOND1 Combination 1.6545 0.5946 38.0432 0.0096 -0.1719 -0.3155
BASE 534 369 COMBPOND1 Combination -1.4239 -0.1192 20.7023 2.8028 -0.6184 0.185
BASE 537 375 COMBPOND1 Combination -0.355 0.155 18.4831 0.9758 -0.2565 0.0066
BASE 541 381 COMBPOND1 Combination -0.2232 0.1681 15.0831 2.4925 -0.1641 0.0195
BASE 545 387 COMBPOND1 Combination -0.1045 0.1303 18.8491 0.8032 -0.0814 0.0453
BASE 548 393 COMBPOND1 Combination 0.9266 0.0184 22.351 2.2616 0.2514 -0.1388
BASE 555 399 COMBPOND1 Combination -1.3718 -1.076 41.9798 -0.1607 -0.0871 0.3627
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Column Reaction Combinasi Pondasi 2 = 1.0DL + 1.0SDL + 1.0LL + 1.0WL-x
Unique FX FY FZ MX MY MZ
Story Label Output Case Case Type
Name tonf tonf tonf tonf-m tonf-m tonf-m
BASE 1 20 COMBPOND2 Combination 0.796 1.929 13.4159 -0.027 -0.1252 0.0135
BASE 2 27 COMBPOND2 Combination -0.4431 -0.2172 17.921 -0.6016 -0.3847 0.0119
BASE 3 33 COMBPOND2 Combination -0.2039 -0.2724 17.2953 -0.5205 -0.2638 -0.0163
BASE 4 39 COMBPOND2 Combination -0.0669 1.7308 20.3861 -0.3892 -0.1727 -0.0139
BASE 5 45 COMBPOND2 Combination 0.3673 1.7042 20.2411 -0.3801 0.0151 -0.009
BASE 6 51 COMBPOND2 Combination -1.2363 1.7318 17.5158 -0.0723 -0.2851 -0.0121
BASE 14 57 COMBPOND2 Combination 0.7423 -0.7283 21.5414 0.3431 -0.073 -0.0008
BASE 15 63 COMBPOND2 Combination -0.2908 0.9736 27.0996 -0.3862 -0.2964 -0.0012
BASE 16 69 COMBPOND2 Combination -0.097 0.842 26.0608 -0.2796 -0.19 -0.0062
BASE 17 75 COMBPOND2 Combination 0.0489 0.2381 32.2463 -0.0691 -0.0874 -0.0051
BASE 18 81 COMBPOND2 Combination 0.6885 0.2347 31.8274 -0.0508 0.1772 -0.0071
BASE 19 87 COMBPOND2 Combination -1.4563 -0.4971 29.5545 0.3312 -0.2082 -0.0084
BASE 27 93 COMBPOND2 Combination 0.7451 -0.0728 20.403 0.0742 -0.0613 -0.0029
BASE 28 99 COMBPOND2 Combination -0.2884 0.2118 25.7155 -0.1182 -0.285 -0.0043
BASE 29 105 COMBPOND2 Combination -0.1093 -0.1439 24.548 0.0837 -0.1842 -0.0016
BASE 30 111 COMBPOND2 Combination 0.0332 -1.8761 27.5034 0.221 -0.0875 0.0001
BASE 31 117 COMBPOND2 Combination 0.6059 -1.9223 27.3017 0.2601 0.1508 -0.0088
BASE 32 123 COMBPOND2 Combination -1.3627 -0.0575 27.367 0.1369 -0.2084 -0.0084
BASE 49 153 COMBPOND2 Combination 0.7235 -0.0293 45.4173 -0.0304 -0.2937 -0.0062
BASE 51 129 COMBPOND2 Combination -0.2606 -0.0923 44.94 -0.0223 -0.2525 -0.0028
BASE 52 135 COMBPOND2 Combination -0.114 1.6329 54.0267 -0.1836 -0.1675 -0.0044
BASE 53 141 COMBPOND2 Combination -0.0042 2.2378 54.7326 -0.5213 -0.0933 -0.0014
BASE 54 147 COMBPOND2 Combination 0.3499 2.227 49.302 -0.4698 0.0633 -0.0034
BASE 56 159 COMBPOND2 Combination -1.0262 -0.3082 58.7829 0.1216 -0.0733 -0.0067
BASE 73 165 COMBPOND2 Combination 0.9071 -1.726 51.6427 0.3573 -0.2637 0.0212
BASE 75 171 COMBPOND2 Combination -0.4466 0.1927 33.0188 -0.0027 -0.5105 -0.0741
BASE 77 177 COMBPOND2 Combination -0.4662 0.2377 55.343 -0.0267 -0.3716 0.0043
BASE 78 183 COMBPOND2 Combination -0.203 -2.0074 53.1192 0.2659 -0.1989 -0.0006
BASE 79 189 COMBPOND2 Combination 0.3813 -1.9789 40.2617 0.3124 0.0537 -0.0083
BASE 81 195 COMBPOND2 Combination -1.2534 -0.0728 70.4518 0.1225 -0.2395 -0.0077
BASE 90 201 COMBPOND2 Combination 3.3412 -0.3017 29.7611 0.1474 0.8463 -0.0288
BASE 91 207 COMBPOND2 Combination -1.567 0.9215 22.9078 -0.1476 -0.3005 -0.0413
BASE 100 213 COMBPOND2 Combination 0.9138 1.0922 55.4241 -0.1246 -0.0498 0.0108
BASE 104 219 COMBPOND2 Combination -0.5163 -1.4269 36.2707 0.1935 -0.3403 0.0168
BASE 106 225 COMBPOND2 Combination -0.2066 -2.4035 53.8385 0.3289 -0.2044 -0.0094
BASE 107 231 COMBPOND2 Combination -0.0787 0.3314 49.9297 -0.0201 -0.1352 -0.0093
BASE 108 237 COMBPOND2 Combination 0.121 0.637 37.5268 -0.0725 -0.0368 -0.0053
BASE 110 243 COMBPOND2 Combination -0.8857 0.4087 62.353 0.0819 -0.2464 -0.0051
BASE 128 220 COMBPOND2 Combination 0.8873 -0.0494 55.8129 0.1865 -0.0053 -0.0066
BASE 130 255 COMBPOND2 Combination -0.5069 0.3555 38.4611 0.0329 -0.2969 -0.0054
BASE 132 267 COMBPOND2 Combination -0.0711 0.1922 51.2593 0.1419 -0.1435 -0.0055
BASE 133 273 COMBPOND2 Combination -0.0824 -0.3661 46.8485 0.2894 -0.1071 -0.0023
BASE 134 279 COMBPOND2 Combination 0.2145 0.0159 34.3102 0.0437 0.0173 -0.0017
BASE 136 285 COMBPOND2 Combination -0.9081 -0.2488 61.3037 0.0826 -0.2138 -0.0046
BASE 150 291 COMBPOND2 Combination 0.0035 0.149 53.5664 0.1166 -0.0808 -0.0055
BASE 153 297 COMBPOND2 Combination 0.0827 0.103 34.3906 0.1774 -0.073 -0.0082
BASE 154 303 COMBPOND2 Combination -0.0944 -1.3771 47.0021 0.8415 -0.0989 -0.0074
BASE 155 309 COMBPOND2 Combination -0.0132 -1.0212 45.0199 0.6848 -0.0616 0.0026
BASE 156 315 COMBPOND2 Combination 0.2715 0.3333 29.8637 -0.0882 0.0425 0.0014
BASE 158 321 COMBPOND2 Combination -0.4217 0.3381 66.7162 -0.104 -0.0752 -0.0056
BASE 181 351 COMBPOND2 Combination 0.839 -1.2773 61.9408 0.3277 -0.2577 0.0088
BASE 188 327 COMBPOND2 Combination -0.3292 -0.5158 52.9302 0.2922 -0.2346 -0.0233
BASE 193 333 COMBPOND2 Combination -0.1067 0.1701 55.4728 1.1892 -0.1114 -0.0158
BASE 201 339 COMBPOND2 Combination 0.0476 0.0622 57.4736 0.9448 -0.0148 0.016
BASE 207 345 COMBPOND2 Combination 0.4368 -0.5622 50.488 -0.0459 0.1602 0.0133
BASE 214 357 COMBPOND2 Combination -1.0096 0.4455 67.5249 -0.344 0.0943 -0.0287
BASE 527 363 COMBPOND2 Combination 1.6588 0.577 37.9469 0.0266 -0.2284 -0.3144
BASE 534 369 COMBPOND2 Combination -1.4857 -0.1188 20.3762 2.8022 -0.6878 0.1853
BASE 537 375 COMBPOND2 Combination -0.4426 0.1542 18.4836 0.9762 -0.3314 0.0066
BASE 541 381 COMBPOND2 Combination -0.308 0.1683 15.0832 2.4922 -0.2377 0.0199
BASE 545 387 COMBPOND2 Combination -0.1919 0.1339 18.8496 0.8005 -0.1561 0.0454
BASE 548 393 COMBPOND2 Combination 0.8658 0.0189 22.6799 2.2602 0.1825 -0.1384
BASE 555 399 COMBPOND2 Combination -1.369 -1.0605 42.074 -0.1805 -0.1433 0.3645
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Column Reaction Combinasi Pondasi 2 = 1.0DL + 1.0SDL + 1.0LL + 1.0WL-y
Unique FX FY FZ MX MY MZ
Story Label Output Case Case Type
Name tonf tonf tonf tonf-m tonf-m tonf-m
BASE 1 20 COMBPOND3 Combination 0.8217 1.951 13.5245 -0.0885 -0.0532 0.0071
BASE 2 27 COMBPOND3 Combination -0.3744 -0.203 17.9158 -0.6381 -0.3031 0.0062
BASE 3 33 COMBPOND3 Combination -0.1397 -0.2683 17.3015 -0.5307 -0.1844 -0.022
BASE 4 39 COMBPOND3 Combination -0.0027 1.7246 20.3777 -0.3732 -0.0934 -0.0196
BASE 5 45 COMBPOND3 Combination 0.4358 1.6902 20.2445 -0.3395 0.0965 -0.0147
BASE 6 51 COMBPOND3 Combination -1.2104 1.7068 17.4041 -0.0039 -0.2131 -0.0185
BASE 14 57 COMBPOND3 Combination 0.776 -0.6925 21.6551 0.2787 0.0213 -0.0066
BASE 15 63 COMBPOND3 Combination -0.2005 0.9966 27.0763 -0.4253 -0.1895 -0.0065
BASE 16 69 COMBPOND3 Combination -0.0126 0.8483 26.065 -0.2905 -0.086 -0.0115
BASE 17 75 COMBPOND3 Combination 0.1333 0.2285 32.2422 -0.0521 0.0166 -0.0104
BASE 18 81 COMBPOND3 Combination 0.7791 0.2128 31.8501 -0.0084 0.2842 -0.0124
BASE 19 87 COMBPOND3 Combination -1.4229 -0.5386 29.4433 0.4033 -0.1139 -0.0143
BASE 27 93 COMBPOND3 Combination 0.7862 -0.0291 20.5388 0.0071 0.0533 -0.0083
BASE 28 99 COMBPOND3 Combination -0.179 0.2444 25.6795 -0.1615 -0.1553 -0.0092
BASE 29 105 COMBPOND3 Combination -0.0072 -0.1324 24.5471 0.071 -0.0581 -0.0066
BASE 30 111 COMBPOND3 Combination 0.1353 -1.8915 27.5046 0.2399 0.0386 -0.0048
BASE 31 117 COMBPOND3 Combination 0.7143 -1.9501 27.3406 0.3038 0.28 -0.0138
BASE 32 123 COMBPOND3 Combination -1.3208 -0.1086 27.2251 0.213 -0.0941 -0.0138
BASE 49 153 COMBPOND3 Combination 0.7585 -0.0102 45.8148 -0.1112 -0.1265 -0.0134
BASE 51 129 COMBPOND3 Combination -0.2014 -0.0568 44.536 -0.073 -0.1529 -0.0098
BASE 52 135 COMBPOND3 Combination -0.043 1.6254 53.2315 -0.1945 -0.0646 -0.01
BASE 53 141 COMBPOND3 Combination 0.0668 2.242 55.5301 -0.5039 0.0097 -0.0068
BASE 54 147 COMBPOND3 Combination 0.413 2.2126 49.6968 -0.4269 0.1644 -0.0087
BASE 56 159 COMBPOND3 Combination -0.9929 -0.3408 58.3928 0.2173 0.0961 -0.0174
BASE 73 165 COMBPOND3 Combination 1.2011 -1.6349 51.3513 0.2795 0.0115 -0.0673
BASE 75 171 COMBPOND3 Combination -0.4514 0.2328 32.128 -0.0647 -0.3106 -0.0555
BASE 77 177 COMBPOND3 Combination -0.1605 0.2557 53.0935 -0.0401 -0.1316 -0.0027
BASE 78 183 COMBPOND3 Combination 0.013 -2.0242 55.3513 0.2849 -0.0013 -0.006
BASE 79 189 COMBPOND3 Combination 0.5001 -2.0062 40.3418 0.3567 0.2233 -0.0138
BASE 81 195 COMBPOND3 Combination -1.1564 -0.1192 71.6612 0.2033 -0.0796 -0.0139
BASE 90 201 COMBPOND3 Combination 3.8101 -0.366 30.7037 0.1153 1.2549 0.0911
BASE 91 207 COMBPOND3 Combination -1.048 0.9386 21.8652 -0.2097 0.0423 -0.0317
BASE 100 213 COMBPOND3 Combination 0.9804 1.1249 54.2075 -0.1848 0.1119 0.0022
BASE 104 219 COMBPOND3 Combination -0.4114 -1.3512 36.1507 0.1288 -0.1695 0.0137
BASE 106 225 COMBPOND3 Combination -0.0407 -2.4026 51.3965 0.3182 -0.0245 -0.0145
BASE 107 231 COMBPOND3 Combination 0.0889 0.3237 52.3421 -0.0032 0.0454 -0.0144
BASE 108 237 COMBPOND3 Combination 0.2247 0.6139 37.6133 -0.0291 0.1345 -0.0105
BASE 110 243 COMBPOND3 Combination -0.8143 0.3639 63.6521 0.1625 -0.082 -0.011
BASE 128 220 COMBPOND3 Combination 0.9622 -0.022 54.5214 0.1211 0.182 -0.0124
BASE 130 255 COMBPOND3 Combination -0.373 0.3927 38.3818 -0.0148 -0.0973 -0.0109
BASE 132 267 COMBPOND3 Combination 0.1172 0.2 48.8313 0.1305 0.0626 -0.0109
BASE 133 273 COMBPOND3 Combination 0.1061 -0.3761 49.2748 0.3064 0.0991 -0.0076
BASE 134 279 COMBPOND3 Combination 0.3474 -0.0096 34.3965 0.0881 0.2164 -0.0071
BASE 136 285 COMBPOND3 Combination -0.8325 -0.2941 62.5874 0.1635 -0.0267 -0.0106
BASE 150 291 COMBPOND3 Combination 0.0853 0.1824 52.3823 0.0475 0.1285 -0.0114
BASE 153 297 COMBPOND3 Combination 0.2414 0.1344 34.2998 0.133 0.1525 -0.0135
BASE 154 303 COMBPOND3 Combination 0.1132 -1.3829 44.7165 0.8337 0.1317 -0.0127
BASE 155 309 COMBPOND3 Combination 0.1946 -1.0179 47.3102 0.6985 0.1692 -0.0027
BASE 156 315 COMBPOND3 Combination 0.4326 0.3026 29.9524 -0.0412 0.269 -0.004
BASE 158 321 COMBPOND3 Combination -0.3428 0.2953 67.8934 -0.0235 0.1342 -0.0116
BASE 181 351 COMBPOND3 Combination 0.9133 -1.2557 62.2899 0.247 0.1621 -0.0016
BASE 188 327 COMBPOND3 Combination -0.1088 -0.5025 52.5197 0.2505 0.0203 -0.0291
BASE 193 333 COMBPOND3 Combination 0.0963 0.1815 54.6804 1.183 0.1336 -0.0209
BASE 201 339 COMBPOND3 Combination 0.2499 0.049 58.2697 0.9567 0.2301 0.0109
BASE 207 345 COMBPOND3 Combination 0.6584 -0.5718 50.8943 0.0002 0.4157 0.0074
BASE 214 357 COMBPOND3 Combination -0.9363 0.41 67.1834 -0.2495 0.515 -0.0391
BASE 527 363 COMBPOND3 Combination 1.6502 0.6127 38.1398 -0.0076 -0.1154 -0.3166
BASE 534 369 COMBPOND3 Combination -1.3621 -0.1194 21.0287 2.8036 -0.549 0.1847
BASE 537 375 COMBPOND3 Combination -0.2673 0.1575 18.483 0.9746 -0.1815 0.0067
BASE 541 381 COMBPOND3 Combination -0.1383 0.1681 15.0834 2.493 -0.0904 0.0191
BASE 545 387 COMBPOND3 Combination -0.0171 0.1282 18.8489 0.805 -0.0066 0.0452
BASE 548 393 COMBPOND3 Combination 0.9874 0.018 22.022 2.2632 0.3203 -0.1392
BASE 555 399 COMBPOND3 Combination -1.3746 -1.0911 41.8851 -0.1412 -0.0308 0.3609
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Unique FX FY FZ MX MY MZ
Story Label Output Case Case Type
Name tonf tonf tonf tonf-m tonf-m tonf-m
BASE 1 20 COMBPOND4 Combination 1.2969 2.3798 15.0415 1.3064 1.2419 0.1019
BASE 2 27 COMBPOND4 Combination 0.8681 0.1339 18.5945 0.4527 1.1628 0.0894
BASE 3 33 COMBPOND4 Combination 1.0243 0.0081 17.6271 0.3571 1.2427 0.0619
BASE 4 39 COMBPOND4 Combination 1.1612 2.046 20.7494 0.6271 1.3337 0.0642
BASE 5 45 COMBPOND4 Combination 1.6786 2.1161 20.9971 0.9437 1.5625 0.0686
BASE 6 51 COMBPOND4 Combination -0.7364 2.236 18.9315 1.5904 1.0816 0.0764
BASE 14 57 COMBPOND4 Combination 1.1596 -0.0058 22.9321 1.7131 1.0815 0.0795
BASE 15 63 COMBPOND4 Combination 0.8176 1.5473 27.3723 0.7006 1.0116 0.0707
BASE 16 69 COMBPOND4 Combination 0.9381 1.2952 26.1116 0.6216 1.0822 0.0661
BASE 17 75 COMBPOND4 Combination 1.0838 0.748 32.2979 0.9753 1.1844 0.0673
BASE 18 81 COMBPOND4 Combination 1.7929 0.9089 32.1156 1.316 1.4833 0.0648
BASE 19 87 COMBPOND4 Combination -1.0368 0.3203 30.8738 2.0377 0.9451 0.0719
BASE 27 93 COMBPOND4 Combination 1.109 0.5548 21.6131 1.3852 0.9447 0.0778
BASE 28 99 COMBPOND4 Combination 0.677 0.7379 25.992 0.9334 0.8545 0.0678
BASE 29 105 COMBPOND4 Combination 0.7924 0.2486 24.623 0.9455 0.924 0.071
BASE 30 111 COMBPOND4 Combination 0.9345 -1.4396 27.587 1.2234 1.0203 0.0728
BASE 31 117 COMBPOND4 Combination 1.5655 -1.3192 27.6535 1.5888 1.2877 0.0634
BASE 32 123 COMBPOND4 Combination -0.9946 0.6295 28.4049 1.7702 0.7962 0.0721
BASE 49 153 COMBPOND4 Combination 1.0271 0.8046 49.2039 1.5289 1.2915 0.1355
BASE 51 129 COMBPOND4 Combination 0.5491 0.6193 45.614 1.0301 0.7079 0.0711
BASE 52 135 COMBPOND4 Combination 0.6456 2.1326 54.065 0.6579 0.7629 0.0675
BASE 53 141 COMBPOND4 Combination 0.7544 2.8159 55.5929 0.4571 0.8365 0.0707
BASE 54 147 COMBPOND4 Combination 1.1652 3.0795 50.3709 0.8696 1.0246 0.0672
BASE 56 159 COMBPOND4 Combination -0.7192 0.6204 62.2165 2.0539 1.5135 0.138
BASE 73 165 COMBPOND4 Combination 2.7162 -0.3963 58.7772 1.7355 1.4832 0.5731
BASE 75 171 COMBPOND4 Combination -0.092 0.8438 38.1077 1.0689 0.8284 0.0743
BASE 77 177 COMBPOND4 Combination 1.3548 0.6986 54.7768 0.7946 1.1414 0.0788
BASE 78 183 COMBPOND4 Combination 1.0818 -1.4995 54.8594 1.2249 1.059 0.0709
BASE 79 189 COMBPOND4 Combination 1.3361 -1.407 40.5987 1.6376 1.1906 0.0617
BASE 81 195 COMBPOND4 Combination -0.6698 0.6388 72.5856 1.6302 0.783 0.0692
BASE 90 201 COMBPOND4 Combination 6.102 0.9155 36.5985 1.5189 3.3325 0.7736
BASE 91 207 COMBPOND4 Combination 1.7202 1.8919 28.0876 0.9931 1.8342 0.1043
BASE 100 213 COMBPOND4 Combination 1.3187 2.036 57.5286 1.1532 0.9632 0.1047
BASE 104 219 COMBPOND4 Combination 0.3036 -0.6026 37.3879 1.2822 0.7731 0.082
BASE 106 225 COMBPOND4 Combination 0.753 -2.0386 52.643 1.1484 0.9224 0.062
BASE 107 231 COMBPOND4 Combination 0.8902 0.739 51.3098 0.9341 0.9948 0.0625
BASE 108 237 COMBPOND4 Combination 0.927 1.2945 37.8491 1.283 1.0764 0.0645
BASE 110 243 COMBPOND4 Combination -0.445 1.0952 64.3922 1.5614 0.7818 0.0724
BASE 128 220 COMBPOND4 Combination 1.389 0.5574 56.7816 1.3627 1.2029 0.0719
BASE 130 255 COMBPOND4 Combination 0.4594 0.912 38.7201 1.09 1.0174 0.0652
BASE 132 267 COMBPOND4 Combination 1.0651 0.5413 50.2816 0.9502 1.1842 0.0659
BASE 133 273 COMBPOND4 Combination 1.0544 0.0238 48.2781 1.2305 1.2203 0.0697
BASE 134 279 COMBPOND4 Combination 1.1709 0.6804 34.6806 1.4018 1.3275 0.0682
BASE 136 285 COMBPOND4 Combination -0.3993 0.4062 63.6141 1.5424 0.9924 0.0729
BASE 150 291 COMBPOND4 Combination 0.5989 0.7015 55.2717 1.2673 1.3414 0.0733
BASE 153 297 COMBPOND4 Combination 1.2114 0.5885 34.7909 1.2208 1.4723 0.0618
BASE 154 303 COMBPOND4 Combination 1.2451 -0.9999 46.5952 1.6257 1.4651 0.0638
BASE 155 309 COMBPOND4 Combination 1.3263 -0.6016 47.0196 1.5877 1.5026 0.0747
BASE 156 315 COMBPOND4 Combination 1.4047 0.9048 30.3307 1.2421 1.5896 0.0712
BASE 158 321 COMBPOND4 Combination 0.1654 0.9056 69.7734 1.3217 1.3464 0.072
BASE 181 351 COMBPOND4 Combination 1.405 -0.6828 67.1378 1.7137 2.901 0.1543
BASE 188 327 COMBPOND4 Combination 1.3778 -0.0695 54.534 1.2888 1.6855 0.0519
BASE 193 333 COMBPOND4 Combination 1.4381 0.542 55.8523 1.9349 1.7223 0.0556
BASE 201 339 COMBPOND4 Combination 1.5862 0.4464 58.7321 1.7904 1.8176 0.0885
BASE 207 345 COMBPOND4 Combination 2.1447 -0.028 52.5837 1.2211 2.0808 0.0883
BASE 214 357 COMBPOND4 Combination -0.4433 1.0486 72.323 1.3481 3.2531 0.1152
BASE 527 363 COMBPOND4 Combination 1.7393 0.8321 39.5884 0.5855 0.8447 -0.2428
BASE 534 369 COMBPOND4 Combination -0.2959 -0.0451 26.0672 3.2981 0.6307 0.2493
BASE 537 375 COMBPOND4 Combination 1.2332 0.3267 18.6085 1.3459 1.0899 0.051
BASE 541 381 COMBPOND4 Combination 1.3081 0.208 15.14 2.8983 1.1572 0.0657
BASE 545 387 COMBPOND4 Combination 1.4787 0.3315 18.9649 1.2164 1.262 0.0916
BASE 548 393 COMBPOND4 Combination 2.0376 0.1029 27.7819 2.7906 1.4923 -0.0755
BASE 555 399 COMBPOND4 Combination -1.3088 -0.7977 43.5049 0.5032 0.9249 0.4348
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Column Reaction Combinasi Pondasi 5 = 1.0DL + 1.0SDL + 1.0LL + 0.3EQX + 1.0EQY
Unique FX FY FZ MX MY MZ
Story Label Output Case Case Type
Name tonf tonf tonf tonf-m tonf-m tonf-m
BASE 1 20 COMBPOND5 Combination 1.0328 2.6461 14.8101 2.1531 0.5218 0.0499
BASE 2 27 COMBPOND5 Combination 0.1774 0.4784 18.7662 1.5163 0.3477 0.0437
BASE 3 33 COMBPOND5 Combination 0.3775 0.3864 18.0853 1.5523 0.4493 0.0158
BASE 4 39 COMBPOND5 Combination 0.5146 2.3987 21.1747 1.7441 0.5405 0.0182
BASE 5 45 COMBPOND5 Combination 0.9902 2.4197 21.1944 1.8786 0.7485 0.0229
BASE 6 51 COMBPOND5 Combination -1.0022 2.4549 18.4572 2.308 0.3621 0.0243
BASE 14 57 COMBPOND5 Combination 0.9456 0.4345 22.1986 2.5865 0.4903 0.0323
BASE 15 63 COMBPOND5 Combination 0.2497 2.1029 27.2426 1.7983 0.3417 0.0283
BASE 16 69 COMBPOND5 Combination 0.4076 1.9064 26.1014 1.8501 0.4307 0.0235
BASE 17 75 COMBPOND5 Combination 0.5534 1.3179 32.2957 2.1228 0.533 0.0247
BASE 18 81 COMBPOND5 Combination 1.2258 1.4004 31.9543 2.2814 0.8139 0.0225
BASE 19 87 COMBPOND5 Combination -1.2507 0.6846 30.1729 2.7743 0.3543 0.0246
BASE 27 93 COMBPOND5 Combination 0.9282 0.9532 21.1585 2.2321 0.4447 0.0304
BASE 28 99 COMBPOND5 Combination 0.1968 1.2442 25.8817 2.001 0.288 0.0255
BASE 29 105 COMBPOND5 Combination 0.344 0.781 24.7109 2.125 0.3732 0.0282
BASE 30 111 COMBPOND5 Combination 0.4866 -0.9483 27.6639 2.3232 0.4699 0.0302
BASE 31 117 COMBPOND5 Combination 1.0897 -0.8734 27.5946 2.5276 0.7231 0.021
BASE 32 123 COMBPOND5 Combination -1.1791 0.9361 27.7439 2.473 0.2971 0.0247
BASE 49 153 COMBPOND5 Combination 0.8714 1.3068 48.6338 2.548 0.4903 0.0641
BASE 51 129 COMBPOND5 Combination 0.1284 1.2659 45.148 2.0932 0.223 0.0277
BASE 52 135 COMBPOND5 Combination 0.2583 2.8113 54.827 1.8091 0.2964 0.0249
BASE 53 141 COMBPOND5 Combination 0.3683 3.4519 56.3117 1.5292 0.3706 0.0284
BASE 54 147 COMBPOND5 Combination 0.7437 3.6969 50.0505 1.8167 0.5406 0.0255
BASE 56 159 COMBPOND5 Combination -0.871 1.0294 61.0898 2.8839 0.7162 0.0525
BASE 73 165 COMBPOND5 Combination 2.1353 0.4845 58.9569 2.6673 0.8205 0.604
BASE 75 171 COMBPOND5 Combination -0.0446 1.4703 36.3975 2.1439 0.281 0.0801
BASE 77 177 COMBPOND5 Combination 0.5411 1.3204 54.9959 1.9252 0.4465 0.0356
BASE 78 183 COMBPOND5 Combination 0.5059 -0.9285 55.3 2.2738 0.4694 0.0297
BASE 79 189 COMBPOND5 Combination 0.8729 -0.983 40.5213 2.5746 0.6423 0.0203
BASE 81 195 COMBPOND5 Combination -0.9274 0.9556 71.8932 2.2758 0.2919 0.0235
BASE 90 201 COMBPOND5 Combination 4.6775 1.394 33.5964 2.4119 1.9951 0.7026
BASE 91 207 COMBPOND5 Combination -0.0188 2.8404 25.7741 2.1384 0.6787 0.1041
BASE 100 213 COMBPOND5 Combination 1.1071 2.665 58.4425 2.0116 0.4482 0.0727
BASE 104 219 COMBPOND5 Combination -0.126 0.0239 38.3442 2.3663 0.2084 0.0473
BASE 106 225 COMBPOND5 Combination 0.2739 -1.5526 52.4008 2.272 0.3561 0.0198
BASE 107 231 COMBPOND5 Combination 0.4085 1.1973 51.0928 1.9783 0.4279 0.0209
BASE 108 237 COMBPOND5 Combination 0.5045 1.7782 37.7072 2.2425 0.5135 0.0232
BASE 110 243 COMBPOND5 Combination -0.6608 1.3971 63.4697 2.1935 0.2665 0.0265
BASE 128 220 COMBPOND5 Combination 1.1325 0.9392 55.7443 2.1392 0.587 0.0275
BASE 130 255 COMBPOND5 Combination -0.0401 1.4237 38.546 2.1638 0.3456 0.0238
BASE 132 267 COMBPOND5 Combination 0.4878 1.0201 49.9918 2.06 0.5066 0.0236
BASE 133 273 COMBPOND5 Combination 0.4806 0.4662 47.9224 2.2623 0.5435 0.0279
BASE 134 279 COMBPOND5 Combination 0.671 1.1687 34.4893 2.3632 0.6556 0.0268
BASE 136 285 COMBPOND5 Combination -0.656 0.6976 62.5609 2.1651 0.3769 0.027
BASE 150 291 COMBPOND5 Combination 0.2896 1.0287 54.0849 2.0144 0.6048 0.0281
BASE 153 297 COMBPOND5 Combination 0.6229 1.0694 34.724 2.2913 0.6709 0.0207
BASE 154 303 COMBPOND5 Combination 0.5536 -0.4878 46.9803 2.6954 0.6547 0.0216
BASE 155 309 COMBPOND5 Combination 0.6371 -0.1178 47.2286 2.5865 0.6925 0.0333
BASE 156 315 COMBPOND5 Combination 0.8115 1.3265 30.3555 2.1824 0.7864 0.0299
BASE 158 321 COMBPOND5 Combination -0.1389 1.1652 68.4387 1.9301 0.6098 0.0261
BASE 181 351 COMBPOND5 Combination 1.1061 -0.3995 65.5038 2.5801 1.2439 0.0695
BASE 188 327 COMBPOND5 Combination 0.4826 0.3562 54.3615 2.3143 0.6782 0.0076
BASE 193 333 COMBPOND5 Combination 0.6277 0.9998 57.0378 2.9401 0.7602 0.0135
BASE 201 339 COMBPOND5 Combination 0.7791 0.8904 59.8562 2.7363 0.8563 0.047
BASE 207 345 COMBPOND5 Combination 1.25 0.3652 52.2084 2.1164 1.0736 0.0439
BASE 214 357 COMBPOND5 Combination -0.7434 1.2895 72.1514 2.0671 1.5961 0.0301
BASE 527 363 COMBPOND5 Combination 1.7022 0.9985 38.7746 0.9297 0.2764 -0.2753
BASE 534 369 COMBPOND5 Combination -0.9239 0.0075 23.0349 3.7993 -0.067 0.2238
BASE 537 375 COMBPOND5 Combination 0.3449 0.5622 18.7344 1.8424 0.3366 0.0259
BASE 541 381 COMBPOND5 Combination 0.4505 0.2609 15.212 3.431 0.4172 0.0393
BASE 545 387 COMBPOND5 Combination 0.5912 0.5445 19.0839 1.685 0.509 0.0656
BASE 548 393 COMBPOND5 Combination 1.4117 0.1526 24.7459 3.2782 0.7955 -0.1
BASE 555 399 COMBPOND5 Combination -1.3371 -0.68 42.9043 0.79 0.3572 0.4044
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.8.2 Frame Element Force Diagram (Diagram Gaya Dalam)

a. Diagram Gaya Dalam Kolom

Lantai 1

Moment Force Diagram (KN.m)

Axial Force Diagram (KN)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Shear Force Diagram (KN)

Lantai 2

Moment Force Diagram (KN.m)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Axial Force Diagram (KN)

Shear Force Diagram (KN)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Lantai Atap

Moment Force Diagram (KN.m)

Axial Force Diagram (KN)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Shear Force Diagram (KN)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

b. Diagram Gaya Dalam Balok


Lantai 1

Moment Force Diagram (KN.m)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Shear Force Diagram (KN)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Lantai 2

Moment Force Diagram (KN.m)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Shear Force Diagram (KN)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Lantai Atap Elev + 9.65

Moment Force Diagram (KN.m)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Shear Force Diagram (KN)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Lantai Atap + 11.20

Moment Force Diagram (KN.m)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Shear Force Diagram (KN)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Lantai Atap +12.20

Moment Force Diagram (KN.m)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Shear Force Diagram (KN)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.8.3 Concrete Design Output - Kolom
Lantai 1

Column Longitudinal Reinforcing (mm²)

Column Rebar Percentage Reinforcing (%)

Column Shear Reinforcing (mm²/mm)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Lantai 2

Column Longitudinal Reinforcing (mm²)

Column Rebar Percentage Reinforcing (%)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Column Shear Reinforcing (mm²/mm)

Lantai Atap

Column Longitudinal Reinforcing (mm²)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Column Rebar Percentage Reinforcing (%)

Column Shear Reinforcing (mm²/mm)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.8.4 Concrete Design Output - Balok
Lantai 1

Beam Longitudinal Reinforcing (mm²)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Beam Shear Reinforcing (mm²/mm)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Lantai 2

Beam Longitudinal Reinforcing (mm²)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Beam Shear Reinforcing (mm²/mm)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Lantai Atap +9.65

Beam Longitudinal Reinforcing (mm²)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Beam Shear Reinforcing (mm²/mm)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Lantai Atap +11.20

Beam Longitudinal Reinforcing (mm²)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Beam Shear Reinforcing (mm²/mm)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Lantai Atap +12.20

Beam Longitudinal Reinforcing (mm²)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Beam Shear Reinforcing (mm²/mm)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.8.5 Steel Design Output
- Steel Capacity Ratio Balok WF.350.175

PMM Ratio Max = 0.906 < 1.0 …OK!!!

- Steel Capacity Ratio Tangka Atap

PMM Ratio Max = 0.736 < 1.0 …OK!!!


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.8.6 Deflection

∆Ijin = L/240 → Bentang Balok, L = 7010 mm


∆Ijin = 7010/240 = 29.21 mm

Diperoleh: ∆aktual = 9.650 mm < ∆Ijin = 29.21 mm …. OK!!!


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.9 Perhitungan Tulangan Kolom, Balok, Slab
3.9.1 Rekapitulas Gaya Dalam Kolom
Mu Pu Vu
Lantai Tipe
KN.m KN KN
K1.A.P 34.2522 913.413 16.6844
K1.P 36.25 901.686 31.9
Pedestal
K2.P 47.7 553.1 2.96
K3.P 31.66 458.77 35.66
K1.A 53.5 802.43 16.95
Lanta 1 - K1 77.24 767.49 30.91
Lantai 2 K2 60.56 516.46 11.04
K3 42.43 296.09 15.36
K1.A 84.6 529.74 93.01
Lantai 2 - K2 117.43 403.494 14.79
atap K3 84.24 109.58 39.55
K4 157.6 424.04 110.08

Diagram Gaya Dalam Kolom K1.A – 500 mm x 500 mm


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.9.2 Perhitungan Tulangan Lentur Kolom
fy = = 420 Mpa
f'c = = 24.9 Mpa K-300
ß= = 0.85
d' = = 40 mm
φ= = 0.75 SNI 03 -2847-2019, pasal 11.3.(1)
Dimensi (mm) Pu Mu P'u Lihat Tabel
Lantai Tipe e1 Agr . Agr .0,85. f 'c
ρ=rxß
b h (N) (N.mm) r ß
K1.A.P 500 500 913,413 34,252,200 37.499 250000 0.2302 0.0173 0.0120 0.996 0.011952
K1.P 400 500 901,686 36,250,000 40.202 200000 0.2840 0.0228 0.0160 0.996 0.015936
Pedestal
K2.P 400 400 553,100 47,700,000 86.241 160000 0.2178 0.0470 0.0180 0.996 0.017928
K3.P 400 500 458,770 31,660,000 69.011 200000 0.1445 0.0199 0.0120 0.996 0.011952

As min 1% As max Cek Kebutuhan Tulangan Tulangan Yang Tulangan Yang Rebar
Lantai Tipe As Perlu
Agr 8% Agr Tulangan D A n≈ dibutuhkan Rencana Percentage
K1.A.P 2500 20000 2988 OK!!! 19 283.53 11 11D19 12D19 1.36%
K1.P 2000 16000 3187.2 OK!!! 19 283.53 12 12D22 12D19 1.70%
Pedestal
K2.P 1600 12800 2868.48 OK!!! 19 283.53 11 12D19 12D19 2.13%
K3.P 2000 16000 2390.4 OK!!! 19 283.53 9 10D19 12D19 1.70%

fy = = 420 Mpa
f'c = = 24.9 Mpa K-300
ß= = 0.85
d' = = 40 mm
φ= = 0.75 SNI 03 -2847-2019, pasal 11.3.(1)
Dimensi (mm) Pu Mu P'u Lihat Tabel
Lantai Tipe e1 Agr . Agr .0,85. f 'c ρ=rxß
b h (N) (N.mm) r ß
K1.A 500 500 802,430 53,500,000 66.672 250000 0.2022 0.0270 0.0170 0.996 0.016932
Lanta 1 - K1 400 500 767,490 77,240,000 100.640 200000 0.2417 0.0487 0.0210 0.996 0.020916
Lantai 2 K2 400 400 516,460 60,560,000 117.260 160000 0.2033 0.0596 0.0240 0.996 0.023904
K3 400 500 296,090 42,430,000 143.301 200000 0.0933 0.0267 0.0160 0.996 0.015936

As min 1% As max Cek Kebutuhan Tulangan Tulangan Yang Tulangan Yang Rebar
Lantai Tipe As Perlu
Agr 8% Agr Tulangan D A n≈ dibutuhkan Rencana Percentage
K1.A 2500 20000 4233 OK!!! 19 283.53 15 16D19 16D19 1.81%
Lanta 1 - K1 2000 16000 4183.2 OK!!! 19 283.53 15 16D19 16D19 2.27%
Lantai 2 K2 1600 12800 3824.64 OK!!! 19 283.53 14 14D19 16D19 2.84%
K3 2000 16000 3187.2 OK!!! 19 283.53 12 12D16 12D19 1.70%

fy = = 420 Mpa
f'c = = 24.9 Mpa K-300
Vu Tump. = 219,84 KN
ß= = 0.85 = 219.845 N
d' = = 40 mm
φ= = 0.75 SNI 03 -2847-2019, pasal 11.3.(1)
Lantai Tipe
Dimensi (mm) Pu Mu
e1 Agr
P'u KuatLihat
Geser
Tabelnominal/kapasitas penampan
ρ=rxß
b h (N) (N.mm) . Agr .0,85. f 'c r ß
K1.A 500 500 1,019,600 97,600,000 95.724 250000 0.2569 0.0492 0.0180 0.996 0.017928
Lantai 2 - K2 400 500 293,300 125,100,000 426.526 200000 0.0924 0.0788 0.0160 0.996 0.015936
atap K3 400 500 822,200 144,200,000 175.383 200000 0.2590 0.0908 0.0060 0.996 0.005976
K4 500 700 1,102,700 299,300,000 271.425 350000 0.1985 0.0770 0.0080 0.996 0.007968
Vc = 108.186,4 N

As min 1% As max Cek Kebutuhan Tulangan Tulangan Yang Tulangan Yang Rebar
Lantai Tipe As Perlu Kuat GeserPercentage
Ijin
Agr 8% Agr Tulangan D A n≈ dibutuhkan Rencana
K1.A 2500 20000 4482 OK!!! 19 283.53 16 16D19 ØVc = 1.81%
16D19 81.139,8 N
Lantai 2 - K2 2000 16000 3187.2 OK!!! 19 283.53 12 12D19 16D19 2.27%
atap K3 2000 16000 2000 OK!!! 19 283.53 8 8D19 12D19 1.70%
K4 3500 28000 3500 OK!!! 19 283.53 13 13D16 Perhitungan1.13%
14D19 Tulangan Geser Tumpuan
Kebutuhan Tulangan Geser
3.9.3 Perhitungan Tulangan Geser Kolom
Vu Vu/φ b d f'c fy Vc 0.5 φ.Vc Kebutuhan
Lantai Beam Type φ
(N) (N) (mm) (mm) (Mpa) (Mpa) (N) (N) Tulangan Sengkag
K1.A.P 47900.0 0.75 63866.667 500 460 24.9 420 191282.9 71731.10596 >Av min 382565.89846
K1.P 52100.0 0.75 69466.667 400 460 24.9 420 153026.4 57384.88477 >Av min184.939,7 <
306052.71877 2163
Pedestal
K2.P 70200.0 0.75 93600.000 400 360 24.9 420 119759.8 44909.90982 Av min 239519.51904
K3.P 46300.0 0.75 61733.333 400 460 24.9 420 153026.4 57384.88477 Dimana:
>Av min 306052.71877
S ≤ d/4 ≤ 600
S max = 118,75 mm
= 100 mm
Kebutuhan Tulangan Geser

Av = 97,3367 mm²
Digunakan tulangan sengkang D10, sehin
Avtul = 2.As = 157,08 mm²
Vu Tump. = 219,84 KN
= 219.845 N

Kuat Geser nominal/kapasitas penampang

Structure Calculation Report


Puskesmas Simpang Pematang, Mesuji
S rencana Av Dia Seng Av. Use VS S min (mm) S max (mm) Tulangan SengkangVc = Check 108.186,4 N
(mm) (mm²) (mm) (mm²) (N) 16db 48ds 600 mm L0 Luar Lo Vs ≥ Vu/φ
100.00 36.83087842 41.66666667 41.6667 10 157.08 303477.9 304 480 600 D10-100 D10-150 OK!
Kuat Geser Ijin
100.00 29.46470274 33.33333333 33.3333 10 157.08 303477.9 304 480 600 D10-100 D10-150 OK!
100.00 29.46470274 33.33333333 33.3333 10 157.08 237504.4 304 480 600 D10-100 ØVc
D10-150 = OK! 81.139,8 N
100.00 29.46470274 33.33333333 33.3333 10 157.08 303477.9 304 480 600 D10-100 D10-150 OK!
Perhitungan Tulangan Geser Tumpuan
Kebutuhan Tulangan Geser
Vu Tump. = 219,84 KN
Vu Vu/φ b d f'c fy Vc 0.5 φ.Vc Kebutuhan = 219.845 N
Lantai Beam Type φ
(N) (N) (mm) (mm) (Mpa) (Mpa) (N) (N) Tulangan Sengkag
K1.A 50000.0 0.75 66666.667 500 460 24.9 420 191282.9 71731.10596 Kuat Geser nominal/kapasitas
>Av min 382565.89846 penampang
Lanta 1 - K1 67100.0 0.75 89466.667 400 460 24.9 420 153026.4 57384.88477 Av min 184.939,7 <
306052.71877 21637
Lantai 2 K2 93800.0 0.75 125066.667 400 360 24.9 420 119759.8 44909.90982 Av min 239519.51904
K3 69900.0 0.75 93200.000 400 460 24.9 420 153026.4 57384.88477 Dimana:
Av min 306052.71877
S ≤ d/4 ≤ 600
S rencana Av Dia Seng Av. Use VS S min (mm) S max (mm) Tulangan SengkangVc = 108.186,4 N
S max = Check 118,75 mm
(mm) (mm²) (mm) (mm²) (N) 16db 48ds 600 mm L0 Luar Lo Vs ≥ Vu/φ
100.00 36.83087842 41.66666667 41.6667 10 157.08 303477.9 304 480 600 D10-100 D10-150 = OK! 100 mm
Kuat Geser Ijin
100.00 29.46470274 33.33333333 33.3333 10 157.08 303477.9 304 480 600 D10-100 Kebutuhan Tulangan
D10-150 OK! Geser
100.00 29.46470274 33.33333333 33.3333 10 157.08 237504.4 304 480 600 D10-100 ØVc = OK!
D10-150 81.139,8 N
100.00 29.46470274 33.33333333 33.3333 10 157.08 303477.9 304 480 600 D10-100 D10-150 OK!
Perhitungan Tulangan Geser Tumpuan
Kebutuhan Tulangan Geser

Vu Vu/φ b d f'c fy Vc 0.5 φ.Vc Av = 97,3367 mm²


Kebutuhan
Lantai Beam Type φ
(N) (N) (mm) (mm) (Mpa) (Mpa) (N) (N) Digunakan
Tulangan tulangan sengkang D10, sehing
Sengkag
K1.A 47600.0 0.75 63466.667 500 460 24.9 420 191282.9 71731.10596 Avtulmin
>Av = 2.As = 157,08 mm²
382565.89846
Lantai 2 - K2 40800.0 0.75 54400.000 400 460 24.9 420 153026.4 57384.88477 >Av min184.939,7 <
306052.71877 21637
atap K3 41200.0 0.75 54933.333 400 460 24.9 420 153026.4 57384.88477 >Avjarak
min tulangan
306052.71877
Cek
K4 93600.0 0.75 124800.000 500 660 24.9 420 274449.4 102918.54334 Dimana:
>Av min 548898.89779
S ≤ d/4 ≤ 600
S rencana Av Dia Seng Av. Use VS S min (mm) S max (mm) Tulangan Sengkang
S max = Check 118,75 mm
(mm) (mm²) (mm) (mm²) (N) 16db 48ds 600 mm L0 Luar LoVs = Vs ≥ Vu/φ 298.451,3 OK!!!
100.00 36.83087842 41.66666667 41.6667 10 157.08 303477.9 304 480 600 D10-100 D10-150 = OK! 100 mm
100.00 29.46470274 33.33333333 33.3333 10 157.08 303477.9 304 480 600 D10-100 Kebutuhan Tulangan
D10-150 OK! Geser
Sehingga dapat disimpulkan tulangan geser
100.00 29.46470274 33.33333333 33.3333 10 157.08 303477.9 304 480 600 D10-100 D10-150 OK!
100.00 36.83087842 41.66666667 41.6667 10 157.08 435424.7 304 480 600 D10-100 adalah:
D10-150 OK!
Tumpuan Menggunakan sengkan D10-100
Lapangan Menggunakan Sengkang D10-15

Av = 97,3367 mm²
Digunakan tulangan sengkang D10, sehing
Avtul = 2.As = 157,08 mm²

Cek jarak tulangan

Vs = 298.451,3 OK!!!

Sehingga dapat disimpulkan tulangan geser


adalah:
Tumpuan Menggunakan sengkan D10-100
Lapangan Menggunakan Sengkang D10-15
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.9.4 Perhitungan Tulangan Confinement Kolom
c1= Dimensi Sisi Terpanjang Kolom
c2= Dimensi Sisi Terpendek Kolom
Ag = Luas Bruto Penampang Kolom
Ach = Luas Penampang Inti
f'c = Mutu Beton
fyt = Mutu Baja Tul Transversal
s = Jarak Tul Pengekang Kolom
bc = Dimensi Penampang Inti
db = Dia 1 bh tul vertikal

≥ Terbesar C1 atau C2
Lo ≥ 1/6 heff kolom
≥ 450 mm

≤ 1/4 C2
Syarat s di Lo ≤ 6 db
100 mm ≤ s ≤ 150 mm

Gbr. 1 - Gempa Arah Sumbu Kuat Kolom Gbr. 2 - Gempa Arah Sumbu Lemah Kolom Syarat s di ≤ 6 db
Luar Lo 100 mm ≤ s ≤ 150 mm

Syarat Luas Tulangan Pengekang :

1. (Pers. 21-4) 2. (Pers. 21-5)

Arah Sumbu Kuat Kolom


Penampang Lo Luar Lo Tulangan Pengekang
Type Ag Ach f'c fyt bc Ash1 Ash2
C1 C2 L s s Jumlah Dia. Ash(used)
Kolom cek
mm mm cm² cm² Mpa Mpa mm mm mm mm mm² mm² bundel bh mm mm²

K1.A 500 500 2,500 1,764 24.9 420 867 100 OK 200 420 312 224 1 3 10 236 OK

K1 400 500 2,000 1,344 24.9 420 867 100 OK 200 320 278 171 1 3 10 236 OK

K2 400 400 1,600 1,024 24.9 420 867 100 OK 200 320 320 171 1 3 10 236 OK

K3 400 500 2,000 1,344 24.9 420 867 100 OK 201 320 278 171 1 3 10 236 OK

K4 400 500 2,000 1,344 24.9 420 867 100 OK 200 320 278 171 1 3 10 236 OK

Arah Sumbu Lemah Kolom


Tulangan Pengekang Tul. Pengekang Pakai Tul. Pengekang Pakai
bc Ash1 Ash2
Jumlah Dia. Ash(used) di Lo di Luar Lo
mm mm² mm² bundel bh mm mm² Sb. Kuat Sb. Lemah Sb. Kuat Sb. Lemah

420 311.67 224 1 3 10 235.50 OK 1 x 1.5D10-100 1 x 1.5D10-100 1 x 1.5D10-200 1 x 1.5D10-200

420 364.61 224 1 3 10 235.50 OK 1 x 1.5D10-100 1 x 1.5D10-100 1 x 1.5D10-200 1 x 1.5D10-200

320 320.14 171 1 3 10 235.50 OK 1 x 1.5D10-100 1 x 1.5D10-100 1 x 1.5D10-200 1 x 1.5D10-200

420 364.61 224 1 3 10 235.50 OK 1 x 1.5D10-100 1 x 1.5D10-100 1 x 1.5D10-201 1 x 1.5D10-201

420 364.61 224 1 3 10 235.50 OK 1 x 1.5D10-100 1 x 1.5D10-100 1 x 1.5D10-200 1 x 1.5D10-200


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.9.5 Rekapitulasi Gaya Dalam Balok
Mu Vu
Lantai Tipe Tumpuan Lapangan Tumpuan Lapangan
KN.m KN.m KN KN
Lantai 1 TB1 - 25x50 58.5802 31.0929 51.3511 25.67555
B1 - 30X50 163.75 121.34 145.73 72.87
B2 - 25X50 108.99 84.97 87.62 46.14
Lantai 2 B3 - 20X40 50.47 44.13 60.58 44.03
B4 - 25X50 92.86 43.82 67.29 30.74
B5 - 20X30 23.47 44.17 53.93 43.38
B6 - 30X50 92.80 52.71 74.29 39.38
B7 - 25X50 83.13 39.87 46.01 31.18
Lantai Atap B8 - 20X40 84.91 41.34 55.67 27.33
B9 - 40X27.5 167.77 86.86 92.48 92.48
B10 - 12X40 45.53 19.53 23.83 13.03

3.9.6 Perrhitungan Tulangan Lentur Balok


Detail Perhitungan Tulangan Balok

Diagram Gaya Dalam Balok B1 – 30 cm x 50 cm (Lantai 2)

Properties and Material List


fy = 420 Mpa
fc' = 25 Mpa
h= 500 mm
d= 470 mm
b= 300 mm
β1 = Untuk fc' ≤ 30 Mpa = 0.85

untuk fc' > 30 Mpa =


β1= 0.85
Perhitungan Tulangan Pada Area Tumpuan

Tulangan Tumpuan Atas


Mu = 164 KN.m (Moment Ultimit)
φ= 0.9
Mn = 181.9444 KN.m = 181944444 N.mm
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Perhitungan Tulangan Pada Area Tumpuan

Tulangan Tumpuan Atas


Mu = 164 KN.m (Moment Ultimit)
φ= 0.9
Mn = 181.9444 KN.m = 181944444 N.mm

Coefficient of Resitance

= 2.745502
Ratio penulangan

m= 19.84

ρ perlu = 0.00703

ρ min = 0.003333

ρ max = 0,75 * ρb

ρb = 0.025196
ρ max = 0.018897

Syarat ρ use:
ρ min < ρ use < ρ max
Jika ρ min > ρ perlu ------------> ρ use = ρ min
Jika ρ perlu > ρ max ------------> ρ use = ρ max

Dari perbandingan nilai ρ di atas, dipeoleh:


ρ use = ρ perlu
0.00703
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Luas tulangan yang dibutuhkan


As = ρ.b.d
= 1054.024 mm²

D tul = 16 mm

As tul = 201.0619 mm²

Jumlah Tulangan Perlu Permeter


n = 5.242283 bh
= 6 bh

Cek Kekuatan Tulangan Terpakai


Distribusi tegangnan tekan ekuivalen pada balok (a)

a = 79.79779 mm
Momen Nominal tulangan Aktual, dimana lengan momen (d - a/2)
Mn.act = Asw.fy.(d-a/2)
= 217,921,935 N.mm

Mn.act ≥ Mn
2.18E+08 > 1.819E+08 Ok!!

Tulangan Tumpuan Bawah


Dari perbandingan nilai ρ di atas, dipeoleh:
ρ use = ρ perlu
0.00351

Luas tulangan yang dibutuhkan


As = ρ.b.d
= 495.3911 mm²

D tul = 16 mm

As tul = 201.0619 mm²

Jumlah Tulangan Perlu Permeter


n = 2.463873 bh
= 3 bh
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Perhitungan Tulangan Pada Area Lapangan
Tulangan Lapangan Bawah
Mu = 121.34 KN.m (Moment Ultimit)
φ= 0.9
Mn = 134.8222 KN.m = 134822222 N.mm

Coefficient of Resitance

= 2.034438

Ratio penulangan

m= 19.84

ρ perlu = 0.00510

ρ min = 0.003333

ρ max = 0,75 * ρb

ρb = 0.025196
ρ max = 0.018897

Syarat ρ use:
ρ min < ρ use < ρ max

Jika ρ min > ρ perlu ------------> ρ use = ρ min

Jika ρ perlu > ρ max ------------> ρ use = ρ max

Dari perbandingan nilai ρ di atas, dipeoleh:


ρ use = ρ perlu
0.00510
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Luas tulangan yang dibutuhkan
As = ρ.b.d
= 719.4095 mm²

D tul = 16 mm

As tul = 201.0619 mm²

Jumlah Tulangan Perlu Permeter


n = 3.578049 bh
= 4 bh

Cek Kekuatan Tulangan Terpakai


Distribusi tegangnan tekan ekuivalen pada balok (a)

a = 53.19853 mm
Momen Nominal tulangan Aktual, dimana lengan momen (d - a/2)
Mn.act = Asw.fy.(d-a/2)
= 149,773,693 N.mm

Mn.act ≥ Mn
1.5E+08 > 1.348E+08 Ok!!

Tulangan Lapangan Atas


Dari perbandingan nilai ρ di atas, dipeoleh:
ρ use = ρ min
0.00333

Luas tulangan yang dibutuhkan


As = ρ.b.d
= 470 mm²

D tul = 16 mm

As tul = 201.0619 mm²

Jumlah Tulangan Perlu Permeter


n = 2.337588 bh
= 3 bh

Perhitungan Tulangan Geser Balok B30x60


Properties and Material List
fy = 420 Mpa
fc' = 24.9 Mpa K-250
h= 500 mm
d= 470 mm
b= 300 mm
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Perhitungan Tulangan Geser Balok B30x60
Properties and Material List
fy = 420 Mpa
fc' = 24.9 Mpa K-250
h= 500 mm
d= 470 mm
b= 300 mm

Vu Tump. = 145.73 KN
= 145,730 N

Kuat Geser nominal/kapasitas penampang beton

Vc = 117,264.8 N

Kuat Geser Ijin


ØVc = 87,948.6 N

Perhitungan Tulangan Geser Tumpuan


Kebutuhan Tulangan Geser

77,041.9 < 234529.53

Dimana:
S ≤ d/4 ≤ 600
S max = 117.5 mm
= 100 mm
Kebutuhan Tulangan Geser

Av = 39.0283 mm²
Digunakan tulangan sengkang D10, sehingga:
Avtul = 2.As = 157.08 mm²

Cek jarak tulangan

Vs = 310,075.2 OK!!! Vu/Ø = 194,307

Sehingga dapat disimpulkan tulangan geser yang dapat digunakan dalam perencanaan ini
adalah:
Tumpuan Menggunakan sengkan D10-100
Lapangan Menggunakan Sengkang D10-150
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Perhitungan Tulangan Lentur Lantai 1
Mu f'c fy b d Mn
Lantai Type Tulangan Lentur 1=0.85 φ Rn ρ perlu ρ min
(N.mm) (Mpa) (Mpa) (mm) (mm) (N.mm)
Tie Beam Tumpuan 58580200 24.9 420 0.85 250 470 0.9 6.509E+07 1.1786 0.00289 0.00350
Lantai 1
250x500 Lapangan 31092900 24.9 420 0.85 250 470 0.9 3.455E+07 0.6256 0.00151 0.00350

As perlu Dia. Tul. Jumlah As' perlu Dia. Tul. Jumlah Tulangan Tulangan Rencana
ρb ρ max ρ use ρ' use
(mm²) (mm) Tulangan (a) (mm²) (mm) (a) Tumpuan Lapangan Tumpuan
0.02520 0.01890 0.00350 411.25 16 3 0.00350 411.25 16 3 5 D 16 3 D 16 5 D 16
0.02520 0.01890 0.00350 411.25 16 3 0.00350 411.25 16 3 3 D 16 5 D 16 3 D 16

Perhitungan Tulangan Lentur Lantai 2


Mu f'c fy b d Mn
Lantai Type Tulangan Lentur 1=0.85 φ Rn ρ perlu ρ min
(N.mm) (Mpa) (Mpa) (mm) (mm) (N.mm)
Tumpuan 163750000 24.9 420 0.85 300 470 0.9 1.819E+08 2.7455 0.00703 0.00350
B1 - 30X50
Lapangan 121340000 24.9 420 0.85 300 470 0.9 1.348E+08 2.0344 0.00510 0.00350
Tumpuan 108990000 24.9 420 0.85 250 470 0.9 1.211E+08 2.1928 0.00552 0.00350
B2 - 25X50
Lapangan 84970000 24.9 420 0.85 250 470 0.9 9.441E+07 1.7096 0.00425 0.00350
Tumpuan 50470000 24.9 420 0.85 200 370 0.9 4.600E+06 0.1680 0.00040 0.00350
Lantai 2 B3 - 20X40
Lapangan 44130000 24.9 420 0.85 200 370 0.9 3.000E+06 0.1096 0.00026 0.00350
Tumpuan 92860000 24.9 420 0.85 250 470 0.9 1.032E+08 1.8683 0.00466 0.00350
B4 - 25X50
Lapangan 43820000 24.9 420 0.85 250 470 0.9 4.869E+07 0.8816 0.00214 0.00350
Tumpuan 23470000 24.9 420 0.85 200 270 0.9 2.608E+07 1.7886 0.00446 0.00350
B5 - 20X30
Lapangan 44170000 24.9 420 0.85 200 270 0.9 4.908E+07 3.3661 0.00878 0.00350

As perlu Dia. Tul. Jumlah As' perlu Dia. Tul. Jumlah Tulangan Tulangan Rencana
ρb ρ max ρ use ρ' use
(mm²) (mm) Tulangan (a) (mm²) (mm) (a) Tumpuan Lapangan Tumpuan
0.02520 0.01890 0.00703 990.78 16 5 0.00351 495.39 16 3 7 D 16 3 D 16 7 D 16
0.02520 0.01890 0.00510 719.41 16 4 0.00350 493.50 16 3 3 D 16 7 D 16 3 D 16
0.02520 0.01890 0.00552 649.05 13 5 0.00350 411.25 13 4 8 D 13 4 D 13 8 D 13
0.02520 0.01890 0.00425 499.33 13 4 0.00350 411.25 13 4 4 D 13 4 D 13 4 D 13
0.02520 0.01890 0.00350 259.00 13 2 0.00350 259.00 13 2 3 D 13 2 D 13 3 D 13
0.02520 0.01890 0.00350 259.00 13 2 0.00350 259.00 13 2 2 D 13 2 D 13 2 D 13
0.02520 0.01890 0.00466 548.05 13 5 0.00350 411.25 13 4 7 D 13 4 D 13 7 D 13
0.02520 0.01890 0.00350 411.25 13 4 0.00350 411.25 13 4 4 D 13 4 D 13 4 D 13
0.02520 0.01890 0.00446 240.60 13 2 0.00350 189.00 13 2 4 D 13 2 D 13 4 D 13
0.02520 0.01890 0.00878 474.08 13 4 0.00439 237.04 13 2 2 D 13 4 D 13 2 D 13

Perhitungan Tulangan Lentur Lantai Atap


Mu f'c fy b d Mn
Lantai Type Tulangan Lentur 1=0.85 φ Rn ρ perlu ρ min
(N.mm) (Mpa) (Mpa) (mm) (mm) (N.mm)
Tumpuan 92800000 24.9 420 0.85 300 470 0.9 1.031E+08 1.5559 0.00385 0.00350
B6 - 30X50
Lapangan 52710000 24.9 420 0.85 300 470 0.9 5.857E+07 0.8838 0.00215 0.00350
Tumpuan 83130000 24.9 420 0.85 250 470 0.9 9.237E+07 1.6726 0.00415 0.00350
B7 - 25X50
Lapangan 39870000 24.9 420 0.85 250 470 0.9 4.430E+07 0.8022 0.00195 0.00350
Lantai Tumpuan 84910000 24.9 420 0.85 200 370 0.9 4.600E+06 0.1680 0.00040 0.00350
B8 - 20X40
Atap Lapangan 41340000 24.9 420 0.85 200 370 0.9 3.000E+06 0.1096 0.00026 0.00350
Tumpuan 167770000 24.9 420 0.85 200 370 0.9 4.600E+06 0.1680 0.00040 0.00350
B9 - 40X27.5
Lapangan 86860000 24.9 420 0.85 200 370 0.9 3.000E+06 0.1096 0.00026 0.00350
Tumpuan 45530000 24.9 420 0.85 120 370 0.9 5.059E+07 3.0794 0.00796 0.00350
B10 - 12X40
Lapangan 19530000 24.9 420 0.85 120 370 0.9 2.170E+07 1.3209 0.00325 0.00350
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
As perlu Dia. Tul. Jumlah As' perlu Dia. Tul. Jumlah Tulangan Tulangan Perlu
ρb ρ max ρ use ρ' use
(mm²) (mm) Tulangan (a) (mm²) (mm) (a) Tumpuan Lapangan Tumpuan
0.02520 0.01890 0.00385 543.10 16 3 0.00350 493.50 16 3 3 D 16 3 D 16 3 D 16
0.02520 0.01890 0.00350 493.50 16 3 0.00350 493.50 16 3 3 D 16 3 D 16 3 D 16
0.02520 0.01890 0.00415 488.03 13 4 0.00350 411.25 13 4 4 D 13 4 D 13 4 D 13
0.02520 0.01890 0.00350 411.25 13 4 0.00350 411.25 13 4 4 D 13 4 D 13 4 D 13
Vu Tump. =
0.02520 219,84
0.01890 KN
0.00350 259.00 13 2 0.00350 259.00 13 2 2 D 13 2 D 13 2 D 13
0.02520= 0.01890 N
219.8450.00350 259.00 13 2 0.00350 259.00 13 2 2 D 13 2 D 13 2 D 13
0.02520 0.01890 0.00350 259.00 16 2 0.00350 259.00 16 2 5 D 16 5 D 16 5 D 16
0.02520 0.01890 0.00350 259.00 16 2 0.00350 259.00 16 2 5 D 16 5 D 16 5 D 16
Kuat Geser nominal/kapasitas penampang beton
0.02520 0.01890 0.00796 353.46 13 3 0.00398 176.73 13 2 3 D 13 2 D 13 3 D 13
0.02520 0.01890 0.00350 155.40 13 2 0.00350 155.40 13 2 2 D 13 2 D 13 2 D 13

Vc =Vu Tump. =108.186,4 N KN


219,84
3.9.7 Perhitungan Tulangan Geser Balok
= 219.845 N
Kuat Geser IjinPerhitungan Tulangan Geser Balok Tie Beam Lantai 1
ØVc = Tulangan Geser Tumpuan
81.139,8 N
Kuat Geser nominal/kapasitas penampang
Vu betonVu/φ b d f'c fy Vc φ.Vc
Beam Type φ
(N)
Perhitungan Tulangan Geser Tumpuan (N) (mm) (mm) (Mpa) (Mpa) (N) (N)
TB1 - 25x50
Kebutuhan Tulangan Geser 51351 0.75 68468.133 300 470 24.9 280 117264.8 87948.57340 117264.76453

Vc = S minN S max S rencana


108.186,4 Av Dia Seng Av. Use VS Tulangan Check
d/4 (mm) (mm) (mm²) (mm) (mm²) (N) Sengkang Vs ≥ Vu/φ

Ijin234529.52906
Kuat Geser184.939,7 < 127.50 600.00
216372,8 100 89.11 13 265.4645792 349351.3863 D10-100 OK!
ØVc = Tulangan 81.139,8 N
Geser Lapangan
Dimana:
Vu Vu/φ b d f'c fy Vc φ.Vc
S ≤ d/4 ≤ 600 Beam Type φ
Perhitungan Tulangan Geser Tumpuan(N) (N) (mm) (mm) (Mpa) (Mpa) (N) (N)
S max = 118,75 mm
Kebutuhan Tulangan Geser 25676
TB1 - 25x50 0.75 34234.067 300 470 24.9 280 117264.8 87948.57340 117264.76453
= 100 mm
Kebutuhan Tulangan Geser S min S max S rencana Av Dia Seng Av. Use VS Tulangan Check
Vu Tump. = 219,84 d/4
KN (mm) (mm) (mm²) (mm) (mm²) (N) Sengkang Vs ≥ Vu/φ
= 219.845 N
234529.52906 127.50 600.00 200 178.2 13 265.4645792 174675.6931 D10-200 OK!
184.939,7 < 216372,8
Kuat Geser nominal/kapasitas penampang beton
Dimana:Av = 97,3367 mm²
Digunakan
S ≤ d/4 ≤ 600tulangan sengkang
Perhitungan D10, sehingga:
Tulangan Geser Balok Lantai 2
Avtul = 2.As = Geser
Tulangan 157,08 mm²
Tumpuan
S max = 118,75 mm
Vu Vu/φ b d f'c fy Vc φ.Vc
Vc= = 100108.186,4
Beam mm
Type N φ
Cek jarak tulangan (N) (N) (mm) (mm) (Mpa) (Mpa) (N) (N)
Kebutuhan Tulangan Geser 145730
B1 - 30X50 0.75 194306.667 300 470 24.9 280 117264.8 87948.57340 117264.76453
Kuat Geser Ijin
B2 - 25X50 87620 0.75 116826.667 250 470 24.9 280 97720.6 73290.47783 97720.63711
ØVc = 81.139,8 N
Vs = 298.451,3 60580
B3 - 20X40 OK!!! 0.75 80773.333
Vu/Ø = 293.126200 370 24.9 280 61543.2 46157.40731 61543.20975
B4 - 25X50
Perhitungan Tulangan 67290
Geser Tumpuan 0.75 89720.000 250 470 24.9 280 97720.6 73290.47783 97720.63711
Sehingga dapatB5disimpulkan
- 20X30
Kebutuhan Tulangan Geser tulangan
53930geser yang
0.75dapat digunakan
71906.667 dalam
200perencanaan
270 ini
24.9 280 44909.9 33682.43236 44909.90982
adalah:
Av = 97,3367 mm²
Tumpuan Menggunakan
Digunakan sengkanS D10-100
tulangan sengkang max S rencana
D10, Ssehingga:
min Av Dia Seng Av. Use VS Tulangan Check
Lapangan
Avtul = Menggunakan
2.As = Sengkang
d/4D10-150
157,08 mm² (mm) (mm) (mm²) (mm) (mm²) (N) Sengkang Vs ≥ Vu/φ
234529.52906
184.939,7 < 127.50 600.00
216372,8 100 89.11 13 265.4645792 349351.3863 D10-100 OK!
195441.27421
Cek jarak tulangan 127.50 600.00 100 74.26 10 157.0796327 206716.7966 D10-100 OK!
Dimana: 123086.41951 102.50 600.00 100 59.4 10 157.0796327 162734.4995 D10-100 OK!
S ≤ d/4 ≤ 600 195441.27421 127.50 600.00 100 74.26 10 157.0796327 206716.7966 D10-100 OK!
S max = 118,75 mm
Vs = 298.451,3
89819.81964 OK!!!
77.50 600.00 100 Vu/Ø
59.4= 293.126
8 100.5309649 76001.40948 D10-100 OK!
= 100 mm
Kebutuhan Tulangan Geser
Sehingga dapat disimpulkan tulangan geser yang dapat digunakan dalam perencanaan ini
adalah:
Tumpuan Menggunakan sengkan D10-100
Lapangan Menggunakan Sengkang D10-150
Av = 97,3367 mm²
Digunakan tulangan sengkang D10, sehingga:
Vu Tump. = 219,84 KN
= 219.845 N

Kuat Geser nominal/kapasitas penampang beton

Structure Calculation Report


Puskesmas Simpang Pematang, Mesuji
Vc = Tulangan108.186,4 N
Geser Lapangan
Vu Vu/φ b d f'c fy Vc φ.Vc
Beam Type φ
Kuat Geser Ijin (N) (N) (mm) (mm) (Mpa) (Mpa) (N) (N)
B1 - 30X50 72865 0.75 97153.333 300 470 24.9 280 117264.8 87948.57340 117264.76453
ØVc = 81.139,8 N
B2 - 25X50 46140 0.75 61520.000 250 470 24.9 280 97720.6 73290.47783 97720.63711
B3 - 20X40 44030 0.75 58706.667 200 370 24.9 280 61543.2 46157.40731 61543.20975
Perhitungan Tulangan Geser Tumpuan
B4 - 25X50 30740 0.75 40986.667 250 470 24.9 280 97720.6 73290.47783 97720.63711
Kebutuhan Tulangan Geser 43380
B5 - 20X30 0.75 57840.000 200 270 24.9 280 44909.9 33682.43236 44909.90982

S min S max S rencana Av Dia Seng Av. Use VS Tulangan Check


d/4 (mm) (mm) (mm²) (mm) (mm²) (N) Sengkang Vs ≥ Vu/φ
234529.52906 127.50 600.00 200 178.2 13 265.4645792 174675.6931 D10-200 OK!
184.939,7
195441.27421< 127.50 600.00
216372,8 200 148.5 10 157.0796327 103358.3983 D10-200 OK!
123086.41951 102.50 600.00 200 118.8 10 157.0796327 81367.24973 D10-200 OK!
Dimana: Vu Tump. = 219,84127.50
195441.27421 KN 600.00 200 148.5 10 157.0796327 103358.3983 D10-200 OK!
= 219.84577.50
S ≤ d/4 ≤ 600 89819.81964 N 600.00 100 59.4 8 100.5309649 76001.40948 D10-200 OK!
S max = 118,75 mm
Kuat Geser
= nominal/kapasitas
100 mm penampang beton
Kebutuhan Tulangan Geser
Perhitungan Tulangan Geser Balok Lantai Atap
Tulangan Geser Tumpuan
Vu Vu/φ b d f'c fy Vc φ.Vc
Vc = Beam108.186,4
Type N φ
(N) (N) (mm) (mm) (Mpa) (Mpa) (N) (N)
B6 - 30X50 74290 0.75 99053.333 300 470 24.9 280 117264.8 87948.57340 117264.76453
Kuat Geser Ijin
Av B7 - 25X50 46010 0.75 61346.667 250 470 24.9 280 97720.6 73290.47783 97720.63711
ØVc= = 97,3367 81.139,8
mm² N
B8 - 20X40 55670 0.75 74226.667 200 370 24.9 280 61543.2 46157.40731 61543.20975
Digunakan tulangan sengkang D10, sehingga:
Perhitungan B9 - 40X27.5 Tumpuan
Tulangan 92480 0.75 123306.667 400 245 24.9 420 81503.2 61127.37725 81503.16967
Avtul = 2.As = Geser157,08 mm²
B10 - 12X40
Kebutuhan Tulangan Geser 23830 0.75 31773.333 120 370 24.9 280 36925.9 27694.44439 36925.92585

Cek jarak tulangan S min S max S rencana Av Dia Seng Av. Use VS Tulangan Check
Vu Tump. = 219,84
d/4 KN(mm) (mm) (mm²) (mm) (mm²) (N) Sengkang Vs ≥ Vu/φ
= 219.845
234529.52906 N 600.00
184.939,7 < 127.50 216372,8 100 89.11 13 265.4645792 349351.3863 D10-100 OK!
Vs = 298.451,3 OK!!!
195441.27421 127.50 600.00 Vu/Ø
100 74.26 = 293.126
8 100.5309649 132298.7498 D10-100 OK!
Kuat Geser
Dimana: nominal/kapasitas penampang
123086.41951 102.50 600.00 beton 100 59.4 10 157.0796327 162734.4995 D10-100 OK!
Sehingga
S ≤ d/4 ≤ dapat disimpulkan 71.25
600 163006.33935 tulangan geser
600.00 yang dapat digunakan
10 dalam perencanaan ini
100 79.21 157.0796327 161634.942 D10-100 OK!
adalah:
S max = 118,75 mm
73851.85170 102.50 600.00 8
100 35.64 100.5309649 104150.0797 D10-100 OK!
Tumpuan= Menggunakan
100 mm sengkan D10-100
Kebutuhan
Lapangan Tulangan
Vc = Menggunakan Geser
Tulangan Sengkang
108.186,4
Geser N D10-150
Lapangan
Vu Vu/φ b d f'c fy Vc φ.Vc
Beam Type φ
Kuat Geser Ijin (N) (N) (mm) (mm) (Mpa) (Mpa) (N) (N)
B6 - 30X50 39380 0.75 52506.667 300 470 24.9 280 117264.8 87948.57340 117264.76453
ØVc = 81.139,8 N
B7 - 25X50 31180 0.75 41573.333 250 470 24.9 280 97720.6 73290.47783 97720.63711
B8 - 20X40
Av = 97,3367 mm² 27330 0.75 36440.000 200 370 24.9 280 61543.2 46157.40731 61543.20975
Perhitungan Tulangan
B9 - Geser
40X27.5 Tumpuan
92480 0.75
Digunakan tulangan sengkang D10, sehingga: 123306.667 400 245 24.9 420 81503.2 61127.37725 81503.16967
Kebutuhan
Avtul = Tulangan
B10 -
2.As = Geser
12X40 13030
157,08 mm² 0.75 17373.333 120 370 24.9 280 36925.9 27694.44439 36925.92585

S min S max S rencana Av Dia Seng Av. Use VS Tulangan Check


Cek jarak tulangan
d/4 (mm) (mm) (mm²) (mm) (mm²) (N) Sengkang Vs ≥ Vu/φ
234529.52906 127.50 600.00 200 178.2 13 265.4645792 174675.6931 D10-200 OK!
184.939,7
195441.27421< 127.50 600.00216372,8 200 148.5 8 100.5309649 66149.37491 D10-200 OK!
Vs = 298.451,3 OK!!! Vu/Ø = 293.126
123086.41951 102.50 600.00 200 118.8 10 157.0796327 81367.24973 D10-200 OK!
Dimana: 163006.33935 71.25 600.00 100 79.21 10 157.0796327 161634.942 D10-100 OK!
Sehingga dapat disimpulkan tulangan geser yang dapat digunakan dalam perencanaan ini
S ≤ d/4 ≤ 600 73851.85170 102.50 600.00 200 71.29 8 100.5309649 52075.03983 D10-200 OK!
adalah:
S max = 118,75 mm
Tumpuan Menggunakan sengkan D10-100
= Menggunakan
Lapangan 100 mm Sengkang D10-150
Kebutuhan Tulangan Geser
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.9.8 Perhitungan Tulangan Pelat lantai
Perhitungan Tulangan Pelat Lantai 2

Tebal Pelat = 120 mm


Mutu Beton = 24.9 Mpa K-300
d' = d - 30 mm
d' = = 90 mm
Fy = 420 Mpa
D = 10 mm

ly lx ly/lx Coef qDL qLL q(1.2DL+1.6LL ) Mu Mn


type pelat
m m m kg/m² kg/m² kg Kgm Nmm Nmm
Mlx 3.70 2.75 1.35 39.82 438 500 1,325.60 399.17 3,991,713.00 4,435,236.67
S12 Mly 3.70 2.75 1.35 21.93 438 500 1,325.60 219.82 2,198,176.20 2,442,418.00
Type 1 Mtx 3.70 2.75 1.35 62.67 438 500 1,325.60 628.28 6,282,846.90 6,980,941.00
Mty 3.70 2.75 1.35 54.02 438 500 1,325.60 541.50 5,415,039.18 6,016,710.20

Ø b d' f'c fy Rn m rho rho min As


Rho Use Use
mm mm Mpa Mpa mm2
0.90 1,000.00 90.00 24.90 400.00 0.55 18.90 0.00139 0.00333 0.00333 300.00 D 10 - 250
0.90 1,000.00 90.00 24.90 400.00 0.30 18.90 0.00076 0.00333 0.00333 300.00 D 10 - 250
0.90 1,000.00 90.00 24.90 400.00 0.86 18.90 0.00220 0.00333 0.00333 300.00 D 10 - 250
0.90 1,000.00 90.00 24.90 400.00 0.74 18.90 0.00189 0.00333 0.00333 300.00 D 10 - 250

ly lx ly/lx Coef qDL qLL q(1.2DL+1.6LL ) Mu Mn


type pelat
m m m kg/m² kg/m² kg Kgm Nmm Nmm
Mlx 3.70 2.75 1.35 39.82 748 100 1,057.60 318.47 3,184,698.00 3,538,553.33
S12 Mly 3.70 2.75 1.35 21.93 748 100 1,057.60 175.38 1,753,765.20 1,948,628.00
Dak Mtx 3.70 2.75 1.35 62.67 748 100 1,057.60 501.26 5,012,627.40 5,569,586.00
Mty 3.70 2.75 1.35 54.02 748 100 1,057.60 432.03 4,320,266.62 4,800,296.25

Ø b d' f'c fy Rn m rho rho min As


Rho Use Use
mm mm Mpa Mpa mm2
0.90 1,000.00 90.00 24.90 400.00 0.44 18.90 0.00110 0.00333 0.00333 300.00 D 10 - 250
0.90 1,000.00 90.00 24.90 400.00 0.24 18.90 0.00060 0.00333 0.00333 300.00 D 10 - 250
0.90 1,000.00 90.00 24.90 400.00 0.69 18.90 0.00175 0.00333 0.00333 300.00 D 10 - 250
0.90 1,000.00 90.00 24.90 400.00 0.59 18.90 0.00150 0.00333 0.00333 300.00 D 10 - 250

Perhitungan Tulangan Pelat Lantai Atap

Tebal Pelat = 100 mm


Mutu Beton = 24.9 Mpa K-300
d' = d - 30 mm
d' = = 70 mm
Fy = 400 Mpa
D = 10 mm

ly lx ly/lx Coef qDL qLL q(1.2DL+1.6LL ) Mu Mn


type pelat
m m m kg/m² kg/m² kg Kgm Nmm Nmm
Mlx 3.75 1.78 2.11 58.90 350 100 580.00 107.63 1,076,342.25 1,195,935.83
S100 Mly 3.75 1.78 2.11 14.97 350 100 580.00 27.36 273,589.63 303,988.47
Dak Mtx 3.75 1.78 2.11 81.89 350 100 580.00 149.64 1,496,378.25 1,662,642.50
Mty 3.75 1.78 2.11 52.77 350 100 580.00 96.44 964,384.13 1,071,537.92

Ø b d' f'c fy Rn m rho rho min As


Rho Use Use
mm mm Mpa Mpa mm2
0.90 1,000.00 70.00 24.90 400.00 0.24 18.90 0.00061 0.00333 0.00333 233.33 D 10 - 333
0.90 1,000.00 70.00 24.90 400.00 0.06 18.90 0.00016 0.00333 0.00333 233.33 D 10 - 333
0.90 1,000.00 70.00 24.90 400.00 0.34 18.90 0.00086 0.00333 0.00333 233.33 D 10 - 333
0.90 1,000.00 70.00 24.90 400.00 0.22 18.90 0.00055 0.00333 0.00333 233.33 D 10 - 333
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.9.9 Perhitungan Tulangan Pelat Drop Panel (Atap Canopy)
Penulangan Drop Panel

Momen M-11 - Arah X

Momen M-22 - Arah Y

Diagram Gaya Dalam Drop Panel

Properties and Material List


fy = 420 Mpa
fc' = 24.9 Mpa K300

β1 = Untuk fc' ≤ 30 Mpa = 0.85

untuk fc' > 30 Mpa =

β1 = 0.85

Balance Ratio

Rasio Tulanga Perlu

ρ min = 0.00350 SNI 2847:2019 (luas tulangan minimum pelat lantai)


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Mu Mn
Item Jenis Tulangan φ Rn ρ perlu ρ min ρb ρ max
(N.mm) (N.mm)
Perhitungan Tulangan Drop Panel
Drop Panel Tul. Tul. Arah x 1.8150E+08 0.9 2.017E+08 2.32E+00 0.00586 0.00350 0.02520 0.01890
Atas Tul. Arah y 2.892E+08 0.9 3.213E+08 3.69E+00 0.00973 0.00350 0.02520 0.01890
Drop Panel Tul. Tul. Arah x 9.0750E+07 0.9 1.008E+08 1.16E+00 0.00293 0.00350 0.02520 0.01890
Bawah Tul. Arah y 1.941E+07 0.9 2.156E+07 2.48E-01 0.00487 0.00350 0.02520 0.01890

b d As perlu Dia. Tul. S Tul utama As Tul terpakai Tulangan


ρ use Check
(mm) (mm) (mm²) (mm) (mm) (mm²) Terpasang

0.00586 1000 295 1728.10 16 100 2211.681 OK! D19-100


0.00973 1000 295 2870.66 19 100 3118.816 OK! D19-100
0.00350 1000 295 1032.50 13 100 1460.055 OK! D13-100
0.00487 1000 295 1435.33 13 100 1460.055 OK! D13-100

Penulangan Pelat Lantai


Diagram Tulangan Arah X

Diagram Momen Arah Y

Diagram Gaya Dalam Slab (t: 275 mm)

Properties and Material List


fy = 420 Mpa
fc' = 24.9 Mpa K300

β1 = Untuk fc' ≤ 30 Mpa = 0.85

untuk fc' > 30 Mpa =

β1 = 0.85
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Mu Mn
Item Jenis Tulangan φ Rn ρ perlu ρ min ρb ρ max
(N.mm) (N.mm)
Perhitungan Tulangan Slab Arah Kolom
Slab Arah Kolom Tumpuan Atas 7.3170E+07 0.9 8.130E+07 1.35E+00 0.00334 0.00350 0.02520 0.01890
Tumpuan Tumpuan Bawah 3.659E+07 0.9 4.065E+07 6.77E-01 0.00164 0.00350 0.02520 0.01890
Slab Arah Kolom Lapangan Bawah 8.5120E+07 0.9 9.458E+07 1.58E+00 0.00167 0.00350 0.02520 0.01890
Lapangan Lapangan Atas 4.256E+07 0.9 4.729E+07 7.88E-01 0.00082 0.00350 0.02520 0.01890
Arah X 2.3750E+07 0.9 2.639E+07 4.40E-01 0.00083 0.00350 0.02520 0.01890
Slab Tengah
Arah Y 2.228E+07 0.9 2.476E+07 4.12E-01 0.00041 0.00350 0.02520 0.01890

b d As perlu Dia. Tul. S Tul utama As Tul terpakai Tulangan


ρ use Check
(mm) (mm) (mm²) (mm) (mm) (mm²) Terpasang

0.00350 1000 245 857.50 13 100 1460.055 OK! D13-100


0.00350 1000 245 857.50 13 100 1460.055 OK! D13-100
0.00350 1000 245 857.50 13 100 1460.055 OK! D13-100
0.00350 1000 245 857.50 13 100 1460.055 OK! D13-100
0.00350 1000 245 857.50 10 100 863.938 OK! D13-100
0.00350 1000 245 857.50 10 100 863.938 OK! D13-100

3.9.10 Perhitungan Tulangan Tangga

1. Modeling Tangga

2. Input Pembebanan Tangga


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Superimposed Dead Load (SDL) Live Load (LL)

3. Diagram Gaya Dalam Tangga

Bordes Arah X = 11.318 KN.m


Momen M11 - Tulangan Arah X Pelat Tangga = 19.618 KN.m

Momen M22 - Tulangan Arah Y

Bordes Arah Y = 15.509 KN.m


Pelat Tangga = 25.267 KN.m
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
4. Penulangan Tangga
Properties and Material List
fy = 420 Mpa
fc' = 24.9 Mpa K300

β1 = Untuk fc' ≤ 30 Mpa = 0.85

untuk fc' > 30 Mpa =

β1 = 0.85
Balance Ratio

Rasio Tulanga Perlu

ρ min = 0.00350 SNI 2847:2019 (luas tulangan minimum pelat lantai)

Mu Mn
Item Jenis Tulangan φ Rn ρ perlu ρ min ρb ρ max
(N.mm) (N.mm)
Perhitungan Tangga
Tul. Arah x 1.1318E+07 0.9 1.258E+07 8.05E-01 0.00195 0.00350 0.02520 0.01890
Tulangan Bordes
Tul. Arah y 1.551E+07 0.9 1.723E+07 1.10E+00 0.00270 0.00350 0.02520 0.01890
Tulangan Pelat Tul. Arah x 1.9618E+07 0.9 2.180E+07 1.40E+00 0.00098 0.00350 0.02520 0.01890
Tangga Tul. Arah y 2.527E+07 0.9 2.807E+07 1.80E+00 0.00135 0.00350 0.02520 0.01890
b d As perlu Dia. Tul. S Tul utama As Tul terpakai Tulangan
ρ use Check
(mm) (mm) (mm²) (mm) (mm) (mm²) Terpasang

0.00350 1000 125 437.50 13 150 1061.858 OK! D13-150


0.00350 1000 125 437.50 13 150 1061.858 OK! D13-150
0.00350 1000 125 437.50 13 150 1061.858 OK! D13-150
0.00350 1000 125 437.50 13 150 1061.858 OK! D13-150
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3.9.11 Perhitungan Sambungan Baja

Peritungan Angkur Kolom WF 300.150

Connection Detail
1. Data Tumpuan

Diagram Gaya Dalam Kolom Baja WF.300.150.6,5.9


Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Pembebana Kolom
No. Pembebanan Kolom Data Pembebanan
1. Gaya aksial akibat beban terfaktor Pᵤ = 79,699 N
2. Momen akibat beban terfaktor Mᵤ = 29,513,200 N.mm
3. Gaya geser akibat beban terfaktor Vᵤ = 34,162 N

Data Tumpuan (Base Plate)


No. Data Tumpuan (Base Plate) Data Pelat Tumpuan
1. Tegangan leleh baja fᵧ = 240 MPa
2. Tegangan tarik putus pelat fᵤᴾ = 370 MPa
3. Lebar pelat tumpuan B= 250 mm
4. Panjang pelat tumpuan L= 400 mm
5. Tebal pelat tumpuan t= 16 mm

Data Kolom Pedestal


No. Data Kolom Pedestal Data Kolom Pedestal
1. Kuat tekan beton Fc' = 24.9 MPa
2. Lebar penampang kolom I= 250 mm
3. Penjang penampang kolom J= 400 mm

Data Kolom Baja


No. Dimensi Kolom Baja Data Profil
1. Profil Baja WF 300.150.6,5.9
2. Tinggi total H= 300 mm
3. Lebar sayap B= 150 mm
4. Tebal badan tw = 7 mm
5. Tebal sayap tf = 9 mm

Data Angkur
No. Data Angkur Baut Data Profil
1. Jenis angkur baut Tipe = ST - 37
2. Tegangan tarik putus angkur baut fᵤᵇ = 825 Mpa
3. Tegangan leleh angkur baut fᵧ = 370 Mpa
4. Diameter angkur baut d= 16 mm
5. Jumlah angkur baut pada sisis tarik nt = 3 bh
6. Jumlah angkur baut pada sisis tekan nc = 3 bh
7. Jarak baut terhadap pusat penampang kolom f1 = 150 mm

8. Panjang angkur baut yang tertanam di beton La = 300 mm

2. Eksentrisitas Beban

Eksentrisitas Beban,
e = Mu / Pu = 370.31 mm
L/6 = 66.67 mm

h = ht - 2.tf = 282.00 mm
et1 = f1 + h/2 = 291.00 mm
ec = f1 - h/2 = 9.00 mm

et2 = f2 + h/2 = 141.00 mm

Jumlah angkur baut total,


n = nt + nc = 6 bh
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

3. Tahanan Tumpuan Beton

Gaya tarik pada angkur baut Pt1 = Pᵤ * (ec/et1) = 7,394.74 N


Pt2 = Pᵤ * (ec/et2) = 0.00 N
Pt3 = Pᵤ * (ec/et3) = 0.00 N
Pt4 = Pᵤ * (ec/et4) = 0.00 N
Gaya tejan total pada pelat tumpuan Puc = Pᵤ+ Ʃ Pt = 87,093.64 N
Panjang bidang tegangan tekan beton Y = 3 * (L - h)/2 = 177.00 mm
Luas pelat tumpuan baja A1 = B * L = 100,000.00 mm²
Luas penampang kolom pedestal A2 = I * J = 100,000.00 mm²
Tegangan tumpuan nominal Fcn = 0.85 *Fc' * √(A 1/A 2) = 21.17 mm²
fcn = 1.70 * fc' = 42.33 Mpa
Tegangan tumpuan nominal beton yang digunakan fcn = 21.17 Mpa
Faktor reduksi kekuatan tekan beton Ф= 0.90
Tegangan tumpuan beton yang diijinkan Ф * fcn = 19.05 Mpa
Tegangan tumpuan maksimum yang terjadi pada beton
fcu = 2 * Puc / (Y * B) = 3.94 Mpa
Syarat yang harus dipenuhi:

fcu ≤ Ф * fcn
3.94 < 19.05 AMAN (OK)

4. Kontrol Dimensi Pelat Tumpuan

Lebar minimum plat tumpuan yng diperlukan


Bp min = Puc / (0.5 * Ф * fcn * Y) = 51.66 mm
Lebar plat yang digunakan B= 250.00 mm
Syarat yang harus dipenuhi:

Bp min ≤ B
51.66 < 250.00 AMAN (OK)

Panjang bagian plat tumpuan jepit bebas,


a = (L - 0.95*ht)/2 = 57.50 mm
fcu1 = (1 - (a/Y)) * fcu = 2.66 Mpa
Modulus penampang plastis pelat Z = 1/4 * B * t² = 16,000.00 mm²
Momen yang terjadi pada plat akibat beban terfaktor
Mup = [1/2 * B * fcu1 * a²] + [1/3 * B *fcu - fcu1) * a²] = 1,450,689.09 N.mm
faktor reduksi kekuatan lentur Фb = 0.90
Tahanan momen nominal pelat Mn = fy * Z = 3,840,000 N.mm
Tahanan momen plat Фb * Mn = 3,456,000 N.mm

Mup ≤ Фb * Mn
1,450,689.09 < 3,456,000.00 AMAN (OK)
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

5. Gaya Tarik Pada Angkur Baut

Gaya tarik pada angkur baut Tu1 = Pt/nt = 2,464.91 N


Tegangn tarik putus angkur baut fᵤᵇ = 825.00 Mpa
Luas penampang angkur baut A b = 1/4 * π * d² = 201.06 mm²
Faktor reduksi kekuatan tarik Фt = 0.90
Tahanan tarik nominal angkur Tn = 0.75 * A b * fᵤᵇ = 124,407.07 N
Tahanan tarik angkur baut Ф t * Tn = 111,966.36 N
Syarat yang harus dipenuhi

Tu1 ≤ Ф t * Tn
2,464.91 < 111,966.36 AMAN (OK)

6. Gaya Geser Pada Angkur Baut

Gaya geser pada angkur baut, Vᵤ1 = Vᵤ/n = 5,693.67 N


Tegangan tarik putus fᵤᵇ = 463 Mpa
Jumlah penampang geser m= 1.00
Faktor pengaruh ulir pada bidang geser r1 = 0.40
Luas penampang baut A b = 1/4 * π * d² = 201.06 mm²
Faktor reduksi kekuatan geser Фf = 0.75
Tahanan geser nominal Vn = r1 * m *A b * fᵤᵇ = 37,196.46 N
Tahanan geser angkur baut Фf * Vn = 27,897.34 N
Syarat yang harus dipenuhi:

Vu1 ≤ Фf * Vn
5,693.67 < 27,897.34 AMAN (OK)

7. Gaya Tumpuan pada Angkur Baut

Gaya tumpuan pada angkur baut Ru1 = Vu1 = 5,693.67 N


Diameter baut d= 16 mm
Tebal pelat tumpu t= 16 mm
Tegangan tarik putus fᵤᴾ = 240 Mpa
Tahanan tumpu nominal Rn = 2.4 * d * t * fᵤᴾ = 147,456 N
Tahanan tumpu Фf * Rn = 110,592 N
Syarat yang harus dipenuhi:

Ru1 ≤ Фf * Rn
5,693.67 < 110,592.00 AMAN (OK)

8. Kombinasi Geser dan Tarik

Konstanta tegangan untuk baut mutu tinggi f1 = 807.00 Mpa


f2 = 621.00 Mpa
Faktor pengaruh ulir pada bidang geser r2 = 1.90
Tegangan geser akibat beban terfaktor fᵤᵥ = Vᵤ / (n * A b) = 28.32 Mpa
Kuat geser angkur baut Фf * r1 * m * fᵤᵇ = 138.75 Mpa
Syarat yang harus dipenuhi:

fᵤᵥ = Vᵤ / (n * A b) ≤ Фf * r1 * m * fᵤᵇ
28.32 < 138.75 AMAN (OK)

Gaya tarik akibat beban terfaktor Tu1 = 2,464.91 N


Tahanan tarik angkur Фf * Tn = Фf * f1 * A b = 121,692.73 N
Syarat yang harus dipenuhi:

Tu1 ≤ Фf * f1 * A b
2,464.91 < 121,692.73 AMAN (OK)
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Kuat tarik angkur baut ft = 0.75 * fᵤᵇ = 346.88 Mpa
Batas tegangan kombinasi f1 - r2 * fᵤᵥ = 753.20 Mpa
f2 = 621.00 Mpa
Syarat yang harus dipenuhi:

ft ≤ f1 - r2 * fᵤᵥ
346.88 < 753.20 AMAN (OK)

Syarat yang harus dipenuhi:

ft ≤ f2
346.88 < 621.00 AMAN (OK)

9. Kontrol panjang Angkur Baut

Panjang angkur tertanam yang dugunakan La = 300.00 mm


Kuat tekan beton Fc' = 25 Mpa
Tegangan leleh baja fᵧ = 370 Mpa
Diameter angkur baut d= 16 mm
Panjang angkur tertanam minimum yang diperlukan
Lmin = fᵧ / (4 *√fc' ) * d = 297 mm
Syarat yang harus dipenuhi:

Lmin ≤ La
296.59 < 300.00 AMAN (OK)

Syarat:
A. Panjang Penyaluran Batang Tulangan dalam Kondisi Tekan L dc

1. = 284.73 mm

λ = Faktor modifikasi , 1 untuk beton normal

2. Ldc= 0,043 * fᵧ * d = 254.56 mm

3. Ldc min ≥ 200 mm = 200.00 mm

Panjang Penyaluran Batang Tulangan dalam Kondisi Tekan L dc


Ldc = 285 mm

B. Panjang Penyaluran Batang Tulangan dalam Kondisi Tarik L dh


(Diakhiri Dengan Kait Standar)

1. = 219.70 mm
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

2. Ldh ≥ 8d = 128.00 mm

3. Ldh min ≥ 150 mm = 150.00 mm

Ldh = 220 mm

Panjang minimum ankur yang diperoleh:

Lmin = 297 mm
Lrencana = 300 mm

Kesimpulan:
Data Kolom Pedestal
Lebar, B= 250 mm
Panjang, L= 400 mm
Data Base Plate
B= 250 mm
L= 400 mm
t= 16 mm
Data Baut
Dimensi Baut, D = 16 mm
Jumlah Baut, n = 6 bh
Panjang Baut, Lb = 300 mm
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Peritungan Samungan Baja WF 350.175

Diagram Gaya Dalam Balok WF.350.175.7.11

1. Data Gaya Dalam (Elemen Force)

No. Pembebanan Kolom Data Pembebanan


1. Momen akibat beban terfaktor Mᵤ = 129,782,400.00 N.mm
2. Gaya geser akibat beban terfaktor Vᵤ = 47,852.40 N
Note: profil yang digunakan WF 350.175.7.11
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
1.1. Baut

No. Data Angkur Baut Data Profil


1. Jenis baut Tipe = ST - 37
2. Tegangan tarik putus baut fᵤᵇ = 825 Mpa
3. Diameter baut d= 16 mm
4. Jarak antar baut a= 50 mm
5. Jumlah baut dalam satu baris nx = 2 bh
6. Jumlah baris baut ny = 6 bh
7. Faktor reduksi kekuatan tarik baut Фt = 0.90
8. Faktor reduksi kekuatan geser baut Фf = 0.75

1.2. Pelat Sambungan

No. Data Angkur Baut Data Profil


1. Tegangan leleh pelat fᵧ = 240 Mpa
2. Tegangan tarik putus pelat fᵤᴾ = 370 Mpa
3. Lebar pelat sambungan b= 175 mm
4. Tebal pelat sambungan t= 12 mm

2. Letak Garis Netral

 1
a/2 Tu 2
a

a x
h
Jumlah baut total a n = nx * ny = 12 bh
Tinggi pelat sambungan h = ny * a = 590 mm
a
Lebar pelat sambungan ekuivalen sebagai pengganti baut tarik
a δ = nx * (1/4 * π * d²) / a = 8.04 mm
Lebar efektif pelat sambungan bagian tekan b' = 0.75 * b = 131 mm
a/2x dari sisi atas pelath-x
Misal garis netral terletak pada jarak sambungan, maka:
b b' 3
Momen statis luasan terhadap garis netral,
1/2 * b' * (h - x)2 = 1/2 * δ * x²
(b' - δ )/2 * x² - b' * h * x + 1/2 * b' * h² = 0 (Persamaan Kuadrat dalam x)
A= (b' - δ)/2 = 61.60
B= - b' * h = -77,438
C= 1/2 * b' * h² = 22,844,063
x= -B ± √(B² - 4 * A * C)
2*A

x1 = -B + √(B² - 4 * A * C) = 784.09 mm
2*A

x2 = -B + √(B² - 4 * A * C) = 472.93 mm
2*A
Tinggi profil baja, h = 600 mm
x = x1 = 472.93 mm
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3. Tegangan yang Terjadi pada Baut

Persamaan hubungan tegangan, σ3 = (h - x)/x*σ1 Pers. (1)


σ2 = (x - a/2)/x*σ1 Pers. (2)
Persamaan momen
1/2 * (h - x) * b' * σ3 * 2/3 *(h - x) + (1/2 * x * δ * σ1 * 2/3 * x) = Mu
1/2 * (h - x) * b' * (h - x)/x *σ 1 * 2/3 *(h - x) + (1/2 * x * δ * σ1 * 2/3 * x) = Mu
Maka diperoleh:
σ1 = 3 * Mu / [(h - x)³ / x * b' + x² * δ] Pers. (3)

Tegangan pada masing - masing baris baut:

Tegangan tarik pada sisi atas pelat sambungan,


Dari pers. (3) σ1 = 3 * Mu / [(h - x)³ / x * b' + x² * δ] = 173.50 Mpa

tegangan tekan pada sisi bawah pelat sambungan,


Dari pers (1) σ3 = (h - x)/x*σ1 = 42.95 Mpa

Tegangan tarik pada baut baris teratas,


Dari pers (2) σ2 = (x - a/2)/x*σ1 = 164.33 Mpa

Tegangan tarik putus pada baut dan pelat:


Tegangan tarik Putus baut fᵤᵇ = 825 Mpa
Tegangan tarik putus pelat fᵤᴾ = 370 Mpa

4. Gaya Tarik pada Baut

Gaya tarik yang terjadi pada baut baris teratas, Tu = σ2 * a * δ = 66,080.12 N


Gaya tarik yang ditahan satu baut Tu1 = Tu/nx = 33,040.06 N
Luas penampang baut A b = 1/4 * π * d² = 201.06 mm²
Faktor reduksi kekuatan tarik Фt = 0.90
Tahanan tarik nominal satu baut (SNI 1729-15 : J3-2) Tn = 0.75 * A b * fᵤᵇ = 124,407.07 N
Tahanan tariksatu baut Ф t * Tn = 111,966.36 N
Syarat yang harus dipenuhi:

Tu1 ≤ Ф t * Tn
33,040.06 < 111,966.36 AMAN (OK)

5. Gaya Geser pada Baut

Gaya geser yang ditahan oleh satu baut Vs1 = Vu / n = 3,987.70 N


Kondisi sambungan baut geser tunggal, maka nilai m= 1
Faktor pengaruh ulir pada bidang geser r1 = 0.40
Luas penampang baut A b = 1/4 * π * d² = 201.06 mm²
Faktor reduksi kekuatan geser Фf = 0.75
Tahanan geser nominal baut Vn = r1 * m * A b * fᵤᵇ = 66,350.44 N
Tahanan geser baut Фf * Vn = 49,762.83 N
Syarat yang harus dipenuhi:

Vs1 ≤ Фf * V
3,987.70 < 49,762.83 AMAN (OK)
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
6. Gaya Tumpuan pada Baut

Gaya tumpuan yang ditahan oleh satu baut Rs1 = Vs1 = 3,987.70 N
Diameter baut d= 16 mm
Tebal pelat sambungan t= 12 mm
Tegangan tarik putuis pelat fᵤᴾ = 370 Mpa
Tahanan tumpu nominal Rn = 2.4 * d * t * fᵤᴾ = 170,496 N
Tahanan tumpu Фf * R n = 127,872 N
Syarat yang harus dipenuhi:

Vs1 ≤ Фf * R n
3,987.70 < 127,872.00 AMAN (OK)

7. Kombinasi Geser & Tarik

Konstanta tegangan (f1) untuk baut mutu tinggi f1 = 807.00 N


Konstanta tegangan (f2) untuk baut mutu tinggi f2 = 621.00 mm
Faktor pengaruh ulir pada bidang geser r2 = 1.90 mm
tegangan geser yang terjadi fᵤᵥ = Vu / (n * A b) = 19.83 Mpa
Tahann geser baut Фf * r1 * m * fᵤᵇ = 247.50 N
Syarat yang harus dipenuhi:

fᵤᵥ = Vu / (n * A b) ≤ Фf * r1 * m * fᵤᵇ
19.83 < 247.50 AMAN (OK)

Gaya tarik yang terjadi Tu1 = 33,040.06 N


Tahanan tarik baut Фf * Tn = Фf * f1 * A b = 121,692.73 N
Syarat yang harus dipenuhi:

fᵤᵥ = Vu / (n * A b) ≤ Фf * f1 * A b
33,040.06 < 121,692.73 AMAN (OK)

Tagangan tarik (SNI 1729-15 : J3-2) ft = 0.75 * fᵤᵇ = 618.75 Mpa


Nilai tegangan kombinasi f1 - r2 *fᵤᵥ = 769.32 Mpa
Syarat yang harus dipenuhi:

ft ≤ f1 - r2 *fᵤᵥ
618.75 < 769.32 AMAN (OK)

Syarat yang harus dipenuhi:

ft ≤ f2
618.75 < 621.00 AMAN (OK)

8. Panjang Penyaluran Baut pada Kolom & Balok Struktur

Panjang angkur tertanam yang dugunakan La = 300.00 mm


Kuat tekan beton F c' = 24.9 Mpa
Tegangan leleh baja fᵧ = 370 Mpa
Diameter angkur baut d= 16 mm
Panjang angkur tertanam minimum yang diperlukan
Lmin = fᵧ / (4 *√fc' ) * d = 297 mm
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Syarat yang harus dipenuhi:

Lmin ≤ La
296.59 < 300.00 AMAN (OK)

Syarat:
A. Panjang Penyaluran Batang Tulangan dalam Kondisi Tekan L dc

1. = 284.73 mm

λ = Faktor modifikasi , 1 untuk beton normal

2. Ldc= 0,043 * fᵧ * d = 254.56 mm

3. Ldc min ≥ 200 mm = 200.00 mm

Panjang Penyaluran Batang Tulangan dalam Kondisi Tekan L dc


Ldc = 285 mm

B. Panjang Penyaluran Batang Tulangan dalam Kondisi Tarik L dh


(Diakhiri Dengan Kait Standar)

1. = 219.70 mm

2. Ldh ≥ 8d = 128.00 mm

3. Ldh min ≥ 150 mm = 150.00 mm

Ldh = 220 mm

Panjang minimum ankur yang diperoleh:

Lmin = 297 mm
Lrencana = 300 mm
Lrencana-2 = 220 mm Dengan kait standar 12D

Kesimpulan:
Data End Plate
B= 175 mm
L= 590 mm
t= 12 mm
Data Baut
Dimensi Baut, D = 16 mm
Jumlah Baut, n = 12 bh
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Peritungan Samungan Baja WF 300.150

Diagram Gaya Dalam Balok WF.300.150.6,5.9

1. Data Gaya Dalam (Elemen Force)

No. Pembebanan Kolom Data Pembebanan


1. Momen akibat beban terfaktor Mᵤ = 57,547,200.00 N.mm
2. Gaya geser akibat beban terfaktor Vᵤ = 54,161.80 N
Note: profil yang digunakan WF 300.150.6,5.9
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
1.1. Baut

No. Data Angkur Baut Data Profil


1. Jenis baut Tipe = ST - 37
2. Tegangan tarik putus baut fᵤᵇ = 825 Mpa
3. Diameter baut d= 16 mm
4. Jarak antar baut a= 50 mm
5. Jumlah baut dalam satu baris nx = 2 bh
6. Jumlah baris baut ny = 5 bh
7. Faktor reduksi kekuatan tarik baut Фt = 0.90
8. Faktor reduksi kekuatan geser baut Фf = 0.75

1.2. Pelat Sambungan

No. Data Angkur Baut Data Profil


1. Tegangan leleh pelat fᵧ = 240 Mpa
2. Tegangan tarik putus pelat fᵤᴾ = 370 Mpa
3. Lebar pelat sambungan b= 200 mm
4. Tebal pelat sambungan t= 8 mm
 1
2. Letak Garis Netral
a/2 Tu 2
a

a x
h
a

a
a/2 h-x
b b' 3

Jumlah baut total n = nx * ny = 10 bh


Tinggi pelat sambungan h = ny * a = 400 mm
Lebar pelat sambungan ekuivalen sebagai pengganti baut tarik
δ = nx * (1/4 * π * d²) / a = 8.04 mm
Lebar efektif pelat sambungan bagian tekan b' = 0.75 * b = 150 mm
Misal garis netral terletak pada jarak x dari sisi atas pelat sambungan, maka:

Momen statis luasan terhadap garis netral,


1/2 * b' * (h - x)2 = 1/2 * δ * x²
(b' - δ )/2 * x² - b' * h * x + 1/2 * b' * h² = 0 (Persamaan Kuadrat dalam x)
A= (b' - δ)/2 = 70.98
B= - b' * h = -60,000
C= 1/2 * b' * h² = 12,000,000
x= -B ± √(B² - 4 * A * C)
2*A

x1 = -B + √(B² - 4 * A * C) = 520.53 mm
2*A

x2 = -B + √(B² - 4 * A * C) = 324.79 mm
2*A
Tinggi profil baja, h = 525 mm
x = x1 = 324.79 mm
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

x1 = -B + √(B² - 4 * A * C) = 520.53 mm
2*A

x2 = -B + √(B² - 4 * A * C) = 324.79 mm
2*A
Tinggi profil baja, h = 525 mm
x = x1 = 324.79 mm

3. Tegangan yang Terjadi pada Baut

Persamaan hubungan tegangan, σ3 = (h - x)/x*σ1 Pers. (1)


σ2 = (x - a/2)/x*σ1 Pers. (2)
Persamaan momen
1/2 * (h - x) * b' * σ3 * 2/3 *(h - x) + (1/2 * x * δ * σ1 * 2/3 * x) = Mu
1/2 * (h - x) * b' * (h - x)/x *σ 1 * 2/3 *(h - x) + (1/2 * x * δ * σ1 * 2/3 * x) = Mu
Maka diperoleh:
σ1 = 3 * Mu / [(h - x)³ / x * b' + x² * δ] Pers. (3)

Tegangan pada masing - masing baris baut:

Tegangan tarik pada sisi atas pelat sambungan,


Dari pers. (3) σ1 = 3 * Mu / [(h - x)³ / x * b' + x² * δ] = 165.23 Mpa

tegangan tekan pada sisi bawah pelat sambungan,


Dari pers (1) σ3 = (h - x)/x*σ1 = 38.26 Mpa

Tegangan tarik pada baut baris teratas,


Dari pers (2) σ2 = (x - a/2)/x*σ1 = 152.51 Mpa

Tegangan tarik putus pada baut dan pelat:


Tegangan tarik Putus baut fᵤᵇ = 825 Mpa
Tegangan tarik putus pelat fᵤᴾ = 370 Mpa

4. Gaya Tarik pada Baut

Gaya tarik yang terjadi pada baut baris teratas, Tu = σ2 * a * δ = 61,328.63 N


Gaya tarik yang ditahan satu baut Tu1 = Tu/nx = 12,265.73 N
Luas penampang baut A b = 1/4 * π * d² = 201.06 mm²
Faktor reduksi kekuatan tarik Фt = 0.90
Tahanan tarik nominal satu baut (SNI 1729-15 : J3-2) Tn = 0.75 * A b * fᵤᵇ = 124,407.07 N
Tahanan tariksatu baut Ф t * Tn = 111,966.36 N
Syarat yang harus dipenuhi:

Tu1 ≤ Ф t * Tn
12,265.73 < 111,966.36 AMAN (OK)

5. Gaya Geser pada Baut

Gaya geser yang ditahan oleh satu baut Vs1 = Vu / n = 5,416.18 N


Kondisi sambungan baut geser tunggal, maka nilai m= 1
Faktor pengaruh ulir pada bidang geser r1 = 0.40
Luas penampang baut A b = 1/4 * π * d² = 201.06 mm²
Faktor reduksi kekuatan geser Фf = 0.75
Tahanan geser nominal baut Vn = r1 * m * A b * fᵤᵇ = 66,350.44 N
Tahanan geser baut Фf * Vn = 49,762.83 N
Syarat yang harus dipenuhi:

Vs1 ≤ Фf * V
5,416.18 < 49,762.83 AMAN (OK)
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
6. Gaya Tumpuan pada Baut

Gaya tumpuan yang ditahan oleh satu baut Rs1 = Vs1 = 5,416.18 N
Diameter baut d= 16 mm
Tebal pelat sambungan t= 8 mm
Tegangan tarik putuis pelat fᵤᴾ = 370 Mpa
Tahanan tumpu nominal Rn = 2.4 * d * t * fᵤᴾ = 113,664 N
Tahanan tumpu Фf * R n = 85,248 N
Syarat yang harus dipenuhi:

Vs1 ≤ Фf * R n
5,416.18 < 85,248.00 AMAN (OK)

7. Kombinasi Geser & Tarik

Konstanta tegangan (f1) untuk baut mutu tinggi f1 = 870.00 N


Konstanta tegangan (f2) untuk baut mutu tinggi f2 = 621.00 mm
Faktor pengaruh ulir pada bidang geser r2 = 1.90 mm
tegangan geser yang terjadi fᵤᵥ = Vu / (n * A b) = 26.94 Mpa
Tahann geser baut Фf * r1 * m * fᵤᵇ = 247.50 N
Syarat yang harus dipenuhi:

fᵤᵥ = Vu / (n * A b) ≤ Фf * r1 * m * fᵤᵇ
26.94 < 247.50 AMAN (OK)

Gaya tarik yang terjadi Tu1 = 12,265.73 N


Tahanan tarik baut Фf * Tn = Фf * f1 * A b = 131,192.91 N
Syarat yang harus dipenuhi:

fᵤᵥ = Vu / (n * A b) ≤ Фf * f1 * A b
12,265.73 < 131,192.91 AMAN (OK)

Tagangan tarik (SNI 1729-15 : J3-2) ft = 0.75* fᵤᵇ = 618.75 Mpa


Nilai tegangan kombinasi f1 - r2 *fᵤᵥ = 818.82 Mpa
Syarat yang harus dipenuhi:

ft ≤ f1 - r2 *fᵤᵥ
618.75 < 818.82 AMAN (OK)

Syarat yang harus dipenuhi:

ft ≤ f2
618.75 < 621.00 AMAN (OK)

Kesimpulan:
Data End Plate
B= 200 mm
L= 400 mm
t= 8 mm
Data Baut
Dimensi Baut, D = 16 mm
Jumlah Baut, n = 10 bh
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

Peritungan Samungan Baja WF 150.75

Diagram Gaya Dalam Balok WF.150.75.5.7

1. Data Gaya Dalam (Elemen Force)

No. Pembebanan Kolom Data Pembebanan


1. Momen akibat beban terfaktor Mᵤ = 759,000.00 N.mm
2. Gaya geser akibat beban terfaktor Vᵤ = 648.30 N
Note: profil yang digunakan WF 150.75.5.7
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
1.1. Baut

No. Data Angkur Baut Data Profil


1. Jenis baut Tipe = ST - 37
2. Tegangan tarik putus baut fᵤᵇ = 825 Mpa
3. Diameter baut d= 12 mm
4. Jarak antar baut a= 40 mm
5. Jumlah baut dalam satu baris nx = 2 bh
6. Jumlah baris baut ny = 2 bh
7. Faktor reduksi kekuatan tarik baut Фt = 0.90
8. Faktor reduksi kekuatan geser baut Фf = 0.75

1.2. Pelat Sambungan

No. Data Angkur Baut Data Profil


1. Tegangan leleh pelat fᵧ = 240 Mpa
2. Tegangan tarik putus pelat fᵤᴾ = 370 Mpa
3. Lebar pelat sambungan b= 100 mm
4. Tebal pelat sambungan t= 8 mm

2. Letak Garis Netral

 1
a/2 Tu 2
a

a
Jumlah baut total x n = nx * ny = 4 bh
a
Tinggi pelat sambungan h h = ny * a = 200 mm
Lebar pelat sambungan ekuivalen sebagai
a pengganti baut tarik
δ = nx * (1/4 * π * d²) / a = 5.65 mm
a
Lebar efektif pelat sambungan bagian tekan b' = 0.75 * b = 75 mm
Misal garis netral terletak pada jarak
a x dari sisi atas pelat sambungan, maka:

a/2netral, h-x
Momen statis luasan terhadap garis
b
1/2 * b' * (h - x)2 = 1/2 * δ * x² b' 3
(b' - δ )/2 * x² - b' * h * x + 1/2 * b' * h² = 0 (Persamaan Kuadrat dalam x)
A= (b' - δ)/2 = 34.67
B= - b' * h = -15,000
C= 1/2 * b' * h² = 1,500,000
x= -B ± √(B² - 4 * A * C)
2*A

x1 = -B + √(B² - 4 * A * C) = 275.71 mm
2*A

x2 = -B + √(B² - 4 * A * C) = 156.91 mm
2*A
Tinggi profil baja, h = 600 mm
x = x1 = 156.91 mm
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
3. Tegangan yang Terjadi pada Baut

Persamaan hubungan tegangan, σ3 = (h - x)/x*σ1 Pers. (1)


σ2 = (x - a/2)/x*σ1 Pers. (2)
Persamaan momen
1/2 * (h - x) * b' * σ3 * 2/3 *(h - x) + (1/2 * x * δ * σ1 * 2/3 * x) = Mu
1/2 * (h - x) * b' * (h - x)/x *σ 1 * 2/3 *(h - x) + (1/2 * x * δ * σ1 * 2/3 * x) = Mu
Maka diperoleh:
σ1 = 3 * Mu / [(h - x)³ / x * b' + x² * δ] Pers. (3)

Tegangan pada masing - masing baris baut:

Tegangan tarik pada sisi atas pelat sambungan,


Dari pers. (3) σ1 = 3 * Mu / [(h - x)³ / x * b' + x² * δ] = 12.83 Mpa

tegangan tekan pada sisi bawah pelat sambungan,


Dari pers (1) σ3 = (h - x)/x*σ1 = 3.52 Mpa

Tegangan tarik pada baut baris teratas,


Dari pers (2) σ2 = (x - a/2)/x*σ1 = 11.20 Mpa

Tegangan tarik putus pada baut dan pelat:


Tegangan tarik Putus baut fᵤᵇ = 825 Mpa
Tegangan tarik putus pelat fᵤᴾ = 370 Mpa

4. Gaya Tarik pada Baut

Gaya tarik yang terjadi pada baut baris teratas, Tu = σ2 * a * δ = 2,532.32 N


Gaya tarik yang ditahan satu baut Tu1 = Tu/nx = 1,266.16 N
Luas penampang baut A b = 1/4 * π * d² = 113.10 mm²
Faktor reduksi kekuatan tarik Фt = 0.90
Tahanan tarik nominal satu baut (SNI 1729-15 : J3-2) Tn = 0.75 * A b * fᵤᵇ = 69,978.98 N
Tahanan tariksatu baut Ф t * Tn = 62,981.08 N
Syarat yang harus dipenuhi:

Tu1 ≤ Ф t * Tn
1,266.16 < 62,981.08 AMAN (OK)

5. Gaya Geser pada Baut

Gaya geser yang ditahan oleh satu baut Vs1 = Vu / n = 162.08 N


Kondisi sambungan baut geser tunggal, maka nilai m= 1
Faktor pengaruh ulir pada bidang geser r1 = 0.40
Luas penampang baut A b = 1/4 * π * d² = 113.10 mm²
Faktor reduksi kekuatan geser Фf = 0.75
Tahanan geser nominal baut Vn = r1 * m * A b * fᵤᵇ = 37,322.12 N
Tahanan geser baut Фf * Vn = 27,991.59 N
Syarat yang harus dipenuhi:

Vs1 ≤ Фf * V
162.08 < 27,991.59 AMAN (OK)
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
6. Gaya Tumpuan pada Baut

Gaya tumpuan yang ditahan oleh satu baut Rs1 = Vs1 = 162.08 N
Diameter baut d= 12 mm
Tebal pelat sambungan t= 8 mm
Tegangan tarik putuis pelat fᵤᴾ = 370 Mpa
Tahanan tumpu nominal Rn = 2.4 * d * t * fᵤᴾ = 85,248 N
Tahanan tumpu Фf * R n = 63,936 N
Syarat yang harus dipenuhi:

Vs1 ≤ Фf * R n
162.08 < 63,936.00 AMAN (OK)

7. Kombinasi Geser & Tarik

Konstanta tegangan (f1) untuk baut mutu tinggi f1 = 870.00 N


Konstanta tegangan (f2) untuk baut mutu tinggi f2 = 621.00 mm
Faktor pengaruh ulir pada bidang geser r2 = 1.90 mm
tegangan geser yang terjadi fᵤᵥ = Vu / (n * A b) = 1.43 Mpa
Tahann geser baut Фf * r1 * m * fᵤᵇ = 247.50 N
Syarat yang harus dipenuhi:

fᵤᵥ = Vu / (n * A b) ≤ Фf * r1 * m * fᵤᵇ
1.43 < 247.50 AMAN (OK)

Gaya tarik yang terjadi Tu1 = 1,266.16 N


Tahanan tarik baut Фf * Tn = Фf * f1 * A b = 73,796.01 N
Syarat yang harus dipenuhi:

fᵤᵥ = Vu / (n * A b) ≤ Фf * f1 * A b
1,266.16 < 73,796.01 AMAN (OK)

Tagangan tarik (SNI 1729-15 : J3-2) ft = 0.75* fᵤᵇ = 618.75 Mpa


Nilai tegangan kombinasi f1 - r2 *fᵤᵥ = 867.28 Mpa
Syarat yang harus dipenuhi:

ft ≤ f1 - r2 *fᵤᵥ
618.75 < 867.28 AMAN (OK)

Syarat yang harus dipenuhi:

ft ≤ f2
618.75 < 621.00 AMAN (OK)

Kesimpulan:
Data End Plate
B= 100 mm
L= 200 mm
t= 8 mm
Data Baut
Dimensi Baut, D = 12 mm
Jumlah Baut, n = 4 bh
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Peritungan Purlin
Jarak Antar Purlin = 1.2 m
o
Sudut Kemiringan Atap ( a ) = 10
Jarak Antar Truss ( L ) = 6.00 m
Jumlah Sagrod = 2 bh
Jarak Antar Sagrod ( Ly ) = 2.00 m
Tipe Purlin CNP 150X50X20X3.2
Wx = 37.400 cm3
Wy = 8.190 cm3
Ix = 280.000 cm4
Iy = 28.300 cm4
Qbs = 6.760 kg/m
BEBAN
Berat Sendiri Penutup Atap ( Tegola + Rangka ) = 5.0 kg/m2
Plafon = 10.0 kg/m2
ME = 10.0 kg/m2
Insulasi ( glasswool 16 kg/m³ , t=1" ) = 0.400 kg/m2
Aluminium foil single sided ( Type 810 ) = 0.130 kg/m2
25.530 kg/m2

Self weight of roof covering ( Tegola + Rangka ) = 30.636 kg/m


Rain water ( 10 kg /m2 ) = 10.000 kg/m
Self weight of purlin = 6.760 kg/m
Total - 1 = 47.396 kg/m
Additional Load ( bracing, sagrod etc ) = 10% DL = 3.740 kg/m
Total - 2 = 51.136 kg/m

Qx = Q sin ( a ) = 8.875 kg/m


Qy = Q cos ( a ) = 50.360 kg/m

Point Load ( P ) = 134 kg

Px = P sin ( a ) = 23.269 kg
Py = P cos ( a ) = 131.964 kg

CHECKING STRESS
Mx1 = ( 1/8) Qx L2 = 4.438 kgm
Mx2 = ( 1/4) Px L = 11.634 kgm
Mx = Mx1 + Mx2 = 16.072 kgm
My1 = ( 1/8) Qy Ly2 = 226.618 kgm
My2 = ( 1/4) Py Ly = 197.946 kgm
My = My1 + My2 = 424.564 kgm
 = ( Mx/WY ) + ( My/WX ) = 1,331 kg/cm2
 allowable = 1,600 kg/cm2
Stress Ratio = 0.832 ( OK )
CHECKING DEFLECTION
Lendutan Max = L / 240 = 2.500 cm
x1 = ( 5 Qy L4 ) / ( 384 E Ix ) = 1.445 cm
x2 = ( Py L3 ) / ( 48 E Ix ) = 1.010 cm
x = Dx1 + Dx2 = 2.455 cm

y1 = ( 5 Qx Ly4 ) / ( 384 E Iy ) = 0.031 cm


y2 = ( Px Ly3 ) / ( 48 E Iy ) = 0.065 cm
y = Dy1 + Dy2 = 0.096 cm
 = ( Dx2 + Dy2 ) 1/2 = 2.457 cm
 izin = 2.500 cm ( OK )
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji

BAB IV PERHITUNGAN STRUKTUR BAWAH


4.1 Perhitungan Daya Dukung Pondasi
4.1.1 Daya Dukung Pondasi DCPT-1
Nama Proyek = Puskesmas Simpang Pematang
Lokasi = Mesuji - Lampung
Data CPT = DCPT-1
Diameter = 40 cm Borepile BP.1a
A Soil Bearing Capacity

Qa = Daya dukung ijin tiang (ton)


Qp = Daya dukung ujung (ton)
Qs = Daya dukung sisi (ton)
qc = Perlawanan konus (kg/cm²)
Ap = Luas pondasi (cm²)
JHL = Jumlah Hambatan Lekat (kg/cm²)
K= keliling penampang pondasi (cm)
SF = Safety Factor ----> SF = 3 untuk daya dukung ujung
----> SF = 5 untuk daya dukung sisi

Kedalama qc Ap Friction Total Friction K Qult Qallowable


No.
(m) (kg/cm²) (cm²) (kg/cm²) cm ton ton
1 0 0.00 1256.64 0.00 0.00 125.66 0.00 0.00
2 0.2 5.00 1256.64 10.00 10.00 125.66 7.54 2.35
3 0.4 10.00 1256.64 40.00 40.00 125.66 17.59 5.19
4 0.6 20.00 1256.64 10.00 10.00 125.66 26.39 8.63
5 0.8 25.00 1256.64 10.00 10.00 125.66 32.67 10.72
6 1 30.00 1256.64 10.00 10.00 125.66 38.96 12.82
7 1.2 35.00 1256.64 20.00 30.00 125.66 47.75 15.41
8 1.4 45.00 1256.64 30.00 60.00 125.66 64.09 20.36
9 1.6 60.00 1256.64 10.00 70.00 125.66 84.19 26.89
10 1.8 65.00 1256.64 20.00 90.00 125.66 92.99 29.49
11 2 65.00 1256.64 10.00 100.00 125.66 94.25 29.74
12 2.2 70.00 1256.64 10.00 110.00 125.66 101.79 32.09
13 2.4 60.00 1256.64 10.00 120.00 125.66 90.48 28.15
14 2.6 60.00 1256.64 20.00 140.00 125.66 92.99 28.65
15 2.8 65.00 1256.64 0.00 140.00 125.66 99.27 30.75
16 3 45.00 1256.64 10.00 150.00 125.66 75.40 22.62
17 3.2 40.00 1256.64 10.00 160.00 125.66 70.37 20.78
18 3.4 35.00 1256.64 10.00 170.00 125.66 65.35 18.93
19 3.6 40.00 1256.64 10.00 180.00 125.66 72.88 21.28
20 3.8 35.00 1256.64 30.00 210.00 125.66 70.37 19.94
21 4 40.00 1256.64 10.00 220.00 125.66 77.91 22.28
22 4.2 45.00 1256.64 10.00 230.00 125.66 85.45 24.63
23 4.4 40.00 1256.64 10.00 240.00 125.66 80.42 22.79
24 4.6 45.00 1256.64 10.00 250.00 125.66 87.96 25.13
25 4.8 50.00 1256.64 10.00 260.00 125.66 95.50 27.48
26 5 45.00 1256.64 10.00 270.00 125.66 90.48 25.64
27 5.2 40.00 1256.64 10.00 280.00 125.66 85.45 23.79
28 5.4 45.00 1256.64 10.00 290.00 125.66 92.99 26.14
29 5.6 35.00 1256.64 10.00 300.00 125.66 81.68 22.20
30 5.8 40.00 1256.64 10.00 310.00 125.66 89.22 24.55
31 6 45.00 1256.64 10.00 320.00 125.66 96.76 26.89
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
32 6.2 50.00 1256.64 10.00 330.00 125.66 104.30 29.24
33 6.4 55.00 1256.64 10.00 340.00 125.66 111.84 31.58
34 6.6 60.00 1256.64 10.00 350.00 125.66 119.38 33.93
35 6.8 65.00 1256.64 10.00 360.00 125.66 126.92 36.27
36 7 70.00 1256.64 10.00 370.00 125.66 134.46 38.62
37 7.2 75.00 1256.64 10.00 380.00 125.66 142.00 40.97
38 7.4 80.00 1256.64 30.00 410.00 125.66 152.05 43.81
39 7.6 95.00 1256.64 30.00 440.00 125.66 174.67 50.85
40 7.8 110.00 1256.64 30.00 470.00 125.66 197.29 57.89
41 8 125.00 1256.64 10.00 480.00 125.66 217.40 64.42
42 8.2 130.00 1256.64 10.00 490.00 125.66 224.94 66.77
43 8.4 135.00 1256.64 10.00 500.00 125.66 232.48 69.12
44 8.6 140.00 1256.64 10.00 510.00 125.66 240.02 71.46
45 8.8 145.00 1256.64 10.00 520.00 125.66 247.56 73.81
46 9 140.00 1256.64 10.00 530.00 125.66 242.53 71.96
47 9.2 145.00 1256.64 10.00 540.00 125.66 250.07 74.31
48 9.4 135.00 1256.64 10.00 550.00 125.66 238.76 70.37
49 9.6 130.00 1256.64 10.00 560.00 125.66 233.73 68.53
50 9.8 135.00 1256.64 10.00 570.00 125.66 241.27 70.87
51 10 120.00 1256.64 10.00 580.00 125.66 223.68 64.84
52 10.2 125.00 1256.64 10.00 590.00 125.66 231.22 67.19
53 10.4 130.00 1256.64 40.00 630.00 125.66 242.53 70.29
54 10.6 150.00 1256.64 40.00 670.00 125.66 272.69 79.67
55 10.8 170.00 1256.64 60.00 730.00 125.66 305.36 89.56
56 11 200.00 1256.64 20.00 750.00 125.66 345.58 83.78

Summary:
Diameter = 40.00 cm Square Pile
Kedalam = 11.00 m
Qa Tekan = 84 Ton
Qa Tarik = 19 Ton
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
4.1.2 Daya Dukung Pondasi DCPT-2
Nama Proyek = Puskesmas Simpang Pematang
Lokasi = Mesuji - Lampung
Data CPT = DCPT-2
Diameter = 40 cm Borepile BP.1a
A Soil Bearing Capacity

Qa = Daya dukung ijin tiang (ton)


Qp = Daya dukung ujung (ton)
Qs = Daya dukung sisi (ton)
qc = Perlawanan konus (kg/cm²)
Ap = Luas pondasi (cm²)
JHL = Jumlah Hambatan Lekat (kg/cm²)
K= keliling penampang pondasi (cm)
SF = Safety Factor ----> SF = 3 untuk daya dukung ujung
----> SF = 5 untuk daya dukung sisi

Kedalama qc Ap Friction Total Friction K Qult Qallowable


No.
(m) (kg/cm²) (cm²) (kg/cm²) cm ton ton
1 0 0.00 1256.64 0.00 0.00 125.66 0.00 0.00
2 0.2 5.00 1256.64 20.00 20.00 125.66 8.80 2.60
3 0.4 15.00 1256.64 10.00 10.00 125.66 20.11 6.53
4 0.6 20.00 1256.64 10.00 10.00 125.66 26.39 8.63
5 0.8 25.00 1256.64 30.00 30.00 125.66 35.19 11.23
6 1 40.00 1256.64 10.00 10.00 125.66 51.52 17.01
7 1.2 35.00 1256.64 10.00 20.00 125.66 46.50 15.16
8 1.4 40.00 1256.64 10.00 30.00 125.66 54.04 17.51
9 1.6 45.00 1256.64 10.00 40.00 125.66 61.58 19.85
10 1.8 50.00 1256.64 10.00 50.00 125.66 69.12 22.20
11 2 55.00 1256.64 10.00 60.00 125.66 76.65 24.55
12 2.2 60.00 1256.64 10.00 70.00 125.66 84.19 26.89
13 2.4 65.00 1256.64 10.00 80.00 125.66 91.73 29.24
14 2.6 70.00 1256.64 10.00 90.00 125.66 99.27 31.58
15 2.8 75.00 1256.64 10.00 100.00 125.66 106.81 33.93
16 3 70.00 1256.64 10.00 110.00 125.66 101.79 32.09
17 3.2 75.00 1256.64 10.00 120.00 125.66 109.33 34.43
18 3.4 70.00 1256.64 10.00 130.00 125.66 104.30 32.59
19 3.6 65.00 1256.64 10.00 140.00 125.66 99.27 30.75
20 3.8 55.00 1256.64 10.00 150.00 125.66 87.96 26.81
21 4 45.00 1256.64 10.00 160.00 125.66 76.65 22.87
22 4.2 50.00 1256.64 50.00 210.00 125.66 89.22 26.22
23 4.4 75.00 1256.64 10.00 220.00 125.66 121.89 36.95
24 4.6 80.00 1256.64 10.00 230.00 125.66 129.43 39.29
25 4.8 85.00 1256.64 10.00 240.00 125.66 136.97 41.64
26 5 75.00 1256.64 10.00 250.00 125.66 125.66 37.70
27 5.2 80.00 1256.64 10.00 260.00 125.66 133.20 40.04
28 5.4 85.00 1256.64 10.00 270.00 125.66 140.74 42.39
29 5.6 80.00 1256.64 10.00 280.00 125.66 135.72 40.55
30 5.8 75.00 1256.64 10.00 290.00 125.66 130.69 38.70
31 6 80.00 1256.64 30.00 320.00 125.66 140.74 41.55
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
32 6.2 85.00 1256.64 10.00 330.00 125.66 148.28 43.90
33 6.4 80.00 1256.64 10.00 340.00 125.66 143.26 42.06
34 6.6 85.00 1256.64 20.00 360.00 125.66 152.05 44.65
35 6.8 95.00 1256.64 20.00 380.00 125.66 167.13 49.34
36 7 105.00 1256.64 10.00 390.00 125.66 180.96 53.78
37 7.2 95.00 1256.64 10.00 400.00 125.66 169.65 49.85
38 7.4 100.00 1256.64 10.00 410.00 125.66 177.19 52.19
39 7.6 90.00 1256.64 10.00 420.00 125.66 165.88 48.25
40 7.8 85.00 1256.64 10.00 430.00 125.66 160.85 46.41
41 8 90.00 1256.64 40.00 470.00 125.66 172.16 49.51
42 8.2 110.00 1256.64 30.00 500.00 125.66 201.06 58.64
43 8.4 115.00 1256.64 10.00 510.00 125.66 208.60 60.99
44 8.6 120.00 1256.64 10.00 520.00 125.66 216.14 63.33
45 8.8 125.00 1256.64 30.00 550.00 125.66 226.19 66.18
46 9 140.00 1256.64 20.00 570.00 125.66 247.56 72.97
47 9.2 150.00 1256.64 20.00 590.00 125.66 262.64 77.66
48 9.4 145.00 1256.64 10.00 600.00 125.66 257.61 75.82
49 9.6 150.00 1256.64 10.00 610.00 125.66 265.15 78.16
50 9.8 155.00 1256.64 20.00 630.00 125.66 273.95 80.76
51 10 165.00 1256.64 10.00 640.00 125.66 287.77 85.20
52 10.2 160.00 1256.64 10.00 650.00 125.66 282.74 83.36
53 10.4 155.00 1256.64 10.00 660.00 125.66 277.72 81.51
54 10.6 160.00 1256.64 10.00 670.00 125.66 285.26 83.86
55 10.8 165.00 1256.64 10.00 680.00 125.66 292.80 86.21
56 11 170.00 1256.64 30.00 710.00 125.66 302.85 89.05
57 11.2 185.00 1256.64 20.00 730.00 125.66 324.21 95.84
58 11.4 195.00 1256.64 10.00 740.00 125.66 338.04 100.28
59 11.6 200.00 1256.64 50.00 790.00 125.66 350.60 103.63

Summary:
Diameter = 40.00 cm Square Pile
Kedalam = 11.60 m
Qa Tekan = 104 Ton
Qa Tarik = 20 Ton
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
4.1.3 Daya Dukung Pondasi DCPT-3
Nama Proyek = Puskesmas Simpang Pematang
Lokasi = Mesuji - Lampung
Data CPT = DCPT-3
Diameter = 40 cm Borepile BP.1a
A Soil Bearing Capacity

Qa = Daya dukung ijin tiang (ton)


Qp = Daya dukung ujung (ton)
Qs = Daya dukung sisi (ton)
qc = Perlawanan konus (kg/cm²)
Ap = Luas pondasi (cm²)
JHL = Jumlah Hambatan Lekat (kg/cm²)
K= keliling penampang pondasi (cm)
SF = Safety Factor ----> SF = 3 untuk daya dukung ujung
----> SF = 5 untuk daya dukung sisi

Kedalama qc Ap Friction Total Friction K Qult Qallowable


No.
(m) (kg/cm²) (cm²) (kg/cm²) cm ton ton
1 0 0.00 1256.64 0.00 0.00 125.66 0.00 0.00
2 0.2 5.00 1256.64 70.00 70.00 125.66 15.08 3.85
3 0.4 40.00 1256.64 20.00 20.00 125.66 52.78 17.26
4 0.6 35.00 1256.64 10.00 10.00 125.66 45.24 14.91
5 0.8 40.00 1256.64 10.00 10.00 125.66 51.52 17.01
6 1 45.00 1256.64 30.00 30.00 125.66 60.32 19.60
7 1.2 60.00 1256.64 20.00 50.00 125.66 81.68 26.39
8 1.4 70.00 1256.64 10.00 60.00 125.66 95.50 30.83
9 1.6 60.00 1256.64 10.00 70.00 125.66 84.19 26.89
10 1.8 65.00 1256.64 20.00 90.00 125.66 92.99 29.49
11 2 60.00 1256.64 10.00 100.00 125.66 87.96 27.65
12 2.2 55.00 1256.64 10.00 110.00 125.66 82.94 25.80
13 2.4 45.00 1256.64 10.00 120.00 125.66 71.63 21.87
14 2.6 50.00 1256.64 10.00 130.00 125.66 79.17 24.21
15 2.8 45.00 1256.64 10.00 140.00 125.66 74.14 22.37
16 3 40.00 1256.64 10.00 150.00 125.66 69.12 20.53
17 3.2 35.00 1256.64 10.00 160.00 125.66 64.09 18.68
18 3.4 40.00 1256.64 10.00 170.00 125.66 71.63 21.03
19 3.6 35.00 1256.64 10.00 180.00 125.66 66.60 19.18
20 3.8 40.00 1256.64 10.00 190.00 125.66 74.14 21.53
21 4 35.00 1256.64 10.00 200.00 125.66 69.12 19.69
22 4.2 40.00 1256.64 10.00 210.00 125.66 76.65 22.03
23 4.4 45.00 1256.64 20.00 230.00 125.66 85.45 24.63
24 4.6 55.00 1256.64 10.00 240.00 125.66 99.27 29.07
25 4.8 60.00 1256.64 10.00 250.00 125.66 106.81 31.42
26 5 55.00 1256.64 10.00 260.00 125.66 101.79 29.57
27 5.2 50.00 1256.64 10.00 270.00 125.66 96.76 27.73
28 5.4 55.00 1256.64 10.00 280.00 125.66 104.30 30.08
29 5.6 60.00 1256.64 10.00 290.00 125.66 111.84 32.42
30 5.8 65.00 1256.64 10.00 300.00 125.66 119.38 34.77
31 6 75.00 1256.64 20.00 320.00 125.66 134.46 39.46
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
32 6.2 85.00 1256.64 20.00 340.00 125.66 149.54 44.15
33 6.4 95.00 1256.64 30.00 370.00 125.66 165.88 49.09
34 6.6 110.00 1256.64 20.00 390.00 125.66 187.24 55.88
35 6.8 120.00 1256.64 30.00 420.00 125.66 203.58 60.82
36 7 135.00 1256.64 70.00 490.00 125.66 231.22 68.86
37 7.2 170.00 1256.64 10.00 500.00 125.66 276.46 83.78
38 7.4 175.00 1256.64 10.00 510.00 125.66 284.00 86.12
39 7.6 180.00 1256.64 10.00 520.00 125.66 291.54 88.47
40 7.8 185.00 1256.64 10.00 530.00 125.66 299.08 90.81
41 8 175.00 1256.64 10.00 540.00 125.66 287.77 86.88
42 8.2 180.00 1256.64 10.00 550.00 125.66 295.31 89.22
43 8.4 185.00 1256.64 10.00 560.00 125.66 302.85 91.57
44 8.6 190.00 1256.64 20.00 580.00 125.66 311.65 94.16
45 8.8 200.00 1256.64 50.00 630.00 125.66 330.50 99.61

Summary:
Diameter = 40.00 cm Square Pile
Kedalam = 8.80 m
Qa Tekan = 100 Ton
Qa Tarik = 16 Ton

4.1.4 Rekapitulasi Daya Dukung


Borepile Dia 400 mm - BP.1a
Data Tanah Kedalaman (m) L Efektif (m) Tekan (Ton) Tarik (Ton)
DCPT-1 11.00 10.40 84 19
DCPT-2 11.60 11.00 104 20
DCPT-3 8.80 8.20 100 16
Min. 84 16
Rata-rata 96 18
Max. 104 20

Kesimpulan
Untuk perencanaan diambil daya dukung ijin sebagai berikut :
P ijin Tekan = 100 Ton
P ijin Tarik = 20 Ton
Dengan kedalam pondasi rencana 12.0 m
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
4.2 Perhitungan Jumlah Pondasi
4.2.1 Jumlah Pondasi
Combo Gravitasi = 1.0 DL + 1.0 SDL + 1.0 LL
Perhitungan Jumlah Pondasi Cominasi Pondasi 1 = 1.0 DL + 1.0SDL + 1.0LL
FX FY FZ Hu Pu Qall Qs Jumlah Pile Pile
Story Label Effisiensi
tonf tonf tonf tonf tonf tonf tonf Tiang Needed Rencana
BASE 1 0.8088 1.9401 13.4701 2.13411 17.51113 100 20 1 1.0000 1 1
BASE 2 0.4088 0.2101 17.9184 0.44968 23.29392 100 20 1 1.0000 1 1
BASE 3 0.1719 0.2703 17.2984 0.29733 22.48792 100 20 1 1.0000 1 1
BASE 4 0.0349 1.7278 20.3819 1.90058 26.49647 100 20 1 1.0000 1 1
BASE 5 0.4015 1.6972 20.2428 1.86692 26.31564 100 20 1 1.0000 1 1
BASE 6 1.2234 1.7193 17.46 1.89123 22.698 100 20 1 1.0000 1 1
BASE 14 0.7591 0.7103 21.5982 0.83501 28.07766 100 20 1 1.0000 1 1
BASE 15 0.2457 0.9851 27.0881 1.08361 35.21453 100 20 1 1.0000 1 1
BASE 16 0.0549 0.8452 26.0631 0.92972 33.88203 100 20 1 1.0000 1 1
BASE 17 0.0911 0.2334 32.2445 0.25674 41.91785 100 20 1 1.0000 1 1
BASE 18 0.7337 0.2238 31.8388 0.80707 41.39044 100 20 1 1.0000 1 1
BASE 19 1.4396 0.5178 29.499 1.58356 38.3487 100 20 1 1.0000 1 1
BASE 27 0.7656 0.0506 20.4704 0.84216 26.61152 100 20 1 1.0000 1 1
BASE 28 0.2338 0.2284 25.6973 0.25718 33.40649 100 20 1 1.0000 1 1
BASE 29 0.0583 0.1373 24.5464 0.15103 31.91032 100 20 1 1.0000 1 1
BASE 30 0.0841 1.8829 27.5028 2.07119 35.75364 100 20 1 1.0000 1 1
BASE 31 0.66 1.9361 27.3209 2.12971 35.51717 100 20 1 1.0000 1 1
BASE 32 1.3418 0.0828 27.2959 1.47598 35.48467 100 20 1 1.0000 1 1
BASE 49 0.7403 0.0204 45.5215 0.81433 59.17795 100 20 1 1.0000 1 1
BASE 51 0.2306 0.0744 44.7106 0.25366 58.12378 100 20 1 1.0000 1 1
BASE 52 0.0789 1.627 53.4794 1.7897 69.52322 100 20 1 1.0000 1 1
BASE 53 0.0311 2.2377 54.9814 2.46147 71.47582 100 20 1 1.0000 1 1
BASE 54 0.3801 2.2197 49.4723 2.44167 64.31399 100 20 1 1.0000 1 1
BASE 56 1.0087 0.3251 58.4939 1.10957 76.04207 100 20 1 1.0000 1 1
BASE 73 1.0531 1.6797 51.224 1.84767 66.5912 100 20 1 1.0000 1 1
BASE 75 0.4475 0.2128 32.5693 0.49225 42.34009 100 20 1 1.0000 1 1
BASE 77 0.3116 0.2482 53.8134 0.34276 69.95742 100 20 1 1.0000 1 1
BASE 78 0.0946 2.0142 53.831 2.21562 69.9803 100 20 1 1.0000 1 1
BASE 79 0.4381 1.9924 40.3009 2.19164 52.39117 100 20 1 1.0000 1 1
BASE 81 1.2018 0.0957 70.7618 1.32198 91.99034 100 20 1 1.0000 1 1
BASE 90 3.5759 0.3339 30.2023 3.93349 39.26299 100 20 1 1.0000 1 1
BASE 91 1.3052 0.93 22.3835 1.43572 29.09855 100 20 1 1.0000 1 1
BASE 100 0.9438 1.1083 54.5236 1.21913 70.88068 100 20 1 1.0000 1 1
BASE 104 0.4607 1.3886 36.2111 1.52746 47.07443 100 20 1 1.0000 1 1
BASE 106 0.1236 2.4034 52.1876 2.64374 67.84388 100 20 1 1.0000 1 1
BASE 107 0.0048 0.3271 50.7065 0.35981 65.91845 100 20 1 1.0000 1 1
BASE 108 0.1693 0.6254 37.5696 0.68794 48.84048 100 20 1 1.0000 1 1
BASE 110 0.8468 0.3862 62.6947 0.93148 81.50311 100 20 1 1.0000 1 1
BASE 128 0.9212 0.0358 54.8583 1.01332 71.31579 100 20 1 1.0000 1 1
BASE 130 0.4364 0.3743 38.4218 0.48004 49.94834 100 20 1 1.0000 1 1
BASE 132 0.0231 0.1963 49.6148 0.21593 64.49924 100 20 1 1.0000 1 1
BASE 133 0.0115 0.3709 47.6313 0.40799 61.92069 100 20 1 1.0000 1 1
BASE 134 0.2772 0.0031 34.3534 0.30492 44.65942 100 20 1 1.0000 1 1
BASE 136 0.8668 0.2714 61.637 0.95348 80.1281 100 20 1 1.0000 1 1
BASE 150 0.0412 0.1652 52.6799 0.18172 68.48387 100 20 1 1.0000 1 1
BASE 153 0.1652 0.1184 34.3452 0.18172 44.64876 100 20 1 1.0000 1 1
BASE 154 0.0095 1.382 45.4542 1.5202 59.09046 100 20 1 1.0000 1 1
BASE 155 0.0903 1.0216 45.7586 1.12376 59.48618 100 20 1 1.0000 1 1
BASE 156 0.3484 0.3176 29.9087 0.38324 38.88131 100 20 1 1.0000 1 1
BASE 158 0.3789 0.3163 67.0138 0.41679 87.11794 100 20 1 1.0000 1 1
BASE 181 0.8755 1.2658 62.0211 1.39238 80.62743 100 20 1 1.0000 1 1
BASE 188 0.2185 0.509 52.6976 0.5599 68.50688 100 20 1 1.0000 1 1
BASE 193 0.0055 0.178 54.926 0.1958 71.4038 100 20 1 1.0000 1 1
BASE 201 0.1487 0.0577 57.7211 0.16357 75.03743 100 20 1 1.0000 1 1
BASE 207 0.5466 0.5668 50.6637 0.62348 65.86281 100 20 1 1.0000 1 1
BASE 214 0.9724 0.4282 67.2579 1.06964 87.43527 100 20 1 1.0000 1 1
BASE 527 1.6545 0.5946 38.0432 1.81995 49.45616 100 20 1 1.0000 1 1
BASE 534 1.4239 0.1192 20.7023 1.56629 26.91299 100 20 1 1.0000 1 1
BASE 537 0.355 0.155 18.4831 0.3905 24.02803 100 20 1 1.0000 1 1
BASE 541 0.2232 0.1681 15.0831 0.24552 19.60803 100 20 1 1.0000 1 1
BASE 545 0.1045 0.1303 18.8491 0.14333 24.50383 100 20 1 1.0000 1 1
BASE 548 0.9266 0.0184 22.351 1.01926 29.0563 100 20 1 1.0000 1 1
BASE 555 1.3718 1.076 41.9798 1.50898 54.57374 100 20 1 1.0000 1 1
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Combo Gravitasi + Beban Angin (WL-1) = 1.0 DL + 1.0 SDL + 1.0 LL + 1.0 WL-1
Perhitungan Jumlah Pondasi Cominasi Pondasi 2 = 1.0 DL + 1.0SDL + 1.0LL + 1.0WL
FX FY FZ Hu Pu Qall Qs Jumlah Pile Pile
Story Label Effisiensi
tonf tonf tonf tonf tonf tonf tonf Tiang Needed Rencana
BASE 1 0.796 1.929 13.4159 2.1219 17.44067 100 20 1 1.0000 1 1
BASE 2 0.4431 0.2172 17.921 0.48741 23.2973 100 20 1 1.0000 1 1
BASE 3 0.2039 0.2724 17.2953 0.29964 22.48389 100 20 1 1.0000 1 1
BASE 4 0.0669 1.7308 20.3861 1.90388 26.50193 100 20 1 1.0000 1 1
BASE 5 0.3673 1.7042 20.2411 1.87462 26.31343 100 20 1 1.0000 1 1
BASE 6 1.2363 1.7318 17.5158 1.90498 22.77054 100 20 1 1.0000 1 1
BASE 14 0.7423 0.7283 21.5414 0.81653 28.00382 100 20 1 1.0000 1 1
BASE 15 0.2908 0.9736 27.0996 1.07096 35.22948 100 20 1 1.0000 1 1
BASE 16 0.097 0.842 26.0608 0.9262 33.87904 100 20 1 1.0000 1 1
BASE 17 0.0489 0.2381 32.2463 0.26191 41.92019 100 20 1 1.0000 1 1
BASE 18 0.6885 0.2347 31.8274 0.75735 41.37562 100 20 1 1.0000 1 1
BASE 19 1.4563 0.4971 29.5545 1.60193 38.42085 100 20 1 1.0000 1 1
BASE 27 0.7451 0.0728 20.403 0.81961 26.5239 100 20 1 1.0000 1 1
BASE 28 0.2884 0.2118 25.7155 0.31724 33.43015 100 20 1 1.0000 1 1
BASE 29 0.1093 0.1439 24.548 0.15829 31.9124 100 20 1 1.0000 1 1
BASE 30 0.0332 1.8761 27.5034 2.06371 35.75442 100 20 1 1.0000 1 1
BASE 31 0.6059 1.9223 27.3017 2.11453 35.49221 100 20 1 1.0000 1 1
BASE 32 1.3627 0.0575 27.367 1.49897 35.5771 100 20 1 1.0000 1 1
BASE 49 0.7235 0.0293 45.4173 0.79585 59.04249 100 20 1 1.0000 1 1
BASE 51 0.2606 0.0923 44.94 0.28666 58.422 100 20 1 1.0000 1 1
BASE 52 0.114 1.6329 54.0267 1.79619 70.23471 100 20 1 1.0000 1 1
BASE 53 0.0042 2.2378 54.7326 2.46158 71.15238 100 20 1 1.0000 1 1
BASE 54 0.3499 2.227 49.302 2.4497 64.0926 100 20 1 1.0000 1 1
BASE 56 1.0262 0.3082 58.7829 1.12882 76.41777 100 20 1 1.0000 1 1
BASE 73 0.9071 1.726 51.6427 1.8986 67.13551 100 20 1 1.0000 1 1
BASE 75 0.4466 0.1927 33.0188 0.49126 42.92444 100 20 1 1.0000 1 1
BASE 77 0.4662 0.2377 55.343 0.51282 71.9459 100 20 1 1.0000 1 1
BASE 78 0.203 2.0074 53.1192 2.20814 69.05496 100 20 1 1.0000 1 1
BASE 79 0.3813 1.9789 40.2617 2.17679 52.34021 100 20 1 1.0000 1 1
BASE 81 1.2534 0.0728 70.4518 1.37874 91.58734 100 20 1 1.0000 1 1
BASE 90 3.3412 0.3017 29.7611 3.67532 38.68943 100 20 1 1.0000 1 1
BASE 91 1.567 0.9215 22.9078 1.7237 29.78014 100 20 1 1.0000 1 1
BASE 100 0.9138 1.0922 55.4241 1.20142 72.05133 100 20 1 1.0000 1 1
BASE 104 0.5163 1.4269 36.2707 1.56959 47.15191 100 20 1 1.0000 1 1
BASE 106 0.2066 2.4035 53.8385 2.64385 69.99005 100 20 1 1.0000 1 1
BASE 107 0.0787 0.3314 49.9297 0.36454 64.90861 100 20 1 1.0000 1 1
BASE 108 0.121 0.637 37.5268 0.7007 48.78484 100 20 1 1.0000 1 1
BASE 110 0.8857 0.4087 62.353 0.97427 81.0589 100 20 1 1.0000 1 1
BASE 128 0.8873 0.0494 55.8129 0.97603 72.55677 100 20 1 1.0000 1 1
BASE 130 0.5069 0.3555 38.4611 0.55759 49.99943 100 20 1 1.0000 1 1
BASE 132 0.0711 0.1922 51.2593 0.21142 66.63709 100 20 1 1.0000 1 1
BASE 133 0.0824 0.3661 46.8485 0.40271 60.90305 100 20 1 1.0000 1 1
BASE 134 0.2145 0.0159 34.3102 0.23595 44.60326 100 20 1 1.0000 1 1
BASE 136 0.9081 0.2488 61.3037 0.99891 79.69481 100 20 1 1.0000 1 1
BASE 150 0.0035 0.149 53.5664 0.1639 69.63632 100 20 1 1.0000 1 1
BASE 153 0.0827 0.103 34.3906 0.1133 44.70778 100 20 1 1.0000 1 1
BASE 154 0.0944 1.3771 47.0021 1.51481 61.10273 100 20 1 1.0000 1 1
BASE 155 0.0132 1.0212 45.0199 1.12332 58.52587 100 20 1 1.0000 1 1
BASE 156 0.2715 0.3333 29.8637 0.36663 38.82281 100 20 1 1.0000 1 1
BASE 158 0.4217 0.3381 66.7162 0.46387 86.73106 100 20 1 1.0000 1 1
BASE 181 0.839 1.2773 61.9408 1.40503 80.52304 100 20 1 1.0000 1 1
BASE 188 0.3292 0.5158 52.9302 0.56738 68.80926 100 20 1 1.0000 1 1
BASE 193 0.1067 0.1701 55.4728 0.18711 72.11464 100 20 1 1.0000 1 1
BASE 201 0.0476 0.0622 57.4736 0.06842 74.71568 100 20 1 1.0000 1 1
BASE 207 0.4368 0.5622 50.488 0.61842 65.6344 100 20 1 1.0000 1 1
BASE 214 1.0096 0.4455 67.5249 1.11056 87.78237 100 20 1 1.0000 1 1
BASE 527 1.6588 0.577 37.9469 1.82468 49.33097 100 20 1 1.0000 1 1
BASE 534 1.4857 0.1188 20.3762 1.63427 26.48906 100 20 1 1.0000 1 1
BASE 537 0.4426 0.1542 18.4836 0.48686 24.02868 100 20 1 1.0000 1 1
BASE 541 0.308 0.1683 15.0832 0.3388 19.60816 100 20 1 1.0000 1 1
BASE 545 0.1919 0.1339 18.8496 0.21109 24.50448 100 20 1 1.0000 1 1
BASE 548 0.8658 0.0189 22.6799 0.95238 29.48387 100 20 1 1.0000 1 1
BASE 555 1.369 1.0605 42.074 1.5059 54.6962 100 20 1 1.0000 1 1
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Combo Gravitasi + Beban Angin (WL-2) = 1.0 DL + 1.0 SDL + 1.0 LL + 1.0 WL-2
Perhitungan Jumlah Pondasi Cominasi Pondasi 2 = 1.0 DL + 1.0SDL + 1.0LL - 1.0WL
FX FY FZ Hu Pu Qall Qs Jumlah Pile Pile
Story Label Effisiensi
tonf tonf tonf tonf tonf tonf tonf Tiang Needed Rencana
BASE 1 0.8217 1.951 13.5245 2.1461 17.58185 100 20 1 1.0000 1 1
BASE 2 0.3744 0.203 17.9158 0.41184 23.29054 100 20 1 1.0000 1 1
BASE 3 0.1397 0.2683 17.3015 0.29513 22.49195 100 20 1 1.0000 1 1
BASE 4 0.0027 1.7246 20.3777 1.89706 26.49101 100 20 1 1.0000 1 1
BASE 5 0.4358 1.6902 20.2445 1.85922 26.31785 100 20 1 1.0000 1 1
BASE 6 1.2104 1.7068 17.4041 1.87748 22.62533 100 20 1 1.0000 1 1
BASE 14 0.776 0.6925 21.6551 0.8536 28.15163 100 20 1 1.0000 1 1
BASE 15 0.2005 0.9966 27.0763 1.09626 35.19919 100 20 1 1.0000 1 1
BASE 16 0.0126 0.8483 26.065 0.93313 33.8845 100 20 1 1.0000 1 1
BASE 17 0.1333 0.2285 32.2422 0.25135 41.91486 100 20 1 1.0000 1 1
BASE 18 0.7791 0.2128 31.8501 0.85701 41.40513 100 20 1 1.0000 1 1
BASE 19 1.4229 0.5386 29.4433 1.56519 38.27629 100 20 1 1.0000 1 1
BASE 27 0.7862 0.0291 20.5388 0.86482 26.70044 100 20 1 1.0000 1 1
BASE 28 0.179 0.2444 25.6795 0.26884 33.38335 100 20 1 1.0000 1 1
BASE 29 0.0072 0.1324 24.5471 0.14564 31.91123 100 20 1 1.0000 1 1
BASE 30 0.1353 1.8915 27.5046 2.08065 35.75598 100 20 1 1.0000 1 1
BASE 31 0.7143 1.9501 27.3406 2.14511 35.54278 100 20 1 1.0000 1 1
BASE 32 1.3208 0.1086 27.2251 1.45288 35.39263 100 20 1 1.0000 1 1
BASE 49 0.7585 0.0102 45.8148 0.83435 59.55924 100 20 1 1.0000 1 1
BASE 51 0.2014 0.0568 44.536 0.22154 57.8968 100 20 1 1.0000 1 1
BASE 52 0.043 1.6254 53.2315 1.78794 69.20095 100 20 1 1.0000 1 1
BASE 53 0.0668 2.242 55.5301 2.4662 72.18913 100 20 1 1.0000 1 1
BASE 54 0.413 2.2126 49.6968 2.43386 64.60584 100 20 1 1.0000 1 1
BASE 56 0.9929 0.3408 58.3928 1.09219 75.91064 100 20 1 1.0000 1 1
BASE 73 1.2011 1.6349 51.3513 1.79839 66.75669 100 20 1 1.0000 1 1
BASE 75 0.4514 0.2328 32.128 0.49654 41.7664 100 20 1 1.0000 1 1
BASE 77 0.1605 0.2557 53.0935 0.28127 69.02155 100 20 1 1.0000 1 1
BASE 78 0.013 2.0242 55.3513 2.22662 71.95669 100 20 1 1.0000 1 1
BASE 79 0.5001 2.0062 40.3418 2.20682 52.44434 100 20 1 1.0000 1 1
BASE 81 1.1564 0.1192 71.6612 1.27204 93.15956 100 20 1 1.0000 1 1
BASE 90 3.8101 0.366 30.7037 4.19111 39.91481 100 20 1 1.0000 1 1
BASE 91 1.048 0.9386 21.8652 1.1528 28.42476 100 20 1 1.0000 1 1
BASE 100 0.9804 1.1249 54.2075 1.23739 70.46975 100 20 1 1.0000 1 1
BASE 104 0.4114 1.3512 36.1507 1.48632 46.99591 100 20 1 1.0000 1 1
BASE 106 0.0407 2.4026 51.3965 2.64286 66.81545 100 20 1 1.0000 1 1
BASE 107 0.0889 0.3237 52.3421 0.35607 68.04473 100 20 1 1.0000 1 1
BASE 108 0.2247 0.6139 37.6133 0.67529 48.89729 100 20 1 1.0000 1 1
BASE 110 0.8143 0.3639 63.6521 0.89573 82.74773 100 20 1 1.0000 1 1
BASE 128 0.9622 0.022 54.5214 1.05842 70.87782 100 20 1 1.0000 1 1
BASE 130 0.373 0.3927 38.3818 0.43197 49.89634 100 20 1 1.0000 1 1
BASE 132 0.1172 0.2 48.8313 0.22 63.48069 100 20 1 1.0000 1 1
BASE 133 0.1061 0.3761 49.2748 0.41371 64.05724 100 20 1 1.0000 1 1
BASE 134 0.3474 0.0096 34.3965 0.38214 44.71545 100 20 1 1.0000 1 1
BASE 136 0.8325 0.2941 62.5874 0.91575 81.36362 100 20 1 1.0000 1 1
BASE 150 0.0853 0.1824 52.3823 0.20064 68.09699 100 20 1 1.0000 1 1
BASE 153 0.2414 0.1344 34.2998 0.26554 44.58974 100 20 1 1.0000 1 1
BASE 154 0.1132 1.3829 44.7165 1.52119 58.13145 100 20 1 1.0000 1 1
BASE 155 0.1946 1.0179 47.3102 1.11969 61.50326 100 20 1 1.0000 1 1
BASE 156 0.4326 0.3026 29.9524 0.47586 38.93812 100 20 1 1.0000 1 1
BASE 158 0.3428 0.2953 67.8934 0.37708 88.26142 100 20 1 1.0000 1 1
BASE 181 0.9133 1.2557 62.2899 1.38127 80.97687 100 20 1 1.0000 1 1
BASE 188 0.1088 0.5025 52.5197 0.55275 68.27561 100 20 1 1.0000 1 1
BASE 193 0.0963 0.1815 54.6804 0.19965 71.08452 100 20 1 1.0000 1 1
BASE 201 0.2499 0.049 58.2697 0.27489 75.75061 100 20 1 1.0000 1 1
BASE 207 0.6584 0.5718 50.8943 0.72424 66.16259 100 20 1 1.0000 1 1
BASE 214 0.9363 0.41 67.1834 1.02993 87.33842 100 20 1 1.0000 1 1
BASE 527 1.6502 0.6127 38.1398 1.81522 49.58174 100 20 1 1.0000 1 1
BASE 534 1.3621 0.1194 21.0287 1.49831 27.33731 100 20 1 1.0000 1 1
BASE 537 0.2673 0.1575 18.483 0.29403 24.0279 100 20 1 1.0000 1 1
BASE 541 0.1383 0.1681 15.0834 0.18491 19.60842 100 20 1 1.0000 1 1
BASE 545 0.0171 0.1282 18.8489 0.14102 24.50357 100 20 1 1.0000 1 1
BASE 548 0.9874 0.018 22.022 1.08614 28.6286 100 20 1 1.0000 1 1
BASE 555 1.3746 1.0911 41.8851 1.51206 54.45063 100 20 1 1.0000 1 1
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Combo Gravitasi + EQx= 1.0 DL + 1.0 SDL + 1.0 LL + 1.0 EQx + 0.3 EQy
Column Reaction Combinasi Pondasi 4= 1.0DL + 1.0SDL + 1.0LL + 1.0EQX + 0.3EQY
FX FY FZ Hu Pu Qall Qs Jumlah Pile Pile
Story Label Effisiensi
tonf tonf tonf tonf tonf tonf tonf Tiang Needed Rencana
BASE 1 1.2969 2.3798 15.0415 2.61778 19.55395 100 20 1 1.0000 1 1
BASE 2 0.8681 0.1339 18.5945 0.95491 24.17285 100 20 1 1.0000 1 1
BASE 3 1.0243 0.0081 17.6271 1.12673 22.91523 100 20 1 1.0000 1 1
BASE 4 1.1612 2.046 20.7494 2.2506 26.97422 100 20 1 1.0000 1 1
BASE 5 1.6786 2.1161 20.9971 2.32771 27.29623 100 20 1 1.0000 1 1
BASE 6 0.7364 2.236 18.9315 2.4596 24.61095 100 20 1 1.0000 1 1
BASE 14 1.1596 0.0058 22.9321 1.27556 29.81173 100 20 1 1.0000 1 1
BASE 15 0.8176 1.5473 27.3723 1.70203 35.58399 100 20 1 1.0000 1 1
BASE 16 0.9381 1.2952 26.1116 1.42472 33.94508 100 20 1 1.0000 1 1
BASE 17 1.0838 0.748 32.2979 1.19218 41.98727 100 20 1 1.0000 1 1
BASE 18 1.7929 0.9089 32.1156 1.97219 41.75028 100 20 1 1.0000 1 1
BASE 19 1.0368 0.3203 30.8738 1.14048 40.13594 100 20 1 1.0000 1 1
BASE 27 1.109 0.5548 21.6131 1.2199 28.09703 100 20 1 1.0000 1 1
BASE 28 0.677 0.7379 25.992 0.81169 33.7896 100 20 1 1.0000 1 1
BASE 29 0.7924 0.2486 24.623 0.87164 32.0099 100 20 1 1.0000 1 1
BASE 30 0.9345 1.4396 27.587 1.58356 35.8631 100 20 1 1.0000 1 1
BASE 31 1.5655 1.3192 27.6535 1.72205 35.94955 100 20 1 1.0000 1 1
BASE 32 0.9946 0.6295 28.4049 1.09406 36.92637 100 20 1 1.0000 1 1
BASE 49 1.0271 0.8046 49.2039 1.12981 63.96507 100 20 1 1.0000 1 1
BASE 51 0.5491 0.6193 45.614 0.68123 59.2982 100 20 1 1.0000 1 1
BASE 52 0.6456 2.1326 54.065 2.34586 70.2845 100 20 1 1.0000 1 1
BASE 53 0.7544 2.8159 55.5929 3.09749 72.27077 100 20 1 1.0000 1 1
BASE 54 1.1652 3.0795 50.3709 3.38745 65.48217 100 20 1 1.0000 1 1
BASE 56 0.7192 0.6204 62.2165 0.79112 80.88145 100 20 1 1.0000 1 1
BASE 73 2.7162 0.3963 58.7772 2.98782 76.41036 100 20 1 1.0000 1 1
BASE 75 0.092 0.8438 38.1077 0.92818 49.54001 100 20 1 1.0000 1 1
BASE 77 1.3548 0.6986 54.7768 1.49028 71.20984 100 20 1 1.0000 1 1
BASE 78 1.0818 1.4995 54.8594 1.64945 71.31722 100 20 1 1.0000 1 1
BASE 79 1.3361 1.407 40.5987 1.5477 52.77831 100 20 1 1.0000 1 1
BASE 81 0.6698 0.6388 72.5856 0.73678 94.36128 100 20 1 1.0000 1 1
BASE 90 6.102 0.9155 36.5985 6.7122 47.57805 100 20 1 1.0000 1 1
BASE 91 1.7202 1.8919 28.0876 2.08109 36.51388 100 20 1 1.0000 1 1
BASE 100 1.3187 2.036 57.5286 2.2396 74.78718 100 20 1 1.0000 1 1
BASE 104 0.3036 0.6026 37.3879 0.66286 48.60427 100 20 1 1.0000 1 1
BASE 106 0.753 2.0386 52.643 2.24246 68.4359 100 20 1 1.0000 1 1
BASE 107 0.8902 0.739 51.3098 0.97922 66.70274 100 20 1 1.0000 1 1
BASE 108 0.927 1.2945 37.8491 1.42395 49.20383 100 20 1 1.0000 1 1
BASE 110 0.445 1.0952 64.3922 1.20472 83.70986 100 20 1 1.0000 1 1
BASE 128 1.389 0.5574 56.7816 1.5279 73.81608 100 20 1 1.0000 1 1
BASE 130 0.4594 0.912 38.7201 1.0032 50.33613 100 20 1 1.0000 1 1
BASE 132 1.0651 0.5413 50.2816 1.17161 65.36608 100 20 1 1.0000 1 1
BASE 133 1.0544 0.0238 48.2781 1.15984 62.76153 100 20 1 1.0000 1 1
BASE 134 1.1709 0.6804 34.6806 1.28799 45.08478 100 20 1 1.0000 1 1
BASE 136 0.3993 0.4062 63.6141 0.44682 82.69833 100 20 1 1.0000 1 1
BASE 150 0.5989 0.7015 55.2717 0.77165 71.85321 100 20 1 1.0000 1 1
BASE 153 1.2114 0.5885 34.7909 1.33254 45.22817 100 20 1 1.0000 1 1
BASE 154 1.2451 0.9999 46.5952 1.36961 60.57376 100 20 1 1.0000 1 1
BASE 155 1.3263 0.6016 47.0196 1.45893 61.12548 100 20 1 1.0000 1 1
BASE 156 1.4047 0.9048 30.3307 1.54517 39.42991 100 20 1 1.0000 1 1
BASE 158 0.1654 0.9056 69.7734 0.99616 90.70542 100 20 1 1.0000 1 1
BASE 181 1.405 0.6828 67.1378 1.5455 87.27914 100 20 1 1.0000 1 1
BASE 188 1.3778 0.0695 54.534 1.51558 70.8942 100 20 1 1.0000 1 1
BASE 193 1.4381 0.542 55.8523 1.58191 72.60799 100 20 1 1.0000 1 1
BASE 201 1.5862 0.4464 58.7321 1.74482 76.35173 100 20 1 1.0000 1 1
BASE 207 2.1447 0.028 52.5837 2.35917 68.35881 100 20 1 1.0000 1 1
BASE 214 0.4433 1.0486 72.323 1.15346 94.0199 100 20 1 1.0000 1 1
BASE 527 1.7393 0.8321 39.5884 1.91323 51.46492 100 20 1 1.0000 1 1
BASE 534 0.2959 0.0451 26.0672 0.32549 33.88736 100 20 1 1.0000 1 1
BASE 537 1.2332 0.3267 18.6085 1.35652 24.19105 100 20 1 1.0000 1 1
BASE 541 1.3081 0.208 15.14 1.43891 19.682 100 20 1 1.0000 1 1
BASE 545 1.4787 0.3315 18.9649 1.62657 24.65437 100 20 1 1.0000 1 1
BASE 548 2.0376 0.1029 27.7819 2.24136 36.11647 100 20 1 1.0000 1 1
BASE 555 1.3088 0.7977 43.5049 1.43968 56.55637 100 20 1 1.0000 1 1
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
Combo Gravitasi + EQy= 1.0 DL + 1.0 SDL + 1.0 LL + 0.3 EQx + 1.0 EQy
Column Reaction Combinasi Pondasi 4= 1.0DL + 1.0SDL + 1.0LL + 1.0EQX + 0.3EQY
FX FY FZ Hu Pu Qall Qs Jumlah Pile Pile
Story Label Effisiensi
tonf tonf tonf tonf tonf tonf tonf Tiang Needed Rencana
BASE 1 1.0328 2.6461 14.8101 2.91071 19.25313 100 20 1 1.0000 1 1
BASE 2 0.1774 0.4784 18.7662 0.52624 24.39606 100 20 1 1.0000 1 1
BASE 3 0.3775 0.3864 18.0853 0.42504 23.51089 100 20 1 1.0000 1 1
BASE 4 0.5146 2.3987 21.1747 2.63857 27.52711 100 20 1 1.0000 1 1
BASE 5 0.9902 2.4197 21.1944 2.66167 27.55272 100 20 1 1.0000 1 1
BASE 6 1.0022 2.4549 18.4572 2.70039 23.99436 100 20 1 1.0000 1 1
BASE 14 0.9456 0.4345 22.1986 1.04016 28.85818 100 20 1 1.0000 1 1
BASE 15 0.2497 2.1029 27.2426 2.31319 35.41538 100 20 1 1.0000 1 1
BASE 16 0.4076 1.9064 26.1014 2.09704 33.93182 100 20 1 1.0000 1 1
BASE 17 0.5534 1.3179 32.2957 1.44969 41.98441 100 20 1 1.0000 1 1
BASE 18 1.2258 1.4004 31.9543 1.54044 41.54059 100 20 1 1.0000 1 1
BASE 19 1.2507 0.6846 30.1729 1.37577 39.22477 100 20 1 1.0000 1 1
BASE 27 0.9282 0.9532 21.1585 1.04852 27.50605 100 20 1 1.0000 1 1
BASE 28 0.1968 1.2442 25.8817 1.36862 33.64621 100 20 1 1.0000 1 1
BASE 29 0.344 0.781 24.7109 0.8591 32.12417 100 20 1 1.0000 1 1
BASE 30 0.4866 0.9483 27.6639 1.04313 35.96307 100 20 1 1.0000 1 1
BASE 31 1.0897 0.8734 27.5946 1.19867 35.87298 100 20 1 1.0000 1 1
BASE 32 1.1791 0.9361 27.7439 1.29701 36.06707 100 20 1 1.0000 1 1
BASE 49 0.8714 1.3068 48.6338 1.43748 63.22394 100 20 1 1.0000 1 1
BASE 51 0.1284 1.2659 45.148 1.39249 58.6924 100 20 1 1.0000 1 1
BASE 52 0.2583 2.8113 54.827 3.09243 71.2751 100 20 1 1.0000 1 1
BASE 53 0.3683 3.4519 56.3117 3.79709 73.20521 100 20 1 1.0000 1 1
BASE 54 0.7437 3.6969 50.0505 4.06659 65.06565 100 20 1 1.0000 1 1
BASE 56 0.871 1.0294 61.0898 1.13234 79.41674 100 20 1 1.0000 1 1
BASE 73 2.1353 0.4845 58.9569 2.34883 76.64397 100 20 1 1.0000 1 1
BASE 75 0.0446 1.4703 36.3975 1.61733 47.31675 100 20 1 1.0000 1 1
BASE 77 0.5411 1.3204 54.9959 1.45244 71.49467 100 20 1 1.0000 1 1
BASE 78 0.5059 0.9285 55.3 1.02135 71.89 100 20 1 1.0000 1 1
BASE 79 0.8729 0.983 40.5213 1.0813 52.67769 100 20 1 1.0000 1 1
BASE 81 0.9274 0.9556 71.8932 1.05116 93.46116 100 20 1 1.0000 1 1
BASE 90 4.6775 1.394 33.5964 5.14525 43.67532 100 20 1 1.0000 1 1
BASE 91 0.0188 2.8404 25.7741 3.12444 33.50633 100 20 1 1.0000 1 1
BASE 100 1.1071 2.665 58.4425 2.9315 75.97525 100 20 1 1.0000 1 1
BASE 104 0.126 0.0239 38.3442 0.1386 49.84746 100 20 1 1.0000 1 1
BASE 106 0.2739 1.5526 52.4008 1.70786 68.12104 100 20 1 1.0000 1 1
BASE 107 0.4085 1.1973 51.0928 1.31703 66.42064 100 20 1 1.0000 1 1
BASE 108 0.5045 1.7782 37.7072 1.95602 49.01936 100 20 1 1.0000 1 1
BASE 110 0.6608 1.3971 63.4697 1.53681 82.51061 100 20 1 1.0000 1 1
BASE 128 1.1325 0.9392 55.7443 1.24575 72.46759 100 20 1 1.0000 1 1
BASE 130 0.0401 1.4237 38.546 1.56607 50.1098 100 20 1 1.0000 1 1
BASE 132 0.4878 1.0201 49.9918 1.12211 64.98934 100 20 1 1.0000 1 1
BASE 133 0.4806 0.4662 47.9224 0.52866 62.29912 100 20 1 1.0000 1 1
BASE 134 0.671 1.1687 34.4893 1.28557 44.83609 100 20 1 1.0000 1 1
BASE 136 0.656 0.6976 62.5609 0.76736 81.32917 100 20 1 1.0000 1 1
BASE 150 0.2896 1.0287 54.0849 1.13157 70.31037 100 20 1 1.0000 1 1
BASE 153 0.6229 1.0694 34.724 1.17634 45.1412 100 20 1 1.0000 1 1
BASE 154 0.5536 0.4878 46.9803 0.60896 61.07439 100 20 1 1.0000 1 1
BASE 155 0.6371 0.1178 47.2286 0.70081 61.39718 100 20 1 1.0000 1 1
BASE 156 0.8115 1.3265 30.3555 1.45915 39.46215 100 20 1 1.0000 1 1
BASE 158 0.1389 1.1652 68.4387 1.28172 88.97031 100 20 1 1.0000 1 1
BASE 181 1.1061 0.3995 65.5038 1.21671 85.15494 100 20 1 1.0000 1 1
BASE 188 0.4826 0.3562 54.3615 0.53086 70.66995 100 20 1 1.0000 1 1
BASE 193 0.6277 0.9998 57.0378 1.09978 74.14914 100 20 1 1.0000 1 1
BASE 201 0.7791 0.8904 59.8562 0.97944 77.81306 100 20 1 1.0000 1 1
BASE 207 1.25 0.3652 52.2084 1.375 67.87092 100 20 1 1.0000 1 1
BASE 214 0.7434 1.2895 72.1514 1.41845 93.79682 100 20 1 1.0000 1 1
BASE 527 1.7022 0.9985 38.7746 1.87242 50.40698 100 20 1 1.0000 1 1
BASE 534 0.9239 0.0075 23.0349 1.01629 29.94537 100 20 1 1.0000 1 1
BASE 537 0.3449 0.5622 18.7344 0.61842 24.35472 100 20 1 1.0000 1 1
BASE 541 0.4505 0.2609 15.212 0.49555 19.7756 100 20 1 1.0000 1 1
BASE 545 0.5912 0.5445 19.0839 0.65032 24.80907 100 20 1 1.0000 1 1
BASE 548 1.4117 0.1526 24.7459 1.55287 32.16967 100 20 1 1.0000 1 1
BASE 555 1.3371 0.68 42.9043 1.47081 55.77559 100 20 1 1.0000 1 1
Structure Calculation Report
Puskesmas Simpang Pematang, Mesuji
4.2.2 Denah Kolom

Anda mungkin juga menyukai