komponen A B C D E
C3H3N 2.75E+01 -1.03E-01 3.40E-04 0.00E+00 0.00E+00
H2O 6.60E+01 -4.99E-01 1.94E-03 -3.37E-06 2.24E-09
C3H5ON 2.45E+01 -3.34E-02 -7.25E-06 4.87E-07 0.00E+00
komponen A B C D E
C3H3N 2.153 5.110E-02 2.000E-05 -3.280E-10 0.00E+00
H2O 7.701 4.595E-03 2.520E-06 -8.590E-10 0.00E+00
C3H5ON 1.843 4.350E-02 -2.400E-05 5.690E-09 0.00E+00
● Kapasitas produksi
Jumlah hari kerja = 330 hari/tahun
Kapasitas Produksi = 60000 ton/tahun = 7575.7576 kg/jam
Konversi CH2OHCH2CN 98% 142.77718763 kgmol/jam
● Bahan baku
Reaksi : C2HOHCH2CN C2HCHCN + H2O
Mula-mula : x - -
Bereaksi : (0.98)x 142.7771876 142.7771876
Kondisi Akhir: 0.2x 142.7771876 142.7771876
● Umpan Masuk
0.98x= 142.7771876
x= 145.6910077551 kgmol/jam
● Kemurnian
CH2OHCH2CN 99.00% 144.23409768 kgmol/jam
H2O 1.00% 1.4569100776 kgmol/jam
Dalam kg/jam
Komponen Masuk Keluar
Atas Bawah
kg/jam kg/jam kg/jam
C3H3N 7575.7576 7500.0000 75.7576
H2O 2612.2252 75.7576 2536.4676
C3H5ON 207.1143 0.0000 207.1143
Total 7575.7576 2612.2252
10187.9828 10187.9828
Dalam kgmol/jam
Komponen Masuk Keluar
Atas Bawah
kgmol/jam kgmol/jam kgmol/jam
C3H3N 142.7772 141.3494 1.4278
H2O 144.9626 4.2041 140.7585
C3H5ON 2.9138 0.0000 2.9138
Total 145.5535 145.1001
290.6536 290.6536
Dalam kg/jam
Komponen Masuk Keluar
Atas Bawah
kg/jam kg/jam kg/jam
C3H3N 75.7576 75.7576 0.0000
H2O 2536.4676 2498.4206096 38.0470
C3H5ON 207.1143 3.1067150503 204.0076
Total 2577.2849 242.0546
2819.3395 2819.3395
Dalam kgmol/jam
Komponen Masuk Keluar
Atas Bawah
kgmol/jam kgmol/jam kgmol/jam
C3H3N 1.4278 1.4278 0.0000
H2O 140.7585 138.6471 2.1114
C3H5ON 2.9138 0.0437 2.8701
Total 140.1186 4.9815
145.1001 145.1001
Dalam kg/jam
Komponen Masuk Keluar
Recycle ST-01 Fresh Feed
kg/jam kg/jam kg/jam
C3H3N 0.0000 0.0000 0.0000
H2O 38.0470 1.3333 39.3803
C3H5ON 204.0076 10151.7092 10355.7168
Total 242.0546 10153.0425
10395.0971 10395.0971
Dalam kgmol/jam
Komponen Masuk Keluar
Recycle ST-01 Fresh Feed
kgmol/jam kgmol/jam kgmol/jam
C3H3N 0 0 0.0000
H2O 2.1114 0.0740 2.1854
C3H5ON 2.87011285366 142.82089495 145.6910
Total 4.9815 142.8949
147.8764 147.8764
Dalam kg/jam
Komponen Masuk Keluar
Umpan Recycle SP-01
kg/jam kg/jam kg/jam
C3H3N 0.0000 0.0000 0.0000
H2O 39.3803 9.8451 49.2253
C3H5ON 10355.7168 2588.9292 12944.6460
Total 10395.0971 2598.7743
12993.8714 12993.8714
Dalam kgmol/jam
Komponen Masuk Keluar
Umpan Recycle SP-01
kgmol/jam kgmol/jam kgmol/jam
C3H3N 0.0000 0.0000 0.0000
H2O 2.1854 0.5463 2.7317
C3H5ON 145.6910 36.4228 182.1138
Total 147.8764 36.9691
184.8455 184.8455
Dalam kg/jam
Komponen Masuk Keluar
dari VP-01 ke VP-01 ke R-01
kg/jam kg/jam kg/jam
C3H3N 0.0000 0.0000 0.0000
H2O 49.2253 9.8451 39.3803
C3H5ON 12944.6460 2588.9292 10355.7168
Total 2598.7743 10395.0971
12993.8714 12993.8714
Dalam kgmol/jam
Komponen Masuk Keluar
dari VP-01 ke VP-01 ke R-01
kgmol/jam kgmol/jam kgmol/jam
C3H3N 0.0000 0.0000 0.0000
H2O 2.7317 0.5463 2.1854
C3H5ON 182.1138 36.4228 145.6910
Total 184.8455 36.9691
221.8146 147.8764
Dalam kg/jam
Komponen Masuk Keluar
kg/jam Produk Limbah
kg/jam kg/jam
C3H3N 0.0000 7500.0000 75.7576
H2O 1.3333 75.7576 2498.4206
C3H5ON 10151.7092 0.0000 3.1067
Total 7575.7576 2577.2849
10153.0425 10153.0425
Dalam kgmol/jam
Komponen Masuk Keluar
kgmol/jam Produk Limbah
kgmol/jam kgmol/jam
C3H3N 0.0000 141.3494 1.4278
H2O 0.0740 4.2041 138.6471
C3H5ON 142.8209 0.0000 0.0437
Total 145.5535 140.1186
142.8949 285.6721
NERACA PANAS
komponen A B C D E
C3H3N 2.75E+01 -1.03E-01 3.40E-04 0.00E+00 0.00E+00
H2O 6.60E+01 -4.99E-01 1.94E-03 -3.37E-06 2.24E-09
C3H5ON 2.45E+01 -3.34E-02 -7.25E-06 4.87E-07 0.00E+00
komponen A B C D E
C3H3N 2.153 5.110E-02 2.000E-05 -3.280E-10 0.00E+00
H2O 7.701 4.595E-03 2.520E-06 -8.590E-10 0.00E+00
C3H5ON 1.843 4.350E-02 -2.400E-05 5.690E-09 0.00E+00
Dimana :
[
H V = A 1−
TC ]
Hv = Panas laten penguapan pada suhu tertentu T , kkal/kmol
Tc = Suhu kritis, K
Komponen A Tc n
C3H3N 41.537 535 0.273
H2O 52.053 647 0.321
C3H5ON 87.147 710 0.117
(H2)
a. Menghitung H1
T Fresh feed = 30 °C = 303.15 K
b. Menghitung H13
H 13 berasal dari hasil bawah menara stripper-01 dan berada pada kondisi cair jenuh
T = 67.593 °C = 340.742989311 K
P = 1.3 atm = 988 mmHg
SP-01
H2
VP-01
Qs
T Campuran = 335.79 K
Q Recycle T= 340.28 K
Komponen kmol/jam Kkal/kmol Q=Kkal/jam
H2O 2.73 761.39 9349.32
C3H5ON 182.11 1332.49 1090801.39
Total 184.85 1100150.71
Qs = 219,156.9404 kkal/jam
Kesimpulan
Komponen Masuk Keluar
kkal/jam kkal/jam
Enthalpi Umpan 25,588.3157 0
Enthalpi Keluar 0.0000 93449.5978
Beban Panas 6,516,674.3672 0.0000
(Qs+Qv) 0 6,448,813.0851
Total 6,542,262.6829 6,542,262.6829
Qhe
H3 H4
HE-01
a. Menghitung H4
T = 250.00 °C = 523.15 K
Kesimpulan
Komponen Masuk Keluar
kkal/jam kkal/jam
Enthalpi Umpan 93,449.5978 0
Enthalpi Keluar 0.0000 623451.7118
Beban Panas 530,002.1140 0.0000
Total 623,451.7118 623,451.7118
Hreaksi
H5 H6
R-01
∆H = 943,503.3392 kkal/jam
Kesimpulan
Komponen Masuk Keluar
kkal/jam kkal/jam
Enthalpi Umpan 623,451.7118 0
Enthalpi Reaksi 943,503.3392 0
Enthalpi Keluar 0.0000 1566872.0071
Beban Panas 0.0000 0.0000
Total 1,566,955.0510 1,566,872.0071
H5 H6
CL-01
a. Menghitung H6
T = 87.5420 °C = 360.692 K
Q = 1,294,298.6902 kkal/jam
Kesimpulan
Komponen Masuk Keluar
kkal/jam kkal/jam
Enthalpi Umpan 1,566,872.0071 0
Enthalpi Keluar 0.0000 272573.3169
Beban Panas 0.0000 1,294,298.6902
Total 1,566,872.0071 1,566,872.0071
H7
Qc
H6 MD-01
H8 H9
H6 MD-01
H8 H9
Qr
H10
α z
∑ α i−θif =1−q
i
d. Menghitung Rmin
Refluks minimum dapat dicari dengan metode Underwood :
α x
∑ α i−θid =R m +1
i
Dengan : Rm = minimum reflux ratio
xid = konsentrasi komponen i di distilat.
αi = volatilitas relatif komponen i
Rmin = 1.8448021828279
Refluks operasi optimum berkisar antara (1.2 - 1.5) kali refluks minimum.
R = 1.25 Rmin
R = 2.3060
1. Menghitung H 6
T = 87.5420 °C = 360.6920 K
2. Menghitung H 7
T = 79.2136 °C = 352.3636 K
5. Menghitung H 9
T = 78.5502 °C = 351.7002 K
Qr = Qc + H9 + H10 - H6
= 2,587,672.9535 kkal/jam
Kesimpulan
Komponen Masuk Keluar
kkal/jam kkal/jam
Enthalpi Umpan 272,573.3169 0
Enthalpi Keluar 0.0000 1093865.6405
Beban Panas (Qc) 0.0000 1,766,380.6298
Beban Panas (Qr) 2,587,672.9535 0.0000
Total 2,860,246.2704 2,860,246.2704
H9 H
CL-02
a. Menghitung H
P = 1 atm
T = 30.0000 °C = 303.15 K
Q = 260,784.1957 kkal/jam
Kesimpulan
Komponen Masuk Keluar
kkal/jam kkal/jam
Enthalpi Umpan 256,214.2298 0
Enthalpi Keluar 0.0000 -4569.9659
Beban Panas 0.0000 260,784.1957
Total 256,214.2298 256,214.2298
H11
H10 ST-01
H12
1. Menghitung H 1
T = 99.8655 °C = 373.0155 K
3. Menghitung H 12
T = 67.5720 °C = 340.7220 K
Qsteam = H 11 +H 12 - H10
= 9,789,317.6429 kkal/jam
H11 H
CD-02
a. Menghitung H
P = 1 atm
T = 30.0000 °C = 303.15 K
Qc = 90,671.0192 kkal/jam
Kesimpulan
Komponen Masuk Keluar
kkal/jam kkal/jam
Enthalpi Umpan 103,723.2674 0
Enthalpi Keluar 0.0000 13052.2482
Beban Panas 0.0000 90,671.0192
Total 103,723.2674 103,723.2674
H11 H
CL-03
a. Menghitung H
P = 1 atm
T = 30.0000 °C = 303.15 K
Q = 96,935.4939 kkal/jam
Kesimpulan
Komponen Masuk Keluar
kkal/jam kkal/jam
Enthalpi Umpan 103,723.2674 0
Enthalpi Keluar 0.0000 6787.7735
Beban Panas 0.0000 96,935.4939
Total 103,723.2674 103,723.2674
REAKTOR
dw dXa
=
Fao -rA
dw =ρ B . Nt .π /4 .(IDt )2 (1-ε) dZ
2
∫ dw =ρ B . Nt . π /4 .( IDt ) (1- ε ) ∫ dZ
w =ρB . Nt .π /4 .(IDt )2 (1-ε) Z
= 1202803.1319 kg
Perancangan Baffle
Dipilih :
Jenis = Single Segmental Baffle
Baffle Cut = 25 % Baffle Diameter
Baffle Spacing (Lb) = 0.5 IDs
Lb = 0.4647 m
Jml Baffle Nb = 9 buah
Head
Bentuk head yang direncanakan : Torispherical
dengan bahan yang sama dengan bahan Shell : SA.283 Grade C
a. Tebal head (th)
0 . 885×P× ri
th= +C
f × E - 0.1 ×P
= 0.15345507652 in
r
Sehingga diperoleh tinggi head :
= 8 9/16 in
= 3/16 m
C
• Volume shell
π
V S= ⋅ID 2⋅LS
4 S
= 169649.96344 in3
BM umpan = 70.28304
Densitas umpan
ρ = P.BM/R.T
= 0.00327567088 gram/cm3
= 3.27567087643 kg/m3
Dopt = 253.5224 mm
= 9.9812 in
Dari Brownell App.k, dipilih ukuran standart :
ID = 10.02 in
OD = 10.75 in
0 .5 - 0 .35
Dopt = 226 Wm ρ
Wm = Kec. umpan out 2.887527 kg/s
ρ = Densitas gas out = 0.9351556 kg/m3
Dopt = 393.1535 mm
= 15.478436 in
Dari Brownell App.k, dipilih ukuran standart :
ID = 15.5 in
OD = 16 in
Dopt = 410.3090 mm
= 12.8714 in
Dari Brownell App.k, dipilih ukuran standart :
ID = 13 in
OD 14 in
Isolator
Asumsi :
1. Keadaan steady state.
2. Suhu dalam reaktor sama dengan suhu permukaan dinding dalam shell, T1 = 250 oC
3. Suhu udara lingkungan, Tu = 303 K 523.15 K
T3 T4
T2
q1 q2 q3 q4 Tu
T1
r1
r2
r3
Keterangan :
r1 = jari-jari dalam shell = 1.5246 ft
r2 = jari-jari luar shell = 1.5402 ft
r3 = jari-jari penyekat
Q1 = transfer panas konveksi dari pendingon ke dalam reaktor
Q2 = transfer panas konveksi dari dinding dalam ke luar reaktor
Q3 = transfer panas konveksi dari dinding luar reaktor ke dinding isolasi
Q4 = transfer panas konveksi dari dinding isolasi ke udara
T1 = suhu reaktor
Tu = suhu udara lingkungan
• Bahan penyekat yang digunakan adalah asbestos yang memiliki sifat : (Kern, 1956)
Ka = 0.129 Btu/jam.ft.°F
ρa = 36 lb/ft3
εa = 0.96
Qisolasi = 2 . π . L ( Ts-Tu )
Ln ( r 2 /r 1 ) Ln ( r3 /r 2 )
+
Ks Ka
Qisolasi =
2×3 ,14×3 , 608913×( 482,27-86 )
1,5402 r
Ln ( ) Ln ( 3 )
1,5246 1,5402
+
21 0,129
r3 = 1.6291205299 ft
SPESIFIKASI R-01
1
Konversi Reaksi
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5
Panjang Pipa, m
Grafik Hubungan antara Panjang Pipa Vs Temperatur
560
550
540
Temperatur, K
530
Temp Shell
520 Temp Tube
510
500
490
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5
Panjang Pipa, m
MENARA DISTILASI - 01
Sehingga,
Dipilih : Light Key Component (LK) = Acrylonitrile
Heavy Key Component (HK) = Air
Dirancang : MD menggunakan kondenser total, dimana uap keluar top menara diembun-
kan seluruhnya. Sebagian diambil sebagai distilat dan sebagian dikembalikan
ke menara sebagai refluks. Cairan distilat berada pada kondisi cair jenuh.
Kondisi operasi bawah menara terjadi pada keadaan Bubble point (titik didih), Σ yii = Σ(ki.xi) = 1
maka Σ yi = Σxi*ki
Kondisi operasi : P = 1.2 atm = 912.0000 mmHg
T= 102.9320 °C = 376.0820 K
αD = Klk/Khk
= 2.2904
αB = Klk/Khk
= 1.81705228382597
Rm + 1 = 2.8448
Rmin = 1.8448
Refluks operasi optimum berkisar antara (1.2 - 1.5) kali refluks minimum.
(Coulson and Richardson, 1983 : 392)
R = 1.25 Rmin
= 2.3060
x LK x HK
N m=
log
[( ) ( ) ]
x HK d x LK b
log α Avg
Nm = 11.2640
= 12
μa = 0.0990 cp
Dimana : μa = Viskositas rata-rata molar cairan, mNs/m^2 (dihitung dari suhu rata-rata)
αa = Volatilitas rata-rata komponen light key.
Eo = 73.4793 % 0.7348
Dimana :
Nr : Jumlah plate umpan dihitung dari atas (top)
Ns : Jumlah plate umpan dihitung dari bawah (bottom)
Nr/Ns = 0.9562
Nr + Ns = Nact - 1
Ns = 17.3802
Jadi feed terletak antara plate 17 dengan 18
Asumsi :
Aliran cairan dan uap sepanjang menara dianggap
Lo
D tetap (Equimolar Overflow).
Enriching V L
Section
Sehingga, L = Lo
F
Lo = R.D
Stripping
Section
V’ L’ L' = L + F = Lo + F
B V = V'
[ ρv ]
4 Vw
Uv
Dc =
√ π . ρ v .u v
= kecepatan uap masuk yag diijinkan bdasarkan luas tampang total menara, m/s
Vw = kecepatan uap/cairan maksimum, m/s
ls = plate spacing, m
Dc = Diameter kolom, m
Enriching section
Densitas Cairan ( ρL)
Komponen yi ρ (kg/m3) yi . ρ
C3H3N 0.9711 851.0000 826.4202
H2O 0.0289 998.0000 28.8256
Total 1.0000 855.2459
Uv = 0.8682 m/s
Vw = 25045.4750 kg/jam
= 6.9571 kg/s
Dc = 2.3814 m
= 7.8128 ft
Stripping section
Densitas cairan ( ρL)
Komponen xi ρ (kg/m3) xi . ρ
C3H3N 0.0098 888.0000 8.7378
H2O 0.9701 987.0000 957.4676
C3C5ON 0.0201 992.0000 19.9208
Total 0.9799 966.2055
Uv = 1.4399 m/s
Vw = 9320.7441 kg/jam
2.5891 kg/s
Dc = 1.7411 m
5.7124 ft
2. Perancangan plate
Enriching Section Stripping Section
- Diameter coloumn = 2.3814 m 1.7411 m
- Luas penampang coloumn (Ac) = 4.4516 m2 2.3798 m2
- Luas downcomer (Ad) = 0.12 Ac = 0.5342 m2 0.2856 m2
- Luas net area (An) = Ac - Ad = 3.9174 m2 2.0942 m2
- Luas active area (Aa) = Ac - 2 Ad = 3.3832 m2 1.8086 m2
- Luas hole area (Ah) = 0.1 Aa = 0.3383 m2 0.1809 m2
a. Panjang Weir
Panjang weir (tw) merupakan fungsi Ad/Ac yang telah digrafikan (fig 11.31, Coulson)
untuk : Ad = 0.12ac, didapat tw/Dc = 0.76
Seksi Enriching Seksi Striping
tw = 1.8098 m tw = 1.3233 m
Dalam perancangan dipilih
Take weir height (hw) = 50 mm = 0.05 m
Hole diameter (Dh) = 5 mm = 0.005 m
Plate thickness / tebal plate = 5 mm = 0.005 m
b. Check Weeping
Seksi Enriching
Kecepatan uap (v) = (R + 1) D = 25,045.4750 kg/jam 6.9571 kg/s
Kecepatan cair (L) = R . D = 17,469.7175 kg/jam 4.8527 kg/s
max Lw = 4.8527 kg/s
Turn Down Rate diambil = 0.8
How = West Crost, mm cairan
2/3
Lw
max how = 750 [ ]
ρ L . tw
= 16.0656 mm liquid
Min Lw = 12.8525 mm liquid
2/3
Lw
min how = 750 [ ]
ρ L .tw
2/3
Lw
min how = 750
=
[ ]
ρ L .tw
30.7540 mm liquid
Uh min=
[ K 2−0. 90 . ( 25. 4−dh ) ]
( ρv )0. 5
Uh min = 5.6232 m/s
Seksi Stripping
Kecepatan uap (v) = R . B = 6,501.4046 kg/jam 1.8059 kg/s
Kecepatan cair (L) = v + B = 9,320.7441 kg/jam 2.5891 kg/s
max Lw = 2.5891 kg/s
Turn Down Rate diambil = 0.7
How = West Crost, mm cairan
2/3
Lw
max how = 750
=
ρ L . tw [ ] 11.8424 mm liquid
Min Lw = 8.2897 mm liquid
2/3
Lw
min how = 750 [ ]
ρ L . tw
= 25.7256 mm liquid
Uhmin=
[ K 2 −0. 90 . ( 25. 4−dh ) ]
( ρv )0. 5
Uh min = 8.4494 m/s
kecepatan fase uap
Qv = (V . BM vapour) / ρv
= 8604.7658 m3/jam
= 2.3902 m3/s
Ah / Ap ≈
Ah / Aa = 0.1
Tebal Plate / dh = 1
Hr = 14.6157 mm liquid
Seksi Stripping
Kecepatan uap max melalui hole
Uh max = Qv/Ah
= 13.2155 m/s
Ah / Ap =
Ah / Aa = 0.1
Tebal Plate / dh = 1
π
Luas satuan hole = .(dh2 )
4
= 1.9625E-05 mm2
Jumlah hole bawah
Ah / luas satuan hole = 9216
Keterangan :
1. Ts = tray spacing
2. Hb = downcomer back-up, diukur dr
permukaan plate,m
1
2 5 3. Hap = tinggi celah antara dinding
downcomer dgn plate
3 4
4. Hw = tinggi weir
5. How = ketinggian cairan diatas weir
Aap = Am
Lwd 2
(Coulson p 468 pers 11.92)
hdc =166 . [
ρLAm ]
Dimana :
Lwd = Kec alir cairan pd Downcomer
Hdc = Head loss pd Downcomer
Seksi Enriching
Flv = 0.0320
Dari fig 11.27 coulson untuk tray spacing 0.35 maka k = 0.07
Karena maximal superfacial veloity terjadi pada keadaan floading maka :
uf = 1.5242 m/s
Agar tidak terjadi floading superfacial velocity 85%
uf = 1.2956 m/s
Seksi Stripping
Flv = 0.0397
Dari fig 11.27 coulson untuk tray spacing 0.35 maka k = 0.018
uf = 0.6500 m/s
Agar tidak terjadi floading superfacial velocity 85%
uf = 0.5525 m/s
c. Check Entrainment
% foading =
(UvUf ) 100 %
Uv = Qv / An
Seksi Enriching
Uv = 0.9866 m/s
% foading = 64.7281 %
Dari fig 11.29 coulson
% foading = 64.7281 dan Flv = 0.0320
ψ = 0.07
Syarat : ψ < 0.1 → memenuhi
Seksi Stripping
Uv = 1.1413 m/s
% foading = 206.5646 %
Dari fig 11.29 coulson
% foading = 206.5646 dan Flv = 0.0397
y = 0.001 memenuhi
b. Tebal Head
Bentuk head = Torispherical Dished Head
(Brownell, pers.13.12)
th 0 . 885 P . ri
= + c
f . E - 0.1 P
th = 0.2693 in
= 0.0068 m
OA b
icr B A
sf Dari tabel 5.6, Brownell, Straight Flange (sf)
ID
antara (1,5-2,5)
a OD Straight Flange(sf) = 2 in
Dari tabel 5.7, Brownell - Young, diperoleh :
r
C
Seksi enriching Seksi stripping
ri = 96 in 66 in
icr = 6 in 4 in
icr / OD = 0.0612 0.0606
(Brownell, P.87)
a = ID/2 = 46.8770 in 34.2746 in
AB = a - icr = 41 in 30 2/7 in
BC = r - icr = 90 1/8 in 62 in
AC = (BC2 - AB2)1/2 = 80.2580 in 54.1059 in
b = r - AC = 15.7420 in 11.8941 in
Hh = th + b + sf = 18.0113 in 14.1634 in
6. Nozzel
0.5 - 0 .35 (R.K. Sinnot, Chem Eng Vol.6)
D opt = 226 Wm ρ
dimana :
Dopt = Diameter optimum, mm
Wm = Kec. umpan masuk/keluar, kg/s
ρ = Densitas gas umpan, kg/m3
Komponen yi ρ (kg/m3) yi . ρ
C3H3N 0.4912 868.00 426.3860
H2O 0.0100 1,250.00 12.5313
C3C5ON 0.4987 894.00 445.8797
Total 1.0000 884.7970
SPESIFIKASI MD-01
2. Perhitungan Condenser
Qc = 1,766,380.6298 kkal/jam
7009565.34735 Btu/jam
Fluida Panas
Uap keluar MD-01
Fluida Dingin
Air
Kec. Fluida Dingin = 4,346.4033 kg/jam
9582.01777329 lb/jam
Tekanan = 1 atm
Suhu masuk = 35 oC
= 95 F
Suhu keluar = 45 o
C
= 113 F
ta = 104 F
Berat molekul = 71.080 gram/gmol
Kapasitas panas = 1.00 kkal/kg F
= 1 btu/lb F
A. Menghitung ∆LMTD
ΔT 2− ΔT 1
Δ LMTD=
ΔT 2
Ln ( )
ΔT 1
∆LMTD = 69.65 oF
Q
A=
U D Δ LMTD
= 670.93 ft2
A
Nt=
a'' L
= 213.6187 buah
Dipakai 196 buah ( standar )
G={ W} over {LtimesNrSup{size8{ {2} over {3} } } } {}# {} }{ ¿¿ (Pers. 12.43 Kern)
¿ = 102.27407
Pada ta = 173.99 F
μ = 0.1919 cP
= 0.4644 lb/hr.ft
k = 0.1526
ρ = 48.5852 lb/ft3
s = 0.7774
De = 0.73
DS x G S
N RS=
μ
Res = 168668
jH = 85 (fig 28)
1
k μc
ho = j H
( )( )De k
3
ho = 308.9987 Btu/hr.ft.oF
Wt
Gt =
At
= 46621.522 lb/jam.ft2
V = Gt /(3600ρ)
ρ = 62.5000 lb/ft3
V = 0.2072068 ft/sec
Pada ta = 104 F
μ = 0.6531 cP
= 1.5805 lb/hr.ft
Dt x Gt
N Rt =
μ
Ret = 1524
hi = 400 Btu/hr.ft2.oF (fig25)
ID
h io=h i⋅
OD
= 330.66667 Btu/hr.ft2.oF
fG 2s D s N+ 1
( )
ΔPs =
5 . 22×1010 De s
= 0.0209 psi
Tube
Ret = 1524
f = 0.00033 (Fig 26)
s = 1
2
fGt Ln
ΔPt =
5 . 22×1010 Ds
= 0.0085 psi
2
4n v 62. 5
Δp R =
s
x ( )( )( )
2g
x
144
= 0.024 psia
ΔPT = ΔP t +ΔP R
= 0.0325 psia
U C −U D
Rd= = 0.000406 jam.ft2.oF/Btu
U C⋅U D
SUMMARY
SPESIFIKASI CD-01
2. Perhitungan Condenser
Qc = 90,671.0192 kkal/jam
359811.709699 Btu/jam
Fluida Panas
Uap keluar MD-01
Fluida Dingin
Air
Kec. Fluida Dingin = 1,511.1837 kg/jam
3331.53362835 lb/jam
Tekanan = 1 atm
Suhu masuk = 25 oC
= 77 F
Suhu keluar = 30 o
C
= 86 F
ta = 81.5 F
Berat molekul = 71.080 gram/gmol
Kapasitas panas = 1.00 kkal/kg F
= 1 btu/lb F
A. Menghitung ∆LMTD
Fluida Panas (F) Suhu Fluida Dingin (F) ∆T
211.76 Suhu Tinggi 86 125.76
86.00 Suhu Rendah 77 9.00
ΔT 2− ΔT 1
Δ LMTD=
ΔT 2
Ln ( )
ΔT 1
∆LMTD = 44.27 oF
Q
A=
U D Δ LMTD
= 54.18 ft2
A
Nt= ''
a L
= 17.2500 buah
Dipakai 196 buah ( standar )
G={ W} over {LtimesNrSup{size8{ {2} over {3} } } } {}# {} }{ ¿¿ (Pers. 12.43 Kern)
¿ = 10.524432
Pada ta = 148.88 F
μ = 0.1919 cP
= 0.4644 lb/hr.ft
k = 0.1526
ρ = 48.5852 lb/ft3
s = 0.7774
De = 0.73
DS x G S
N RS=
μ
Res = 17357
jH = 85 (fig 28)
1
k
μc
ho = j H
( ) k)
( De
3
ho = 308.9987 Btu/hr.ft.oF
Wt
Gt =
At
Wt
Gt =
At
= 16209.651 lb/jam.ft2
V = Gt /(3600ρ)
ρ = 62.5000 lb/ft3
V = 0.0720429 ft/sec
Pada ta = 81.5 F
μ = 0.6531 cP
= 1.5805 lb/hr.ft
Dt x Gt
NR =
t μ
Ret = 530
hi = 400 Btu/hr.ft2.oF (fig25)
ID
h io=h i⋅
OD
= 330.66667 Btu/hr.ft2.oF
Tube
Ret = 530
f = 0.00033 (Fig 26)
s = 1
2
fGt Ln
ΔPt =
5 . 22×1010 Ds
= 0.0010 psi
2
4n v 62. 5
Δp R = ( )( )( )
s
x
2g
x
144
= 0.024 psia
ΔPT = ΔP t +ΔP R
= 0.0250 psia
Menghitung Clean Overall Coefficient
hio⋅ho
Uc= = 159.7328 Btu/jam.ft2.oF
hio + ho
U C −U D
Rd= = 0.000406 jam.ft2.oF/Btu
U C⋅U D
SUMMARY
SPESIFIKASI CD-02
Fungsi : Sebagai penampung arus keluaran kondensor pada menara distilasi 1 untuk
menjaga kontinuitas dan kestabilan aliran keluar
Type : Tangki silinder horizontal
Asumsi :
Kapasitas waktu tinggal 5 menit : 0.0833 jam (Treybal, 1966)
c. Volume tangki
Dianggap tangki berisi 80% cairan, maka :
volume tangki = 3.0612 m3 108.1688 ft3
809.0409 gal
2. Menentukan diameter dan panjang tangki
Dipilih tangki horizontal dengan
4
L= D
3
π π
V = D2 L× D3
4 12
= 1.309D^3
1
V
D= ( 1 , 309 ) 3
= 1.327342166 m
= 52.25756559 in
L = 1.769789555 m
= 69.67675412 in
t shell = 0.1668 in
0.0042 m
0 . 885 P . ri
th= +C
f . E - 0 .1 P
OD = ID + 2ts
= 52.6326 in
Dari tabel 5.7 digunakan OD = 54 in
icr = 3 1/4 in
r = 54 in
th = 0.1989 in
Dipakai tebal head standar (th) = 1/4 in
SPESIFIKASI ACC-01
Fungsi : Menguapkan cairan yang keluar dari MD-01 sebagai hasil bawah
Jenis : Kettle Reboiler
2. Perhitungan Reboiler
Q = 2587672.953 kkal/jam
= 10268716.92 btu/jam
Fluida Dingin
Cair keluar bawah MD-01
Fluida Panas
Steam
Kec. Fluida Panas = 5,130.3127 kg/jam
11310.213196 lb/jam
Tekanan = 1 atm
Suhu masuk = 151 oC
= 302.91998 F
Suhu keluar = 151 o
C
= 302.91998 F
ta = 302.91998 F
λ = 907.9 btu/lb
A. Menghitung ∆LMTD
Fluida Panas (F) Suhu Fluida Dingin (F) ∆T
150.51 Suhu Tinggi 104 46.07
150.51 Suhu Rendah 103 47.09
ΔT 2−ΔT 1
Δ LMTD=
ΔT 2
Ln( ΔT 1 )
∆LMTD = 46.58 oF
Q
A=
U D Δ LMTD
= 1469.67 ft2
A
Nt= ''
a L
= 415.9370 buah
Dipakai 384 buah ( standar )
ID⋅C '⋅B
as=
144⋅P T
as = 0.6903 ft2
G={ W} over {LtimesNrSup{size8{ {2} over {3} } } } {}# {} }{ ¿¿ (Pers. 12.43 Kern)
¿ = 21.60814848
Pada ta = 219.07 F
μ = 0.1919 cP
= 0.4644 lb/hr.ft
k = 0.1526
ρ = 48.5852 lb/ft3
s = 0.7774
De = 0.73
DS x G S
N RS=
μ
Res = 84892
jH = 85 (fig 28)
1
k
μc
ho = j H
( ) k)
( De
3
ho = 308.9987 Btu/hr.ft.oF
Wt
Gt =
At
= 14044.1389 lb/jam.ft2
V = Gt /(3600ρ)
ρ = 62.5000 lb/ft3
V = 0.062418395 ft/sec
Pada ta = 302.91998 F
μ = 0.6531 cP
= 1.5805 lb/hr.ft
Dt x Gt
NR =
t μ
Ret = 459
hi = 400 Btu/hr.ft2.oF (fig25)
ID
h io=h i⋅
OD
= 330.6666667 Btu/hr.ft2.oF
Tube
Ret = 459
f = 0.00033 (Fig 26)
s = 1
2
fGt Ln
ΔPt =
5 . 22×1010 Ds
= 0.0004 psi
2
4n v 62. 5
Δp R =
s
x
2g( )( )( )
x
144
= 0.012 psia
ΔPT = ΔP t +ΔP R
= 0.0124 psia
Menghitung Clean Overall Coefficient
hio⋅ho
Uc= = 159.7328 Btu/jam.ft2.oF
hio + ho
U C −U D
Rd= = 0.000406 jam.ft2.oF/Btu
U C⋅U D
SUMMARY
SPESIFIKASI RB-01
2. Perhitungan Cooler-01
Qc = 1,294,298.6902 kkal/jam
5136192.67263 Btu/jam
Fluida Panas
Uap keluar R-01
Fluida Dingin
Air
Kec. Fluida Dingin = 21,571.6448 kg/jam
47556.5362364 lb/jam
Tekanan = 1 atm
Suhu masuk = 30 oC
= 86 F
Suhu keluar = 50 o
C
= 122 F
ta = 104 F
Berat molekul = 71.080 gram/gmol
Kapasitas panas = 1.00 kkal/kg F
= 1 btu/lb F
A. Menghitung ∆LMTD
ΔT 2−ΔT 1
Δ LMTD=
ΔT 2
Ln ( )
ΔT 1
∆LMTD = 199.38 oF
Q
A=
U D Δ LMTD
= 171.74 ft2
A
Nt= ''
a L
= 87.4890 buah
Dipakai 92 buah ( standar )
G={ W} over {LtimesNrSup{size8{ {2} over {3} } } } {}# {} }{ ¿¿ (Pers. 12.43 Kern)
¿ = 112.45108
Pada ta = 326.47 F
μ = 0.1919 cP
= 0.4644 lb/hr.ft
k = 0.1526
ρ = 48.5852 lb/ft3
s = 0.7774
De = 0.73
DS x G S
N RS=
μ
Res = 49343
jH = 85 (fig 28)
1
k
μc
ho = j H
( ) k)
( De
3
ho = 308.9987 Btu/hr.ft.oF
Wt
Gt =
At
= 492955.75 lb/jam.ft2
V = Gt /(3600ρ)
ρ = 62.5000 lb/ft3
V = 2.1909144 ft/sec
Pada ta = 104 F
μ = 0.6531 cP
= 1.5805 lb/hr.ft
Dt x Gt
NR =
t μ
Ret = 16115
hi = 400 Btu/hr.ft2.oF (fig25)
ID
h io=h i⋅
OD
= 330.66667 Btu/hr.ft2.oF
Tube
Ret = 16115
f = 0.00033 (Fig 26)
s = 1
fGt2 Ln
ΔPt =
5 . 22×1010 Ds
= 0.5947 psi
4n v 2 62. 5
Δp R=
s
x ( )( )( )
x
2g 144
= 0.024 psia
hio⋅ho
Uc= = 159.7328 Btu/jam.ft2.oF
hio + ho
hio⋅ho
Uc=
hio + ho
U C −U D
Rd= = 0.000406 jam.ft2.oF/Btu
U C⋅U D
SUMMARY
SPESIFIKASI CL-01
2. Perhitungan Cooler-02
Qc = 260,784.1957 kkal/jam
1034875.40034 Btu/jam
Fluida Panas
Uap keluar MD-01
Fluida Dingin
Air
Kec. Fluida Dingin = 4,346.4033 kg/jam
9582.01777329 lb/jam
Tekanan = 1 atm
Suhu masuk = 20 oC
= 68 F
Suhu keluar = 35 o
C
= 95 F
ta = 81.5 F
Berat molekul = 71.080 gram/gmol
Kapasitas panas = 1.00 kkal/kg F
= 1 btu/lb F
A. Menghitung ∆LMTD
ΔT 2−ΔT 1
Δ LMTD=
ΔT 2
Ln ( )
ΔT 1
∆LMTD = 41.04 oF
A
Nt= ''
a L
= 85.6286 buah
Dipakai 92 buah ( standar )
G={ W} over {LtimesNrSup{size8{ {2} over {3} } } } {}# {} }{ ¿¿ (Pers. 12.43 Kern)
¿ = 81.952298
Pada ta = 129.70 F
μ = 0.1919 cP
= 0.4644 lb/hr.ft
k = 0.1526
ρ = 48.5852 lb/ft3
s = 0.7774
De = 0.73
DS x G S
N RS=
μ
Res = 35960
jH = 85 (fig 28)
1
k
μc
ho = j H
( ) k)
( De
3
ho = 308.9987 Btu/hr.ft.oF
Wt
Gt =
At
= 99324.112 lb/jam.ft2
V = Gt /(3600ρ)
ρ = 62.5000 lb/ft3
V = 0.4414405 ft/sec
Pada ta = 81.5 F
μ = 0.6531 cP
= 1.5805 lb/hr.ft
Dt x Gt
N Rt =
μ
Ret = 3247
hi = 400 Btu/hr.ft2.oF (fig25)
ID
h io=h i⋅
OD
= 330.66667 Btu/hr.ft2.oF
Tube
Ret = 3247
f = 0.00033 (Fig 26)
s = 1
2
fGt Ln
ΔPt =
5 . 22×1010 Ds
= 0.0241 psi
2
4n v 62. 5
Δp R=
s
x( )( )( )
2g
x
144
= 0.024 psia
hio⋅ho
Uc= = 159.7328 Btu/jam.ft2.oF
hio + ho
Menghitung Dirty Factor (Rd)
U C −U D
Rd= = 0.000406 jam.ft2.oF/Btu
U C⋅U D
SUMMARY
SPESIFIKASI CL-01
2. Perhitungan Heatter
Q = 530002.114 kkal/jam
= 2103218.519 btu/jam
Fluida Dingin
Uap keluar Separtor
Fluida Panas
Steam
Kec. Fluida Panas = 1,303.9963 kg/jam
2874.771469 lb/jam
Tekanan = 2 atm
Suhu masuk = 252 oC
= 486.21 F
Suhu keluar = 252 o
C
= 486.21 F
ta = 486.21 F
λ = 907.9 btu/lb
A. Menghitung ∆LMTD
Q
A=
U D Δ LMTD
= 274.14 ft2
A
Nt=
a' ' L
= 261.7805 buah
Dipakai 262 buah ( standar )
ID⋅C '⋅B
as=
144⋅P T
ID⋅C '⋅B
as=
144⋅P T
as = 0.4825 ft2
G={ W} over {LtimesNrSup{size8{ {2} over {3} } } } {}# {} }{ ¿¿ (Pers. 12.43 Kern)
¿ = 69.96239324
Pada ta = 313.37 F
μ = 0.1919 cP
= 0.4644 lb/hr.ft
k = 0.1526
ρ = 48.5852 lb/ft3
s = 0.7774
De = 0.73
DS x G S
N RS=
μ
Res = 79155
jH = 85 (fig 28)
1
k
μc
ho = j H
( ) k)
( De
3
ho = 308.9987 Btu/hr.ft.oF
Wt
Gt =
At
= 14684.26642 lb/jam.ft2
V = Gt /(3600ρ)
ρ = 62.5000 lb/ft3
V = 0.065263406 ft/sec
Pada ta = 486.21 F
μ = 0.6531 cP
= 1.5805 lb/hr.ft
Dt x Gt
NR =
t μ
Ret = 286
hi = 400 Btu/hr.ft2.oF (fig25)
ID
h io=h i⋅
OD
ID
h io=h i⋅
OD
= 296 Btu/hr.ft2.oF
fG 2s D s N+ 1 ( )
ΔPs =
5 . 22×1010 De s
= 0.0009 psi
Tube
Ret = 286
f = 0.00033 (Fig 26)
s = 1
2
fGt Ln
ΔPt =
5 . 22×1010 Ds
= 0.0004 psi
2
4n v 62. 5
Δp R =
s ( )( )( )
x
2g
x
144
= 0.012 psia
ΔPT = ΔP t +ΔP R
= 0.0124 psia
U C −U D = 0.003385 jam.ft2.oF/Btu
Rd=
U C⋅U D
SUMMARY
SPESIFIKASI HE-01
W
GS =
aS
1
k μc
ho = j H
( )( )
De k
3
f⋅G 2⋅L⋅n
t
ΔP =
t
5 , 22⋅1010⋅D⋅s⋅φ
f⋅G 2⋅D S⋅( N +1 )
S
ΔP =
S
5,22⋅1010⋅De⋅s
VAPORIZER-01
1 2
vaporiser sp1
arus 3 arus 4
kg/jam kmol/jam kg/jam kmol/jam
39.38027939 2.1854 9.8451 0.5463
10355.71683 145.6910 2588.9292 36.4228
10395.0971 147.8764 2598.7743 36.9691
Fluida Dingin
Preheating :
t1 = 62.7888 °C = 145.0198 °F
t2 = 67.1241 °C = 152.8234 °F
tavg = 148.92 °F
Vaporizing :
t1 = TBP = 67.1241 °C = 152.8234 °F
t2 = TDP = 69.6807 °C = 157.4252 °F
tavg = 155.12 °F
Fluida Panas
Sebagai pemanas digunakan steam dengan kondisi :
T1 = 130.6944 C = 267 °F
T2 = 130.6944 C = 267 °F
Wh = 3243.8295 kg/jam = 7151.4114 lb/jam
Beban panas
Vaporizer terbagi menjadi 2 bagian :
a. Beban panas preheating (Qs) = 219156.9404 kkal/jam
= 869685.09 Btu/jam
Beban vaporizer :
Q = 6516674.37 kkal/jam
= 25860255.74 Btu/jam
Delt Weighted
∆ LMTD tp = 118.2854 °F
∆ LMTD tv = 118.2854 °F
Heat load :
Qs / ∆ LMTD tp = 7352.4272 Btu/jam.°F
Qv / ∆ LMTD tv = 208996.7732 Btu/jam.°F
∑ (Q / ∆t) = 216349.2004 Btu/jam.°F
Delt Weighted :
∆tw = Q / ∑ (Q / ∆t) = 119.5302 °F
Menentukan UD
Hot fluid = Steam
Cold fluid = Light Organics
UD = 100 - 200 Btu/hr.ft2.oF
Dipilih UD = 150 Btu/hr.ft2.oF
Qc = 1442.33 ft2
A=
U D⋅Δt
Jenis HE : Shell & Tube Heat Exchanger
Karena A>200 ft2, maka dapakai Shell and Tube
Pada Tc = 148.92 °F
ρ = 48.59 lb/ft3
cp = 0.95 Btu/lb F
k = 0.153 Btu/j.ft.F
μ = 0.3424 cp
= 0.8286 lb/jam.ft
Res = 1920.5695
Dari Fig. 28, Kern, diperoleh :
jH = 63
1/3
k Cp⋅μ
ho = jH⋅
De( )( )
⋅
k
ho = 273.0609
hio⋅ho
U p,v =
hio +ho
Preheating :
Up = 231.0081
Vaporizing :
Uv = 231.0081
Qp,v
A p,v =
U p,v⋅Δtp,v
Qp,v
A p,v =
U p,v⋅Δtp,v
Preheating :
Ap = 31.8276 ft2
Vaporizing :
Av = 904.7164 ft2
UC=
∑ U⋅A
AC
= 231.0081 Btu/jam.ft2.oF
Dirt factor
(UC−UD )
Rd =
UC⋅UD
= 0.0023378134 jam.ft2.oF/Btu
ΔPT = ΔP t +ΔP R
= 0.0287 psia
Vaporizing :
(1) Re = 1920.5695
Dari fig.29 didapatkan f = 0.0018
SPESIFIKASI VP-01
Fungsi : Memisahkan komponen uap dan cairan yang keluar dari Vaporizer
Type : Vertikal Separator Single Stage
Kondisi operasi : P = 2 atm
T = 69.68 ºC
= 342.83 K
3
1 2
vaporiser sp1
BMgas =
∑ kg/ jam = 70.2959 kg/kmol
∑ kmo/ jam
P×BMgas
ρV = = 0.0050 kg/L
R×T = 0.3120 lb/ft3
a. Faktor pemisah
0.5
WL ρV
UV=
( )( )
WV ρL
(Evans, Eq.5.1)
= 0.0173
Dari fig.51, Evans diperoleh :
kv = 0.25
b. Kecepatan gas maksimum
0.5
ρ L−ρV
V max=kv
( ρV )
= 3.6001 ft3
= 0.1019 m3 3.6001 ft3
26.92643997 gal
c. Minimum crosse sectional area
Wv = 6.3659 lb/s
Qv = Wv / ρV
= 20.4038 ft3/s
= 1,224.229 ft3/menit
A min = Qv / Uv max
= 5.6676 ft2
d. Diameter minimum
D min = (4 (A min) / л) 0.5
= 2.6870 ft
= 32.2439 in
Diambil ukuran standar dengan pembulatan kelipatan 6 in
D = 36 in
SPESIFIKASI SP-01
komponen C1 C2 C3 C4 C5
C3H3N 2.75E+01 -1.03E-01 3.40E-04 0.00E+00 0.00E+00
H2O 6.60E+01 -4.99E-01 1.94E-03 -3.37E-06 2.24E-09
C3H5ON 2.45E+01 -3.34E-02 -7.25E-06 4.87E-07 0.00E+00
Hasil atas stripper diharapkan sebagian besar Acrylonitrile, sedangkan hasil bawah
diharapkan sebagian besar Air.
Diinginkan sebanyak 100 %-mol Acrylonitrile berada di hasil atas, dan 98.5 %-mol
Ethylene Cyanohydrine berada di hasil atas.
Sehingga,
Dipilih : Light Key Component (LK) = Air
Heavy Key Component (HK) = Ethylene Cyanohydrine
Dirancang : stripper menggunakan reboiler parsial, dimana cairan keluar bottom menara
diuapkan sebagian. Uap dikembalikan ke menara sebagai boil-up dan cairan di-
ambil sebagai bottom product. Bottom product berada pada kondisi cair jenuh.
Kondisi operasi bawah menara terjadi pada keadaan Bubble point (titik didih), Σ yii = Σ(ki.xi) = 1
maka Σ yi = Σxi*ki
Kondisi operasi : P= 1.3 atm = 988.0000 mmHg
T 67.5741 °C = 340.7241 K
Perhitungan Plate
Stripping dilakukan dengan open steam dan perhitungan dengan cara Ludwig, 1984
Komponen Kunci Air
( Se M +1−Se ) (Pers 8-73, Ludwig)
Es=
( Se M +1−1 )
Dimana:
Es = Effisiensi Stripping
Se = Stripping Faktor
M = Jumlah Plate Ideal, Dari Grafik
( 1+ ∑ Xi )
Se
( )
K
Air=
1,2
0,9243
= 1 , 2983 =
Vο
Lο ( ){ ( 1+ ∑ Yi ) }
1+ Xi
Vο
(Lο ) { ((1+∑ ) digunakan untuk mencari Es komponen lain
∑ Yi ) }
komponen ki = Po/Pt Se=Ki Se Grafik kmol/jam
C3H3N 1.6795 - 0.0165 1.4278
H2O 0.9243 1.2 0.8966 140.7585
C3H5ON 4.3232 - 0.0868 2.9138
Total 6.9269 1.2 1.0000 145.1001
1,9701
{ 1+
1+
140,7585
145,1001
Vο
}
Vο=182,7468×
( 1+
140,7585
Vο )
Vο +140,7585=360 ,0531
kmol kg
Vο=219 ,2946 =3. 951 , 6894
jam jam
komponen xf μ xf.μ
C3H3N 0.0098 0.21 0.0021
H2O 0.9701 0.31 0.3007
C3H5ON 0.0201 0.52 0.0104
Total 1.0000 1.04 0.3132
μa = 0.3132 cP
Eo = 92.44538 %
≈ 0.9244538
Komponen yi BM yi.BM
C3H3N 0.0102 53.06 0.5407
H2O 0.9895 18.02 17.8308
C3H5ON 0.0003 71.08 0.0222
Total 1.0000 18.3936
FLV = 0.0282475
Dari fig 11.27 coulson untuk tray spacing 0.35 maka k = 0.07
Karena maximal superfacial veloity terjadi pada keadaan floading maka :
ρL - ρV
uf=k
Dimana :
√ ρV (Coulson p 454 pers 11.81)
uf = 2.7099 m/s
Agar tidak terjadi floading superfacial velocity 85%
uf = 2.3034 m/s
Vmax = 0.47355981 m2
A
uf
4×A
DC =
√ π
= 1.0690 m
b. Tebal Head
Bentuk head = torispherical dished head
(Brownell, pers.13.12)
0.885 P . ri
th= +C
f . E - 0 .1 P
th = 0.3382 in
= 0.0086 m
SPESIFIKASI ST-01
1. Bahan Konstruksi
Bahan konstruksi yang dipilih Carbon Stell SA-283 C, dengan pertimbangan :
a. Mempunyai tekanan maksimum yang diijinkan cukup rendah (12650 psia)
b. Harganya lebih murah
2. Dimensi Tangki
a. Volume tangki
Kapasitas untuk waktu tinggal = 15 hari
H = 5.6062255 m
= 18.393073 ft
• Tebal shell
ts = P . d
+ C
2fE
Dimana :
ts = Tebal shell, in
d = Diameter dalam
f = Allowable stress, psia
E = Effisiensi sambungan
C = Faktor koreksi, in
P = Internal pressure, lb/in2
P = H-1
ρ
144
Dimana :
ρ = Densitas air pada suhu 60 oF
= 62.37 lb/ft3
(H - 1 )
ts=
( ρ
144 ) . d
+C
2fE
Tebal Shell tiap CoursePlate
a. Tinggi head
D
minsin θ=
430 t s
θ Dimana :
D/2 ts = ts pada plate course 1
Sehingga :
D
min θ=arcsin
( )
430 t s
min
θ = 0.6585808 rad
= 37.733902 degree
Dipakai ; θ = 45 degree
= 0.7853982 rad
Tinggi puncak head = Hh = D/2 tan θ
= 25 ft
b. Tebal head
Persamaan yang digunakan :
Pd
t h= +C
2 f E sin θ
Dimana :
th = Tebal head, in
d = Diameter tanki, in
C = Faktor koreksi, in
P = Teakanan, psia
faktor keamanan : 10%
P desain = P x 1.1
= 16.165545 psia
th = 0.8027134283 in
= 0.0203889211 m
1. Bahan Konstruksi
Bahan konstruksi yang dipilih Carbon Stell SA-283 C, dengan pertimbangan :
a. Mempunyai tekanan maksimum yang diijinkan cukup rendah (12650 psia)
b. Harganya lebih murah
2. Dimensi Tangki
a. Volume tangki
Kapasitas untuk waktu tinggal = 15 hari
H = 5.5193558 m
= 18.108068 ft
• Tebal shell
ts = P . d
+ C
2fE
Dimana :
ts = Tebal shell, in
d = Diameter dalam
f = Allowable stress, psia
E = Effisiensi sambungan
C = Faktor koreksi, in
P = Internal pressure, lb/in2
H-1
P = ρ
144
Dimana :
ρ = Densitas air pada suhu 60 oF
= 62.37 lb/ft3
ts=
( ρ
144 ). d + C
2fE
Tebal Shell tiap CoursePlate
a. Tinggi head
D
minsin θ=
430 t s
θ Dimana :
D/2 ts = ts pada plate course 1
Sehingga :
D
min θ=arcsin
( )
430 t s
min
θ = 0.6585808 rad
= 37.733902 degree
Dipakai ; θ = 45 degree
= 0.7853982 rad
Tinggi puncak head = Hh = D/2 tan θ
= 25 ft
b. Tebal head
Persamaan yang digunakan :
Pd
t h= +C
2 f E sin θ
Dimana :
th = Tebal head, in
d = Diameter tanki, in
C = Faktor koreksi, in
P = Teakanan, psia
faktor keamanan : 10%
P desain = P x 1.1
= 16.165545 psia
th = 0.8027134283 in
= 0.0203889211 m
ρ = 1.0420 kg/L
= 65.048512 lb/ft3
ρ.V . D
Re=
μ
Komponen yi µ yi.µ
H2O 0.0005 0.8542 0.0004
C3H5ON 0.9995 0.9643 0.9638
Total 1.0000 0.9642
µ cairan = 0.9642 cP
= 2.3335 lb/ft jam
= 0.0006 lb/ft s
Re = 59333
Karena Re > 2100, maka aliran turbulen
Dari Brown, fig.126, didapat ε/D = 0.0006 (commercial steel)
Dari Brown, fig.125, didapat f = 0.034
Persamaan Bernoulli: Δ Zg ΔV 2 ΔP
−Ws= + + +∑ F
gc 2 gc ρ
kondisi titik 1 :
P1 = 1.0 atm = 2116.2170 lb/ft2
z1 = 1.0 m = 3.2808 ft
kondisi titik 2 :
P2 = 1.0 atm = 2116.2170 lb/ft2
z2 = 7.0 m = 22.9658 ft
v1=v2
a. static head = ∆z.g/gc = 19.6850 ft
b. velocity head = ∆v2/2gc = 0 ft
c. pressure head = ∆p/ρ = 0.0000 ft
d. friksi head (Σ F) = f V2.Le = 1.0702 ft
2 gc ID
Head pompa (H) = (-Ws) = 20.7551 ft =
. = 6.3262 m
POMPA - 02
ρ = 1.0413 kg/L
= 65.009341 lb/ft3
ρ.V . D
Re=
μ
Komponen yi µ yi.µ
H2O 0.0148 0.8542 0.0126
C3H5ON 0.9852 0.9643 0.9500
Total 1.0000 0.9627
µ cairan = 0.9627 cP
= 2.3297 lb/ft jam
= 0.0006 lb/ft s
Re = 60846
Karena Re > 2100, maka aliran turbulen
Dari Brown, fig.126, didapat ε/D = 0.0006 (commercial steel)
Dari Brown, fig.125, didapat f = 0.034
Persamaan Bernoulli: Δ Zg ΔV 2 ΔP
−Ws= + + +∑ F
gc 2 gc ρ
kondisi titik 1 :
P1 = 2.0 atm = 4232.4340 lb/ft2
z1 = 1.0 m = 3.2808 ft
kondisi titik 2 :
P2 = 2.0 atm = 4232.4340 lb/ft2
z2 = 7.0 m = 22.9658 ft
v1=v2
a. static head = ∆z.g/gc = 19.6850 ft
b. velocity head = ∆v2/2gc = 0 ft
c. pressure head = ∆p/ρ = 0.0000 ft
d. friksi head (Σ F) = f V2.Le = 1.1232 ft
2 gc ID
Head pompa (H) = (-Ws) = 20.8081 ft =
. = 6.3423 m
POMPA - 03
ρ = 0.7913 kg/L
= 49.402141 lb/ft3
ρ.V . D
Re=
μ
Komponen yi µ yi.µ
C3H3N 0.9711166 0.7521 0.7303768
H2O 0.0289 0.8541 0.0247
C3H5ON 0.0000 0.9564 0.0000
Total 1.0000 0.7550
µ cairan = 0.7550 cP
= 1.8272 lb/ft jam
= 0.0005 lb/ft s
Re = 56538
Karena Re > 2100, maka aliran turbulen
Dari Brown, fig.126, didapat ε/D = 0.0006 (commercial steel)
Dari Brown, fig.125, didapat f = 0.034
3. Menentukan Head Pompa (H)
Sistem pemipaan :
No Jenis Jumlah Le (ft)
1 pipa lurus 1 74.8031
2 elbow standar 90° 2 22.0000
3 gate valve 1 15.0000
Panjang ekivalen (Le) 111.8031
Persamaan Bernoulli: Δ Zg ΔV 2 ΔP
−Ws= + + +∑ F
gc 2 gc ρ
kondisi titik 1 :
P1 = 1.0 atm = 2116.2170 lb/ft2
z1 = 1.0 m = 3.2808 ft
kondisi titik 2 :
P2 = 1.0 atm = 2116.2170 lb/ft2
z2 = 7.0 m = 22.9658 ft
v1=v2
a. static head = ∆z.g/gc = 19.6850 ft
b. velocity head = ∆v2/2gc = 0 ft
c. pressure head = ∆p/ρ = 0.0000 ft
d. friksi head (Σ F) = f V2.Le = 2.2866 ft
2 gc ID
Head pompa (H) = (-Ws) = 21.9716 ft =
. = 6.6969 m
POMPA - 04
ρ = 0.7913 kg/L
= 49.402141 lb/ft3
ρ.V . D
Re=
μ
Komponen yi µ yi.µ
C3H3N 0.9711166 0.6874 0.6675455
H2O 0.0289 0.8547 0.0247
C3H5ON 0.0000 0.9861 0.0000
Total 0.0289 0.6922
µ cairan = 0.6922 cP
= 1.6752 lb/ft jam
= 0.0005 lb/ft s
Re = 61668
Karena Re > 2100, maka aliran turbulen
Dari Brown, fig.126, didapat ε/D = 0.0006 (commercial steel)
Dari Brown, fig.125, didapat f = 0.034
Persamaan Bernoulli: Δ Zg ΔV 2 ΔP
−Ws= + + +∑ F
gc 2 gc ρ
kondisi titik 1 :
P1 = 1.0 atm = 2116.2170 lb/ft2
z1 = 1.0 m = 3.2808 ft
kondisi titik 2 :
P2 = 1.0 atm = 2116.2170 lb/ft2
z2 = 7.0 m = 22.9658 ft
v1=v2
a. static head = ∆z.g/gc = 19.6850 ft
b. velocity head = ∆v2/2gc = 0 ft
c. pressure head = ∆p/ρ = 0.0000 ft
d. friksi head (Σ F) = f V2.Le = 1.7715 ft
2 gc ID
Head pompa (H) = (-Ws) = 21.4564 ft =
. = 6.5399 m
POMPA - 05
ρ = 0.9968 kg/L
= 62.227544 lb/ft3
ρ.V . D
Re=
μ
Komponen yi µ yi.µ
C3H3N 0.0098 0.7562 0.0074
H2O 0.9701 0.8794 0.8531
C3H5ON 0.0201 0.9862 0.0198
Total 0.9902 0.8803
µ cairan = 0.8803 cP
= 2.1304 lb/ft jam
= 0.0006 lb/ft s
Re = 26889
Karena Re > 2100, maka aliran turbulen
Dari Brown, fig.126, didapat ε/D = 0.0006 (commercial steel)
Dari Brown, fig.125, didapat f = 0.034
Persamaan Bernoulli: Δ Zg ΔV 2 ΔP
−Ws= + + +∑ F
gc 2 gc ρ
kondisi titik 1 :
P1 = 1.2 atm = 2539.4604 lb/ft2
z1 = 1.0 m = 3.2808 ft
kondisi titik 2 :
P2 = 1.2 atm = 2539.4604 lb/ft2
z2 = 7.0 m = 22.9658 ft
v1=v2
a. static head = ∆z.g/gc = 19.6850 ft
b. velocity head = ∆v2/2gc = 0 ft
c. pressure head = ∆p/ρ = 0.0000 ft
d. friksi head (Σ F) = f V2.Le = 0.7220 ft
2 gc ID
Head pompa (H) = (-Ws) = 20.4069 ft =
. = 6.2200 m
POMPA - 06
ρ = 0.9958 kg/L
= 62.168594 lb/ft3
ρ.V . D
Re=
μ
ρ.V . D
Re=
μ
Komponen yi µ yi.µ
C3H3N 0.0102 0.7864 0.0080132
H2O 0.9895 0.8214 0.8128
C3H5ON 0.0003 0.9578 0.0003
Total 0.9898 0.8211
µ cairan = 0.8211 cP
= 1.9870 lb/ft jam
= 0.0006 lb/ft s
Re = 27081
Karena Re > 2100, maka aliran turbulen
Dari Brown, fig.126, didapat ε/D = 0.0006 (commercial steel)
Dari Brown, fig.125, didapat f = 0.034
Persamaan Bernoulli: Δ Zg ΔV 2 ΔP
−Ws= + + +∑ F
gc 2 gc ρ
kondisi titik 1 :
P1 = 1.0 atm = 2116.2170 lb/ft2
z1 = 1.0 m = 3.2808 ft
kondisi titik 2 :
P2 = 1.0 atm = 2116.2170 lb/ft2
z2 = 7.0 m = 22.9658 ft
v1=v2
a. static head = ∆z.g/gc = 19.6850 ft
b. velocity head = ∆v2/2gc = 0 ft
c. pressure head = ∆p/ρ = 0.0000 ft
d. friksi head (Σ F) = f V2.Le = 0.9844 ft
2 gc ID
Head pompa (H) = (-Ws) = 20.6694 ft =
. = 6.3000 m
POMPA - 07
Fungsi : Mengalirkan hasil bawah ST-01 sebagai recycle dengan Fresh Feed
Type : Centrifugal pump
ρ = 1.0234 kg/L
= 63.885705 lb/ft3
ρ.V . D
Re=
μ
Komponen yi µ yi.µ
H2O 0.4238 0.9614 0.4075
C3H5ON 0.5762 0.7026 0.4048
Total 1.0000 0.8123
µ cairan = 0.8123 cP
= 1.9658 lb/ft jam
= 0.0005 lb/ft s
Re = 6665
Karena Re > 2100, maka aliran turbulen
Dari Brown, fig.126, didapat ε/D = 0.0006 (commercial steel)
Dari Brown, fig.125, didapat f = 0.034
Persamaan Bernoulli: Δ Zg ΔV 2 ΔP
−Ws= + + +∑ F
gc 2 gc ρ
kondisi titik 1 :
P1 = 1.3 atm = 2751.0821 lb/ft2
z1 = 1.0 m = 3.2808 ft
kondisi titik 2 :
P2 = 1.3 atm = 2751.0821 lb/ft2
z2 = 7.0 m = 22.9658 ft
v1=v2
a. static head = ∆z.g/gc = 19.6850 ft
b. velocity head = ∆v2/2gc = 0 ft
c. pressure head = ∆p/ρ = 0.0000 ft
d. friksi head (Σ F) = f V2.Le = 1.1788 ft
2 gc ID
Head pompa (H) = (-Ws) = 20.8637 ft =
. = 6.3593 m
Fungsi : Mengalirkan hasil bawah ST-01 sebagai recycle dengan Fresh Feed
Type : Centrifugal pump
Unit utilitas merupakan unit pendukung dalam penyediaan air, uap, listrik dan bahan bakar.
Dimana keberadaannya sangat penting dan harus ada. Unit utilitas ini terdiri dari unit pengolahan
air, pengadaan steam dan penyediaan bahan bakar serta listrik.
Kebutuhan Air
Air yang digunakan meliputi :
1. Air pendingin
1. Air steam
2. Air kebutuhan kantor dan rumah tangga serta kebutuhan lain.
Air diperoleh dari sungai terdekat dengan lokasi pabrik yang kemudiaan diolah dahulu
sehingga memenuhi persyaratan. Secara sederhana pengolahan air ini meliputi :
a. Pengendapan
b. Penggumpalan
c. Penyaringan
d. Demineralisasi
e. Deaerasi
A. Pengolahan Air
Kebutuhan air :
1. Air pendingin
Diperkirakan air yang hilang 20% sehingga kebutuhan make up air untuk pendingin :
= 28,168.3074 kg/jam
= 28.1683 m^3/jam
2. Air untuk steam
Diperkirakan air yang hilang 20% sehingga kebutuhan make up air untuk steam :
= 23,809.3655 kg/jam
= 23.8094 m^3/jam
Jadi total air yang disuplai dari tangki air 55.2214 m^3/jam
= 55,221.42 kg/jam
Kehilangan akibat kebocoran diperkirakan 10% sehingga make up dari sumber air adalah :
= 60.7436 m^3/jam
= 60,743.5652 kg/jam
= ### kg/th
Ditentukan luas penampang perpindahan panas adalah 10 ft^2/Hp (Severn, hal. 126)
Jadi total heating surface sebesar = 39,347.0304 ft^2
Spesifikasi boiler :
. Tipe = Water-Tube Boiler
. Jumlah = 1 buah
. Kapasitas steam = 66817.9217671 kg/jam
= 147308.126686 lb/jam
= 18.5605 kg/s
. Tekanan = 16.5 atm
. Suhu = 395 C
. Bahan bakar = Fuel Oil Grade 4
. Kebutuhan bahan bakar = 4,472.9057 kg/jam
pemilihan pipa :
Dopt = 3,9 * (Q)^0,45 * (ρ)^0,13
= 5.2879 in
pemilihan pipa : (Tabel 23, P.123, Brown)
D nominal = 4 in
Sch = 40
ID = 4.026 in = 0.3355 ft
at = 12.7 in2 = 0.0882 ft²
Re = 323,859.47
persamaan bernoully :
ws = (Z g/gc) + (V^2)/2gc + P/ρ + f
static head = z g/gc = (3,208 - 0 ) = 3.2080 ft
pressure head = P/ρ = 0
velocity head V^2 /2gc = 0.7088 ft
friksi head = (f V^2 (Le+L)) / (2 gc ID) = 7.3070 ft
total head (H) = 11.2238 ft
= 3.4210 m
3. Pompa 2 (PU-02)
Tugas : mengalirkan air dari Bak Penampung Awal (BU-01) menuju tangki Flokulator (TF-01)
dengan kecepatan 60,743.5652 kg/jam
rapat massa = 1000 kg/m^3 62.4291 lb/ft^3
viskositas cairan = 0.65 cP 0.0004 lb/ftsec
suhu = 30 C
a. Laju alir (Q)
Q = m/ρ
= 60.7436 m^3/jam
= 0.0169 m^3/sec 0.5959 ft^3/sec
= 267.4223 gpm
pemilihan pipa :
Dopt = 3,9 * (Q)^0,45 * (ρ)^0,13
= 5.2879 in
pemilihan pipa : (Tabel 23, P.123, Brown)
D nominal = 4 in
Sch = 40
ID = 4.026 in = 0.3355 ft
at = 12.7 in2 = 0.0882 ft²
persamaan bernoully :
ws = (Z g/gc) + (V^2)/2gc + P/ρ + f
4. Pompa 3 (PU-03)
Tugas : mengalirkan air dari tangki Flokulator (TF-01) menuju clarifier (CL-01)
dengan kecepatan 60,743.5652 kg/jam
rapat massa = 1000 kg/m^3 62.4291 lb/ft^3
viskositas cairan = 0.65 cP 0.0004 lb/ftsec
suhu = 30 C
a. Laju alir (Q)
Q = m/ρ
= 60.7436 m^3/jam
= 0.0169 m^3/sec 0.5959 ft^3/sec
= 267.4223 gpm
pemilihan pipa :
Dopt = 3,9 * (Q)^0,45 * (ρ)^0,13
= 5.2879 in
pemilihan pipa : (Tabel 23, P.123, Brown)
D nominal = 4 in
Sch = 40
ID = 4.026 in = 0.3355 ft
at = 12.7 in2 = 0.0882 ft²
persamaan bernoully :
ws = (Z g/gc) + (V^2)/2gc + P/ρ + f
= 2.2478 m
H = (H/D) * D
= 4.4956 m
6. Clarifier (CLU-01)
Tugas : menggumpalkan dan mengendapkan kotoran yang bersifat koloid yang berasal dari Bak
penampung awal (BU-01) dengan waktu tinggal 8 jam.
dipakai motor dengan kekuat 6.25 hp
Perhitungan :
dibuat clarifier yang berbentuk conis dengan perbandingan D/L = 2 dan H/L = 2
kapasitas :
volume air yang harus ditampung :
V = 60,743.5652 kg/jam * 8 jam
= 485,948.5219 kg
= 485.9485 m^3
= 128,374.0415 gallon
Perhitungan dimensi clarifier :
diameter (D) = 2 * kedalaman (L)
kedalaman (L) = 2 * tinggi cone (H)
D = 48*V ^1/3
7*π
= 10.2000 m
L = 1/2 * D
= 5.1000 m
H = 1/4 * D
= 1.2750 m
pemilihan pipa :
Dopt = 3,9 * (Q)^0,45 * (ρ)^0,13
= 5.2879 in
pemilihan pipa : (Tabel 23, P.123, Brown)
D nominal = 4 in
Sch = 40
ID = 4.026 in = 0.3355 ft
at = 12.7 in2 = 0.0882 ft²
persamaan bernoully :
ws = (Z g/gc) + (V^2)/2gc + P/ρ + f
pemilihan pipa :
Dopt = 3,9 * (Q)^0,45 * (ρ)^0,13
= 3.7419 in
pemilihan pipa : (Tabel 23, P.123, Brown)
D nominal = 4 in
Sch = 40
ID = 4.026 in = 0.3355 ft
at = 12.7 in2 = 0.0882 ft²
persamaan bernoully :
ws = (Z g/gc) + (V^2)/2gc + P/ρ + f
pemilihan pipa :
Dopt = 3,9 * (Q)^0,45 * (ρ)^0,13
= 3.7419 in
pemilihan pipa : (Tabel 23, P.123, Brown)
D nominal = 4 in
Sch = 40
ID = 4.026 in = 0.3355 ft
at = 12.7 in2 = 0.0882 ft²
persamaan bernoully :
ws = (Z g/gc) + (V^2)/2gc + P/ρ + f
apabila resin sudah jenuh pencuciaan dilakukan dengan menggunakan larutan H2SO4 2%
Reaksi yang terjadi pada waktu regenerisasi adalah :
R Na2 + H2SO4 RH2 + Na2SO4
R Ca + H2SO4 RH2 + CaSO4
R Ba + H2SO4 RH2 + BaSO4
persamaan bernoully :
ws = (Z g/gc) + (V^2)/2gc + P/ρ + f
apabila resin sudah jenuh pencuciaan dilakukan dengan menggunakan larutan NaOH 4 %.
Reaksi yang terjadi pada waktu regenerisasi adalah :
R Cl2 + 2 NaOH R(OH)2 + 2NaCl
R SO4 + 2NaOH R(OH)2 + 2Na2SO4
RCO3 + 2NaOH R(OH)2 + 2Na2CO3
kebutuhan NaOH untuk regenerasi dapat diperkirakan sebagai berikut :
Q = 23,809.37 kg/jam
kesadahan terikat resin = 65 ppm * Q
= 1.5476 kg/jam
NaOH yang diperlukan 1.2381 kg/jam
= 9,805.65 kg/tahun
debit air = 104.8326 gpm
dari tabel 7, hal 186 (Powell,1954) diketahui kecepatan perluas penampang bed yang biasa
dipakai 3-10 gpm/ft^2
dipilih kecepatan 3 gpm/ft^2
luas penam 34.9442 ft^2
dipakai 2 tangki penukar kation yang bekerja bergantiaan
diameter (D) = 6.6719 m
Tinggi bed resin dalam exchanger = 30 - 75 in
Ditetapkan tinggi bed (T) 50 in
= 4.17 ft
= 1.27 m
V = AxT
= 145.6008 ft3
Siklus regenerasi :
1 gallon air diperkirakan mengandung 10 grain hard resin.
Jenis Duolit A-2.
Kapasitas penyerapan 3000 grain/ft3
Kandungan grain hardnes dalam air :
= 62899.5470 grain/jam
Volume bak resin 436802.4096 grain
Waktu oeprasi kation Volume bak resin / kandungan grain hardness dalam air
= 6.9444 jam
= 7 jam
persamaan bernoully :
ws = (Z g/gc) + (V^2)/2gc + P/ρ + f
pemilihan pipa :
Dopt = 3,9 * (Q)^0,45 * (ρ)^0,13
= 3.4693 in
persamaan bernoully :
ws = (Z g/gc) + (V^2)/2gc + P/ρ + f
2. NaH2PO4
Fungsi : untuk mencegah timbulnya kerak di boiler dengan kadar 12-17 ppm.
kadar 15 ppm
kebutuhan 0.3571 kg/jam
= 2,828.5526 kg/tahun
Tipe alat : Tangki silinder vertikal
perhitungan dimensi alat :
kapasitas untuk waktu tinggal 24 jam
W = 23,809.3655 kg/jam * 24 jam
= 571,424.77 kg
densitas cairan 1.0020 kg/lt
volume cairan 570,284.20 lt
= 570.2842 m^3
over design : 20%
volume tangki = 684.3410 m^3
= 180,783.8109 gallon
D = 9.5529 m
H = (H/D)*D
= 9.5529 m
Untuk semua area di luar ruangan direncanakan menggunakan lampu mercury 100 watt.
Lumen output starting daylight 100 watt adalah 3000
Jumlah lumen dalam ruanga = 1,001,052
maka jumlah lampu = 333.684 buah
= 334 buah
4. Generator
Kebutuhan bahan bakar minyak diesel oil dihitung sebagai berikut :
dianggap listrik padam 1 kali dalam 1 bulam selama 2 jam
Effisiensi motor diesel : 80%
Effisiensi bahan bakar : 70%
Digunakan generator dengan efisiensi 80%, maka input generator :
= 211.8 KW
ditetapkan input generator 300 KW, sehingga untuk keperluan lain masih tersedia :
= 88.2 KW
Spesifikasi Generator :
Tipe = AC generator
Kapasitas = 300 Kw
Tegangan = 220/360 volt
Effisiensi = 80%
Phase = 3
Jumlah = 1 buah
Bahan bakar = Solar
ANALISIS EKONOMI
410
400
f(x) = 4.357 x − 8317.79233333334
390 R² = 0.888639234017932
380
370
360
350
340
330
1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002
EX = ( NX / NY ) * EY
Dimana :
EX = Harga pembelian tahun 2009
EY = Harga pembelian pada tahun referensi (2003)
NX = Indeks harga pada tahun 2009
NY = Indeks harga pada tahun referensi (2003) = 409.20
Ex = 1.0747 EY
Harga dalam rupiah dibulatkan ratusan ribu terdekat
Harga dalam dollar dibulatkan dalam satuan terdekat
Labor = 37 % PEC
Labor : Tenaga Indonesia 95%
Tenaga Asing 5%
Asing : Indonesia = 1 : 2
1 man hour asing = $ 15.00
1 man hour indonesia = Rp 15,000
Jumlan man hour = 119044.03
Tenaga Asing = $ 89,283.02
Tenaga Indonesia = Rp 3,392,754,790
$ 357,132.08
Total Biaya Pemipaan = $ 3,180,707.62
Rp 30,216,722,352
1.4. Instrumentasi
Instrumentasi (instrumentation, 30 % PEC)
Material = 24 x PEC
$ 1,339,245.31
Labor = 6% PEC
Labor : Tenaga Indonesia 95%
Tenaga Asing 5%
Asing : Indonesia = 1:2
1 man hour asing $ 15.00
1 man hour indonesia = Rp 15,000
Jumlah man hour 22320.76
Tenaga asing $ 16,740.57
Tenaga Indonesia Rp 636,141,523
$ 66,962.27
Total Biaya Instrumentasi = $ 1,422,948.14
Rp 13,518,007,368
1.5. Insulasi
Insulasi (insulation, 8% PEC)
Material 3 % x PEC
= 167405.6640
Labor 5 % x PEC
1 Man hour Indonesia = Rp 15,000
Jumlah man hour = 18601
Pemasangan alat menggunakan 100% tenaga Indonesia
Tenaga Indonesia = Rp 558,018,880
$ 58,738.83
Total Biaya Insulasi = $ 226,144.49
Rp 2,148,372,688
1.6. Listrik
Listrik ( 15 % PEC)
Material = 10 % PEC
$ 558,018.88
Labor = 5 % PEC
1 man hour Indonesia= Rp 15,000
Jumlah man hour = 18601
Pemasangan alat menggunakan 100 % tenaga indonesia
Tenaga Indonesia = Rp 558,018,880
= $ 58,738.83
Total Biaya Listrik = $ 616,757.71
Rp 5,859,198,240
1.7. Bangunan
Luas bangunan = 29700 m2
Harga bangunan = Rp 1,600,000 /m2
Total biaya bangunan= Rp 47,520,000,000
$ 5,002,105.26
1.12. Contigency
Contigency ( 10 - 25 % DPC)
= $ 5,378,995.60 (diambil 20%)
= Rp 51,100,458,195
2. MANUFACTURING COST
Merupakan biaya yang dikeluarkan untuk pembuatan suatu barang produksi.
2.3. Supervisor
# Kepala seksi
Gaji = Rp 3,500,000
Jumlah = 14
Biaya untuk satu tahun = Rp 588,000,000
# Kepala Bagian
Gaji = Rp 6,000,000
jumla = 6
biaya untuk satu tahun = Rp 432,000,000
Total biaya Supervisor = Rp 1,020,000,000
$ 107,368.42
2.4. Maintenance
Maintenance Cost (2 - 20 % FCI)
Biaya Maintenance = 2% * Fixed Capital
Biaya Maintenance = Rp 6,730,421,622
$ 708,465.43
2.7. Utilities
Jenis Utilitas Kebutuhan, th Harga satuan, $ Biaya, $
a. Steam, /1000 lb 415,726,045.91 0.70 291,008.2321
b. Listrik, /KWH 169.46 0.01 1.6946
c. Cooling Tower, /1000 ga 491,835,830.67 0.01 4,918.3583
e. Fuel Oil, /gal 78,099,661.99 0.05 3,904,983.0997
Biaya Utilitas = 4,200,911
2.2 Laboratory
Laboratory dibutuhkan untuk menjamin quality control, karenannya biaya
tergantung dari produk yang dihasilkan
Laboratory (10 - 20% labor cost)
Laboratory = Rp 96,480,000 (diambil 10%)
= $ 10,155.79
2.12. Depreciation
Depreciation (8 -10 % FCI)
= Rp 30,286,897,298 (diambil 9%)
= $ 3,188,094.45
3. WORKING CAPITAL
Modal yang dibutuhkan untuk menjalankan pabrik secara normal
4. GENERAL EXPENSE
yaitu macam-macam pengeluaran yang berkaitan dengan fungsi perusahaan yang tidak termasuk
manufacturing cost. General expense terdiri dari :
4.1. Administration
a. Management Salaries
# Direktur Utama
Jumlah = 1 Orang
Gaji = Rp 30,000,000
Biaya 1 tahun = Rp 360,000,000
# Direktur
Jumlah = 2 Orang
Gaji = Rp 20,000,000
Biaya 1 tahun = Rp 480,000,000
# Staf ahli
Jumlah = 3 Orang
Gaji = Rp 10,000,000
Biaya 1 tahun = Rp 360,000,000
# Sekretaris
Jumlah = 3 Orang
Gaji = Rp 3,000,000
Biaya 1 tahun = Rp 108,000,000
# Karyawan Administratif
Jumlah = 18 Orang
Gaji = Rp 1,250,000
Biaya 1 tahun = Rp 270,000,000
# Satpam
Jumlah = 12 Orang
Gaji = Rp 850,000
Biaya 1 tahun = Rp 122,400,000
# Sopir
Jumlah = 5 Orang
Gaji = Rp 750,000
Biaya 1 tahun = Rp 45,000,000
# Pesuruh
Jumlah = 5 Orang
Gaji = Rp 650,000
Biaya 1 tahun = Rp 39,000,000
5.3. Research
Research (3.5 - 8 % MC)
= Rp 40,947,990,871 (diambil 4 %)
= $ 4,310,314.83
5.4. Finance
Biaya untuk membayar bunga pinjaman bank atau deviden para pemegang saham.
Finance = 4% * Capital Investment
= Rp 21,882,823,208
= $ 2,303,455.07
Total General Expanse = Rp 187,499,186,693
= $ 19,736,756.49
6. ANALISA KEUNTUNGAN
Total penjualan : Rp 1,296,750,000,000
Total Production cost : Rp 1,211,198,958,476
Keuntungan sebelum pajak : Rp 85,551,041,524
Pajak (50 % dari keuntungan) : Rp 42,775,520,762
Keuntungan setelah pajak : Rp 42,775,520,762
ANALISA KELAYAKAN
1. Return of Investment ( ROI )
a. Fa ( Fixed Cost )
Depresiasi = Rp 30,286,897,298
Proerty Taxes = Rp 3,365,210,811
Asuransi = Rp 3,365,210,811
TOTAL Nilai Fa = Rp 37,017,318,920
b. Ra ( Regulated Cost )
Gaji Karyawan = Rp 964,800,000
Payroll Overhead = Rp 144,720,000
Supervision = Rp 1,020,000,000
Laboratorium = Rp 96,480,000
General Expense = Rp 187,499,186,693
Maintenance = Rp 6,730,421,622
Plant Supplies = Rp 1,009,563,243
TOTAL Nilai Ra = Rp 197,465,171,558
c. Va ( Variabel Cost )
Raw Material = Rp 793,682,909,843
Packaging and Shipping = Rp 129,675,000,000
Utilities = Rp 39,908,658,154
Royalty & Patent = Rp 12,967,500,000
TOTAL Nilai Va = Rp 976,234,067,998
d. Sa ( Sales )
= Rp 1,296,750,000,000
SDP = 32.50 %
Discounted cash flow rate dihitung dengan cara trial & error
R= S
R = ((WC+FCI)*((1+ i)^n))/ CF
S = (((1+ i)^(n-1))+((1+ i)^(n-2))+((1+ i)^(n-3))+ . . . +(1+ i)+1)+((WC+SV)/CF)
65140 69994.424
223350 239994.7
8376 9000.2041
744516 799999.51
554153 595450.11
515066 553450.23
15311 16452.021
15404 16551.951
14123 15175.487
9708 10431.469
4188 4500.102
4188 4500.102
419 450.22511
419 450.22511
605 650.08637
559 600.65832
419 450.22511
419 450.22511
419 450.22511
7555 8118.0207
11590 12453.721
B ia y a da lam m ily a r ru p ia h
1400
Ra
1200
1000
Sa
800
600 Va
400
200 SDP BE
0.3R P
a Fa
0
0 10 20 30 40 50 60 70 80 90 100
Kapasitas Produksi, %
INDEX
2003 = 409.27
2010 = 439.77
Dimensi
No Nama Alat Jumlah Ukuran 2003 2010 Total harga ($)
Diameter Panjang / Tinggi
1 TP-01 (Tangki C3H5ON) 5 20 ft (6.09 m) 115 ft (35.06 m) 222245.31 galon 20,000 21,490.46 107,452.29
2 TP-02 (Tangki C3H3N) 4 60 ft (18.288 m) 24 ft (7.31 m) 329601.79 galon 48,500 52,114.36 208,457.45
2 VP-01 (Vaporizer) 1 10 in (0.254 m) 12 ft (3.66 m) 122.49 ft2 (11.39 m2) 10,500 11,282.49 11,282.49
3 SP-01 (Setelah VP-01) 1 873.6 galon 2,500 2,686.31 2,686.31
3 R-01 1 2m 9.03 m 89,746 96,434.13 96,434.13
4 MD-01 1 1.62 m 9.8 m 12 tray 26,400 28,367.41 28,367.41
4 ST-01 1 0.91 m 9.7 m 10 tray 11,000 11,819.75 11,819.75
5 AC-01 (MD-01) 1 1.7 m 7.02 m 2397.53 galon 6,500 6,984.40 6,984.40
5 CD-01 (MD-01) 1 23.25 in (0.59) 12 ft (3.66 m) 757.01 ft2 (70.36 m2) 5,000 5,372.61 5,372.61
6 CD-02 (ST-01) 1 15.25 in (0.38) 10 ft (3.05) 242.19 ft2 (22.51 m2) 2,000 2,149.05 2,149.05
6 RB-01 (MD-01) 1 12 in (0.3 m) 8 ft (2.44 m) 1318.20 ft2 (122.53 m2) 20,000 21,490.46 21,490.46
7 HE-01 (Sebelum Reaktor) 1 3 in 12 ft (3.66 m) 43.86 ft2 (4.08 m2) 1,700 1,826.69 1,826.69
7 CL-01 (Sebelum MD-01) 1 12 in (0.3 m) 12 ft (3.66 m) 190.59 ft2 (17.71 m2) 4,000 4,298.09 4,298.09
8 CL-02 (Sebelum TP-02) 1 3 in 12 ft (3.66 m) 29.12 ft2 (2.71 m2) 700 752.17 752.17
8 P-01 (Sebelum TP-01) 1 25.68 gpm 0.25 hp (0.1864 kw) 3,750 4,029.46 4,029.46
9 P-02 (Sesudah VP-01) 1 25.68 gpm 0.25 hp (0.1864 kw) 4,250 4,566.72 4,566.72
9 P-03 (Sebelum TP-02) 1 16.78 gpm 0.5 hp (0.373 kw) 475 510.40 510.40
10 P-04 (sesudah TP-02) 1 16.78 gpm 0.25 hp (0.1864 kw) 525 564.12 564.12
10 P-05 (Sebelum ST-01) 1 3.45 gpm 0.25 hp (0.1864 kw) 700 752.17 752.17
11 P-06 (Sebelum UPL) 1 134.48 gpm 0.75 hp (0.559 kw) 6,000 6,447.14 6,447.14
11 P-07 (Sebelum Recycle) 1 62.79 gpm 0.5 hp (0.373 kw) 1,700 1,826.69 1,826.69
528,070.00
2003 = 409.27
2010 = 439.77
INVENTARISASI PERALATAN PROSES