Community of Practice :
Success Story pada Cyclone Preheater PT SBI - Pabrik Cilacap
1
Build – ups & Blockage at Cyclone Riser Duct
2
Penyebab Cyclone Blockage
Cyclone
Blockage
Build up Material
Process
• Circulation fenomena
3
Mechanical
Flap Damper
Maker : HANSA
6
Feed Box / Splash Box
7
Feed Box / Splash Box – Cilacap Plant
Plat avesta 12 mm
8
Central Tube Design
Spesifikasi :
• Fabrikasi local
• Cyclone 1 :
• Plat avesta ketebalan 9 -10 mm
• 1 segmen
• Life time : dari awal comisioning belum pernah diganti
• Cyclone 2 :
• Plat avesta ketebalan 16 mm
• 3 segmen
• Life time : dari commisioning baru diganti di tahun 2019
9
Inner Tube Original Design
(Segmented, Installed at C3&C4)
10
Design Inner Tube C3 & C4
11
Penggantian Inner Tube C4 ILC & SLC
dengan Design dari Magotteux (Installed 2019)
Cara pemasangan castable inner tube based on Condition in Field
Castable Roof :
200 mm Spesifikasi
Blanket
200 Tebal min. 25
mm Roof mm
Apabila mengacu pada Persayaratan dari
Magotteaux, terdapat perbedaan dengan
770 kondisi actual sebagai berikut :
mm a. Existing Castable yang akan terinstal
adalah setebal 200 mm diukur dari
underneath top roof.(see pic.bag yg Pengelasan dilakukan di sisi-
diwarnai) sisi miring trapesium (fully
b. Penambahan tebal castable hingga 1
segment (sesuai requirement
welding)
Magotteaux) akan menambah berat
beban inner tube
c. Berdasarkan hasil diskusi dengan expert
Magotteaux, pihak Magotteaux
mengizinkan untuk menggunakan Penguncian akan dilakukan
castable dengan ketebalan 200 mm.
di akhir segment
12
Inner Tube Performance
Spesifikasi :
• Cyclone 3 :
• Fabrikasi Hansa
• Terdiri dari 6 segmen ketebalan plat 10 mm rata di semua
segmen
• Life time : untuk ILC sekitar 3 tahun dan SLC sekitar 2 tahun
• Cyclone 4 :
• Fabrikasi Hansa
• Terdiri dari 6 segmen ketebalan plat 10 mm rata disemua
segmen
• Life time : untuk sekitar 1 tahun
• Fabrikasi Maggoteux
• Terdiri dari 4 segmen
• Segmen 1 ketebalan plat 25 mm, segmen 2 ketebalan 20
mm, dan segmen 3 – 4 ketebalan 15 mm
• Life tme : diinstall di tahun 2019 sampai saat ini masih baik
(sudah hampir 3 tahun)
13
Process
Circulating Fenomena Volatile Element
Volatile element :
• Sulphur Raw material & Fuel
• Chlorine
• Alkali 15
Enrichment of Volatile Elements at Preheater
16
Contoh Sample Coating di C4 & Riser Duct
17
Analisa Sample Coating Riser Duct CIL Plant
Hasil Analisa Coating di Riser Duct :
18
Steps for Analyzing Build- Up Problems
19
Systematic Analysis Hot Meal
21
Sulfur – Chlorine Input Limitation
22
Molar Alkali / Sulfur Ratio
Conservative Target
24
Clinker Quality -> Alk / Sulfur Ratio
25
Sulfur Volatility
26
High Sulfur Volatility
Causes:
1. Too high inputs ?
• Check balance and input limits
2. Unfavorable alkali / sulfur ratio ?
• Check balance and input limits
3. Because of kiln operation problems (sulfur volatility)?
• Burner setting => long flame
• Oxygen deficiency
• Overburn clinker
27
High sulfur Volatility Cilacap till mid year of 2021
28
Pengaruh Oxygen terhadap Sulfur Volatility
29
Coal Mill Dynamic Seal Separator Modification to
Reduce R212
• Kondisi Awal:
• Nilai R90 fine coal ½ dari voaltile matter : 20% => 19.8%
• Nilai R212 fine coal di Cilacap saat ini masih sering > 2% (average sebesar 2.22%)
• Nilai ratio R212/R90 rata rata > 10% (average sebesar 11.38%)
31
AFR SOP based on Hot Meal Quality
32
Fighting of Circulation Phenomena Problems
1. Intelligence Cleaning
2. Interlock System
3. Measured again Sulfur & Chlorine problem
33
Shock Blaster Installation
34
Shock Blaster Lantai 3A Sliding Wall (Riser Duct)
35
Shock Blaster Lantai 3B (Riser Duct)
Panel Shock Blower Shock Blower Panel Shock Blower Shock Blower
Preheater Lantai 3B Preheater Lantai Preheater Lantai 3B Preheater Lantai
Barat 3B Barat Utara 3B Utara
36
Shock Blaster Lantai 3B Sisi Barat (Riser Duct)
37
Shock Blaster Lantai 3B Sisi Utara (Riser Duct)
38
Shock Blaster Lantai 3B Sisi Selatan (Riser Duct)
39
Shock Blaster Preheater Lantai 4
Shock Blower Preheater Panel Shock Blower Shock Blower Preheater Panel Shock
Lantai 4 sisi Selatan Preheater Lantai 4 sisi Lantai 4 sisi Utara Blower Preheater
Selatan Lantai 4 sisi Utara
Shock blower pada lantai 4 preheater akan bekerja di waktu yang sama pada suatu titik
40
Shock Blaster Lantai 4 Sisi Utara (Riser Duct)
41
Shock Blaster Lantai 4 Sisi Selatan (Riser Duct)
42
Compressor Specifications
43
Riser Duct Manual Cleaning -> Jet Cleaner
Spesifikasi Pompa :
• Pressure pompa 590
• Flow rate 50 l/menit
• Installed power 55 kW
44
Pressure Sensor Modification di C3 & C4
Sistem Interlock :
• Khusus untuk cyclone 3 dan 4 yang sudah memiliki 3 pressure sensor,
interlock baru active jika minimal 2 sensor tertriger, jika hanya 1 sensor
maka akan create alarm
• Delay time interlock :
• Cyclone 1 & 2 selama 60 seconds
• Cyclone 3 & 4 selama 5 seconds
46
Riser Duct Index
Note.
PI7 : ILC Tertiary Air Pressure
47
Measured Against Sulfur & Chlorine Problem
Dust by pass
48
49
Jenis Castable Area Cyclone & Riser Duct
50
Kiln Feed 2013 - 2022
51
Clinker 2013 - 2022
52