Halaman
HALAMAN JUDUL
LEMBAR PENGESAHAN ............................................................................................. i
ABSTRAK ....................................................................................................................... ii
KATA PENGANTAR .................................................................................................... iv
DAFTAR ISI ................................................................................................................... vi
DAFTAR GAMBAR ..................................................................................................... xii
DAFTAR TABEL ......................................................................................................... xv
DAFTAR LAMPIRAN ................................................................................................ xxi
vi
2.12 Volume Tampungan Embung Daerah CAT Non Aluvial .................................. 8
2.13 Neraca Air (Water Balanace)Daerah CAT Non Aluvial.................................... 8
2.14 Penelusuran Banjir (Floud Routing) Daerah CAT Non Aluvial ........................ 8
2.15 Perencanaan Embung CAT Non Aluvial.......................................................... 56
2.15.1 Pemilihan Lokasi Embung ........................................................................ 56
2.15.2 Kajian Lokasi Potensi Embung ................................................................. 57
2.15.3 Tipe Embung ............................................................................................ 61
2.15.4 Perhitungan Gempa (Seismic) ................................................................... 65
2.15.5 Rencana Teknis Pondasi ........................................................................... 63
2.15.6 Rencana Elevasi Puncak Embung ............................................................. 65
2.15.7 Perencanaan Tubuh Embung .................................................................. 67
2.15.8 Stabilitas Lereng Embung ......................................................................... 71
2.16 Rencana Teknis Bangunan Pelimpah (Spillway).............................................. 56
2.17 Rencana Teknis Pintu Pengambilan (Intake) ................................................... 56
BAB III METODOLOGI ............................................................................................. 95
3.1 Metode Perencanaan Embung CAT Non Aluvial ............................................ 95
3.2 Survey dan investigasi pendahuluan ................................................................ 95
3.3 Identifikasi masalah .......................................................................................... 95
3.4 Studi pustaka .................................................................................................... 95
3.5 Pengumpulan data ............................................................................................ 95
3.6 Kajian Lokasi ................................................................................................... 95
3.7 Analisis data ..................................................................................................... 95
3.8 Analisis Kebutuhan Air .................................................................................... 95
3.9 Perencanaan konstruksi .................................................................................... 95
3.10 Stabilitas Konstruksi......................................................................................... 95
3.11 Gambar konstruksi ........................................................................................... 95
3.12 RKS dan RAB .................................................................................................. 95
vii
BAB IV ANALISIS HIDROLOGI ............................................................................ 104
4.1 Pemilihan Lokasi Embung CAT Non Aluvial ................................................ 147
4.2 Pengaruh Daerah CAT Non Aluvial Terhadap Hidrologi .............................. 110
4.3 Penentuan Daerah Aliran Sungai (DAS).. ...................................................... 110
4.4 Curah Hujan Rencana CAT Non Aluvial.. ..................................................... 110
4.5 Analisis Frekuensi Curah Hujan Rencana CAT Non Aluvial.. ...................... 110
4.6 Intensitas Curah Hujan CAT Non Aluvial.. ................................................... 110
4.7 Perhitungan Debit Rencana CAT Non Aluvial.. ............................................ 110
4.8 Perhitungan Debit Andalan CAT Non Aluvial............................................... 110
4.9 Analisa Kebutuhan Air Daerah CAT Non Aluvial ......................................... 147
4.10 Hubungan Elevasi, Luas Genangan dan Volume Embung ............................. 158
4.11 Volume Embung CAT Non Aluvial ............................................................... 162
4.12 Neraca Air (Water Balance) CAT Non Aluvial ............................................. 164
4.13 Penelusuran Banjir (Flood Routing) CAT Non Aluvial ................................. 167
BAB V PERENCANAAN KONSTRUKSI ............................................................... 171
5.1 Pengaruh CAT Non Aluvial Terhadap Konstruksi Embung .......................... 171
5.2 Perencanaan Tubuh Embung CAT Non Aluvial ............................................ 171
5.2.1 Material Konstruksi Embung................................................................... 171
5.2.2 Dimensi Hidrolis Embung ....................................................................... 174
5.2.3 Perhitungan Stabilitas Embung .............................................................. .181
5.3 Perencanaan Bangunan Pelimpah (Spillway) ................................................. 185
5.3.1 Data Teknis Perencanaan ........................................................................ 185
5.3.2 Saluran Pengarah Aliran ......................................................................... 185
5.3.3 Saluran Pengatur Aliran .......................................................................... 186
5.3.4 Saluran Peluncur ..................................................................................... 192
5.3.5 Rencana Teknis Hidrolis ......................................................................... 194
5.3.6 Perencanaan Kolam Olak ........................................................................ 196
5.3.7 Analisa Stabilitas Bangunan Pelimpah ................................................... 200
5.4 Perencanaan Bangunan Pengambilan (Intake) ................................................ 209
viii
BAB VI RENCANA KERJA DAN SYARAT SYARAT ........................................ 214
6.1 Metode Pelaksanaan Pekerjaan Embung CAT Non Aluvial .......................... 214
6.1.1 Pekerjaan Persiapan ....................................................................................... 215
6.1.2 Pekerjaan Konstruksi Tubuh Embung ........................................................... 216
6.1.3 Pekerjaan Konstruksi Bangunan Pelimpah (Spillway) .................................. 217
6.1.3 Pekerjaan Bangunan Pengambilan (Intake) .................................................. 217
6.2 Syarat Syarat Umum dan Administrasi .......................................................... 218
6.2.1 Ketentuan dan Persyaratan Umum ................................................................ 218
6.2.2 Ketentuan dan Persyaratan Administrasi....................................................... 227
6.3 Syarat Syarat Teknis ....................................................................................... 246
BAB VII RENCANA ANGGARAN BIAYA ........................................................... 270
7.1 Perhitungan Volume Pekerjaan Embung CAT Non Aluvial .......................... 270
7.2 Analisis Harga Satuan Pekerjaan.................................................................... 276
7.2.1 Harga Satuan Upah Pekerja .................................................................... 276
7.2.2 Harga Satuan Sewa Alat ......................................................................... 277
7.2.3 Harga Satuan Bahan Bangunan............................................................... 278
7.2.4 Harga Satuan Pekerjaan .......................................................................... 291
7.2.5 Rencana Anggaran Biaya Embung ......................................................... 296
7.3 Analisis Kebutuhan Tenaga Kerja (Man Power) .......................................... 297
7.4 Jadwal Waktu Pelaksanann (Time Schedule) ................................................ 300
7.5 Jaringan Kerja (Network Planning)............................................................... 300
BAB VIII PENUTUP .................................................................................................. 304
8.1 Kesimpulan ..................................................................................................... 304
8.2 Saran. .............................................................................................................. 304
DAFTAR PUSTAKA
LAMPIRAN
ix
DAFTAR GAMBAR
Halaman
Gambar 1.1 Peta Jawa Tengah .......................................................................................... 4
Gambar 1.2 Peta Kota Semarang ...................................................................................... 4
Gambar 1.3 Peta Kecamatan Mijen .................................................................................. 5
Gambar 2.1 Pengaruh Bentuk DAS Pada Aliran Permukaan ........................................ 10
x
Gambar 2.2 Pengaruh Kerapatan Parit Pada Hidrograf Aliran Permukaan .. ................. 11
Gambar 2.3 Metode Poligon Thiessen ............................................................................ 14
Gambar 2.4 Hubungan Curah Hujan Dengan Aliran Permukaan ................................... 34
Gambar 2.5 Sketsa Hidrograf Satuan Sintetik Gama 1 .................................................. 42
Gambar 2.6 Sketsa Penerapan WF ................................................................................. 43
Gambar 2.7 Sketsa Penerapan RUA ............................................................................... 44
Gambar 2.8 Pembagian Zona Gempa Indonesia ............................................................. 55
Gambar 2.9 Analisis Prioritas Embung Metode Cluster Analysis ................................ 58
Gambar 2.10 Embung Urugan ........................................................................................ 62
Gambar 2.11 Tipe Tipe Embung Beton .......................................................................... 63
Gambar 2.12 Tinggi Jagaan Pada Mercu Embung.......................................................... 65
Gambar 2.13 Tinggi Embung ......................................................................................... 68
Gambar 2.14 Berat Bahan Yang Terletak Di Bawah Garis Depresi ............................... 75
Gambar 2.15 Gaya Tekanan Hidrostatis Pada Bidang Luncur ...................................... 76
Gambar 2.16 Skema Pembebanan Yang Bekerja Pada Bidang Luncur ......................... 76
Gambar 2.17 Cara Menentukan Harga N dan T ............................................................. 79
Gambar 2.18 Skema Perhitungan Bidang Luncur Kondisi Penuh Air ........................... 80
Gambar 2.19 Skema Perhitungan Bidang Luncur Kondisi Rapid Down ........................ 81
Gambar 2.20 Saluran Pengarah Aliran dan Ambang Pengatur Debit ............................. 83
Halaman
Gambar 2.21 Penampang Memanjang Bangunan Pelimpah ........................................... 84
Gambar 2.22 Ambang Bebas .......................................................................................... 84
Gambar 2.23 Skema Penampang Memanjang Saluran Peluncur .................................... 86
Gambar 2.24 Bagian Berbentuk Terompet Saluran Peluncur ......................................... 86
Gambar 2.25 Bentuk Kolam Olakan Datar Tipe I USBR ............................................... 89
Gambar 2.26 Bentuk Kolam Olakan Datar Tipe II USBR.............................................. 90
Gambar 2.27 Bentuk Kolam Olakan Datar Tipe III USBR ............................................ 90
xi
Gambar 2.28 Bentuk Kolam Olakan Datar Tipe IV USBR ............................................ 91
Gambar 2.29 Tekanan Hidrostatis Air ............................................................................ 92
Gambar 3.1 Diagram Alir Perencanaan Embung ............................................................ 96
Gambar 3.2 Stabilitas Lereng Saat Kondisi Embung Dibangun ................................... 102
Gambar 3.3 Stabilitas Lereng Saat Kondisi Air Penuh ................................................. 102
Gambar 3.4 Stabilitas Lereng Saat Kondisi Rapid Down ............................................. 102
Gambar 4.1 Lokasi Potensi Embung............................................................................. 105
Gambar 4.2 Peta Kelerengan Semarang........................................................................ 106
Gambar 4.3 Peta Tata Guna Lahan Semarang .............................................................. 107
Gambar 4.4 Peta Geologi Semarang ............................................................................ 108
Gambar 4.5 Poligon Thiessen ....................................................................................... 111
Gambar 4.6 Pengaruh 3 Stasiun Hujan dan DAS Embung ........................................... 112
Gambar 4.7 Kondisi Pertemuan Sungai di Kota Semarang .......................................... 128
Gambar 4.8 Sketsa Penentuan Jumlah dan Pertemuan Sungai ..................................... 129
Gambar 4.9 Rekapitulasi Hidrograf Banjir Rancangan ................................................ 140
Gambar 4.10 Peta Kontur Lokasi Embung ................................................................... 159
Gambar 4.11 Daerah Genangan .................................................................................... 160
Gambar 4.12 Grafik Hubungan Elevasi, Luas dan Volume Genangan ........................ 166
Gambar 4.13 Neraca Air ............................................................................................... 166
Halaman
Gambar 4.14 Grafik Simulasi Embung ......................................................................... 166
Gambar 4.15 Grafik Flood Routing Periode Ulang 25 Tahun ...................................... 170
Gambar 5.1 Grafik Gradasi Bahan Penimbunan Embung Urugan ............................... 172
Gambar 5.2 Pelapisan Embung Urugan ........................................................................ 173
Gambar 5.3 Menentukan Tinggi Embung..................................................................... 174
Gambar 5.4 Tinggi Jagaan ............................................................................................ 175
Gambar 5.5 Pembagian Zona Gempa Indonesia ........................................................... 177
xii
Gambar 5.6 Tinggi Tampungan Embung...................................................................... 179
Gambar 5.7 Dimensi Embung ....................................................................................... 180
Gambar 5.8 Jaringan Trayektori Aliran Filtrasi ............................................................ 182
Gambar 5.9 Sliding Metode Irisan Bidang Luncur ....................................................... 184
Gambar 5.10 Saluran Pengatur Aliran dan Ambang Pengatur Debit ........................... 186
Gambar 5.11 Saluran Ambang Penyadap Spillway....................................................... 188
Gambar 5.12 Koordinat Penampang Memanjang Saluran Pengatur Debit................... 189
Gambar 5.13 Skema Bagian Transisi Saluran Pengarah ............................................... 191
Gambar 5.14 Penampang Melintang Saluran Pengatur ................................................ 192
Gambar 5.15 Penampang Melintang Saluran Peluncur ............................................... 193
Gambar 5.16 Potongan Memanjang Spillway ............................................................... 194
Gambar 5.17 Skema Penampang Memanjang Saluran ................................................. 194
Gambar 5.18 Rembesan dan Tekanan Air Tanah Dibawah Spillway ........................... 203
Gambar 5.19 Diagram Stabilitas Pelimpah ................................................................... 208
Gambar 5.20 Potongan Memanjang Diversion Tunnel ................................................. 210
Gambar 5.21 Potongan Memanjang Diversion Tunnel ................................................. 213
Gambar 5.22 Hubungan Penempatan Cofferdam Dengan Diversion Tunnel ............... 213
Gambar 5.23 Potongan Melintang Cofferdam .............................................................. 213
DAFTAR TABEL
Halaman
Tabel 2.1 Pedoman Pemilihan Sebaran ........................................................................... 20
Tabel 2.2 Reduced Mean (Yn) untuk Metode Sebaran Gumbel Tipe 1.......................... 21
Tabel 2.3 Reduced Standard Deviation (Sn) Metode Sebaran Gumbel Tipe 1 ............. 22
Tabel 2.4 Reduced Variate (YT) untuk Metode Sebaran Gumbel Tipe 1 ...................... 22
xiii
Tabel 2.5 Harga K untuk Metode Sebaran Log Pearson III ........................................... 25
Tabel 2.7 Standard Variable (Kt) untuk Metode Sebaran Log Normal ........................ 29
Tabel 2.11 Koefisien Aliran untuk Metode Rasional (dari Hassing, 1995) .................... 37
Tabel 2.14 Kebutuhan Air Non Domestik Kota Kategori I,II,II dan IV ........................ 49
Halaman
Tabel 2.25 Lebar Puncak Bendungan Kecil (Embung) yang Dianjurkan ...................... 69
xiv
Tabel 2.27 Angka Aman Minimum Dalam Tinjauan Stabilitas ..................................... 73
Tabel 2.28 Angka Aman Minimum untuk Analisis Stabilitas Lereng ........................... 73
Tabel 3.2 Angka Aman Minimum untuk Analisis Stabilitas Lereng ........................... 101
Tabel 4.2 Luas Pengaruh Stasiun Hujan Terhadap DAS Sungai Blorong ................... 113
Tabel 4.3 Curah Hujan Maksimum Stasiun Karang Tengah ....................................... 114
Tabel 4.5 Curah Hujan Maksimum Stasiun Mangkang Waduk .................................. 115
Tabel 4.7 Parameter Statistik Curah Hujan (Sosrodarsono, 1993) .............................. 116
Tabel 4.8 Parameter Logaritmik Curah Hujan (Sosrodarsono, 1993) .......................... 117
Halaman
Tabel 4.10 Hasil Uji Distribusi Dengan Metode Pendekatan ....................................... 118
Tabel 4.14 Curah Hujan Rencana Sebaran Normal Periode Ulang T Tahun ............... 121
xv
Tabel 4.16 Debit Banjir Rencana Metode Rasional ...................................................... 124
Tabel 4.17 Perhitungan Debit Banjir dengan Metode Haspers .................................... 125
Tabel 4.18 Debit Banjir Rencana Metode Jawa Sumatra ............................................. 126
Tabel 4.20 Intesitas Curah Hujan Jam-Jaman Metode Gama I .................................... 132
Tabel 4.26 Higrograf Banjir Periode Ulang 100 Tahun ............................................... 138
Tabel 4.27 Rekapitulasi Perhitungan Banjir Rencana Metode HSS Gama I ............... 139
Tabel 4.28 Debit Rencana Periode Ulang T Tahun Metode HSS Gama I ................... 140
Halaman
Tabel 4.37 Kriteria Perencanaan Sistem Penyediaan Air Baku ................................... 155
xvi
Tabel 4.38 Kebutuhan Air Bersih Kategori IV ............................................................ 155
Tabel 4.40 Hubungan Jumlah Penduduk Dengan Tingkat Pelayanan ......................... 157
Tabel 4.43 Hubungan Elevasi, Luas dan Volume Daerah Genangan ......................... 160
Tabel 4.44 Elevasi, Luas dan Volume Komulatif Daerah Genangan ........................ 162
Tabel 5.1 Ukuran Batu dan Ketebalan Hamparan Pelindung Rip-rap .......................... 173
Tabel 5.4 Percepatan Dasar Gempa (DHV Consultant, 1991) ..................................... 177
Halaman
Tabel 5.10 Perhitungan Rembesan dan Tekanan Air Tanah ........................................ 199
Tabel 5.13 Perhitungan Rembesan dan Tekanan Air Tanah ........................................ 203
xvii
Tabel 5.14 Pehitungan Gaya Uplift Pressure Kondisi Muka Air Banjir ..................... 204
Tabel 5.17 Rekapitulasi Gaya-gaya yang Bekerja pada Tubuh Pelimpah ................... 205
Halaman
xviii
DAFTAR LAMPIRAN
xix
Lampiran 7. Gambar Penampang Hidrogeologi Ungaran-Semarang
Lampiran 8. Formulir Permohonan Tugas Akhir
Lampiran 9. Surat Permohonan Data Tugas Akhir
Lampiran 10. Surat Penugasan Pembimbing Tugas Akhir
Lampiran 11. Jaringan Kerja (Network Planning)
Lampiran 12. Gambar Rencana
xx
iv
i