- Morning Assembly
- Kiken Yochi Meeting
- Pre- operation
Inspection
- HSE Induction
- Daily Patrol MORNING ASSEMBLY & CHECK PPE
- Daily permit to Work dilakukan setiap shift kerja. Supervisor/ Pelaksana memaparkan rencana kerja, potensi bahaya
dan pengendaliannya. Safety Officer menyampaikan temuan Daily Patrol kemarin dan
- JSA tindakan perbaikannya.
- Safety Talk
- General Cleaning
- Joint Weekly Site
Patrol & Meeting
- Blood Pressure
Checking SAFETY TALK
- Weekly Inspection Bentuk kegiatan hampir sama dengan morning assembly, ditambah dengan penyampaian
terkait pencapaian kinerja K3L, safety alert dan isu K3L. Bertujuan menumbuhkan kesadaran
pekerja untuk turut mencapai target K3L proyek
- Safety Campaign
- Medical Check Up
- Emergency Drill
- Color Coding
Inspection
- P2K3 Inspection &
Meeting
- Management Tour SAFETY CAMPAIGN REWARD
CONTROL
SAFETY CROSS INSPECTION HSE PRE – CONSTRUCTION CSMS dan KICK OF MEETING
Patrol dan Inspeksi K3L di salah MEETING SUBKONTRAKTOR
satu proyek yang dihadiri oleh Membahas control dari Menyampaikan persyaratan
perwakilan HSE Coordinator / method yang akan kerja di Kajima Workplace Measurement
HSE Manager proyek lainnya dilaksanakan, dihadiri oleh
PM, Spv, dan HSE proyek lain.
Bisa dilaksanakan beberapa
kali sesuai progress
TRAINING
Training Documentation
BASIC TRAINING
SPECIFIC TRAINING
1. OHSAS 18001:2007 & ISO
1. Foundation Work
14001:2015 recognition
2. Excavation Work
2. SMK3 (PP No. 50 / 2012)
3. Install dan Dismantling
3. Behavior-Based Safety
Perancah Formwork
4. Mobile Crane & Excavator
4. Re-Bar Work
Operation
5. Steel Structure work
5. Office safety
6. Dstnya sesuai dengan
6. Working at height
metode kerja yang akan
7. Job safety analysis dilaksanakan (Based on
8. Scaffolding progress)
9. Electrical safety
10. Hot work practice
11. Incident & investigation report Semua training di ikuti oleh SM,
12. Fire Fighting Supervisor , Foreman dan
13. Lifting and Rigging Plan Subkont.
14. Site Security
15. Tool Box Meeting / Kiken Materi berdasarkan Method
Yochi Statement (termasuk dari
Subkont), yang di review oleh
16. Work Permit
Safety Engineer menjadi materi
17. Heavy Equipment inspection Training dan Checklist Pekerjaan
18. Safety & Environment (Integrated QSE Checklist)
Awareness
SITE SAFETY ENGINEERING
Site Safety Engineering (Lifting Plan)
1 2 3
Pre-use Inspection
Pre mobilization Inspection Form Weekly/ Monthly Inspection Mobile Crane
Mobile Crane
4 5 6 7
RING ON SIRINE
Crane Inspection
1 4 7
2 5 8
Auxiliary & Main Hoist Drum Water pass (outrigger) Load Display
3 6 9
Hook Clutch Anti two Angle Detector Moment Limiter Indicator lamp
block
Site Safety Engineering
TOTAL LOAD
1.Steel Truss (TR1) = 4,28 Ton
2.Spreader beam = 1,2 Ton
3.Hook Weight = 1,3 Ton
==================================
SWL = 14.2 TON x 80% = 11,36 TON
==================================
1.Radius = 30 m
2.Height Level = 61 m
3.Boom Length = 51,8 m
4.Boom Angle = 61°
Site Safety Engineering
61O
9m
Height Level =
61 meter
Site Safety Engineeting
SAFE
PASTIKAN TOTAL BEBAN YANG
DIANGKAT, TERMASUK JIKA ADA
PENGANGKATAN YANG ABNORMAL/
DILUAR KEBIASAAN/ DI LUAR STANDAR
YANG DIMILIKI, SUDAH TERIDENTIFIKASI
DAN DILAKUKAN KALKULASI dan
DIREVIEW OLEH SAFETY ENGINEER &
APPROVED PM
Site Safety Engineeting
CRITICAL LIFTING
Kriteria Umum Critical Lifting:
1. Total beban yg diangkat melebihi ambang batas standar . Contoh angkatan > 80% dari
SWL load chart.
2. Pengangkatan orang
3. Material khusus/ Abnormal Size
4. Pengangkatan menggunakan dua crane atau lebih
5. Pengangkatan material yg khusus, mudah rusak, dan bila rusak tidak bisa diperbaiki,
mengganggu proses kerja, dll.
6. Pengangkatan material yg akan dibongkar/demolish, ketidaktahuan berat beban yg
akan diangkat
7. Pengangkatan di area power lines, over active work areas, occupied buildings, public
roadways, transportation systems, etc.
8. Operasional pengangkatan di area terbatas (confined space), keterbatasan ketinggian
boom, dll.
*Safety Engineering melakukan review pada lifting plan yang diajukan, memastikan lifting plan memenuhi standar atau merekomendasikan
standar adopsi standar baru jika perusahaan/ proyek yang bersangkutan belum memiliki acuan terkait pekerjaan baru/ abnormal activity
Site Safety Engineering (PERANCAH)
CONSTANTA
• Concrete and rebar Dead Load : 24 kN/m3 = 2400 kg
• Formwork Dead Load : 0.4 kN/m3 = 40 kg/m2
• Life Load : 1.5 kN/m2 = 150
kg/m2
SAFETY FACTOR
• Dead Load (DL) = DL x 1.2
• Life Load (LL) = LL x 1.6
Typical Floor Formwork Conventional Calculation 400 X 700 Typical Floor Formwork Conventional Calculation 450 X 900
= 230 Kg 807.9 Kg