DAFTAR ISI
1.
UMUM........................................................................................................... 4
2.
3.
SIMBOL PROYEK........................................................................................................ 4
3.2
3.3
KODE AREA............................................................................................................... 5
3.4
3.5
SIMBOL DOKUMEN.................................................................................................... 5
3.6
FILE: 318468979.doc
Sheet 4 of 12
PROSEDUR
PENOMORAN DOKUMEN
SHEET
: 4 of 12
REV
: 1
DATE
1.
UMUM
Prosedur ini menerangkan metode penomoran dokumen untuk dokumen proyek yang
disiapkan dalam pelaksanaan pekerjaan, kecuali untuk surat menyurat lebih spesifik di
dokumen No. KDL-00-G0-PE-102, Prosedur surat menyurat.
2.
X XX
XX
XX
XX
X
Project Symbol
Zone Identification
Number (See Appendix1)
Area Code
(See Appendix2)
Work Category Code
(See Appendix3)
Document Symbol
(See Appendix4)
Sequence / Serial Number
Prosedur pelaksanaan proyek, sistem penomoran berikut harus digunakan.
KDL-00-G0-PE -
1 XX
3.
3.1
PROJECT SYMBOL
KDL kepanjangan dari Meratus Jaya Iron & Steel Project, selalu digunakan.
3.2
ZONE IDENTIFICATION
Nomor ini adalah identifikasi zona yang diinginkan dan kelompok fasilitas dimana
dokumen berhubungan.
Lampiran 1 : Nomer Identifikasi Zona
FILE: 318468979.doc
Sheet 5 of 12
PROSEDUR
PENOMORAN DOKUMEN
SHEET
: 5 of 12
REV
: 1
DATE
3.3
KODE AREA
Kode ini menggolongkan area pabrik dimana dokumen dibuat.
Lampiran 2 : Kode Area
3.4
3.5
SIMBOL DOKUMEN
Kode ini menggolongkan type dokumen, seperti lembar perhitungan, lembar data,
spesifikasi dan lain-lain.
Lampiran 4 : Daftar Symbol Dokumen
3.6
KDL-316-20-A4-DW-201
Engineering Drawing for Foundation of
3.7
FILE: 318468979.doc
Sheet 6 of 12
PROSEDUR
PENOMORAN DOKUMEN
SHEET
: 6 of 12
REV
: 1
DATE
Lampiran 1
NOMOR IDENTIFIKASI ZONA
CODE
FILE: 318468979.doc
ZONE
GENERAL PLANT
ROTARY KILN
ROTARY COOLER
DEDUSTING SYSTEM
WATER SYSTEM
AUXILIARY FACILITIES
POWER PLANT
Sheet 7 of 12
PROSEDUR
PENOMORAN DOKUMEN
SHEET
: 7 of 12
REV
: 1
DATE
Lampiran 2
KODE AREA
CODE
FILE: 318468979.doc
AREA
00
GENERAL PLANT
01
02
03
04
05
06
07
08
Power Plant
09
10
11
12
Bagging System
13
Miscelleous Equipment
14
Ancillary Building
Sheet 8 of 12
PROSEDUR
PENOMORAN DOKUMEN
SHEET
: 8 of 12
REV
: 1
DATE
Lampiran 3
KODE KATEGORI PEKERJAAN
CODE
DESCRIPTION
G0
GENERAL PROJECT
B0
PROCUREMENT
1
2
3
4
5
6
9
Q0
Purchasing
Subcontracting
Expediting
Shipping & Transportation
Material Control
Ware Housing
Unclassified
INSPECTION & QUALITY ASSURANCE
1
2
3
9
S0
1
2
9
P0
1
2
9
C0
1
2
3
4
5
9
Y0
1
2
3
9
E0
FILE: 318468979.doc
Safety
Security
Unclassified
COMMISSIONING
Pre-commissioning
Plant Star-up and Operation
Unclassified
FIELD CONSTRUCTION
Construction Management and Supervision
Construction Equipment
Construction Tools
Consumable
Temporary Facilities
Unclassified
FIELD OFFICE OPERATION
Field Administration
Field Purchasing and Subcontracting
Field Financing and Accounting
Unclassified
ENGINEERING
Sheet 9 of 12
PROSEDUR
PENOMORAN DOKUMEN
SHEET
: 9 of 12
REV
: 1
DATE
CODE
0
1
2
3
4
5
6
7
9
FILE: 318468979.doc
DESCRIPTION
Process
Mechanical
Electrical
Steel Structure
Civil
Instrument
Piping
Architechture
Unclassified
Sheet 10 of 12
PROSEDUR
PENOMORAN DOKUMEN
SHEET
: 10 of 12
REV
: 1
DATE
Lampiran - 4
SIMBOL DOKUMEN
DOCUMENT
CODE
DESCRIPTION
1. ENGINEERING
DOCUMENT
a. Drawing
PF
EF
HD
PP
DW
IM
PS
SK
SD
SO
b. Specification
GS
IS
IN
WS
General Specification
Individual Specification
Inspection Specification
Construction Specification
c. Requisition
ER
MR
CR
Engineering Requisition
Material Requisition
Construction Requisition
BE
BD
BR
DS
CS
EL
SL
DI
BM
BQ
IR
MM
PR
BP
2. PROCUREMENT DOC.
BL
RQ
BT
LO
PO
CT
MP
FILE: 318468979.doc
Sheet 11 of 12
PROSEDUR
PENOMORAN DOKUMEN
SHEET
: 11 of 12
REV
: 1
DATE
DOCUMENT
CODE
DESCRIPTION
DC
PL
EX
SH
OS
MQ
MS
SM
MU
SA
SE
CP
3. CONSTRUCTION DOC.
Man-hour Control
Material Unloading Report
Subcontract Control
Expenses Control
Financial Control
Engineering Schedule Control
Procurement Schedule Control
Construction Schedule Control
Monthly Internal Report
Monthly External Report
Monthly Internal Report
Weekly External Report
Weekly Internal Report
Change Notification
Change Proposal
Change Order
Change Work Document
Project Execution Procedure
RP
RC
Report
Record
5. OTHERS
FILE: 318468979.doc
Sheet 12 of 12
PROSEDUR
PENOMORAN DOKUMEN
SHEET
: 12 of 12
REV
: 1
DATE
Lampiran - 5
IDENTIFIKASI UTAMA UNTUK PROSEDUR PELAKSANAAN PROYEK
NO.
100
200
300
400
500
600
FILE: 318468979.doc
DESCRIPTION
Project Coordination
Project Control
Engineering
Procurement & Sub-contracting
Construction
SH&E