Anda di halaman 1dari 38

PROGRAM STUDI TEKNIK SIPIL

FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PENJABARAN PERHITUNGAN

III. PERHITUNGAN BEBAN PADA ABUTMEN

1. BEBAN STRUKTUR ATAS


1.1 BEBAN MATI (M)

1 1
Beban mati struktur atas pada Abutmen ¿ ×Total beban mati= × 302,820
2 2

¿ 151,41Ton

−Bx b7
Eksentrisitas beban thd. Fondasi e= +b 8+
2 2

3,20 0,80
¿− +0,90+
2 2

¿−30 m

Momen akibat beban mati struktur atas ¿ Bebanmati struktur atas × e

¿ 151,41×−30=−45,432Ton

1.2.1 Beban Merata q

Beban hidup pada Abutmen akibat beban merata q pada jalur lalu-lintas

1
= × [ q × L× 5,5× 100 %+ q × L× ( b 1−5,5 ) ×50 % ]
2

1
= × [ 0,9 ×18 ×5,5 × 100 %+0,9 ×18 × (7−5,5 ) ×50 % ]=56,625 Ton
2

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PENJABARAN PERHITUNGAN

Beban hidup pada Abutmen akibat beban merata pada trotoar

1
= × ( 0,5 × b 2× 2 ) × L
2

1
= × ( 0,5 ×1,5 × 2 ) ×18=13,500 Ton
2

Beban hidup pada Abutmen akibat beban merata

= Beban hidup pada Abutmen akibat beban merata q pada jalur lalu-lintas + Beban hidup
pada Abutmen akibat beban merata pada trotoar

= 56,625+13,500=64,125Ton

1.2.2 Beban garis P + Kejut

Beban hidup pada Abutmen akibat beban garis P

=P ×5,5 ×100 %+ P × ( b 1−5,5 ) ×50 %

=4,9 × 5,5× 100 %+ 4,9× ( 7−5,5 ) ×50 %=30,625 Ton

Koefisien kejut

K = 1+0,4=1,4

Beban hidup pada Abutmen akibat beban garis P + Kejut

= [ P ×5,5 ×100 %+ P × ( b 1−5,5 ) ×50 % ] × K

= [ 4,9 ×5,5 × 100 %+ 4,9× ( 7−5,5 ) ×50 % ] ×1,4=42,875 Ton

Beban hidup + Kejut ( H + K ) pada Abutmen

= Beban hidup pada Abutmen akibat beban merata q pada jalur lalu lintas + Beban hidup
pada Abutmen akibat beban merata pada trotoar + Beban hidup pada Abutmen akibat
beban garis P +Kejut

= 50,625+13,500+ 42,875=107,000 Ton

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PENJABARAN PERHITUNGAN

Eksentrisitas beban thd. Fondasi

−bx b7
= +b 8+
2 2

−3,20 0,80
= + 0,90+ =−0,3 m
2 2

Momen akibat Beban hidup + kejut ( H + K )

= Beban hidup + kejut ( H + K ) pada Abutmen × Eksentrisitas beban thd. Fondasi

= 107,000 ×−0,3=−32,100Ton−m

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PENJABARAN PERHITUNGAN

2.2 BEBAN MATI (M) AKIBAT BERAT TANAH DI ATAS FONDASI

Beban mati akibat berat sendiri Abutmen dan Berat Tanah

=W ( abutment )+ W ( tanah )=72,489+ 27,135=99,633 Ton

Momen akibat beban mati berat sendiri abutment dan berat tanah

= Mbs+ Mwt =−23,048±33,200=−56,247 Ton−m

3.BEBAN – BEBAN SEKUNDER

3.1 BEBAN GEMPA (Gb)

Waktu getar alami

h3
T = 2×π×
√[ ( W a+0,5 ×Wb ) ×
( 3× Ec × Ic × g ) ]
2,553
T = 2×π×
√[ ( 151,410+0,5 ×99,633 ) ×
( 3 ×23452,95291 ×1,2× 9,81 ) ]
T = 0,398

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PENJABARAN PERHITUNGAN

3.2 BEBAN ANGIN (A)

3.2.1 Beban Angin Arah Melintang Jembatan

Gaya angin

Ultimit 69,4585
A= = =7,080Ton
9,81 9,81

Lengan terhadap fondasi

h 7+h 2 1,69+ 2,00


= = =2,650 m
2 2

Momen pada fondasi akibat gaya angin

= A × y =7,080× 2,650=18,753 Ton−m

1 h
Va = [ ]
× × A ×2
2 2

1 3
Va = [ ]
× ×1,652 ×2
2 2

Va = 1,888 Ton/m

3.2.2 Beban Angin Pada Lantai Jembatan

Reaksi akibat gaya akibat

L 18
A = Va × =1,888× =16,993 Ton
2 2
PERANCANGAN JEMBATAN M. IQBAL AL HAFIS
(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

y= e = -0,300 m

Momen pada fondasi akibat gaya angin

Ma = A × y =16,993×−0,300=−5,098 Ton−m

PENJABARAN PERHITUNGAN

3.3 BEBAN REM DAN TRAKSI (Rm)

Beban D tanpa koefisien kejut = 94,750

Rm = Beban D tanpa koefisien kejut × 0,05=94,750 × 0,05=4,738Ton

Lengan terhadap fondasi

= H +1,80=2,55+1,80=4,35 m

Momen pada fondasi akibat gaya rem

Mrm = Rm × Lengan terhadap fondasi=4,738 × 4,35=20,608 Ton−m

3.4 BEBAN GESEKAN PADA TUMPUAN (F)

Momen pada fondasi akibat gaya gesek

Mf = F × h7=27,254 × 1,65=44,969Ton−m

3.5 BEBAN TEMPERATUR (Tm)

Gaya horisontal pier akibat perbedaan temperatur

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

L
Tm = α × ∆ T × K × n ×
2

18
Tm = 0,00004 × 12,5× 153× 2× =0,344 Ton
2

Momen pada fondasi akibat temperatur

Mtm = Tm × h7=0,344 × 1,65=0,568Ton−m

PENJABARAN PERHITUNGAN

V. PERHITUNGAN STRUKTUR ABUTMENT

1. PERHITUNGAN PILE CAP

1.1 BEBAN ULTIMIT PADA PILE CAP

Jarak pusat tiang bor ke tepi luar pile-cap

xp1 =
[ Bx−( nt−1 ) × xt ]
2

xp1 =
[ 3,20−( 3−1 ) × 0,85 ] =0,75 m
2

Lengan tiang bor terhadap sisi luar pier

X1 = b9 – xp1 = 1,50 – 0,75 = 0,75 m

Momen pada pile cap

Mp1 = nb × Pmax 1× x 1=5× 61,10 ×0,75=229,140Ton−m

Momen rencana pile cap

Mr = Mp−Mbs=229,140−11,391=217,749 Ton−m

Untuk lebar pile cap = 9,000 m

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

Mr 217,749
Mr = = =24,194 Ton−m/m
Lebar pile cap 9

Gaya geser rencana pile cap

Vr = nt × Pmax−Wbs=3 ×61,10−16,031=289,488 Ton

Untuk lebar pile cap = 9,000 m

Vr 289,488
Vr = = =32,165 Ton/m
Lebar pile cap 9

PENJABARAN PERHITUNGAN

2. PERHITUNGAN BREAST WALL


2.1 TINJAUAN POTONGAN BAGIAN BREAST WALL

2.1.2 Beban Hidup + Kejut ( H + K ) Ultimit Struktur Atas

Beban hidup struktur atas akibat beban merata q pada jalur lalu lintas

1 1
= × [ q × L×100 % ] = × [ 0,900 ×18 × 100 % ] =8,100 Ton
2 2

Beban hidup pada struktur atas akibat beban garis P

=P ×100 %=4,900 × 100 %=4,900 Ton

Beban hidup pada struktur atas akibat beban garis P + Kejut

= [ P× 100 % ] × K =[ 4,900 ×100 % ] ×1,4=6,860 Ton

Beban Hidup + Kejut pada struktur atas = 8,100 + 6,860 = 14,960 Ton

Beban hidup + Kejut Ultimit pada struktur atas, Phku

=Beban Hidup+ Kejut pada struktur atas× Faktor bebanultimit

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

= 14,960 ×1,80=26,93Ton

2.1.4 Gaya dan Momen Ultimit Akibat Tekanan Tanah (Ta)

Hu = H × Faktor beban ultimit=1,920 ×1,25=2.400Ton−m

Mhu = Mh × Faktor beban ultimit=1,520 ×1,25=1,900 Ton−m

2.1.5 Gaya dan Momen Ultimit Akibat Beban Angin (A)

A
Reaksi akibat gaya angin = =1,699 Ton
By

Vu = A × Faktor beban ultimit=1,699 ×1,20=2,039Ton−m

Mvu = By × Faktor beban ultimit=10,00 ×1,20=12,00 ¿ n−m

PENJABARAN PERHITUNGAN

2.1.6 Gaya dan Momen Ultimit Akibat Gempa (Gb)

Hu = H × Faktor beban ultimit=8,780 ×1,00=8,780 Ton−m

Mhu = Mh × Faktor beban ultimit=7,032 ×1,00=7,032Ton−m

2.1.7 Gaya dan Momen Ultimit Akibat Gaya gesek (F)

Hu = H × Faktor beban ultimit=2,725 ×1,30=3,543Ton−m

Mhu = Mh × Faktor beban ultimit=2,998 ×1,30=3,897 Ton−m

2.1.8 Gaya dan Momen Ultimit Akibat Gaya Rem (Rm)

Hu = H × Faktor beban ultimit=0,474 ×1,80=0,853 Ton−m

Mhu = Mh × Faktor beban ultimit=1,800 ×1,80=3,240 Ton−m


PERANCANGAN JEMBATAN M. IQBAL AL HAFIS
(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PENJABARAN PERHITUNGAN

3. PERHITUNGAN BACK WALL DAN CORBEL


3.1 TINJAUAN POTONGAN-A
3.1.1 Gaya dan Momen Akibat Berat Sendiri (M)

Vu = V × Faktor beban ultimit=0,200 ×1,30=0,260 Ton−m

Mhu = Ma × Faktor beban ultimit=−0,200× 1,30=−0,026Ton−m

3.1.2 Gaya dan Momen Akibat Tekanan Tanah (Ta)

Hu = H × Faktor beban ultimit=0,192 ×1,25=0,240Ton−m

Mhu = Mh × Faktor beban ultimit=0,035 ×1,25=0,044 Ton−m

3.1.3 Gaya dan Momen Akibat Beban Hidup + Kejut ( H + K )


PERANCANGAN JEMBATAN M. IQBAL AL HAFIS
(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

Vu = Akibat b . hidupTruck × F . bebanultimit =11,25 ×1,80=20,25Ton−m

Mvu = Ma × Faktor beban ultimit=1,125 ×1,80=2,025 Ton−m

3.1.4 Gaya dan Momen t Akibat Beban Gempa (Gb)

Hu = H × Faktor beban ultimit=0,053 ×1,00=0,053Ton−m

Mhu = Mh × Faktor beban ul timit=0,011× 1,00=0,011Ton−m

3.1.4 Gaya dan Momen t Akibat Gaya Rem (Rm)

Hu = Rm × Faktor beban ultimit=0,474 × 1,80=0,853 Ton−m

Mhu = Ma × Faktor beban ultimit=1,042 ×1,00=1,876 Ton−m

PENJABARAN PERHITUNGAN

3.2 TINJAUAN POTONGAN-B

3.2.1 Gaya dan Momen t Akibat Berat Sendiri

Vu = V × Faktor beban ultimit=0,600 ×1,30=0,780 Ton−m

Mvu = Mv × Faktor beban ultimit=−0,120 ×1,30=−0,156 Ton−m

3.2.2 Gaya dan Momen t Akibat Tekanan Tanah

Hu = H × Faktor beban ultimit=0,480 ×1,25=0,600 Ton−m

Mhu = Mh × Faktor beban ultimit=0,166 × 1,25=0,208 Ton−m

3.2.3 Gaya dan Momen t Akibat Berat Hidup + Kejut

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

Vu = Vb × Faktor beban ultimit=10 ×1,80=18,00Ton−m

Mvu = Mb × Faktor beban ultimit=2 ×1,80=3,600 Ton−m

3.2.4 Gaya dan Momen t Akibat Gaya Rem

Hu = Rem × Faktor beban ultimit=0,474 × 1,80=0,853Ton−m

Mhu = Mb × Faktor beban ultimit=1,232 ×1,80=2,217 Ton−m

3.2.5 Gaya dan Momen t Akibat Beban Gempa

Hu = H × Faktor beban ultimit=0,159 ×1,00=0,159Ton−m

Mhu = Mh × Faktor beban ultimit=0,053 ×1,00=0,053 Ton−m

PENJABARAN PERHITUNGAN

3.3 TINJAUAN POTONGAN –C

3.3.1 Gaya dan Momen t Akibat Beban Sendiri (M)

V = V × Faktor beban ultimit=0,900 ×1,30=1,170Ton−m

Mv = Mv × Faktor beban ultimit=0,153 ×1,30=0,199 Ton−m

3.3.2 Gaya dan Momen t Akibat Beban Hidup +Kejut ( H + K )

Vu = MuatanT × Faktor beban ultimit=10 ×1,80=18,00 Ton−m

Mhu = Mc × Faktor beban ultimit=0,000 ×1,80=0,000 Ton−m

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

3.4 TINJAUAN POTONGAN-D

3.4.1 Gaya dan Momen Akibat Berat Sendiri (M)

V = V × Faktor beban ultimit=0,300 ×1,30=0,390 Ton−m

Mv = Mv × Faktor beban ultimit=0,053 ×1,30=0,069 Ton−m

3.4.2 Gaya dan Momen t Akibat Beban Mati (M)

Vu = Pm × Faktor beban ultimit=15,441 ×1,30=19,683 Ton−m

Mvu = Lengan Pot −D × Faktor beban ultimit=0,2 ×1,30=3,937 Ton−m

3.4.3 Gaya dan Momen t Akibat Beban Hidup +Kejut ( H + K )

Vu = Ph× Faktor bebanultimit =10,07× 1,80=19,260 Ton−m

Mvu = Lengan Pot −D × Faktor beban ultimit=0,2 ×1,80=3,852Ton−m

PENJABARAN PERHITUNGAN

9. PERHITUNGAN WING WALL

Beban merata akibat tekanan tanah pada Wing Wall

1
q¿ Q × Ka+ × H ×γ × Ka
2

1 2
q = 1,08 ×0,33+ × 2,150× 1,80× 0,33=1,005 Ton/m
2

Momen Tumpuan : Mt = Cx × q × Lx 2

Mt = 0,450 ×1,005 ×1,2802 =0,741Ton−m

Momen Lapangan : Ml = Cy × q × Lx 2

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

Mt = 0,100 ×1,005 ×1,2802 =0,165 Ton−m

Momen tumpuan ultimit

Mtu = Momen tumpuan× Faktor bebanultimit

Mtu = 0,741 ×1,25=0,927 Ton−m

Momen lapangan ultimit

Mtu = Momen lapangan × Faktor beban ultimit

Mtu = 0,165 ×1,25=0,206 Ton−m

PENJABARAN PERHITUNGAN

IV. PERHITUNGAN FONDASI

2. GAYA YANG DITERIMA TIANG BOR

2.1. GAYA AKSIAL PADA TIANG BOR

Gaya aksial yang diderita satu tiang bor :


ΣV X max
P= ± ΣV × e x ×
n Σ X2
358,043 0,85
P 1= + 358,043 × -0,295 × = 12,81 Ton
15 7,23
358,043 0,85
P 1= - 358,043 × -0,295 × = 36,28 Ton
15 7,23
PERANCANGAN JEMBATAN M. IQBAL AL HAFIS
(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

ΣV X max
P 2= ± ΣV × e x ×
n Σ X2
268,035 0,85
P 2= + 268,035 × -0,053 × = 18,11 Ton
15 7,23
268,035 0,85
P 2= - 268,035 × -0,053 × = 19,54 Ton
15 7,23
ΣV X max
P 3= ± ΣV × e x ×
n Σ X2
375,035 0,85
P 3= + 375,035 × -0,068 × = 24,58 Ton
15 7,23
375,035 0,85
P 3= - 375,035 × -0,068 × = 28,02 Ton
15 7,23
169,228 0,85
P4 = +169,228 × 0,269 × = 18,60 Ton
15 7,23
169,228 0,85
P4 = -169,228 × 0,269 × = 5,92 Ton
15 7,23

2.2. GAYA LATERAL PADA TIANG BOR

Gaya lateral yang diderita satu tiang bor :

ΣH −H tiang miring
H max =
n

28,688−57,30
H max 1 = = -1,91 Ton
15

63,366−81,00
H max 2 = = -1,18 Ton
15

68,103−109,91
H max 3 = = -2,79 Ton
15

122,367−83,20
H max 4 = = 2,61 Ton
15

PENJABARAN PERHITUNGAN

3. DAYA DUKUNG IJIN TIANG BOR BERDASARKAN KEKUATAN BAHAN


PERANCANGAN JEMBATAN M. IQBAL AL HAFIS
(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

π
Luas tampang tiang bor : A= × ds 2
4

π
A= × 7 ×0,3 2 = 0,07 m 2
4

Berat tiang : W = A × L × 2,4

W = 0,07 × 25 × 2,4 = 4,24 Ton

Daya dukung izin : P izin = A × f – W

P izin = 0,07 × 821,70 – 4,24 = 53,86 Ton

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PENJABARAN PERHITUNGAN

4. DAYA DUKUNG IJIN TIANG BOR KEKUATAN TANAH

4.1 DAYA DUKUNG TIANG BOR MENURUT BAGEMENT (DATA


PENGUJIAN CPT)

A × qc K × L× qf
P izin = +
3 5

0,20 ×1700 1,57× 23 ×0,7


P izin = + = 116,36 Ton
3 5

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PENJABARAN PERHITUNGAN

5. DAYA DUKUNG LATERAL IJIN TIANG PANCANG

Diagram Tekanan Tanah Pasif efektif :


BAGIAN   KEDALAMAN H (m) H*g*Kp BAGIAN TEKANAN

        (Ton/m2)   (Ton/m2)

OK La + Ld = 8.733 47.160   0.000

FJ La + 3/4*Ld = 6.650 35.910 FN=1/4*FJ 8.978

EI La + 1/2*Ld = 4.567 24.660 EM=1/2*EI 12.330

DH La + 1/4*Ld = 2.483 13.410 DL=3/4*DH 8.940

CG La = 0.400 2.160 CG 2.160

Bagian OK

Kedalaman = La + Ld = 0,40 + 8,333 = 8,733 m

= H × g × Kp

Ton
= 8,733 × 1,8 × 3 = 47,160
m2

Ton
Tekanan = 0
m2

Bagian FJ

3 3
Kedalaman = La + × Ld = 0,40 + × 8,333 = 6,650 m
4 4

= H × g × Kp

Ton
= 6,650 × 1,8 × 3 = 35,910
m2

3 Ton
Tekanan = × FJ = 8,978 2
4 m

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PENJABARAN PERHITUNGAN

Bagian EI

1 1
Kedalaman = La + × Ld = 0,40 + × 8,333 = 4,567 m
2 2

= H × g × Kp

Ton
= 4,567 × 1,8 × 3 = 24,660 2
m

1 Ton
Tekanan = × EI = 12,330 2
2 m

Bagian DH

3 3
Kedalaman = La + × Ld = 0,40 + × 8,333 = 2,483 m
4 4

= H × g × Kp

Ton
= 2,483 × 1,8 × 3 = 13,410
m2

3 Ton
Tekanan = × DH = 8,940 2
4 m

Bagian DH

3 3
Kedalaman = La + × Ld = 0,40 + × 8,333 = 2,483 m
4 4

= H × g × Kp

Ton
= 2,483 × 1,8 × 3 = 13,410
m2

3 Ton
Tekanan = × DH = 8,940 2
4 m

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

Bagian CG

Kedalaman = La = 0,400 m

= H × g × Kp

Ton
= 0,400 × 1,8 × 3 = 2,160
m2

Ton
Tekanan = CG = 2,160
m2

PENJABARAN PERHITUNGAN
BESAR
KODE TEG-1 TEG-2 LEBAR GAYA LENGAN MOMEN

(Ton/m2
  ) (Ton/m2) (m) (Ton) THD. O (m) (Ton-m)

F1 0.000 8.978 0.400 5.746 8.467 48.646

F2 8.978 12.330 2.083 71.025 7.292 517.891

F3 12.330 8.940 2.083 70.900 5.208 369.271

F4 8.940 2.160 2.083 37.000 3.125 115.625

F5 2.160 0.000 2.083 7.200 1.389 10.000

TEG 1+TEG 2
Besar Gaya (T) = × Lebar × By
2

0+8,978
F1 = × 0,4 × 3,20 = 5,746 Ton
2

8,978+12,330
F2 = × 2,083 × 3,20 = 71,025 Ton
2

12,330+ 8,940
F3 = × 2,083 × 3,20 = 70,900 Ton
2

8,940+2,160
F4 = × 2,083 × 3,20 = 37,000 Ton
2

2,083+0
F5 = × 2,083 × 3,20 = 7,200 Ton
2

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

La
Lengan Terhadap O (m) F1 = Ld +
3

0,40
F1 = 8,333 + = 8,467 m
3

7
F2 = × Ld
8

7
F2 = × 8,333 = 7,292 m
8

Ld
F3 = Lengan Terhadap O F2 -
4

8,333
F3 = 7,292 - = 5,208 m
4

Ld
F4 = Lengan Terhadap O F3 -
4

8,333
F4 = 7,208 - = 3,125 m
4

PENJABARAN PERHITUNGAN

Ld 8,333
F5 = = = 1,389
6 6

Momen = F1 = 5,746 × 8,467 = 48,646 Ton-m

F2 = 71,025 × 7,292 = 517,891 Ton-m

F3 = 70,900 × 5,208 = 369,271 Ton-m

F4 = 37,000 × 3,125 = 115,625 Ton-m

F5 = 7,200 × 1,389 = 10,000 Ton-m

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

6. MOMEN MAKSIMUM AKIBAT GAYA LATERAL


6.1. PERHITUNGAN DENGAN CARA BENDING MOMENT DIAGRAM
(BMD)
LENGA MOMEN AKIBAT
N MOMEN LENGAN   GAYA F (Ton-m)    

yh Mh = H*yh yf F1 F2 F3 F4 F5

(m) (Ton-m) (m) 5.746 71.025 70.900 37.000 7.200

0.267 39.6833663 0.133 0.766        

1.308 194.6965159 1.175 6.751 9.470      

3.392 504.7228151 3.258 18.721 83.454 9.453    

5.475 814.7491144 5.342 30.691 231.423 83.308 4.933  

7.558 1124.775414 7.425 42.661 379.392 231.016 43.475 0.960

9.642 1434.801713 9.508 54.631 527.361 378.724 120.558 8.460

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

11.725 1744.828012 11.592 66.601 675.329 526.433 197.642 23.460

Momen 1 = H × yh1

= 148,813 × 0,267 = 39,6833663 Ton-m

Momen 2 = H × yh2

= 148,813 × 1,308 = 194,6965159 Ton-m

Momen 3 = H × yh3

= 148,813 × 3,392 = 504,7228151 Ton-m

Momen 4 = H × yh4

= 148,813 × 5,475 = 814,7491144 Ton-m

Momen 5 = H × yh5

= 148,813 × 7,558 = 1124,775414 Ton-m

Momen 6 = H × yh6

= 148,813 × 9,642 = 1434,801713 Ton-m

Momen 7 = H × yh7

= 148,813 × 11,725 = 1744,828012 Ton-m

PENJABARAN PERHITUNGAN

BMD M1 = Momen – F1 – F2 – F3 – F4 – F5

= 39,6833663 – 0,766 – 0 – 0 – 0 – 0

= 38,917 Ton-m

BMD M2 = Momen – F1 – F2 – F3 – F4 – F5

= 194,6965159 – 6,751 – 9,470 – 0 – 0 – 0

= 178,275 Ton-m

BMD M3 = Momen – F1 – F2 – F3 – F4 – F5

= 504,7228151 – 18,721 – 83,454 – 9,453 – 0 – 0

= 393,094 Ton-m
PERANCANGAN JEMBATAN M. IQBAL AL HAFIS
(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

BMD M4 = Momen – F1 – F2 – F3 – F4 – F5

= 814,7491144 – 30,691 – 231,423 – 83,308 – 4,933 – 0

= 464,394 Ton-m

BMD M5 = Momen – F1 – F2 – F3 – F4 – F5

= 1124,775414 – 42,661 – 379,392 – 231,016 – 43,475 – 0,960

= 427,272 Ton-m

BMD M6 = Momen – F1 – F2 – F3 – F4 – F5

= 1434,801713 – 54,631 – 527,361 – 378,724 – 120,558 – 8,460

= 345,068 Ton-m

BMD M7 = Momen – F1 – F2 – F3 – F4 – F5

= 1744,828012 – 66,601 – 675,329 – 526,433 – 197,642 – 23,460

= 255,363 Ton-m

Momen maksimum yang diijinkan untuk satu tiang PANCANG akibat gaya lateral =

464,394
Mmax = = 15,480 Ton-m
5 ×2 ×3

PENJABARAN PERHITUNGAN

6.2. PERHITUNGAN DENGAN CARA EMPIRIS

Ec = 0,043 × Wc 1,5 × √ fc '

Ec = 0,043 × 25001,5 × √ 24 , 90 = 26821,1961 Mpa

π π
lc = × D4 = ×3004 = 397607820 mm 4
64 64

Z 25400
K = kl × = 550 × = 46566,67
D 300

λ = 40 √ ¿)] 300 × 46566,67 ¿

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

300 × 46566,67
= 40 √ [ ] = 0,02289
( 4 ×26821,1961 ×397607820 )

0,322 0,322
e= = = 14,07 mm
λ 0,02289

Mmax = Pizin × e = 116 × 14,07 = 1636,88 Ton-mm = 1,637 Ton-m

7. PEMBESIAN BORE PILE

π π
Ag = × D2 = ×3002 = 70685,83 mm2
4 4

Luas tulangan yang diperlukan : As = r × Ag = 1,0 × 70685,83 = 706,9 mm2

PENJABARAN PERHITUNGAN

V. PEMBESIAN ABUTMENT

β 1 × 0.85 × fc ' 0,85× 0.85 ×24,90


ρb = = = 0,027
fy × 600/(600+ fy) 400 ×600 /(600+ 400)

1
1− ×0,75 × ρb× fy
Rmax = 0,75 × ρb × fy × [ 2 ]
'
(0,85 × fc )

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

1
1− ×0,75 × 0,027× 400
= 0,75 × 0,027 × 400 × [ 2 ]
(0,85 × 24,90)

= 6,547

1.3. PERHITUNGAN PEMBESIAN PILE-CAP

Mu 241943411,97
Mn = = = 268826013,30 Nmm
φ 0,9

Mn 268826013,30
Rn = 2 = = 4,30
( b ×d ) ( 1000× d 02502 )
Rasio tulangan yang diperlukan :
'
0,85× fc
ρ= Rn
fy ×[1−2 × × fc ' ]
0,85

0,85× 24,90
= 4,30
400 ×[1−2× × 24,90]
0,85

= 0,01215

As = ρ × b × d

= 0,01215 × 1000 × 250

= 3036,85 mm2

π b
Jarak tulangan yang diperlukan : S = × D2 ×
4 As

π 1000
= × 192 ×
4 3036,85

= 93,363

PENJABARAN PERHITUNGAN
PERANCANGAN JEMBATAN M. IQBAL AL HAFIS
(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

3.1.2. Tulangan Geser


1
Vc = × (√ fc ' ) × b × d
6

1
= × (√ 24,90) × 1000 × 250
6

= 207916 N

d
Jarak tulangan geser : S = Asv × fy
Vs

250
= 1327,3229 × 400 ×
220955

= 45,6547126 mm

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PENJABARAN PERHITUNGAN

2. PEMBESIAN BREAST WALL

2.1. TULANGAN AKSIAL TEKAN LENTUR

Luas tulangan yang diperlukan :

As = ρ×b×d

= 0,4 × 1000 × 700

= 2450 mm2

π b
S = × D2 ×
4 As

π 1000
= × 192 ×
4 2450

= 231,452

2.2. TULANGAN GESER

Vc max = 0,2 × fc ' × b × d

= 0,2 × 24,90 × 1000 × 750

= 2241000 N

d 750
β 1= 1,4 - = 1,4 - = 1,025
2000 2000

Pu 942601
β 2= 1 + ' =1+ = 1,003
1,4 × fc × b ×h 1,4 ×24,90 ×1000 ×800

As × fc '
Vuc = β 1× β 2× β 3 × b × d × √
b×d

2450 ×24,90
= 1,025 × 1,003 × 1 × 1000 × 750 × √
1000 ×750

= 191965,7547 N

Vc = Vuc + 0,6 × b × d
PERANCANGAN JEMBATAN M. IQBAL AL HAFIS
(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

= 191965,7547 + 0,6 × 1000 × 750

= 551965,7547 N

PENJABARAN PERHITUNGAN

d
Jarak tulangan geser yang diperlukan : S = Asv × fy ×
Vs

750
= 265,46 × 400 ×
373277
= 213,35 mm

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PENJABARAN PERHITUNGAN

3. PEMBESIAN BACK WALL DAN CORBEL

β 1 × 0.85 × fc ' 0,85× 0.85 ×24,90


ρb = = = 0,027
fy × 600/(600+ fy) 400 ×600 /(600+ 400)

1
1− ×0,75 × ρb× fy
Rmax = 0,75 × ρb × fy × [ 2 ]
(0,85 × fc ' )

1
1− ×0,75 × 0,027× 400
= 0,75 × 0,027 × 400 × [ 2 ]
(0,85 × 24,90)

= 6,547

3.1. PERHITUNGAN PEMBESIAN BACK WALL POT. - A

3.1.1. Tulangan Lentur

Mu 39190500
Mn = = = 43545000 Nmm
φ 0,9

Mn 43545000
Rn = 2 = = 0,425244141
( b ×d ) ( 1000× 3202 )
Rasio tulangan yang diperlukan :

0,85× fc '
ρ= Rn
fy ×[1−2 × × fc ' ]
0,85

0,85 ×24,90
= 0,425244141
400 ×[1−2× × 24,90]
0,85
PERANCANGAN JEMBATAN M. IQBAL AL HAFIS
(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

= 0,00107

π b
Jarak tulangan yang diperlukan : S = × D2 ×
4 As

π 1000
= × 192 ×
4 343,68

= 585,021 mm

3.1.2. Tulangan Geser

1
Vc = × (√ fc ' ) × b × d
6

1
= × (√ 24,90) × 1000 × 320
6

= 266133 N

d
Jarak tulangan geser : S = Asv × fy
Vs

16
= 1474,8032 × 400 ×
246763

= 38,2502575 mm

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PENJABARAN PERHITUNGAN

3.2. PERHITUNGAN PEMBESIAN BACK WALL POT. – B

3.2.1. Tulangan Lentur

Mu 76861500
Mn = = = 85401667 Nmm
φ 0,9

Mn 85401667
Rn = 2 = = 0,834000651
( b ×d ) ( 1000× 3202 )
Rasio tulangan yang diperlukan :

0,85× fc '
ρ= Rn
fy ×[1−2 × × fc ' ]
0,85

0,85 ×24,90
= 0,834000651
400 ×[1−2× × 24,90]
0,85

= 0,00213

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

π b
Jarak tulangan yang diperlukan : S = × D2 ×
4 As

π 1000
= × 162 ×
4 680,89

= 295,292 mm

3.2.2. Tulangan Geser

1
Vc = × (√ fc ' ) × b × d
6

1
= × (√ 24,90) × 1000 × 320= 266133 N
6

d
Jarak tulangan geser : S = Asv × fy
Vs

16
= 2234,0214 × 400 ×
246763

= 58,9412184 mm

PENJABARAN PERHITUNGAN

3.3. PERHITUNGAN PEMBESIAN BACK WALL POT. – C

3.3.1. Tulangan Lentur

Mu 1993333
Mn = = = 2214815 Nmm
φ 0,9

Mn 2214815
Rn = 2 = = 0,021629051
( b ×d ) ( 1000× 3202 )
Rasio tulangan yang diperlukan :

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

0,85× fc '
ρ= Rn
fy ×[1−2 × × fc ' ]
0,85

0,85 ×24,90
= 0,021629051
400 ×[1−2× × 24,90]
0,85

= 0,00005

π b
Jarak tulangan yang diperlukan : S = × D2 ×
4 As

π 1000
= × 162 ×
4 280

= 718,078 mm

3.3.2. Tulangan Geser

1
Vc = × (√ fc ' ) × b × d
6

1
= × (√ 24,90) × 1000 × 320
6

= 266133 N

d
Jarak tulangan geser : S = Asv × fy
Vs

16
= 2234,0214 × 400 ×
266133

= 53,7240704 mm

PENJABARAN PERHITUNGAN

3.4. PERHITUNGAN PEMBESIAN CORBEL POT. – D

3.4.1. Tulangan Lentur


PERANCANGAN JEMBATAN M. IQBAL AL HAFIS
(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

Mu 40059933,33
Mn = = = 44511037 Nmm
φ 0,9

Mn 44511037
Rn = 2 = = 0,434678096
( b ×d ) ( 1000× 3202 )
Rasio tulangan yang diperlukan :

0,85× fc '
ρ= Rn
fy ×[1−2 × × fc ' ]
0,85

0,85× 24,90
= 0,434678096
400 ×[1−2× ×24,90]
0,85

= 0,00110

π b
Jarak tulangan yang diperlukan : S = × D2 ×
4 As

π 1000
= × 162 ×
4 351,39

= 572,192 mm

3.4.2. Tulangan Geser

1
Vc = × (√ fc ' ) × b × d
6

1
= × (√ 24,90) × 1000 × 320
6

= 266133 N

d
Jarak tulangan geser : S = Av × fy
Vs

16
= 54287 × 400 ×
266133

= -229907 mm

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PENJABARAN PERHITUNGAN

4. PEMBESIAN WING WALL

β 1 × 0.85 × fc ' 0,85× 0.85 ×24,90


ρb = = = 0,027
fy × 600/(600+ fy) 400 ×600 /(600+ 400)

1
1− ×0,75 × ρb× fy
Rmax = 0,75 × ρb × fy × [ 2 ]
'
(0,85 × fc )

1
1− ×0,75 × 0,027× 400
= 0,75 × 0,027 × 400 × [ 2 ]
(0,85 × 24,90)

= 6,547

4.1. PEMBESIAN WING WALL SISI DALAM

Mu 9265445,887
Mn = = = 10294940 Nmm
φ 0,9

Mn 10294940
Rn = 2 = = 0,041179759
( b ×d ) ( 1000× 3202 )
Rasio tulangan yang diperlukan :

0,85× fc '
ρ= Rn
fy ×[1−2 × × fc ' ]
0,85

0,85 ×24,90
= 0,041179759
400 ×[1−2× ×24,90 ]
0,85

= 0,00010

π b
Jarak tulangan yang diperlukan : S = × D2 ×
4 As

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

π 1000
= × 162 ×
4 437,50

= 459,570 mm

4.2. PEMBESIAN WING WALL SISI LUAR

Mu 2058987,975
Mn = = = 2287764 Nmm
φ 0,9

Mn 2287764
Rn = 2 = = 0,009151058
( b ×d ) ( 1000× 3202 )
Rasio tulangan yang diperlukan :

PENJABARAN PERHITUNGAN

0,85× fc '
ρ= Rn
fy ×[1−2 × × fc ' ]
0,85

0,85 × 24,90
= 0,009151058
400 ×[1−2× ×24,90]
0,85

= 0,00002

π b
Jarak tulangan yang diperlukan : S = × D2 ×
4 As

π 1000
= × 132 ×
4 437,50

= 303,388 mm

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS BENGKULU

PERANCANGAN JEMBATAN M. IQBAL AL HAFIS


(G1B018091)
CINDY OKTA SINORA (G1B018105)

Anda mungkin juga menyukai