JMF Dan Pelaksanaan Aspal
JMF Dan Pelaksanaan Aspal
FCR
(FORMULA CAMPURAN RENCANA)
FCK
(FORMULA CAMPURAN KERJA)
JMF
(JOB MIX FORMULA)
JSD
(JOB STANDART DENSITY)
SI POLMED Flexible Pavement Method 3
PEKERJAAN LAPANGAN
2. Tebal padat
98
3. Jumlah passing
PRIME COAT
BY COMPRESSOR/ASPHALT SPRAYER
ASPHALT CONCRETE SURFACE COURSE t=40 A C t=40
ASPHALT CONCRETE BINDER COURSE t=60 A T B t=40
ASPHALT TREATED BASE thick = 10 cm
ASPHALT TREATED BASE t=100 BY DT/ASPHALT FINISHER/TANDEM ROLLER/PNEUMATIC TYRED ROLLER
AGGREGAT BASE CLASS-A t=275
TACK COAT
BY COMPRESSOR/ASPHALT SPRAYER
FINISH
SI POLMED Flexible Pavement Method 23
SUB GRADE PREPARATION
1. HAULING SUBGRADE MATERIAL FROM 2. DUMPING SUBGRADE MATERIAL FROM DUMP TRUCK
BORROW AREA GOING TO PROJECT (IF NECESSARY)
LOCATION BY DUMP TRUCK (IF NECESSARY)
20CM
1. DUMPING THE AGGREGAT BASE A MATERIAL FROM 2. UNLOAD AGGREGATE MATERIAL FROM DUMP TRUCK
BORROW AREA GOING TO PROJECT LOCATION BY
DUMP TRUCK
2. ASPHALT TREATED BASE 10 3. SPREADING THE HOT ASPHALTIC MIX TURES BY ASPHALT FINISHER
CM 4. FIRST COMPACTING BY TANDEM ROLLER, MIDDLE COMPACTING BY
PNEUMATIC TYRE ROLLER AND FINAL COMPACTING BY TANDEM ROLLER
1. THE PRIME COAT APPLIED TO SURFACE OF THE BASE COARSE BY ALSO
ASPHALT SPRAYER, BEFORE THAT CLEAN THE SURFACE BY COMPRESSOR
2. ALOCATE THE HOT ASPHALTIC MIXTURES (ASPHALT TREATED BASE BY
DUMP TRUCK) INTO ASPHALT FINISHER
- THE ASPHALT TEMPERATURE IS NOT LESS THAN 120ºC
3 4A 4B 4C
1 2
1
WIDENING ROAD
FLEXIBLE PAVEMENT
3. TACK COAT 3. SPREADING THE HOT ASPHALTIC MIX TURES BY ASPHALT FINISHER
5. TACK COAT
3 4A 4B 4C
1 2
1
1.Kerataan
2.Kemiringan melintang
3.Kemiringan memanjang
4.Ketebalan
5.kepadatan