Anda di halaman 1dari 5

DIKETAHUI DISETUJUI DISETUJUI DIRENCANAKAN JUDUL GAMBAR REVISI NO.

GBR TOTAL
PEKERJAAN RENCANA TEKNIK AKHIR/ DETAILED ENGINEERING DESIGN PT. JASAMARGA SMRG-BTG PT. WASKITA KARYA PROJECT MANAGER HIGHWAY ENGINEER F 22/06/2017 A 08/12/2016
B0- 01 5
PEMBANGUNAN JALAN TOL TERBANGGI BESAR - KAYU AGUNG TIPIKAL POTONGAN MELINTANG
E 26/05/2017
D 27/04/2017
PADA RUAS TERBANGGI BESAR - MESUJI (STA 3+650 - STA 28+650) PADA DAERAH TIMBUNAN C 18/04/2017 SKALA : 1 : 200
ABDUL ROKHIM YANA AGUSTIAN SUNJAS MURWATONO AGUS SANTOSO B 19/01/2017

DETAIL A
DETAIL B
DETAIL B

TIPIKAL POTONGAN MELINTANG PADA DAERAH TIMBUNAN


( PERKERASAN BETON, TAHAP AKHIR )

DETAIL A
DETAIL B
DETAIL B

TIPIKAL POTONGAN MELINTANG PADA DAERAH TIMBUNAN


( PERKERASAN BETON, TAHAP AKHIR )

DETAIL B
DETAIL A
DIKETAHUI DISETUJUI DISETUJUI DIRENCANAKAN JUDUL GAMBAR REVISI NO. GBR TOTAL
PEKERJAAN RENCANA TEKNIK AKHIR/ DETAILED ENGINEERING DESIGN PT. JASAMARGA SMRG-BTG PT. WASKITA KARYA PROJECT MANAGER HIGHWAY ENGINEER F 22/06/2017 A 08/12/2016
B0- 02 5
PEMBANGUNAN JALAN TOL TERBANGGI BESAR - KAYU AGUNG TIPIKAL POTONGAN MELINTANG
E 26/05/2017
D 27/04/2017
PADA RUAS TERBANGGI BESAR - MESUJI (STA 3+650 - STA 28+650) PADA DAERAH GALIAN C 18/04/2017 SKALA : 1 : 200
ABDUL ROKHIM YANA AGUSTIAN SUNJAS MURWATONO AGUS SANTOSO B 19/01/2017

DETAIL A
DETAIL B
DETAIL B

TIPIKAL POTONGAN MELINTANG PADA DAERAH GALIAN


( PERKERASAN BETON, TAHAP AWAL )

DETAIL A
DETAIL B

TIPIKAL POTONGAN MELINTANG PADA DAERAH GALIAN


( PERKERASAN BETON, TAHAP AKHIR )

DETAIL B
DETAIL A
DIKETAHUI DISETUJUI DISETUJUI DIRENCANAKAN JUDUL GAMBAR REVISI NO. GBR TOTAL
PEKERJAAN RENCANA TEKNIK AKHIR/ DETAILED ENGINEERING DESIGN PT. JASAMARGA SMRG-BTG PT. WASKITA KARYA PROJECT MANAGER HIGHWAY ENGINEER F 22/06/2017 A 08/12/2016
B0- 03 5
PEMBANGUNAN JALAN TOL TERBANGGI BESAR - KAYU AGUNG TIPIKAL POTONGAN MELINTANG
E 26/05/2017
D 27/04/2017
PADA RUAS TERBANGGI BESAR - MESUJI (STA 3+650 - STA 28+650) PADA DAERAH SUPERELEVASI C 18/04/2017 SKALA : 1 : 200
ABDUL ROKHIM YANA AGUSTIAN SUNJAS MURWATONO AGUS SANTOSO B 19/01/2017

DETAIL A
DETAIL B
DETAIL B

TIPIKAL POTONGAN MELINTANG PADA SUPERELEVASI


( PERKERASAN BETON, TAHAP AWAL )

DETAIL A
DETAIL B
DETAIL B

TIPIKAL POTONGAN MELINTANG PADA SUPERELEVASI


( PERKERASAN BETON, TAHAP AKHIR )

DETAIL B
DETAIL A
DIKETAHUI DISETUJUI DISETUJUI DIRENCANAKAN JUDUL GAMBAR REVISI NO. GBR TOTAL
PEKERJAAN RENCANA TEKNIK AKHIR/ DETAILED ENGINEERING DESIGN PT. JASAMARGA SMRG-BTG PT. WASKITA KARYA PROJECT MANAGER HIGHWAY ENGINEER F 22/06/2017 A 08/12/2016
B0- 04 5
PEMBANGUNAN JALAN TOL TERBANGGI BESAR - KAYU AGUNG TIPIKAL POTONGAN MELINTANG
E 26/05/2017
D 27/04/2017
PADA RUAS TERBANGGI BESAR - MESUJI (STA 3+650 - STA 28+650) JALAN AKSES C 18/04/2017 SKALA : 1 : 200
ABDUL ROKHIM YANA AGUSTIAN SUNJAS MURWATONO AGUS SANTOSO B 19/01/2017

JALAN AKSES (DUA ARAH)


( PERKERASAN BETON )

RAMP (SATU ARAH) JALAN NASIONAL DAN PROPINSI (B=11.0m)


( PERKERASAN BETON )

JALAN LOKAL DAN OVERPASS (B=8.0m) JALAN PERKEBUNAN (B=5.0m)


DIKETAHUI DISETUJUI DISETUJUI DIRENCANAKAN JUDUL GAMBAR REVISI NO. GBR TOTAL
PEKERJAAN RENCANA TEKNIK AKHIR/ DETAILED ENGINEERING DESIGN PT. JASAMARGA SMRG-BTG PT. WASKITA KARYA PROJECT MANAGER HIGHWAY ENGINEER F 22/06/2017 A 08/12/2016
B0- 05 5
PEMBANGUNAN JALAN TOL TERBANGGI BESAR - KAYU AGUNG TIPIKAL POTONGAN MELINTANG
E 26/05/2017
D 27/04/2017
PADA RUAS TERBANGGI BESAR - MESUJI (STA 3+650 - STA 28+650) PADA DAERAH SISI GALIAN & TIMBUNAN C 18/04/2017 SKALA : 1 : 200
ABDUL ROKHIM YANA AGUSTIAN SUNJAS MURWATONO AGUS SANTOSO B 19/01/2017

TIPIKAL POTONGAN MELINTANG PADA DAERAH TIMBUNAN SISI KANAN


( PERKERASAN BETON, TAHAP AKHIR )

TIPIKAL POTONGAN MELINTANG PADA DAERAH GALIAN SISI KANAN


( PERKERASAN BETON, TAHAP AKHIR )