Pengantar P&P Tambang
Pengantar P&P Tambang
(MINE PLANNING)
OB
THN I
THN II
315
190 ..
HARI HUJAN
125 ..
HJ SEDIKIT
40.
HJ BANYAK
85
SHIFT KERJA
DIKENAL SBG SHIFT NORMAL
8.00-16.00
SHIFT II
16.00-24.00
SHIFT III
24.00-8.00
SHIFT I
LONG SHIFT
7.00-18.30 SHIFT II
18.30-7.00 SHIFT I
JIKA ADA KETERLAMBATAN (DELAY) DALAM
OPR.TAMKA, MIS HANYA MAMPU 30.000 BCM
DALAM SHIFT II MAKA AKAN DITAMBAHKAN
(KALAU PERLU DGN OVER TIME) PADA SHIFT III
DAN I (SHIFT II LONG SHIFT) AGAR TARGET
PROD OB TERCAPAI.
PERCOBAAN PENAMBANGAN
SUATU PERCOBAAN PENAMBANGAN
DIPERLUKAN AGAR SISTEM
PENAMBANGAN YG AKAN DITERAPKAN
DALAM KAP.MAX DAPAT BERJALAN DGN
EFEKTIF DAN EFFISIEN. SEBELUM
OPR.TAMKA PD SKALA FULL, MAKA
DIBUAT DULU MINIATURNYA (L.K 25 %)
DARI SKALA SESUNGGUHNYA AGAR DPT
MENGUJI KESIAPAN DAN UNJUK KERJA
ALAT, MANAJEMEN LAPANGAN, STRUKTUR
ORG, LOGISTIK DLL, SHG TDK AKAN
MENGALAMI KENDALA DLM OPR.MAX
NANTINYA.
UTAMA/DT)
JALAN TAMBANG BISA DLM 3
JALUR
JALUR I..LEBAR DT 2,5 M, JALAN TAMBANG
5 M,
JALUR 2.LEBAR DT 2,5 M, JALAN TAMBANG
8,8 M.
JALUR 3, LEBAR DT 2,5 M, JALAN TAMBANG
12,5 M.
OB MINGGU III..147.000 M3
ALAT GALI (RENCANA)
DOZER 300 M3/JAM (AKTUAL) , SHIFT II 200
JAM , SHIFT III 200 JAM. ..
RENCANA UNIT DOZER (SHIFT
II)=( (588.000)/2 +(60.000)(0,79))2 / (200)
(300) =
( 294.000 +23.700)/60.000 = 5,295. 5
UNIT
PADA SHIFT III.5 UNIT JUGA
EXCAVATOR JUGA 5 UNIT
DUMP TRUCK60 M3/JAM, JAM KERJA 200
JAM
DT = (294.000+23.700)/(60)(200) = 26,475
UNIT.
REALISASI
(MINGGU I, II, III DAN IV)
DOZER TERNYATA HANYA DPT DIPAKAI 4
UNIT, SATU UNIT OVER HAUL, MAKA DOZER
1 UNIT DR RENTAL.
EXCAVATOR JUGA RUSAK SATU UNIT, TETAPI
ADA YANG SDH PERBAIKAN DR
WORKSHOP..5 UNIT.
DT..HANYA TERSEDIA 20 UNIT, 6 UNIT
DARI PIHAK RENTAL, ADA RENCANA BELI DT
BEKAS.
CONTOH SOAL
SUATU TAMBANG TERBUKA LOGAM DASAR
DENGAN
KAP.TAMBANG 35.000 MT/BULAN, SR 1/7,8
KAP.DOZER (II)
= (250)(225)(1) + (320)(225)
(2)=56.250+144.000=200.250 BCM
KAP.PENAMBANGAN DLM SHIFT II =
(0,65)((35.000)(0,27)+(35.000)(7,8))
=(0,65) (9.450+273.000) BCM = 183.592,5
BCM
TDK PERLU ADA PENAMBAHAN DOZER LAGI
KAP. DT 63 M3/JAM,
1 TON BHN GALIAN = 0,79 M3
HITUNG:
UNIT DOZER PADA PIT A, B DAN C
UNIT DT UNTUK MENGANGKUT OB DAN
BATUBARA
PADA SEMUA PIT
CONTOH SOAL
SUATU BLOK TAMBANG (MINING BLOCK)
BATUBARA
DENGAN DIMENSI PANJANG SEARAH JURUS
160
METER, LEBAR SEARAH KEMIRINGAN 75 M,
DAN
KETEBALAN RATA-RATA 4,5 METER, BJ NYA
1,29 TON/M3. JIKA KAP.DOZER 325 M3/JAM
DAN 275 M3/JAM, DENGAN FAKTOR
EFISIENSI 0,81 DAN 0,75. JAM KERJA 270
JAM/BLN, HITUNGLAH BERAPA LAMA
JAWAB :
1.RENCANA PRODUKSI DAN OB/TAHUN
TAHUN PERTAMA
200.000 MT, SR = 1/5
OB = 1.000.000 M3
TAHUN KEDUA
300.000 MT, SR = 1/7,
M3
OB = 2.100.000
TAHUN KETIGA
450.000 MT
M3
SR = 1/8,5 OB = 3.825.000
TAHUN KEEMPAT
OB = 4.275.000
TAHUN KELIMA
300.000 MT, SR = 1/14,67 OB = 4.400.000
M3
TAHUN KEENAM
300.000 MT, SR = 1/14,67
4.400.000 M3
2.000.000 MT
M3 (BCM)
OB =
OB = 20.000.000
SR TOTAL = 1/10.
2.PERHITUNGAN ALAT GALI DAN MUAT