Ip
Cp = x Co
Io
Dengan metode least square dan data-data pada tabel di atas dilaku-
kan pendekatan atau penafsiran indeks harga peralatan pada awal tahun di-
mana data-data.
Keterangan :
Y = Indeks Harga Peralatan pada Tahun ke-n
X = Tahun ke-n
X Y X² Y² XY
2007 525.40 4,028,049 276,045 1,054,478
2008 575.40 4,032,064 331,085 1,155,403
2009 521.90 4,036,081 272,380 1,048,497
2010 550.80 4,040,100 303,381 1,107,108
2011 585.70 4,044,121 343,044 1,177,843
2012 584.60 4,048,144 341,757 1,176,215
2013 567.30 4,052,169 321,829 1,141,975
2014 590.08 4,056,196 348,194 1,188,421
2015 612.80 4,060,225 375,524 1,234,792
2016 635.50 4,064,256 403,860 1,281,168
20115 5749.48 40,461,405 3,317,100 11,565,900
Jumlah data = n
= 10
x 2
x x x n
2 2
= 82.5000
y 2
y y y
2 2
= 11447.9794
n
x y =
x x y y xy
n
821.0000
b
x x y y = 9.9515
x x
2
ΣY
Rata-rata Y = = 574.9480
n
ΣX
Rata-rata X = = 2011.500
n
y = a + b(x-c)
= 574.95 + 9.95 (x - 2011.5 )
= -19442.5247 + 10 x
Dari persamaan di atas diperoleh indeks harga pada tahun 2020 sebesar
y = 659.5359 Rumus yang digunakan untuk menentukan harga per-
alatan pada tahun 2020 diambil dari "Plant Designand Econo mics for-
Chemical Engineers, fifth edition":Peters, Max.S (6:236)
a. Air
Kebutuhan air tiap hari = 16664.6300 m3/hari
Biaya air tiap hari = 16664.6300 x Rp 1,750
= Rp 29,163,103
Biaya pengolahan/thn = Rp 9,623,823,825.00
B. Vanadium PentaOksida
Kebutuhan 123,310 kg/jam
Biaya per kg Rp 12,500 per kg
Hari kerja per tahun 330
Biaya per tahun Rp 508,653,750,000
Total harga bahan baku Rp 519,708,331,230
D.6 Depresiasi
A. Depresiasi Peralatan
Harga pembelian peralatan (A) Rp 175,343,383,600
Taksiran harga akhir masa pakai 5% (A) Rp 8,767,169,180
Umur 10 tahun
Depresiasi Rp 16,657,621,442
B. Depreasiasi Bangunan
Harga Bangunan (B) Rp 98,750,000,000
Taksiran harga akhir bangunan 20% (B) Rp 19,750,000,000
Umur 10 tahun
Depreasiasi Rp 7,900,000,000
(Scribd/Pedoman beli)
BAB XI
ANALISA EKONOMI
Analisa ekonomi merupakan salah satu unsur yang sangat penting dalam melakukan suatu
perancangan, karena dari analisa ekonomi ini kita dapat mengetahui apakah perencaaan itu memenuhi
atau tidak ketika diapilkasikan secara lagsung.
Faktor-faktor yang perlu untuk ditinjau antara lain :
1. Laju pengembalian modal (Rate of Return)
2. Lama pengembalian modal (Pay out Periode)
3. Titik impas (Break Event Point)
Manufacturing Cost :
Manufacturing cost = Rp 748,804,519,145 + 0.1242 TCI
= Rp 748,804,519,145 + 0.1242 TCI
= Rp 748,804,519,145 + 0.1242 Rp 1,747,390,795,495
= Rp 748,804,519,145 + Rp 217,085,222,859
Manufacturing Cost = Rp 965,889,742,003
General Expanses
1 Biaya administrasi = 0.0300 TPC
= 0.0300 Rp 1,163,722,580,727
Biaya administrasi = Rp 34,911,677,422
1 2 19 (13-18-12)
Laba
Tahun ke Kapasitas Pabrik (%)
Kotor
-2 0%
-1 0%
0 0%
1 80% Rp 300,548,625,203
2 90% Rp 429,611,136,500
3 100% Rp 558,673,647,796
4 100% Rp 558,673,647,796
5 100% Rp 558,673,647,796
6 100% Rp 558,673,647,796
7 100% Rp 558,673,647,796
8 100% Rp 558,673,647,796
9 100% Rp 558,673,647,796
10 100% Rp 558,673,647,796
Rp 519,954,894,407
Rp 519,954,894,407
Sendiri 60% Asing 40%
Rp 932,062,219,224 Rp 621,374,812,816
4 5
Investasi (Rp.)
Modal Sendiri 60% Modal Asing 40%
Inflasi 8% Jumlah Pengeluaran
Rp 559,237,331,535 Rp 372,824,887,690
Rp 44,738,986,523 Rp 417,563,874,212 Rp 248,549,925,126
Rp 74,564,977,538 Rp 74,564,977,538
Rp 72,576,578,137 Rp 24,557,621,442
Rp 72,576,578,137 Rp 1,560,000,000,000 Rp 24,557,621,442
Rp 72,576,578,137 Rp 1,755,000,000,000 Rp 24,557,621,442
Rp 72,576,578,137 Rp 1,950,000,000,000 Rp 24,557,621,442
Rp 72,576,578,137 Rp 1,950,000,000,000 Rp 24,557,621,442
Rp 72,576,578,137 Rp 1,950,000,000,000 Rp 24,557,621,442
Rp 72,576,578,137 Rp 1,950,000,000,000 Rp 24,557,621,442
Rp 72,576,578,137 Rp 1,950,000,000,000 Rp 24,557,621,442
Rp 72,576,578,137 Rp 1,950,000,000,000 Rp 24,557,621,442
Rp 72,576,578,137 Rp 1,950,000,000,000 Rp 24,557,621,442
Rp 1,950,000,000,000 Rp 24,557,621,442
15 16 17
Production Cost
Fixed Cost Variabel Cost Semi Variabel Cost
Rp 272,711,584,941
Rp 272,711,584,941 Rp 527,499,909,627 Rp 386,663,302,092
Rp 272,711,584,941 Rp 593,437,398,330 Rp 386,663,302,092
Rp 272,711,584,941 Rp 659,374,887,033 Rp 386,663,302,092
Rp 272,711,584,941 Rp 659,374,887,033 Rp 386,663,302,092
Rp 272,711,584,941 Rp 659,374,887,033 Rp 386,663,302,092
Rp 272,711,584,941 Rp 659,374,887,033 Rp 386,663,302,092
Rp 272,711,584,941 Rp 659,374,887,033 Rp 386,663,302,092
Rp 272,711,584,941 Rp 659,374,887,033 Rp 386,663,302,092
Rp 272,711,584,941 Rp 659,374,887,033 Rp 386,663,302,092
Rp 272,711,584,941 Rp 659,374,887,033 Rp 386,663,302,092
18(15+16+17)
TPC
Rp 272,711,584,941
Rp 1,186,874,796,660
Rp 1,252,812,285,363
Rp 1,318,749,774,067
Rp 1,318,749,774,067
Rp 1,318,749,774,067
Rp 1,318,749,774,067
Rp 1,318,749,774,067
Rp 1,318,749,774,067
Rp 1,318,749,774,067
Rp 1,318,749,774,067
IX.6 IRR (Internal rate of Return)
Untuk memperoleh harga i yaitu laju pengembalian total investasi akhir
masa konstruksi harus dipenuhi
CF
(1 i) n Total investasi pada akhir masa konstruksi
Total modal investasi pada akhir masa konstruksi = Rp 1,747,390,795,495
Dengan cara trial and error seperti Tabel 9, akan diperoleh harga :
IX.7 ROI
Laba kotor rata-rata = Rp 519,954,894,407
Laba bersih rata-rata = Rp 337,970,681,365
Total investasi = Rp 1,553,437,032,040
= 4.66
total investasi dapat dicapai pada = 4.66 tahun
FC + 0.3 SVC
BEP =
S - VC - 0.7 SVC
= 31.51%
Grafik BEP
Rp2,500,000,000,000 Chart Title
Rp2,500,000,000,000
Rp2,000,000,000,000
Rp2,000,000,000,000
Rp1,500,000,000,000
Rp1,500,000,000,000
Rp1,000,000,000,000
Rp1,000,000,000,000
Rp500,000,000,000
Rp500,000,000,000
Rp-
0 20 40 60 80 100 120
Rp-
0 100
Biaya Tetap Biaya Produksi Total Penjualan
Column D Column I Column M