HV DEAD END CLAMP

LV DEAD END CLAMP

HV SUSPENSION CLAMP

LV SUSPENSION CLAMP

J HOOK

UNIVERSAL BAND

TRINGULAR BRACKET

CABLE SLAB CONCRETE(33KV)

TIANG SPUN 10-5KN

KABEL ABC 33KV(3x150mmp+70mmp- 500m/drum)

LUBANG TIANG DIKOREK MENGGUNAKAN KREN AUGER SEDALAM 1.7m

TIANG DIANGKUT DAN DITANAM ATAU DITEGAKKAN MENGGUNAKAN KREN AUGER.

TIANG TELAH SELESAI DITANAM KAN.

PERATURAN KESELAMATAN LALU-LINTAS HENDAKLAH DIPATUHI APABILA KERJA-KERJA DILAKUKAN DI TEPI JALAN MENGIKUT PERATURAN KESELAMATAN LALU-LINTASOLEH SPESIFIKASI JKR.

TIANG SPUN.

MENAMPUNG PEPASANGAN MAKSIMUM (2LITAR HV ABC,2LITAR LV ABC)

-EARTHWIRE DI DALAM TIANG DISEDIAKAN UNTUKMEMBUMIKAN DAWAI NEUTRAL DANAKSESORI SISTEM LV ABC SAHAJA -TAMBAHAN EARTHWIRE YANG BERASINGANDIGUNAKAN UNTUK MEMBUMIKANSAMBUNGAN (EARTH BONDING JOINT)SAHAJA. - PEMASANGAN EARTH WIRE INI KEPADA HV ABCMESSENGER WIRE ATAU AKSESORI HV ABC ADALAH TIDAK DIBENARKAN.

TIANG SUDUT 90

TIANG TAMATAN

TIANG SAMBUNGAN

PANDANGAN ATAS TIANG SAMBUNGAN

PANDANGAN SISI TIANG SAMBUNGAN

TIANG SESALUR TERUS

TIANG SUDUT KURANG 90

PEMASANGAN TRIANGULAR BRACKET

HV CABLE TRAY PANDANGAN BAWAH

HV CABLE TRAY PANDANGAN ATAS

CABLE TRAY MEMPUNYAI LUBANG DI BAHAGIAN BAWAH UNTUK MENGELAKKAN AIR BERTAKUNG

PEMASANGAN HV CABLE TRAY

HV CABLE TRAY YNG TELAH SIAP DIPASANG

PEMASANGAN CABLE TRAY UTK SAMBUNGAN KABEL

JARAK SPAN ANTARA TIANG ADALAH 30-35m

KELEGAAN DARI PARAS TANAH MELINTASI JALANRAYA.

1 METER DARI KIRI,KANAN DAN BAWAH SISTEM HV ABC

SEMUA DAHAN YANG DIATAS SISTEM HV ABC MESTI DICANTAS.

MELINTASI TALIAN ATAS VOLTAN TINGGI TIDAK BETEBAT

BAHAN-BAHAN PEMBINAAN UMBANG.

TIANG SUDUT-BIL UMBANG=2

TIANG SAMBUNGAN-BIL UMBANG=2

TIANG TAMATAN-BIL UMBANG=2

TIANG PEMBAHAGIAN-BIL UMBANG=2KIRI,2KANAN

HV ABC ROLLER

ROLLER DIPASANG PADA TIANG SEMASA MERENTANG KABEL

SINGLE CIRCUIT END BRACKET