Anda di halaman 1dari 14

MODEL DAN SIMULASI

OLEH :

LARISSA NAVIA RANI M.KOM

Simulasi Monte Carlo


Bagian 2

Universitas Putra Indonesia ‘YPTK’ Padang


DENGAN CARA EKSPEKTASI

RUMUS :
1. UNTUK RERATA (MEAN) DARI X 2. UNTUK VARIANCE (X)
E (X) = VAR(XI) =

3. STANDAR DEVIASI
SD =
CONTOH SOAL
DIKETAHUI DISTRIBUSI PEMAKAIAN DUA JENIS
BARANG A DAN B UNTUK ASSEMBLING BARANG C,
TENTUKANLAH RATA-RATA(MEAN), VARIANCE, DAN
STANDAR DEVIASI YANG DIHARUSKAN UNTUK
BARANG C !
JENIS A PROB A JENIS B PROB B

10 0.25 17 0.07

11 0.25 18 0.14

12 0.25 19 0.23

13 0.25 20 0.38

21 0.12
DARI RUMUS DIATAS KEMUDIAN DAPAT DICARI MASING-MASING PART A DAN PART B
a. UNTUK PART A DIPEROLEH :
E(A) =

= (10*0.25) + (11*0.25) +(12*0.25) + (13*0.25)


= 2.5 +2.75 +3.0 +3.25 = 11.5
BERARTI UNTUK RERATA (MEAN) DARI PART A =11,5 CM
Ø SEDANGKAN UNTUK VARIANCE DARI PART A ADALAH :
VAR (A) =

= (10-11,5)²*0,25 + (11-11,5)²*0,25 + (12-11,5)²*0,25 +


(13-11,5)²*0,25
= 0,5625+0,0625+0,0625+0,5625= 1,25
Ø STANDAR DEVIASINYA ADALAH :
SD PART A = = √ 1,25 = 1,12
B. PART B DIAMBIL JUGA DARI TABEL DAN DENGAN CARA YANG SAMA YANG
DITUNJUKAN PADA PART A SEHINGGA PERHITUNGANNYA ADALAH :
RERATA = 19,52
STANDAR DEVIASI = 1,25
VARIANCE B = 1,55
C. UNTUK GABUNGAN PART A DAN PART B YANG MENGHASILKAN PART C AKAN
DIPEROLEH :
RERATA / MEAN C = MEAN A + MEAN B
= 11,5 + 19,52
= 31,02
VARIANCE C = VARIANCE A + VARIANCE B
= 1,25 + 1,54
= 2,80
STANDAR DEVIASI C = STANDAR DEVIASI A + STANDAR DEVIASI B
= 1,12 + 1,25
= 2,37
CONTOH SOAL
DISTRIBUSI SUPPLY PEDAGANG GROSIR KE PEDAGANG ECERAN DAN
DISTRIBUSI KEBUTUHAN PELANGGAN (PERMINTAAN) KEPADA PEDAGANG
ECERAN SEPERTI YANG TERTERA DIBAWAH INI. PEDAGANG MEMBELI $10/UNIT
DARI GROSIR DAN MENJUAL $20/UNIT KE PELANGGAN DENGAN HARI KERJA
289 HARI. TENTUKAN :

a. SIMULASIKAN KEUNTUNGAN YANG DIPEROLEH UNTUK 10 HARI BERIKUTNYA

b. ESTIMASIKAN RATA-RATA, VARIANCE, DAN STANDAR DEVIASI TAHUNAN


Kebutuhan RN (A) RN(B)
Supply grosir Pelanggan 7 83
A PROB A B PROB B 71 88
50 0.2 50 0.2 92 92
84 37
100 0.3 100 0.2
28 28
150 0.3 150 0.5 91 34
18 48
200 0.2 200 0.1
21 63
20 75
26 18
CONTOH SOAL
PT. XYZ AKAN MENGIDENTIFIKASI PERSOALAN DIBAGIAN
PRODUKSINYA, KHUSUSNYA DI LINTASAN PRODUKSI DARI
STASIUN KERJA MANUAL A DAN B. TUJUAN YANG AKAN
DICAPAI DARI MODEL INI ADALAH UNTUK MEMBUAT ESTIMASI,
PANJANG ANTRIAN YANG MUNGKIN ADA ANTARA KEDUA
STASIUN KERJA MANUAL TERSEBUT. PANJANG ANTRIAN AKAN
BERVARIASI KARENA VARIASI DARI WAKTU PENGERJAAN OLEH
DUA OPERATOR DAN RATE KEDATANGAN DARI BENDA KERJA.
DIASUMSIKAN BENDA KERJA DIAMBIL DARI PERSEDIAAN YANG
TAK TERBATAS DIDEPAN STASIUN KERJA PERTAMA.

DATA CYCLE TIME UNTUK KEDUA PROSES MANUAL TELAH


DIKUMPULKAN DAN DISAJIKAN SEBAGAI BERIKUT :
SIMULASI 2 LINTASAN PRODUKSI
(TABEL 4.6 HASIL PENGAMATAN UNTUK MASING2 OPERATOR)
Frekuensi Pengamatan Operation A Operation B
Waktu
Operasi Operator A Operator B Prob. Prob.Kum Range RN Prob. Prob.Kum Range RN
0.25 3 2
0.30 2 10
0.35 10 17
0.40 22 20
0.45 28 18
0.50 27 13
0.55 24 10
0.60 18 6
0.65 15 5
0.70 6 5
0.75 5 4
0.80 5 3
0.85 2 2
4.3. SIMULASI 2 LINTASAN PRODUKSI (JAWAB)
(TABEL 4.7 PROSES PENENTUAN RANGE RANDOM)
Frekuensi Pengamatan Operation A Operation B
Waktu
Operasi Operator A Operator B Prob. Prob.Kum Range RN Prob. Prob.Kum Range RN
0.25 3 2 0.02 0.02 00-01 0.02 0.02 00-01
0.30 2 10 0.01 0.03 02-02 0.09 0.10 02-09
0.35 10 17 0.06 0.09 03-08 0.15 0.25 10-24
0.40 22 20 0.13 0.22 09-21 0.17 0.43 25-42
0.45 28 18 0.17 0.39 22-38 0.16 0.58 43-58
0.50 27 13 0.16 0.55 39-54 0.11 0.70 59-69
0.55 24 10 0.14 0.70 55-69 0.09 0.78 70-78
0.60 18 6 0.11 0.80 70-79 0.05 0.83 79-83
0.65 15 5 0.09 0.89 80-88 0.04 0.88 84-87
0.70 6 5 0.04 0.93 89-92 0.04 0.92 88-91
0.75 5 4 0.03 0.96 93-95 0.03 0.96 92-95
0.80 5 3 0.03 0.99 96-98 0.03 0.98 96-97
0.85 2 2 0.01 1.00 99-99 0.02 1.00 98-99
4.3.B. SIMULASI 2 LINTASAN PRODUKSI (JAWAB)
(CEK : PEMBULATAN)
Frekuensi Pengamatan Operation A Operation B
Waktu
Operasi Operator A Operator B Prob. Prob.Kum Range RN Prob. Prob.Kum Range RN
0.25 3 2 0.018 0.02 00 - 01 0.0174 0.017 00 - 01
0.30 2 10 0.012 0.03 02 - 02 0.0870 0.104 02 - 09
0.35 10 17 0.060 0.09 03 - 08 0.15 0.25 10 - 24
0.40 22 20 0.132 0.22 09 - 21 0.17 0.43 25 - 42
0.45 28 18 0.17 0.39 22 - 38 0.16 0.58 43 - 57
0.50 27 13 0.16 0.55 39 - 54 0.11 0.70 58 - 69
0.55 24 10 0.14 0.69 55 - 68 0.09 0.78 70 - 77
0.60 18 6 0.11 0.80 69 - 79 0.05 0.83 78 - 82
0.65 15 5 0.09 0.89 80 - 88 0.04 0.88 83 - 87
0.70 6 5 0.04 0.93 89 - 92 0.04 0.92 88 - 91
0.75 5 4 0.03 0.96 93 - 95 0.03 0.96 92 - 95
0.80 5 3 0.03 0.99 96 - 98 0.03 0.98 96 - 97
0.85 2 2 0.01 1.00 99 -99 0.02 1.00 98 - 99
167 115 1.00 1.00
4.3.B. SIMULASI 2 LINTASAN PRODUKSI (JAWAB)

3 digit likely A B
Waktu Ops Range RN 2 Range RN 3 Range RN 2 Range RN 3
0.25 00 - 01 000 - 019 00 - 01 000-019
0.30 02 - 02 020 - 029 02 - 09 020-099
0.35 03 - 08 030 - 089 10 - 24 100-249
0.40 09 - 21 090 - 219 25 - 42 250-429
0.45 22 - 38 220 - 389 43 - 57 430-579
0.50 39 - 54 390 - 549 58 - 69 580-699
0.55 55 - 68 550 - 689 70 - 77 700-779
0.60 69 - 79 690 - 799 78 - 82 780-829
0.65 80 - 88 800 - 889 83 - 87 830-879
0.70 89 - 92 890 - 929 88 - 91 880-919
0.75 93 - 95 930 - 959 92 - 95 920-959
0.80 96 - 98 960 - 989 96 - 97 960-979
0.85 99 - 99 990 - 999 98 - 99 980-999
4.3.c. Simulasi 2 Lintasan Produksi (Jawab)
(Tabel 4.8 Hasil Simulasi untuk hari -1 pada 20 benda kerja)
Benda Operasi Durasi Operasi Benda Operat Benda Operator Durasi
Kerja A Random Waktu A A Kerja A or B Kerja B Operasi B Random Waktu Operasi B
ke- dimulai Number (jam) berakhir Tersedia siap mnunggu mnunggu dimulai Number B berakhir
1 0.00 495 848
2 701 451
3 554 626
4 962 780
5 316 279
6 265 568
7 982 465
8 656 502
9 243 172
10 115 199
11 437 510
12 352 959
13 433 664
14 594 585
15 632 575
16 429 747
17 929 374
18 719 12
19 806 766
20 169 915
PERHITUNGAN
1. DIMULAI DARI BENDA KERJA 1

2. BARANG YANG DATANG DIMULAI PADA OPERASI A MULAI PADA


WAKTU 0.00 JAM.

3. BILANGAN RANDOM YANG KITA BANGKITKAN MUNCUL 495, DENGAN


MELIHAT TABEL ANGKA INI MASUK DALAM RANGE NUMBER 390-549
DAN WAKTU OPERASINYA 0.50

4. MAKA OPERASI BERAKHIR SEBESAR ((DURASI WAKTU


*60MENIT/1000)+OPERASI DIMULAI)).

5. WAKTU OPERASI BERAKHIR MENJADI WAKTU OPERASI MULAI DI


BENDA KERJA BERIKUTNYA.
4.3.C. SIMULASI 2 LINTASAN PRODUKSI (JAWAB)
Benda Operasi Durasi Operasi Benda Operat Benda Operator Durasi
Kerja A Random Waktu A A Kerja A or B Kerja B Operasi B Random Waktu Operasi B
ke- dimulai Number (jam) berakhir Tersedia siap mnunggu mnunggu dimulai Number B berakhir
1 0.00 495 0.50 0.03 0.03 0.03 0 0 0.03 848 0.65 0.07
2 0.03 701 0.60 0.07 0.07 0.07 0 0 0.07 451 0.45 0.10
3 0.07 554 0.55 0.10 0.10 0.10 0 0 0.10 626 0.5 0.13
4 0.10 962 0.80 0.15 0.15 0.13 2 0 0.13 780 0.6 0.16
5 0.15 316 0.45 0.17 0.17 0.16 1 0 0.16 279 0.4 0.19
6 0.17 265 0.45 0.20 0.20 0.19 1 0 0.19 568 0.45 0.21
7 0.20 982 0.80 0.25 0.25 0.21 4 0 0.21 465 0.45 0.24
8 0.25 656 0.55 0.28 0.28 0.24 4 0 0.24 502 0.45 0.27
9 0.28 243 0.45 0.31 0.31 0.27 4 0 0.27 172 0.35 0.29
10 0.31 115 0.40 0.33 0.33 0.29 4 0 0.29 199 0.35 0.31
11 0.33 437 0.50 0.36 0.36 0.31 5 0 0.31 510 0.45 0.34
12 0.36 352 0.45 0.39 0.39 0.34 5 0 0.34 959 0.75 0.38
13 0.39 433 0.50 0.42 0.42 0.38 4 0 0.38 664 0.5 0.41
14 0.42 594 0.55 0.45 0.45 0.41 4 0 0.41 585 0.5 0.44
15 0.45 632 0.55 0.49 0.49 0.44 5 0 0.44 575 0.45 0.47
16 0.49 429 0.50 0.52 0.52 0.47 5 0 0.47 747 0.55 0.50
17 0.52 929 0.70 0.56 0.56 0.50 6 0 0.50 374 0.4 0.53
18 0.56 719 0.60 0.59 0.59 0.53 6 0 0.53 12 0.25 0.54
19 0.59 806 0.65 0.63 0.63 0.54 9 0 0.54 766 0.55 0.57
20 1.03 169 0.40 1.05 1.05 0.57 6 0 0.57 915 0.7 1.02

Anda mungkin juga menyukai