GABLE FRAME
Gudang baja BJ/PPBBI/Ys/01 GudangBaja
Jembatan Jalan BJ/PPBBI/Tbr/02 Jembatan1
Kolam Renang BJ/PPBBI/Tbr/03 Kolamrenang
Tandon BJ/PPBBI/Ys/04 tandon
TRUSS
Kontrol Tegangan Rangka Baja BJ/PPBBI/TS/06 tegtruss
No. Doc : BJ/PPBBI/Ys/01
Judul Dokument Gudang Baja
Rev :
I. DATA-DATA PERENCANAAN
I.1. DATA UMUM BANGUNAN
NAMA =
LUAS LANTAI = 24 m X 41 m
JARAK PORTAL = 6.00 m
TINGGI KOLOM = 10.00 m
SUDUT ATAP = 25.00 degree = 0.44 radian
II. DESIGN STRUKTUR SKUNDER :
2.1. DESIGN GORDING
COBA = C 125x50x20x4,5
Wx = 38.00 cm3
Wy = 10.10 cm3
JARAK GORDING (Jg) = 125.00 cm
a. BEBAN TETAP
TEKANAN HUJAN = 20.00 kg/m2
t ATAP = 0.40 mm = 3.14 m2
BERAT ATAP = 3.93 kg/m'
BERAT GORDING = 8.32 kg/m'
BERAT HUJAN = 25.00 kg/m' +
TOTAL BEBAN TETAP = 37.25 kg/m'
d. TOTAL TEGANGAN :
Mx = MtetapX + MhidupX + Mangin = 301.91
My = MtetapY + MhidupY = 49.40
60.44 kg/m
b. BEBAN HIDUP TERPUSAT = 100.00 kg
c. BEBAN ANGIN , SUDUT ATAP = 25 derajat
TEKANAN ANGIN = 25.00 kg/m2
KOF. TEKAN ANGIN ATAP = 0,02(SUDUT ATAP) - 0,4 = 0.10
KOF. TEKAN HISAP ATAP = - 0,4 = -0.40
KOF. TEKAN ANGIN DINDING = + 0,9 = 0.90
KOF. TEKAN HISAP DINDING = - 0,4 = -0.40
4. Structure analysis
- Manual : for structure
- SAP 90 : for structure
- COSMIC : for roof
d. Stress check
fb = Mu c / I = 14.53 kg/cm2
No. Doc : BJ/PPBBI/Ys/01
Judul Dokument Gudang Baja
Rev :
fb / Fb = 0.01 OK
Fb = 0.54 fy
= 129.64 Mpa
b.2. Compact check :
- Flens bf / 2.tf < 65 / fy^0,5
8.33 < 11.02 OK
- Web d / tw < 640 / fy^0,5
46.15 < 108.49 OK
c. Stress check
fb = Mu c / I = 803.88 kg/cm2
fb / Fb = 0.62 OK
fa = Pu / A = 42.95 kg/cm2
k factor = 0.80
k l /r = 58.06
From tab. AISC , Fa = 17.62 (ksi)
1214.90 kg/cm2
fa / Fa = 0.04 < 0.15
OK
Total stress ratio :
No. Doc : BJ/PPBBI/Ys/01
Judul Dokument Gudang Baja
Rev :
c. Stress check
fb = Mu c / I = 528.22 kg/cm2
fb / Fb = 0.41 OK
fa = Pu / A = 34.93 kg/cm2
k factor = 0.80
k l /r = 58.06
From tab. AISC , Fa = 17.62 (ksi)
1214.90 kg/cm2
fa / Fa = 0.03 < 0.15
OK
No. Doc : BJ/PPBBI/Ys/01
Judul Dokument Gudang Baja
Rev :
b. shear check :
Resultan of shear = 1638.92 kg
Allow. Shear = 0,6 (fy/1.5) = 950.40 kg/cm2
Allow. Shear Load 1f1,2 = 1074.33 kg
n = 1.53 pcs.
No. Doc : BJ/PPBBI/Tbr/02
Judul Dokument Jembatan Jalan Rev :
10,5
Denah
2,00
2,00
15,00
10,5
Pembebanan :
Beban Mati :
- Berat sendiri pelat 20cm = 0.2*2400*2 = 960 kg/m'
- Berat aspal = 0.07*2300*2 = 322 kg/m'
- Berat air hujan = 0,01 * 1000 *2 = 20 kg/m'
1302 kg/m'
Beban Hidup :
- Beban Hidup = 400 *2 = 800 kg/m'
8 / 25
No. Doc : BJ/PPBBI/Tbr/02
Judul Dokument Jembatan Jalan Rev :
Beban Kendaraan :
P = 10000 kg
l= 10.5 m
2
= 1/8 3418.4 10.5 + 1/4 6,000 10.5
= 47,109.83 + 15,750
= 62,859.83 kg.m
= 62,859.83 E4 N.mm
Data balok :
- lebar b = 400 mm
- tinggi h = 800 mm
- beton decking = 25 mm
- tebal efektif d = 775 mm
- Mutu beton fc' = K-300 = 24.61 Mpa
- Mutu baja fy = U-39 = 390 MPa
0.003
Cc a=b1.xb
xb
d
Tb=As.fy
es=ey
b
9 / 25
No. Doc : BJ/PPBBI/Tbr/02
Judul Dokument Jembatan Jalan Rev :
xb ecu
=
d ecu + (fy/Es)
ecu
xb = .d
ecu + (fy/Es)
0.003
= 775
0,003 + 390
200000
= 469.70 mm
xmax = 0,75 . Xb
= 0,75 469.70
= 352.2727
a = b xmax
= 0,85 352.2727
= 299.43 mm
Cc = 0,85.fc.b.a
= 0.85 24.61 400 299.43
= 2,505,466 N
Mn = Cc . (d - (a/2))
= 2,505,466 ( 775 - 299 / 2)
= 1,566,627,902 Nmm > 628,598,250 Nmm
m = fy / (0,85 .fc')
390
=
0.85 24.61
= 18.64
Rn = M / (f b d2)
628,598,250.00
=
0.85 400 775 2
= 3.0782
1 2 3.0782 18.64
= (1- 1-
18.64 390
= 0.00857876
0,85*f'c'*b1 600
rb =
fy 600 + fy
10 / 25
No. Doc : BJ/PPBBI/Tbr/02
Judul Dokument Jembatan Jalan Rev :
r max = 0,75 r b
= 0,75 0.02763127
= 0.02072346 > r = 0.00857876
r min = 1,4 / fy
= 0.00359 < r = 0.00857876
Aperlu = r .b .d
= 0.00858 400 775 = 2,659.41 mm2
Dipasang tulangan :
A = 7 D 25 ( Aact = 3,436.12 mm2)
A' = 4 D 25 ( Aact = 1,963.50 mm2)
P1 = 6,000 kg P2 = 1,500 kg
w= 3418.4 kg/m'
l= 10.5 m
V max = 1/2 w l + P1 + P2
= 1/2 3418.4 10.5 + 6,000 + 1,500
= 17,946.60 + 6,000 + 1,500
= 25,446.60 kg
= 254,466.00 N
f Vc = f .1/6. pbfc'. bw .d
11 / 25
No. Doc : BJ/PPBBI/Tbr/02
Judul Dokument Jembatan Jalan Rev :
f Vs = Av .fy .d / s
f Av .fy .d
s =
f Vs
25,243,325.29
=
100,679.75
= 250.73 mm
Rencana Pondasi :
12 / 25
No. Doc : BJ/PPBBI/Tbr/02
Judul Dokument Jembatan Jalan Rev :
A. Cn K. JHP
P= +
3 5
125600 125600
= +
3 5
= 41,866.67 + 25,120
= 66,986.67 kg
431,909.00
= = 21,595 kg < P= 66,987 kg ….. (OK)
20
Denah
120 200
Tampak Samping
60
200
13 / 25
No. Doc : BJ/PPBBI/Tbr/02
Judul Dokument Jembatan Jalan Rev :
Tampak Depan
ABUTMENT
60
Pembebanan
Pembebanan pada 1 Balok Gelagar (l=10.5m)
kondisi Beban max terjadi saat :
P1 = 6,000 kg P2 = 1,500 kg
w= 0 kg/m'
l= 10.5 m
P max = 1/2 w l + P1 + P2
= 1/2 3418.4 10.5 + 6,000 + 1,500
= 17,946.60 + 6,000 + 1,500
= 25,446.60 kg
P = 25,446.60 kg
w= 2,880 kg/m'
60
350
14 / 25
No. Doc : BJ/PPBBI/Tbr/02
Judul Dokument Jembatan Jalan Rev :
Data Abutment :
- lebar b = 1200 mm
- tinggi h = 600 mm
- beton decking = 25 mm
- tebal efektif d = 575 mm
- Mutu beton fc' = K-300 = 24.61 Mpa
- Mutu baja fy = U-32 = 320 MPa
0.003
Cc a=b1.xb
xb
d
Tb=As.fy
es=ey
b
xb ecu
=
d ecu + (fy/Es)
ecu
xb = .d
ecu + (fy/Es)
0.003
= 575
0,003 + 320
200000
= 375.00 mm
xmax = 0,75 . Xb
= 0,75 375.00
= 281.25
a = b xmax
= 0,85 281.25
= 239.06 mm
Cc = 0,85.fc.b.a
= 0.85 24.61 1200 239.06
= 6,000,995 N
Mn = Cc . (d - (a/2))
15 / 25
No. Doc : BJ/PPBBI/Tbr/02
Judul Dokument Jembatan Jalan Rev :
m = fy / (0,85 .fc')
320
=
0.85 24.61
= 15.30
Rn = M / (f b d2)
140,728,875.00
=
0.85 1200 575 2
= 0.4173
1 2 0.4173 15.30
= (1- 1-
15.30 320
= 0.00131733
0,85*f'c'*b1 600
rb =
fy 600 + fy
r max = 0,75 r b
= 0,75 0.03623789
= 0.02717842 > r = 0.00131733
r min = 1,4 / fy
= 0.00438 > r = 0.00131733
Aperlu = r min .b .d
= 0.00438 1200 575 = 3,018.75 mm2
Dipasang tulangan :
380.133
A = D 22 - 125 ( Aact = 3,041.06 mm2)
16 / 25
No. Doc : BJ/PPBBI/Tbr/02
Judul Dokument Jembatan Jalan Rev :
P = 25,446.60 kg
w= 2,880 kg/m'
60
120
m = fy / (0,85 .fc')
320
=
0.85 24.61
= 15.30
Rn = M / (f b d2)
81,523,800.00
=
0.85 1000 575 2
= 0.2901
1 2 0.2901 15.30
= (1- 1-
15.30 320
= 0.00091290
Aperlu = r .b .d
= 0.00091 1000 575 = 524.92 mm2
Dipasang tulangan :
A = D 16 - 125 ( Aact = 1,608.50 mm2)
17 / 25
No. Doc : BJ/PPBBI/Tbr/02
Judul Dokument Jembatan Jalan Rev :
D22 - 125 D16 - 125
1500
18 / 25
No. Doc : BJ/PPBBI/Tbr/02
Judul Dokument Jembatan Jalan Rev :
P1 = 2,880 kg P2 = 720 kg
w= 0 kg/m'
l= 10.5 m
V max = 1/2 w l + P1 + P2
= 1/2 3418.4 10.5 + 2,880 + 720
= 17,946.60 + 2,880 + 720
= 21,546.60 kg
= 215,466.00 N
f .1/6. pbfc'. bw .d
f Vc
=
600
D16 - 125 D22 - 125
2000
19 / 25
No. Doc : BJ/PPBBI/Tbr/03
Judul Dokument Kolam Renang Rev :
3.00
7.00
1.50
20 / 25
No. Doc : BJ/PPBBI/Tbr/03
Judul Dokument Kolam Renang Rev :
m = fc / (0,85 .fy)
= 240 / (0.85 . 17.89)
= 15.78
Rn = M / (f b d2)
= ( 0.8622.10^7) / (0,85 1000 . 130^2)
= 0.600209
= 0.00255
Menurut PBI-71 psl 9.1(2) , tulangan minimum untuk pelat adalah 0,25% dari
luas beton yang ada, atau :
Amin = 0,25% . 1000 . 150 = 375 mm2
Apakai = 375 mm2
Dipasang tulangan f10 - 200 393 mm2 (ok)
Tulangan pembagi = 20% A = 20% 393 = 78.6 mm2
Dipasang tulangan f8 - 200 251 mm2 (ok)
21 / 25
No. Doc : BJ/PPBBI/Tbr/03
Judul Dokument Kolam Renang Rev :
B.1 Gaya yang bekerja pada pelat, ketika kolam dalam keadaan kosong
3.00
7.00
ly = 3,5
lx 3.00 m
ly 3.50 m
ly/lx 1.17
Jepit penuh/elastis {1/2] 2
wlx (tabel setelah interpolasi) 44.67
wly (tabel setelah interpolasi) 37.67
22 / 25
No. Doc : BJ/PPBBI/Tbr/03
Judul Dokument Kolam Renang Rev :
m = fc / (0,85 .fy)
= / (0.85 . 240)
= 15.78
Rn = M / (f b d2)
= ( 603.10^4) / (0,85 1000 . 130^2)
= 0.42
= 0.00177
Menurut PBI-71 psl 9.1(2) , tulangan minimum untuk pelat adalah 0,25% dari
luas beton yang ada, atau :
Amin = 0,25% . 1000 . 150 = 375 mm2
Apakai = 375 mm2
Dipasang tulangan f10 - 200 393 mm2 (ok)
C GAMBAR PENULANGAN
f10 - 200
3 f 12
f 8 - 150
3 f 12
SLOFF 15x25
23 / 25
No. Doc : BJ/PPBBI/Ys/04
Judul Dokument Tandon Rev :
Pa = 1080 kg/m
Mu = 1,2 x Pa x 1/3h 864 kg.m 8.4672 kN.m
2. Beban hidup
Beban hidup yang bekerja = 2000 kg/m2
As perlu = ρ perlu . b . d
Arah Mu Mn Rn=Mn/bd2 r perlu cek r As perlu tul.pakai As ada
kNm kNm N/mm2 > ρmin mm2 Ø (mm)
1. Plat vertikal x ( lap ) 8.47 10.584 0.847 0.00353 0.0035 441 f8 - 100 503
2. Plat lantai y ( lap ) 6.28 7.8538768 0.503 0.00209 0.0025 313 f8 - 150 335