LAMPIRAN E
ANALISA EKONOMI
𝐶𝑎 0.6
Ea = Eb x ( ) (Ulrich, 1984)
𝐶𝑏
𝑛.(𝛴𝑥.𝑦)−(𝛴𝑥)(𝛴𝑦) (11×803)−(0×3533)
b= = = 7,3
𝑛.(𝛴𝑥 2 )−(𝛴𝑥)2 (11𝑥110)−0
Direncanakan alat pabrik akan dibeli pada tahun 2020, x = 35, maka indeks harga pada
tahun 2020 adalah :
y = 321,1818 + 7,3x
= 321,1818 + 7,3 (35)
= 576,6818
Tanah Bangunan
No Jenis
Luas (m2) Biaya (Rp) Biaya (Rp)
Area Loading
1 1259,06 2.769.940.800 3.000.000
Area Parkir
2 1601,96 3.524.320.800 3.000.000
Area Perluasan Pabrik
3 4768,2 10.490.040.000 -
Area Persiapan Bahan
4 baku 234,36 515.592.000 7.000.000
4. 1 4.140,48
Tangki 4 4.480,81 4.480,81
5. 1 3.394.151,59
Tangki 5 3.673.132,48 3.673.132,48
6. 1 1.272.806,85
Deaerator 1.377.424,68 1.377.424,68
7. 1 275.774,82
Boiler 298.442,01 298.442,01
8. T.
1 33.941,52
Kondensat 36.731,32 36.731,32
9. T. Bahan
1 190.921,03
bakar boiler 206.613,70 206.613,70
10. 1 941.336,29
Blower 1.018.709,04 1.018.709,04
11. 1 383.058,05
Compresor 414.543,35 414.543,35
12. 2 161.222,20
Pompa 1 174.473,79 348.947,59
13. 2 141.019,40
Pompa 2 152.610,44 305.220,87
14. 2 229.397,34
Pompa 3 248.252,56 496.505,12
15. 2 244.367,16
Pompa 4 264.452,82 528.905,64
16. 2 23.370,13
T. Silika 25.291,03 50.582,06
17. 2 93.038,11
Generator 100.685,34 201.370,67
Biaya Peralatan Produksi 384.287,30
Biaya Pengangkutan dan Asuransi (10%) 38.428,73
Sub Total (US$) 422.716,03
Pajak Pertambahan Nilai / PPN (10%) 42.271,60
Total (US$) 464.987,63
Total Gaji = Total gaji karyawan/tahun + tunjangan hari raya (1 bulan gaji)
= ( Rp 917.000.000) x12 + Rp 917.000.000
= Rp 11.921.000.000,00
= US$ 856.393,68
Kenaikan gaji sebesar 10% per tahun.
LAMPIRAN E ANALISA EK ONOMI |E-10
Total 41.140.754,56
Struktur permodalan adalah 50% modal sendiri dan 50% pinjaman dari bank. Masa
konstruksi pabrik satu tahun dan selama masa tersebut cicilan hutang yang harus dibayar ke
bank adalah bunganya 20% saja.
Bunga pinjaman selama masa konstruksi = (20% x 40% x 1) x TCI
= US$ 4.038.786,91
Total = TCI + bunga bank selama konstruksi
= US$ 46.720.409,07+ US$ 4.038.786,91
= US$ 54.523.623,29
Modal sendiri = TCI x 50% = US$ 27.261.811,64
Pinjaman bank = TCI x 50% = US$ 27.261.811,64
E.7.2 Perhitungan Angsuran dan Bunga Bank
Jangka waktu pinjaman 5 tahun.
Angsuran pertama dihitung saat pabrik beroperasi.
Bunga bank adalah 20% per tahun (dianggap tetap tiap tahun).
Sistem perhitungan bunga bank 20% dari sisa pinjaman tiap tahun.
Besar pinjaman bank (P) = US$ 27.261.811,64
LAMPIRAN E ANALISA EK ONOMI |E-12
E.7.3 Depresiasi
1. Biaya yang didepresiasikan adalah modal tetap tanpa harga tanah.
2. Umur aset pabrik (n) adalah 10 tahun.
3. Original Value (V) = FCI – harga tanah
= US$ (9.344.081,81- 2.809.700,53 )
= US$ 6.534.381,28
4. Salvage Value (Vs) = dianggap nol (0)
Depresiasi dihitung dengan metode Sum of The Year Digit :
Nilai depresiasi pada setiap tahunnya diketahui dengan persamaan :
da = 2 x (n – a +1) x (V – Vs)
n (n + 1)
Tahun ke 1 2 3 4 5 6 7 8 9 10
Kapasitas Produksi % 80 90 100 100 100 100 100 100 100 100
1. Fixed Cost (FC)
a. Gaji Karyawan 856.394 942.033 1.036.236 1.139.860 1.253.846 1.379.231 1.517.154 1.668.869 1.835.756 2.019.331
b. Biaya Pemeliharaan ( 2 % FCI ) 186.882 205.570 226.127 248.739 273.613 300.975 331.072 364.179 400.597 440.657
c. Biaya Pengawasan ( 10 % Gaji ) 85.639 942.033 1.036.236 1.139.860 1.253.846 1.379.231 1.517.154 1.668.869 1.835.756 2.019.331
d. Biaya Laboratorium ( 10 % Gaji ) 85.639 94.203 103.624 113.986 125.385 137.923 151.715 166.887 183.576 201.933
e. Depresiasi 1.188.069 1.069.262 950.455 831.649 712.842 594.035 475.228 356.421 237.614 118.807
f. Pajak Daerah ( 2 % FCI ) 186.882 205.570 226.127 248.739 273.613 300.975 331.072 364.179 400.597 440.657
g. Asuransi ( 1 % FCI ) 93.440,82 102.785 113.063 124.370 136.807 150.487 165.536 182.090 200.299 220.329
h. Bunga Bank + Angsuran Pokok 10.904.725 9.814.252 8.723.780 7.633.307 6.542.835 - - - - -
i. Biaya Administrasi ( 2 % Penjualan ) 1.280.000 1.440.000 1.600.000 1.616.000 1.632.160 1.648.482 1.664.966 1.681.616 1.698.432 1.715.417
i. Biaya Plant Overhead
50 % ( Gaji + Pemeliharaan + Pengawasan ) 564.457 1.044.818 1.149.300 1.264.230 1.390.653 1.529.718 1.682.690 1.850.959 2.036.055 2.239.660
TOTAL FIXED COST (FC) 15.432.128 15.860.526 15.164.948 14.360.740 13.595.599 7.421.055 7.836.587 8.304.069 8.828.682 9.416.123
2. Variable Cost
a. Biaya bahan baku 16.100.536 18.113.103 20.125.670 20.326.927 20.530.196 20.735.498 20.942.853 21.152.282 21.363.805 21.577.443
b. Biaya Utilitas 12.292.424 13.828.977 15.365.530 15.519.185 15.674.377 15.831.121 15.989.432 16.149.326 16.310.819 16.473.928
c. Biaya Distribusi dan Penjualan
( 2 % Penjualan ) 1.280.000 1.440.000 1.600.000 1.616.000 1.632.160 1.648.482 1.664.966 1.681.616 1.698.432 1.715.417
d. Biaya Royalti dan Paten
( 2 % Penjualan ) 1.280.000 1.440.000 1.600.000 1.616.000 1.632.160 1.648.482 1.664.966 1.681.616 1.698.432 1.715.417
TOTAL VARIABLE COST (VC) 30.952.960,13 34.822.080 38.691.200 39.078.112 39.468.893 39.863.582 40.262.218 40.664.840 41.071.489 41.482.204
TPC 46.385.088 50.682.607 53.856.148 53.438.852 53.064.492 47.284.638 48.098.805 48.968.909 49.900.170 50.898.326
TOTAL SALE (TS) 64.000.000,00 72.000.000,00 80.000.000,00 88.000.000,00 88.880.000,00 89.768.800,00 90.666.488,00 91.573.152,88 92.488.884,41 93.413.773,25
BEP = FC / ( TS - VC ) 46,70 42,66 36,71 29,35 27,52 14,87 15,55 16,31 17,17 18,13
BEP rata - rata 26,50
LAMPIRAN E ANALISA EK ONOMI |E-16
Pajak penghasilan yang dipakai adalah Undang – Undang No. 10 Tahun 1994, pasal 25,
yaitu :
a. Penghasilan < Rp 25 juta dikenakan pajak sebesar 10%
b. Penghasilan Rp 25 juta – Rp 50 juta dikenakan pajak sebesar 15%
c. Penghasilan > Rp 50 juta dikenakan pajak sebesar 30%
MPP = TCI
( Laba bersih rata-rata + depresiasi rata-rata)
TCI = US$ 46.720.409,07
Laba bersih rata-rata = US$ 45.288.608,19
Depresiasi rata-rata = US$ 6.534.381,28
Jadi, MPP = 46.720.409,07
(US$ 45.288.608,19+ US$ 6.534.381,28)
= 1,00
Jangka waktu pengembalian modal adalah 1.00 tahun.