1. Latar Belakang
2. Process Flow Diagram Raw Material
3. Process Flow Diagram Kapur
4. Mesin Ball Mill
5. Hidrosiklon
6. Rotary Screen
7. Kesimpulan
Latar Belakang 3
Pencampuran bauksit
dengan alkali
Flow Chart Proses 4
Raw Material
Kandungan di dalam bauksit:
SiO2 TiO2 Fe2O3 Al2O3
9% 1% 14.50% 48.50%
Weightfeeder output:
140 T/h
Alkali input:
~420-440 m3/h
Alkali : Bauksit
~ 3.2 m3 : 1T
𝑘= 𝑁𝑘 ×1.645
∝
𝐴𝑜
Flow Chart Proses Kapur 5
1 2 belt conveyor 14
yor
e
o nv
lt c
be
silo bauksit
ballmill
larutan alkali
evaporasi rotary screen
ke
digesti
b el
t co
nve
yor
16
hidrosiklon
Hidrosiklon
Rotary Screen
Pompa
Perbandingan AO dan NaOH 12
(Ruys, 2018)
RPM kritis pada Ball Mill 14
Data Penggunaan Ball Mill 15
Candaleria, El Soldado, Le Bronches, Africa (Open Africa (U- Mantos Cerro Verde,
Chile Chile
Rod + Ball
di Berbagai
Chile Pit) Industri
ground) Blancos, Chile Peru
Ball Mill Mill Ball Mill Ball Mill Ball Mill Ball Mill Ball Mill
4 4 rod 7 ball 3 1 1 2 4
6*9 3.6 * 2.5 7 * 11 6.1 * 9.05 4.27 * 7.01 3.8 * 4.6 7.3 * 11
rod 350 ball
5600 550 10800 6000 1860 1120 13000
28 12 18 16 21.6 12.2
47 35 35 32 38-40 38
6.35
0.67
70% ore 30% 65% ore 35%
H2O H2O 85%:15% 85%:15% 84%:16% 75%:25%
80% < 212 80% < 125 80% < 100 75% < 212 80% < 150
um um um um um
1. Ball Mill diisi hingga 40% volume dengan bola baja berdiameter 30-80 mm agar
bekerja secara efektif (Jankovic, 2015).
2. Jumlah media (bola baja) yang digunakan pada Ball Mill biasanya 50%-95%
volume Ball Mill (McKeen, 2006)
3. Perbandingan material dan bola baja yang benar pada ball mill adalah: (Dorey,
2012)
a. Kering: 25% bubuk, 50% bola baja, 25% ruang
b. Basah: 40% slurry, 50% bola baja, 10% ruang