• All pressurized test equipment and fittings should be marked up with an ID number / rating /
calibration certification to ensure their traceability.
• Ensure exclusion zone for pressure test is calculated, identified, and verified as complete
with warning signs displayed. NO Unauthorized person allowed to enter the exclusion
zone.
• Pre-test safety checklist should be implemented to ensure all pre-pressurisation safety
checks and verifications are completed before testing commences.
• Do not modify or remove any Isolation equipment/system.
• Never work on live equipment until it has been Isolated (ICC or IDP in place) and Proven
Dead
• Verify Integrity Line Walks, Operating Limits, Test Package requirements are in place
• Verify all system barriers against overpressure are working as intended prior to the
commencement of each pressure test (ex. PRV, PSV, manifold, PG, Hoses, PCV whether
permanent or temporary equipment).