4.1.2 Perhitungan Kebutuhan Air .182
4.2 Sistem Penyediaan dan Distribusi Steam dan Listrik .184
4.2.1 Distribusi dan Produksi Steam .184
4.2.2 Distribusi dan Produksi Listrik .185
4.2.3 Simulasi Unit Penyediaan Steam, Listrik, dan Sirkulasi Dowtherm A
Thermal Fluid .188
4.3 Instrumentasi dan Pengendalian .191
4.3.1 Sistem Pengendalian dan Instrumentasi Unit Waste Acid Gas
Kompresi .191
4.3.2 Sistem Pengendalian dan Instrumentasi Unit Konversi COS ke H2S .194
4.3.3 Sistem Pengendalian dan Instrumentasi Unit CO2 Removing I .197
4.3.4 Sistem Pengendalian dan Instrumentasi Unit Acid Gas Kompresi . 201
4.3.5 Sistem Pengendalian dan Instrumentasi Unit CO2 Removing II .203
4.3.6 Sistem Pengendalian dan Instrumentasi Unit Unit SO2 Production .207
4.3.7 Hazop PT. Company One Engineering .209
4.4 Sistem Pengolahan Limbah .216
4.4.1 Limbah Cair .216
4.4.2 Limbah Padat .217
4.4.3 Limbah Gas .218
4.5 Utilitas Lain .218
4.5.1 Sistem Refrigirasi .218
4.5.2 Penyediaan Udara Tekan .220
4.5.3 Penyediaan Natural Gas . 220
4.5.4 Sistem Distribusi Produk SO2 oleh Pipeline 150 km .220
4.6 Layout Pabrik .220
LAMPIRAN – BAGIAN 5 SISTEM MANAJEMEN DAN KESELAMATAN KERJA .223
5.2 Kesehatan dan Keselamatan Kerja .223
5.2.1 Material Safety Data Sheet (MSDS) Bahan Kimia di PT. Company One
Engineering .223
LAMPIRAN – BAGIAN 6 ANALISIS EKONOMI . 244
6.0 Ringkasan Revisi _______ 244
.
6.1 Asumsi Umum Analisis Ekonomi .244
6.2 Perhitungan Perkiraan Harga Alat Utama .245
ii
6.2.1 Perkiraan Harga Shell and Tube . 245
6.2.2 Perkiraan Harga Compressor .220
6.2.3 Perkiraan Harga PFR .273
6.2.4 Perkiraan Harga Vessel . 274
6.2.5 Perkiraan Harga Tower . 277
6.2.6 Perkiraan Harga Pump .285
6.2.7 Perkiraan Harga Pump .289
6.3 Perhitungan Perkiraan Harga Biaya Investasi .291
6.4 Perhitungan Perkiraan Penjualan dan Biaya Produksi Tahunan .292
6.5 Analisis Kelaiakan Ekonomi .295
DAFTAR PUSTAKA .298
iii
DAFTAR TABEL
iv
DAFTAR GAMBAR
v
vi
LAMPIRAN 0 – PROBLEM DESKRIPSI PT. Company One Engineering
Background
A feasibility study is to be performed to investigate the possibility of producing high-value,
specialty sulfur chemicals from a sulfur-rich, acid gas waste stream produced by a coal
gasification facility. In this facility, a Shell gasifier is used to process approximately 16,000 tons
of coal per day into a synthesis gas used primarily to produce higher alcohol oxygenates and
fuel additives. The process produces a waste gas stream of 50,000 kg / hr with the following
composition:
The traditional method for the treatment of a waste gas of this type is a sequential
application of the Claus and Beavon processes, resulting in elemental sulfur suitable for
landfill [1,2]. The goal is to explore the possibility of producing sulfur chemicals from the
stream. Bulk chemicals such as sulfuric acid are to be avoided.
The results of the feasibility study show that a reaction method, which is preferred
over the Claus and Beavon method, is most profitable. This requires the production of
sulfur dioxide via the combustion hydrogen sulfide. The SO2 is then processed into
carbon disulfide, ammonium sulfate, sodium sulfite, and sodium bisulfite. Carbon
disulfide is used in the manufacture of rayon, carbon tetrachloride, soil disinfectants, and
as a solvent for phosphorus, sulfur, selenium, bromide, iodine, fats, resins, and rubbers.
Ammonium sulfate is used in fertilizers, flame proofing, and galvanization. Sodium
sulfite is used in the chemical pulping of wood, water treatment, photography, ore
floatation, and textile processing and sodium bisulfite is used as a disinfectant, a bleach,
and as a preservative in the bleaching of food.
Process Description
A simplified BFD of the overall process is shown in Figure 1.
Unit 100-Hydrogen Sulfide Separation
The purpose of Unit 100 is to separate hydrogen sulfide from the carbon dioxide in
the acid gas waste stream. The PFD for Unit 100 is shown in Figure 2. The acid waste gas
enters Unit 100 and is heated. Stream 3 now combines with superheated steam and is sent
into a fired heater, H-101. The stream is heated to the reaction temperature, and it then
enters an isothermal packed bed reactor, R-101. Here carbonyl sulfide reacts with steam
over a titanium oxide catalyst to form hydrogen sulfide and carbon dioxide. Cooled and
partially condensed, the reactor effluent is sent to the flash unit, V-101, where the excess
steam is removed as condensed water. Stream 16 enters the bottom of absorber T-101
flowing upward countercurrently against the Selexol solvent. The Selexol preferentially
absorbs the hydrogen sulfide as opposed to carbon dioxide. The cleaned carbon dioxide
leaves the top of the absorber and is sent to Unit 600. The hydrogen sulfide-rich Selexol
solvent is preheated in heat exchanger E-106 and sent to distillation column, T-102. In T-
102, the Selexol solvent is regenerated, and the absorbed waste gases are sent to absorber
T-103. Heat exchanger E-105, using refrigerated water, reduces the temperature of the
recycled Selexol to 25°C. Fresh Selexol is added to the recovered Selexol and enters the top
of T-101. The top of T-102 is sent the bottom of a second absorber, T-103, where the stream
again flows counter-currently against additional Selexol solvent. Absorber T-103 removes
most of the carbon dioxide from the recovered hydrogen sulfide stream. The waste gas
(Stream 38) exiting the absorber is sent to Unit 600. The bottom is preheated in two heat
exchangers, E-110 and E-111, and is sent to a second distillation column, T-104, where the
Selexol solvent is regenerated. The purified hydrogen sulfide leaves Unit 100 and is shared
by Units 200 and 500. The bottom stream preheats the tower feed in E-110 and is then
pumped up, cooled and combined with fresh Selexol to re-enter T-103.
Equipment Descriptions
E-101 Effluent Cooler P-101 Recycle Pump
E-102 Heat Exchanger (Heating) P-102 Reflux Pump
E-103 Heat Exchanger (Heating) P-103 Reflux Pump
E-104 Heat Exchanger (Heating) P-104 Recycle Pump
E-105 Tower Preheater R-101 Packed Bed Reactor
E-106 Tower Preheater T-101 Medium Pressure Absorber
E-107 Effluent Cooler T-102 Low Pressure Absorber
E-108 Reboiler T-103 Selexol Distillation Column
E-109 Reboiler T-104 Selexol Distillation Column
E-110 Heat Exchanger (Heating) V-101 Flash Vessel
E-111 Heat Exchanger (Heating) V-102 Reflux Vessel
E-112 Condenser V-103 Reflux Vessel
References
1. Kohl, A. and F. Riesenfeld, Gas Purification 4th ed., Gulf Publishing, Houston, TX, 1985. pp.
446-451, 739-753.
2. Kohl, A. and F. Riesenfeld, Gas Purification 4th ed., Gulf Publishing, Houston, TX, 1985. pp.
739-743.
3. Tong, S., I.G. Dalla Lana, and K.T. Chuang, “Kinetic Modelling of the Hydrolysis of
Carbonyl Sulfide Catalyzed by Either Titania or Alumina,” The Canadian Journal of
Chemical Engineering, 71 (3), 392-400 (1993).
5. McKetta, J.J. Encyclopedia of Chemical Processing Design, Vol. 52., Marcel Dekker
Inc., New York, 1995, pp.458-472.
8. U.S. Patent # 5,266,296 Cocurrent Flow Process for the Manufacture of Sodium Sulfite
and Bisulfite Solutions.
Table Mass and Energi Balance of Unit 100-Hydrogen Sulfide Separation Unit
Harga padatan sulfur dan gas H2S diperoleh dari harga pasar di Alibaba.com.
Sedangkan harga waste acid gas diestimasi dengan persamaan :
𝐻𝑎𝑟𝑔𝑎 𝑊𝑎𝑠𝑡𝑒 𝐴𝑐𝑖𝑑 𝐺𝑎𝑠 = 𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑒𝑑 𝑆𝑢𝑙𝑓𝑢𝑟 × 𝐻𝑎𝑟𝑔𝑎 𝑆𝑢𝑙𝑓𝑢𝑟 − 𝐵𝑖𝑎𝑦𝑎 𝑃𝑒𝑛𝑔𝑜𝑙𝑎ℎ𝑎𝑛
Waste Acid Gas biasanya diolah melalui proses Claus dengan persen recovery sulfur
99%. Biaya operasi untuk mengolah 140 ton/hari waste acid gas adalah $3104/hari[11]
$ 3104/ℎ𝑎𝑟𝑖
𝐵𝑖𝑎𝑦𝑎 𝑃𝑒𝑛𝑔𝑜𝑙𝑎ℎ𝑎𝑛 =
140 𝑡𝑜𝑛 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠/ℎ𝑎𝑟𝑖
𝐵𝑖𝑎𝑦𝑎 𝑃𝑒𝑛𝑔𝑜𝑙𝑎ℎ𝑎𝑛 = $ 22.17/𝑡𝑜𝑛 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
𝑚𝑎𝑠𝑠𝑎 𝑆
𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑒𝑑 𝑆𝑢𝑙𝑓𝑢𝑟 =
𝑚𝑎𝑠𝑠𝑎 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
𝑚𝑜𝑙 𝑆 × 𝑀𝑟 𝑆
𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑒𝑑 𝑆𝑢𝑙𝑓𝑢𝑟 =
𝑚𝑎𝑠𝑠𝑎 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
𝑚𝑜𝑙 𝐻2𝑆 × 𝑀𝑟 𝑆
𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑒𝑑 𝑆𝑢𝑙𝑓𝑢𝑟 =
𝑚𝑎𝑠𝑠𝑎 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
% 𝑚𝑜𝑙 𝐻2𝑆 × 𝑚𝑜𝑙 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠 × 𝑀𝑟 𝑆
𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑒𝑑 𝑆𝑢𝑙𝑓𝑢𝑟 =
𝑚𝑎𝑠𝑠𝑎 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
𝑚𝑎𝑠𝑠𝑎 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
% 𝑚𝑜𝑙 𝐻2𝑆 × × 𝑀𝑟 𝑆
𝑀𝑟 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑒𝑑 𝑆𝑢𝑙𝑓𝑢𝑟 =
𝑚𝑎𝑠𝑠𝑎 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
𝑀𝑟 𝑆
𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑒𝑑 𝑆𝑢𝑙𝑓𝑢𝑟 = % 𝑚𝑜𝑙 𝐻2𝑆 ×
𝑀𝑟 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
32
𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑒𝑑 𝑆𝑢𝑙𝑓𝑢𝑟 = 0.3318 ×
40.9129
𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑒𝑑 𝑆𝑢𝑙𝑓𝑢𝑟 = 0.26 𝑡𝑜𝑛 𝑆/𝑡𝑜𝑛 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
Sehingga
𝐻𝑎𝑟𝑔𝑎 𝑊𝑎𝑠𝑡𝑒 𝐴𝑐𝑖𝑑 𝐺𝑎𝑠 = 𝑅𝑒𝑐𝑜𝑣𝑒𝑟𝑒𝑑 𝑆𝑢𝑙𝑓𝑢𝑟 × 𝐻𝑎𝑟𝑔𝑎 𝑆𝑢𝑙𝑓𝑢𝑟 − 𝐵𝑖𝑎𝑦𝑎 𝑃𝑒𝑛𝑔𝑜𝑙𝑎ℎ𝑎𝑛
𝐻𝐺𝑎𝑠 = 0.26 𝑡𝑜𝑛 𝑆/𝑡𝑜𝑛 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠 × $230/𝑡𝑜𝑛 𝑆 − $ 22.17/𝑡𝑜𝑛 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
𝐻𝑎𝑎𝑠 = $ 𝟑𝟖/𝒕𝒐𝒏 𝒘𝒂𝒔𝒕𝒆 𝒂𝒄𝒊𝒅 𝒈𝒂𝒔
Aspek Produksi SO2 dari Produksi SO2 dari Produksi SO2 dari
Pembanding Padatan Sulfur 99% H2S 99% Waste Acid Gas
Jenis Proses Oksidasi Oksidasi Oksidasi
Temperatur 1000oC 600oC 600oC
Tekanan 130 kPa 130 kPa 130 kPa
H2S + 3/2O2 SO2 + COS + H2O H2S + CO2
Reaksi S + O2 SO2
H2O H2S + 3/2O2 SO2 + H2O
Harga Raw $232 / ton kandungan $1064 / ton $141 / ton kandungan
material sulfur kandungan sulfur sulfur
Konversi ≥ 99% ≥ 99% ≥ 99%
Produk
- - CO2
samping
GPM $684/ton SO2 $264/ton SO2 $724/ton SO2
Tabel 1.3 Perbandingan Beberapa Metode Produksi Sulfur Dioksida (SO2) (lanjutan)
Aspek Produksi SO2 dari Produksi SO2 dari Produksi SO2 dari
Pembanding Padatan Sulfur 99% H2S 99% Waste Acid Gas
Tidak perlu tahap Harga raw material
Tidak perlu tahap
pemisahan H2S karena termurah
Keuntungan pemisahan H2S dari
SO2 langsung dikonversi Gross profit margin
gas-gas lain
dari padatan sulfur tetinggi
Perlu tahap pemisahan
H2S
Temperatur operasi Harga raw material
Kelemahan Perlu tambahan tahap
tertinggi termahal
untuk mengkonversi COS
menjadi H2S dan CO2
Berikut adalah perhitungan gros marginal produk beberapa Metode Produksi Sulfur
Dioksida (SO2)
- Kebutuhan Padatan Sulfur (S) 99% ntuk Produksi 1 ton SO2
S + O2 SO2
1 𝑡𝑜𝑛 𝑆𝑂2 = 0.0156 𝑡𝑜𝑛 𝑚𝑜𝑙 𝑆𝑂2
𝑚𝑜𝑙 𝑆 = 𝑚𝑜𝑙 𝑆𝑂2 = 0.0156 𝑡𝑜𝑛 𝑚𝑜𝑙 𝑆
𝑚𝑜𝑙 𝑆 × 𝑀𝑟 𝑆
𝑚𝑎𝑠𝑠𝑎 𝑆 =
% 𝑘𝑒𝑚𝑢𝑟𝑛𝑖𝑎𝑛
0.0156 × 32
𝑚𝑎𝑠𝑠𝑎 𝑆 = 𝑡𝑜𝑛
0.99
𝑚𝑎𝑠𝑠𝑎 𝑆 = 0.5050 𝑡𝑜𝑛
- Kebutuhan H2S Gas (S) 99% ntuk Produksi 1 ton SO2
3
H2S + O2 SO2 + H2O
2
𝑚𝑜𝑙 𝐻2 𝑆 = 𝑚𝑜𝑙 𝐻2 𝑆 𝑑𝑎𝑟𝑖 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠 + 𝑚𝑜𝑙 𝐻2 𝑆 𝑑𝑎𝑟𝑖 𝑘𝑜𝑛𝑣𝑒𝑟𝑠𝑖 𝐶𝑂𝑆 𝑘𝑒 𝐻2 𝑆
𝑚𝑜𝑙 𝐻2 𝑆 = 0.27 𝑚𝑜𝑙 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠 + 0.05 𝑚𝑜𝑙 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
0.0156
𝑚𝑜𝑙 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠 = 𝑡𝑜𝑛 𝑚𝑜𝑙
0.27 + 0.05
𝑚𝑜𝑙 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠 = 0.0788 𝑡𝑜𝑛 𝑚𝑜𝑙 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
𝑚𝑎𝑠𝑠𝑎 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠 = 0.0488 𝑡𝑜𝑛 𝑚𝑜𝑙 × 𝑀𝑟 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
𝑡𝑜𝑛 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
𝑚𝑎𝑠𝑠𝑎 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠 = 0.0488 𝑡𝑜𝑛 𝑚𝑜𝑙 × 40.5129
𝑡𝑜𝑛 𝑚𝑜𝑙
𝑚𝑎𝑠𝑠𝑎 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠 = 1.9977 𝑡𝑜𝑛 𝑤𝑎𝑠𝑡𝑒 𝑎𝑐𝑖𝑑 𝑔𝑎𝑠
Tabel 1.4 Gross Profit Margin per Ton Produksi SO2 untuk Beberapa Raw Material
Raw Material Penjualan Gross Profit
Jenis Bahan
Kebutuhan Harga Pembelian SO2 Margin
Dasar
(ton/ton SO2) ($/ton) ($/ton SO2) ($/ton SO2) ($/ton SO2)
Waste Acid Gas 1.9977 38 76 800 724
Sulfur 0.5050 230 116 800 684
H2S 0.5365 1000 536 800 264
Tabel 1.5 Perbandingan Beberapa Pilihan Pendirian PT. Company One Engineering
Tabel 1.5 Perbandingan Beberapa Pilihan Pendirian PT. Company One Engineering (lanjutan)
Palembang, Tanjung Enim, Cikarang,
Aspek
Kecamatan Kalidoni, Kecamatan Lawang Kawasan Industri
Pembanding
Sumatera Selatan Kidul,Sumatera Selatan Jababeka,Jawa Barat
Sumatera SNG Project Sumatera SNG Project Sumatera SNG Project
Sumber raw
Tanjung Enim Fertilizer Tanjung Enim Fertilizer Tanjung Enim Fertilizer
material
Plant Plant Plant
Rute Waste Acid Gas dialirkan Waste Acid Gas dialirkan Waste Acid Gas dialirkan
pengambilan melalui perpipaan 150 km melalui perpipaan <1 km melalui perpipaan 400 km
raw material dari Tanjung Enim dari Tanjung Enim
Compressor untuk Compressor untuk Compressor untuk
Estimasi biaya perpipaan 30000 kW atau perpipaan perpipaan
$90/ton SO2 --- $125/ton SO2
Ketersediaan Sungai Musi Anak Sungai Lematang PT Jababeka Infrastruktur
air PDAM PDAM Tirta Enim
Utilitas Steam Steam diproduksi sendiri Steam diproduksi sendiri PT Jababeka Infrastruktur
PT PLN 1200 MW PT PLN 266 MW PT Cikarang Listrindo 720
Utilitas Listrik
MW
Pengolahan Limbah dikelola sendiri Limbah dikelola sendiri PT Jababeka Infrastruktur
Limbah Cair
Jalur kereta api Tanjung Jalur kereta api Tanjung Pelabuhan Tanjung Priok
Enim Palembang, Enim Palembang 40 km,
Bandara Sultan Mahmud Dermaga Kertapati 150 Cikarang 2 km,
Transportasi Badaruddin II 20 km, km, Bandara Soekarno-Hatta
Dermaga Pusri Dermaga Pusri 150 km 65 km,
Tol Jakarta - Cikampek 35
km
Infrastruktur
Rumah Sakit, Gd. Sekolah (SD, SMP, SMA), Perumahan, Hotel, Area Wisata
masyarakat
Berdasarkan Tabel 1.5, PT. Company One Engineering didirikan di daerah Tanjung Enim,
Kec. Lawang Kidul. Alasan utama pemilihan tempat tersebut adalah biaya tambahan
paling murah untuk mengalirkan produk dan raw material melalui perpipaan. Selain itu
pengelolaan dan kontruksi kebutuhan steam serta limbah yang dikelola sendiri akan
lebih sederhana dan mudah dikontrol dibanding pengelolaan dan kontruksi perpipaan
dari Tanjung Enim ke Cikarang yang melewati Selat Sunda.
Tabel 2.2 Data Heat Targeting, Pendingin Eksternal, dan Pemanas Eksternal
Heat Exchanger Heat Exchanger Heat Exchanger Pendingin Eksternal
Data Hot Stream Beban Panas Sisa,
Heat Transfer, Heat Transfer, Heat Transfer, Heat Transfer,
(Cooling) Kode Kode Kode kJ/kg Kode
kJ/kg kJ/kg kJ/kg kJ/kg
2 E-101 1206235 - - - - 3427120 E-102 3427120
5 E-103 2002044 - - - - 3519257 E-104 3519257
37 E-107 155746708 - - - - 9792955 E-108 9792955
46 E-113 926031 - - - - 2072640 E-114 2072640
49 E-115 1006738 - - - - 2147806 E-116 2147806
70 E-117 164167614 - - - - 19996601 E-118 19996601
25 E-110 26093787 - - - - 2115363 E-111 2115363
58 E-120 18033324 - - - - 1513572 E-121 1513572
14 E-105 8913394 - - - - 7929011 E-106 7929011
80 E-123 5257328 E-124 5304524 E-125 37092405 0 - -
PFR PFR-101 1321098 - - - - 0 - -
E-112
45870495
by DowTherm
Gas Hasil Pembakaran H2S E-122 FH-102 11789579 - - 0 - -
48741807
by DowTherm
Boiler
63360274
by DowTherm
Heat Exchanger Heat Exchanger Heat Exchanger Pemanas Eksternal
Data Cold Stream Beban Panas Sisa,
Heat Transfer, Heat Transfer, Heat Transfer, Heat Transfer,
(Heating) Kode Kode Kode kJ/kg Kode
kJ/kg kJ/kg kJ/kg kJ/kg
35 E-112 45870495 - - - - 0 - -
68 E-122 48741807 - - - - 0 - -
22 E-107 155746708 - - - - 0 - -
55 E-117 5257328 - - - - 0 - -
10 E-105 8913394 - - - - 576809 FH-101 -
BFW to power generation E-125 37092405 Boiler 63360274 FH-102 11789578 0 - -
E-101 1206235
E-103 2002044
E-113 926031
BFW to unit proses E-115 1006738 - - - - 0 - -
E-110 26093787
E-120 18033324
PFR-101 1321098
MPS power generation E-123 5304524 - - - - 0 - -
LPS power generation E-124 5257328 - - - - 0 - -
- Klik menu tab Reactions dan Add Rxn untuk men-setup reaksi pertama (Rxn-1).
Reaksi Rxn-1 merupakan reaksi heterogenius katalitik dengan laju reaksi dan
persamaan reaksi sebagai berikut :
Kemudian Pilih menu Reaction Set dan klik Add set. Kemudian pilih Rxn-1 sebagai
Active List
1
2700 𝑗𝑢𝑚𝑙𝑎ℎ 𝑘𝑜𝑚𝑝𝑟𝑒𝑠𝑜𝑟
𝑀𝑎𝑘𝑠𝑖𝑚𝑢𝑚 𝑅𝑎𝑡𝑖𝑜 𝐾𝑜𝑚𝑝𝑟𝑒𝑠𝑖 = ( ) =4
101.3
𝑗𝑢𝑚𝑙𝑎ℎ 𝑘𝑜𝑚𝑝𝑟𝑒𝑠𝑜𝑟 ≅ 3
Pada program simulasi dibuat urutan kompresi dan intercooler seperti berikut
E-101 dan E-103 merupakan intercooler dengan pendingin boiler feed water
(Saturated, T=102.5). Sedangkan E-102 dan E-104 merupakan intercooler dengan
pendingin cooling water.
- Masukan laju alir di stream 1 yakni 1218 kmol/h dan komposisi masing-masing
komponennya
- Untuk mencapai tekanan minimal 2700 kPa pada stream 8 maka daya masing-
masing kompresor di set 1450kW dan temperatur keluar masing-masing cooler
adalah 40oC untuk E-102 dan E-104 kemudian 112.5 oC (10oC diatas temperatur
pendingin) untuk E-101 dan E-103. Adiabatic Efficiency kompresor diasumsikan
75%
- Set stream 9 (umpan steam) dengan fraksi mol H2O adalah 1. Kemudian set
kondisi stream 7 dengan temperatur 250oC dan kekanan 2700 kPa di menu tab
worksheet serta laju alir 60 kmol/h
- Set temperatur stream 11 320oC pada menu tab worksheet Heater E-105
- Pemanasan dengan Fired Heater menggunakan bahan bakar natural gas dan
oksigen diambil dari udara bebas. Komposisi natural gas dan udara di set seperti
berikut
- Pemanasan oleh Fired Heater (FH-101) diatur hanya pada bagian Radiant Zone
dengan effisiensi 70%. Eksess udara adalah 100% dan efisiensi pencampuran
100%. Jumlah tube pass pada Fired Heater dibuat 1 pass.
- Pada tab menu worksheet Fired Heater set temperatur stream 12-13 330oC.
Serta temperatur dan tekanan udara (air) atau natural gas (ng) yang masuk ke
Fired Heater adalah 25oC dan 130kPa.
- Pada menu worksheet, temperatur stream keluar PFR (stream 14) diatur 330oC
- Stream 19 waste acid gas stream (H2S dan CO2) di-set pada tekanan 2300 kPa
oleh VLV-100
- Stream 20 adalah stream selexol yang di-set pada tekanan 2250 kPa dan
Temperatur 25oC dengan laju alir 1150 kmol/h
- Tekanan tray paling bawah kolom absorber T-101 di-set pada 2300 kPa dan
jumlah tray 60
- Pada stream 22 terdapat selexol yang mengikat H2S. Selexol diregenerasi pada
kolom stripper T-102 yang dioperasikan pada tekanan 197 kPa. Exchanger E-107
memanaskan stream 22 sampai 260oC dari sumber panas stream 37 dengan cara
emergy stream E-107 dan E-107a harus sama. Kemudian VLV-101 menurunkan
tekanan sampai 197kPa
- Sistem kondensasi vapor top produk T-102 digunakan dua condenser partial E-
110 dengan pendingin BFW 102.5oC dan E-111 dengan pendingin cooling water.
E-110 mendinginkan sampai 112.5oC. Gas dari E-110 masuk ke E-111 sedangkan
kondensate masuk ke kondensat akumulator V-101. E-111 mendinginkan sampai
40oC. Gas dari E-111 masuk ke kompresor C-104 sedangkan kondensate masuk
ke kondensat akumulator V-101
- Kondensat dari V-101 di pompakan oleh P-102 ke tray paling atas T-102 yakni
vessel teratas pada Gambar 2.33
- Pada bagian kolom T-102, aliran bottom stream 34 dibagi menjadi dua aliran
yakni aliran untuk di kembalikan ke kolom T-101 dan aliran stream 35 untuk di
boil up kembali ke kolom T-102 oleh reboiler E-112
- Stream 38 yakni aliran selexol yang dikembalikan ke kolom absorber T-101 harus
pada kondisi tekanan 2250 kPa dan temperature 25oC. Sehingga diperlukan
pendinginan sampai 40oC dan didiinginkan kembali hingga 25oC serta
dipompakan hingga 2250 kPa.
1
1100 𝑗𝑢𝑚𝑙𝑎ℎ 𝑘𝑜𝑚𝑝𝑟𝑒𝑠𝑜𝑟
𝑀𝑎𝑘𝑠𝑖𝑚𝑢𝑚 𝑅𝑎𝑡𝑖𝑜 𝐾𝑜𝑚𝑝𝑟𝑒𝑠𝑖 = ( ) =4
197
𝑗𝑢𝑚𝑙𝑎ℎ 𝑘𝑜𝑚𝑝𝑟𝑒𝑠𝑜𝑟 ≅ 2
Pada program simulasi Hysys dibuat urutan kompresi dan intercooler seperti
berikut
E-113 dan E-115 merupakan intercooler dengan pendingin boiler feed water
(Saturated, T=102.5). Sedangkan E-114 dan E-116 merupakan intercooler dengan
pendingin cooling water.
- Untuk mencapai tekanan minimal 1100 kPa pada stream 51 maka daya masing-
masing kompresor di set 810kW dan temperatur keluar masing-masing cooler
adalah 40oC untuk E-114 dan E-116 kemudian 112.5 oC (10oC diatas temperatur
pendingin) untuk E-113 dan E-115. Adiabatic Efficiency kompresor diasumsikan
75%
-
Gambar 2.43 Setup Kompresor C-104
- Stream 51 acid gas stream (H2S dan CO2) di-set pada tekanan 1100 kPa oleh VLV-
102
- Stream 53 adalah stream selexol yang di-set pada tekanan 1150 kPa dan
Temperatur 25oC dengan laju alir 1370 kmol/h
- Tekanan tray paling bawah kolom absorber T-103 di-set pada 1100 kPa dan
jumlah tray 60
- Pada stream 55 terdapat selexol yang mengikat H2S. Selexol diregenerasi pada
kolom stripper T-104 yang dioperasikan pada tekanan 140 kPa. Exchanger E-117
memanaskan stream 55 sampai 240oC dari sumber panas stream 70 dengan cara
energy stream E-117 dan E-117a harus sama. Kemudian VLV-103 menurunkan
tekanan sampai 140 kPa
- Sistem kondensasi vapor top produk T-104 digunakan dua condenser partial E-
120 dengan pendingin BFW 102.5oC dan E-121 dengan pendingin cooling water.
E-120 mendinginkan sampai 112.5oC. Gas dari E-120 masuk ke E-121 sedangkan
kondensate masuk ke kondensat akumulator V-103. E-121 mendinginkan sampai
97oC. Gas dari E-121 masuk ke tahap selajutnya yakni proses produksi SO2
sedangkan kondensate masuk ke kondensat akumulator V-103
- Kondensat dari V-103 di pompakan oleh P-104 ke tray paling atas T-104 yakni
vessel teratas pada Gambar 2.55
- Pada bagian kolom T-104, aliran bottom stream 67 dibagi menjadi dua aliran
yakni aliran untuk di kembalikan ke kolom T-103 dan aliran stream 68 untuk di
boil up kembali ke kolom T-104 oleh reboiler E-122
- Stream 71 yakni aliran selexol yang dikembalikan ke kolom absorber T-103 harus
pada kondisi tekanan 1150 kPa dan temperature 25oC. Sehingga diperlukan
pendinginan sampai 40oC dan didiinginkan kembali hingga 25oC serta
dipompakan hingga 1150 kPa.
- Set stream 78, yakni stream udara dengan laju 3095 kmol/h dan komposisi sebagai berikut
- Set stream 77, yakni stream low pressure steam tekanan 130 kPa dan temperatur 160oC
dengan laju alir 37 kmol/h
- Pada reaktor Gibbs diambil asumsi bahwa jika dilakukan pada Fired Heater,
dengan dasar perhitungan kesetimbangan kimia berdasarkan energi Gibs
- Panas dari zone burn diambil oleh DowTherm A Thermal Fluid (konfigurasi
lengkap pada lampiran bagian 4.2.3) sehingga temperatur radiant zone FH-102
yakni 600oC. Perpindahan panas di radiant zone disimulasikan oleh cooler:
Radiant ZoneFH102
- Sisa panas dari gas produk stream 80 selanjutnya direcovery panas untuk
memanaskan ulang steam HPS dan LPS pada power generation serta preheater
BWF (konfigurasi lengkap pada lampiran bagian 4.2.3). Recovery panas
disimulasikan dengan 3 Heat Exchanger E-123, E-124, dan E-125
44 in
1/4 in
7/16 in
O.D 0.5 in
O.D 20 in O.D 0.5 in Blowdown
50 in
7/16 in
3/8 in
O.D 18 in O.D 5 in
44 in
1/4 in
7/16 in
O.D 0.5 in
O.D 14 in O.D 0.75 in Blowdown
30 in 192 in
O.D 14 in O.D 5 in
3/8 in 25 in 7/16 in
7/16 in
50 in
7/16 in
3/8 in
O.D 14 in O.D 5 in
30 in 39 in 30 in
O.D 3.5 in
1/4 in 1/4 in
21 in
O.D 12 in O.D 12 in
1/4 in
O.D 0.75 in
Catalyst
O.D 14 in O.D 12 in
3/8 in 12.4 in
5/16 in
62 in
3/8 in
5/16 in
5/16 in
O.D 12 in O.D 12 in
58 in
3/8 in
7/16 in
O.D 12 in O.D 8 in
1.1875 in
O.D 12 in
679 in
226 in
2.25 in
O.D 0.5 in
0.75 in
1.375 in
O.D 11 in Stage 1
Stage 20
1358 in (34.5m)
Stage 40
O.D 12 in
O.D 12 in
78.7 in (2m)
0.25 in
Stage 3
Stage 5
Stage 10 35 in (0.9 m)
O.D 30 in
O.D 18 in
128 in (3.26 m)
O.D 5 in
195 in
65 in
0.25 in
O.D 5 in
70 in 420 in
O.D 14 in O.D 18 in
3/8 in 20 in
3/8 in
100 in
3/8 in
3/8 in
3/8 in
O.D 12 in O.D 12 in
O.D 12 in O/D 10 in
1/4 in 22 in
7/16 in
44 in
1/4 in
7/16 in
7/16 in
O.D 12 in O.D 10 in
O.D 12 in O.D 8 in
3/8 in 25 in
7/16 in 7/16 in
50 in
7/16 in
3/8 in
O.D 12 in O.D 4 in
- LPS – Acid Gas Partial Condenser E-110 - Cooling Water – Acid Gas Partial
86 in Condenser E-111
44 in
1/2 in
48 in 7/16 in
O.D 18 in
30 in O.D 16 in
1/2 in
O.D 14 in 7/16 in O.D 4 in
252 in 192 in
1/4 in
22 in
O.D 4 in
5/8 in
6 in
43 in
O.D 2.5 in
O.D 18 in 70 in
12 in
O.D 5 in
O.D 24 in 100 in
O.D 5 in
84 in
1/2 in
50 in
O.D 30 in
1/2 in
O.D 24 in
216 in
5/8 in
42 in
O.D 10 in
O.D 12 in
44 in
1/4 in
7/16 in
O.D 0.5 in
O.D 12 in O.D 0.5 in blowdown
42 in
7/16 in
1/4 in
O.D 8 in O.D 4 in
42 in
1/4 in
7/16 in
O.D 0.5 in
O.D 12 in O.D 05 in blowdown
42 in
7/16 in
1/4 in
O.D 10 in O.D 4 in
0.5 in
0.625 in
O.D 14 in Stage 1
Stage 17
1161 in (29.5m)
Stage 34
O.D 16 in
O.D 14 in
59 in (1.5 m)
0.25 in
Stage 3
Stage 5
370 in (9.4 m)
Stage 7
Stage 10 35 in (0.9 m)
O.D 30 in
O.D 18 in
119 in (3.02 m)
0.25 in
O.D 4 in
176 in 59 in
0.25 in
O.D 4 in
60 in 336 in
O.D 14 in O.D 20 in
3/8 in 18 in
3/8 in
90 in
3/8 in
3/8 in
3/8 in
O.D 14 in O.D 14 in
O.D 14 in O/D 12 in
1/4 in 22 in
7/16 in
44 in
1/4 in
7/16 in
7/16 in
O.D 14 in O.D 12 in
O.D 14 in O.D 8 in
3/8 in 25 in
7/16 in 7/16 in
50 in
7/16 in
3/8 in
O.D 14 in O.D 4 in
- LPS – Acid Gas Partial Condenser E-120 - Cooling Water – Acid Gas Partial
74 in Condenser E-121
42 in
1/2 in
42 in O.D 16 in 7/16 in
30 in O.D 16 in
1/2 in
O.D 14 in 7/16 in O.D 2 in
252 in 192 in
1/4 in
21 in
O.D 2 in
5/8 in
6 in
47 in
O.D 2 in
O.D 16 in 70 in
12 in
O.D 4 in
O.D 22 in 100 in
O.D 4 in
82 in
1/2 in
50 in
O.D 30 in
1/2 in
O.D 24 in
216 in
5/8 in
41 in
O.D 10 in
O.D 12 in
1/4 in
44 in
7/16 in
O.D 14 in O.D 36 in
30 in 288 in
O.D 24 in O.D 36 in
1/4 in 22 in
7/16 in 7/16 in
44 in 1/4 in
7/16 in
O.D 22 in O.D 36 in
40 in 264 in
O.D 5 in O.D 36 in
1/2 in 32 in
5/16 in
64 in
1/2 in
5/16 in
5/16 in
O.D 5 in O.D 36 in
𝑃𝑡𝑎𝑟𝑔𝑒𝑡
log ( )
𝑃𝑖𝑛𝑙𝑒𝑡
𝑛=
log(𝐶𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑖𝑜𝑛𝑅𝑎𝑠𝑖𝑜)
2700
log ( )
𝑛= 101.3
log(3.5)
𝑛 = 2.62 ≈ 3
𝑤. 𝐻𝑎𝑑 𝑊𝑎𝑑
𝑊𝑎𝑑 = 𝑊=
1000 𝜂
(13.8583)(78517 ) 1088.12
𝑊𝑎𝑑 = 𝑊=
1000 0.75
𝑊𝑎𝑑 = 1088.12 𝑘𝑊 𝑊 = 1450.83 𝑘𝑊
𝑤. 𝐻𝑎𝑑 𝑊𝑎𝑑
𝑊𝑎𝑑 = 𝑊=
1000 𝜂
(13.8583)(78455 ) 1087.25
𝑊𝑎𝑑 = 𝑊=
1000 0.75
𝑊𝑎𝑑 = 1087.25 𝑘𝑊 𝑊 = 1449.67 𝑘𝑊
𝑤. 𝐻𝑎𝑑 𝑊𝑎𝑑
𝑊𝑎𝑑 = 𝑊=
1000 𝜂
(13.8583)(78455 ) 1087.25
𝑊𝑎𝑑 = 𝑊=
1000 0.75
𝑊𝑎𝑑 = 1087.25 𝑘𝑊 𝑊 = 1449.67 𝑘𝑊
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 2 3 -
o
Temperature, 𝑡1 , 𝑡2 C 137.37 112.50 -
Pressure kPa 319 309 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 12928 12520 -
Heat Flow, J/kg- oC -308255304 -309461539 -
Mass Flow, 𝑚𝑡 kg/h 49889 49889 49889
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 0.9820 0.9679 0.9723
Mass Density, 𝜌𝑡 kg/m3 3.8591 3.9848 3.9220
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0250 0.0232 0.0241
Viscosity, 𝜇𝑡 cP 0.0188 0.0176 0.0182
Heat Exchanger Duty kJ/h 1206235
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Liquid Outlet Shell Side Vapor
Stream Number - BFW LPS
o
Temperature, 𝑇1 , 𝑇2 C 101.00 102.32
Pressure kPa 125 110
Actual Volume Flow, 𝑉𝑠̇ m3/h 0.5584 828
Heat Flow, J/kg- oC -8.29E+06 -7.08E+06
Mass Flow, 𝑚𝑠 kg/h 534 534
Mass Heat Capacity, 𝐶𝑝𝐿 , 𝐶𝑝𝑉 kJ/kg- oC 4.2180 2.0379
Mass Density, 𝜌𝐿 , 𝜌𝑉 kg/m3 957 0.6453
Thermal Conductivity, 𝑘𝐿 , 𝑘𝑉 W/m- oC 0.6811 0.0246
Viscosity, 𝜇𝐿 , 𝜇𝑉 cP 0.2761 0.0121
Laten Heat, 𝜆 kJ/kg 2241.5025
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 )
𝐿𝑀𝑇𝐷 =
(𝑡 − 𝑇2 )
ln 1
(𝑡2 − 𝑇1 )
11.49℃ − 35.05℃
𝐿𝑀𝑇𝐷 =
11.49℃
ln
35.05℃
𝐿𝑀𝑇𝐷 = 21.1284℃
Jumlah pass Heat Exchanger E-101 yakni 1-2 pass dengan nilai diasumsikan 𝐹𝑇 = 1 karena shell
side merupakan total evaporation
Material Selecting
Require Material
Tube Acid Resist H2S & CO2 Stainless Steel 316
Channel Cover Acid Resist H2S & CO2 Stainless Steel 316
Shell - Carbon Steel
Baffle - Carbon Steel
Tubesheet Acid Resist H2S & CO2 Stainless Steel 316
Shell and Tube Design
Keterangan in m
Shell Diameter, 𝐷𝑠 Trial Error 44 1.1176
Outside Diameter, 𝐷𝑜 Trial Error 2 0.0508
Inside Diameter, 𝐷𝑖 Trial Error 1.843 0.0468
Tebal tube, 𝑡𝑡𝑢𝑏𝑒 Trial Error 0.0785 0.0020
Panjang Tube, 𝐿 Trial Error 192 4.8768
Tube Pitch, 𝑃𝑡 1.25𝐷𝑜 , T.E.M.A. 9th Ed 2.5 0.0635
Baffle Pitch, 𝑃𝑏 0.5𝐷𝑠 22 0.5588
Jumlah Tube, 𝑁𝑡𝑢𝑏𝑒 Trial Error 182 tube
Opened Baffle General Opened Baffle, Mc.Cabe 25%
Shell, Channel, Head Thickness Min. Shell Thickness, T.E.M.A. 9th 7/16 in
Baffle Thickness Min. Baffle Thickness, T.E.M.A. 9th 1/4 in
1 1
ℎ𝑑𝑖 = = BTU/ft 2 h°F = 2269.79 W/m2 ℃
𝑅𝑖 0.0025
1 1
ℎ𝑑𝑜 = = BTU/ft 2 h°F = 5674.47 W/m2 ℃
𝑅𝑜 0.0010
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0508 0.0020 0.0508 1 1 0.0508 1
( )( )+( )( )+( )+( )( )+( )
210.99 0.0468 45 0.0488 331 2269.79 0.0468 5674.47
2
𝑈𝑜 = 112.85 𝑊/𝑚 ℃
∆𝑇𝑓𝑤 = 12.26℃ 𝜆𝑐 = 2𝜋 ( )
𝑔(𝜌𝐿 − 𝜌𝑉 )
1
0.0584 2
𝜆𝑐 = 2𝜋 ( )
9.82(957.15 − 0.6453)
𝜆𝑐 = 0.0157 𝐽/𝑘𝑔
1
𝜆𝑐 𝜇𝑉 ∆𝑇𝑓𝑤 4 𝜆𝑐
ℎ𝑜 ( 3 ′
) = 0.59 + 0.069 ( )
𝑘𝑉 𝜌𝑉 (𝜌𝐿 − 𝜌𝑉 )𝜆 𝑔 𝐷𝑜
1
(0.0157)(0.0000121)(12.26) 4 0.0157
ℎ𝑜 ( ) = 0.59 + 0.069 ( )
(0.0246)3 (0.6453)(957.15 − 0.6453)(2224540)(9.82) 0.0508
ℎ𝑜 = 331.66 𝑊/𝑚2 ℃
𝒉𝒐 ≈ 𝒉𝒐 𝒂𝒔𝒎𝒔𝒊
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 3 4 -
o
Temperature, 𝑡1 , 𝑡2 C 112.5 40.0 -
Pressure kPa 309 299 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 12520 10429 -
Heat Flow, J/kg- oC -309461539 -312888658 -
Mass Flow, 𝑚𝑡 kg/h 49889 49889 49889
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 0.9679 0.9294 0.9475
Mass Density, 𝜌𝑡 kg/m3 3.9848 4.7835 4.3841
Mass Enthalpy kJ/kg -6203 -6272 -
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0232 0.0179 0.0205
Viscosity, 𝜇𝑡 cP 0.0176 0.0141 0.0158
Heat Exchanger Duty kJ/h 3427120
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - Cooling Water Cooling Water -
o
Temperature, 𝑇1 , 𝑇2 C 30 45 -
Pressure kPa 130 109 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 54.927 55.231 -
Mass Flow, 𝑚𝑠 kg/h 54679 54679 54679
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 4.1795 4.1807 4.1801
Mass Density, 𝜌𝑠 kg/m3 995 990 998
Mass Enthalpy kJ/kg -15800 -15737 -
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.6182 0.6376 0.6279
Viscosity, 𝜇𝑠 cP 0.7972 0.5939 0.6956
2
Fouling Factor, 𝑅𝑜 ft -°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡1 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 30 ℃ − 45℃ 40℃ − 112.5℃
(𝑡2 − 𝑇1 ) 𝑅= 𝑆=
67.50℃ − 10℃ 40℃ − 112.5℃ 30 ℃ − 112.5℃
𝐿𝑀𝑇𝐷 = 𝑅 = 0.2069 𝑆 = 0.8788
67.50℃
ln
10℃
𝐿𝑀𝑇𝐷 = 30.1119℃
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (1.2700)2 𝜋. (0.0508)2 𝑆𝑐 = (0.6350)(1.2700). (1 − 0.8)
𝑆𝑏 = (0.1955). − 3.0547.
4 4 𝑆𝑐 = 0.1613 𝑚2
𝑆𝑏 = 0.2415 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 62.9030 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 94.1700 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(62.9030)(94.1700) (4180)(0.000696) 0,33 0.6279
ℎ𝑜 = 0,2 ((0.0508) ) ( )
0.000696 0.6279 0.0508
ℎ𝑜 = 728.70 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0508 0.0020 0.0508 1 1 0.0508 1
( )( )+( )( )+( )+( )( )+( )
288.78 0.0468 45 0.0488 728.70 2269.79 0.0468 5674.47
2
𝑈𝑜 = 171.51 𝑊/𝑚 ℃
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 5 6 -
o
Temperature, 𝑡1 , 𝑡2 C 152.88 112.50 -
Pressure kPa 908 898 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 4660 4235 -
Heat Flow, J/kg- oC -307668658 -309670702 -
Mass Flow, 𝑚𝑡 kg/h 49889 49889 49889
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 1.0049 0.9861 0.9937
Mass Density, 𝜌𝑡 kg/m3 10.7059 11.7806 11.2433
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0265 0.0236 0.0250
Viscosity, 𝜇𝑡 cP 0.0197 0.0178 0.0187
Heat Exchanger Duty kJ/h 2002044
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Liquid Outlet Shell Side Vapor
Stream Number - BFW LPS
o
Temperature, 𝑇1 , 𝑇2 C 101.00 102.32
Pressure kPa 125 110
Actual Volume Flow, 𝑉𝑠̇ m3/h 0.9268 1374
Heat Flow, J/kg- oC -8.29E+06 -7.08E+06
Mass Flow, 𝑚𝑠 kg/h 887 887
Mass Heat Capacity, 𝐶𝑝𝐿 , 𝐶𝑝𝑉 kJ/kg- oC 4.2180 2.0379
Mass Density, 𝜌𝐿 , 𝜌𝑉 kg/m3 957 0.6453
Thermal Conductivity, 𝑘𝐿 , 𝑘𝑉 W/m- oC 0.6811 0.0246
Viscosity, 𝜇𝐿 , 𝜇𝑉 cP 0.2761 0.0121
Laten Heat, 𝜆 kJ/kg 2241.5025
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 )
𝐿𝑀𝑇𝐷 =
(𝑡 − 𝑇2 )
ln 1
(𝑡2 − 𝑇1 )
11.49℃ − 50.56℃
𝐿𝑀𝑇𝐷 =
11.49℃
ln
50.56℃
𝐿𝑀𝑇𝐷 = 26.3746℃
Jumlah pass Heat Exchanger E-103 yakni 1-2 pass dengan nilai diasumsikan 𝐹𝑇 = 1 karena shell
side merupakan total evaporation
Material Selecting
Require Material
Tube Acid Resist H2S & CO2 Stainless Steel 316
Channel Cover Acid Resist H2S & CO2 Stainless Steel 316
Shell - Carbon Steel
Baffle - Carbon Steel
Tubesheet Acid Resist H2S & CO2 Stainless Steel 316
Shell and Tube Design
Keterangan in m
Shell Diameter, 𝐷𝑠 Trial Error 44 1.1176
Outside Diameter, 𝐷𝑜 Trial Error 2 0.0508
Inside Diameter, 𝐷𝑖 Trial Error 1.843 0.0468
Tebal tube, 𝑡𝑡𝑢𝑏𝑒 Trial Error 0.0785 0.0020
Panjang Tube, 𝐿 Trial Error 192 4.8768
Tube Pitch, 𝑃𝑡 1.25𝐷𝑜 , T.E.M.A. 9th Ed 2.5 0.0635
Baffle Pitch, 𝑃𝑏 0.5𝐷𝑠 22 0.5588
Jumlah Tube, 𝑁𝑡𝑢𝑏𝑒 Trial Error 174 tube
Opened Baffle General Opened Baffle, Mc.Cabe 25%
Shell, Channel, Head Thickness Min. Shell Thickness, T.E.M.A. 9th 7/16 in
Baffle Thickness Min. Baffle Thickness, T.E.M.A. 9th 1/4 in
1 1
ℎ𝑑𝑖 = = BTU/ft 2 h°F = 2269.79 W/m2 ℃
𝑅𝑖 0.0025
1 1
ℎ𝑑𝑜 = = BTU/ft 2 h°F = 5674.47 W/m2 ℃
𝑅𝑜 0.0010
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0508 0.0020 0.0508 1 1 0.0508 1
( )( )+( )( )+( )+( )( )+( )
398.49 0.0468 45 0.0488 338 2269.79 0.0468 5674.47
2
𝑈𝑜 = 156.77 𝑊/𝑚 ℃
∆𝑇𝑓𝑤 = 11.26℃ 𝜆𝑐 = 2𝜋 ( )
𝑔(𝜌𝐿 − 𝜌𝑉 )
1
0.0584 2
𝜆𝑐 = 2𝜋 ( )
9.82(957.15 − 0.6453)
𝜆𝑐 = 0.0157 𝐽/𝑘𝑔
1
𝜆𝑐 𝜇𝑉 ∆𝑇𝑓𝑤 4 𝜆𝑐
ℎ𝑜 ( 3 ′
) = 0.59 + 0.069 ( )
𝑘𝑉 𝜌𝑉 (𝜌𝐿 − 𝜌𝑉 )𝜆 𝑔 𝐷𝑜
1
(0.0157)(0.0000121)(11.26) 4 0.0157
ℎ𝑜 ( ) = 0.59 + 0.069 ( )
(0.0246)3 (0.6453)(957.15 − 0.6453)(2225926)(9.82) 0.0508
ℎ𝑜 = 338.86 𝑊/𝑚2 ℃
𝒉𝒐 ≈ 𝒉𝒐 𝒂𝒔𝒎𝒔𝒊
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 6 7 -
o
Temperature, 𝑡1 , 𝑡2 C 112.50 40.00 -
Pressure kPa 898 888 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 4235 3396 -
Heat Flow, J/kg- oC -309670702 -313189959 -
Mass Flow, 𝑚𝑡 kg/h 49889 49889 49889
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 0.9861 0.9633 0.9730
Mass Density, 𝜌𝑡 kg/m3 11.7806 14.6899 13.2353
Mass Enthalpi kJ/kg -6207 -6278 -
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0236 0.0184 0.0210
Viscosity, 𝜇𝑡 cP 0.0178 0.0143 0.0160
Heat Exchanger Duty kJ/h 3519257
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - Cooling Water Cooling Water -
o
Temperature, 𝑇1 , 𝑇2 C 30 45 -
Pressure kPa 130 109 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 56.403 56.716 -
Mass Flow, 𝑚𝑠 kg/h 56149 56149 56149
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 4.1795 4.1807 4.1801
Mass Density, 𝜌𝑠 kg/m3 995 990 998
Mass Enthalpi kJ/kg -15800 -15737 -
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.6182 0.6376 0.6279
Viscosity, 𝜇𝑠 cP 0.7972 0.5939 0.6956
2
Fouling Factor, 𝑅𝑜 ft -°F-h/BTU 0.0025
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡1 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 30 ℃ − 45℃ 40℃ − 112.5℃
(𝑡2 − 𝑇1 ) 𝑅= 𝑆=
67.50℃ − 10℃ 40℃ − 112.5℃ 30 ℃ − 112.5℃
𝐿𝑀𝑇𝐷 = 𝑅 = 0.2069 𝑆 = 0.8788
67.50℃
ln
10℃
𝐿𝑀𝑇𝐷 = 30.1119℃
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (1.2700)2 𝜋. (0.0508)2 𝑆𝑐 = (0.6350)(1.2700). (1 − 0.8)
𝑆𝑏 = (0.1955). − 3.0547.
4 4 𝑆𝑐 = 0.1613 𝑚2
𝑆𝑏 = 0.2415 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 64.5942 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 96.7017 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(64.5942)(96.7017) (4180)(0.000696) 0,33 0.6279
ℎ𝑜 = 0,2 ((0.0508) ) ( )
0.000696 0.6279 0.0508
ℎ𝑜 = 740.40 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0508 0.0020 0.0508 1 1 0.0508 1
( )( )+( )( )+( )+( )( )+( )
298.91 0.0468 45 0.0488 740.40 2269.79 0.0468 5674.47
𝑈𝑜 = 176.01 𝑊/𝑚2 ℃
Overall Coefficient Heat Transfer untuk gas-gas berdasarkan heuristic Turton adalah 30 W/m2 oC.
Jika diasumsikan temperature terpanas gas pemanas adalah 1000oC maka, LMTD adalah
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 )
𝐿𝑀𝑇𝐷 =
(𝑡 − 𝑇2 )
ln 1
(𝑡2 − 𝑇1 )
(1000 − 330) − (340.73 − 320)
𝐿𝑀𝑇𝐷 =
(1000 − 320)
ln
(340.73 − 330)
𝐿𝑀𝑇𝐷 = 186.80℃
Jika digunakan tube O.D. 2 in (0.0508 m) dengan panjang 12 ft (3.6576 m) serta jumlah tube 64 maka
𝐴𝑜 = 𝜋. 𝐷𝑜 . 𝐿. 𝑁𝑡𝑢𝑏𝑒
𝐴𝑜 = 38.35 𝑚2
𝑨𝒐 > 𝑨𝒎𝒊𝒏𝒊𝒎𝒂𝒍
8 tube/wall
Total 64 tube
burner
5 ft
2.5 ft
2.5 ft
burner 12 ft
Panas Reaksi
COS + H2O H2S + CO2 ∆H reaksi = 32474 kJ/kmole COS 99.99% konversi
𝑃𝑎𝑛𝑎𝑠 𝑟𝑒𝑎𝑘𝑡𝑜𝑟 𝑃𝐹𝑅101 = ∆H𝑟𝑒𝑎𝑘𝑠𝑖 ∙ 𝐶𝑂𝑆 ∙ 𝑘𝑜𝑛𝑣𝑒𝑟𝑠𝑖
75800 6000
𝑘[𝐶𝑂𝑆][𝐻2 𝑂]0.5
𝑘 = 1.82 ∙ 1014 𝑒 − 𝑅𝑇 𝐾 = 486𝑒 𝑅𝑇
−𝑅𝐶𝑂𝑆 =
−
75800 6000 1 + 𝐾[𝐶𝑂2 ]
𝑘 = 1.82 ∙ 1014 𝑒 (8.314)(603) 𝐾= 486𝑒 (8.314)(603) 4.94 ∙ 107 [𝐶𝑂𝑆][𝐻2 𝑂]0.5
𝑘 = 4.94 ∙ 107 𝐾 = 1.642 ∙ 103 −𝑅𝐶𝑂𝑆 =
1 + 1.642 ∙ 103 [𝐶𝑂2 ]
Mole Balance
Component Initial Change Remaining
COS 𝐹𝐶𝑂𝑆𝑜 = 13.30 −𝑥𝐹𝐶𝑂𝑆𝑜 𝐹𝐶𝑂𝑆 = 𝐹𝐶𝑂𝑆𝑜 − 𝑥𝐹𝐶𝑂𝑆𝑜
H2O 𝐹𝐻2𝑂𝑜 = 16.67 −𝑥𝐹𝐶𝑂𝑆𝑜 𝐹𝐻2𝑂 = 𝐹𝐻2𝑂𝑜 − 𝑥𝐹𝐶𝑂𝑆𝑜
H2S 𝐹𝐻2𝑆𝑜 = 112.26 +𝑥𝐹𝐶𝑂𝑆𝑜 𝐹𝐻2𝑆 = 𝐹𝐻2𝑂𝑜 + 𝑥𝐹𝐶𝑂𝑆𝑜
CO2 𝐹𝐶𝑂2𝑜 = 210 +𝑥𝐹𝐶𝑂𝑆𝑜 𝐹𝐶𝑂2 = 𝐹𝐶𝑂2𝑜 + 𝑥𝐹𝐶𝑂𝑆𝑜
Inert 𝐹𝐼𝑜 = 4.77 0 𝐹𝐼 = 𝐹𝐼𝑜
𝐹𝑇 = 𝐹𝐶𝑂𝑆𝑜 + 𝐹𝐻2𝑂𝑜 + 𝐹𝐻2𝑂𝑜 + 𝐹𝐶𝑂2𝑜 + 𝐹𝐼𝑜
Total 𝐹𝑇𝑜 = 355 0
𝐹𝑇 = 𝐹𝑇𝑜
𝑥
1
𝑊𝑐𝑎𝑡𝑎𝑙𝑦𝑠𝑡 = 𝐹𝐶𝑂𝑆𝑜 ∫ 𝑑𝑥
0 −𝑅𝐶𝑂𝑆
𝑥
1
𝑊𝑐𝑎𝑡𝑎𝑙𝑦𝑠𝑡 = 𝐹𝐶𝑂𝑆𝑜 ∫ 𝑑𝑥
0 𝑘[𝐶𝑂𝑆][𝐻2 𝑂]0.5
1 + 𝐾[𝐶𝑂2 ]
0.9999
1
𝑊𝑐𝑎𝑡𝑎𝑙𝑦𝑠𝑡 = 13.30 ∫ 𝑑𝑥
0 13.30 − 𝑥13.30 16.67 − 𝑥13.30 −0.5
𝑘[ ][ ]
0.654 0.654
210 − 𝑥13.30
1+𝐾[ ]
0.654
𝑊𝑐𝑎𝑡𝑎𝑙𝑦𝑠𝑡 = 0.192 𝑘𝑔
𝑊𝑐𝑎𝑡𝑎𝑙𝑦𝑠𝑡 0.192
𝑉𝑐𝑎𝑡𝑎𝑙𝑦𝑠𝑡 = = = 2.565 ∙ 10−4 𝑚3
𝜌𝑐𝑎𝑡𝑎𝑙𝑦𝑠𝑡 750
Jika digunakan tipe reaktor shell and tube PFR dengan reaksi dalam tube. Serta tube yang
digunakan 16 tube diameter 4 inch dengan panjang 1 m maka
Jika catalyst jenis screen yang digunakan memiliki fraksi void (pori-pori) 𝑓𝑣 = 0.76 dengan
tebal screen tscreen 2mm maka jumlah screen yang digunakan
𝑉𝑐𝑎𝑡𝑎𝑙𝑦𝑠𝑡 2.565 ∙ 10−4
𝑉𝑠𝑐𝑟𝑒𝑒𝑛 = = = 1.069 ∙ 10−3 𝑚3
1 − 𝑉𝑜𝑖𝑑𝐹𝑟𝑎𝑐𝑡𝑖𝑜𝑛 1 − 0.76
𝑉𝑠𝑐𝑟𝑒𝑒𝑛 1.069 ∙ 10−3
𝑛𝑠𝑐𝑟𝑒𝑒𝑛 = = = 65.945 𝑠𝑐𝑟𝑒𝑒𝑛
𝜋. 𝐷𝑖 2 𝜋. (4(0.0254))2
. (0.002)
. 𝑡𝑠𝑐𝑟𝑒𝑒𝑛 4
4
𝑛𝑠𝑐𝑟𝑒𝑒𝑛 65.945
𝑛𝑠𝑐𝑟𝑒𝑒𝑛 𝑝𝑒𝑟 𝑡𝑢𝑏𝑒 = = = 3.664 ≈ 𝟒 𝒔𝒄𝒓𝒆𝒆𝒏
𝑛𝑡𝑢𝑏𝑒 18
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 14 15 -
o
Temperature, 𝑡1 , 𝑡2 C 330.00 170.07 -
Pressure kPa 2363 2343 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 2679 1926 -
Heat Flow, J/kg- oC -313918918 -322832312 -
Mass Flow, 𝑚𝑡 kg/h 50970 50970 50970
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 1.1270 1.0652 1.0934
Mass Density, 𝜌𝑡 kg/m3 19.0239 26.4604 22.7421
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0403 0.0290 0.0346
Viscosity, 𝜇𝑡 cP 0.0281 0.0208 0.0244
Heat Exchanger Duty kJ/h 8913394
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - 10 11 -
o
Temperature, 𝑇1 , 𝑇2 C 161.28 320.00 -
Pressure kPa 2700 2679 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 1614 2314 -
Heat Flow, J/kg- oC -322088022 -313174628 -
Mass Flow, 𝑚𝑠 kg/h 50970 50970 50970
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 1.0794 1.1296 1.1018
Mass Density, 𝜌𝑠 kg/m3 31.5727 22.0259 26.7993
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.0284 0.0395 0.0340
Viscosity, 𝜇𝑠 cP 0.0200 0.0272 0.0236
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0025
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 1
(𝑡2 − 𝑇1 ) 330 ℃ − 161.28℃ 320℃ − 170.07℃
8.79℃ − 10℃ 𝑅= 𝑆=
𝐿𝑀𝑇𝐷 = 320℃ − 170.07℃ 330 ℃ − 170.07℃
8.79℃ 𝑅 = 0.9924 𝑆 = 0.9479
ln
10℃
𝐿𝑀𝑇𝐷 = 9.3800℃
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (1.5748)2 𝜋. (0.0127)2 𝑆𝑐 = (0.3150)(1.5748). (1 − 0.8)
𝑆𝑏 = (0.1955). − 31.8665.
4 4 𝑆𝑐 = 0.0992 𝑚2
𝑆𝑏 = 0.3768 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 237.7919 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 142.7251 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(37.5796)(142.7251) (1101.8)(0.0000236) 0,33 0.0340
ℎ𝑜 = 0,2 ((0.0127) ) ( )
0.0000236 0.0340 0.0127
ℎ𝑜 = 279.94 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0127 0.0017 0.0127 1 1 0.0127 1
( )( )+( )( )+( )+( )( )+( )
1049.45 0.0094 45 0.0110 2378.5 2269.79 0.0094 2269.79
2
𝑈𝑜 = 168.39 𝑊/𝑚 ℃
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 15 16 -
o
Temperature, 𝑡1 , 𝑡2 C 170.07 40.00 -
Pressure kPa 2343 2322 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 1926 1229 -
Heat Flow, J/kg- oC -322832312 -330761322 -
Mass Flow, 𝑚𝑡 kg/h 50970 50970 50970
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 1.0652 1.1161 1.1960
Mass Density, 𝜌𝑡 kg/m3 26.4604 41.4669 33.9636
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0290 0.0201 0.0245
Viscosity, 𝜇𝑡 cP 0.0208 0.0149 0.0178
Heat Exchanger Duty kJ/h 7929011
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - Cooling Water Cooling Water -
o
Temperature, 𝑇1 , 𝑇2 C 30 45 -
Pressure kPa 130 109 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 127.079 127.784 -
Mass Flow, 𝑚𝑠 kg/h 126506 126506 126506
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 4.1795 4.1807 4.1801
Mass Density, 𝜌𝑠 kg/m3 995 990 998
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.6182 0.6376 0.6279
Viscosity, 𝜇𝑠 cP 0.7972 0.5939 0.6956
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡1 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 30 ℃ − 45℃ 40℃ − 170.07℃
(𝑡2 − 𝑇1 ) 𝑅= 𝑆=
125.07℃ − 10℃ 40℃ − 170.07℃ 30 ℃ − 170.07℃
𝐿𝑀𝑇𝐷 = 𝑅 = 0.1153 𝑆 = 0.9286
125.07℃
ln
10℃
𝐿𝑀𝑇𝐷 = 45.5486℃
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (1.4732)2 𝜋. (0.0508)2 𝑆𝑐 = (0.7366)(1.4732). (1 − 0.8)
𝑆𝑏 = (0.1955). − 4.1544.
4 4 𝑆𝑐 = 0.2170 𝑚2
𝑆𝑏 = 0.3248 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 108.1844 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 161.9147 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(108.1844)(161.9147) (4180)(0.000696) 0,33 0.6279
ℎ𝑜 = 0,2 ((0.0508) ) ( )
0.000696 0.6279 0.0508
ℎ𝑜 = 1008.8 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0508 0.0020 0.0508 1 1 0.0508 1
( )( )+( )( )+( )+( )( )+( )
297.36 0.0468 45 0.0488 1008.8 2269.79 0.0468 5674.47
𝑈𝑜 = 187.22 𝑊/𝑚2 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 100
V-101
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Design Pressure
𝑃𝑑𝑒𝑠𝑖𝑔𝑛 = 1.25𝑃𝑜𝑝𝑒𝑟𝑎𝑡𝑖𝑜𝑛
𝑃𝑑𝑒𝑠𝑖𝑔𝑛 = 336.79𝑝𝑠𝑖 𝑥 1.25
𝑃𝑑𝑒𝑠𝑖𝑔𝑛 = 420.99 𝑝𝑠𝑖
Volume Require
𝑉𝑜𝑙𝑢𝑚𝑒 = 𝑎𝑐𝑡. 𝑉𝑜𝑙𝑢𝑚𝑒 𝐹𝑙𝑜𝑤 𝑥 ℎ𝑜𝑙𝑑𝑢𝑝 𝑡𝑖𝑚𝑒
𝑚3 1ℎ
𝑉𝑜𝑙𝑢𝑚𝑒 = 1229 ( ) 5 𝑚𝑖𝑛𝑢𝑡𝑒
ℎ 60 𝑚𝑖𝑛𝑢𝑡𝑒
𝑉𝑜𝑙𝑢𝑚𝑒 = 102.43 𝑚3
Diameter Vessel
4 ∙ 𝑉𝑜𝑙𝑢𝑚𝑒 1/3
𝐷=( )
(3 ∙ 3.14)
1/3
4 ∙ 102.43𝑚3
𝐷=( )
3 ∙ 3.14
𝐷 = 3.52 𝑚 = 226 𝑖𝑛
𝐻 = 3𝐷
𝐻 = 3(3.52 𝑚)
𝐻 = 10.55 = 679 𝑖𝑛
Shell Thickness
𝑃𝑑𝑒𝑠𝑖𝑔𝑛 ∙ 0.5𝐷 + 𝐶𝐴
𝑡𝑆ℎ𝑒𝑙𝑙 = + 𝐶𝐴
𝑆 ∙ 𝐸 − 0.6𝑃𝑑𝑒𝑠𝑖𝑔𝑛
(420.99) ∙ 0.5(226) + 0.125
𝑡𝑆ℎ𝑒𝑙𝑙 = + 0.125
(16700)(0.85) − 0.6(420.99)
𝑡𝑆ℎ𝑒𝑙𝑙 = 2.219 𝑖𝑛 ≈ 2.25 𝑖𝑛
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 101
T-101
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Trial error tray number dengan syarat maximum H2S loss < 3%
- Masukan kondisi tekanan operasi pada menu design dan trial error Number of stage = 10
- Set effisiensi tray 19% (effisinsi tray untuk gas absorption H2S oleh selexol pada T=25oC)
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 102
T-101
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Shell Thickness
Stress Tensile : 16.700 psi stress value of Stainless Steel SA-240, 316L
T operation : 40oC
E : 0.85 joint efficiency, spot examined
CA : 0.125 inches corrosion allowance
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 103
T-102
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
K Value ∝𝐿,𝐻
Key Component ̅ 𝐿,𝐻
∝
Top Bottom Top Bottom
Light Key (H2O) 4.0566 3.2227
17.82 3.32 10.57
Heavy Key (SELEXOL) 0.2277 0.9719
Reflux Ratio, R
𝐿𝑚𝑖𝑛 𝐹 𝑅 = 1.25𝑅𝑚𝑖𝑛
𝑅𝑚𝑖𝑛 = ( )
𝐹 𝐷 𝑅 = 1.25(0.2547)
1909.52 𝑅 = 0.3184
𝑅𝑚𝑖𝑛 = (0.1013)
759.64
𝑅𝑚𝑖𝑛 = 0.2547
Tray Number
(𝑥 /𝑥 ) 𝑁𝑚𝑖𝑛
ln [ 𝑑 𝑏 𝐿𝐾 ] 𝑁𝑎𝑐𝑡 =
(𝑥𝑑 /𝑥𝑏 )𝐻𝐾 𝜂
𝑁𝑚𝑖𝑛 =
̅ 𝐿,𝐻 ]
ln[∝ 0.9579
(0.0049/0.0001) 𝑁𝑎𝑐𝑡 =
ln [ ] 0.1
(0.0002/0.9997)
𝑁𝑚𝑖𝑛 =
ln[10.57] 𝑁𝑎𝑐𝑡 = 𝟗. 𝟓𝟕𝟗 ≈ 𝟏𝟎 𝒕𝒂𝒉𝒂𝒑
𝑁𝑚𝑖𝑛 = 0.9579
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 104
T-102
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
17292
4𝑉̇ 4( )
𝐷=√ =√ 3600 = 3.2647 𝑚 = 128.5 𝑖𝑛
𝜋𝑢 𝜋 (0.5737 )
Shell Thickness
Stress Tensile : 16.700 psi stress value of Stainless Steel SA-240, 316L
T operation : 40oC
E : 0.85 joint efficiency, spot examined
CA : 0.125 inches corrosion allowance
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 105
V-102
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Design Pressure
𝑃𝑑𝑒𝑠𝑖𝑔𝑛 = 1.25𝑃𝑜𝑝𝑒𝑟𝑎𝑡𝑖𝑜𝑛
𝑃𝑑𝑒𝑠𝑖𝑔𝑛 = 26.754 𝑝𝑠𝑖 𝑥 1.25
𝑃𝑑𝑒𝑠𝑖𝑔𝑛 = 33.44 𝑝𝑠𝑖
Volume Require
𝑉𝑜𝑙𝑢𝑚𝑒 = 𝑎𝑐𝑡. 𝑉𝑜𝑙𝑢𝑚𝑒 𝐹𝑙𝑜𝑤 𝑥 ℎ𝑜𝑙𝑑𝑢𝑝 𝑡𝑖𝑚𝑒 𝑥 2
𝑚3 1ℎ
𝑉𝑜𝑙𝑢𝑚𝑒 = 63.68 ( ) 5 𝑚𝑖𝑛𝑢𝑡𝑒𝑥 2
ℎ 60 𝑚𝑖𝑛𝑢𝑡𝑒
𝑉𝑜𝑙𝑢𝑚𝑒 = 10.613 𝑚3
Diameter Vessel
4 ∙ 𝑉𝑜𝑙𝑢𝑚𝑒 1/3
𝐷=( )
(3 ∙ 3.14)
1/3
4 ∙ 10.613𝑚3
𝐷=( )
3 ∙ 3.14
𝐷 = 1.65 𝑚 = 65 𝑖𝑛
𝐻 = 3𝐷
𝐻 = 3(1.65 𝑚)
𝐻 = 4.95 = 195 𝑖𝑛
Shell Thickness
𝑃𝑑𝑒𝑠𝑖𝑔𝑛 ∙ 0.5𝐷 + 𝐶𝐴
𝑡𝑆ℎ𝑒𝑙𝑙 = + 𝐶𝐴
𝑆 ∙ 𝐸 − 0.6𝑃𝑑𝑒𝑠𝑖𝑔𝑛
(33.44) ∙ 0.5(65) + 0.125
𝑡𝑆ℎ𝑒𝑙𝑙 = + 0.125
(16700)(0.85) − 0.6(33.44)
𝑡𝑆ℎ𝑒𝑙𝑙 = 0.2020 𝑖𝑛 ≈ 0.25 𝑖𝑛
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 106
P-101
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Head (𝑯𝒔 )
Tabel Assumption
𝐷𝑖 suction pipe ≈ 𝐷𝑖 discharge pipe 𝑣𝑠𝑢𝑐𝑡𝑖𝑜𝑛 ≈ 𝑣𝑑𝑖𝑠𝑐ℎ𝑎𝑟𝑔𝑒
𝑓∙𝐿∙𝑣 2
Smooth pipe ≈0
2∙𝑔∙𝐷
Friction Losses in valve low 𝐻𝑣 ≈ 0
NPSH
𝑃𝑠𝑢𝑐𝑡𝑖𝑜𝑛 − 𝑃𝑠𝑎𝑡 𝐹𝑠𝑢𝑐𝑡𝑖𝑜𝑛 𝑁𝑃𝑆𝐻𝑟𝑒𝑞𝑢𝑖𝑟𝑒 = 1.35 𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒
𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 = − − ∆𝑧𝑠𝑢𝑡𝑖𝑜𝑛
𝜌𝑔 𝑔 𝑁𝑃𝑆𝐻𝑟𝑒𝑞𝑢𝑖𝑟𝑒 = 1.35 ∙ 17.86 𝑚
171316 − 0.2463 𝑁𝑃𝑆𝐻𝑟𝑒𝑞𝑢𝑖𝑟𝑒 = 24.12 𝑚
𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 = −0−0
976.55 ∙ 9.82
𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 = 17.86 𝑚
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 107
P-102
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Head (𝑯𝒔 )
Tabel Assumption
𝐷𝑖 suction pipe ≈ 𝐷𝑖 discharge pipe 𝑣𝑠𝑢𝑐𝑡𝑖𝑜𝑛 ≈ 𝑣𝑑𝑖𝑠𝑐ℎ𝑎𝑟𝑔𝑒
𝑓∙𝐿∙𝑣 2
Smooth pipe ≈0
2∙𝑔∙𝐷
Friction Losses in valve low 𝐻𝑣 ≈ 0
NPSH
𝑃𝑠𝑢𝑐𝑡𝑖𝑜𝑛 − 𝑃𝑠𝑎𝑡 𝐹𝑠𝑢𝑐𝑡𝑖𝑜𝑛 𝑁𝑃𝑆𝐻𝑟𝑒𝑞𝑢𝑖𝑟𝑒 = 1.35 𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒
𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 = − − ∆𝑧𝑠𝑢𝑡𝑖𝑜𝑛
𝜌𝑔 𝑔 𝑁𝑃𝑆𝐻𝑟𝑒𝑞𝑢𝑖𝑟𝑒 = 1.35 ∙ 0.40𝑚
182000 − 178300 𝑁𝑃𝑆𝐻𝑟𝑒𝑞𝑢𝑖𝑟𝑒 = 0.54 𝑚
𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 = −0−0
941.65 ∙ 9.82
𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 = 0.40𝑚
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 108
E-107
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 37 38 -
o
Temperature, 𝑡1 , 𝑡2 C 293.20 58.19 -
Pressure kPa 182 161 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 402 322 -
Heat Flow, kJ/h 96392571.56 -59354136.7 -
Mass Flow, 𝑚𝑡 kg/h 310268 310268 310268
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 2.4599 1.7673 2.1360
Mass Density, 𝜌𝑡 kg/m3 771.7117 963.3723 867.5420
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0640 0.0936 0.0788
Viscosity, 𝜇𝑡 cP 0.3446 5.5544 0.3446
Heat Exchanger Duty kJ/h 155746708
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - 22 23 -
o
Temperature, 𝑇1 , 𝑇2 C 44.24 260.00 -
Pressure kPa 2300 2279 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 327 440 -
Mass Flow, 𝑚𝑠 kg/h 338874 338874 338874
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 1.7454 2.2733 2.1302
Mass Density, 𝜌𝑠 kg/m3 1033.2887 209.3757 621.3322
Mass Enthalpi kJ/kg -620 -161 -
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.0886 0.0338 0.0612
Viscosity, 𝜇𝑠 cP 3.8390 0.0246 0.0246
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0025
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 1
(𝑡2 − 𝑇1 ) 44.24 ℃ − 260.00℃ 58.19℃ − 293.20℃
13.95℃ − 33.20℃ 𝑅= 𝑆=
𝐿𝑀𝑇𝐷 = 58.19℃ − 293.20℃ 44.24 ℃ − 293.20℃
13.95℃ 𝑅 = 0.9181 𝑆 = 0.9440
ln
33.20℃
𝐿𝑀𝑇𝐷 = 22.1991℃
Jumlah pass Heat Exchanger E-107 yakni 6-12 pass dengan nilai 𝐹𝑇 = 0,78.
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 109
E-102
E-107
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 110
E-107
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (2.5400)2 𝜋. (0.0127)2 𝑆𝑐 = (0.5080)(2.5400). (1 − 0.8)
𝑆𝑏 = (0.1955). − 80.6438.
4 4 𝑆𝑐 = 0.2581 𝑚2
𝑆𝑏 = 0.9804 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 96.0141 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 364.7617 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(37.5796)(142.7251) (2130.2)(0.0000246) 0,33 0.0612
ℎ𝑜 = 0,2 ((0.0127) ) ( )
0.0000246 0.0612 0.0127
ℎ𝑜 = 896.69 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0127 0.0017 0.0127 1 1 0.0127 1
( )( )+( )( )+( )+( )( )+( )
1166.74 0.0094 45 0.0110 896.69 2269.79 0.0094 2269.79
2
𝑈𝑜 = 298.31 𝑊/𝑚 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 111
E-108
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 38 39 -
o
Temperature, 𝑡1 , 𝑡2 C 58.19 40.00 -
Pressure kPa 161 141 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 322 318 -
Heat Flow, kJ/h -59354136 -69147092 -
Mass Flow, 𝑚𝑡 kg/h 310268 310268 310268
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 1.7673 1.7015 0.9475
Mass Density, 𝜌𝑡 kg/m3 963.3723 976.6556 4.3841
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0936 0.0956 0.0205
Viscosity, 𝜇𝑡 cP 5.5544 7.3520 0.0158
Heat Exchanger Duty kJ/h 9792955
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - Cooling Water Cooling Water -
o
Temperature, 𝑇1 , 𝑇2 C 30 45 -
Pressure kPa 130 109 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 157 158 -
Mass Flow, 𝑚𝑠 kg/h 156245 156245 156245
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 4.1795 4.1807 4.1801
Mass Density, 𝜌𝑠 kg/m3 995 990 998
Mass Enthalpi kJ/kg -15800 -15737 -
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.6182 0.6376 0.6279
Viscosity, 𝜇𝑠 cP 0.7972 0.5939 0.6956
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡1 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 30 ℃ − 45℃ 40℃ − 58.19℃
(𝑡2 − 𝑇1 ) 𝑅= 𝑆=
13.19℃ − 10℃ 40℃ − 58.19℃ 30 ℃ − 58.19℃
𝐿𝑀𝑇𝐷 = 𝑅 = 0.8246 𝑆 = 0.6453
13.19℃
ln
10℃
𝐿𝑀𝑇𝐷 = 11.5216℃
Jumlah pass Heat Exchanger E-108 yakni 3-6 pass dengan nilai 𝐹𝑇 = 0,97.
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 112
E-102
E-108
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 113
E-108
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (1.1176)2 𝜋. (0.0191)2 𝑆𝑐 = (0.5588)(1.1176). (1 − 0.8)
𝑆𝑏 = (0.1955). − 32.5019.
4 4 𝑆𝑐 = 0.1249 𝑚2
𝑆𝑏 = 0.1825 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 237.7919 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 347.4815 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(237.7919)(347.4815) (4180)(0.000696) 0,33 0.6279
ℎ𝑜 = 0,2 ((0.0191) ) ( )
0.000696 0.6279 0.0191
ℎ𝑜 = 2378.50 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0191 0.0034 0.0191 1 1 0.0191 1
( )( )+( )( )+( )+( )( )+( )
338.85 0.0122 45 0.0154 2378.5 2269.79 0.0122 5674.47
2
𝑈𝑜 = 167.52 𝑊/𝑚 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 114
E-109
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 40 41 -
o
Temperature, 𝑡1 , 𝑡2 C 41.01 25.00 -
Pressure kPa 2271 2250 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 317 313 -
Heat Flow, kJ/h -68244848 -76568741 -
Mass Flow, 𝑚𝑡 kg/h 310268 310268 310268
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 1.7043 1.6449 1.6754
Mass Density, 𝜌𝑡 kg/m3 978.3716 990.0090 984.1903
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0955 0.0973 0.0964
Viscosity, 𝜇𝑡 cP 7.2415 9.6402 8.4409
Heat Exchanger Duty kJ/h 8323893
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Liquid Outlet Shell Side Vapor
Stream Number - Liquid NH3 Vapor NH3
o
Temperature, 𝑇1 , 𝑇2 C 15.42 15.00
Pressure kPa 734 724
Actual Flow m3/h 141 1352
Mass Flow, 𝑚𝑠 kg/h 7474 7474
Mass Heat Capacity, 𝐶𝑝𝐿 , 𝐶𝑝𝑉 kJ/kg- oC 4.4817 2.2335
Mass Density, 𝜌𝐿 , 𝜌𝑉 kg/m3 52.6416 5.5257
Thermal Conductivity, 𝑘𝐿 , 𝑘𝑉 W/m- oC 0.5013 0.0265
Viscosity, 𝜇𝐿 , 𝜇𝑉 cP 0.1395 0.0082
Laten Heat, 𝜆 kJ/kg 1235.47564
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 )
𝐿𝑀𝑇𝐷 =
(𝑡 − 𝑇2 )
ln 1
(𝑡2 − 𝑇1 )
26.01℃ − 9.58℃
𝐿𝑀𝑇𝐷 =
26.01℃
ln
9.58℃
𝐿𝑀𝑇𝐷 = 16.4537℃
Jumlah pass Heat Exchanger E-109 yakni 1-4 pass dengan nilai diasumsikan 𝐹𝑇 = 1 karena shell
side merupakan total evaporation
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 115
E-109
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 116
E-109
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0127 0.0017 0.0127 1 1 0.0127 1
( )( )+( )( )+( )+( )( )+( )
286.12 0.0094 45 0.0110 308.5 2269.79 0.0094 5674.47
2
𝑈𝑜 = 115.47 𝑊/𝑚 ℃
ℎ𝑜 = 304.52 𝑊/𝑚2 ℃
𝒉𝒐 ≈ 𝒉𝒐 𝒂𝒔𝒎𝒔𝒊
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 117
E-110
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Vapor Outlet Liquid
Stream Number - 25 26 27
o
Temperature, 𝑡1 , 𝑡2 C 231.37 112.5 112.5
Pressure kPa 182 172 172
Actual Volume Flow, 𝑉̇𝑡 m3/h 21267 14073 49.300
Heat Flow, kJ/h -109556320 -131090044 -4560063
Mass Flow, 𝑚𝑡 kg/h 74468 28870 45597
Mass Heat Capacity, 𝐶𝑝𝐿𝑡 , 𝐶𝑝𝑉𝑡 kJ/kg- oC 1.4716 1.0044 1.9530
Mass Density, 𝜌𝐿𝑡 , 𝜌𝑉𝑡 kg/m3 3.5016 2.0515 925
Thermal Conductivity, 𝑘𝐿𝑡 , 𝑘𝑉𝑡 W/m- oC 0.0288 0.0229 0.0866
Viscosity, 𝜇𝐿𝑡 , 𝜇𝑉𝑡 cP 0.0218 0.0167 2.0724
Heat Exchanger Duty kJ/h 26093787
Laten Heat, 𝜆𝑡 kJ/kg 789.676
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Liquid Outlet Shell Side Vapor
Stream Number - BFW LPS
o
Temperature, 𝑇1 , 𝑇2 C 101.00 102.32
Pressure kPa 125 110
Actual Flow m3/h 12.079 17917
Mass Flow, 𝑚𝑠 kg/h 11562 11562
Mass Heat Capacity, 𝐶𝑝𝐿𝑠 , 𝐶𝑝𝑉𝑠 kJ/kg- oC 4.2180 2.0379
Mass Density, 𝜌𝐿𝑠 , 𝜌𝑉𝑠 kg/m3 957 0.6453
Thermal Conductivity, 𝑘𝐿𝑠 , 𝑘𝑉𝑠 W/m- oC 0.6811 0.0246
Viscosity, 𝜇𝐿𝑠 , 𝜇𝑉𝑠 cP 0.2761 0.0121
Laten Heat, 𝜆𝑠 kJ/kg 2241.502
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 )
𝐿𝑀𝑇𝐷 =
(𝑡 − 𝑇2 )
ln 1
(𝑡2 − 𝑇1 )
11.50℃ − 129.05℃
𝐿𝑀𝑇𝐷 =
11.50℃
ln
129.05℃
𝐿𝑀𝑇𝐷 = 48.6119℃
Jumlah pass Heat Exchanger E-110 yakni 1-1 pass dengan nilai diasumsikan 𝐹𝑇 = 1 karena shell
side merupakan total evaporation
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 118
E-110
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Material Selecting
Require Material
Tube Acid Resist H2S , CO2 Stainless Steel 316
Channel Cover Acid Resist H2S , CO2 Stainless Steel 316
Shell - Carbon Steel
Baffle - Carbon Steel
Tubesheet Acid Resist H2S , CO2 Stainless Steel 316
Shell and Tube Design
Keterangan in m
Shell Diameter, 𝐷𝑠 Trial Error 86 2.1844
Outside Diameter, 𝐷𝑜 Trial Error 2 0.0508
Inside Diameter, 𝐷𝑖 Trial Error 1.843 0.0468
Tebal tube, 𝑡𝑡𝑢𝑏𝑒 Trial Error 0.0785 0.0020
Panjang Tube, 𝐿 Trial Error 252 6.4008
Tube Pitch, 𝑃𝑡 1.25𝐷𝑜 , T.E.M.A. 9th Ed 2.5 0.0635
Baffle Pitch, 𝑃𝑏 0.5𝐷𝑠 43 1.0922
Jumlah Tube, 𝑁𝑡𝑢𝑏𝑒 Trial Error 713 tube
Opened Baffle General Opened Baffle, Mc.Cabe 25%
Shell, Channel, Head Thickness Min. Shell Thickness, T.E.M.A. 9th 1/2 in
Baffle Thickness Min. Baffle Thickness, T.E.M.A. 9th 5/8 in
𝑚𝑣𝑎𝑝𝑜𝑟 𝑖𝑛𝑙𝑒𝑡 1 1
Γ𝑏 =
𝑁𝑡𝑢𝑏𝑒 ∙ 𝐿 𝜇𝐿𝑡 2 34Γ𝑏 −3
ℎ𝑖 ( 3 2 ) = 1.47 ( )
45597/3600 𝑘𝐿𝑡 𝜌𝐿𝑡 𝑔 𝜇𝐿𝑡
Γ𝑏 = 1 1
(713)(6.4008) 0.00207242 3 4(0.00278 )
−
3
Γ𝑏 = 0.00278 𝑘𝑔/𝑚𝑠 ℎ𝑖 ( 3 2
) = 1.47 ( )
(0.0866) (925) (9.82) 0.0020724
ℎ𝑖 = 909.96 𝑊/𝑚2 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 119
E-110
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
∆𝑇𝑓𝑤 = 11.88℃
1
𝜆𝑐 𝜇𝑉𝑠 ∆𝑇𝑓𝑤 4 𝜆𝑐
ℎ𝑜 ( 3 ′
) = 0.59 + 0.069 ( )
𝑘𝑉𝑠 𝜌𝑉𝑠 (𝜌𝐿𝑠 − 𝜌𝑉𝑠 )𝜆 𝑔 𝐷𝑜
1
(0.0157)(0.0000121)(11.88) 4 0.0157
ℎ𝑜 ( ) = 0.59 + 0.069 ( )
(0.0246)3 (0.6453)(957.15 − 0.6453)(2241503 )(9.82) 0.0508
ℎ𝑜 = 334.94 𝑊/𝑚2 ℃
𝒉𝒐 ≈ 𝒉𝒐 𝒂𝒔𝒎𝒔𝒊
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 120
E-111
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 26 28 -
o
Temperature, 𝑡1 , 𝑡2 C 112.50 40.00 -
Pressure kPa 172 162 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 14073 12077 -
Heat Flow, kJ/h -131090045 -133205407 -
Mass Flow, 𝑚𝑡 kg/h 28870 28870 28870
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 1.0044 0.9670 1.0106
Mass Density, 𝜌𝑡 kg/m3 2.0515 2.3781 2.2148
Mass Enthalpi kJ/kg -4541 -4637 -
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0229 0.0179 0.0204
Viscosity, 𝜇𝑡 cP 0.0167 0.0134 0.0150
Heat Exchanger Duty kJ/h 2115363
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - Cooling Water Cooling Water -
o
Temperature, 𝑇1 , 𝑇2 C 30 45 -
Pressure kPa 130 109 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 34 34 -
Mass Flow, 𝑚𝑠 kg/h 33750 33750 33750
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 4.1795 4.1807 4.1801
Mass Density, 𝜌𝑠 kg/m3 995 990 998
Mass Enthalpi kJ/kg -15800 -15737 -
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.6182 0.6375 0.6279
Viscosity, 𝜇𝑠 cP 0.7972 0.5939 0.6956
2
Fouling Factor, 𝑅𝑜 ft -°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡1 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 30 ℃ − 45℃ 40℃ − 112.5℃
(𝑡2 − 𝑇1 ) 𝑅= 𝑆=
67.50℃ − 10℃ 40℃ − 112.5℃ 30 ℃ − 112.5℃
𝐿𝑀𝑇𝐷 = 𝑅 = 0.4849 𝑆 = 0.7557
67.50℃
ln
10℃
𝐿𝑀𝑇𝐷 = 30.1119℃
Heat Exchanger E-111 digunakan jenis fall film condenser, sehingg jumlah pass Heat Exchanger E-
111 yakni 1-1 pass dengan nilai 𝐹𝑇 diasumsikan 0.9. Perhitungan koefisien individual bagian dalam tetap
digunakan persamaan Dittus-Boelter karena massa condensate kecil dibanding massa non-condensable dan
temperature drop bagian tube tinggi
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 121
E-102
E-111
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 122
E-111
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (1.1176)2 𝜋. (0.0254)2 𝑆𝑐 = (0.5588)(1.1176). (1 − 0.8)
𝑆𝑏 = (0.1955). − 40.0775.
4 4 𝑆𝑐 = 0.1249 𝑚2
𝑆𝑏 = 0.1715 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 54.6732 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 75.0590 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(54.6732)(75.0590) (4180)(0.000696) 0,33 0.6279
ℎ𝑜 = 0,2 ((0.0254) ) ( )
0.000696 0.6279 0.0254
ℎ𝑜 = 861.27 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0254 0.0009 0.0254 1 1 0.0254 1
( )( )+( )( )+( )+( )( )+( )
83.56 0.0236 45 0.0245 861.27 2269.79 0.0236 5674.47
2
𝑈𝑜 = 68.03 𝑊/𝑚 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 123
E-112
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Liquid Tube Side Outlet Vapor Tube Side
Stream Number - 35 36
o
Temperature, 𝑡1 , 𝑡2 C 293 298
Pressure kPa 182 182
Actual Volume Flow, 𝑉̇𝑡 m3/h 280 19582
Heat Flow, kJ/h 67035334 112906974
Mass Flow, 𝑚𝑡 kg/h 215773 215773
Mass Heat Capacity, 𝐶𝑝𝐿𝑡 , 𝐶𝑝𝑉𝑡 kJ/kg- oC 2.4599 1.9163
Mass Density, 𝜌𝐿𝑡 , 𝜌𝑉𝑡 kg/m3 772 11.019
Thermal Conductivity, 𝑘𝐿𝑡 , 𝑘𝑉𝑡 W/m- oC 0.0640 0.0290
Viscosity, 𝜇𝐿𝑡 , 𝜇𝑉𝑡 cP 0.3446 0.0120
Heat Exchanger Duty kJ/h 45871640
Laten Heat, 𝜆𝑡 kJ/kg 212.5866
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Vapor Outlet Shell Side Liquid
Stream Number - DowTherm A Vapor DowTherm A Liquid
o
Temperature, 𝑇1 , 𝑇2 C 350 349
Pressure kPa 549 543
Actual Flow m3/h 9050 253
Heat Flow, J/kg- oC 165581956 119710317
Mass Flow, 𝑚𝑠 kg/h 188617 188617
Mass Heat Capacity, 𝐶𝑝𝐿𝑠 , 𝐶𝑝𝑉𝑠 kJ/kg- oC 2.0665 2.4693
Mass Density, 𝜌𝐿𝑠 , 𝜌𝑉𝑠 kg/m3 20.841 746.229
Thermal Conductivity, 𝑘𝐿𝑠 , 𝑘𝑉𝑠 W/m- oC 0.0283 0.0703
Viscosity, 𝜇𝐿𝑠 , 𝜇𝑉𝑠 cP 0.0113 0.1462
Laten Heat, 𝜆𝑠 kJ/kg 241.410
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0025
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 )
𝐿𝑀𝑇𝐷 =
(𝑡 − 𝑇2 )
ln 1
(𝑡2 − 𝑇1 )
56.07℃ − 51.91℃
𝐿𝑀𝑇𝐷 =
56.07℃
ln
51.91℃
𝐿𝑀𝑇𝐷 = 53.9634℃
Jumlah pass Heat Exchanger E-112 yakni 1-1 pass dengan nilai diasumsikan 𝐹𝑇 = 1 karena tube
side merupakan total evaporation dan shell side total condensation
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 124
E-112
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Material Selecting
Require Material
Tube - Carbon Steel
Channel Cover - Carbon Steel
Shell - Carbon Steel
Baffle - Carbon Steel
Tubesheet - Carbon Steel
Shell and Tube Design
Keterangan in m
Shell Diameter, 𝐷𝑠 Trial Error 84 2.1336
Outside Diameter, 𝐷𝑜 Trial Error 1 0.0254
Inside Diameter, 𝐷𝑖 Trial Error 0.67 0.0170
Tebal tube, 𝑡𝑡𝑢𝑏𝑒 Trial Error 0.165 0.0042
Panjang Tube, 𝐿 Trial Error 216 5.4864
Tube Pitch, 𝑃𝑡 1.25𝐷𝑜 , T.E.M.A. 9th Ed 1.25 0.0318
Baffle Pitch, 𝑃𝑏 0.5𝐷𝑠 42 1.0668
Jumlah Tube, 𝑁𝑡𝑢𝑏𝑒 Trial Error 3300 tube
Opened Baffle General Opened Baffle, Mc.Cabe 25%
Shell, Channel, Head Thickness Min. Shell Thickness, T.E.M.A. 9th 1/2 in
Baffle Thickness Min. Baffle Thickness, T.E.M.A. 9th 5/8 in
𝑚𝑣𝑎𝑝𝑜𝑟 𝑖𝑛𝑙𝑒𝑡 1 1
Γ𝑏 =
𝑁𝑡𝑢𝑏𝑒 ∙ 𝐿 𝜇𝐿𝑠 2 3 4Γ𝑏 −3
ℎ𝑜 ( 3 2 ) = 1.47 ( )
188617/3600 𝑘𝐿𝑠 𝜌𝐿𝑠 𝑔 𝜇𝐿𝑠
Γ𝑏 = 1 1
(3300)(5.4864) 0.00014622 3 4(0.00289)
−
3
Γ𝑏 = 0.00289 𝑘𝑔/𝑚𝑠 ℎ𝑜 ( ) = 1.47 ( )
(0.0703)3 (746)2 (9.82) 0.0001462
ℎ𝑜 = 1527.93 𝑊/𝑚2 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 125
E-110
E-112
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
1 1
ℎ𝑑𝑜 = = BTU/ft 2 h°F = 2269.79 W/m2 ℃
𝑅𝑜 0.0025
1
𝑈𝑜 =
1 𝐷 𝑡 𝐷 1 1 𝐷 1
( ) ( 𝑜 ) + ( 𝑡 ) ( ̅𝑜 ) + ( ) + ( ) ( 𝑜 ) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0254 0.0042 0.0254 1 1 0.0254 1
( )( )+( )( )+( )+( )( )+( )
253.19 0.0170 45 0.0209 1527.93 2269.79 0.0170 2269.79
𝑈𝑜 = 163.93 𝑊/𝑚2 ℃
∆𝑇𝑓𝑤 = 52.15℃ 𝜆𝑐 = 2𝜋 ( )
𝑔(𝜌𝐿𝑡 − 𝜌𝑉𝑡 )
1
0.0584 2
𝜆𝑐 = 2𝜋 ( )
9.82(771.71 − 11.0187)
𝜆𝑐 = 0.0176 𝐽/𝑘𝑔
1
𝜆𝑐 𝜇𝑉𝑡 ∆𝑇𝑓𝑤 4 𝜆𝑐
ℎ𝑜 ( 3 ′
) = 0.59 + 0.069 ( )
𝑘𝑉𝑡 𝜌𝑉𝑡 (𝜌𝐿𝑡 − 𝜌𝑉𝑡 )𝜆 𝑔 𝐷𝑜
1
(0.0157)(0.0000120)(52.15) 4 0.0176
ℎ𝑜 ( ) = 0.59 + 0.069 ( )
(0.0290)3 (0.6453)(771.71 − 11.0187)(134308)(9.82) 0.0254
ℎ𝑜 = 252.30 𝑊/𝑚2 ℃
𝒉𝒐 ≈ 𝒉𝒐 𝒂𝒔𝒎𝒔𝒊
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 126
C-104 C-105
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝑃𝑡𝑎𝑟𝑔𝑒𝑡 1100
log ( ) log ( )
𝑃𝑖𝑛𝑙𝑒𝑡 162 = 1.53 ≈ 2
𝑛 𝑐𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑜𝑟 = =
log(𝐶𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑖𝑜𝑛𝑅𝑎𝑠𝑖𝑜) log(3.5)
𝑤. 𝐻𝑎𝑑 𝑊𝑎𝑑
𝑊𝑎𝑑 = 𝑊=
1000 𝜂
(7.9889)(76490 ) 611.07
𝑊𝑎𝑑 = 𝑊=
1000 0.75
𝑊𝑎𝑑 = 611.07 𝑘𝑊 𝑊 = 814.76 𝑘𝑊
𝑤. 𝐻𝑎𝑑 𝑊𝑎𝑑
𝑊𝑎𝑑 = 𝑊=
1000 𝜂
(7.9889)(76538 ) 611.46
𝑊𝑎𝑑 = 𝑊=
1000 0.75
𝑊𝑎𝑑 = 611.46 𝑘𝑊 𝑊 = 815.28 𝑘𝑊
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 127
E-113
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 46 47 -
o
Temperature, 𝑡1 , 𝑡2 C 144.22 112.50 -
Pressure kPa 439 429 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 5930 5592 -
Heat Flow, J/kg- oC -130276871 -131202901 -
Mass Flow, 𝑚𝑡 kg/h 28726 28726 28726
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 1.0264 1.0107 0.9937
Mass Density, 𝜌𝑡 kg/m3 4.8444 5.1370 11.2433
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0253 0.0231 0.0250
Viscosity, 𝜇𝑡 cP 0.0182 0.0167 0.0187
Heat Exchanger Duty kJ/h 926031
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Liquid Outlet Shell Side Vapor
Stream Number - BFW LPS
o
Temperature, 𝑇1 , 𝑇2 C 101.00 102.32
Pressure kPa 125 110
Actual Volume Flow, 𝑉𝑠̇ m3/h 0.4287 635
Heat Flow, J/kg- oC -8.29E+06 -7.08E+06
Mass Flow, 𝑚𝑠 kg/h 410 410
Mass Heat Capacity, 𝐶𝑝𝐿 , 𝐶𝑝𝑉 kJ/kg- oC 4.2180 2.0379
Mass Density, 𝜌𝐿 , 𝜌𝑉 kg/m3 957 0.6453
Thermal Conductivity, 𝑘𝐿 , 𝑘𝑉 W/m- oC 0.6811 0.0246
Viscosity, 𝜇𝐿 , 𝜇𝑉 cP 0.2761 0.0121
Laten Heat, 𝜆 kJ/kg 2241.5025
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 )
𝐿𝑀𝑇𝐷 =
(𝑡 − 𝑇2 )
ln 1
(𝑡2 − 𝑇1 )
11.49℃ − 41.91℃
𝐿𝑀𝑇𝐷 =
11.49℃
ln
41.91℃
𝐿𝑀𝑇𝐷 = 23.5106℃
Jumlah pass Heat Exchanger E-113 yakni 1-2 pass dengan nilai diasumsikan 𝐹𝑇 = 1 karena shell
side merupakan total evaporation
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 128
E-113
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Material Selecting
Require Material
Tube Acid Resist H2S & CO2 Stainless Steel 316
Channel Cover Acid Resist H2S & CO2 Stainless Steel 316
Shell - Carbon Steel
Baffle - Carbon Steel
Tubesheet Acid Resist H2S & CO2 Stainless Steel 316
Shell and Tube Design
Keterangan in m
Shell Diameter, 𝐷𝑠 Trial Error 44 1.1176
Outside Diameter, 𝐷𝑜 Trial Error 2 0.0508
Inside Diameter, 𝐷𝑖 Trial Error 1.843 0.0468
Tebal tube, 𝑡𝑡𝑢𝑏𝑒 Trial Error 0.0785 0.0020
Panjang Tube, 𝐿 Trial Error 168 4.2672
Tube Pitch, 𝑃𝑡 1.25𝐷𝑜 , T.E.M.A. 9th Ed 2.5 0.0635
Baffle Pitch, 𝑃𝑏 0.5𝐷𝑠 22 0.5588
Jumlah Tube, 𝑁𝑡𝑢𝑏𝑒 Trial Error 182 tube
Opened Baffle General Opened Baffle, Mc.Cabe 25%
Shell, Channel, Head Thickness Min. Shell Thickness, T.E.M.A. 9th 7/16 in
Baffle Thickness Min. Baffle Thickness, T.E.M.A. 9th 1/4 in
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 129
E-113
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
1 1
ℎ𝑑𝑖 = = BTU/ft 2 h°F = 2269.79 W/m2 ℃
𝑅𝑖 0.0025
1 1
ℎ𝑑𝑜 = = BTU/ft 2 h°F = 5674.47 W/m2 ℃
𝑅𝑜 0.0010
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0508 0.0020 0.0508 1 1 0.0508 1
( )( )+( )( )+( )+( )( )+( )
142.55 0.0468 45 0.0488 331 2269.79 0.0468 5674.47
2
𝑈𝑜 = 88.26 𝑊/𝑚 ℃
∆𝑇𝑓𝑤 = 15.80℃ 𝜆𝑐 = 2𝜋 ( )
𝑔(𝜌𝐿 − 𝜌𝑉 )
1
0.0584 2
𝜆𝑐 = 2𝜋 ( )
9.82(957.15 − 0.6453)
𝜆𝑐 = 0.0157 𝐽/𝑘𝑔
1
𝜆𝑐 𝜇𝑉 ∆𝑇𝑓𝑤 4 𝜆𝑐
ℎ𝑜 ( 3 ′
) = 0.59 + 0.069 ( )
𝑘𝑉 𝜌𝑉 (𝜌𝐿 − 𝜌𝑉 )𝜆 𝑔 𝐷𝑜
1
(0.0157)(0.0000121)(15.80) 4 0.0157
ℎ𝑜 ( ) = 0.59 + 0.069 ( )
(0.0246)3 (0.6453)(957.15 − 0.6453)(2219667)(9.82) 0.0508
ℎ𝑜 = 311.15 𝑊/𝑚2 ℃
𝒉𝒐 ≈ 𝒉𝒐 𝒂𝒔𝒎𝒔𝒊
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 130
E-114
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 47 48 -
o
Temperature, 𝑡1 , 𝑡2 C 112.50 40.00 -
Pressure kPa 429 419 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 5592 4599 -
Heat Flow, J/kg- oC -131202901 -133275541 -
Mass Flow, 𝑚𝑡 kg/h 28726 28726 28726
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 1.0107 0.9824 0.9952
Mass Density, 𝜌𝑡 kg/m3 5.1370 6.2459 5.6915
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0231 0.0181 0.0206
Viscosity, 𝜇𝑡 cP 0.0167 0.0135 0.0151
Heat Exchanger Duty kJ/h 2072640
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - Cooling Water Cooling Water -
o
Temperature, 𝑇1 , 𝑇2 C 30 45 -
Pressure kPa 130 109 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 33.218 33.403 -
Mass Flow, 𝑚𝑠 kg/h 33069 33069 33069
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 4.1795 4.1807 4.1801
Mass Density, 𝜌𝑠 kg/m3 995 990 998
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.6182 0.6376 0.6279
Viscosity, 𝜇𝑠 cP 0.7972 0.5939 0.6956
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡1 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 30 ℃ − 45℃ 40℃ − 112.5℃
(𝑡2 − 𝑇1 ) 𝑅= 𝑆=
67.50℃ − 10℃ 40℃ − 0.2069℃ 30 ℃ − 112.5℃
𝐿𝑀𝑇𝐷 = 𝑅 = 0.1153 𝑆 = 0.8788
67.50℃
ln
10℃
𝐿𝑀𝑇𝐷 = 30.1119℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 131
E-102
E-114
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 132
E-114
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (1.0668)2 𝜋. (0.0508)2 𝑆𝑐 = (0.5334)(1.0668). (1 − 0.8)
𝑆𝑏 = (0.1955). − 1.9306.
4 4 𝑆𝑐 = 0.1138 𝑚2
𝑆𝑏 = 0.1708 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 53.7709 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 80.7139 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(53.7709)(80.7139) (4180)(0.000696) 0,33 0.6279
ℎ𝑜 = 0,2 ((0.0508) ) ( )
0.000696 0.6279 0.0508
ℎ𝑜 = 663.8 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0508 0.0020 0.0508 1 1 0.0508 1
( )( )+( )( )+( )+( )( )+( )
280.73 0.0468 45 0.0488 663.8 2269.79 0.0468 5674.47
𝑈𝑜 = 164.67 𝑊/𝑚2 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 133
E-115
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 49 50 -
o
Temperature, 𝑡1 , 𝑡2 C 146.25 112.50 -
Pressure kPa 1153 1143 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 2230 2052 -
Heat Flow, J/kg- oC -130359541 -131366279 -
Mass Flow, 𝑚𝑡 kg/h 28726 28726 28726
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 1.0469 1.0349 1.0385
Mass Density, 𝜌𝑡 kg/m3 12.8821 14.0021 13.4421
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0259 0.0236 0.0248
Viscosity, 𝜇𝑡 cP 0.0184 0.0169 0.0177
Heat Exchanger Duty kJ/h 1006738
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Liquid Outlet Shell Side Vapor
Stream Number - BFW LPS
o
Temperature, 𝑇1 , 𝑇2 C 101.00 102.32
Pressure kPa 125 110
Actual Volume Flow, 𝑉𝑠̇ m3/h 0.4660 691
Heat Flow, J/kg- oC -8.29E+06 -7.08E+06
Mass Flow, 𝑚𝑠 kg/h 446 446
Mass Heat Capacity, 𝐶𝑝𝐿 , 𝐶𝑝𝑉 kJ/kg- oC 4.2180 2.0379
Mass Density, 𝜌𝐿 , 𝜌𝑉 kg/m3 957 0.6453
Thermal Conductivity, 𝑘𝐿 , 𝑘𝑉 W/m- oC 0.6811 0.0246
Viscosity, 𝜇𝐿 , 𝜇𝑉 cP 0.2761 0.0121
Laten Heat, 𝜆 kJ/kg 2241.5025
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 )
𝐿𝑀𝑇𝐷 =
(𝑡 − 𝑇2 )
ln 1
(𝑡2 − 𝑇1 )
11.49℃ − 43.93℃
𝐿𝑀𝑇𝐷 =
11.49℃
ln
43.93℃
𝐿𝑀𝑇𝐷 = 24.1928℃
Jumlah pass Heat Exchanger E-115 yakni 1-2 pass dengan nilai diasumsikan 𝐹𝑇 = 1 karena shell
side merupakan total evaporation
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 134
E-115
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Material Selecting
Require Material
Tube Acid Resist H2S & CO2 Stainless Steel 316
Channel Cover Acid Resist H2S & CO2 Stainless Steel 316
Shell - Carbon Steel
Baffle - Carbon Steel
Tubesheet Acid Resist H2S & CO2 Stainless Steel 316
Shell and Tube Design
Keterangan in m
Shell Diameter, 𝐷𝑠 Trial Error 42 1.0668
Outside Diameter, 𝐷𝑜 Trial Error 2 0.0508
Inside Diameter, 𝐷𝑖 Trial Error 1.843 0.0468
Tebal tube, 𝑡𝑡𝑢𝑏𝑒 Trial Error 0.0785 0.0020
Panjang Tube, 𝐿 Trial Error 192 4.8768
Tube Pitch, 𝑃𝑡 1.25𝐷𝑜 , T.E.M.A. 9th Ed 2.5 0.0635
Baffle Pitch, 𝑃𝑏 0.5𝐷𝑠 21 0.5334
Jumlah Tube, 𝑁𝑡𝑢𝑏𝑒 Trial Error 150 tube
Opened Baffle General Opened Baffle, Mc.Cabe 25%
Shell, Channel, Head Thickness Min. Shell Thickness, T.E.M.A. 9th 7/16 in
Baffle Thickness Min. Baffle Thickness, T.E.M.A. 9th 1/4 in
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 135
E-115
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
1 1
ℎ𝑑𝑖 = = BTU/ft 2 h°F = 2269.79 W/m2 ℃
𝑅𝑖 0.0025
1 1
ℎ𝑑𝑜 = = BTU/ft 2 h°F = 5674.47 W/m2 ℃
𝑅𝑜 0.0010
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0508 0.0020 0.0508 1 1 0.0508 1
( )( )+( )( )+( )+( )( )+( )
170.74 0.0468 45 0.0488 331 2269.79 0.0468 5674.47
2
𝑈𝑜 = 99.27 𝑊/𝑚 ℃
∆𝑇𝑓𝑤 = 15.26℃ 𝜆𝑐 = 2𝜋 ( )
𝑔(𝜌𝐿 − 𝜌𝑉 )
1
0.0584 2
𝜆𝑐 = 2𝜋 ( )
9.82(957.15 − 0.6453)
𝜆𝑐 = 0.0157 𝐽/𝑘𝑔
1
𝜆𝑐 𝜇𝑉 ∆𝑇𝑓𝑤 4 𝜆𝑐
ℎ𝑜 ( 3 ′
) = 0.59 + 0.069 ( )
𝑘𝑉 𝜌𝑉 (𝜌𝐿 − 𝜌𝑉 )𝜆 𝑔 𝐷𝑜
1
(0.0157)(0.0000121)(15.26) 4 0.0157
ℎ𝑜 ( ) = 0.59 + 0.069 ( )
(0.0246)3 (0.6453)(957.15 − 0.6453)(2220400)(9.82) 0.0508
ℎ𝑜 = 313.85 𝑊/𝑚2 ℃
𝒉𝒐 ≈ 𝒉𝒐 𝒂𝒔𝒎𝒔𝒊
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 136
E-116
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 50 51 -
o
Temperature, 𝑡1 , 𝑡2 C 112.50 40.00 -
Pressure kPa 1143 1133 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 2052 1627 -
Heat Flow, J/kg- oC -131366279 -133514085 -
Mass Flow, 𝑚𝑡 kg/h 28726 28726 28726
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 1.0349 1.0316 1.0313
Mass Density, 𝜌𝑡 kg/m3 14.0021 17.6513 15.8267
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0236 0.0187 0.0212
Viscosity, 𝜇𝑡 cP 0.0169 0.0138 0.0153
Heat Exchanger Duty kJ/h 2147806
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - Cooling Water Cooling Water -
o
Temperature, 𝑇1 , 𝑇2 C 30 45 -
Pressure kPa 130 109 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 34.423 34.614 -
Mass Flow, 𝑚𝑠 kg/h 34268 34268 34268
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 4.1795 4.1807 4.1801
Mass Density, 𝜌𝑠 kg/m3 995 990 998
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.6182 0.6376 0.6279
Viscosity, 𝜇𝑠 cP 0.7972 0.5939 0.6956
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡1 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 30 ℃ − 45℃ 40℃ − 112.5℃
(𝑡2 − 𝑇1 ) 𝑅= 𝑆=
67.50℃ − 10℃ 40℃ − 0.2069℃ 30 ℃ − 112.5℃
𝐿𝑀𝑇𝐷 = 𝑅 = 0.1153 𝑆 = 0.8788
67.50℃
ln
10℃
𝐿𝑀𝑇𝐷 = 30.1119℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 137
E-102
E-116
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 138
E-116
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (1.0668)2 𝜋. (0.0508)2 𝑆𝑐 = (0.5334)(1.0668). (1 − 0.8)
𝑆𝑏 = (0.1955). − 1.9306.
4 4 𝑆𝑐 = 0.1138 𝑚2
𝑆𝑏 = 0.1708 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 55.7210 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 83.6411 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(55.7210)(83.6411) (4180)(0.000696) 0,33 0.6279
ℎ𝑜 = 0,2 ((0.0508) ) ( )
0.000696 0.6279 0.0508
ℎ𝑜 = 678.12 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0508 0.0020 0.0508 1 1 0.0508 1
( )( )+( )( )+( )+( )( )+( )
291.79 0.0468 45 0.0488 678.12 2269.79 0.0468 5674.47
𝑈𝑜 = 169.66 𝑊/𝑚2 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 139
T-103
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Trial error tray number dengan syarat maximum H2S loss < 3%
- Masukan kondisi tekanan operasi pada menu design dan trial error Number of stage = 10
- Set effisiensi tray 19% (effisinsi tray untuk gas absorption H2S oleh selexol pada T=25oC)
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 140
T-103
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
459.0537
4𝑉̇ 4( )
𝐷=√ = √ 3600 = 1.5246 = 60 𝑖𝑛
𝜋𝑢 𝜋 (0.0698 )
Shell Thickness
Stress Tensile : 16.700 psi stress value of Stainless Steel SA-240, 316L
T operation : 40oC
E : 0.85 joint efficiency, spot examined
CA : 0.125 inches corrosion allowance
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 141
T-104
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
K Value ∝𝐿,𝐻
Key Component ̅ 𝐿,𝐻
∝
Top Bottom Top Bottom
Light Key (H2O) 6.4977 3.3746
28.48 4.28 16.38
Heavy Key (SELEXOL) 0.2282 0.7876
Reflux Ratio, R
𝐿𝑚𝑖𝑛 𝐹 𝑅 = 1.25𝑅𝑚𝑖𝑛
𝑅𝑚𝑖𝑛 = ( )
𝐹 𝐷 𝑅 = 1.25(0.21203)
1923.58 𝑅 = 0.26504
𝑅𝑚𝑖𝑛 = (0.08435)
553.68
𝑅𝑚𝑖𝑛 = 0.21203
Tray Number
(𝑥 /𝑥 ) 𝑁𝑚𝑖𝑛
ln [ 𝑑 𝑏 𝐿𝐾 ] 𝑁𝑎𝑐𝑡 =
(𝑥𝑑 /𝑥𝑏 )𝐻𝐾 𝜂
𝑁𝑚𝑖𝑛 =
̅ 𝐿,𝐻 ]
ln[∝ 0.5862
(0.0067/0.0002) 𝑁𝑎𝑐𝑡 =
ln [ ] 0.1
(0.0002/0.9989)
𝑁𝑚𝑖𝑛 =
ln[16.38] 𝑁𝑎𝑐𝑡 = 𝟓. 𝟖𝟔𝟐 ≈ 𝟔 𝒕𝒂𝒉𝒂𝒑
𝑁𝑚𝑖𝑛 = 0.5862
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 142
T-104
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
17603.2298
4𝑉̇ 4( )
𝐷=√ =√ 3600 = 3.0184 𝑚 = 119 𝑖𝑛
𝜋𝑢 𝜋 (0.6833)
Shell Thickness
Stress Tensile : 16.700 psi stress value of Stainless Steel SA-240, 316L
T operation : 40oC
E : 0.85 joint efficiency, spot examined
CA : 0.125 inches corrosion allowance
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 143
V-103
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Design Pressure
𝑃𝑑𝑒𝑠𝑖𝑔𝑛 = 1.25𝑃𝑜𝑝𝑒𝑟𝑎𝑡𝑖𝑜𝑛
𝑃𝑑𝑒𝑠𝑖𝑔𝑛 = 19.11 𝑝𝑠𝑖 𝑥 1.25
𝑃𝑑𝑒𝑠𝑖𝑔𝑛 = 23.88 𝑝𝑠𝑖
Volume Require
𝑉𝑜𝑙𝑢𝑚𝑒 = 𝑎𝑐𝑡. 𝑉𝑜𝑙𝑢𝑚𝑒 𝐹𝑙𝑜𝑤 𝑥 ℎ𝑜𝑙𝑑𝑢𝑝 𝑡𝑖𝑚𝑒 𝑥 2
𝑚3 1ℎ
𝑉𝑜𝑙𝑢𝑚𝑒 = 46.74 ( ) 5 𝑚𝑖𝑛𝑢𝑡𝑒𝑥 2
ℎ 60 𝑚𝑖𝑛𝑢𝑡𝑒
𝑉𝑜𝑙𝑢𝑚𝑒 = 7.79 𝑚3
Diameter Vessel
4 ∙ 𝑉𝑜𝑙𝑢𝑚𝑒 1/3
𝐷=( )
(3 ∙ 3.14)
1/3
4 ∙ 7.79 𝑚3
𝐷=( )
3 ∙ 3.14
𝐷 = 1.65 𝑚 = 59 𝑖𝑛
𝐻 = 3𝐷
𝐻 = 3(1.4899 𝑚)
𝐻 = 4.4699 = 176 𝑖𝑛
Shell Thickness
𝑃𝑑𝑒𝑠𝑖𝑔𝑛 ∙ 0.5𝐷 + 𝐶𝐴
𝑡𝑆ℎ𝑒𝑙𝑙 = + 𝐶𝐴
𝑆 ∙ 𝐸 − 0.6𝑃𝑑𝑒𝑠𝑖𝑔𝑛
(23.88) ∙ 0.5(59) + 0.125
𝑡𝑆ℎ𝑒𝑙𝑙 = + 0.125
(16700)(0.85) − 0.6(23.88)
𝑡𝑆ℎ𝑒𝑙𝑙 = 0.1746 𝑖𝑛 ≈ 0.25 𝑖𝑛
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 144
P-103
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Head (𝑯𝒔 )
Tabel Assumption
𝐷𝑖 suction pipe ≈ 𝐷𝑖 discharge pipe 𝑣𝑠𝑢𝑐𝑡𝑖𝑜𝑛 ≈ 𝑣𝑑𝑖𝑠𝑐ℎ𝑎𝑟𝑔𝑒
𝑓∙𝐿∙𝑣 2
Smooth pipe ≈0
2∙𝑔∙𝐷
Friction Losses in valve low 𝐻𝑣 ≈ 0
NPSH
𝑃𝑠𝑢𝑐𝑡𝑖𝑜𝑛 − 𝑃𝑠𝑎𝑡 𝐹𝑠𝑢𝑐𝑡𝑖𝑜𝑛 𝑁𝑃𝑆𝐻𝑟𝑒𝑞𝑢𝑖𝑟𝑒 = 1.35 𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒
𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 = − − ∆𝑧𝑠𝑢𝑡𝑖𝑜𝑛
𝜌𝑔 𝑔 𝑁𝑃𝑆𝐻𝑟𝑒𝑞𝑢𝑖𝑟𝑒 = 1.35 ∙ 12.44 𝑚
119316 − 0.2644 𝑁𝑃𝑆𝐻𝑟𝑒𝑞𝑢𝑖𝑟𝑒 = 16.80 𝑚
𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 = −0−0
976.62 ∙ 9.82
𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 = 12.44 𝑚
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 145
P-104
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Head (𝑯𝒔 )
Tabel Assumption
𝐷𝑖 suction pipe ≈ 𝐷𝑖 discharge pipe 𝑣𝑠𝑢𝑐𝑡𝑖𝑜𝑛 ≈ 𝑣𝑑𝑖𝑠𝑐ℎ𝑎𝑟𝑔𝑒
𝑓∙𝐿∙𝑣 2
Smooth pipe ≈0
2∙𝑔∙𝐷
Friction Losses in valve low 𝐻𝑣 ≈ 0
NPSH
𝑃𝑠𝑢𝑐𝑡𝑖𝑜𝑛 − 𝑃𝑠𝑎𝑡 𝐹𝑠𝑢𝑐𝑡𝑖𝑜𝑛 𝑁𝑃𝑆𝐻𝑟𝑒𝑞𝑢𝑖𝑟𝑒 = 1.35 𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒
𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 = − − ∆𝑧𝑠𝑢𝑡𝑖𝑜𝑛
𝜌𝑔 𝑔 𝑁𝑃𝑆𝐻𝑟𝑒𝑞𝑢𝑖𝑟𝑒 = 1.35 ∙ 0.16 𝑚
130000 − 128568 𝑁𝑃𝑆𝐻𝑟𝑒𝑞𝑢𝑖𝑟𝑒 = 0.21 𝑚
𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 = −0−0
939.18 ∙ 9.82
𝑁𝑃𝑆𝐻𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 = 0.16 𝑚
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 146
E-117
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 70 71 -
o
Temperature, 𝑡1 , 𝑡2 C 278.83 70.93 -
Pressure kPa 140 119 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 471 388 -
Heat Flow, J/kg- oC 101850192.2 -62317421.4 -
Mass Flow, 𝑚𝑡 kg/h 369667 369667 369667
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 2.4245 1.8123 2.1361
Mass Density, 𝜌𝑡 kg/m3 785.0684 953.9512 869.5098
Mass Enthalpi kJ/kg 276 -169 -
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0660 0.0921 0.0791
Viscosity, 𝜇𝑡 cP 0.3829 4.4186 0.3829
Heat Exchanger Duty kJ/h 164167614
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - 55 56 -
o
Temperature, 𝑇1 , 𝑇2 C 38.35 240.00 -
Pressure kPa 1100 1079 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 381 2343 -
Heat Flow, J/kg- oC -146767778 17399835.19 -
Mass Flow, 𝑚𝑠 kg/h 389181 389181 389181
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 1.7217 2.2638 2.0919
Mass Density, 𝜌𝑠 kg/m3 1018.9683 166.1036 592.5360
Mass Enthalpi kJ/kg -377 45 -
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.0976 0.0694 0.0835
Viscosity, 𝜇𝑠 cP 5.6622 0.5025 0.5025
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0025
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 1
(𝑡2 − 𝑇1 ) 38.35 ℃ − 240.00℃ 70.93℃ − 278.83℃
32.58℃ − 38.83℃ 𝑅= 𝑆=
𝐿𝑀𝑇𝐷 = 70.93℃ − 278.83℃ 38.35 ℃ − 278.83℃
32.58℃ 𝑅 = 0.9700 𝑆 = 0.8645
ln
38.83℃
𝐿𝑀𝑇𝐷 = 35.6169℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 147
E-102
E-117
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 148
E-117
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (2.2860)2 𝜋. (0.0127)2 𝑆𝑐 = (0.5080)(2.2860). (1 − 0.8)
𝑆𝑏 = (0.1955). − 67.2031.
4 4 𝑆𝑐 = 0.2090 𝑚2
𝑆𝑏 = 0.7939 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 136.1738 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 364.7617 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(136.1738)(517.1752) (2091.9)(0.0005025) 0,33 0.0835
ℎ𝑜 = 0,2 ((0.0127) ) ( )
0.0005025 0.0835 0.0127
ℎ𝑜 = 599.61 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0127 0.0017 0.0127 1 1 0.0127 1
( )( )+( )( )+( )+( )( )+( )
1459.53 0.0094 45 0.0110 599.61 2269.79 0.0094 2269.79
2
𝑈𝑜 = 272.30 𝑊/𝑚 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 149
E-118
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 71 72 -
o
Temperature, 𝑡1 , 𝑡2 C 70.93 40.00 -
Pressure kPa 119 99 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 388 379 -
Heat Flow, J/kg- oC -62317421.4 -82416611.4 -
Mass Flow, 𝑚𝑡 kg/h 369667 369667 369667
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 1.8123 1.7015 1.7578
Mass Density, 𝜌𝑡 kg/m3 953.9512 976.6428 965.2970
Mass Enthalpi kJ/kg -169 -223
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0921 0.0956 0.0939
Viscosity, 𝜇𝑡 cP 4.4186 7.3502 5.884
Heat Exchanger Duty kJ/h 20099190
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - Cooling Water Cooling Water -
o
Temperature, 𝑇1 , 𝑇2 C 30 45 -
Pressure kPa 130 109 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 320 322 -
Mass Flow, 𝑚𝑠 kg/h 319043 319043 319043
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 4.1795 4.1807 4.1801
Mass Density, 𝜌𝑠 kg/m3 995 990 998
Mass Enthalpi kJ/kg -15800 -15737 -
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.6182 0.6376 0.6279
Viscosity, 𝜇𝑠 cP 0.7972 0.5939 0.6956
2
Fouling Factor, 𝑅𝑜 ft -°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡1 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 30 ℃ − 45℃ 40℃ − 70.93℃
(𝑡2 − 𝑇1 ) 𝑅= 𝑆=
25.93℃ − 10℃ 40℃ − 70.93℃ 30 ℃ − 70.93℃
𝐿𝑀𝑇𝐷 = 𝑅 = 0.4849 𝑆 = 0.7557
25.93℃
ln
10℃
𝐿𝑀𝑇𝐷 = 16.7197℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 150
E-102
E-118
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 151
E-118
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (1.1176)2 𝜋. (0.0191)2 𝑆𝑐 = (0.5588)(1.1176). (1 − 0.8)
𝑆𝑏 = (0.1955). − 31.0845.
4 4 𝑆𝑐 = 0.1249 𝑚2
𝑆𝑏 = 0.1829 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 486.9693 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 713.1756 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(486.9693)(713.1756) (4180)(0.000696) 0,33 0.6279
ℎ𝑜 = 0,2 ((0.0191) ) ( )
0.000696 0.6279 0.0191
ℎ𝑜 = 3659.09 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0191 0.0034 0.0191 1 1 0.0191 1
( )( )+( )( )+( )+( )( )+( )
424.11 0.0122 45 0.0154 3659.1 2269.79 0.0122 5674.47
2
𝑈𝑜 = 204.12 𝑊/𝑚 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 152
E-119
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 73 74 -
o
Temperature, 𝑡1 , 𝑡2 C 40.51 25.00 -
Pressure kPa 1171 1150 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 378 374 -
Heat Flow, J/kg- oC -81812261 -91408443 -
Mass Flow, 𝑚𝑡 kg/h 369383 369383 369383
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 1.7029 1.6454 1.6750
Mass Density, 𝜌𝑡 kg/m3 977.5122 988.7609 983.1365
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0956 0.0973 0.0964
Viscosity, 𝜇𝑡 cP 7.2943 9.6295 8.4619
Heat Exchanger Duty kJ/h 9596182
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Liquid Outlet Shell Side Vapor
Stream Number - Liquid NH3 Vapor NH3
o
Temperature, 𝑇1 , 𝑇2 C 15.42 15.00
Pressure kPa 734 724
Actual Volume Flow, 𝑉𝑠̇ m3/h 164 1559
Heat Flow, J/kg- oC -28739724 -20415831
Mass Flow, 𝑚𝑠 kg/h 8616 8616
Mass Heat Capacity, 𝐶𝑝𝐿 , 𝐶𝑝𝑉 kJ/kg- oC 4.4817 2.2335
Mass Density, 𝜌𝐿 , 𝜌𝑉 kg/m3 52.6416 5.5257
Thermal Conductivity, 𝑘𝐿 , 𝑘𝑉 W/m- oC 0.5013 0.0265
Viscosity, 𝜇𝐿 , 𝜇𝑉 cP 0.1395 0.0082
Laten Heat, 𝜆 kJ/kg 1235.47564
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 )
𝐿𝑀𝑇𝐷 =
(𝑡 − 𝑇2 )
ln 1
(𝑡2 − 𝑇1 )
25.51℃ − 9.58℃
𝐿𝑀𝑇𝐷 =
25.51℃
ln
9.58℃
𝐿𝑀𝑇𝐷 = 16.4537℃
Jumlah pass Heat Exchanger E-119 yakni 1-4 pass dengan nilai diasumsikan 𝐹𝑇 = 1 karena shell
side merupakan total evaporation
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 153
E-102
E-119
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 154
E-119
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝜆𝑐 = 0.0491 𝐽/𝑘𝑔
1
𝜆𝑐 𝜇𝑉 ∆𝑇𝑓𝑤 4 𝜆𝑐
ℎ𝑜 ( 3 ) = 0.59 + 0.069 ( )
𝑘𝑉 𝜌𝑉 (𝜌𝐿 − 𝜌𝑉 )𝜆′ 𝑔 𝐷𝑜
1
(0.0157)(0.0000082)(8.47) 4 0.0491
ℎ𝑜 ( ) = 0.59 + 0.069 ( )
(0.0265)3 (5.5257)(52.64 − 5.5257)(1216925)(9.82) 0.0127
ℎ𝑜 = 309.01 𝑊/𝑚2 ℃
𝒉𝒐 ≈ 𝒉𝒐 𝒂𝒔𝒎𝒔𝒊
1
𝑈𝑜 =
1 𝐷 𝑡 𝐷 1 1 𝐷 1
( ) ( 𝑜 ) + ( 𝑡 ) ( ̅𝑜 ) + ( ) + ( ) ( 𝑜 ) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0127 0.0017 0.0127 1 1 0.0127 1
( )( )+( )( )+( )+( )( )+( )
316.57 0.0094 45 0.0110 309.3 2269.79 0.0094 5674.47
𝑈𝑜 = 122.00 𝑊/𝑚2 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 155
E-120
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Vapor Outlet Liquid
Stream Number - 58 59 60
o
Temperature, 𝑡1 , 𝑡2 C 222.99 112.5 112.5
Pressure kPa 140 139 139
Actual Volume Flow, 𝑉̇𝑡 m3/h 19771 12669 35.341
Heat Flow, kJ/h -38880967 -131090044 -4560063
Mass Flow, 𝑚𝑡 kg/h 52512 19877 32677
Mass Heat Capacity, 𝐶𝑝𝐿𝑡 , 𝐶𝑝𝑉𝑡 kJ/kg- oC 1.4698 1.0331 1.9532
Mass Density, 𝜌𝐿𝑡 , 𝜌𝑉𝑡 kg/m3 2.6559 0.0225 0.0867
Thermal Conductivity, 𝑘𝐿𝑡 , 𝑘𝑉𝑡 W/m- oC 0.0277 0.0159 2.0734
Viscosity, 𝜇𝐿𝑡 , 𝜇𝑉𝑡 cP 0.0208 0.0167 2.0724
Heat Exchanger Duty kJ/h 18010630
Laten Heat, 𝜆𝑡 kJ/kg 798.676
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Liquid Outlet Shell Side Vapor
Stream Number - BFW LPS
o
Temperature, 𝑇1 , 𝑇2 C 15.42 15.00
Pressure kPa 734 724
Actual Flow m3/h 8.3375 12366
Mass Flow, 𝑚𝑠 kg/h 7980 7980
Mass Heat Capacity, 𝐶𝑝𝐿𝑠 , 𝐶𝑝𝑉𝑠 kJ/kg- oC 4.4817 2.2335
Mass Density, 𝜌𝐿𝑠 , 𝜌𝑉𝑠 kg/m3 52.6416 5.5257
Thermal Conductivity, 𝑘𝐿𝑠 , 𝑘𝑉𝑠 W/m- oC 0.5013 0.0265
Viscosity, 𝜇𝐿𝑠 , 𝜇𝑉𝑠 cP 0.1395 0.0082
Laten Heat, 𝜆𝑠 kJ/kg 2241.502
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 )
𝐿𝑀𝑇𝐷 =
(𝑡 − 𝑇2 )
ln 1
(𝑡2 − 𝑇1 )
11.50℃ − 120.67℃
𝐿𝑀𝑇𝐷 =
11.50℃
ln
120.67℃
𝐿𝑀𝑇𝐷 = 46.4345℃
Jumlah pass Heat Exchanger E-110 yakni 1-1 pass dengan nilai diasumsikan 𝐹𝑇 = 1 karena shell
side merupakan total evaporation
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 156
E-110
E-120
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Material Selecting
Require Material
Tube Acid Resist H2S , CO2 Stainless Steel 316
Channel Cover Acid Resist H2S , CO2 Stainless Steel 316
Shell - Carbon Steel
Baffle - Carbon Steel
Tubesheet Acid Resist H2S , CO2 Stainless Steel 316
Shell and Tube Design
Keterangan in m
Shell Diameter, 𝐷𝑠 Trial Error 74 1.8796
Outside Diameter, 𝐷𝑜 Trial Error 2 0.0508
Inside Diameter, 𝐷𝑖 Trial Error 1.843 0.0468
Tebal tube, 𝑡𝑡𝑢𝑏𝑒 Trial Error 0.0785 0.0020
Panjang Tube, 𝐿 Trial Error 240 6.0960
Tube Pitch, 𝑃𝑡 1.25𝐷𝑜 , T.E.M.A. 9th Ed 2.5 0.0635
Baffle Pitch, 𝑃𝑏 0.5𝐷𝑠 37 0.9398
Jumlah Tube, 𝑁𝑡𝑢𝑏𝑒 Trial Error 540 tube
Opened Baffle General Opened Baffle, Mc.Cabe 25%
Shell, Channel, Head Thickness Min. Shell Thickness, T.E.M.A. 9th 7/16 in
Baffle Thickness Min. Baffle Thickness, T.E.M.A. 9th 3/8 in
𝑚𝑣𝑎𝑝𝑜𝑟 𝑖𝑛𝑙𝑒𝑡 1 1
Γ𝑏 =
𝑁𝑡𝑢𝑏𝑒 ∙ 𝐿 𝜇𝐿𝑡 2 34Γ𝑏 −3
ℎ𝑖 ( 3 2 ) = 1.47 ( )
32677/3600 𝑘𝐿𝑡 𝜌𝐿𝑡 𝑔 𝜇𝐿𝑡
Γ𝑏 = 1 1
(540)(6.0960) 0.00207242 3 4(0.00276 )
−
3
Γ𝑏 = 0.00276 𝑘𝑔/𝑚𝑠 ℎ𝑖 ( 3 2
) = 1.47 ( )
(0.0867) (925) (9.82) 0.0020734
ℎ𝑖 = 912.94 𝑊/𝑚2 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 157
E-120
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
∆𝑇𝑓𝑤 = 11.40℃
1
𝜆𝑐 𝜇𝑉𝑠 ∆𝑇𝑓𝑤 4 𝜆𝑐
ℎ𝑜 ( 3 ′
) = 0.59 + 0.069 ( )
𝑘𝑉𝑠 𝜌𝑉𝑠 (𝜌𝐿𝑠 − 𝜌𝑉𝑠 )𝜆 𝑔 𝐷𝑜
1
(0.0157)(0.0000121)(11.40) 4 0.0157
ℎ𝑜 ( ) = 0.59 + 0.069 ( )
(0.0246)3 (0.6453)(957.15 − 0.6453)(2226383)(9.82) 0.0508
ℎ𝑜 = 337.81 𝑊/𝑚2 ℃
𝒉𝒐 ≈ 𝒉𝒐 𝒂𝒔𝒎𝒔𝒊
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 158
E-121
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - 59 61 -
o
Temperature, 𝑡1 , 𝑡2 C 112.50 40.00 -
Pressure kPa 139 139 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 12668 10289 -
Heat Flow, J/kg- oC -53735445.1 -55251012.3 -
Mass Flow, 𝑚𝑡 kg/h 19877 19877 19877
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 1.0331 1.0051 1.0517
Mass Density, 𝜌𝑡 kg/m3 1.5690 1.9318 1.7504
Mass Enthalpi kJ/kg -2703 -2780
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0225 0.0177 0.0201
Viscosity, 𝜇𝑡 cP 0.0159 0.0129 0.0144
Heat Exchanger Duty kJ/h 1515567
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - Cooling Water Cooling Water -
o
Temperature, 𝑇1 , 𝑇2 C 30 45 -
Pressure kPa 130 109 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 34 34 -
Mass Flow, 𝑚𝑠 kg/h 33750 33750 33750
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 4.1795 4.1807 4.1801
Mass Density, 𝜌𝑠 kg/m3 995 990 998
Mass Enthalpi kJ/kg -15800 -15737 -
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.6182396 0.6375601 0.6279
Viscosity, 𝜇𝑠 cP 0.7972324 0.5938817 0.6956
2
Fouling Factor, 𝑅𝑜 ft -°F-h/BTU 0.0010
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡1 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 30 ℃ − 45℃ 40℃ − 112.5℃
(𝑡2 − 𝑇1 ) 𝑅= 𝑆=
67.50℃ − 10℃ 40℃ − 112.5℃ 30 ℃ − 112.5℃
𝐿𝑀𝑇𝐷 = 𝑅 = 0.4849 𝑆 = 0.7557
67.50℃
ln
10℃
𝐿𝑀𝑇𝐷 = 30.1119℃
Heat Exchanger E-121 digunakan jenis fall film condenser, sehingg jumlah pass Heat Exchanger E-
121 yakni 1-1 pass dengan nilai 𝐹𝑇 diasumsikan 0.9. Perhitungan koefisien individual bagian dalam tetap
digunakan persamaan Dittus-Boelter karena massa condensate kecil dibanding massa non-condensable dan
temperature drop bagian tube tinggi
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 159
E-102
E-121
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 160
E-121
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (1.0668)2 𝜋. (0.0254)2 𝑆𝑐 = (0.5334)(1.1176). (1 − 0.8)
𝑆𝑏 = (0.1955). − 28.3475.
4 4 𝑆𝑐 = 0.1138 𝑚2
𝑆𝑏 = 0.1604 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 41.8808 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 59.0201 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(41.8808)(59.0201) (4180)(0.000696) 0,33 0.6279
ℎ𝑜 = 0,2 ((0.0254) ) ( )
0.000696 0.6279 0.0254
ℎ𝑜 = 739.76 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0254 0.0009 0.0254 1 1 0.0254 1
( )( )+( )( )+( )+( )( )+( )
86.06 0.0236 45 0.0245 739.76 2269.79 0.0236 5674.47
2
𝑈𝑜 = 68.03 𝑊/𝑚 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 161
E-122
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Liquid Tube Side Outlet Vapor Tube Side
Stream Number - 68 69
o
Temperature, 𝑡1 , 𝑡2 C 279 286
Pressure kPa 140 140
Actual Volume Flow, 𝑉̇𝑡 m3/h 275 25234
Heat Flow, kJ/h 59457736 108200052
Mass Flow, 𝑚𝑡 kg/h 215720 215720
Mass Heat Capacity, 𝐶𝑝𝐿𝑡 , 𝐶𝑝𝑉𝑡 kJ/kg- oC 2.4246 1.8823
Mass Density, 𝜌𝐿𝑡 , 𝜌𝑉𝑡 kg/m3 785 8.549
Thermal Conductivity, 𝑘𝐿𝑡 , 𝑘𝑉𝑡 W/m- oC 0.0660 0.0279
Viscosity, 𝜇𝐿𝑡 , 𝜇𝑉𝑡 cP 0.3828 0.0117
Heat Exchanger Duty kJ/h 48764491
Laten Heat, 𝜆𝑡 kJ/kg 212.5866
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0025
SHELL SIDE DATA FLUID Unit Inlet Shell Side Vapor Outlet Shell Side Liquid
Stream Number - DowTherm A Vapor DowTherm A Liquid
o
Temperature, 𝑇1 , 𝑇2 C 350 349
Pressure kPa 549 543
Actual Flow m3/h 9621 269
Heat Flow, J/kg- oC 176024226 127259734
Mass Flow, 𝑚𝑠 kg/h 200512 200512
Mass Heat Capacity, 𝐶𝑝𝐿𝑠 , 𝐶𝑝𝑉𝑠 kJ/kg- oC 2.0665 2.4693
Mass Density, 𝜌𝐿𝑠 , 𝜌𝑉𝑠 kg/m3 20.841 746.229
Thermal Conductivity, 𝑘𝐿𝑠 , 𝑘𝑉𝑠 W/m- oC 0.0283 0.0703
Viscosity, 𝜇𝐿𝑠 , 𝜇𝑉𝑠 cP 0.0113 0.1462
Laten Heat, 𝜆𝑠 kJ/kg 241.410
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0025
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 )
𝐿𝑀𝑇𝐷 =
(𝑡 − 𝑇2 )
ln 1
(𝑡2 − 𝑇1 )
70.40℃ − 63.76℃
𝐿𝑀𝑇𝐷 =
70.40℃
ln
63.76℃
𝐿𝑀𝑇𝐷 = 67.0225℃
Jumlah pass Heat Exchanger E-122 yakni 1-1 pass dengan nilai diasumsikan 𝐹𝑇 = 1 karena tube
side merupakan total evaporation dan shell side total condensation
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 162
E-122
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Material Selecting
Require Material
Tube - Carbon Steel
Channel Cover - Carbon Steel
Shell - Carbon Steel
Baffle - Carbon Steel
Tubesheet - Carbon Steel
Shell and Tube Design
Keterangan in m
Shell Diameter, 𝐷𝑠 Trial Error 82 2.0828
Outside Diameter, 𝐷𝑜 Trial Error 1 0.0254
Inside Diameter, 𝐷𝑖 Trial Error 0.67 0.0170
Tebal tube, 𝑡𝑡𝑢𝑏𝑒 Trial Error 0.165 0.0042
Panjang Tube, 𝐿 Trial Error 216 5.4864
Tube Pitch, 𝑃𝑡 1.25𝐷𝑜 , T.E.M.A. 9th Ed 1.25 0.0318
Baffle Pitch, 𝑃𝑏 0.5𝐷𝑠 41 1.0414
Jumlah Tube, 𝑁𝑡𝑢𝑏𝑒 Trial Error 3250 tube
Opened Baffle General Opened Baffle, Mc.Cabe 25%
Shell, Channel, Head Thickness Min. Shell Thickness, T.E.M.A. 9th 7/16 in
Baffle Thickness Min. Baffle Thickness, T.E.M.A. 9th 3/8 in
𝑚𝑣𝑎𝑝𝑜𝑟 𝑖𝑛𝑙𝑒𝑡 1 1
Γ𝑏 =
𝑁𝑡𝑢𝑏𝑒 ∙ 𝐿 𝜇𝐿𝑠 2 3 4Γ𝑏 −3
ℎ𝑜 ( 3 2 ) = 1.47 ( )
188617/3600 𝑘𝐿𝑠 𝜌𝐿𝑠 𝑔 𝜇𝐿𝑠
Γ𝑏 = 1 1
(3210)(5.4864) 0.00014622 3 4(0.00316)
−
3
Γ𝑏 = 0.00316 𝑘𝑔/𝑚𝑠 ℎ𝑜 ( ) = 1.47 ( )
(0.0703)3 (746)2 (9.82) 0.0001462
ℎ𝑜 = 1483.37 𝑊/𝑚2 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 163
E-110
E-122
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
1 1
ℎ𝑑𝑜 = = BTU/ft 2 h°F = 2269.79 W/m2 ℃
𝑅𝑜 0.0025
1
𝑈𝑜 =
1 𝐷 𝑡 𝐷 1 1 𝐷 1
( ) ( 𝑜 ) + ( 𝑡 ) ( ̅𝑜 ) + ( ) + ( ) ( 𝑜 ) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0254 0.0042 0.0254 1 1 0.0254 1
( )( )+( )( )+( )+( )( )+( )
209.88 0.0170 45 0.0209 1483.37 2269.79 0.0170 2269.79
𝑈𝑜 = 144 𝑊/𝑚2 ℃
∆𝑇𝑓𝑤 = 68.63℃ 𝜆𝑐 = 2𝜋 ( )
𝑔(𝜌𝐿𝑡 − 𝜌𝑉𝑡 )
1
0.0584 2
𝜆𝑐 = 2𝜋 ( )
9.82(771.71 − 11.0187)
𝜆𝑐 = 0.0176 𝐽/𝑘𝑔
1
𝜆𝑐 𝜇𝑉𝑡 ∆𝑇𝑓𝑤 4 𝜆𝑐
ℎ𝑖 ( 3 ′
) = 0.59 + 0.069 ( )
𝑘𝑉𝑡 𝜌𝑉𝑡 (𝜌𝐿𝑡 − 𝜌𝑉𝑡 )𝜆 𝑔 𝐷𝑜
1
(0.0157)(0.0000120)(68.63) 4 0.0176
ℎ𝑖 ( ) = 0.59 + 0.069 ( )
(0.0290)3 (0.6453)(771.71 − 11.0187)(114491)(9.82) 0.0254
ℎ𝑖 = 209.33 𝑊/𝑚2 ℃
𝒉𝒐 ≈ 𝒉𝒐 𝒂𝒔𝒎𝒔𝒊
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 164
C-106
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝑛 = 0.199 ≈ 1
𝑃2 130
𝐶𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑖𝑜𝑛𝑅𝑎𝑠𝑖𝑜 = = = 1.28
𝑃1 101.3
𝑘−1
𝑘𝑍𝑅𝑇1 𝑃2 𝑘
𝐻𝑎𝑑 = [( ) − 1]
𝑀𝑟(𝑘 − 1) 𝑃1
1.403−1
(1.403)(0.9994)(8.314)(25 + 273) 130 1.403
𝐻𝑎𝑑 = [( ) − 1]
28.96(1.403 − 1) 101.3
𝐻𝑎𝑑 = 22110 𝑚
𝑤. 𝐻𝑎𝑑 𝑊𝑎𝑑
𝑊𝑎𝑑 = 𝑊=
1000 𝜂
(24.8111)(22110 ) 548.59
𝑊𝑎𝑑 = 𝑊=
1000 0.75
𝑊𝑎𝑑 = 548.59 𝑘𝑊 𝑊 = 734.45 𝑘𝑊
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 165
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Panas yang diambil di convective zone yakni panas untuk memanaskan steam tekanan 9990 kPa
temperature 389oC menjadi 500oC sebanyak 38192 kg/h dengan enthalpy masuk 12549 kJ/kg dan
enthalpy keluar 12858 kJ/kg
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 166
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Heat Rate Fired Heater Heat Rate (kW/m2) Heat Rate (kJ/hm2)
Radiant Zone 37.6 135360
Convective Zone 12.5 45000
Jika digunakan tube 16ft O.D. 4.5in maka jumlah radiant tube
𝐴𝑜 𝑟𝑎𝑑𝑖𝑎𝑛𝑡 𝑡𝑢𝑏𝑒 𝑚𝑖𝑛𝑖𝑚𝑎𝑙 𝑛𝑟𝑎𝑑𝑖𝑎𝑛𝑡 𝑡𝑢𝑏𝑒 𝑚𝑖𝑛𝑖𝑚𝑎𝑙
𝑛𝑟𝑎𝑑𝑖𝑎𝑛𝑡 𝑡𝑢𝑏𝑒 𝑚𝑖𝑛𝑖𝑚𝑎𝑙 = 𝑛𝑡𝑢𝑏𝑒 𝑝𝑒𝑟 𝑠𝑖𝑑𝑒 𝑤𝑎𝑙𝑙 =
𝐴𝑜 𝑝𝑒𝑟 𝑓𝑡 𝑡𝑢𝑏𝑒 ∙ 𝐿𝑡𝑢𝑏𝑒 𝑛𝑠𝑖𝑑𝑒 𝑤𝑎𝑙𝑙
12561 𝑓𝑡 2 666.37 𝑡𝑢𝑏𝑒
𝑛𝑟𝑎𝑑𝑖𝑎𝑛𝑡 𝑡𝑢𝑏𝑒 𝑚𝑖𝑛𝑖𝑚𝑎𝑙 = 𝑛𝑡𝑢𝑏𝑒 𝑝𝑒𝑟 𝑠𝑖𝑑𝑒 𝑤𝑎𝑙𝑙 =
(1.1781𝑓𝑡 2 /𝑓𝑡 ) ∙ 16 𝑓𝑡 40 𝑤𝑎𝑙𝑙
𝑛𝑡𝑢𝑏𝑒 𝑝𝑒𝑟 𝑠𝑖𝑑𝑒 𝑤𝑎𝑙𝑙 = 16.659
𝑛𝑟𝑎𝑑𝑖𝑎𝑛𝑡 𝑡𝑢𝑏𝑒 𝑚𝑖𝑛𝑖𝑚𝑎𝑙 = 666.37 𝑡𝑢𝑏𝑒
𝑛𝑡𝑢𝑏𝑒 𝑝𝑒𝑟 𝑠𝑖𝑑𝑒 𝑤𝑎𝑙𝑙 = 17 𝑡𝑢𝑏𝑒 𝑝𝑒𝑟 𝑤𝑎𝑙𝑙
𝑛𝑏𝑢𝑟𝑛𝑒𝑟 = 10
𝑛𝑠𝑖𝑑𝑒 𝑤𝑎𝑙𝑙 = 4(𝑛𝑏𝑢𝑟𝑛𝑒𝑟 ) 𝑛𝑟𝑎𝑑𝑖𝑎𝑛𝑡 𝑡𝑢𝑏𝑒 = 𝑛𝑡𝑢𝑏𝑒 𝑝𝑒𝑟 𝑠𝑖𝑑𝑒 𝑤𝑎𝑙𝑙 ∙ 𝑛𝑠𝑖𝑑𝑒 𝑤𝑎𝑙𝑙
𝑛𝑠𝑖𝑑𝑒 𝑤𝑎𝑙𝑙 = 4(10) 𝑛𝑟𝑎𝑑𝑖𝑎𝑛𝑡 𝑡𝑢𝑏𝑒 = (17)(40)
𝑛𝑠𝑖𝑑𝑒 𝑤𝑎𝑙𝑙 = 40 𝑤𝑎𝑙𝑙 𝑛𝑟𝑎𝑑𝑖𝑎𝑛𝑡 𝑡𝑢𝑏𝑒 = 680 𝑟𝑎𝑑𝑖𝑎𝑛𝑡 𝑡𝑢𝑏𝑒
17 tube/wall
18 ft
ctc = 6 in
Center to center tube
45 ft
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 167
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
6 ft 30 ft
SO2 Product Stream
Pipe O.D. 36 in
Convective Convective
10 ft
zone zone
2 ft
Radiant
18 ft Radiant
zone
zone
18 ft 45 ft
Material Selection
Object Require
Tube Material Temperature 650oC, Acid Resist SO2 , CO2 Stainless Steel 316
Tube Support Temperature 650oC, Acid Resist SO2 , CO2 Stainless Steel 316
Interior Temperature 650oC, Acid Resist SO2 , CO2 Stainless Steel 316
Insulation Material (Heuristic) Insulation 650oC 85% magnesia 25% Iron
Insulation Thickness (Heuristic) Insulation 650oC 2 in
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 168
E-123
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - MPS Heated MPS -
o
Temperature, 𝑡1 , 𝑡2 C 338.01 400.00 -
Pressure kPa 2700 2680 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 3669 4146 -
Heat Flow, J/kg- oC -476086782 -470829454 -
Mass Flow, 𝑚𝑡 kg/h 37111 37111 37111
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 2.3436 2.2366 2.2854
Mass Density, 𝜌𝑡 kg/m3 10.1150 8.9511 9.5331
Mass Enthalpi kJ/kg -12829 -12687 -
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0506 0.0574 0.0540
Viscosity, 𝜇𝑡 cP 0.0219 0.0246 0.0233
Heat Exchanger Duty kJ/h 5257328
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0010
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - 80 81 -
o
Temperature, 𝑇1 , 𝑇2 C 505.71 463.07 -
Pressure kPa 120 110 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 187786 193634 -
Heat Flow, J/kg- oC -231142037 -236399365 -
Mass Flow, 𝑚𝑠 kg/h 110044 110044 389181
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 1.1257 1.1157 1.1205
Mass Density, 𝜌𝑠 kg/m3 0.5860 0.5683 0.5772
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.0519 0.0494 0.0507
Viscosity, 𝜇𝑠 cP 0.0339 0.0325 0.0332
2
Fouling Factor, 𝑅𝑜 ft -°F-h/BTU 0.0025
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 1
(𝑡2 − 𝑇1 ) 505.71℃ − 463.07℃ 400℃ − 338.01℃
105.71℃ − 125.06℃ 𝑅= 𝑆=
𝐿𝑀𝑇𝐷 = 400℃ − 338.01℃ 505.71 ℃ − 338.01℃
105.71℃ 𝑅 = 0.6878 𝑆 = 0.3696
ln
125.06℃
𝐿𝑀𝑇𝐷 = 115.1109℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 169
E-102
E-123
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 170
E-123
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (1.1176)2 𝜋. (0.0508)2 𝑆𝑐 = (0.5588)(1.1176). (1 − 0.8)
𝑆𝑏 = (0.1955). − 4.6431.
4 4 𝑆𝑐 = 0.1249 𝑚2
𝑆𝑏 = 0.1824 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 167.6128 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 244.7326 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(167.6128)(244.7326) (1120.5)(0.0000332) 0,33 0.0507
ℎ𝑜 = 0,2 ((0.0508) ) ( )
0.0000332 0.0507 0.0508
ℎ𝑜 = 355.00 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0508 0.0020 0.0508 1 1 0.0508 1
( )( )+( )( )+( )+( )( )+( )
304.48 0.0468 45 0.0488 355.00 5674.47 0.0468 2269.79
2
𝑈𝑜 = 141.67 𝑊/𝑚 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 171
E-124
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - LPS Heated LPS -
o
Temperature, 𝑡1 , 𝑡2 C 182.27 252.00 -
Pressure kPa 260 239 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 29522 37288 -
Mass Flow, 𝑚𝑡 kg/h 37111 37111 37111
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 2.0649 2.0225 2.0498
Mass Density, 𝜌𝑡 kg/m3 1.2571 0.9953 1.1262
Mass Enthalpi kJ/kg -13094 -12951 -
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.0318 0.0385 0.0352
Viscosity, 𝜇𝑡 cP 0.0154 0.0183 0.0168
Heat Exchanger Duty kJ/h 5304524
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0010
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - 81 82 -
o
Temperature, 𝑇1 , 𝑇2 C 463.07 419.65 -
Pressure kPa 110 100 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 193634 200424 -
Heat Flow, J/kg- oC -2.36E+08 -2.42E+08 -
Mass Flow, 𝑚𝑠 kg/h 110044 110044 110044
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 1.1157 1.1050 1.1101
Mass Density, 𝜌𝑠 kg/m3 0.5683 0.5491 0.5587
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.0494 0.0469 0.0482
Viscosity, 𝜇𝑠 cP 0.0325 0.0312 0.0318
Fouling Factor, 𝑅𝑜 ft2-°F-h/BTU 0.0025
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 1
(𝑡2 − 𝑇1 ) 463.07℃ − 419.65℃ 252℃ − 182.27℃
211.07℃ − 237.38℃ 𝑅= 𝑆=
𝐿𝑀𝑇𝐷 = 252℃ − 182.27℃ 463.07℃ − 182.27℃
211.07℃ 𝑅 = 0.6227 𝑆 = 0.2483
ln
237.38℃
𝐿𝑀𝑇𝐷 = 223.97℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 172
E-102
E-124
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 173
E-124
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (0.9652)2 𝜋. (0.0508)2 𝑆𝑐 = (0.4826)(0.9652). (1 − 0.8)
𝑆𝑏 = (0.1955). − 6.2560.
4 4 𝑆𝑐 = 0.0932 𝑚2
𝑆𝑏 = 0.1304 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 234.4796 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 328.1180 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(234.4796)(328.1180) (1110.1)(0.0000318) 0,33 0.0482
ℎ𝑜 = 0,2 ((0.0508) ) ( )
0.0000318 0.0482 0.0508
ℎ𝑜 = 417.84 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0508 0.0020 0.0508 1 1 0.0508 1
( )( )+( )( )+( )+( )( )+( )
194.33 0.0468 45 0.0488 417.84 5674.47 0.0468 2269.79
2
𝑈𝑜 = 115.53 𝑊/𝑚 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 174
E-125
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
TUBE SIDE DATA FLUID Unit Inlet Tube Side Outlet Tube Side Average
Stream Number - BFW Heated BFW -
o
Temperature, 𝑡1 , 𝑡2 C 102.52 310.96 -
Pressure kPa 10021 10000 -
Actual Volume Flow, 𝑉̇𝑡 m3/h 40 55 -
Heat Flow, J/kg- oC -591534259 -554441854 -
Mass Flow, 𝑚𝑡 kg/h 38192 38192 38192
Mass Heat Capacity, 𝐶𝑝𝑡 kJ/kg- oC 4.1979 6.1440 4.6594
Mass Density, 𝜌𝑡 kg/m3 960.7715 688.2528 824.5121
Mass Enthalpi kJ/kg -15488 -14517 -
Thermal Conductivity, 𝑘𝑡 W/m- oC 0.6817 0.5209 0.6013
Viscosity, 𝜇𝑡 cP 0.2718 0.0868 0.0001793
Heat Exchanger Duty kJ/h 37092405
Fouling Factor, 𝑅𝑖 ft2-°F-h/BTU 0.0010
SHELL SIDE DATA FLUID Unit Inlet Shell Side Outlet Shell Side Average
Stream Number - 82 83 -
o
Temperature, 𝑇1 , 𝑇2 C 419.65 112.25 -
Pressure kPa 100 90 -
Actual Volume Flow, 𝑉𝑠̇ m3/h 200424 120510 -
Heat Flow, J/kg- oC -241703890 -278796295 -
Mass Flow, 𝑚𝑠 kg/h 110044 110044 110044
Mass Heat Capacity, 𝐶𝑝𝑠 kJ/kg- oC 1.1050 1.0160 1.0965
Mass Density, 𝜌𝑠 kg/m3 0.5491 0.9132 0.7311
Thermal Conductivity, 𝑘𝑠 W/m- oC 0.0469 0.0272 0.0370
Viscosity, 𝜇𝑠 cP 0.0312 0.0194 0.0000253
2
Fouling Factor, 𝑅𝑜 ft -°F-h/BTU 0.0025
Logarithmic Mean Temperature Differential (LMTD) dan faktor koreksi suhu (𝑭𝑻 )
(𝑡1 − 𝑇2 ) − (𝑡2 − 𝑇1 ) 𝑇1 − 𝑇2 𝑡2 − 𝑡1
𝐿𝑀𝑇𝐷 = 𝑅= 𝑆=
(𝑡 − 𝑇2 ) 𝑡2 − 𝑡1 𝑇1 − 𝑡1
ln 1
(𝑡2 − 𝑇1 ) 419.65℃ − 112.25℃ 310.96℃ − 102.52℃
108.69℃ − 9.73℃ 𝑅= 𝑆=
𝐿𝑀𝑇𝐷 = 310.96℃ − 102.52℃ 419.65℃ − 102.52℃
108.69℃ 𝑅 = 1.4748 𝑆 = 0.6573
ln
9.73℃
𝐿𝑀𝑇𝐷 = 41.0064℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 175
E-102
E-125
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 176
E-125
LAMPIRAN – BAGIAN 3 SPESIFIKASI PERALATAN PT. Company One Engineering
𝜋. 𝐷𝑠 2 𝜋. 𝐷𝑜 2 𝐷𝑜
𝑆𝑏 = 𝑓𝑏 . − 𝑁𝑏 . 𝑆𝑐 = 𝑃𝑏 . 𝐷𝑠 . (1 − )
4 4 1.25𝐷𝑜
𝜋. (1.6256)2 𝜋. (0.0191)2 𝑆𝑐 = (0.8128)(1.6256). (1 − 0.8)
𝑆𝑏 = (0.1955). − 14.8580.
4 4 𝑆𝑐 = 0.2643 𝑚2
𝑆𝑏 = 0.4015 𝑚2
𝑚𝑠 𝑚𝑠
𝐺𝑏 = = 76.1303 𝑘𝑔/𝑚2 𝑠 𝐺𝑐 = = 115.6744 𝑘𝑔/𝑚2 𝑠
𝑆𝑏 𝑆𝑐
0,6
√𝐺𝑏 . 𝐺𝑐 𝐶𝑝𝑠 𝜇𝑠 0,33 𝑘𝑠
ℎ𝑜 = 0,2 (𝐷𝑜 ) ( )
𝜇𝑠 𝑘𝑠 𝐷𝑜
0,6
√(76.1303)(115.6744) (1096.5)(0.0000253) 0,33 0.0370
ℎ𝑜 = 0,2 ((0.0191) ) ( )
0.0000253 0.0370 0.0191
ℎ𝑜 = 286.99 𝑊/𝑚2 ℃
1
𝑈𝑜 =
1 𝐷𝑜 𝑡𝑡 𝐷𝑜 1 1 𝐷 1
( ) ( ) + ( ) ( ̅ ) + ( ) + ( ) ( 𝑜) + ( )
ℎ𝑖 𝐷𝑖 𝑘𝑚 𝐷𝐿 ℎ𝑜 ℎ𝑑𝑖 𝐷𝑖 ℎ𝑑𝑜
1
𝑈𝑜 =
1 0.0191 0.0034 0.0191 1 1 0.0191 1
( )( )+( )( )+( )+( )( )+( )
3073.82 0.0122 45 0.0154 286.99 5674.47 0.0122 2269.79
2
𝑈𝑜 = 208.31 𝑊/𝑚 ℃
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 177
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 178
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
dengan filtrasi saja. Berikut adalah deskripsi pada masing-masing tahapan pengolahan
air PT. Company One Engineering:
- Filtrasi
Filtrasi digunakan untuk memisahkan sisa padatan tidak terlarut yang ada di raw
water. Jenis Filtrasi yang digunakana adalah filtrasi menggunakan membrane.
- Softening (Ion Exchange)
Garam terlarut yang terdapat di raw water khususnya ion Mg dan Ca yang dapat
menyebabkan scaling. Pemisahan garam ini menggunakan resin sodium zeolite(Z)
dengan reaksi adalah sebagai berikut:
𝑆𝑂4 𝑁𝑎2 𝑆𝑂4
𝐶𝑎 𝐶𝑎
[ ] . [ 2𝐶𝑙 ] + 𝑁𝑎2 . 𝑍 → 𝑍. [ ] + [ 2𝑁𝑎𝐶𝑙 ]
𝑀𝑔 𝑀𝑔
2𝐻𝐶𝑂3 2𝑁𝑎𝐻𝐶𝑂3
Resin ini diregenerasi dengan sodium klorida
𝐶𝑎 𝐶𝑎
𝑍. [ ] + 2𝑁𝑎𝐶𝑙 → 𝑁𝑎2 . 𝑍 + [ ] . 𝐶𝑙2
𝑀𝑔 𝑀𝑔
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 179
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
melalui vent. Perbedaan temperature sebesar 10oC antara BFW dan steam
harus dipenuhi untuk efektivitas fungsi dari dearator itu sendiri.
Chemical Agent untuk Boiler Feed Water
Proses ini berguna untuk memisahkan sisa CO2 dan O2 yang belum terpisah dari
proses deaerasi dan sisa garam yang belum terpisah dari proses Ion exchange.
Hydroquinone ditambahkan sebagai O2 scavenger dan senyawa antiscalant
seperti Chelants atau Polyphosphates untuk menahan sisa Ca atau Mg agar
tidak terjadi fouling pada boiler. Dalam proses produki steam dalam boiler,
komponen-komponen sisa tersebut akan dibuang melalui system blowdown
pada boiler
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 180
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Gambar 4.1 Sistem Pengelolaan dan Distribusi Air PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 181
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
- Evaporation lost
Evaporation lost berdasarkan wallas yakni 1% cooling water total dari setiap 10oF
temperatur drop cooling water di cooling tower
𝑡𝑒𝑚𝑝𝑒𝑟𝑎𝑡𝑢𝑟 𝑑𝑟𝑜𝑝 𝑐𝑜𝑜𝑙𝑖𝑛𝑔 𝑤𝑎𝑡𝑒𝑟
𝐸𝑣𝑎𝑝𝑜𝑟𝑎𝑡𝑖𝑜𝑛 𝑙𝑜𝑠𝑡 = 𝑚 (0.01 )
10oF
45℃ − 30℃
𝐸𝑣𝑎𝑝𝑜𝑟𝑎𝑡𝑖𝑜𝑛 𝑙𝑜𝑠𝑡 = 1201236 𝑘𝑔/ℎ (0.01 )
10℉
59℉
𝐸𝑣𝑎𝑝𝑜𝑟𝑎𝑡𝑖𝑜𝑛 𝑙𝑜𝑠𝑡 = 1201236 𝑘𝑔/ℎ (0.01 )
10℉
𝐸𝑣𝑎𝑝𝑜𝑟𝑎𝑡𝑖𝑜𝑛 𝑙𝑜𝑠𝑡 = 70873 𝑘𝑔/ℎ
- Blowdown
Blowdown cooling water dihitung berdasarkan referensi Robin Smith dengan konsep
cycle of concentration (CC). Cycle of concentration adalah 5 untuk operasi cooling
tower pada umumnya
𝐸𝑣𝑎𝑝𝑜𝑟𝑎𝑡𝑖𝑜𝑛 𝑙𝑜𝑠𝑡
𝐵𝑙𝑜𝑤𝑑𝑜𝑤𝑛 =
𝐶𝐶 − 1
70873 𝑘𝑔/ℎ
𝐵𝑙𝑜𝑤𝑑𝑜𝑤𝑛 =
5−1
𝐵𝑙𝑜𝑤𝑑𝑜𝑤𝑛 = 17718 𝑘𝑔/ℎ
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 182
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
- Blowdown
Blowdown cooling water dihitung berdasarkan referensi Robin Smith dengan konsep
cycle of concentration (CC). Cycle of concentration adalah 5 untuk operasi cooling tower
pada umumnya
𝐶𝑜𝑛𝑑𝑒𝑛𝑠𝑎𝑡𝑒 𝑙𝑜𝑠𝑡 𝑝𝑜𝑤𝑒𝑟 𝑔𝑒𝑛𝑒𝑟𝑎𝑡𝑖𝑜𝑛
𝐵𝑙𝑜𝑤𝑑𝑜𝑤𝑛 𝑚𝑎𝑖𝑛 𝑏𝑜𝑖𝑙𝑒𝑟 =
𝐶𝐶 − 1
7422𝑘𝑔/ℎ
𝐵𝑙𝑜𝑤𝑑𝑜𝑤𝑛 𝑚𝑎𝑖𝑛 𝑏𝑜𝑖𝑙𝑒𝑟 =
5−1
𝐵𝑙𝑜𝑤𝑑𝑜𝑤𝑛 𝑚𝑎𝑖𝑛 𝑏𝑜𝑖𝑙𝑒𝑟 = 1856 𝑘𝑔/ℎ
35 m3/hari
Total Air Sanitasi
1458 kg/h
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 183
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 184
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 185
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Tabel 4.6 Detail Kebutuhan Listrik Untuk Fasitilas Lain (Penerangan Area Pabrik)
Listrik per Total
Luas Luas Lumen
Nama Area Cd Lumen Lampu Listrik
(m2) (ft2) Lampu
(kW) (kW)
Area Produksi 2562 27577 40 1103084 20000 0.218 12.02
Utilitas Steam dan
800 8611 40 344445 20000 0.218 3.75
Listrik
Utilitas Penyediaan
800 8611 40 344445 20000 0.218 3.75
Air
Utilitas Refrigerasi 242 2608 40 104314 20000 0.218 1.14
Utilitas Pengolahan
727 7824 30 234707 20000 0.218 2.56
Limbah
Area Perluasan 2277 24509 5 122545 20000 0.218 1.34
Parkir 3364 36212 10 362116 20000 0.218 3.95
Lapangan 362 3901 10 39006 20000 0.218 0.43
Jalan 6167 66381 10 663807 20000 0.218 7.24
Air Sungai Treatment 396 4263 30 127875 20000 0.218 1.39
Raw Water Basin 700 7535 10 75347 20000 0.218 0.82
Total Penerangan Outdor 38.39
Tabel 4.7 Detail Kebutuhan Listrik Untuk Fasitilas Gedung (Penerangan dan Peralatan Listrik)
Luas Daya Rata-Rata 1 Tahun Daya per Tahun Listrik
Nama Gedung 2 2
(m ) per Luas (kWh/m year) (kWh/ year) (kW)
Control Room Produksi
720 228 164160 18.74
(3 lantai)
Control Room Utilitas
720 228 164160 18.74
(3 lantai)
RnD dan Laboratorium
1080 313 338040 38.59
(3 lantai)
Ruang Maintenance 477 313 149245 17.04
Kantor (5 lantai) 2279 228 519617 59.32
Poliklinik (2 lantai) 192 313 60021 6.85
Kantin (2 lantai) 373 242 90202 10.30
Masjid (2 lantai) 603 190 114488 13.07
Pos Keamanan 80 228 18240 2.08
Total Penggunaan Listrik Dalam Gedung (Penerangan dan Peralatan Listrik) 184.72
Total kebutuhan listrik adalah 8650 kW sehingga PT. Company One Engineering memiliki
kelebihan listrik sebesar 2354 kW.
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 186
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Gambar 4.2 Sistem Penyediaan dan Distribusi Steam Serta Listrik beresta Sistem Sirkulasi Dowtherm A Thermal Fluid PT. Company One Engineering.
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 187
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
4.2.3 Simulasi Unit Penyediaan Steam, Listrik, dan Sirkulasi Dowtherm A Thermal Fluid
• Fluid Package
- Fluid Package untuk steam adalah ASME Steam, Fluid Package untuk Dowtherm A
Thermal Fluid adalah PRSV.
- Komposisi Dowtherm A Thermal Fluid yakni 10% BiPhenyl C12H10 dan 90% diPH-Ether
C12H10O
• Menentukan jumlah sirkulasi Dowtherm A Thermal Fluid
- Set fraksi uap Dowtherm A Thermal Fluid masuk E-112 E-122 dan boiler E-201 yakni 1
dan keluar exchanger tersebut adalah 0 pada tekanan 550 kPa. Yakni tekanan agar
temperatur saturated DowThrem 350oC yakni diatas temperature fluida dingin E-112
E-122 dan boiler E-201
- Set temperature convective zone adalah 600oC
- Dengan demikian jumlah sirkulasi Dowtherm A Thermal Fluid akan terhitung dengan
jumlah 649624 kg/h
• Menentukan sisa panas Dowtherm A yang akan digunakan untuk boiler E-201
- Set energi stream pada E-112 dan E-122 sesuai dengan heat yang diperlukan masing-
masing exchanger yakni 45871639 kJ/h dan 4876449 kJ/h
- Dengan demikian sisa panas Dowtherm A yang akan digunakan untuk boiler E-201
akan terhitung dengan jumlah 63352026 kJ/h
• Set up pada Boiler E-201
- Tekanan steam boiler yang dipilih adalah 10000 kPa dan fraksi uap steam boiler adalah
1.
- Maka temperatur steam keluar boiler adalah 310oC. Temperatur harus dibawah
temperatur pemenas boiler yakni 350oC
• Set up Convective Zone FH-102
- Pressure drop yakni 3 psi untuk steam dan 10 psi untuk hot gas SO2 (stream 80)
- Temperatur steam keluar Convective Zone FH-102 diset 500 untuk steam yakni
temperature dibawah hot gas SO2 (stream 80) keluar Convective Zone FH-102
• Set up Turbin
- Tekanan discharge turbin 1 (turbin ekstraksi) adalah 2700 kPa. Tekanan dipilih
karena sebagian steam tekanan 2700 akan diambil untuk konsumsi di unit produksi
- Laju alir massa HPS to Proses adalah 1081 kg/h
- Tekanan discharge turbin 2 adalah 260 kPa. Yakni tekanan terkecil sampai steam
masih berfasa uap.
- Tekanan discharge turbin 3 (turbin condensing) adalah 15 kPa. Tekanan steam yang
masih berfasa uap dan agar temperatur kondensasi pada condenser adalah 40oC
dengan pressure drop condenser 4 kPa
- Temperatur masuk turbin 2 yakni 400oC
- Temperatur masuk turbin 3 atau s9 diasumsikan awal 252oC
• Set up aliarn condensate lost, condenser E-202, condensate pump P-201
- Aliran kondensate lost power generation adalah 20% steam keluar condensing
turbin
- Fraksi condensate keluar E-202 adalah 0
- Tekanan discharge P-201 dalah 105 kPa yakni sedikit diatas tekanan atmosfer agar
vent deaerator dapat bekerja.
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 188
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 189
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Simulasi Unit Penyediaan Steam, Listrik, dan Sirkulasi Dowtherm A Thermal Fluid
Gambar 4.3 Proses Simulasi Unit Penyediaan Steam, Listrik, dan Sirkulasi Dowtherm A Thermal Fluid
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 190
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 191
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
- Pengendalian Temperatur Aliran Masuk Kompressor oleh Intercooler E-102 dan E-103
Temperatur aliran masuk kompressor oleh Intercooler E-102 dan E-103 (stream 4 dan 7)
diatur dengan memanipulasi stream masing-masing pendingin yakni cooling water.
Temperatur stream keluaran Intercooler dibaca dan dikirim oleh TT (temperture
trasnmitan) ke TRC (Temperature Record Control) untuk dimonitor oleh operator. Jika
temperatur terlalu tinggi atau rendah maka alarm pada TAL (Temperature Alarm Low) dan
TAH (Temperature Alarm High) akan berbunyi. Signal tersebut diteruskan dan diolah oleh
TY untuk menentukan tindakan. Signal hasil pengolahan diteruskan ke FIC (Flow Indicator
Control) untuk mengubah signal menjadi tindakan memperbesar atau memperkecil
bukaan masing-masing control valve cooling water
- Feed Ratio Control Process (Stream 9)
Laju alir massa HPS (stream 9) harus dijaga dengan perbandingan yang tepat terhadap
aliran waste aci gas (stream 8). Laju alir massa stream 8 dikendalikan oleh Feed Ratio
Control dengan membaca variabel laju alir volume, temperatur, dan tekanan kedua
stream 8 dan 9. Variabel-variabe tersebut diolah oleh Feed Ratio Control sehingga
diketahui Mass Feed Ratio Stream 8 dan 9. Feed Ratio Control juga mengolah signal input
untuk menentukan tindakan pada bukaan control valve dengan mengirimkan signal hasil
olahan ke FIC. Sistem alarm dan monitoring juga dibuat dengan menggunakan FRRC (Feed
Ration Record Control) untuk dimonitor oleh operator dan FRAL (Feed Ratio Alarm Low)
dan FRAH (Feed Ratio Alarm High) yang akan berbunyi jika feed ration terlalu tinggi atau
rendah.
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 192
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Gambar 4.4 Sistem Pengendalian dan Instrumentasi Unit Waste Acid Gas Multistage Compression PT. Company One Engineering.
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 193
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 194
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
berbunyi. Signal tersebut diteruskan dan diolah oleh TY untuk menentukan tindakan.
Signal hasil pengolahan diteruskan ke FIC untuk mengubah signal menjadi tindakan
memperbesar atau memperkecil bukaan control valve cooling water.
- Level Cairan Separator Vessel V-101
Level cairan V-101 diatur dengan memanipulasi stream keluaran V-101 untuk liquid
(stream 17). Level cairan V-100 dibaca dan dikirim oleh LT (Level Transmitan) ke LRC (Level
Record Control) untuk dimonitor oleh operator. Jika level terlalu tinggi atau rendah maka
alarm pada TAL (Level Alarm Low) dan TAH (Level Alarm High) akan berbunyi. Signal
tersebut diteruskan dan diolah oleh LY (Level Relay) untuk menentukan tindakan. Signal
hasil pengolahan diteruskan ke FIC (Flow Indicator Control) untuk mengubah signal
menjadi tindakan memperbesar atau memperkecil bukaan control valve stream 17.
- Tekanan Separator Vessel V-101
Tekanan V-101 diatur dengan memanipulasi stream keluaran V-100 untuk vapor
(stream 18). Tekanan V-101 dibaca dan dikirim oleh PT ke PRC untuk dimonitor oleh
operator. Jika tekanan terlalu tinggi atau rendah maka alarm pada PAL dan PAH akan
berbunyi. Signal tersebut diteruskan dan diolah oleh PY untuk menentukan tindakan.
Signal hasil pengolahan diteruskan ke FIC untuk mengubah signal menjadi tindakan
memperbesar atau memperkecil bukaan control valve stream 18.
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 195
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Gambar 4.5 Sistem Pengendalian dan Instrumentasi Unit Konversi COS ke H2S PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 196
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 197
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 198
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
berbunyi. Signal tersebut diteruskan dan diolah oleh PY untuk menentukan tindakan. Signal
hasil pengolahan diteruskan ke FIC untuk mengubah signal menjadi tindakan memperbesar
atau memperkecil bukaan control valve pump P-102A/B yang terhubung dengan pipa suction
pump. Sehingga tekanan suction pump akan berubah dan diikuti dengan berubahnya tekanan
discharge pump.
- Pengendalian Temperature Stream 39 dari E-108
Temperatur keluar E-108 diatur dengan memanipulasi stream pendingin yakni cooling water.
Temperatur stream 39 dibaca dan dikirim oleh TT ke TRC untuk dimonitor oleh operator. Jika
temperatur terlalu tinggi atau rendah maka alarm pada TAL dan TAH akan berbunyi. Signal
tersebut diteruskan dan diolah oleh TY untuk menentukan tindakan. Signal hasil pengolahan
diteruskan ke FIC untuk mengubah signal menjadi tindakan memperbesar atau memperkecil
bukaan control valve cooling water.
- Pengendalian Tekanan Stream 40 dari P-101 A/B
Tekanan stream 40 diatur dengan memanipulasi bukaan control valve pada pump P-101A atau
P-101B. Tekanan discharge pump dibaca dan dikirim oleh PT ke PRC untuk dimonitor oleh
operator. Jika tekanan terlalu tinggi atau rendah maka alarm pada PAL dan PAH akan
berbunyi. Signal tersebut diteruskan dan diolah oleh PY untuk menentukan tindakan. Signal
hasil pengolahan diteruskan ke FIC untuk mengubah signal menjadi tindakan memperbesar
atau memperkecil bukaan control valve pump P-101A atau P-101B yang terhubung dengan
pipa suction pump. Sehingga tekanan suction pump akan berubah dan diikuti dengan
berubahnya tekanan discharge pump.
- Pengendalian Temperature Stream 41 dari E-109
Temperatur keluar E-109 diatur dengan memanipulasi stream pendingin yakni refrigerant
NH3. Temperatur stream 41 dibaca dan dikirim oleh TT ke TRC untuk dimonitor oleh operator.
Jika temperatur terlalu tinggi atau rendah maka alarm pada TAL dan TAH akan berbunyi. Signal
tersebut diteruskan dan diolah oleh TY untuk menentukan tindakan. Signal hasil pengolahan
diteruskan ke FIC untuk mengubah signal menjadi tindakan memperbesar atau memperkecil
bukaan control valve refrigerant NH3.
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 199
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Gambar 4.6 Sistem Pengendalian dan Instrumentasi Unit CO2 Removing 1 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 200
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
4.3.4 Sistem Pengendalian dan Instrumentasi Unit Acid Gas Multistage Compression
Pada rangkaian alat Multistage Compression terdapat beberapa variabel yang dikendalikan
yakni tekanan akhir pada stream 51, dan temperatur gas keluar kedua intercooler.
- Pengendalian Tekanan Akhir Stream 51
Multistage Compression (C-104 C-105) bertujuan untuk meningkatkan tekanan hingga 1171
kPa pada stream 51. Sistem pengendalian mutistage compressor ini dilakukan dengan cara
signal tekanan stream 51akan mengubah kompressi ratio C-104 kemudian signal kompressi
ratio C-103 digunakan untuk mengubah kompresi ratio kompresor C-105. Mula-mula tekanan
stream 51 dibaca dan ditransmisikan ke PRC untuk dimonitor oleh operator. Jika tekanan
terlalu tinggi atau rendah maka alarm pada PAL dan PAH akan berbunyi. Signal input
diteruskan dioleh oleh PIC kemudian diteruskan ke SIC untuk mengubah signal menjadi
tindakan mempercepat atau memperlambat kecepatan impeler kompresor C-104, dengan
demikian ratio kompresi C-104 akan berubah. Ratio kompressi (∆P) C-104 serta tekanan dan
temperatur masuk C-104 dibaca dan signalnya dikirim ke FFIC yakni sebagai Compressor Ratio
Dividing Control untuk diolah. Hasil pengolahan signal tersebut dikirim ke SIC untuk mengatur
ratio kompresi C-105. FFIC juga memerlukan data ratio kompresi serta tekanan dan
temperatur aliran masuk C-105.
- Pengendalian Temperatur Keluaran Intercooler E-113 dan E-115
Temperatur keluaran Intercooler E-113 dan E-115 (stream 47 dan 50) diatur dengan
memanipulasi stream masing-masing pendingin yakni BFW. Temperatur stream keluaran
Intercooler dibaca dan dikirim oleh TT ke TRC untuk dimonitor oleh operator. Jika temperatur
terlalu tinggi atau rendah maka alarm pada TAL dan TAH akan berbunyi. Signal tersebut
diteruskan dan diolah oleh TY untuk menentukan tindakan. Signal hasil pengolahan diteruskan
ke FIC untuk mengubah signal menjadi tindakan memperbesar atau memperkecil bukaan
masing-masing control valve BFW.
- Pengendalian Temperatur Keluaran Intercooler E-114 dan E-116
Temperatur keluaran Intercooler E-114 dan E-116 (stream 48 dan 51) diatur dengan
memanipulasi stream masing-masing pendingin yakni cooling water. Temperatur stream
keluaran Intercooler dibaca dan dikirim oleh TT ke TRC untuk dimonitor oleh operator. Jika
temperatur terlalu tinggi atau rendah maka alarm pada TAL dan TAH akan berbunyi. Signal
tersebut diteruskan dan diolah oleh TY untuk menentukan tindakan. Signal hasil pengolahan
diteruskan ke FIC untuk mengubah signal menjadi tindakan memperbesar atau memperkecil
bukaan masing-masing control valve cooling water.
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 201
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Gambar 4.7 Sistem Pengendalian dan Instrumentasi Acid Gas Unit Multistage Compression PT.
Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 202
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 203
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 204
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
berbunyi. Signal tersebut diteruskan dan diolah oleh PY untuk menentukan tindakan. Signal
hasil pengolahan diteruskan ke FIC untuk mengubah signal menjadi tindakan memperbesar
atau memperkecil bukaan control valve pump P-104A/B yang terhubung dengan pipa suction
pump. Sehingga tekanan suction pump akan berubah dan diikuti dengan berubahnya tekanan
discharge pump.
- Pengendalian Temperature Stream 72 dari E-118
Temperatur keluar E-118 diatur dengan memanipulasi stream pendingin yakni cooling water.
Temperatur stream 72 dibaca dan dikirim oleh TT ke TRC untuk dimonitor oleh operator. Jika
temperatur terlalu tinggi atau rendah maka alarm pada TAL dan TAH akan berbunyi. Signal
tersebut diteruskan dan diolah oleh TY untuk menentukan tindakan. Signal hasil pengolahan
diteruskan ke FIC untuk mengubah signal menjadi tindakan memperbesar atau memperkecil
bukaan control valve cooling water.
- Pengendalian Tekanan Stream 73 dari P-103 A/B
Tekanan stream 73 diatur dengan memanipulasi bukaan control valve pada pump P-103A atau
P-103B. Tekanan discharge pump dibaca dan dikirim oleh PT ke PRC untuk dimonitor oleh
operator. Jika tekanan terlalu tinggi atau rendah maka alarm pada PAL dan PAH akan
berbunyi. Signal tersebut diteruskan dan diolah oleh PY untuk menentukan tindakan. Signal
hasil pengolahan diteruskan ke FIC untuk mengubah signal menjadi tindakan memperbesar
atau memperkecil bukaan control valve pump P-103A atau P-103B yang terhubung dengan
pipa suction pump. Sehingga tekanan suction pump akan berubah dan diikuti dengan
berubahnya tekanan discharge pump.
- Pengendalian Temperature Stream 74 dari E-119
Temperatur keluar E-119 diatur dengan memanipulasi stream pendingin yakni refrigerant
NH3. Temperatur stream 74 dibaca dan dikirim oleh TT ke TRC untuk dimonitor oleh operator.
Jika temperatur terlalu tinggi atau rendah maka alarm pada TAL dan TAH akan berbunyi. Signal
tersebut diteruskan dan diolah oleh TY untuk menentukan tindakan. Signal hasil pengolahan
diteruskan ke FIC untuk mengubah signal menjadi tindakan memperbesar atau memperkecil
bukaan control valve refrigerant NH3.
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 205
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Gambar 4.8 Sistem Pengendalian dan Instrumentasi Unit CO2 Removing 2 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 206
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 207
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Sistem alarm dan monitoring juga dibuat dengan menggunakan FRRC (Feed Ration Record Control) untuk dimonitor oleh operator dan FRAL (Feed Ratio Alarm Low) dan FRAH (Feed Ratio Alarm High) yang akan berbunyi
jika feed ration terlalu tinggi atau rendah.
Gambar 4.9 Sistem Pengendalian dan Instrumentasi Unit Konversi H2S ke SO2 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 208
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 209
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Tabel 4.8 Hazard Operability Study (HAZOP) PT. Company One Engineering
Multi Stage Compresssor (C-101, C-102, C-103, E-101, E-102, E-103, E-104)
Possible
Equip. Element Deviation Consequences Safeguard Action
Causes
C-100 Pressure High Kecepatan impeller melebihi batas Tempearatur keluar kompresso Pressure Alarm Maintenance Compressor Control yang
C-101 akibat kesalahan Speed Control naik, Pressure naik, beban listrik High bersangkutan
C-102 naik
Low Kecepatan impeller kurang akibat Tekanan tidak sesuai spesifikasi Pressure Alarm Maintenance Compressor Control
kesalahan Speed Control Low yang bersangkutan
Intercooler Temp. High Laju alir BFW kurang akibat kesalahan Beban pendingin E-102 dan E-104 Temperature Maintenance Flow Control, dan
E-101 dan E-103 Flow Control meningkat Alarm High lakukan manual kontrol pada aliran
cooling water
Temp. High Adanya tumpukan scale pada tube Beban pendingin E-102 dan E-104 Temperature Membersihkan tube dari scale
meningkat Alarm High
Intercooler Temp. High Laju alir cooling water kurang akibat Efisiensi kompresor berkurang Temperature Maintenance Flow Control, dan
E-102 dan E-104 kesalahan Flow Control Alarm High lakukan manual kontrol pada aliran
cooling water
Temp. High Adanya tumpukan scale pada tube Efisiensi kompresor berkurang Temperature Membersihkan tube dari scale
Alarm High
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 210
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Tabel 4.8 Hazard Operability Study (HAZOP) PT. Company One Engineering (lanjutan)
Possible
Equip. Element Deviation Consequences Safeguard Action
Causes
Low Udara terlalu sedikit akibat kesalahan Pembakaran tidak sempurna, Temperature Maintenance Flow Control, dan
Flow Control Udara Terbentuk jelaga karbon pada tube, Alarm Low lakukan manual kontrol pada aliran
reaksi pada PFR menjadi lambat dan udara
konversi kurang
PFR-101 Temp. High Fluida pendingin BFW kurang akibat Temperature tidak sesuai Temperature Maintenance Flow Control, dan
kesalahan Flow Control spesifikasi, berkemungkinan terjadi Alarm Low lakukan manual kontrol pada aliran
reaksi samping pendingin BFW
Cooler Temp. High Laju alir cooling water kurang akibat Efisiensi pemisahan pada flash drum Temperature Maintenance Flow Control, dan
E-106 kesalahan Flow Control V-101 berkurang Alarm High lakukan manual kontrol aliran cooling
water
Temp. High Adanya tumpukan scale pada tube Efisiensi pemisahan pada flash drum Temperature Membersihkan tube dari scale
V-101 berkurang Alarm High
Flash Drum Pressure High Aliran Gas keluar kurang Vessel dapat meledak Pressure Alarm Maintenance Flow Control, dan
V-101 High, lakukan manual kontrol pada aliran gas
System vent
Low Aliran Gas keluar terlalu banyak Pemisahan uap cair tidak sesusi Pressure Alarm Maintenance Flow Control, dan
spesifikasi, terlalu banyak air yang Low lakukan manual kontrol pada aliran gas
terbawa
Level High Aliran cairan keluar terlalu rendah Cairan dapat masuk ke pipa kluar Level Alarm Maintenance Flow Control, dan
gas High, sistem lakukan manual kontrol pada aliran
emergency cairan
drain
Low Aliran cairan keluar terlalu tinggi Gas dapat masuk ke pipa kluar Level Alarm Maintenance Flow Control, dan
Cairan Low lakukan manual kontrol pada aliran
cairan
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 211
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Tabel 4.8 Hazard Operability Study (HAZOP) PT. Company One Engineering (lanjutan)
Absorption Tower (T-101, T-103), Selexol - Refrigerant Cooler (E-108, E-118), Selexol Pump (P-101, P-103)
Possible
Equip. Element Deviation Consequences Safeguard Action
Causes
Absorpstion Pressure High Pressure control valve tidak bekerja CO2 terlalu banyak terabsorp, Pressure Alarm Maintenance Pressure Control, dan
Tower dengan baik Kolom dapat pecah High lakukan manual kontrol
T-101 dan T-103 Low Pressure control valve tidak bekerja H2S terlalu banyak tidak terabsorp Pressure Alarm Maintenance Pressure Control, dan
dengan baik Low lakukan manual kontrol,
Refrigerant Temp. High Laju alir refrigerant kurang akibat Efisiensi pemisahan di absorption Temperature Maintenance Flow Control, dan
Cooler kesalahan Flow Control tower berkurang, H2S banyak tidak Alarm High lakukan manual kontrol pada aliran
E-108, E-118 terabsorp refrigerant NH3
Low Laju alir refrigerant lebih akibat Efisiensi pemisahan di absorption Temperature Maintenance Flow Control, dan
kesalahan Flow Control tower berkurang, CO2 banyak Alarm Low lakukan manual kontrol pada aliran
terabsorp refrigerant NH3
Pump Selexol Pressure Low Pressure control valve tidak bekerja Aliran selexol tidak mencapai kolom Pressure Alarm Maintenance Pressure Control, dan
P-101 dan P-103 dengan baik absorber Low lakukan manual kontrol,
Low Speed Impeller tidak bekerja baik Aliran selexol tidak mencapai kolom Pressure Alarm Maintenance Pump
absorber Low
High Pressure control valve tidak bekerja Pump casing dapat pecah Pressure Alarm Maintenance Pressure Control, dan
dengan baik High lakukan manual kontrol,
Distilastion Temp. High Laju Reflux terlalu rendah Komposisi tidak sesuai, terlalu Temperatur Maintenance Flow Control, dan
T-102 dan T-104 Top Stage banyak fraksi berat (selexol) Alarm High lakukan manual kontrol pada aliran
reflux
Low Laju Reflux terlalu tinggi Komposisi tidak sesuai Temperatur Maintenance Pressure Control, dan
Alarm Low lakukan manual kontrol pada aliran
reflux
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 212
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Tabel 4.8 Hazard Operability Study (HAZOP) PT. Company One Engineering (lanjutan)
Possible
Equip. Element Deviation Consequences Safeguard Action
Causes
Temp. High Laju uap dari reboiler terlalu banyak Komposisi tidak sesuai, terlalu Temperatur Maintenance Flow Control, dan
Bottom banyak fraksi berat (selexol) Alarm High lakukan manual kontrol pada aliran
Stage pemanas reboiler
Low Laju uap dari reboiler terlalu sedikit Komposisi tidak sesuai Temperatur Maintenance Pressure Control, dan
Alarm Low lakukan manual kontrol pada aliran
pemanas reboiler
Condenser Temp. High Laju alir cooling water kurang akibat Fraksi berat banyak tidak Temperatur Maintenance Flow Control, dan
Partial kesalahan Flow Control terkondensasi Alarm High lakukan manual kontrol pada aliran
E-110 dan E-120 Beban pendingin E-111 dan E-121 pendingin cooling water
meningkat
Condenser Temp. High Laju alir cooling water kurang akibat Fraksi berat banyak tidak Temperatur Maintenance Flow Control, dan
Partial kesalahan Flow Control terkondensasi Alarm High lakukan manual kontrol pada aliran
E-111 dan E-121 pendingin BFW
Condensate Pressure High Terlalu banyak uap pada vesel Vesel dapat pecah Pressure Alarm Buka vent secara manual jika vent tidak
Akumulator High, sistem bekerja
V-102 dan emergency
V-103 vent
Level High Terlalu banyak cairan dalam vesel Cairan dapat masuk ke vent valve Level Alarm Buka drain secara manual jika drain
High, sistem valve tidak bekerja
emergency
drain
Condensate Level Low Terlalu sedikit cairan dalam vesel Jika cairan habis maka tidak akan Level Alarm Kurangi sedikit laju reflux sebelum level
Akumulator ada aliran reflux sehingga Low cairan terlalu sedikit atau habis
V-102 dan pemisahan di tower distilasi akan
V-103 terganngu
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 213
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Tabel 4.8 Hazard Operability Study (HAZOP) PT. Company One Engineering (lanjutan)
Possible
Equip. Element Deviation Consequences Safeguard Action
Causes
Pump Reflux Pressure Low Pressure control valve tidak bekerja Aliran reflux tidak mencapai kolom Pressure Alarm Maintenance Pressure Control, dan
P-102 dan P-104 dengan baik distilasi Low lakukan manual kontrol
Low Speed Impeller tidak bekerja baik Aliran reflux tidak mencapai kolom Pressure Alarm Maintenance Pump
distilasi Low
High Pressure control valve tidak bekerja Pump casing dapat pecah Pressure Alarm Maintenance Pressure Control, dan
dengan baik High lakukan manual kontrol,
Selexol – Cooling Water Cooler (E-107 dan E-117)
Possible
Equip. Element Deviation Consequences Safeguard Action
Causes
Cooler Temp. High Laju alir cooling water kurang akibat Beban pendingin refrigerant pada Temperature Maintenance Flow Control, dan
E-107 dan E-117 kesalahan Flow Control cooler selanjutnya meningkat Alarm High lakukan manual kontrol pada aliran
cooling water
Temp. High Adanya tumpukan scale pada tube Beban pendingin refrigerant pada Temperature Membersihkan tube dari scale
cooler selanjutnya meningkat Alarm High
Multi Stage Compresssor (C-104, C-105, E-113, E-114, E-115 dan E-116)
Possible
Equip. Element Deviation Consequences Safeguard Action
Causes
C-104 Pressure High Kecepatan impeller melebihi batas Tempearatur keluar kompresso Pressure Alarm Maintenance Compressor Control yang
C-105 akibat kesalahan Speed Control naik, Pressure naik, beban listrik High bersangkutan
naik
Low Kecepatan impeller kurang akibat Tekanan tidak sesuai spesifikasi Pressure Alarm Maintenance Compressor Control
kesalahan Speed Control Low yang bersangkutan
Intercooler Temp. High Laju alir BFW kurang akibat kesalahan Beban pendingin E-114 dan E-116 Temperature Maintenance Flow Control, dan
E-113 dan E-115 Flow Control meningkat Alarm High lakukan manual kontrol pada aliran
BFW
Temp. High Adanya tumpukan scale pada tube Beban pendingin E-114 dan E-116 Temperature Membersihkan tube dari scale
meningkat Alarm High
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 214
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Possible
Equip. Element Deviation Consequences Safeguard Action
Causes
Intercooler Temp. High Laju alir cooling water kurang akibat Efisiensi kompresor berkurang Temperature Maintenance Flow Control, dan
E-114 kesalahan Flow Control Alarm High lakukan manual kontrol pada aliran
cooling water
Temp. High Adanya tumpukan scale pada tube Efisiensi kompresor berkurang Temperature Membersihkan tube dari scale
Alarm High
Cooler E-115 Temp. High Laju alir cooling water kurang akibat Efisiensi pemisahan pada tower Temperature Maintenance Flow Control, dan
kesalahan Flow Control absorpsi T-103 berkurang, H2S Alarm High lakukan manual kontrol pada aliran
banyak tidak terabsorsi cooling water
Temp. High Adanya tumpukan scale pada tube Efisiensi pemisahan pada tower Temperature Membersihkan tube dari scale
absorpsi T-103 berkurang, H2S Alarm High
banyak tidak terabsorsi
Temp. Low Laju alir cooling water lebih akibat Efisiensi pemisahan di absorption Temperature Maintenance Flow Control, dan
kesalahan Flow Control tower kurang, CO2 banyak terabsorp Alarm Low lakukan manual kontrol pada aliran CW
Fired Heater FH-102, Compressor Udara C-106, Feed Rasio Acid Gas – Udara
Possible
Equip. Element Deviation Consequences Safeguard Action
Causes
Fired Heater FH- Temp. High Laju alir thermal fluid kurang akibat Panas terbuang dan tidak Temperature Maintenance Flow Control, dan
102 kesalahan Flow Control terecovery Alarm High lakukan manual kontrol pada aliran
thermal fluid
Compressor C- Pressure High Kecepatan impeller melebihi batas Beban listrik naik Pressure Alarm Maintenance Compressor Control yang
106 akibat kesalahan Speed Control High bersangkutan
Low Kecepatan impeller kurang akibat Udara tidak dapat masuk FH-102 Pressure Alarm Maintenance Compressor Control
kesalahan Speed Control sehingga reaksi produksi tidak Low yang bersangkutan
berjalan
Feed Rasio Acid Feed High Laju alir udara kurang akibat kesalahan Terdapat H2S yang tidak bereaski Ratio Feed Maintenance Flow Control dan lakukan
Gas – Udara Ratio control valve pada aliran udara Alarm Low kontrol manual pada aliran udara
Low Laju alir udara lebih akibat kesalahan Terdapat produk samping SO3 Ratio Feed Maintenance Flow Control dan lakukan
control valve pada aliran udara Alarm Low kontrol manual pada aliran udara
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 215
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Gambar 4.10 Sistem Pengolahan Limbah Cair PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 216
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 217
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Gambar 4.11 Sistem Pengolahan Limbah Padat PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 218
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
NH3 dapat dikondisikan di atas temperatur cooling water sehingga tahap kondensais
dapat dilakukan dengan cooling water. Sirkulasi refrigeant NH3 yakni 16094 kg/h dengan
tambahan energi utilitas oleh kompressor adalah 655 kW serta beban kondenser oleh
cooling water adalah 5634 kW. Gambar 4.11 merupakan gambar siklus refrigerasi PT.
Company One Engineering
Gambar 4.13. Proses Simulasi Siklus Refrigerasi PT. Company One Engineering
Step Simulasi Unit Refrigerasi
- Fluid Package yang digunakan adalah PRSV dengan refrigeran NH3
- Set fraksi uap aliran keluar E-109 dan E-119 yakni 1 dan temperatur 15oC
- Set up Heat E-109 yakni 8325320 kJ/h dan E-119 yakni 9598973 kJ/h sesuai dengan
kebutuhan pendingin masing-masing exchanger
- Set up fraksi uap dan temperature masuk valve yakni 0 dan 40oC
- Set up fraksi uap dan temperature keluar E-301 yakni 0 dan 40oC
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 219
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 220
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 221
LAMPIRAN – BAGIAN 4 UTILITAS DAN LAYOUT PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 222
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 223
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 224
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 225
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 226
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
CARBON DIOXIDE CO2 (Gas Buang T-101 T-102, Komponen Utama Waste
Acid Gas)
Health 1
0
MATERIAL SAFETY DATA SHEET 1 0
Fire 0
Reactivity 0
(MSDS) OF CARBON DIOXIDE 1 Personal
Protection
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 227
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 228
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 229
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 230
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 231
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 232
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 233
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 234
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 235
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 236
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 237
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 238
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 239
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 240
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 241
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 242
LAMPIRAN – BAGIAN 5 PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 243
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Pinjaman modal
65% Total Cost Investment -
investasi
Tahun ke-1 : 60% ; Tahun ke Kapasitas awal tidak 100%
Kapasitas produksi
2 : 80% karena dalam rangka test dan
tahunan
Tahun ke 3 – 20 : 100% infeksi performa pabrik
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 244
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 141.65 m2 (1525 ft2)
Pressure Shell/Tube : 3 psig / 28 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝑓𝑚 = 2.2
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏 𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑜𝑠𝑡 = 1.218(0.637)(2.2)(1.142)(27375) 𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $53340
𝐶𝑜𝑠𝑡 = $53340 402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $73038
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 245
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 194.58 m2 (2094 ft2)
Pressure Shell/Tube : 4 psig / 26 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝑓𝑚 = 2.2
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.655)(2.2)(1.158)(33705.41)
𝐶𝑜𝑠𝑡 = $69757
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $69757
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $95517
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 246
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 135.42 m2 (1458 ft2)
Pressure Shell/Tube : 3 psig / 144 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝑓𝑚 = 2.2
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.634)(2.2)(1.140)(26542)
𝐶𝑜𝑠𝑡 = $51407
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $51407
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $70390
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 247
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 194.58 m2 (2094 ft2)
Pressure Shell/Tube : 4 psig / 111 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝑓𝑚 = 2.2
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.655)(2.2)(1.158)(33705.41)
𝐶𝑜𝑠𝑡 = $69757
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $69757
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $95517
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 248
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 2093.24 m2 (22531 ft2)
Pressure Shell/Tube : 377 psig / 49 psig
Type : Fixed Tube
Material Shell/Tube : Stainless Steel 316 / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003. Luas perpindahan panas lebih besar dari range valid persamaan
empiris yakni < 12000 ft2. Maka estimasi digunakan HE sejenis dengan Ai = 12000 ft2 dan size
exponent n = 0.6
𝐴 𝑛 𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡𝑖 ( )
𝐴𝑖 𝐶𝐸𝑃𝐶𝐼2003
22531 0.6 550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $735672 ( )
12000 402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $1470080
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 249
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 264.62 m2 (2848 ft2)
Pressure Shell/Tube : 4 psig / 321 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝑓𝑚 = 2.2
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.674)(2.2)(1.598)(43259)
𝐶𝑜𝑠𝑡 = $124834
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $124834
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $170933
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 250
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 8427.55 m2 (90713 ft2)
Pressure Shell/Tube : 11 psig / 315 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003. Luas perpindahan panas lebih besar dari range valid persamaan
empiris yakni < 12000 ft2. Maka estimasi digunakan HE sejenis dengan Ai = 12000 ft2 dan size
exponent n = 0.6
𝐴 𝑛 𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡𝑖 ( )
𝐴𝑖 𝐶𝐸𝑃𝐶𝐼2003
90713 0.6 550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $735672 ( )
12000 402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $3390551
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 251
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 1455.67 m2 (15669 ft2)
Pressure Shell/Tube : 4 psig / 4 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Carbon Steel
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003. Luas perpindahan panas lebih besar dari range valid persamaan
empiris yakni < 12000 ft2. Maka estimasi digunakan HE sejenis dengan Ai = 12000 ft2 dan size
exponent n = 0.6
𝐶𝑜𝑠𝑡𝑖 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏 𝑓𝑚 = 1
𝐶𝑜𝑠𝑡𝑖 = 1.218(0.767)(1)(1.245)(151762)
𝐶𝑜𝑠𝑡𝑖 = $176618
𝐴 𝑛 𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡𝑖 ( )
𝐴𝑖 𝐶𝐸𝑃𝐶𝐼2003
15669 0.6 550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $176618 ( )
12000 402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $283817
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 252
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 1220.96 m2 (13142 ft2)
Pressure Shell/Tube : 93 psig / 222 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Carbon Steel
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003. Luas perpindahan panas lebih besar dari range valid persamaan
empiris yakni < 12000 ft2. Maka estimasi digunakan HE sejenis dengan Ai = 12000 ft2 dan size
exponent n = 0.6
𝐶𝑜𝑠𝑡𝑖 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏 𝑓𝑚 = 1
𝐶𝑜𝑠𝑡𝑖 = 1.218(0.767)(1)(1.245)(151762)
𝐶𝑜𝑠𝑡𝑖 = $176618
𝐴 𝑛 𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡𝑖 ( )
𝐴𝑖 𝐶𝐸𝑃𝐶𝐼2003
13142 0.6 550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $176618 ( )
12000 402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $255401
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 253
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris
dari Wallas[x] Chapter 21 yang dipublikasikan tahun 2003
𝑓𝑚 = 2.2
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.738)(2.2)(1.224)(101642)
𝐶𝑜𝑠𝑡 = $246126
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $246126
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $337015
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 254
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris
dari Wallas[x] Chapter 21 yang dipublikasikan tahun
2003
𝑓𝑚 = 2.2
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.685)(2.2)(1.183)(50131)
𝐶𝑜𝑠𝑡 = $108863
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $108863
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $149064
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 255
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris
dari Wallas[8] Chapter 21 yang dipublikasikan tahun
2003. Luas perpindahan panas lebih besar dari range
valid persamaan empiris yakni < 12000 ft2. Maka
estimasi digunakan HE sejenis dengan Ai = 12000 ft2 dan
size exponent n = 0.6
𝑓𝑚 = 1
𝐶𝑜𝑠𝑡𝑖 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡𝑖 = 1.218(0.767)(1)(1.245)(265446.48)
𝐶𝑜𝑠𝑡𝑖 = $176618
𝐴 𝑛 𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡𝑖 ( )
𝐴𝑖 𝐶𝐸𝑃𝐶𝐼2003
15551 0.6 550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $176618 ( )
12000 402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $282534
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 256
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 123.94 m2 (1334 ft2)
Pressure Shell/Tube : 3 psig / 47 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝑓𝑚 = 2.2
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.629)(2.2)(1.136)(24996)
𝐶𝑜𝑠𝑡 = $47839
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $47839
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $65505
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 257
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 122.97 m2 (1324 ft2)
Pressure Shell/Tube : 4 psig / 44 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝑓𝑚 = 2.2
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.629)(2.2)(1.135)(24865)
𝐶𝑜𝑠𝑡 = $47538
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $47538
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $65092
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 258
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 116.75 m2 (1257 ft2)
Pressure Shell/Tube : 3 psig / 149 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝑓𝑚 = 2.2
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.629)(2.2)(1.133)(24019)
𝐶𝑜𝑠𝑡 = $45601
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $45601
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $62440
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 259
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 122.97 m2 (1324 ft2)
Pressure Shell/Tube : 4 psig / 146 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝑓𝑚 = 2.2
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.629)(2.2)(1.135)(24865)
𝐶𝑜𝑠𝑡 = $47538
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $47538
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $65092
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 260
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 5618.37 m2 (60476 ft2)
Pressure Shell/Tube : 13 psig / 306 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003. Luas perpindahan panas lebih besar dari range valid persamaan
empiris yakni < 12000 ft2. Maka estimasi digunakan HE sejenis dengan Ai = 12000 ft2 dan size
exponent n = 0.6
𝐴 𝑛 𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡𝑖 ( )
𝐴𝑖 𝐶𝐸𝑃𝐶𝐼2003
60476 0.6 550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $538390 ( )
12000 402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $1945486
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 261
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 1670.63 m2 (17983 ft2)
Pressure Shell/Tube : 4 psig / 1 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Carbon Steel
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003. Luas perpindahan panas lebih besar dari range valid persamaan
empiris yakni < 12000 ft2. Maka estimasi digunakan HE sejenis dengan Ai = 12000 ft2 dan size
exponent n = 0.6
𝐶𝑜𝑠𝑡𝑖 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏 𝑓𝑚 = 1
𝐶𝑜𝑠𝑡𝑖 = 1.218(0.767)(1)(1.245)(151762)
𝐶𝑜𝑠𝑡𝑖 = $176618
𝐴 𝑛 𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡𝑖 ( )
𝐴𝑖 𝐶𝐸𝑃𝐶𝐼2003
17983 0.6 550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $176618 ( )
12000 402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $308269
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 262
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 1343.30 m2 (14459 ft2)
Pressure Shell/Tube : 93 psig / 62 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Carbon Steel
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003. Luas perpindahan panas lebih besar dari range valid persamaan
empiris yakni < 12000 ft2. Maka estimasi digunakan HE sejenis dengan Ai = 12000 ft2 dan size
exponent n = 0.6
𝐶𝑜𝑠𝑡𝑖 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏 𝑓𝑚 = 1
𝐶𝑜𝑠𝑡𝑖 = 1.218(0.767)(1)(1.245)(151762)
𝐶𝑜𝑠𝑡𝑖 = $176618
𝐴 𝑛 𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡𝑖 ( )
𝐴𝑖 𝐶𝐸𝑃𝐶𝐼2003
14459 0.6 550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $176618 ( )
12000 402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $270461
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 263
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris
dari Wallas[x] Chapter 21 yang dipublikasikan tahun 2003
𝑓𝑚 = 2.2
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.738)(2.2)(1.224)(101642)
𝐶𝑜𝑠𝑡 = $246126
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $246126
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $337015
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 264
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris
dari Wallas[x] Chapter 21 yang dipublikasikan tahun 2003
𝑓𝑚 = 2.2
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.664)(2.2)(1.165)(38310)
𝐶𝑜𝑠𝑡 = $79448
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $79448
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $108786
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 265
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris
dari Wallas[8] Chapter 21 yang dipublikasikan tahun
2003. Luas perpindahan panas lebih besar dari range
valid persamaan empiris yakni < 12000 ft2. Maka
estimasi digunakan HE sejenis dengan Ai = 12000 ft2
dan size exponent n = 0.6
𝑓𝑚 = 1
𝐶𝑜𝑠𝑡𝑖 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡𝑖 = 1.218(0.767)(1)(1.245)(151762)
𝐶𝑜𝑠𝑡𝑖 = $176618
𝐴 𝑛 𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡𝑖 ( )
𝐴𝑖 𝐶𝐸𝑃𝐶𝐼2003
15127 0.6 550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $176618 ( )
12000 402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $277886
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 266
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 92.42 m2 (995 ft2)
Pressure Shell/Tube : 3 psig / 374 psig
Type : Fixed Tube
Material Shell/Tube : Stainless Steel 316 / Carbon Steel
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.612)(2.47)(1.523)(20646)
𝐶𝑜𝑠𝑡 = $57913
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $57913
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $79299
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 267
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 62.26 m2 (670 ft2)
Pressure Shell/Tube : 1 psig / 22 psig
Type : Fixed Tube
Material Shell/Tube : Stainless Steel 316 / Carbon Steel
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝐶𝑏 = exp[8.821 − 0.30863 ln(𝐴) + 0.0681(ln(𝐴))2 ]
𝐶𝑏 = exp[8.821 − 0.30863 ln(1659) + 0.0681(ln 1659)2 ]
𝐶𝑏 = 16260
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.591)(2.38)(1.495)(16260)
𝐶𝑜𝑠𝑡 = $41581
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $41581
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $56936
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 268
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Perpindahan Panas : 1463.99 m2 (15758 ft2)
Pressure Shell/Tube : 0.5 psig / 1436 psig
Type : Fixed Tube
Material Shell/Tube : Stainless Steel 316 / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003. Luas perpindahan panas lebih besar dari range valid persamaan
empiris yakni < 12000 ft2. Maka estimasi digunakan HE sejenis dengan Ai = 12000 ft2 dan size
exponent n = 0.6
𝐴 𝑛 𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡𝑖 ( )
𝐴𝑖 𝐶𝐸𝑃𝐶𝐼2003
15758 0.6 550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $1096451 ( )
12000 402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $1767980
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 269
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
0.8 m
3m
Data Perhitungan
Power : 1450 kW (1944 HP)
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝐶𝑜𝑠𝑡 = 𝐽𝑢𝑚𝑙𝑎ℎ𝐶𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑜𝑟(𝐶𝑐 + 𝐶𝑚 )
𝐶𝑜𝑠𝑡 = 3($864342 + $32176)
𝐶𝑜𝑠𝑡 = $2689553
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $2689553
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $3682747
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 270
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
0.65 m
2m
Data Perhitungan
Power : 810 kW (1086 HP)
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝐶𝑜𝑠𝑡 = 𝐽𝑢𝑚𝑙𝑎ℎ𝐶𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑜𝑟(𝐶𝑐 + 𝐶𝑚 )
𝐶𝑜𝑠𝑡 = 2($602418 + $23923)
𝐶𝑜𝑠𝑡 = $1252683
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $1252683
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $1715272
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 271
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
0.65 m
2m
Data Perhitungan
Power : 735 kW (986 HP)
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003
𝐶𝑜𝑠𝑡 = 𝐶𝑐 + 𝐶𝑚
𝐶𝑜𝑠𝑡 = $567199 + $22715
𝐶𝑜𝑠𝑡 = $589914
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $589914
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $807757
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 272
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Luas Permukaan Tube : 5.563 m2 (59.88 ft2)
Pressure Shell/Tube : 24 psig / 353 psig
Type : Fixed Tube
Material Shell/Tube : Carbon Steel / Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003. Perkiraan harga alat mengikuti perkuraan harga HE Shell and
Tube karena kontruksinya yang mirip dengan HE Shell and Tube
𝑓𝑚 = 2.2
𝐶𝑜𝑠𝑡 = 1.218𝑓𝑑 𝑓𝑚 𝑓𝑝 𝐶𝑏
𝐶𝑜𝑠𝑡 = 1.218(0.475)(2.2)(1.323)(5994)
𝐶𝑜𝑠𝑡 = $10087
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $10087
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $13811
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 273
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris
4.96 m
dari Wallas[x] Chapter 21 yang dipublikasikan tahun 2003
𝜋
𝑉𝑠 = 𝐿[𝐷 2 − (𝐷 − 2𝑡𝑠 )2 ]
4
𝜋
𝑉𝑠 = [10.55][3.522 − (3.52 − 2(0.05715))2 ]
4
𝑉𝑠 = 6.5559
1 𝜋
𝑉ℎ = [ [𝐷 3 − (𝐷 − 2𝑡ℎ )3 ]]
4 6
1 𝜋
𝑉ℎ = [ [3.523 − (3.52 − 2(0.0302))3 ]]
4 6 1.65 m
𝑉ℎ = 0.2884
𝑊 = 𝜌(𝑉𝑠 + 2𝑉ℎ )
𝑊 = 8000(6.5559 + 2(0.2884))
𝑊 = 57061𝑘𝑔 = 125798𝑙𝑏
𝐶𝑜𝑠𝑡 = 𝑓𝑚 𝐶𝑏 + 𝐶𝑎
𝐶𝑜𝑠𝑡 = (1.7)(201678) + 22418
𝐶𝑜𝑠𝑡 = $365271
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $365271 Perkiraan Berat
402.00 57061 kg
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $500157
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 274
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris
4.96 m
dari Wallas[8] Chapter 21 yang dipublikasikan tahun 2003
𝜋
𝑉𝑠 = 𝐿[𝐷 2 − (𝐷 − 2𝑡𝑠 )2 ]
4
𝜋
𝑉𝑠 = [4.96][1.652 − (1.65 − 2(0.00635))2 ]
4
𝑉𝑠 = 0.1626
1 𝜋
𝑉ℎ = [ [𝐷 3 − (𝐷 − 2𝑡ℎ )3 ]]
4 6
1 𝜋
𝑉ℎ = [ [1.653 − (1.65 − 2(0.00635))3 ]] 1.65 m
4 6
𝑉ℎ = 0.01346
𝑊 = 𝜌(𝑉𝑠 + 2𝑉ℎ )
𝑊 = 8000(0.1626 + 2(0.01346))
𝑊 = 1487𝑘𝑔 = 3279𝑙𝑏
𝐶𝑜𝑠𝑡 = 𝑓𝑚 𝐶𝑏 + 𝐶𝑎
𝐶𝑜𝑠𝑡 = (1.7)(21107) + 7510
𝐶𝑜𝑠𝑡 = $43391
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡 Perkiraan Berat
𝐶𝐸𝑃𝐶𝐼2003
550.45 1487 kg
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $43391
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $59414
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 275
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Perkiraan Harga
4.47 m
Perkiraan harga alat berdasarkan persamaan empiris dari
Wallas[8] Chapter 21 yang dipublikasikan tahun 2003
𝜋
𝑉𝑠 = 𝐿[𝐷 2 − (𝐷 − 2𝑡𝑠 )2 ]
4
𝜋
𝑉𝑠 = [4.47][1.492 − (1.49 − 2(0.00635))2 ]
4
𝑉𝑠 = 0.1322
1 𝜋
𝑉ℎ = [ [𝐷 3 − (𝐷 − 2𝑡ℎ )3 ]]
4 6
1 𝜋 1.49 m
𝑉ℎ = [ [1.493 − (1.49 − 2(0.00635))3 ]]
4 6
𝑉ℎ = 0.01097
𝑊 = 𝜌(𝑉𝑠 + 2𝑉ℎ )
𝑊 = 8000(0.1322 + 2(0.01097))
𝑊 = 1210𝑘𝑔 = 2668𝑙𝑏
𝐶𝑜𝑠𝑡 = 𝑓𝑚 𝐶𝑏 + 𝐶𝑎
𝐶𝑜𝑠𝑡 = 1.7(19266) + 6470
𝐶𝑜𝑠𝑡 = $39222
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45 Perkiraan Berat
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $39222
402.00 1210 kg
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $53706
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 276
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari
Wallas[8] Chapter 21 yang dipublikasikan tahun 2003
𝜋
𝑉𝑠 = 𝐿[𝐷2 − (𝐷 − 2𝑡𝑠 )2 ]
4
𝜋
𝑉𝑠 = [34.5][2.012 − (2.01 − 2(0.0349))2 ]
4
𝑉𝑠 = 7.4856
1 𝜋 3
𝑉ℎ = [ [𝐷 − (𝐷 − 2𝑡ℎ )3 ]]
4 6
34.5 m
1 𝜋
𝑉ℎ = [ [2.013 − (2.01 − 2(0.0191))3 ]]
4 6
𝑉ℎ = 0.0595
𝑊 = 𝜌(𝑉𝑠 + 2𝑉ℎ )
𝑊 = 8000(7.5941 + 2(0.0595))
𝑊 = 60837𝑘𝑔
𝑊 = 134122𝑙𝑏
𝐶𝑡 = 457.7exp[0.1739𝐷] 2.01 m
𝐶𝑡 = 457.7exp[0.1739(6.59)]
𝐶𝑡 = 1444
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 277
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
𝑓1 = 1.7
𝑓2 = exp[1.189 + 0.0577𝐷]
𝑓2 = exp[1.189 + 0.0577(6.59)]
𝑓2 = 1.5702
𝑓3 = 0.95
𝑓4 = 1
(𝑁𝑢𝑚𝑏𝑒𝑟𝑇𝑟𝑎𝑦𝑗𝑎𝑢ℎ𝑑𝑖𝑎𝑡𝑎𝑠20, 𝑓4 𝑚𝑒𝑛𝑑𝑒𝑘𝑎𝑡𝑖1)
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $604525
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $827763
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 278
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8]
14 m
Chapter 21 yang dipublikasikan tahun 2003
𝜋
𝑉𝑠 = 𝐿[𝐷2 − (𝐷 − 2𝑡𝑠 )2 ]
4
𝜋
𝑉𝑠 = [13][3.262 − (3.26 − 2(0.0095))2 ]
4
𝑉𝑠 = 1.2653
1 𝜋 3
𝑉ℎ = [ [𝐷 − (𝐷 − 2𝑡ℎ )3 ]]
4 6
1 𝜋
𝑉ℎ = [ [3.263 − (3.26 − 2(0.0064))3 ]] 3.26 m
4 6
𝑉ℎ = 0.0529
𝑊 = 𝜌(𝑉𝑠 + 2𝑉ℎ )
𝑊 = 8000(1.2653 + 2(0.0529))
𝑊 = 10969𝑘𝑔
𝑊 = 24183𝑙𝑏
𝐶𝑡 = 457.7exp[0.1739𝐷]
𝐶𝑡 = 457.7exp[0.1739(10.7)]
𝐶𝑡 = 2947
𝑓1 = 1.7
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 279
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
𝑓2 = exp[1.189 + 0.0577𝐷]
𝑓2 = exp[1.189 + 0.0577(10.7)]
𝑓2 = 1.8069
𝑓3 = 1.59
2.25
𝑓4 =
1.0414𝑁
2.25
𝑓4 =
1.041410
𝑓4 = 1.4930
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $356927
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $488733
Perkiraan Berat
10969 kg
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 280
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8]
Chapter 21 yang dipublikasikan tahun 2003
𝜋
𝑉𝑠 = 𝐿[𝐷2 − (𝐷 − 2𝑡𝑠 )2 ]
4
𝜋
𝑉𝑠 = [29.5][1.522 − (1.52 − 2(0.0349))2 ]
4
𝑉𝑠 = 4.8173
1 𝜋 3
𝑉ℎ = [ [𝐷 − (𝐷 − 2𝑡ℎ )3 ]]
4 6
29.5 m
1 𝜋
𝑉ℎ = [ [1.523 − (1.52 − 2(0.0191))3 ]]
4 6
𝑉ℎ = 0.0339
𝑊 = 𝜌(𝑉𝑠 + 2𝑉ℎ )
𝑊 = 8000(4.8173 + 2(0.0339))
𝑊 = 39080𝑘𝑔
𝑊 = 86158𝑙𝑏
𝐶𝑡 = 457.7exp[0.1739𝐷]
𝐶𝑡 = 457.7exp[0.1739(5)]
𝐶𝑡 = 1092
1.52 m
𝑓1 = 1.7
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 281
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
𝑓2 = exp[1.189 + 0.0577𝐷]
𝑓2 = exp[1.189 + 0.0577(5)]
𝑓2 = 1.4775
𝑓3 = 0.95
𝑓4 = 1(𝑁𝑢𝑚𝑏𝑒𝑟𝑇𝑟𝑎𝑦𝑗𝑎𝑢ℎ𝑑𝑖𝑎𝑡𝑎𝑠20, 𝑓4 𝑚𝑒𝑛𝑑𝑒𝑘𝑎𝑡𝑖1)
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $419407
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $574285
Perkiraan Berat
39080 kg
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 282
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8]
12 m
Chapter 21 yang dipublikasikan tahun 2003
𝜋
𝑉𝑠 = 𝐿[𝐷2 − (𝐷 − 2𝑡𝑠 )2 ]
4
𝜋
𝑉𝑠 = [10][3.022 − (3.02 − 2(0.0079))2 ]
4
𝑉𝑠 = 0.7063
1 𝜋 3
𝑉ℎ = [ [𝐷 − (𝐷 − 2𝑡ℎ )3 ]]
4 6
1 𝜋
𝑉ℎ = [ [3.023 − (3.02 − 2(0.0064))3 ]] 3.02 m
4 6
𝑉ℎ = 0.0454
𝑊 = 𝜌(𝑉𝑠 + 2𝑉ℎ )
𝑊 = 8000(0.7063 + 2(0.0454))
𝑊 = 6376𝑘𝑔
𝑊 = 14056𝑙𝑏
𝐶𝑡 = 457.7exp[0.1739𝐷]
𝐶𝑡 = 457.7exp[0.1739(9.92)]
𝐶𝑡 = 2568
𝑓1 = 1.7
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 283
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
𝑓2 = exp[1.189 + 0.0577𝐷]
𝑓2 = exp[1.189 + 0.0577(9.91)]
𝑓2 = 1.7612
𝑓3 = 1.59
2.25
𝑓4 =
1.0414𝑁
2.25
𝑓4 =
1.041410
𝑓4 = 1.7561
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $236712
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $324125
Perkiraan Berat
6376 kg
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 284
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
0.5 m
2m
Data Perhitungan
Laju Alir (Q) : 321 m3/h (1413 gpm)
Head (H) : 254 m (833 ft)
Power : 284 kW (381 HP)
Speed : 4600 rpm
Material : Cast Steel
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003. Berasarkan data spesifikasi Pump P-101, maka digunakan
multistage pump, sehingga
2
𝐹𝑇 = exp [9.8849 − 1.616 ln(𝑄√𝐻) + 0.0834(ln(𝑄√𝐻)) ]
2
𝐹𝑇 = exp [9.8849 − 1.616 ln(1413√381) + 0.0834(1413√381) ]
𝐹𝑇 = 8.368
2
𝐶𝑏 = 1.39 exp [8.833 − 0.6019 ln(𝑄√𝐻) + 0.0519(ln(𝑄√𝐻)) ]
2
𝐶𝑏 = 1.39 exp [8.833 − 0.6019 ln(1413√381) + 0.0519(1413√381) ]
𝐶𝑏 = 5552
𝐹𝑚 = 1.35
𝐶𝑜𝑠𝑡 = 𝐽𝑢𝑚𝑙𝑎ℎ𝑝𝑢𝑚𝑝(𝐹𝑚 𝐹𝑇 𝐶𝑏 )
𝐶𝑜𝑠𝑡 = (2)(1.35)(8.368)(5552)
𝐶𝑜𝑠𝑡 = $125428
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $125428
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $171746
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 285
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Laju Alir (Q) : 63 m3/h (277 gpm)
Head (H) : 15.20 m (50 ft)
Power : 2.45 kW (3.28 HP)
Speed : 774 rpm
Material : Cast Steel
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003. Berasarkan data spesifikasi Pump P-102, maka digunakan 1
stage VCS pump, sehingga
2
𝐹𝑇 = exp [5.1029 − 1.222 ln(𝑄√𝐻) + 0.0771(ln(𝑄√𝐻)) ]
2
𝐹𝑇 = exp [5.1029 − 1.222 ln(277√50) + 0.0771(277√50) ]
𝐹𝑇 = 1.313
2
𝐶𝑏 = 1.39 exp [8.833 − 0.6019 ln(𝑄√𝐻) + 0.0519(ln(𝑄√𝐻)) ]
2
𝐶𝑏 = 1.39 exp [8.833 − 0.6019 ln(277√50) + 0.0519(277√50) ]
𝐶𝑏 = 1962
𝐹𝑚 = 1.35
𝐶𝑜𝑠𝑡 = 𝐽𝑢𝑚𝑙𝑎ℎ𝑝𝑢𝑚𝑝(𝐹𝑚 𝐹𝑇 𝐶𝑏 )
𝐶𝑜𝑠𝑡 = (2)(1.35)(1.313)(1962)
𝐶𝑜𝑠𝑡 = $6957
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $6957
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $9526
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 286
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
0.5 m
1.5 m
Data Perhitungan
Laju Alir (Q) : 426 m3/h (1876 gpm)
Head (H) : 140 m (459 ft)
Power : 2.45 kW (3.28 HP)
Speed : 774 rpm
Material : Cast Steel
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003. Berasarkan data spesifikasi Pump P-103, maka digunakan 2
stage HSV pump, sehingga
2
𝐹𝑇 = exp [13.7321 − 2.830 ln(𝑄√𝐻) + 0.1542(ln(𝑄√𝐻)) ]
2
𝐹𝑇 = exp [13.7321 − 2.830 ln(1876√459) + 0.1542(1876√459) ]
𝐹𝑇 = 2.876
2
𝐶𝑏 = 1.39 exp [8.833 − 0.6019 ln(𝑄√𝐻) + 0.0519(ln(𝑄√𝐻)) ]
2
𝐶𝑏 = 1.39 exp [8.833 − 0.6019 ln(1876√459) + 0.0519(1876√459) ]
𝐶𝑏 = 5511
𝐹𝑚 = 1.35
𝐶𝑜𝑠𝑡 = 𝐽𝑢𝑚𝑙𝑎ℎ𝑝𝑢𝑚𝑝(𝐹𝑚 𝐹𝑇 𝐶𝑏 )
𝐶𝑜𝑠𝑡 = (2)(1.35)(2.876)(5511)
𝐶𝑜𝑠𝑡 = $42793
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $42793
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $58596
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 287
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Laju Alir (Q) : 63 m3/h (277 gpm)
Head (H) : 11.16 m (38 ft)
Power : 1.70 kW (2.27 HP)
Speed : 929 rpm
Material : Cast Steel
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003. Berasarkan data spesifikasi Pump P-104, maka digunakan 1
stage VCS pump, sehingga
2
𝐹𝑇 = exp [5.1029 − 1.222 ln(𝑄√𝐻) + 0.0771(ln(𝑄√𝐻)) ]
2
𝐹𝑇 = exp [5.1029 − 1.222 ln(277√38) + 0.0771(277√38) ]
𝐹𝑇 = 1.324
2
𝐶𝑏 = 1.39 exp [8.833 − 0.6019 ln(𝑄√𝐻) + 0.0519(ln(𝑄√𝐻)) ]
2
𝐶𝑏 = 1.39 exp [8.833 − 0.6019 ln(277√38) + 0.0519(277√38) ]
𝐶𝑏 = 1916
𝐹𝑚 = 1.35
𝐶𝑜𝑠𝑡 = 𝐽𝑢𝑚𝑙𝑎ℎ𝑝𝑢𝑚𝑝(𝐹𝑚 𝐹𝑇 𝐶𝑏 )
𝐶𝑜𝑠𝑡 = (2)(1.35)(1.324)(1916)
𝐶𝑜𝑠𝑡 = $6850
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $6850
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $9379
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 288
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Heat Flow (Q) : 576809 kJ/h (5.47 MBTU/h)
Pressure Box : 130 kPa (19 psi)
Pressure Radiant Tube : 2679 kPa (389 psi)
Pressure Convective Tube : 2679 kPa (389 psi)
Type : Box, Process Heating
Tube Material : Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003.
𝑘 = 45
𝑓𝑑 = 0
𝑓𝑝 = 0
𝐶𝐸𝑃𝐶𝐼2015
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡
𝐶𝐸𝑃𝐶𝐼2003
550.45
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $236
402.00
𝐶𝑢𝑟𝑟𝑒𝑛𝑡𝐶𝑜𝑠𝑡 = $323
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 289
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Data Perhitungan
Heat Flow (Q) : 169775557 kJ/h (1609.16 MBTU/h)
Pressure Box : 130 kPa (19 psi)
Pressure Radiant Tube : 980 kPa (142 psi)
Pressure Convective Tube : 10000 kPa (1450 psi)
Type : Box, Process Converter
Tube Material : Stainless Steel 316
Perkiraan Harga
Perkiraan harga alat berdasarkan persamaan empiris dari Wallas[8] Chapter 21 yang
dipublikasikan tahun 2003.
𝑘 = 45
𝑓𝑑 = 0.35
𝑓𝑝 = 0.25
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 290
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 291
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Raw Material
Harga Kebutuhan Pengeluaran
Komponen Unit
(US$/unit) (unit/h) (unit/tahun) (US$/tahun)
Waste Acid Gas ton 38 49.889 437028 16607049
Selexol make-up ton 2300 0.569 4987 11470700
Total Raw Material 28077749
Utilitas*
Harga Kebutuhan Pengeluaran
Komponen Unit
(US$/unit) (unit/h) (unit/tahun) (US$/tahun)
Cooling Tower Water ton 1201 10522828 155738 1201
BFW ton 16 136420 334228 16
Deionizized Water ton 108 944047 944047 108
Refrigerant ton 16 141054 624867 16
Non-Hazardous Waste ton 33.878 296773 10683838 33.878
Heating NG GJ 0.577 5053 10106 0.577
Total Utilitas 12752823
Keterangan : * Harga per unit utilitas mengikuti reference Turton [7]
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 292
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Utilitas
Refrigerant 1 1 1
Electricity Power
Turbin 1 0.25 0.25
generator 1 0.25 0.25
Deaerator 1 0.1 0.1
Pump 3 0.1 0.3
Total Labor 0.9 1
Water treatment
Cooling Tower 1 0.1 0.1
Kolom Packing 4 0.2 0.8
Filter 1 0.5 0.5
Pump 4 0.1 0.4
Tank, Claifier 4 0.15 0.6
Total Labor 2.4 3
Waste Treatment 1 1 1 1
Other Labor
Analis Quality Control 2
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 293
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
Gaji Pokok S1 Rp 43750/jam dengan jam kerja 40jam/minggu (atau Rp7000000/bulan tanpa
lembur)
Gaji Pokok D3 Rp 25000/jam dengan jam kerja 40jam/minggu (atau Rp4000000/bulan tanpa
lembur)
Jika diasumsikan dari keseluruhan operator labor 50% adalah S1 dan 50% adalah D3 maka
Jika dalam 1 tahun terdapat 19 hari libur maka jam kerja lembur:
𝑗𝑎𝑚𝑘𝑒𝑟𝑗𝑎 365 ∙ 24
=
𝑘𝑒𝑙𝑜𝑚𝑝𝑜𝑘. 𝑚𝑖𝑛𝑔𝑔𝑢 𝑘𝑒𝑙𝑜𝑚𝑝𝑜𝑘 (52 − ℎ𝑎𝑟𝑖𝑙𝑖𝑏𝑢𝑟𝑝𝑒𝑟𝑡𝑎ℎ𝑢𝑛)
7
𝑗𝑎𝑚𝑘𝑒𝑟𝑗𝑎 365 ∙ 24
= = 44.43𝑗𝑎𝑚/𝑚𝑖𝑛𝑔𝑔𝑢
𝑘𝑒𝑙𝑜𝑚𝑝𝑜𝑘. 𝑚𝑖𝑛𝑔𝑔𝑢 4 (52 − 19)
7
𝑗𝑎𝑚𝑘𝑒𝑟𝑗𝑎
= 44.43𝑗𝑎𝑚/𝑚𝑖𝑛𝑔𝑔𝑢
𝑘𝑒𝑙𝑜𝑚𝑝𝑜𝑘. 𝑚𝑖𝑛𝑔𝑔𝑢
𝐽𝑎𝑚𝑘𝑒𝑟𝑗𝑎𝑙𝑒𝑚𝑏𝑢𝑟 = 𝐽𝑎𝑚𝑘𝑒𝑟𝑗𝑎𝑡𝑜𝑡𝑎𝑙 − 𝐽𝑎𝑚𝑘𝑒𝑟𝑗𝑎𝑛𝑜𝑟𝑚𝑎𝑙
𝐽𝑎𝑚𝑙𝑒𝑚𝑏𝑢𝑟 = 44.43 − 40
𝐽𝑎𝑚𝑙𝑒𝑚𝑏𝑢𝑟 = 4.43𝑗𝑎𝑚/𝑚𝑖𝑛𝑔𝑔𝑢
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 294
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
𝑃𝑙𝑎𝑛𝑡𝑐𝑜𝑠𝑡 − 𝑛𝑖𝑙𝑎𝑖𝑠𝑖𝑠𝑎
𝐷𝑒𝑝𝑟𝑒𝑠𝑖𝑎𝑠𝑖𝑆𝑡𝑟𝑎𝑖𝑔ℎ𝑡𝐿𝑖𝑛𝑒𝑝𝑒𝑟𝑡𝑎ℎ𝑢𝑛 =
𝑈𝑚𝑢𝑟𝑃𝑎𝑏𝑟𝑖𝑘
165166357– 16516636
𝐷𝑒𝑝𝑟𝑒𝑠𝑖𝑎𝑠𝑖𝑆𝑡𝑟𝑎𝑖𝑔ℎ𝑡𝐿𝑖𝑛𝑒𝑝𝑒𝑟𝑡𝑎ℎ𝑢𝑛 =
20
𝐷𝑒𝑝𝑟𝑒𝑠𝑖𝑎𝑠𝑖𝑆𝑡𝑟𝑎𝑖𝑔ℎ𝑡𝐿𝑖𝑛𝑒𝑝𝑒𝑟𝑡𝑎ℎ𝑢𝑛 = US$7432486/tahun
- Sales
𝑆𝑎𝑙𝑒𝑠 = %𝑘𝑎𝑝𝑎𝑠𝑖𝑡𝑎𝑠 × 𝐾𝑎𝑝𝑎𝑠𝑖𝑡𝑎𝑠𝑑𝑒𝑠𝑖𝑔𝑛 × 𝐻𝑎𝑟𝑔𝑎𝑆𝑂2
𝑆𝑎𝑙𝑒𝑠 = 100%(236959)(800)
𝑆𝑎𝑙𝑒𝑠 = US$189567546/tahun
- Interest
𝑝𝑖𝑛𝑗𝑎𝑚𝑎𝑛 = 0.65𝑇𝐶𝐼
𝑝𝑖𝑛𝑗𝑎𝑚𝑎𝑛 = 0.65(176963954)
𝑝𝑖𝑛𝑗𝑎𝑚𝑎𝑛 = US$115026570/tahun
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 295
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
𝑝𝑖𝑛𝑗𝑎𝑚𝑎𝑛
𝑐𝑖𝑐𝑖𝑙𝑎𝑛 =
𝑢𝑚𝑢𝑟𝑝𝑎𝑏𝑟𝑖𝑘
115026570
𝑐𝑖𝑐𝑖𝑙𝑎𝑛 =
20
𝑐𝑖𝑐𝑖𝑙𝑎𝑛 = $5751329/𝑡𝑎ℎ𝑢𝑛
𝑏𝑢𝑛𝑔𝑎𝑥𝑝𝑖𝑛𝑗𝑎𝑚𝑎𝑛
𝐵𝑢𝑛𝑔𝑎 =
𝑢𝑚𝑢𝑟𝑡𝑎ℎ𝑢𝑛
0.1275(115026570)
𝐵𝑢𝑛𝑔𝑎 =
20
𝐵𝑢𝑛𝑔𝑎 = US$733294/tahun
Keuntungan
𝐾𝑒𝑢𝑛𝑡𝑢𝑛𝑔𝑎𝑛𝐾𝑜𝑡𝑜𝑟 = 𝑆𝑎𝑙𝑒𝑠𝑡𝑎ℎ𝑢𝑛 − 𝐵𝑃
𝐾𝑒𝑢𝑛𝑡𝑢𝑛𝑔𝑎𝑛𝐾𝑜𝑡𝑜𝑟 = 189567546 − 121546354
𝐾𝑒𝑢𝑛𝑡𝑢𝑛𝑔𝑎𝑛𝐾𝑜𝑡𝑜𝑟 = US$68021192/tahun
𝑃𝑎𝑗𝑎𝑘 = 0.2(𝐾𝑒𝑢𝑛𝑡𝑢𝑛𝑔𝑎𝑛𝐾𝑒𝑛𝑎𝑃𝑎𝑗𝑎𝑘)
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 296
LAMPIRAN BAGIAN – ANALISIS EKONOMI PT. Company One Engineering
- Cash Flow
𝐶𝑎𝑠ℎ𝐹𝑙𝑜𝑤 = 𝑘𝑒𝑢𝑛𝑡𝑢𝑛𝑔𝑎𝑛𝑏𝑒𝑟𝑠𝑖ℎ + 𝑑𝑒𝑝𝑟𝑒𝑠𝑖𝑎𝑠𝑖
𝐶𝑎𝑠ℎ𝐹𝑙𝑜𝑤 = 48470965 + 7432486
𝐶𝑎𝑠ℎ𝐹𝑙𝑜𝑤 = US$55903451/tahun
𝐵𝑃𝑇𝑡𝑎𝑛𝑝𝑎𝑑𝑒𝑝𝑟𝑒𝑠𝑖𝑎𝑠𝑖 + 𝑝𝑒𝑚𝑏𝑎𝑦𝑎𝑟𝑎𝑛𝑢𝑡𝑎𝑛𝑔
𝐵𝐸𝑃𝑠𝑒𝑏𝑒𝑙𝑢𝑚𝑑𝑒𝑝𝑟𝑒𝑠𝑖𝑎𝑠𝑖 =
𝑠𝑎𝑙𝑒𝑠 − 𝐵𝑃𝑉
36317650 + 6484623
𝐵𝐸𝑃𝑠𝑒𝑏𝑒𝑙𝑢𝑚𝑑𝑒𝑝𝑟𝑒𝑠𝑖𝑎𝑠𝑖 =
189567546 − 78744081
𝐵𝐸𝑃𝑠𝑒𝑏𝑒𝑙𝑢𝑚𝑑𝑒𝑝𝑟𝑒𝑠𝑖𝑎𝑠𝑖 = 38.62%
Produksi SO2 dari Waste Acid Gas hasil Gasifikasi Batubara 297
DAFTAR PUSTAKA PT. Company One Engineering
DAFTAR PUSTAKA
Boyce Meherwan P., dkk. 2008. Perry’s Chemical Engineering Handbook 8th Ed Transport and
Storage of Fluids. McGraw-Hill
Boyce Meherwan P., dkk. 2008. Perry’s Chemical Engineering Handbook 8th Ed. McGraw-Hill
Calabrese, A. M. Control And Optimization Of Unit Operations: Furnace And Reformer Controls
Cheresources. 2015. Chemical Engineering Plant Cost Index (Cepci). Diakses dari
http://www.cheresources.com/invision/topic/21446-chemical-engineering-plant-cost-
indexcepci/page-2 pada 9 Desember 2015 pukul 17.45 WIB
Economic Indicators. 2008. Economic Indicators chemical engineering plant cost index. Diakses
Darihttp://www.engr.uconn.edu/~ewanders/Design/Chemical%20Engineering%20Cost
%20Indices%20Jan%202008.pdf pada 9 Desember 2015 pukul 17.30 WIB
Economic Indicators. 2015. Economic Indicators chemical engineering plant cost index.
http://www.isr.umd.edu/~adomaiti/chbe446/literature/ChECostIndexJan2015.pdf
Diakses daripada 9 Desember 2015 pukul 17.30 WIB
Garrett, Donald E. 1989. Chemical Engineering Economics. New York : Van Nostrand Reinhold
Gupta, B. P. Control And Optimization Of Unit Operations: Heat Exchanger Control And
Optimization
Hoeterickx Georges. Good Cooling Tower Practice: Evapco. Diakses dari
http://www.districtenergy.org/08CoolingConference/Proceedings/4A2_HOETICKXGoo
d_Cooling_Tower_Practises.pdf pada tanggal 18 November 2015
Horowitz, F. B. Control And Optimization Of Unit Operations: Compressor Control And
Optimization
Humas Kemenko. 2015. Inilah Hari Libur Nasional Dan Cuti Bersama Tahun 2016. Diakses dari
http://setkab.go.id/nilah-hari-libur-nasional-dan-cuti-bersama-tahun-2016/ pada 9
Desember 2015 pukul 17.30 WIB
Lek, C. M., Rangaiah, G. P., and Hidajat, K. 2004. DISTILLATION: Revisiting Some Rules of Thumb
Mc.Cabe, Warrem L., dkk. 2005. Unit Operation of Chemical Engineering 7th Ed. Singapore:
McGraw-Hill
Pipe Schedules (According To ASME/ANSI B36.10M). diakses dari
http://ds.arcelormittal.com/repo/projects%20oil%20and%20gas/pipe%20schedule.pdf
. pada tanggal 20 November 2015
Produksi SO2 dari Waste Acid Gas Hasil Gasifikasi Batubara 298
DAFTAR PUSTAKA PT. Company One Engineering
Rausand, Marvin. 2005. HAZOP Hazard And Operability. Study Department Of Production And
Quality Engineering. Norwegian University Of Science And Technology
Red-Bag. 2015. Tubesheet Layout Calculation. Diakses dari www.red-bag.com/tubesheet-
layout.html
Shunzheng, Zhao., Honghong, Yi., Xiaolong, Tang,. Shanxue, Jiang,. Fengyu, Gao,. Bowen,
Zhang,. Yanran, Zuo,. and Zhixiang, Wang. 2013. The Hydrolysis of Carbonyl Sulfide: A
Review. The Scientific World Journal Aspentech. 2004. Tutorials & Applications
Smith, Robin. 2005.Chemicl Process Design and Integration. Chicherter: John Woley & Sons
Tradingeconomics. 2015. Indonesia Interest Rate 2005-2015. Diakses dari
http://www.tradingeconomics.com/indonesia/interest-rate pada 9 Desember 2015
pukul 17.00 WIB
Turton, Richard., dkk. Analysis, Synthesis and Design of Chemical Processes 4th Edition. New
York : Pearson Education Internasional
Walas, Stanley M., Penney, W. Roy., James, R. Fair., and James, R. Couper. 2010. Chemical