Pakulonan dan Tangerang

Nilai Kontrak = 3,303,061,850


DPP/FAKTUR = 10/11 3,303,061,850 3,002,783,500
PPN = 10% 3,002,783,500 300,278,350.0
PPH = 4% 3,002,783,500 120,111,340
Jumlah Potongan = 420,389,690
Sisa Yang diterima = REKENING 2,882,672,160.00
580,000,000

20% -

50% -
2,882,672,160
0
-
- -
5,000,000.00 -500000000% 1,500,000.00
-5,000,000 boska 109,400,000
5,000,000 110,900,000.00

Untuk mencari nilai kontrak 110 100

4,000,000.00

2,882,672,160.00 2,882,672,160.00

4,000,000
4,000,000
3,000,000
4,000,000 50% 2,000,000.00

-
- - 8,000,000.00
8,000,000.0
- 8,000,000.00
- 1,500,000 -
110,000 8 880,000
- 6 -
1,500,000 880,000
1,000,000
1,000,000
1,000,000
Nilai Kontr= 99,648,000
DPP/FAKT = 10/11 99,648,000 90,589,091
PPN = 10% 90,589,091 9,058,909
PPH = 4% 90,589,091 3,623,564
Jumlah Po = 12,682,473
Sisa Yang d= 86,965,527

86,965,527 4% 3,478,621
86,965,527 1% 869,655

-
70,991,127 3% 2,129,734

haikal punya -
-
Nilai Kontrak = 245,000,000 Nilai Kontr=
DPP/FAKTUR = 10/11 245,000,000 222,727,273 DPP/FAKT =
PPN = 10% 222,727,273 22,272,727 PPN =
PPH = 4% 222,727,273 8,909,091 PPH =
Jumlah Potongan = 31,181,818 Jumlah Po =
Sisa Yang diterima = 213,818,182 Sisa Yang d=

25,309,091 5% 1,265,455
71,991,127 2% 1,439,823

-
25,309,091 3% 759,273

MAMUJU MAMUJU

25,309,091
6,240,000
31,549,091
245,000,000
10/11 245,000,000 222,727,273
10% 6,500,000 650,000
4% 6,500,000 260,000
910,000
244,090,000

6,240,000 -
6,240,000 2% 124,800

-
6,240,000 3% 187,200 946,473