Anda di halaman 1dari 22

INDONESIAN HYDRODYNAMIC

LABORATORY

A e r i a l V i e w INDONESIAN HYDRODYNAMIC
KEMAMPUAN DESIGN, RISET DAN PELAYANAN
1. Teknologi Hidrodinamika
2. Desain kapal dan Bangunanan Lepas Pantai
3. Analisa Struktur Kapal dan Lepas Pantai
4. Navigasi dan Manajemen Logistik laut
5. Energi Terbarukan dari Laut
6. Pengkajian Resiko Kelautan
7. Supervisi di lapangan untuk masalah kemaritiman
Fasilitas Pengujian
Towing Tank
Jenis Pekerjaan/Pengujian:

Kolam ini digunakan untuk: penetapan gaya tahanan


hidrodinamika dan tenaga penggerak utama dari desain
kapal, serta pengujian captive sea-keeping model kapal.

ship power prediction from model test


Dimensi kolam: wave pattern analysis & flow visualization test
Panjang 235.4 m propeller open water test & engine matching solution
Lebar 11.0 m unconventional propulsion system model test
Kedalaman 5.5 m (max.) numerical computation: statistical power prediction
dilengkapi dengan pembangkit
gelombang regular & iregular.
Fasilitas Pengujian
Maneuvering & Ocean Basin
Jenis Pekerjaan/Pengujian:

Kegunaan kolam ini untuk: pengujian olah gerak dan


kehandalan perilaku gerakan kapal, dan pengukuran
respon gerakan dari bangunan kelautan.

offshore design appraisal


offshore hydrodynamic experiment
mooring design and analysis Dimensi:
sea-keeping quality investigation & model test Seksi Kolam Perairan Dalam:
maneuvering quality assessment & simulation P=60m; L=35m; Kedalaman 2.5 m (max.)
numerical computation in: Pit = 4x4x9m
Seksi Perairan Dangkal:
ship motion analysis
P=45m; L=35m; Kedalaman 1.25 m (max.)
time domain mooring analysis mampu mensimulasikan gelombang regular &
ship maneuverability prediction irregular dari berbagai arah.
Fasilitas Pengujian
Cavitation Tunnel

Jenis Pekerjaan/Pengujian:

Fasilitas ini digunakan untuk uji prestasi hasil


desain baling-baling, nozzle , kemudi, hidrofoil
dari kapal maupun kapal selam

cavitation phenomena prediction


measurement of propeller excited hull vibration
berbentuk bidang vertikal, media air, numerical computation: prediction of unsteady
sirkulasi tertutup, dengan ukuran
seksi uji & pengamatan 0.85 x 0.85 x propeller cavitation
4 m.
Sub Scale Model Test
Bidang Perminyakan & Gas
Bumi Lepas Pantai:

Simulasi Model Movable Gravity Production Unit


(MoGPU)
Validasi Mooring System FPSO Sempec
Floating Production Unit
Uji Seakeeping Model FLNG Daewoo
Validasi Desain Turret System FLNG Inpex-
Masela
Simulasi Peluncuran Struktur Jaket dari Barge
Motion & Tension Tes of Mooring Systemt Decay test-Tsunami Buoy
Floating Production Unit, EMP Kangean TEWS-BPPT
Jacket Launching, Upending, Top side Transportation
& Mating
PT Technip-CONOCO indonesia

Hydro-Ocean Model Test of Floating Pipe, PTIP-BPPT

Jacket Launching ModelTest Top side Transport & MatingTest


FPSO in Transportation Phase
FPU in Operational Belanak Field, Natuna Mooring System Test,
West Seno, Makassar Strt FSO Model-SEMPEC PETRO CHINA
(Location : Betara Field, Tg. Jabung, Jambi)

MoGPU in Transportation Phase


Hang Tua Field, Natuna

Motion and Mooring System Test


FPU Model-UNOCAL Towing & seakeeping Test
(Location: West Seno, Makasar Strt) FPSO Model-Conoco-Halliburton, Singapore
(Location : Belanak Field, Natuna)

Transportation & Installation Test MoGPU


Model-CONOCO
(Location: Hang Tuah, Field Natuna)
Bidang Teknologi Transportasi Laut &
Keselamatan Pelayaran:

RB Wing in Surface Effect Craft


RB Surface Effect Planning Hull Craft
Uji Tahanan & Olah Gerak Kapal Tongkang
Dorong
Uji Terbalik Kapal Ferry Ro-Ro
Uji Kebasahan Geladak Kapal Barang
Uji Stabilitas Kapal Ferry Ro-Ro
Uji Olah Gerak Kapal LNG
Captive Seakeeping Test, Sailing Test FPB 35m Resistance Test of
Fast Patroli Boat 35m, Dislitbangal KRI Anakonda Submarine 22M- Dislitbangal

600 TEUs Container ship Resistance & Stability Test Resistance and Propulsion Test
Palwa Buana Seatrial Tanker 6500 DWT Dive Support Vessel 83.5 m Of Research ship P3GL - PT.PAL
Bremer Vulkan, Germany PT Dok & Perkapalan Sby (ABG Shipyard, India)

Resistance & Propulsion Test


Container Ship Seakeeping behaviour Tuff Test, Tug Boat 35 m
Tanker 6500 DWT Resistance Test LCU
(ABG Shipyard, India)
(Niigata Co., Japan) 1000 DWT, Hamtis TNI AD
Bidang HANKAM:
LCU 1000 DWT TNI-AD
Kapal Patroli 35m & 40m TNI-AL
Kapal Selam 22m
Kapal Siluman Bajul
Kapal Patroli 38m POLRI
Kendaraan Tempur Amphibi

Bidang HANKAM
Non-militer
RB Surface Buoy untuk Indonesian Tsunami Early
Warning System
Kegiatan Diseminasi Teknologi dengan Pemerintah
Daerah
RB Alat Apung Tambahan pada Kapal Ikan Tradisional Kab. Cilacap (2002)
Modifikasi Alat Pengangkat Jaring pada Bagan Apung Penangkap Ikan Kab. Lombok
Barat (2003)

Re-Powering Kapal Ikan 25 GT Kab. Sampang (2004)


Penerapan Teknologi Tepat Guna Pembuatan Baling-Baling Kapal Ikan Kab. Ogan
Komering Ilir (2003-2004)

Penerapan Teknologi Tepat Guna Pembuatan Kapal Ikan Fiberglass Kab. Buton
(2009)
PROTOTYPE

Renewable Energy
Arus Laut

Bubble Vessel
Kapal Selam Mini 22 M

14
TRANSDUCERS LOAD CELLS
Rancang Bangun Prototipe Satu Kanal Sensor Mekanis Berbasis Material Piezoelectric
untuk Penimbangan Gerbong Kereta Api PT. INKA

Beban/Roda KA

Interface/ Display
Signal Microcontroller/ (Oscilloscope/Com
Conditioning Program puter)
Piezoelectric Sensor

Piezoelectric Sensor Modul Sensor

15
Numerical calculation
Offshore Structural Analysis
Finite Element Analysis
Ship Motion Analysis
Time Domain Mooring Analysis
Offshore Hydrodynamic Analysis
Ship Powering Prediction
Ship Maneouvering Prediction
Propeller Design and Analysis
Marine Environmental Modelling and Analysis
Computing Fluid Dynamic
OCEAN SURVEY

PIPELINE ANALYSIS
DESAIN JACK UP STRUCTURE

18
MARITIME STRUCTURE STRUCTURAL INTEGRITY
DESAIN KAPAL
SUB SEA AND SYSTEM

Anda mungkin juga menyukai