Anda di halaman 1dari 12

BERAT MATERIAL UTAMA

NO
1
A.

URAIAN KEGIATAN

SAT

Berat
(kg)
3

Haspel

Dalam
(kg)

Dalam
(Ton)

54

6=(4+5)

dibulatkan
x 1.1
(TON)
8

MATERIAL
TOLOK UKUR GD

I
1
2
4
4
5
6
7

Trafo dist. 160 kVA 3 phasa 220/380 V B2,20 kV Type OD


Trafo dist. 100 kVA 3 phasa 220/380 V B2,20 kV Type OD
Trafo dist. 50 kVA 3 phasa 220/380 V B2,20 kV Type OD
Trafo dist. 25 kVA 3 phasa 220/380 V B2,20 kV Type OD
Trafo dist. 25 kVA 1 phasa 220/380 V B2,20 kV Type OD
Lighning Arester 10 kA, 24 kV
Fuse Cut Out 20 kV

1
2

Tiang besi 11 M, 156 daN


Tiang besi 9 M, 100 daN

1
2

Isolator Tumpu 20 kV (Type Pin Post Insulator)


Isolator Asfpan 20 kV (Type Strain Rod Insulator)

1
2
3

Kawat AAAC 150 mm2


Kawat AAAC 70 mm2
Kawat AAAC 35 mm2

km
km
km

434
208
94

88
88
88

1
2
3

Kabel LVTC 3 x 70 + 50 mm2


Kabel LVTC 3 x 35 + 25 mm2
Kabel LVTC 2 x 35 + 25 mm2

km
km
km

988
546
340

110
110
110

Catatan D
: ata tersebut di salin dari Brosur / speckt Teknik Material tersebut.
Angka yg diambil sebagai Volume HPS

Unit
Unit
Unit
Unit
Unit
buah
buah

1,216
910
512
425
265
4.10
4.10

btg
btg

185.00
162.00

1,216.00
910.00
512.00
425.00
265.00
4.10
4.10
185.00
162.00

10.0
9.4

10.00
9.40

buah
buah

522.00
296.00
182.00
1,098.00
656.00
450.00

1.216
0.910
0.512
0.425
0.265
0.004
0.004
0.185
0.162
0.010
0.009
0.522
0.296
0.182
1.098
0.656
0.450

1.338
1.001
0.563
0.468
0.292
0.005
0.005
0.204
0.178
0.011
0.010
-

ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD


(BELUM TERMASUK HARGA MATERIAL UTAMA (MDU)
DI PT. PLN (PERSERO) SULAWESI BARAT
DIPA TAHUN 2013

URAIAN KEGIATAN

No

VOLUME PENGADAAN
MDU
REKANAN
SATUAN

HARGA SATUAN
(Rp)

JLH HRGA
(Rp)

JARINGAN TEGANGAN MENENGAH


1 Penarikan kawat JTM 3 phasa 1 kms
a.Penyediaan
- Kawat HIC 70 mm2
- Comprension tension joint 70/70 mm2

1,150
0

b. Pemasangan
- Pemasangan/ penarikan
c. Angkutan

0
0

0
3

mtr
bh

1
#REF!

kms
ton.km

0
3

mtr
bh

1
#REF!

kms
ton.km

0
3

mtr
bh

1
#REF!

kms
ton.km

set
set
btg
buah
mtr
bh
mtr
buah
buah
unit
ton km

bh
mtr
set

Jumlah
2 Penarikan kawat JTM 3 phasa 1 kms dengan kawat AAAC 150 mm2
a.Penyediaan
- Kawat AAA3C 150 mm2
- Comprension tension joint 150/150 mm2

1,150
0

b. Pemasangan
- Pemasangan/ penarikan
c. Angkutan

0
0

Jumlah

#REF!
#REF!

#REF!
#REF!

3 Penarikan JTM 3 phs 1 kms dengan kawat AAAC 70 mm2


a.Penyediaan
- Kawat AAAC 70 mm2
- Comprension tension joint 70/70 mm2
b. Pemasangan
- Pemasangan/ penarikan
c. Angkutan

1,090
0
0
0

Jumlah

#REF!
#REF!

4 Pemasangan LBS 20 kV
a.Penyediaan Load Break Switch 20 kV, 630 Amp (LBS)
- Pole mounted LBS 20 kV 630 Amp
- Pipa galvanis 1"x 1000 mm
- Unimax clamp 50 mm/Split bolt line tap for B-27
- Kabel NYA 1x50 mm2
- Kabel schoen 50 mm2
- Staindles stell stript
- Youke for staindles stell stript
- link
b. Pemasangan
c. Angkutan

0
0
0
0
0
0
0
0
0
0
0

1.00
1.00
1.00
1.00
15.00
1.00
2.00
2.00
2.00
1
1.00

Jumlah
5 Pemasangan pembesian dan isolator tumpu tgl 20 KV 3 ph UNP 10 pd tiang beton
a.Penyediaan
- Pin post insulator 20 KV
- Binding wire
- Travers tp TM 3 pole UNP 10 x 50x2000mm2
- Tanda bahaya pada tiang
- Staindless steel stript
- Yoke for staindles steel stript/ stoping bukle
b. Pemasangan
c. Angkutan

3
0
0
0
0
0
0
0

0
3
1
1
1
2
1
#REF!

6
0
0
0
0
0
0
0

0
6
2
1
1
2
1
#REF!

ton.km

3
3
3
0
0
0
0
0
0
0

0
0
0
3
1
1
1
2
1
#REF!

set
bh
set
bh
set
bh
mtr
bh
set
ton.km

6
6
6
1
0

0
0
0
0
1

set
bh
set
bh
mtr

bh
mtr
bh
set
ton.km

Jumlah

#REF!
#REF!

6 Pemasangan pembesian dan isolator tumpu gd 20 KV 3 ph UNP 10 pd tiang beton


a.Penyediaan
- Pin post insulator 20 KV
- Binding wire
- Travers tp TM 3 pole UNP 10 x 50x2000mm2
- Tanda bahaya pada tiang
- Staindless steel stript
- Yoke for staindles steel stript/ stoping bukle
b. Pemasangan
c. Angkutan

bh
mtr
set
bh
mtr
bh
set

Jumlah

#REF!
#REF!

7 Pemasangan pembesian dan isolator afspan tgl 20 KV 3 ph UNP 10 pd tiang beton


a.Penyediaan
- Isolator tarik 20 KV lengkap assesories type suspention
- Nut eye/ cross arm clevis
- Strain clamp 70-150 mm2
- Comprention non tention joint 150/150 mm2
- Travers afspan TM 3 pole UNP 10 x 50x2000 mm2 lengkap
- Tanda bahaya pada tiang
- Staindless steel stript
- Yoke for staindles steel stript/ stoping bukle
b. Pemasangan
c. Angkutan

Jumlah

#REF!
#REF!

8 Pemasangan pembesian dan isolator Afspan ganda 20 KV 3 ph UNP 10 pd tiang beton


a.Penyediaan
- Isolator tarik 20 KV lengkap assesories type suspention
- Nut eye/ cross arm clevis
- Strain clamp 70-150 mm2
- Pin post insulator 20 KV
- Binding wire

ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD


(BELUM TERMASUK HARGA MATERIAL UTAMA (MDU)
DI PT. PLN (PERSERO) SULAWESI BARAT
DIPA TAHUN 2013

URAIAN KEGIATAN

No

- Comprention non tention joint 150/150 mm2


- Travers afspan TM 3 pole UNP 10 x 50x2000 mm2
- Tanda bahaya pada tiang
- Staindless steel stript
- Yoke for staindles steel stript/ stoping bukle
b. Pemasangan
c. Angkutan

VOLUME PENGADAAN
MDU
REKANAN
SATUAN

HARGA SATUAN
(Rp)

JLH HRGA
(Rp)

0
0
0
0
0
0
0

6
2
1
1
2
1
#REF!

bh
set
bh
mtr
bh
set
ton.km

6
6
6
1
0
0
0
0
0
0
0
0

0
0
0
0
1
3
1
1
1
2
1
#REF!

set
bh
set
bh
mtr
bh
set
bh
mtr
bh
set
ton.km

3
3
3
1
0
0
0
0
0
0
0
0

0
0
0
0
1
3
1
1
1
2
1
#REF!

set
bh
set
bh
mtr
bh
set
bh
mtr
bh
set
tom.km

6
6
6
1
0
0
0
0
0
0
0
0

0
0
0
0
1
3
2
2
2
2
1
#REF!

set
bh
set
bh
mtr
bh
set
bh
mtr
bh
set
ton.km

3
0
0
0
0
0
0
0

0
3
1
1
1
2
1
#REF!

bh
mtr
set
bh
mtr
bh
set
ton.km

3
0
0
0
0
0
0
0

0
3
2
1
1
2
1
#REF!

bh
mtr
set
bh
mtr
bh
set
ton.km

0
0
0

set
set
set

Jumlah
9 Pems.pembesian & isolator afspan typy ujung 20KV 3PH UNP 10 T. Beton
a.Penyediaan
- Isolator tarik 20 KV lengkap accessories type suspension
- Nut eye / Eye Bolt
- Strain clamp 70 - 150 mm.
- Pin post insulator 20 KV
- binding wire
- Compression Non tension joint 150 / 150 mm
- Travers afspan TM 3pole UNP 10x50x2000mm2
- Tanda bahaya pada tiang
- Stainless steel strip
- Yoke for stainless steel strip/stopping buckle
b. Pemasangan
c. Angkutan

Jumlah

#REF!
#REF!

#REF!
#REF!

10 Pems.pembesian & isolator afspan Tgl 20KV 3PH UNP 10 t.ujung T. Beton
a.Penyediaan
- Isolator tarik 20 KV lengkap accessories type suspension
- Nut eye / Eye Bolt
- Strain clamp 70 - 150 mm.
- Pin post insulator 20 KV
- binding wire
- Compression Non tension joint 150 / 150 mm
- Travers afspan TM 3pole UNP 10 x 50x2000 mm2
- Tanda bahaya pada tiang
- Stainless steel strip
- Yoke for stainless steel strip/stopping buckle
b. Pemasangan
c. Angkutan

Jumlah

#REF!
#REF!

11 Pems.pembesian & isolator afspan gd Type H 20KV 3PH UNP 10. T. Beton
a.Penyediaan
- Isolator tarik 20 KV lengkap accessories type suspension
- Nut eye / Eye Bolt
- Strain clamp 70 - 150 mm.
- Pin post insulator 20 KV
- binding wire
- Compression Non tension joint 150 / 150 mm
- Travers afspan TM 3pole UNP 10x50x 2000 mm2
- Tanda bahaya pada tiang
- Stainless steel strip
- Yoke for stainless steel strip/stopping buckle
b. Pemasangan
c. Angkutan

Jumlah

#REF!
#REF!

12 Pemasangan pembesian dan isolator tumpu tgl 20 KV 3 ph UNP 10 pd tiang besi


a.Penyediaan
- Pin Post insulator 20 KV
- binding wire
- Travers Tumpu TM 3 pole UNP 10 x 50x2000 mm2
- Tanda bahaya pada tiang
- Staindless steel stript
- Yoke for staindles steel stript/ stoping bukle
b. Pemasangan
c. Angkutan

Jumlah

#REF!
#REF!

13 Pemasangan pembesian dan isolator tumpu gd 20 KV 3 ph UNP 10 pd tiang besi


a.Penyediaan
- Pin Post insulator 20 KV
- binding wire
- Travers Tumpu TM 3 pole UNP 10 x 50x2000 mm2
- Tanda bahaya pada tiang
- Staindless steel stript
- Yoke for staindles steel stript/ stoping bukle
b. Pemasangan
c. Angkutan

Jumlah

#REF!
#REF!

14 Pemasangan pembesian dan isolator Afspan tgl(type Ujung) 20 KV 3 ph UNP 10 pd tiang besi
a.Penyediaan
- Isolator tarik 20 KV lengkap accessories type suspension
- Nut eye / Eye Bolt
- Strain clamp 35 - 70 mm2

3
3
3

ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD


(BELUM TERMASUK HARGA MATERIAL UTAMA (MDU)
DI PT. PLN (PERSERO) SULAWESI BARAT
DIPA TAHUN 2013

URAIAN KEGIATAN

No

VOLUME PENGADAAN
MDU
REKANAN
SATUAN

HARGA SATUAN
(Rp)

JLH HRGA
(Rp)

3
0
0
0
0
0
0

0
1
1
1
2
1
#REF!

bh
set
bh
mtr
bh
set
ton.km

6
6
6
1
0
0
0
0
0
0
0
0
0

0
0
0
0
1
2
3
1
1
2
1
#REF!

set
bh
set
bh
mtr
set
bh
bh
mtr
bh
set
ton.km

6
6
6
1
0
0
0
0
0
0
0
0

0
0
0
0
1
6
2
1
1
2
1
#REF!

set
bh
set
bh
mtr
bh
set
bh
mtr
bh
set
ton.km

a. Penyediaan
- Tiang besi 11 meter 200 daN
- Galian/pembuatan lubang
b. Pemasangan

0
0

1
1

btg
btg

- Memantel tiang (penggonian + selubung beton type C) + bahan


- Pemancangan dan pengecatan + bahan
c. Angkutan

0
0
0

1
1
#REF!

btg
btg
ton.km

0
0

1
1

btg
btg

0
0
0

1
1
#REF!

btg
btg
ton.km

0
0
0
0
0
0
0
0
0
0

1
1
1
1
1
8
2
15
1
0

bh
bh
bh
bh
set
bh
bh
mtr
set
ton.km

0
0
0
0
0
0
0
0
0

1
1
1
1
1
8
2
15
1

bh
bh
bh
bh
set
bh
bh
mtr
set

- Compression Non tension Joing 150 / 150 mm2


- Travers asfpan TM 3 pole UNP 10 x50x 2000 mm2
- Tanda bahaya pada tiang
- Staindless steel stript
- Yoke for staindles steel stript/ stoping bukle
b. Pemasangan
c. Angkutan

Jumlah
15 Pemasangan pembesian dan isolator Afspan gd 20 KV 3 ph UNP 10 pd tiang besi
a.Penyediaan
- Isolator tarik 20 KV lengkap accessories type suspension
- Nut eye/eros arm clevis
- Strain clamp 35 - 70 mm2
- Pin Post insulator 20 KV
- binding wire
- Travers asfpan TM 3 pole UNP 10 x50x 2000 mm2
- Compression Non tension Joing 150 / 150 mm2
- Tanda bahaya pada tiang
- Staindless steel stript
- Yoke for staindles steel stript/ stoping bukle
b. Pemasangan
c. Angkutan

Jumlah

#REF!
#REF!

#REF!
#REF!

16 Pemasangan pembesian dan isolator Afspan gd Type ujung 20 KV 3 ph UNP 10 pd tiang besi
a.Penyediaan
- Isolator tarik 20 KV lengkap accessories type suspension
- Nut eye/eros arm clevis
- Strain clamp 35 - 70 mm2
- Pin Post insulator 20 KV
- binding wire
- Compression Non tension Joing 150 / 150 mm2
- Travers asfpan TM 3 pole UNP 10 x 50x2000 mm2
- Tanda bahaya pada tiang
- Staindless steel stript
- Yoke for staindles steel stript/ stoping bukle
b. Pemasangan
c. Angkutan

Jumlah

#REF!
#REF!

17 Pemancangan tiang besi 11 meter

Jumlah

#REF!
#REF!

18 Pemancangan tiang besi 9 meter


a. Penyediaan
- Tiang besi 9 meter 156 daN
- Galian/pembuatan lubang
b. Pemasangan
- Memantel tiang (penggonian + selubung beton type C) + bahan
- Pemancangan dan pengecatan + bahan
c. Angkutan

Jumlah

#REF!
#REF!

19 Pemasangan tupang tarik tiang beton.


a. Penyediaan
- Strain insulator for guy 12 KV / Isolator Guy
- Double beugel/ Mour Baut Mata / Eye Bolt
- Spanscroef 5/8" / Trun Buckle TM
- Plat beton 40 x 40 x 10 cm
- Angker rod + klem penyambung + mur baut
- U klem
- Kaos baja / Thimble TM
- Steel wire D 7
b. Pemasangan
c. Angkutan

Jumlah
20 Pemasangan tupang tarik tiang besi.
a. Penyediaan
- Strain insulator for guy 12 KV / Isolator Guy
- Double beugel/ Mour Baut Mata / Eye Bolt
- Spanscroef 5/8" / Trun Buckle TM
- Plat beton 40 x 40 x 10 cm
- Angker rod + klem penyambung + mur baut
- U klem
- Kaos baja / Thimble TM
- Steel wire D 7
b. Pemasangan

ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD


(BELUM TERMASUK HARGA MATERIAL UTAMA (MDU)
DI PT. PLN (PERSERO) SULAWESI BARAT
DIPA TAHUN 2013

URAIAN KEGIATAN

No
c. Angkutan

VOLUME PENGADAAN
MDU
REKANAN
SATUAN
0

ton.km

0
0
0
0
0
0
0
0
0
0

1
1
1
1
1
1
1
30
1
0

bh
bh
bh
bh
set
bh
bh
mtr
set
ton.km

HARGA SATUAN
(Rp)

JLH HRGA
(Rp)
-

Jumlah
21 Pemasangaan tupang tarik khusus pada tiang beton
a. Penyediaan
- Strain insulator for guy 12 KV / Isolator Guy
- Double beugel/ Mour Baut Mata / Eye Bolt
- Spanscroef 5/8" / Trun Buckle TM
- Plat beton 40 x 40 x 10 cm
- Angker rod + klem penyambung + mur baut
- U klem
- Kaos baja / Thimble TM
- Steel wire 50 mm2
b. Pemasangan
c. Angkutan

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-

Jumlah

#REF!

22 Pemasangan tupang tarik dengan tiang bantu tiang beton.


a. Penyediaan
- Tiang beton
- Strain insulator for guy 12 KV / Isolator Guy
- Double beugel/ Mour Baut Mata / Eye Bolt
- Spanscroef 5/8" / Trun Buckle TM
- Plat beton 40 x 40 x 10 cm
- Angker rod + klem penyambung + mur baut
- U klem
- Kaos baja / Thimble TM
- Steel wire 50 mm2
b. Pemasangan
c. Angkutan

1
0
0
0
0
0
0
0
0
0
0

0
1
1
1
1
1
1
1
25
1
0

btg
bh
bh
bh
bh
set
bh
bh
mtr
set
ton.km

0
0
0
0
0
0
0
0
0
0

1
1
1
3
1
1
1
12
4
25

btg
btg
bh
set
bh
bh
set
bh
bh
mtr

0
0
0

1
1
#REF!

btg
btg
ton.km

0
0
0
0
0

1
1
1
1
1

btg
bh
bh
bh
bh

0
0
0

1
1
#REF!

btg
btg
ton.km

1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-

0
0
1
15
6
2
6
3
3
3
2
4
1
3
3
1
-

btg
bh
set
mtr
mtr
bh
bh
bh
bh
bh
bh
set
bh
set
bh
set
-

Jumlah
23 Pemasangan tupang tarik dengan tiang bantu tiang besi.
a. Penyediaan
- Tiang besi 9 mtr 156 daN
- Galian/pembuatan lubang
- Strain insulator for guy 12 KV / Isolator Guy
- Double beugel/ Mour Baut Mata / Eye Bolt
- Spanscroef 5/8" / Trun Buckle TM
- Plat beton 40 x 40 x 10cm
- Angker rod + klem penyambung + mur baut
- U klem
- Kaos baja / Thimble TM
- Steel wire 50 mm2
b. Pemasangan
- Memantel tiang (penggonian + selubung beton type C) + bahan
- Pemasangan, pemancangan dan pengecatan tiang + bahan
c. Angkutan

Jumlah

#REF!
#REF!

24 Pemasangan tupang tekan


a. Penyediaan
- Tiang besi 11 meter 156 daN
- Double beugel / Clam Beugel
- Beugel
- Sangga tupang tekan
- Plat beton 40 x 40 x 10 cm
b. Pemasangan
- Memantel tiang (penggonian + selubung beton type C) + bahan
- Pemasangan, pemancangan dan pengecatan tiang + bahan
c. Angkutan

Jumlah

#REF!
#REF!

GARDU DISTRIBUSI :
25 Pembangunan gardu tiang 3 phasa 20 kV (1 tiang) pd tiang beton
a. Penyediaan
- Tiang
- Trafo 3 phasa (25 atau 50 kVA) 20 kV 400/ 230 Volt
- Konstruksi dudukan trafo 3 phasa type cantol lengkap
- BC draad 50 mm / NYY 1x50
- Kabel NYA 1 x 35 mm
- Terminal lugs 50 mm CU / Sepatu Cbale CU 50
- Terminal lugs 35 mm CU / Sepatu Cbale CU 35
- Tap connector / Bimetal paralel clamp 35 - 70 mm2 Al/ CU
- Fuse cut out 20 kV 100 Amp + fuse link 8 Amp.
- 24 kV lightning arrester 10 kA.
- Travers dudukan fuse cut out/Arrester UNP 10 x 1.200 mm
- Beugel + mur baut.
- Tanda bahaya
- Earthing Rod
- Split bolt line tap to fit.
- Lemari bagi TR 3 phasa lengkap minimal terdapat alat-alat sbb::
*-Kotak lemari bagi 3 phasa 2 jurusan UK 1000x700x400 mm tebl 2mm
* Rel tembaga 40 x 5 mm

ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD


(BELUM TERMASUK HARGA MATERIAL UTAMA (MDU)
DI PT. PLN (PERSERO) SULAWESI BARAT
DIPA TAHUN 2013

URAIAN KEGIATAN

No

* Dudukan rel tembaga


* NT fuse zise 1, minimal 100 amp. = 6 set
* NH Fuse Holder size 250 Amp = 6 set
* Lampu kontrol
* MCB 2 Amp = 1 buah
* Bola lampu 40 W = 1 bh
* Stop kontak arde = 1 bh
* Saklar engkel outbow = 1 bh
* Kabel NYAF 1 x 2,5 mm = 3 mtr
* Kunci panel seragam/master
* LBS minimal 400 Amp
- Travers dudukan lemari bagi 1 phasa lengkap (UNP 6,5 x 600 mm)+mur baut
c. Pemasangan :
- Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut
out, lightning arrester, pentanahan, lemari bagi, trafo).
d. Angkutan

VOLUME PENGADAAN
MDU
REKANAN
SATUAN
0

set

HARGA SATUAN
(Rp)

JLH HRGA
(Rp)

set

#REF!

ton.km

0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1
0
1
15
6
4
6
2
3
3
2
2
1
3
3
1
1

btg
btg
set
mtr
mtr
bh
bh
bh
bh
set
set
set
bh
set
set
set
set

2
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-

Jumlah
26 Pembangunan gardu tiang 3 phasa 20 kV (1 tiang) pd tiang besi
a. Penyediaan
- Tiang besi 11 mtr 200 daN
- Trafo 3 phasa ( 25 atau 50 kVA) 20 kV 400/ 230 Volt
- Konstruksi dudukan trafo 3 phasa type cantol lengkap
- BC draad 50 mm / NYY 1x50
- Kabel NYA 1 x 35 mm
- Terminal lugs 50 mm CU / Sepatu Cbale CU 50
- Terminal lugs 35 mm CU / Sepatu Cbale CU 35
- Tap connector / Bimetal paralel clamp 35 - 70 mm2 Al/ CU
- Fuse cut out 20 kV 100 Amp + fuse link 8 Amp.
- 24 kV lightning arrester 10 kA.
- Travers dudukan fuse cut out/Arrester UNP 10 x 1.2000 mm
- Beugel + mur baut.
- Tanda bahaya
- Earthing Rod
- Split bolt line tap to fit.
- Lemari bagi TR 3 phasa lengkap: 2 JURUSAN
*-Kotak lemari bagi 3 phasa 2 jurusan UK 1000x700x400 mm tebl 2mm
* Rel tembaga 40 x 5 mm
* Dudukan rel tembaga
* NT fuse zise 1, minimal 100 amp. = 6 set
* NH Fuse Holder size 250 Amp = 6 set
* Lampu kontrol
* MCB 2 Amp = 1 buah
* Bola lampu 40 W = 1 bh
* Stop kontak arde = 1 bh
* Saklar engkel outbow = 1 bh
* Kabel NYAF 1 x 2,5 mm = 3 mtr
* Kunci panel seragam
* LBS minimal 400 Amp
- Travers dudukan lemari bagi 1 phasa lengkap (UNP 6,5 x 600 mm)+mur baut
c. Pemasangan :
- Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut
out, lightning arrester, pentanahan, lemari bagi, trafo).
d. Angkutan

#REF!
#REF!

set

#REF!

ton.km

0
0
1
15
6
4
6
2
2
1
3
3
2
3
3
1
-

btg
bh
set
mtr
mtr
bh
bh
bh
bh
bh
bh
bh
set
set
set
set
-

Jumlah

#REF!
#REF!

27 Pembangunan gardu tiang 3 phasa 20 kV (2 tiang) pd tiang beton/besi


1.Penyediaan :
- Tiang
- Trafo 3 phasa 20 kV B2 100 kVA
- Konstruksi dudukan trafo 3 phasa type portal (2tiang)
- BC draad 50 mm / NYY 1x50 mm
- Kabel NYA 1 x 35 mm2
- Terminal lugs 50 mm CU / Sepatu Cbale CU 50
- Terminal lugs 35 mm CU / Sepatu Cbale CU 35
- Tap connector / Bimetal paralel clamp 70 / 35 mm2 Al/CU
- Double beugel + spanscroef 5/8" / Clam Schoer
- Tanda bahaya
- Fuse cut out 20 kV 100 Amp + fuse link 8 Amp.
- Lightning arrester 24 KV 10 kA.
- Travers dudukan fuse cut out / Arrester UNP 10 x 2.400 mm+beuge&murbaut
- Earthing Rod
- Split bolt line tap to fit.
- Lemari bagi TR 3 phasa lengkap:
*-Kotak lemari bagi 3 phasa 2 jurusan UK 1000x700x400 mm tebl 2mm
* Rel tembaga 40 x 5 mm
* Dudukan rel tembaga
* NT fuse zise 1, minimal 100 amp. = 6 set
* NH Fuse Holder size 250 Amp = 6 set
* Lampu kontrol
* MCB 2 Amp = 1 buah
* Bola lampu 40 W = 1 bh
* Stop kontak arde = 1 bh

ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD


(BELUM TERMASUK HARGA MATERIAL UTAMA (MDU)
DI PT. PLN (PERSERO) SULAWESI BARAT
DIPA TAHUN 2013

URAIAN KEGIATAN

No

* Saklar engkel outbow = 1 bh


* Kabel NYAF 1 x 2,5 mm = 3 mtr
* Kunci panel seragam
* LBS minimal 400 Amp
- Travers dudukan lemari bagi 1 phasa lengkap (UNP 6,5 x 600 mm)+beugel&murbaut
2. Pemasangan :
- Konstruksi gardu tiang 3 phasa (pemasangan lemari bagi,
konstruksi dudukan trafo, cut out, lightning arrester,
pentanahan dan pemasangan trafo).
3. Angkutan

VOLUME PENGADAAN
MDU
REKANAN
SATUAN
0

set

HARGA SATUAN
(Rp)

JLH HRGA
(Rp)

set

#REF!

ton.km

2
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
1
15
6
4
6
2
2
1
3
3
2
3
3
1
1

btg
bh
set
mtr
mtr
bh
bh
bh
bh
bh
bh
bh
set
set
set
set
set

Jumlah
28 Pembangunan gardu tiang 3 phasa 20 kV (2 tiang) pd tiang beton :

#REF!
#REF!

1.Penyediaan :
- Tiang
- Trafo 3 phasa 20 kV B2 100 kVA
- Konstruksi dudukan trafo 3 phasa type portal (2tiang)
- BC draad 50 mm / NYY 1x50 mm
- Kabel NYA 1 x 35 mm2
- Terminal lugs 50 mm CU / Sepatu Cbale CU 50
- Terminal lugs 35 mm CU / Sepatu Cbale CU 35
- Tap connector / Bimetal paralel clamp 70 / 35 mm2 Al/CU
- Double beugel + spanscroef 5/8" / Clam Schoer
- Tanda bahaya
- Fuse cut out 20 kV 100 Amp + fuse link 8 Amp.
- Lightning arrester 24 KV 10 kA.
- Travers dudukan fuse cut out / Arrester UNP 10 x 2.400 mm+ beugel &murbaut
- Earthing Rod
- Split bolt line tap to fit.
- Lemari bagi TR 3 phasa lengkap:
*-Kotak lemari bagi 3 phasa 2 jurusan UK 1000x700x400 mm tebl 2mm
* Rel tembaga 40 x 5 mm
* Dudukan rel tembaga
* NT fuse zise 1, minimal 100 amp. = 6 set
* NH Fuse Holder size 250 Amp = 6 set
* Lampu kontrol
* MCB 2 Amp = 1 buah
* Bola lampu 40 W = 1 bh
* Stop kontak arde = 1 bh
* Saklar engkel outbow = 1 bh
* Kabel NYAF 1 x 2,5 mm = 3 mtr
* Kunci panel seragam
* LBS minimal 400 Amp
- Travers dudukan lemari bagi 1 phasa lengkap (UNP 6,5 x 600 mm)+beugel&murbaut
2. Pemasangan :
- Konstruksi gardu tiang 3 phasa (pemasangan lemari bagi,
konstruksi dudukan trafo, cut out, lightning arrester,
pentanahan dan pemasangan trafo).
3. Angkutan

set

#REF!

ton.km

0
0
0
0
0
0
0
0
0

120
8
16
3
2
1
2
2
3

mtr
bh
bh
btg
btg
btg
set
set
bh

0
0

3
#REF!

set
ton.km

0
0
0
0
0
0
0
0
0
0

48
96
8
8
8
3
2
1
1
3

mtr
mtr
bh
bh
bh
btg
btg
btg
set
bh

0
0

3
#REF!

set
ton.km

Jumlah

#REF!
#REF!

29 Pengadaan / pemasangan kabel naik dan turun di gardu 3 phasa 2 jurusan type cantol (1 tiang)
a. Penyediaan
- Kabel NYY 1 x 50 mm2 CU
- Bimetal compression joint 35 - 70 mm (Al / Cu)
- Terminal lugs 50 mm CU / Sepatu Cbale CU 50
- Pipa galvanized 3" x 6.000 mm
- Pipa galvanized 1" x 5.000 mm
- Pipa galvanized 1" x 1.000 mm
- Beugel khusus 3" x tiga mata + mur baut untuk pipa
- UNP 6,5 x 500 mm2 + beugel plat dan mour baut 2 bh
- L boch Plastik type panjang 3"
b. Pemasangan
- Kabel naik / turun
c. Angkutan

Jumlah
30 Pengadaan / pemasangan kabel naik/turun di gardu 3 phasa 2 jurusan type portal (2 tiang)
a. Penyediaan
- Kabel NYY 1 x 70 mm2 CU
- Kabel NYY 1 x 50 mm2 CU
- Bimetal compression joint 35 - 70 mm (Al / Cu)
- Terminal lugs 70 mm CU / Sepatu Cbale CU 70
- Terminal lugs 50 mm CU / Sepatu Cbale CU 50
- Pipa galvanized 3" x 4.000 mm
- Pipa galvanized 1" x 5.000 mm
- Pipa galvanized 1" x 1.000 mm
- UNP 6,5 x 2400 mm2 + beugel plat dan mour baut 4 bh
- L boch Plastik 3" Type panjang untuk ujung pipa
b. Pemasangan
- Kabel naik/turun
c. Angkutan

Jumlah

#REF!
#REF!

#REF!
#REF!

ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD


(BELUM TERMASUK HARGA MATERIAL UTAMA (MDU)
DI PT. PLN (PERSERO) SULAWESI BARAT
DIPA TAHUN 2013

VOLUME PENGADAAN
MDU
REKANAN
SATUAN

URAIAN KEGIATAN

No

HARGA SATUAN
(Rp)

JLH HRGA
(Rp)

JARINGAN TEGANGAN RENDAH

31 Pemasangan LVTC 3x35+25mm sepanjang 1 kms


a. Penyediaan dan pemasangan
- Bundle conductor (LVTC) 3x35+25 mm
- Insulated tension joint

1,050.0
0
0
0

0
4
1
#REF!

mtr
bh
kms
ton.km

1,050.00
0
0

0
4
1
#REF!

mtr
bh
kms
ton.km

1
1
2
#REF!

set
bh
bh
ton.km

1
1
1.5
2
0.33
#REF!

set
set
mtr
bh
mtr
ton.km

set
bh
mtr
bh
ton.km

1
1
1.5
2
#REF!

0
0
0
0
0
0
0
0
0
0

1
12
1
1
1
1
1.5
4
1
#REF!

set
mtr
set
btg
set
bh
mtr
bh
set
ton.km

0
0
0
0
0

1
2
1
1

bh
mtr
set
set
ton.km

- Penarikan LVTC 3 phasa.


b. Angkutan

Jumlah
32 Pemasangan LVTC 3x70+50mm sepanjang 1 kms
a. Penyediaan dan Pemasangan
- Penyediaan Bundle conductor (LVTC) 3x70+50 mm
- Insulated tension joint
- Penarikan LVTC 3 phasa.
b. Angkutan

Jumlah

#REF!
#REF!

#REF!
#REF!

33 Pemasangan suspension / small angle assembly


a. Penyediaan dan pemasangan
- Suspension/small angle assembly
- Penarikan dan pemasangan
- Yoke for stainless steel strip / stopping buckle

= 2.0 BH

0
0
-

b.. Angkutan

Jumlah

#REF!
#REF!

34 Pemasangan large angle assembly


a. Penyediaan dan pemasanagn
- Large angle assembly
- Stainless steel strip
- Yoke for stainless steel strip / stopping buckle
- Protective plastik for stainless steel strip

= 1.5 Mtr
= 2.0 BH
= 0.33 Mtr

0
-

b. Angkutan

Jumlah

#REF!
#REF!

35 Pemasangan dead and assembly


a. Penyediaan dan pemasangan
- Dead and assembly = 1 bh
- Stainless steel strip
- Yoke for stainless steel strip / stopping buckle

0
= 1.5 Mtr
= 2.0 BH

b. Angkutan

Jumlah

#REF!
#REF!

36 Pemasangan pentanahan ujung JTR pd tiang beton biasa/tiang besi


a. Penyediaan
- Unimax clamp 50 mm / split bolt line tap
- BC draad 50 mm / kabel NYY 1 x 50 mm
- Pipa aarde 1,5" x 3.000 mm lengkap./ Earthing Rod
- Pipa galvanized 1" x 3.000 mm
- Bundle end protection set
- Insulated non tension connector
- Stainless steel strip
- Yoke for stainless steel strip / stopping buckle
b. Pemasangan bundled end protection set + pentanahan.
c. Angkutan

Jumlah

#REF!
#REF!

37 Pemasangan pentanahan ujung JTR pd tiang beton type E


a. Penyediaan
- Tap connector 35 / 70 mm2 CU
- BC draad 50 mm / kabel NYY 1 x 50 mm
- Pipa aarde 1,5" x 3.000 mm lengkap./ Earthing Rod
b. Pemasangan bundled end protection set + pentanahan.
c. Angkutan

Catatan :
- Semua material pembesian yang di suplay rekanan, harus melalui proses hot Dip Galvanized
kecuali lemari bagi hanya di dico sesuai dengan warna standar sdh mengikuti warna gardu
-

PLN area Mamuju


Tiang besi di cat almium dan hitam
Cat yang dipergunakan adalah cat ICI atau cat yang sama mutunya
Pembesian yang tidak dicamtumkan ukurannya disesuaikan dengan tiang yang akan dipasang
Spesifkasi material lihat gambar Konstruksi. JTM,JTR gardu edisi thn 2010

Manager UPK /PPKSULBAR

SYAMSUDDIN

PT. PLN (PERSERO)


SATKER LISTRIK PERDESAAN
SULAWESI BARAT

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN PEMBANGUNAN JARING DISTRIBUSI (JTM,JTR, DAN GD (SUPPLY ERECT)
DI PT (PLN) Persero) AREA MAMUJU PAKET POLMAN II
TAHUN ANGGARAN 2013
Pekerjaan : Pembangunan Jaringan Tegangan Menengah (JTM), Jaringan tegangan rendah (JTR), dan Gardu Distribusi (GD).
Lokasi :

NO. DOKUMEN
KUALIFIKASI
JANGKA WAKTU
SUMBER DANA

Dsn.Talepo,Palembongan,Batupanga daala, Siratuang Ds.Batupanga, Kec.Luyo, Polman

URAIAN PEKERJAAN

NO
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
B
1
2
3
4
5
6
7
8
9
10

C
1
2
3
4
5

Jaringan Tegangan Menengah (JTM)


Penarikan kawat JTM 3 Ph. AAAC 70 mm2
Penarikan kawat JTM 3 Ph. AAAC 150 mm2
Pemas. Pembesian & isolator afspan 3 Ph. UNP 10 type ujung pada tiang beton
Pemas. Pembesian & isolator afspan tgl 3 Ph. UNP 10 pada tiang beton
Pemasangan pembesian dan isolator tumpu tgl 20 KV 3 ph UNP 10 pd tiang beton
Pemasangan pembesian dan isolator tumpu gd 20 KV 3 ph UNP 10 pd tiang beton
Pemasangan pembesian dan isolator Afspan gd 20 KV 3 ph UNP 10 pd tiang beton
Pemasangan pembesian dan isolator Afspan gd type H, 20 KV 3 ph UNP 10 pd tiang beton
Pemasangan pembesian dan isolator Afspan Type ujung 20 KV 3 ph UNP 10 pd tiang besi
Pengadaan dan pemancangan tiang besi 11 meter 200 daN
Pemasangan LBS 20 KV 630 Ampere
Pemasangan pembesian dan isolator Afspan gd 20 KV 3 ph UNP 10 pd tiang besi
Pemas. Tupang tarik pada tiang beton
Pemasangan Tupang Tarik Tiang bantu tiang beton
Pemas. Tupang tarik pada tiang besi
Pemasangan Tupang Tekan
Pemas. Tupang tarik khusus
Jumlah JTM (A)
Jaringan Tegangan Rendah (JTR)
Pemancangan tiang besi 9 meter
Penarikan JTR 3 Phasa LVTC 3x35+25 mm2
Penarikan JTR 3 Phasa LVTC 3x70+50 mm2
Pemas Suspension Angle Assembly
Pemas Large angle assembly
Pemas Dead End assembly
Pemas. pentanahan ujung TR pada tiang beton type E
Pemasangan pentanahan ujung pd tiang biasa (beton&besi)
Pemasangan Tupang Tarik Tiang bantu tiang beton
Pemas. Tupang tarik pada tiang beton
Jumlah JTR (B)
Gardu Distribusi (GD)
Pembangunan GD tiang 3 Ph. 1 tiang 2 Jurusan (Untuk Trafo 25 kVA)
Pembangunan GD tiang 3 Ph. 1 tiang 2 Jurusan (Untuk Trafo 50 kVA)
Pembangunan GD tiang 3 Ph. 2 tiang 2 Jurusan (Untuk Trafo 100 kVA)
Pengadaan/ Pemasangan kabel naik/turun di gardu 3 ph type cantol (1 tiang)
Pengadaan/ Pemasangan kabel naik/turun di gardu 3 ph type portal (2 tiang)
Jumlah GD ( C )

A
B
C

JTM
JTR
GD

=
=
=

15.95 kms
9.20 kms
10.00 buah
Jumlah (Rp).

Harga Dasar
#REF!
#REF!

dibulatkan (Rp)
#REF!
#REF!
#VALUE!

PPN 10 %
#REF!
#REF!
#VALUE!

#REF!

#REF!

#REF!

=
.DP/LISDES-SULBAR/2013
= USAHA KECIL/NON KECIL
= 120 (Seratus Dua Puluh) hari kalender
= APBN Tahun Anggaran 2013
HARGA
SATUAN
(Rp)

JUMLAH
HARGA
(Rp)

15.95
0.00
8.00
0.00
218.00
129.00
9.00
0.00
0.00
0.00
0.00
0.00
71.00
1.00
0.00
0.00
0.00
15.95

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
-

#REF!
#REF!
#REF!

0
0
0
0
0
0
0
0
0
0
0

0.00
9.20
0.00
133.00
64.00
35.00
3.00
18.00
1.00
2.00
9.20

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

0
0
0
0
0
0

7.00
3.00
0.00
30.00
0.00
10.00

#REF!
#REF!
#REF!
#REF!
#REF!
-

#REF!
#REF!
#REF!
#REF!
#REF!

SAT

JMH

kms
kms
set
set
set
set
set
set
set
btg
set
set
set
set
set
set
set
kms

15.95
0
8
0
218
129
9
0
0
0
0
0
71
1
0
0
0
15.95

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

btg
kms
kms
set
set
set
set
set
set
set
kms

0
9.2
0
133
64
35
3
18
1
2
9.2

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

set
set
set
set
set
Set

7
3
0
30
0
10

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

#REF!

#REF!

#REF!

#REF!

Jumlah
#REF!
#REF!
#VALUE!

795,443,000

Terbilang :
Mamuju,

Januari
Direktur

2013

PT. PLN (PERSERO)


SATKER LISTRIK PERDESAAN
SULAWESI BARAT

RENCANA ANGGARAN BIAYA (RAB)


PENGADAAN MATERIAL UTAMA (MDU)
PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI JTM, JTR, DAN GD
DI PT PLN (Persero) AREA MAMUJU PAKET POLMAN II TA. 2013
Lokasi Desa

:
A

NO

URAIAN PEKERJAAN

A
1
2
3
4

MATERIAL JTM
Kawat AAAC 70 mm2
Kawat AAAC 150 mm2
Isolator Tumpu 20 kV
Isolator Tarik / Afspan 20 kV Lengkap Accessories

SAT

VOL

km
km
bh
set

HARGA
DASAR
(Rp)
5

49.29
0.00
1,428
78

JUMLAH (JTM)
B

MATERIAL JTR
1 LVTC 3 x 35 + 25 mm2
2 LVTC 3 x 70 + 50 mm2

km
km

1
2
3
4
5

GARDU DISTRIBUSI (GD)


Trafo distribusi 3 phasa 100 kVA B2 20 kV type D.3
Trafo distribusi 3 phasa 50 kVA B2 20 kV type D.3
Trafo distribusi 3 phasa 25 kVA B2 20 kV type D.3
Fuse Cut Out 100 A 20 kV + Fuse link 8 Amper
Lightining Arrester 10 kA, 24 kV

Unit
Unit
Unit
buah
buah

PPN
10%
(Rp)

TOTAL
HARGA
(Rp)

6=(4x5)

7=(6/10000)x10000

8=(7x10/100)

9=(7+8)

Rp.
-

Rp.

30.00
30.00

JUMLAH (GD)
-

DIBULATKAN
PULUHAN
RIBU

0.00
3.00
7.00

.DP/LISDES-SULBAR/2013
USAHA KECIL/NON KECIL
120 (Seratus Dua Puluh) hari kalender
APBN Tahun Anggaran 2013

JUMLAH
HARGA
(Rp)

9.66
0.00

JUMLAH (JTR)
C

No. Dok.
=
KUALIFIKASI
=
JANGKA WAKTU =
SUMBER DANA =

Dsn.Talepo,Palembongan,Batupanga daala, Siratuang Ds.Batupanga, Kec.Luyo, Polman

Rp.

TOTAL (JTM + JTR + GD)

Rp.

Mamuju,

Januari

Direktur

2013

PT. PLN (PERSERO)


SATKER LISTRIK PERDESAAN
SULAWESI BARAT

REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
DAN PENGADAAN MATERIAL UTAMA (MDU)
PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI JTM, JTR DAN GD
DI PT PLN (Persero) AREA MAMUJU, PAKET POLMAN II
TAHUN ANGGARAN 2013
Lokasi Desa :
A

NO

URAIAN PEKERJAAN

A
I
1
2
3
4
II

No. Dok.
=
.DP/LISDES-SULBAR/2013
KUALIFIKASI
= USAHA KECIL/NON KECIL
JANGKA WAKTU = 120 (Seratus Dua Puluh) hari kalender
SUMBER DANA = APBN Tahun Anggaran 2013

Dsn.Talepo,Palembongan,Batupanga daala, Siratuang Ds.Batupanga, Kec.Luyo, Polman

MATERIAL JTM
PENGADAAN MATERIAL UTAMA
Kawat AAAC 70 mm2
Kawat AAAC 150 mm2
Isolator Tumpu 20 kV
Isolator Tarik / Afspan 20 kV Lengkap Accessories

SAT

VOL

HARGA
DASAR
(Rp)
5

HARGA
DIBULATKAN
(Rp)

PPN
10%
(Rp)

JUMLAH
HARGA
(Rp)

km
49.29
km
0.00
Buah
1,428
Set
78
JUMLAH MDU (JTM) Rp.

JASA PEMASANGAN
1 Pemas./Penarikan Kawat AAAC 70 mm2
2 Pemas./Penarikan Kawat AAAC 150 mm2

kms
15.95
kms
0.00
JUMLAH JASA (JTM) Rp.

#REF!

#REF!
Rp.

TOTAL (JTM)
B
I

MATERIAL JTR
PENGADAAN MATERIAL UTAMA
1 LVTC 3 x 35 + 25 mm2
2 LVTC 3 x 70 + 50 mm2

II

km
9.66
km
0.00
JUMLAH MDU (JTR) Rp.

#REF!
#REF!

JASA PEMASANGAN
1 Pemas./Penarikan LVTC 3 x 70+50 mm2
2 Pemas./Penarikan LVTC 3 x 35 + 25 mm2

km
0.00
km
9.20
JUMLAH JASA (JTR)

Rp.

#REF!

#REF!

#REF!

Rp.

#REF!

TOTAL (JTR)
C
I
1
2
3
4
5
II

GARDU DISTRIBUSI (GD)


PENGADAAN MATERIAL UTAMA
Trafo distribusi 3 phasa 25 kVA B2 20 kV type D.3
Trafo distribusi 3 phasa 50 kVA B2 20 kV type D.3
Trafo distribusi 3 phasa 100 kVA B2 20 kV type D.3
Fuse Cut Out 100 A 20 kV + Fuse link 8 Amper
Lightining Arrester 10 kA, 24 kV

Unit
7
Unit
3
Unit
0
buah
30
buah
30
JUMLAH MDU (GD)

Rp.

JASA PEMASANGAN
1
2
3

Pemas. Trafo dist. 3 ph 25 kVA B2 20 kV type D.3 (1 Tiang)


Pemas. Trafo dist. 3 ph 50 kVA B2 20 kV type D.3 (1 Tiang)
Pemas. Trafo dist. 3 ph 100 kVA B2 20 kV type D.3 (2 Tiang)

Terbilang :

Set
Set
Set

7.00
3.00
JUMLAH JASA (GJ)
Rp.
TOTAL GD
TOTAL (JTM + JTR + GD)

#VALUE!

#VALUE!
Rp.
Rp.

#VALUE!
#VALUE!
2,668,149,000

DUA MILYAR, ENAM RATUS ENAM PULUH DELAPAN JUTA, SERATUS EMPAT PLH SEMBILAN RIBU RUPIAH,-

KESIMPULAN
URAIAN
JTM
JTR
GD

15.95
9.20
10.00

TOTAL

Km
Km
Set

JASA PASANG
#REF!
#REF!
#VALUE!

Rp.

#REF!

Mamuju,

MATERIAL
-

Januari

Direktur

2013

JUMLAH
#REF!
#REF!
#VALUE!

2,668,149,000

ANALISA HARGA SATUAN


PENGADAAN MATERIAL UTAMA (MDU)
PEMBANGUNAN JARINGAN DIST. JTM, JTR, DAN GD (SUPLY ERECT)

No.

U R A I A N KEGIATAN

SAT

VOLUME

HARGA
SATUAN
Rp.

JUMLAH
HARGA
Rp.

MATERIAL UTAMA JTM

A 1 -1
A 1 -2

Kawat AAAC 150 mm2


Angkutan material

km
T/M3

1.00
0.52200
Jumlah Rp.

A 2 -1
A 2 -2

Kawat AAAC 70 mm2


Angkutan material

km
T/M3

1.00
0.29600
Jumlah Rp.

A 3 -1
A 3 -2

Isolator Tumpu 20 kV
Angkutan material

buah
T/M3

1.00
0.01100
Jumlah Rp.

A 4 -1

A 4 -2

Isolator Tarik (Type Suspension/Starin Rod)


a. Jika Isolator Strain Rod + Acc
- Cross Arm Clevis
- Strain clamp 70-150 mm2
b. Jika Isolator Suspension 20 kV + Acc
- Cross Arm clevice
- Ball Clevice
- Socket eyes
- Strain clamp 70 -150 mm2
Angkutan material

T/M3

0.01034
Jumlah Rp.

A 5 -1
A 5 -2

Tiang besi 11 meter 200 daN


Angkutan material

btg
T/M3

1.00
0.19
Jumlah Rp.

A 6 -1
A 6 -2

Tiang besi 9 meter 100 daN


Angkutan material

btg
T/M3

1.00
0.11
Jumlah Rp.

Set

1.00

MATERIAL UTAMA JTR

B. 1 -1
B. 1 -2

LVTC 3 x 70 + 50 mm2
Angkutan material

km
T/M3

1.00
1.09800
Jumlah Rp.

B. 2 -1
B. 2 -2

LVTC 3 x 35 + 25 mm2
Angkutan material

km
T/M3

1.00
0.65600
Jumlah Rp.

MATERIAL UTAMA GD

C. 1 -1
C. 1 -2

Trafo distribusi 3 phasa 25 kVA B2 20 kV, D3


Angkutan Material

Unit
T/M3

1.00
0.46750
Jumlah Rp.

C. 2 -1
C. 2 -2

Trafo distribusi 3 phasa 50 kVA B2 20 kV, D3


Angkutan Material

Unit
T/M3

1.00
0.56320
Jumlah Rp.

C. 3 -1
C. 3 -2

Trafo distribusi 3 phasa 100 kVA B2 20 kV, D3


Angkutan Material

Unit
T/M3

1.00
1.00100
Jumlah Rp.

C. 4 -1
C. 4 -2

Fuse Cut Out 100 A 20 kV + Fuse Link 8 Amper


Angkutan material

buah
T/M3

1.00
0.00451
Jumlah Rp.

C. 5 -1
C. 5 -2

Lightning Arrester 10 kA, 20 kV


Angkutan material

buah
T/M3

1.00
0.00451
Jumlah Rp.

Mamuju,

Januari

Direktur

2013