Standar Costing
Standar Costing
A MANAGERIAL TOOL
TUJUAN PEMBELAJARAN
MENGAPA STANDARD
COSTING DIPERLUKAN?
Sistem
KELEMAHAN STANDARD
COSTING
Tidak
Manufacturing Costs
Direct
Materials
Actual
Actual
Direct
Labor
Actual
Actual
Overhead
Actual
Applied
Standard
Standard
Standard
Bagaimana menyusun
standard cost?
UNTUK MERAKIT
SEBUAH KOMPUTER
KUALITAS
Spesifikasi
Komputer yg
bagaimana?
Sparepart apa yg
dibutuhkan
Berapa unit
spaperpart yg
dibutuhkan?
Berapa harga
masing2
sparepart?
PENGGUNAAN BIAYA
STANDAR
CONTOH :
PRODUK KERIPIK JAGUNG
18 oz.
2 oz.
1 oz.
0.01 oz.
1 bag.
$0.108
0.062
0.005
0.004
0.044
$0.223
Description
Bahan Baku
Tenaga Kerja Langsung:
Pengawas
$7 /jam 0.0070 hr.
Operator Mesin
$10 /jam 0.0008 hr.
Total direct labor
Overhead:
Variable overhead
3.850
0.078 hr.
Fixed overhead
32.050 0.0078 hr.
Total biaya overhead
Total Biaya Standar per Unit (bungkus)
$0.223
$0.049
0.008
0.057
$0.030
0.250
0.280
$0.560
Pada
Pada minggu
minggu pertama
pertama bulan
bulan Maret,
Maret,
diproduksi
diproduksi 100.000
100.000 bungkus
bungkus keripik
keripik jagung
jagung
PERHITUNGAN STANDAR
KUANTITAS
ANALISIS VARIAN
Penggunaan Standar untuk
Kebutuhan Managerial
2. SP x AQ (Actual
Quantity of Input x
Standard Price)
Price Variance
(1-2)
3. SP x SQ
(Standard
Quantity of Input
x Standard Price)
Usage Variance
(2-3)
Budget
Variance (1-3)
Varian
Varian tidak
tidak
menguntungkan
menguntungkan (u.v)
(u.v)
terjadi
terjadi pada
pada saat
saat harga
harga
aktual
aktual atau
atau kuantitas
kuantitas
aktual
aktual lebih
lebih besar
besar
daripada
daripada harga/kuantitas
harga/kuantitas
standarnya
standarnya
Varian
Varian yang
yang
menguntungkan
menguntungkan (v)
(v)
adalah
adalah sebaliknya
sebaliknya
Cost
Batas atas
x
x
standar
$110,000
$100,000
x
x
Batas bawah
Time
$ 90,000
CONTOH PERHITUNGAN
VARIAN
Analisis
Analisis Varian
Varian:: Bahan
Bahan Baku
Baku dan
dan TKL
TKL
Produksi Aktual
Biaya Aktual-jagung
Biaya Inspeksi
aktual
Corn
Inspection labor
Biaya Aktual
$5.382,00
2.646,00
Anggaran
$5.238,00
2.376,50
Total Variance
$144,00 U
269,50 U
AQ x SP
780.000 x $.0,0060
$4.680
$702 U
Varian Harga
SQ x SP
873.000 x $0,0060
$5.238
$558 F
Varian Kuantias
$144 U
Varian Total
Material
Material Price
Price Variance
Variance
Material
Material Price
Price Variance
Variance
MPV = (AP SP)AQ
= ($0,0069 $0,0060)780.000
= $0,0009 x 780.000
= $702 U
Percent
Percent of
of SP
SPxx SQ
SQ == $702/$4.680
$702/$4.680 == 15%
15%
Direct
Direct Materials
Materials Usage
Usage Variance
Variance
Direct
Direct Materials
Materials Usage
Usage Variance
Variance
MUV = (AQ SQ)SP
= (780.000 873.000)($0,006)
= 93.000 x $0,006
= $558 F
Percent of SQ x SP = $558/$5.238 = 10.7%
Labor
Labor Rate
Rate Variances
Variances
Labor
Labor Rate
Rate Variances
Variances
LRV = (AR SR)AH
= ($7,35 $7,00)360
= $0,35 x 360
= $126 U
Percent of SR x SH = $126/$2.520 = 5%
AH x SR
360 x $7
$2.520
$126 U
Varian Tarif
SH x SR
339,5 x $7
$2.376,5
$143,5 U
Varian Efisiensi
$269,5 U
Varian Total
Labor
Labor Efficiency
Efficiency Variances
Variances
Labor
Labor Efficiency
Efficiency Variances
Variances
LEV = (AH SH)SR
= (360 339,5)$7
= 20,5 x $7
= $143,5 U
Percent of SH x SR = $143,5/$2.376,5 = 6%
VO aktual
$1.600
$60 U
Spending
Variance
Tarif VO x Jam
Standar
$1.456
$84 U
Varian Efisiensi
$144 U
Varian Total
Variable
Variable Overhead
Overhead
Spending
Spending Variances
Variances
VOSV = (AVOR x AH) (SVOR x AH)
= (AVOR SVOR)AH
= ($4 $3,85)400
= $60 U
Actual
Costs
Spending
Budget Variance
$3,00
$1.190
$1.200
$10 F
Listrik
0,78
385
312
73 U
Air
0,07
25
28
3 F
$3,85
$1,600
$1,540
$60 U
Gas
Biaya Total
Variable
Variable Overhead
Overhead
Efficiency
Efficiency Variances
Variances
VOEV = (AH x SVOR) (SH x SVOR)
= (AH SH)SVOR
= (400 378,3)$3,85
= $84 U
Actual
Cost
Formulaa Costs
Gas
Budget
untuk Jam
Spending Standar c Varian
Budget Variance b
Efisiensi d
$3,00
$1.190
$1.200
$10 F
$1.135
$65 U
Listrik
0,78
385
312
73 U
295
17 U
Air
0,07
25
28
3 F
26
2U
$3,85
$1.600
$1.540
$60 U
$1.456
$84 U
Total cost
a per JKL
VARIAN OVERHEAD
TETAP
PEMILIHAN KAPASITAS
FO dianggarkan
$749.970
FO Aktual
$749.000
$970 F
Spending
Variance
Applied FO
$687.473
$62.497 U
Varian
Volume
$61.527 U
Varian Total
Actual
Costs
$530.000
Budgeted
Cost
Variance
$530.000 $ ----
Gaji
159.370
159.970
600 F
Pajak
50.500
50.000
500 U
9.130
10.000
870 F
$749.000
$749.970
$970 F
Asuransi
Total fixed overhead
Variance Volume
Volume variance = $32,05(23.400 21.450)
= ($32,05 x 23.400) ($32,05 x 21.450)
= $749.970 $687.473
= FOH Tetap dianggarkan FOH Tetap
applied
= $62.497 U
Appendix:
Accounting for
Variances
Harga
Harga aktual
aktual jagung
jagung $0,0069
$0,0069 per
per ons
ons dan
dan
harga
harga standar
standar $0,0060,
$0,0060, dan
dan dibeli
dibeli
780.000
780.000 ons
ons jagung.
jagung.
Materials Inventory
4 680 00
5 382 00
Selama
Selama periode
periode ini
ini 780.000
780.000 ons
ons jagung
jagung
dimasukkan
dimasukkan ke
ke produksi.
produksi. Kuantitas
Kuantitas
standar
standar adalah
adalah 873.000
873.000 ons,
ons, dan
dan harga
harga
standar
standar adalah
adalah $0,006
$0,006 per
per ons.
ons.
Work in Process
5 238 00
Material
Material Usage
UsageVariance
Variance
558 00
4 680 00
Selama
Selama periode
periode ini,
ini, jam
jam inspeksi
inspeksi yang
yang
digunakan
digunakan adalah
adalah 360
360 jam,
jam, sedangkan
sedangkan
standar
standar untuk
untuk produksi
produksi seharusnya
seharusnya adalah
adalah
339,5
339,5 jam.
jam. Tarif
Tarif aktual
aktual adalah
adalah $7,35
$7,35 per
per
jam
jam sedangkan
sedangkan tarif
tarif standar
standar $7,00
$7,00 per
per jam
jam
Work in Process
2 376 00
2 646 00
Labor
LaborVariances
Variances
Pada
Pada akhir
akhir periode,
periode, varian
varian bahan
bahan baku
baku dan
dan
tenaga
tenaga kerja
kerja ditutup
ditutup ke
ke Harga
Harga Pokok
Pokok
Penjualan.
Penjualan.
Cost of Goods Sold
971 50
Closing
ClosingVariances
Variances
702 00
143 50
126 00
Pada
Padaakhir
akhir periode,
periode, varian
varian bahan
bahan baku
baku dan
dan tenaga
tenaga
kerja
kerja ditutup
ditutup ke
ke Harga
Harga Pokok
Pokok Penjualan.
Penjualan.
558 00
558 00
The
The End
End