Masa Masa
Pelan Mengajar Teori Pelan Mengajar Amali Bersemuka
Work Activities Bersemuka
(Tajuk) (Tajuk) ( Amali )
( Teori )
MC-024-3:2012-C01/P(1/42)PM MC-024-3:2012-C01/K(1/32)PM
2.8
KESELAMATAN DI TEMPAT KERJA PERIKSA KESELAMATAN DALAM 5.6
MC-024-3:2012-C01/P(2/42)PM BENGKEL
PUNCA KEBAKARAN, ALAT
2.8 MC-024-3:2012-C01/K(2/32)PM
PEMADAM API DAN KESAN 5.6
KEMALANGAN DI TEMPAT KERJA
KEBAKARAN
MC-024-3:2012-C01/P(3/42)PM MC-024-3:2012-C01/K(3/32)PM
2.8 5.6
1. Carry out safety KELENGKAPAN KESELAMATAN DIRI PROSES PEMADAMAM KEBAKARAN
assessment at MC-024-3:2012-C01/P(4/42)PM MC-024-3:2012-C01/K(4/32)PM
work area. PENGENALAN HAZARD CUACA DAN LAKUKAN BANTUAN KECEMASAN 5.6
2.8
PERSEKITARAN
MC-024-3:2012-C01/P(5/42)PM MC-024-3:2012-C01/K(5/32)PM
PUNCA KEMALANGAN CERAMAH KESELAMATAN DALAM 5.6
BENGKEL
2.8
MC-024-3:2012-C01/PA (6/32)PM
BUAT SENARAI SEMAK KESELAMATAN 5.6
BENGKEL DAN LAKUKAN AUDIT
Lampiran
MC-024-3:2012-C01/P(6/42)PM
JENIS-JENIS SAMBUNGAN
2
ASAS KIMPAL
MC-024-3:2012-C01/PA (7/32)PM
MC-024-3:2012-C01/P(7/42)PM
MEREKOD KERJA-KERJA KIMPALAN
SIMBOL KIMPALAN 2
MC-024-3:2012-C01/P(8/42)PM
JENIS-JENIS PROSES 2 MC-024-3:2012-C01/PA (8/32)PM
2. Comply to work KIMPALAN BUAT RAWATAN HABA (Baik pulih dan
instruction and MC-024-3:2012-C01/P(9/42)PM Pengerasan)
relevant Welding
PROSEDUR SPESIFIKASI
Procedure
KIMPALAN (WPS) / TATACARA 2
Specification (WPS).
MENGIMPAL
MC-024-3:2012-C01/P(10/42)PM
KOD PIAWAIAN 2
MC-024-3:2012-C01/P(11/42)PM
RAWATAN HABA
2
Lampiran
MC-024-3:2012-C01/P(21/42)PM
6. Perform SMAW KELENGKAPAN PROSES API 2.8 MC-024-3:2012-C01/K(13/32)PM
process. PEMOTONGAN OKSI ASITILIN PASANG PERALATAN MEMOTONG 8
MC-024-3:2012-C01/P(22/42)PM GAS OKSI-ASTILIN DAN
LAKUKAN PEMOTONGAN
PROSES MEMOTONG LOGAM 2.8
DENGAN GAS OKSI-ASITILIN
MC-024-3:2012-C01/P(23/42)PM MC-024-3:2012-C01/K(14/32)PM
POTONG LOGAM DENGAN
PENGENALAN KEPADA MESIN PEMOTONG 2.8 7.8
DISC CUTTER (CUT-OFF
DISC CUTTER (CUT-OFF MACHINE) MACHINE).
MC-024-3:2012-C01/P(24/42)PM MC-024-3:2012-C01/K(15/32)PM
2.8 KENALPASTI JENIS-JENIS MATA 7.8
GERGAJI KUASA (POWER SAW)
PEMOTONG GERGAJI KUASA
MC-024-3:2012-C01/K(17/32)PM
MC-024-3:2012-C01/P(25/42)PM 7.8
2.8 PEMASANGAN MESIN
PEMOTONGAN ARKA PLASMA
PEMOTONGAN ARKA PLASMA
Lampiran
MC-024-3:2012-C01/P(26/42)PM
MC-024-3:2012-C01/K(18/32)PM
TEKNIK MEMULA SERTA
2.8 BUAT KIMPAL SEMULA 7.8
MEMBERHENTIKAN ARKA DAN KIMPAL
(PADDING).
SEMULA BUTTERING / PADDING)
MC-024-3:2012-C01/K(19/32)PM
KIMPAL KELULI KARBON PADA 7.8
KEDUDUKAN RATA 1F
MC-024-3:2012-C01/K(20/32)PM
KIMPAL KELULI KARBON PADA 7.8
MC-024-3:2012-C01/P(27/42)PM KEDUDUKAN MELINTANG 2F
TEKNIK MENGIMPAL KAMBI 2.8 MC-024-3:2012-C01/K(21/32)PM
TEE DAN KEDUDUKANNYA KIMPAL KELULI KARBON PADA 7.8
KEDUDUKAN MENEGAK 3F
MC-024-3:2012-C01/K(22/32)PM
KIMPAL KELULI KARBON PADA 7.8
KEDUDUKAN ATAS KEPALA 4F
MC-024-3:2012-C01/K(23/32)PM
KIMPAL KELULI KARBON PADA 7.8
MC-024-3:2012-C01/P(28/42)PM KEDUDUKAN RATA 1G
TEKNIK KIMPALAN KEDUDUKAN RATA DAN 2.8 MC-024-3:2012-C01/K(24/32)PM
MELINTANG KIMPAL KELULI KARBON PADA
KEDUDUKAN MELINTANG 2G 7.8
Lampiran
MC-024-3:2012-C01/P(37/42)PM 3
Lampiran