Disusun Oleh:
Bastian Stevanus Situmorang
Mentor:
Bayu Budhi Setijono
SEKSI ENJINIRING
DEPARTEMEN SIPIL UMUM 1
PT. WIJAYA KARYA (PERSERO) Tbk.
2019
DAFTAR ISI
HALAMAN JUDUL ................................................................................................ i
LEMBAR PERSETUJUAN .................................................................................... ii
LEMBAR PENGESAHAN .................................................................................... iii
KATA PENGANTAR ............................................................................................ iv
DAFTAR ISI ........................................................................................................... v
DAFTAR GAMBAR ............................................................................................ viii
DAFTAR TABEL .................................................................................................. ix
BAB 1 PENDAHULUAN ....................................................................................... 1
1.1 Latar Belakang............................................................................................. 1
1.2 Rumusan Masalah ....................................................................................... 2
1.3 Tujuan .......................................................................................................... 2
1.4 Manfaat ........................................................................................................ 2
1.5 Ruang Lingkup ............................................................................................ 2
BAB 2 TINJAUAN PUSTAKA .............................................................................. 3
2.1 Perencanaan Site Layout ............................................................................. 3
2.2 Pertimbangan Tata Letak Site Layout ......................................................... 3
2.3 Permasalahan Pada Perencanaan Site Layout ............................................. 4
2.4 Identifikasi Fasilitas ..................................................................................... 5
2.5 Jarak Tempuh (Travelling Distance) dan Indeks Keamanan (Safety Index) 6
2.6 Elemen Dalam Perencanaan Site Layout .................................................... 7
2.7 Optimasi Site Layout ................................................................................... 7
2.8 Prosedur WIKA yang Terkait Makalah ....................................................... 8
2.8.1 Prosedur Design dan Build (No. Dok: WIKA-ENG-PM-02.03) ..... 8
2.8.2 Prosedur Safety, Health & Environmental plan (SHE PLAN)
2.8.3 (No. Dok: WIKA-PEM-PM-03.03) ............................................... 10
2.8.4 Prosedur Sistem Manajemen Keselamatan & Kesehatan Kerja dan
Lingkungan (SMK3L) Nalar Usaha Konstruksi
(No. Dok: WIKA-PEM-PM-03.01) ............................................... 12
BAB 3 METODE PENELITIAN .......................................................................... 14
3.1 Tahap Penelitian ........................................................................................ 14
3.2 Perencanaan Site Facilities Batching Plant ............................................... 15
v
3.3 Pengumpulan Data ..................................................................................... 15
3.3.1 Survey Lokasi dan Identifikasi Fasilitas ........................................ 15
3.3.2 Pengukuran Jarak Antar Fasilitas................................................... 15
3.3.3 Menghitung Frekuensi Perjalanan ................................................. 16
3.3.4 Traveling Distance (DT) ................................................................ 16
3.3.5 Safety Index (SI) ............................................................................. 17
3.4 Optimasi Site Layout ................................................................................. 17
BAB IV ANALISIS & PEMBAHASAN .............................................................. 18
4.1 Perencanaan Site Facilities ........................................................................ 18
4.2 Survey dan Pengumpulan Data ................................................................. 32
4.2.1 Perhitungan Jarak Antar Fasilitas .................................................. 36
4.2.2 Menghitung Frekuensi Perpindahan .............................................. 39
4.2.3 Kriteria Nilai Safety Index ............................................................. 40
4.3 Travelling Distance.................................................................................... 46
4.4 Analisis Safety Index ................................................................................. 50
4.5 Optimasi Site Layout ................................................................................. 52
4.6 Pemilihan Alternatif Site Layout ............................................................... 72
4.7 Tinjauan Biaya ........................................................................................... 75
BAB V MANAJEMEN RISIKO........................................................................... 80
5.1 Prinsip Risiko ............................................................................................ 80
5.2 Tujuan Manajemen Risiko ........................................................................ 80
5.3 Fungsi Manajemen Risiko ......................................................................... 80
5.4 Penanganan Risiko (Risk Treatment) ........................................................ 81
5.5 Analisis Manajemen Risiko ....................................................................... 81
BAB VI SISTEM MANAJEMEN WIKA ............................................................ 84
6.1 Visi dan Misi WIKA ................................................................................. 84
6.2 WIKA Values ............................................................................................ 84
6.3 Kebijakan Sistem Manajemen WIKA ....................................................... 84
6.3.1 Sistem Manajemen Mutu WIKA ................................................... 85
6.3.2 Sistem Manajemen SHE (Safety, Health & Environment) ............ 86
BAB VII KESIMPULAN DAN SARAN ............................................................. 88
7.1 Kesimpulan ................................................................................................ 88
vi
7.2 Saran .......................................................................................................... 88
BAB VIII BUDAYA WIKA ................................................................................. 89
8.1 Nilai Nilai (Values) WIKA........................................................................ 89
8.2 Penerapan Nilai WIKA .............................................................................. 90
DAFTAR PUSTAKA ............................................................................................ 92
LAMPIRAN 1 ....................................................................................................... 93
LAMPIRAN 2 ....................................................................................................... 94
LAMPIRAN 3 ....................................................................................................... 95
LAMPIRAN 4 ....................................................................................................... 96
LAMPIRAN 5 ....................................................................................................... 97
LAMPIRAN 6 ....................................................................................................... 98
LAMPIRAN 7 ....................................................................................................... 99
vii
DAFTAR GAMBAR
viii
DAFTAR TABEL
ix
Tabel 4.30 Nilai Safety Index Iterasi 1 DK 135 .................................................... 72
Tabel 4.31 Nilai Travelling Distance dan Safety Index dari layout DK 118 ........ 72
Tabel 4.32 Nilai Travelling Distance dan Safety Index dari layout DK 125 ........ 73
Tabel 4.33 Nilai Travelling Distance dan Safety Index dari layout DK 135 ........ 73
Tabel 4.34 Nilai Total dari Travelling Distance dan Safety Index DK 118 .......... 74
Tabel 4.35 Nilai Total dari Travelling Distance dan Safety Index DK 125 .......... 75
Tabel 4.36 Nilai Total dari Travelling Distance dan Safety Index 135 ................. 75
Tabel 4.37 Spesifikasi Alat.................................................................................... 76
Tabel 4.38 Biaya Alat Loader, Dump Truck, dan Truck Mixer layout DK 118 ... 76
Tabel 4.39 Biaya Alat Forklift layout DK 118 ...................................................... 77
Tabel 4.40 Biaya Alat Loader, Dump Truck, dan Truck Mixer layout DK 125 ... 77
Tabel 4.41 Biaya Alat Forklift layout DK 125 ...................................................... 78
Tabel 4.42 Biaya Alat Loader, Dump Truck, dan Truck Mixer layout DK 135 ... 78
Tabel 4.43 Biaya Alat Forklift layout DK 135 ...................................................... 78
Tabel 5.1 Matriks Tingkat Risiko PT. Wijaya Karya ............................................ 81
Tabel 5.2 Kriteria Probabilitas............................................................................... 82
Tabel 5.3 Kriteria Rating Akbiat ........................................................................... 82
Tabel 5.4 Analisis Manajemen Risiko................................................................... 83
Tabel 5.5 Analisis Tindak Lanjut Risiko ............................................................... 83
x
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
BAB 1
PENDAHULUAN
Salah satu mega proyek yang strategis dan tengah dikerjakan oleh WIKA
yaitu Pembangunan kereta cepat Jakarta-Bandung sepanjang 142 km. Proyek
pembangunan kereta cepat tersebut sangat vital mengingat pesatnya pertumbuhan
perekonomian di DKI Jakarta dan Jawa barat khusunya Kota Bandung. Kegiatan
perekonomian masyarakat dan industri terus menggeliat menuntut tersedianya
insfrastruktur yang memadai. Pembangunan jalur kereta cepat Jakarta-Bandung
dibagi 4 section, dimana section 1 dimulai dari DK 1 - DK 41, section 2 dimulai
dari DK 41 - DK 85, section 3 dari DK 85 - DK 114, section 4 dari DK 114 - DK
142.
Ruang gerak yang sempit akan sulit untuk menentukan penempatan site
facilities. Dengan perencanaan site layout facilities yang dapat menghemat
pemakaian ruang bangun, hal ini memerlukan kecermatan dalam penempatannya
karena berpengaruh pada produktivitas kerja. Semakin besar area yang digunakan
dalam penempatan site facilities maka perjalanan antar fasilitas juga semakin
banyak memakan waktu. Pembuatan alternatif site layout perlu dilakukan agar
memperoleh site facilities yang optimal.
1
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
pelaksanaan proyek adalah perencanaan dan optimasi penataan lokasi proyek (site
layout planning) termasuk penataan fasilitas pendukungnya. Pada penelitian ini
dilakukan perencanaan site layout facilities dengan metode Traveling Distance dan
Safety Index (SI) atau bisa disebut multi objectives function sebagai acuannya.
1.3 Tujuan
Adapun tujuan yang akan dicapai dalam makalah ini adalah:
1. Memberikan rekomendasi dan sebagai bahan evaluasi untuk site layout
proyek pembangunan jalur kereta cepat Jakarta - Bandung section 4
ditinjau dari aspek Travelling Distance (DT), Safety Index (SI) dan
biaya.
2. Memberikan rekomendasi perencanaan site layout yang paling optimum
dan dapat sebagai bahan pertimbangan untuk proyek WIKA selanjutnya.
1.4 Manfaat
Makalah ini diharapkan dapat memberikan manfaat sebagai berikut:
1. Memberikan informasi terhadap perusahaan tentang site layout eksisting
pada proyek pembangunan jalur kereta cepat Jakarta - Bandung section 4
2. Mendapatkan suatu alternatif site layout planning baru yang dapat
meningkatkan efisiensi operasional dan tingkat keselamatan kerja di site
Wijaya Konstruksi.
2
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
BAB 2
TINJAUAN PUSTAKA
3
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
fasilitas yang kita rencanakan dapat meningkatkan produktivitas kerja dan tidak
memakan banyak tempat, beberapa hal itu yakni:
a) Safety.
b) Keamanan.
c) Akomodasi.
d) Kantor.
e) Supply air dan sanitasi.
f) Penanganan material.
g) Tempat penyimpanan.
h) Batch plant dan Tempat fabrikasi.
4
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
5
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Identifikasi juga dilakukan untuk mengetahui tipe fasilitas yang ditinjau. Tipe
fasilitas yang akan dipindahkan menjadi bahan pertimbangan dalam optimasi site
layout. Fasilitas-fasilitas tersebut kemudian dibagi sesuai tipe masing-masing
sebagai berikut:
a) Fasilitas tetap (fixed facilities) adalah fasilitas yang memiliki tempat yang fix/
tetap dilapangan dan berhubungan dengan fasilitas lain, antara lain yaitu : Keet
kantor, genset, tower crane, fabrikasi besi, stockyard besi, dan bangunan gedung.
dengan :
n = Jumlah fasilitas total
frv = frekuensi perjalanan dari fasilitas r menuju v
drv = jarak dari fasilitas r menuju v
dengan :
n = Jumlah fasilitas total
6
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
7
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
8
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
9
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
10
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Gambar 2.2 Diagram Alir Urutan dan Proses kerja SHE Plan
11
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
12
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
13
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
BAB III
METODE PENELITIAN
14
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
15
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A B C D E F G H I J K L M N O P Q R S T U V
1 Kantor A
2 Workshop B
3 Stockyard Pagar Spandex C
4 Gudang K3, R. Mekanik D
5 Stockyard Sheetpile E
6 Stockyard Pagar Galian Pilecap F
7 Stockyard Scaffolding G
8 Stockyard MCB H
9 Formwork Pilecap I
10 Formwork Pier J
11 Material Stock 1 K
12 Material Stock 2 L
13 Material Stock 3 M
14 Material Stock 4 N
15 Material Stock 5 O
16 Material Stock 6 P
17 Material Stock 7 Q
18 Material Stock 8 R
19 Batching Plant S
20 Parkir Truck Mixer T
21 Direksi Keet U
22 Lab Beton V
16
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Keterangan:
DT = hubungan antara jarak dengan frekuensi perpindahan antar fasilitas
d = jarak antar fasilitas
f = Frekuensi perpindahan antar fasilitas
n = jumlah fasilitas
Keterangan:
SI = Hubungan antara tingkat keamanan dan keselamatan dengan frekuensi
perpindahan
n = Jumlah fasilitas (nonfixed facilities dan fixed facilities)
sij = Tingkat keamanan dan keselamatan (safety) antar fasilitas i dan j
Fij = Frekuensi perpindahan antar fasilitas i dan j
17
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
BAB IV
ANALISIS & PEMBAHASAN
18
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
a) Workshop
1) Kuantitas Set Bekisting Pile cap
Asumsi 1 set bekisting pile cap untuk tiap pilecap = 10 hari/siklus
Total durasi untuk pekerjaan pile cap berdasarkan schedule 6 bulan
Maka total kuantitas set bekisting:
b) Batching Plant
1) Volume Concrete Bore pile
Asumsi 1 borepile membutuhkan 87 m3 volume concrete
Total durasi untuk pekerjaan borepile berdasarkan schedule 10 bulan
Maka total kuantitas set volume beton tiap borepile adalah:
19
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
c) Office
Asumsi 1 orang membutuhkan luas 4 m2
Jumlah lantai bangunan adalah 2 lantai
Maka total area yang dibutuhkan adalah:
20
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
(120 x 4) 480
Luasan kantor yang dibutuhkan = = = 240 m2
2 2
21
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
f) Stockyard MCB
22
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
g) Stockyrad Sheetpile
Panjang (m) 12
Lebar (m) 1,5
Tinggi tumpukan (m) 4
Jumlah tumpukan (tingkat) 3
Jumlah kebutuhan (buah) 720
Jumlah 1 tumpukan (buah) 240
Lebar ruangan (m) 10
Panjang ruangan (m) 24
Luas Area (m) 240
23
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
i) Stockyard Scaffolding
24
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
25
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
26
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
l) Direksi Keet
Panjang : 23 m
Lebar : 11 m
Luas area : 253 m2
m) Water Treatment
Panjang : 16 m
Lebar :7m
Luas area : 112 m2
27
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
28
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
29
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Spesifikasi bekisting:
Flange Tebal 12 mm
Panjang 1800 mm
Tinggi 1950 mm
Vertical Tebal (mm) 12 mm
Panjang (mm) 1616 mm
Tinggi (mm) 1950 mm
Panel Tinggi 200 mm
Panjang 6000 mm
Lebar 50 mm
Crown Tebal 12 mm
Panjang 1750 mm
Lebar 1950 mm
30
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
31
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
32
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
33
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
34
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Dari hasil pengamatan site layout diatas, kondisi eksisting dikategorikan tipe
unequal site layout. Hal tersebut dikarenakan masih ada terdapat ruang atau lahan
yang dapat dimanfaatkan untuk menambah fasilitas ataupun menggeser atau
pemindahan fasilitas yang sudah ada, namun dari hasil pengamatan di lapangan
35
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
kondisi di area site layout terdapat banyak pabrik yang berdekatan dan padat
sehingga tidak dapat menambah atau memperluas lahan tersebut.
No Fasilitas Kode A I J K L M N O
1 Kantor A 211,15 211,26 298,3 283,82 269,19 238,21 225,97
2 Workshop B 180,75 180,82 198,29 183,82 169,19 138,21 125,97
3 Stockyard Pagar Spandex C 141,51 141,51 242,14 222,46 206 178,75 166,77
4 Gudang K3, R. Mekanik D 158,68 158,68 259,31 239,63 223,17 195,92 183,94
5 Stockyard Sheetpile E 97,29 97,29 197,92 178,24 161,78 134,53 122,55
6 Stockyard Pagar Galian Pilecap F 116,87 116,87 217,5 197,82 181,36 154,11 142,13
7 Stockyard Scaffolding G 134,43 134,43 235,06 215,38 198,92 171,67 159,69
8 Stockyard MCB H 97,29 97,29 197,92 178,24 161,78 134,53 122,55
9 Formwork Pilecap I 4,66 147,85 128,17 111,71 84,46 72,48
10 Formwork Pier J 147,85 128,17 111,71 84,46 72,48
11 Material Stock 1 K 65,66 84,08 79,41 89,71
12 Material Stock 2 L 64,4 59,73 70,03
13 Material Stock 3 M 43,27 53,57
14 Material Stock 4 N 26,32
15 Material Stock 5 O
36
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A P Q R S T U V
1 Kantor A 223,82 213,67 202,79 67,51 281,99 155,45 159,68
2 Workshop B 123,81 113,67 102,85 37,12 181,99 55,45 59,67
3 Stockyard Pagar Spandex C 163,53 155,37 144,59 35,27 222,49 169,55 168,07
4 Gudang K3, R. Mekanik D 180,7 172,54 161,76 52,44 239,66 186,72 185,24
5 Stockyard Sheetpile E 119,31 111,15 100,37 89,27 178,27 125,33 123,85
6 Stockyard Pagar Galian Pilecap F 138,89 130,73 119,95 53,69 197,85 144,91 143,43
7 Stockyard Scaffolding G 156,45 148,29 137,51 71,25 215,41 162,47 160,99
8 Stockyard MCB H 119,31 111,15 100,37 89,27 178,27 125,33 123,85
9 Formwork Pilecap I 69,24 61,08 50,3 145,6 128,2 75,26 73,78
10 Formwork Pier J 69,24 61,08 50,3 145,6 128,2 75,26 73,78
11 Material Stock 1 K 109,43 118,97 129,89 145,12 21,98 173,56 175,04
12 Material Stock 2 L 89,75 99,29 110,21 125,44 48,34 153,88 155,36
13 Material Stock 3 M 73,29 82,83 93,75 108,98 66,76 137,42 138,9
14 Material Stock 4 N 46,04 55,58 66,5 81,73 62,09 110,17 111,65
15 Material Stock 5 O 34,06 43,6 54,52 69,75 72,39 98,19 99,67
16 Material Stock 6 P 40,36 51,28 66,51 92,11 94,95 96,43
17 Material Stock 7 Q 43,12 53,1 101,65 86,79 88,27
18 Material Stock 8 R 42,32 112,57 76,01 77,49
19 Batching Plant S 226,58 145,78 147,26
20 Parkir Truck Mixer T 168,41 171,37
21 Direksi Keet U 7,95
22 Lab Beton V
No Fasilitas Kode A I J K L M N O
1 Kantor A 94,19 116,01 241,57 217,24 192,99 174,89 163,62
2 Workshop B 37,68 15,86 159,54 135,21 112 93,9 82,63
3 Stockyard Pagar Spandex C 94,19 116,01 241,57 217,24 192,99 174,89 163,62
4 Gudang K3, R. Mekanik D 56,67 34,85 124,58 100,25 89,5 107,6 118,87
5 Stockyard Sheetpile E 56,67 34,85 119,76 95,43 84,68 102,78 114,05
6 Stockyard Pagar Galian Pilecap F 45,86 24,04 142,29 117,96 107,21 125,31 136,58
7 Stockyard Scaffolding G 52,76 30,94 135,39 111,06 100,31 118,41 129,68
8 Stockyard MCB H 22,12 43,94 199,37 175,04 164,29 182,39 193,66
9 Formwork Pilecap I 23,82 179,25 154,92 144,17 162,27 173,54
10 Formwork Pier J 157,43 133,1 122,35 140,45 151,72
11 Material Stock 1 K 26,33 50,58 68,68 79,95
12 Material Stock 2 L 26,25 44,35 55,62
13 Material Stock 3 M 20,1 31,37
14 Material Stock 4 N 13,27
15 Material Stock 5 O
37
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A P Q R S T U V
1 Kantor A 154,02 144,8 134,56 108,775 193,24 144,04 161,77
2 Workshop B 73,03 63,81 53,57 27,785 81,36 36,96 49,89
3 Stockyard Pagar Spandex C 154,02 144,8 134,56 108,775 193,24 144,04 161,77
4 Gudang K3, R. Mekanik D 128,47 137,69 147,93 64,575 34,75 6,82 14,93
5 Stockyard Sheetpile E 123,65 132,87 143,11 59,755 29,93 6,82 10,11
6 Stockyard Pagar Galian Pilecap F 146,18 155,4 165,64 82,285 52,46 14,89 32,64
7 Stockyard Scaffolding G 139,28 148,5 158,74 75,385 45,56 7,99 25,74
8 Stockyard MCB H 203,26 212,48 222,72 139,365 109,54 71,97 89,72
9 Formwork Pilecap I 183,14 192,36 202,6 119,245 89,42 51,85 69,6
10 Formwork Pier J 161,32 170,54 180,78 97,425 67,6 30,03 47,78
11 Material Stock 1 K 89,55 98,77 109,01 62,005 62,005 129,4 111,65
12 Material Stock 2 L 65,22 74,44 84,68 37,675 37,675 105,07 87,32
13 Material Stock 3 M 40,97 50,19 60,43 26,925 26,925 94,32 76,57
14 Material Stock 4 N 22,87 32,09 42,33 45,025 45,025 112,42 94,67
15 Material Stock 5 O 11,6 20,82 31,06 56,295 56,295 123,69 105,94
16 Material Stock 6 P 11,22 21,46 65,895 65,895 133,29 115,54
17 Material Stock 7 Q 12,24 75,115 75,115 142,51 124,76
18 Material Stock 8 R 85,355 85,355 152,75 135
19 Batching Plant S 2 69,395 51,645
20 Parkir Truck Mixer T 39,57 21,82
21 Direksi Keet U 19,75
22 Lab Beton V
No Fasilitas Kode A I J K L M N O
1 Kantor A 118,62 91,59 34,207 50,207 66,207 84,207 104,21
2 Workshop B 37,09 64,12 53,707 69,707 85,707 103,71 123,71
3 Stockyard Pagar Spandex C 47,02 74,05 172,63 156,63 140,63 122,63 102,63
4 Gudang K3, R. Mekanik D 116,48 89,45 51,767 67,767 83,767 101,77 121,77
5 Stockyard Sheetpile E 59 86,03 160,65 144,65 128,65 110,65 90,65
6 Stockyard Pagar Galian Pilecap F 89,44 116,47 147,71 131,71 115,71 97,71 77,71
7 Stockyard Scaffolding G 104,99 132,02 163,26 147,26 131,26 113,26 93,26
8 Stockyard MCB H 28,07 55,1 156,12 172,117 159,58 141,58 121,58
9 Formwork Pilecap I 29,03 130,05 146,047 162,047 167,65 147,65
10 Formwork Pier J 103,02 119,017 135,017 140,62 120,62
11 Material Stock 1 K 18 34 52 72
12 Material Stock 2 L 18 36 56
13 Material Stock 3 M 20 40
14 Material Stock 4 N 22
15 Material Stock 5 O
38
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A P Q R S T U V
1 Kantor A 120,207 132,207 144,21 51,05 219,25 182,8 168,83
2 Workshop B 139,707 151,707 163,71 24,83 85,58 113,2 127,17
3 Stockyard Pagar Spandex C 118,63 130,63 142,63 66,78 57,61 85,23 99,2
4 Gudang K3, R. Mekanik D 137,767 149,767 161,77 68,61 236,81 200,36 186,39
5 Stockyard Sheetpile E 106,65 118,65 130,65 54,8 45,63 73,25 87,22
6 Stockyard Pagar Galian Pilecap F 93,71 105,71 117,71 41,86 32,69 60,31 74,28
7 Stockyard Scaffolding G 109,26 121,26 133,26 57,41 48,24 75,86 89,83
8 Stockyard MCB H 137,58 149,58 161,58 47,83 38,66 66,28 80,25
9 Formwork Pilecap I 163,65 175,65 187,65 21,76 12,59 40,21 54,18
10 Formwork Pier J 136,62 148,62 160,62 48,79 39,62 67,24 81,21
11 Material Stock 1 K 88 100 112 7,98 160,9 136,62 150,59
12 Material Stock 2 L 72 84 96 7,98 144,9 120,62 134,59
13 Material Stock 3 M 56 68 80 7,98 128,9 104,62 118,59
14 Material Stock 4 N 38 50 62 7,98 110,9 86,62 100,59
15 Material Stock 5 O 18 30 42 7,98 90,9 66,62 80,59
16 Material Stock 6 P 14 26 7,98 92,21 64,59 50,62
17 Material Stock 7 Q 14 7,98 80,21 52,59 38,62
18 Material Stock 8 R 7,98 68,21 40,59 26,62
19 Batching Plant S 7,38 4,25 4,25
20 Parkir Truck Mixer T 29,62 43,59
21 Direksi Keet U 15,97
22 Lab Beton V
39
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A I J K L M N O
1 Kantor A 9 10 2 3 2 5 4
2 Workshop B 61 67 8 5 7 6 5
3 Stockyard Pagar Spandex C 2 3 1 0 2 1 1
4 Gudang K3, R. Mekanik D 4 3 2 2 1 2 0
5 Stockyard Sheetpile E 2 2 3 2 3 3 4
6 Stockyard Pagar Galian Pilecap F 10 5 3 3 2 4 2
7 Stockyard Scaffolding G 5 7 3 4 2 2 1
8 Stockyard MCB H 8 4 5 3 3 2 4
9 Formwork Pilecap I 14 8 6 7 4 5
10 Formwork Pier J 9 7 6 4 4
11 Material Stock 1 K 28 15 14 9
12 Material Stock 2 L 34 22 21
13 Material Stock 3 M 32 26
14 Material Stock 4 N 37
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 7 6 8 23 12 9 14
2 Workshop B 6 4 3 97 32 18 5
3 Stockyard Pagar Spandex C 3 2 1 1 2 1 1
4 Gudang K3, R. Mekanik D 1 2 2 5 1 3 4
5 Stockyard Sheetpile E 2 1 0 2 1 5 3
6 Stockyard Pagar Galian Pilecap F 1 1 2 4 2 3 3
7 Stockyard Scaffolding G 3 2 1 2 3 4 3
8 Stockyard MCB H 3 3 2 1 2 2 1
9 Formwork Pilecap I 4 3 2 7 1 3 4
10 Formwork Pier J 5 3 2 6 2 5 6
11 Material Stock 1 K 8 10 7 45 14 11 15
12 Material Stock 2 L 19 18 15 24 13 6 9
13 Material Stock 3 M 17 16 14 31 11 9 5
14 Material Stock 4 N 25 19 15 27 7 8 11
15 Material Stock 5 O 41 29 17 29 12 7 5
16 Material Stock 6 P 39 24 39 18 12 7
17 Material Stock 7 Q 42 41 14 8 6
18 Material Stock 8 R 75 13 11 9
19 Batching Plant S 56 41 38
20 Parkir Truck Mixer T 6 3
21 Direksi Keet U 17
22 Lab Beton V
40
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Berdasarkan area project yang dikerjakan, untuk bahaya yang kemungkinan terjadi
di area kawasan project ialah nilai safety 2 dengan zona bahaya tersengat lintrik
genset/ledakan rumah B3 & BBM.
Bahaya yang paling diantisipasi ialah tangki solar, oleh sebab itu berikut literatur
yang dijadikan sebagai acuan untuk menentukan tingkat safety index:
Berdasarkan tabel diatas, zona safety index dapat dikategorikan sebagai berikut:
Zona 1 Sangat berbahaya < 5m
Zona 2 Berbahaya 5m ≤ r < 20m
Zona 3 Cukup berbahaya 20m ≤ r < 30m
41
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Solar
42
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Solar
43
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Solar
Berdasarkan site layout diatas maka nilai safety index tiap site facilities sebagai
berikut:
44
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
45
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
46
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A I J K L M N O
1 Kantor A 633,45 704,20 198,87 283,82 179,46 397,02 301,29
2 Workshop B 3.675,25 4.038,31 528,77 306,37 394,78 276,42 209,95
3 Stockyard Pagar Spandex C 94,34 141,51 80,71 0,00 137,33 59,58 55,59
4 Gudang K3, R. Mekanik D 211,57 158,68 172,87 159,75 74,39 130,61 0,00
5 Stockyard Sheetpile E 64,86 64,86 197,92 118,83 161,78 134,53 163,40
6 Stockyard Pagar Galian Pilecap F 389,57 194,78 217,50 197,82 120,91 205,48 94,75
7 Stockyard Scaffolding G 224,05 313,67 235,06 287,17 132,61 114,45 53,23
8 Stockyard MCB H 259,44 129,72 329,87 178,24 161,78 89,69 163,40
9 Formwork Pilecap I 21,75 394,27 256,34 260,66 112,61 120,80
10 Formwork Pier J 443,55 299,06 223,42 112,61 96,64
11 Material Stock 1 K 612,83 420,40 370,58 269,13
12 Material Stock 2 L 729,87 438,02 490,21
13 Material Stock 3 M 461,55 464,27
14 Material Stock 4 N 324,61
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 522,25 427,34 540,77 517,58 1.127,96 466,35 745,17
2 Workshop B 247,62 151,56 102,85 1.200,21 1.941,23 332,70 99,45
3 Stockyard Pagar Spandex C 163,53 103,58 48,20 11,76 148,33 56,52 56,02
4 Gudang K3, R. Mekanik D 60,23 115,03 107,84 87,40 79,89 186,72 246,99
5 Stockyard Sheetpile E 79,54 37,05 0,00 59,51 59,42 208,88 123,85
6 Stockyard Pagar Galian Pilecap F 46,30 43,58 79,97 71,59 131,90 144,91 143,43
7 Stockyard Scaffolding G 156,45 98,86 45,84 47,50 215,41 216,63 160,99
8 Stockyard MCB H 119,31 111,15 66,91 29,76 118,85 83,55 41,28
9 Formwork Pilecap I 92,32 61,08 33,53 339,73 42,73 75,26 98,37
10 Formwork Pier J 115,40 61,08 33,53 291,20 85,47 125,43 147,56
11 Material Stock 1 K 291,81 396,57 303,08 2.176,80 102,57 636,39 875,20
12 Material Stock 2 L 568,42 595,74 551,05 1.003,52 209,47 307,76 466,08
13 Material Stock 3 M 415,31 441,76 437,50 1.126,13 244,79 412,26 231,50
14 Material Stock 4 N 383,67 352,01 332,50 735,57 144,88 293,79 409,38
15 Material Stock 5 O 465,49 421,47 308,95 674,25 289,56 229,11 166,12
16 Material Stock 6 P 524,68 410,24 864,63 552,66 379,80 225,00
17 Material Stock 7 Q 603,68 725,70 474,37 231,44 176,54
18 Material Stock 8 R 1.058,00 487,80 278,70 232,47
19 Batching Plant S 4.229,49 1.992,33 1.865,29
20 Parkir Truck Mixer T 336,82 171,37
21 Direksi Keet U 45,05
22 Lab Beton V
47
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A I J K L M N O
1 Kantor A 282,57 386,70 161,05 217,24 128,66 291,48 218,16
2 Workshop B 766,16 354,21 425,44 225,35 261,33 187,80 137,72
3 Stockyard Pagar Spandex C 62,79 116,01 80,52 0,00 128,66 58,30 54,54
4 Gudang K3, R. Mekanik D 75,56 34,85 83,05 66,83 29,83 71,73 0,00
5 Stockyard Sheetpile E 37,78 23,23 119,76 63,62 84,68 102,78 152,07
6 Stockyard Pagar Galian Pilecap F 152,87 40,07 142,29 117,96 71,47 167,08 91,05
7 Stockyard Scaffolding G 87,93 72,19 135,39 148,08 66,87 78,94 43,23
8 Stockyard MCB H 58,99 58,59 332,28 175,04 164,29 121,59 258,21
9 Formwork Pilecap I 111,16 478,00 309,84 336,40 216,36 289,23
10 Formwork Pier J 472,29 310,57 244,70 187,27 202,29
11 Material Stock 1 K 245,75 252,90 320,51 239,85
12 Material Stock 2 L 297,50 325,23 389,34
13 Material Stock 3 M 214,40 271,87
14 Material Stock 4 N 163,66
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 359,38 289,60 358,83 833,94 772,96 432,12 754,93
2 Workshop B 146,06 85,08 53,57 898,38 867,84 221,76 83,15
3 Stockyard Pagar Spandex C 154,02 96,53 44,85 36,26 128,83 48,01 53,92
4 Gudang K3, R. Mekanik D 42,82 91,79 98,62 107,63 11,58 6,82 19,91
5 Stockyard Sheetpile E 82,43 44,29 0,00 39,84 9,98 11,37 10,11
6 Stockyard Pagar Galian Pilecap F 48,73 51,80 110,43 109,71 34,97 14,89 32,64
7 Stockyard Scaffolding G 139,28 99,00 52,91 50,26 45,56 10,65 25,74
8 Stockyard MCB H 203,26 212,48 148,48 46,46 73,03 47,98 29,91
9 Formwork Pilecap I 244,19 192,36 135,07 278,24 29,81 51,85 92,80
10 Formwork Pier J 268,87 170,54 120,52 194,85 45,07 50,05 95,56
11 Material Stock 1 K 238,80 329,23 254,36 930,08 289,36 474,47 558,25
12 Material Stock 2 L 413,06 446,64 423,40 301,40 163,26 210,14 261,96
13 Material Stock 3 M 232,16 267,68 282,01 278,23 98,73 282,96 127,62
14 Material Stock 4 N 190,58 203,24 211,65 405,23 105,06 299,79 347,12
15 Material Stock 5 O 158,53 201,26 176,01 544,19 225,18 288,61 176,57
16 Material Stock 6 P 145,86 171,68 856,64 395,37 533,16 269,59
17 Material Stock 7 Q 171,36 1.026,57 350,54 380,03 249,52
18 Material Stock 8 R 2.133,88 369,87 560,08 405,00
19 Batching Plant S 37,33 948,40 654,17
20 Parkir Truck Mixer T 79,14 21,82
21 Direksi Keet U 111,92
22 Lab Beton V
= 52.406,04 m
48
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A I J K L M N O
1 Kantor A 355,86 305,3 22,8 50,207 44,138 140,345 138,943
2 Workshop B 754,163 1432,01 143,2 116,178 199,983 207,414 206,178
3 Stockyard Pagar Spandex C 31,3467 74,05 57,54 0 93,7533 40,8767 34,21
4 Gudang K3, R. Mekanik D 155,307 89,45 34,51 45,178 27,9223 67,8447 0
5 Stockyard Sheetpile E 39,3333 57,3533 160,7 96,4333 128,65 110,65 120,867
6 Stockyard Pagar Galian Pilecap F 298,133 194,117 147,7 131,71 77,14 130,28 51,8067
7 Stockyard Scaffolding G 174,983 308,047 163,3 196,347 87,5067 75,5067 31,0867
8 Stockyard MCB H 74,8533 73,4667 260,2 172,117 159,58 94,3867 162,107
9 Formwork Pilecap I 135,473 346,8 292,094 378,11 223,533 246,083
10 Formwork Pier J 309,1 277,706 270,034 187,493 160,827
11 Material Stock 1 K 168 170 242,667 216
12 Material Stock 2 L 204 264 392
13 Material Stock 3 M 213,333 346,667
14 Material Stock 4 N 271,333
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 280,48 264,41 384,55 391,38 877,00 548,39 787,86
2 Workshop B 279,41 202,28 163,71 802,84 912,85 679,20 211,95
3 Stockyard Pagar Spandex C 118,63 87,09 47,54 22,26 38,41 28,41 33,07
4 Gudang K3, R. Mekanik D 45,92 99,84 107,84 114,35 78,94 200,36 248,52
5 Stockyard Sheetpile E 71,10 39,55 0,00 36,53 15,21 122,08 87,22
6 Stockyard Pagar Galian Pilecap F 31,24 35,24 78,47 55,81 21,79 60,31 74,28
7 Stockyard Scaffolding G 109,26 80,84 44,42 38,27 48,24 101,15 89,83
8 Stockyard MCB H 137,58 149,58 107,72 15,94 25,77 44,19 26,75
9 Formwork Pilecap I 218,20 175,65 125,10 50,77 4,20 40,21 72,24
10 Formwork Pier J 227,70 148,62 107,08 97,58 26,41 112,07 162,42
11 Material Stock 1 K 234,67 333,33 261,33 463,16 750,87 500,94 752,95
12 Material Stock 2 L 456,00 504,00 480,00 375,02 627,90 241,24 403,77
13 Material Stock 3 M 317,33 362,67 373,33 649,73 472,63 313,86 197,65
14 Material Stock 4 N 316,67 316,67 310,00 727,89 258,77 230,99 368,83
15 Material Stock 5 O 246,00 290,00 238,00 975,14 363,60 155,45 134,32
16 Material Stock 6 P 182,00 208,00 1.519,40 553,26 258,36 118,11
17 Material Stock 7 Q 196,00 1.761,32 374,31 140,24 77,24
18 Material Stock 8 R 3.521,93 295,58 148,83 79,86
19 Batching Plant S 137,76 58,08 53,83
20 Parkir Truck Mixer T 59,24 43,59
21 Direksi Keet U 90,50
22 Lab Beton V
= 57.200 m
49
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
50
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
51
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
52
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
53
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
= 82.039,13 m
b) Iterasi 2 DK 118
Iterasi kedua dilakukan dengan pemindahan stockyard sheetpile, stockyard
pagar spandek, stockyard pagar galian pilecap, stockyard scaffolding, ruang
mekanik dan gudang K3, serta kantor untuk menghemat ruangan, namun
untuk nilai safety index tetap. Pemodelan site layout iterasi 2 dapat dilihat
pada gambar 4.17
54
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
55
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A I J K L M N O
1 Kantor A 406,02 528,67 172,48 241,23 148,25 329,32 247,41
2 Workshop B 3.012,99 3.828,83 818,85 461,35 575,28 443,52 349,55
3 Stockyard Pagar Spandex C 75,81 136,97 81,48 0,00 122,62 53,05 49,04
4 Gudang K3, R. Mekanik D 248,87 209,91 212,29 192,12 85,97 155,42 0,00
5 Stockyard Sheetpile E 62,13 77,64 223,94 129,12 163,42 138,63 168,80
6 Stockyard Pagar Galian Pilecap F 649,50 363,52 260,40 230,14 133,25 233,45 108,71
7 Stockyard Scaffolding G 306,50 483,37 271,35 321,45 140,55 124,03 58,00
8 Stockyard MCB H 165,20 113,61 308,88 167,84 148,99 82,80 149,56
9 Formwork Pilecap I 264,23 417,97 278,50 280,93 127,48 139,30
10 Formwork Pier J 304,44 192,80 127,56 51,99 35,95
11 Material Stock 1 K 282,33 245,50 285,27 219,48
12 Material Stock 2 L 358,25 320,03 389,69
13 Material Stock 3 M 264,43 319,11
14 Material Stock 4 N 148,37
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 450,10 352,68 442,69 446,89 989,24 655,98 1.020,41
2 Workshop B 366,90 230,83 162,79 687,73 3.153,71 950,64 264,07
3 Stockyard Pagar Spandex C 120,83 73,67 33,39 27,96 186,47 31,94 31,94
4 Gudang K3, R. Mekanik D 64,94 122,99 116,11 99,57 102,34 169,81 226,41
5 Stockyard Sheetpile E 66,88 30,00 0,00 69,60 70,84 125,52 75,31
6 Stockyard Pagar Galian Pilecap F 45,59 42,15 77,41 90,59 165,99 111,77 111,77
7 Stockyard Scaffolding G 147,73 91,60 42,36 37,99 259,94 163,63 122,72
8 Stockyard MCB H 119,51 102,95 61,75 33,44 115,95 96,85 48,42
9 Formwork Pilecap I 121,23 74,36 42,69 300,79 48,44 116,68 155,57
10 Formwork Pier J 83,50 39,77 19,63 304,34 61,38 296,18 355,42
11 Material Stock 1 K 265,17 365,90 280,23 4.895,10 57,91 569,65 776,80
12 Material Stock 2 L 519,02 553,68 513,05 2.368,64 81,64 273,02 409,53
13 Material Stock 3 M 357,57 391,63 390,88 2.746,81 138,20 352,98 196,10
14 Material Stock 4 N 319,25 308,05 294,85 2.169,27 116,01 247,65 340,52
15 Material Stock 5 O 359,16 353,90 265,99 2.213,67 352,12 188,63 134,73
16 Material Stock 6 P 134,29 165,28 2.635,36 590,16 218,24 127,31
17 Material Stock 7 Q 144,62 2.629,33 507,22 117,95 88,46
18 Material Stock 8 R 4.551,50 470,99 124,30 101,70
19 Batching Plant S 5.878,69 2.428,70 2.250,99
20 Parkir Truck Mixer T 287,90 143,95
21 Direksi Keet U 44,94
22 Lab Beton V
56
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
c) Iterasi 3 DK 118
Iterasi ketiga dilakukan dengan memindahkan workshop dan batching plant
ke sebelah kanan dan stockyard serta kantor berpindah ke sebelah kiri,
sedangkan untuk material stock tetap, hanya lokasi parkir truk mixer
dipimdah dan diganti ke material stock 6,7,8. Dengan adanya perombakan
yang cukup banyak sehingga menghemat ruangan dan menekan travelling
distance namun untuk safety index menjadi bertambah. Untuk gambar site
layout iterasi 3 dapat dilihat pada gambar 4.18
57
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
58
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A I J K L M N O
1 Kantor A 211,92 212,97 166,33 228,47 138,95 309,95 232,45
2 Workshop B 2.972,94 3.114,61 558,69 314,15 393,03 291,98 223,93
3 Stockyard Pagar Spandex C 17,49 32,99 52,20 0,00 77,03 31,03 27,15
4 Gudang K3, R. Mekanik D 18,91 7,43 128,69 114,67 50,65 86,34 0,00
5 Stockyard Sheetpile E 30,84 26,34 225,11 136,06 184,04 161,59 199,95
6 Stockyard Pagar Galian Pilecap F 204,03 113,27 157,60 136,58 77,69 125,44 54,97
7 Stockyard Scaffolding G 43,73 76,98 156,61 180,79 77,03 62,06 27,15
8 Stockyard MCB H 96,19 39,09 358,20 193,90 173,85 100,93 186,36
9 Formwork Pilecap I 40,83 482,27 319,66 326,15 156,44 176,17
10 Formwork Pier J 562,80 388,69 293,06 165,44 149,93
11 Material Stock 1 K 431,76 331,55 305,76 231,45
12 Material Stock 2 L 513,29 326,33 392,91
13 Material Stock 3 M 260,80 312,69
14 Material Stock 4 N 168,10
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 589,03 495,90 636,83 627,21 589,60 349,89 544,27
2 Workshop B 424,92 277,29 198,83 2.185,41 1.145,81 840,48 233,47
3 Stockyard Pagar Spandex C 159,56 103,38 48,64 23,24 36,35 7,92 7,92
4 Gudang K3, R. Mekanik D 65,33 127,66 121,57 114,07 30,31 60,17 80,23
5 Stockyard Sheetpile E 152,04 74,52 0,00 54,17 41,01 153,75 92,25
6 Stockyard Pagar Galian Pilecap F 53,52 52,02 97,95 46,35 37,01 24,74 24,74
7 Stockyard Scaffolding G 159,56 103,38 48,64 46,49 54,52 31,67 23,75
8 Stockyard MCB H 217,87 213,38 136,16 15,52 75,22 54,71 27,35
9 Formwork Pilecap I 245,07 179,31 113,45 219,26 26,25 47,99 63,99
10 Formwork Pier J 317,58 186,06 117,95 147,74 57,01 91,23 109,48
11 Material Stock 1 K 75,17 79,00 76,63 4.126,50 485,75 591,69 806,85
12 Material Stock 2 L 311,66 268,32 177,90 2.032,64 359,97 280,70 421,05
13 Material Stock 3 M 392,47 345,44 259,61 2.418,31 231,07 360,90 200,50
14 Material Stock 4 N 570,58 405,21 274,20 1.904,22 94,66 260,93 358,78
15 Material Stock 5 O 1.094,70 730,90 376,66 1.932,85 115,76 201,18 143,70
16 Material Stock 6 P 156,00 176,00 3.614,65 642,24 657,28 383,41
17 Material Stock 7 Q 168,00 3.738,65 478,57 426,21 319,66
18 Material Stock 8 R 6.610,50 404,78 552,53 452,07
19 Batching Plant S 3.229,52 1.018,03 943,54
20 Parkir Truck Mixer T 118,56 59,28
21 Direksi Keet U 56,78
22 Lab Beton V
59
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
d) Iterasi 4 DK 118
Iterasi keempat dilakukan dengan memindahkan seluruh material stock ke
bawah kiri pada site layout dan untuk stockyard dan gudang berada diatas
pada site layout sedangkan untuk workshop dan batching plant berada di
sebelah kanan pada site layout, dengan demikian sehingga dapat menekan
travelling distance cukup signifikan dan safety index nya. Pemodelan site
layout iterasi keempat dapat dilihat pada gambar 4.19
60
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
61
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A I J K L M N O
1 Kantor A 326,34 331,20 60,91 110,71 88,52 247,87 211,84
2 Workshop B 3.094,33 3.188,31 95,60 90,17 156,17 165,74 155,05
3 Stockyard Pagar Spandex C 42,85 54,86 44,14 0,00 115,89 63,26 66,65
4 Gudang K3, R. Mekanik D 116,49 77,95 46,63 59,53 37,12 84,87 0,00
5 Stockyard Sheetpile E 53,68 47,40 116,18 90,35 157,60 173,54 244,93
6 Stockyard Pagar Galian Pilecap F 218,53 93,57 101,22 120,57 95,09 211,44 112,49
7 Stockyard Scaffolding G 82,20 93,10 117,46 182,41 105,92 116,55 61,66
8 Stockyard MCB H 27,60 26,36 272,78 183,02 205,09 147,35 308,25
9 Formwork Pilecap I 53,29 414,19 349,34 459,06 283,57 371,40
10 Formwork Pier J 437,70 385,58 374,64 271,01 284,56
11 Material Stock 1 K 199,27 217,10 277,01 208,56
12 Material Stock 2 L 272,79 293,41 351,19
13 Material Stock 3 M 191,36 243,53
14 Material Stock 4 N 149,97
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 427,40 386,26 541,57 948,21 306,12 261,21 449,40
2 Workshop B 234,64 179,83 144,83 545,14 258,45 558,24 170,45
3 Stockyard Pagar Spandex C 224,23 156,13 81,38 48,05 78,39 42,71 45,79
4 Gudang K3, R. Mekanik D 53,92 114,48 121,12 170,45 18,37 65,66 99,85
5 Stockyard Sheetpile E 138,66 72,65 0,00 85,27 33,78 186,48 121,12
6 Stockyard Pagar Galian Pilecap F 64,34 67,66 141,97 150,59 57,59 96,93 106,16
7 Stockyard Scaffolding G 209,27 146,15 76,40 86,12 102,63 150,89 122,40
8 Stockyard MCB H 255,48 265,44 183,60 58,46 99,23 106,25 56,20
9 Formwork Pilecap I 329,51 257,09 178,03 389,76 46,83 151,03 213,68
10 Formwork Pier J 396,18 247,67 171,75 315,24 87,38 236,02 301,68
11 Material Stock 1 K 250,16 345,90 265,37 541,20 78,54 300,04 455,30
12 Material Stock 2 L 471,58 506,52 471,90 313,92 156,78 202,36 331,23
13 Material Stock 3 M 296,88 332,53 337,45 538,06 213,58 369,75 220,80
14 Material Stock 4 N 303,75 293,93 281,85 397,89 173,11 371,17 544,21
15 Material Stock 5 O 359,30 350,42 261,86 385,31 337,40 348,48 264,30
16 Material Stock 6 P 155,48 175,36 802,62 651,84 694,56 426,70
17 Material Stock 7 Q 167,44 707,66 553,47 489,60 385,66
18 Material Stock 8 R 1.543,50 557,09 709,72 608,37
19 Batching Plant S 729,68 1.068,46 1.107,19
20 Parkir Truck Mixer T 134,00 76,23
21 Direksi Keet U 491,70
22 Lab Beton V
62
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
e) Iterasi 5 DK 118
Iterasi kelima dengan melakukan memindahkan stockyard dan gudang ke
atas dan material stock ke sebelah kanan pada site layout, sedangkan
batching plant dan workshop tetap terletak pada sebelah kiri bawah pada
site layout. Dengan demikian dapat meningkatkan efesiensi ruangan dan
menurunkan safety index. Pemodelan pada site layout iterasi kelima dapat
dilihat pada gambar 4.20
63
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
64
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A I J K L M N O
1 Kantor A 695,04 699,77 89,06 110,88 57,82 127,93 89,05
2 Workshop B 5.166,50 5.188,93 414,67 221,32 253,49 197,34 147,83
3 Stockyard Pagar Spandex C 39,23 37,10 24,93 0,00 81,11 43,88 47,20
4 Gudang K3, R. Mekanik D 136,73 80,80 40,23 55,37 35,73 78,11 0,00
5 Stockyard Sheetpile E 49,73 35,23 59,05 54,51 105,91 115,88 167,80
6 Stockyard Pagar Galian Pilecap F 245,33 86,42 60,05 82,76 71,27 155,84 84,57
7 Stockyard Scaffolding G 94,70 81,83 75,80 131,35 81,77 88,42 47,53
8 Stockyard MCB H 23,81 40,91 181,70 131,73 155,88 110,57 234,43
9 Formwork Pilecap I 101,50 266,91 245,60 342,88 209,23 278,15
10 Formwork Pier J 235,02 235,78 250,40 180,23 193,52
11 Material Stock 1 K 230,63 244,30 274,54 206,40
12 Material Stock 2 L 296,37 264,88 322,63
13 Material Stock 3 M 106,35 172,81
14 Material Stock 4 N 122,96
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 132,58 93,70 98,35 343,08 524,56 461,22 645,07
2 Workshop B 157,46 91,68 58,79 196,59 1.470,93 732,60 177,65
3 Stockyard Pagar Spandex C 151,57 107,69 57,17 77,95 34,69 35,90 41,54
4 Gudang K3, R. Mekanik D 45,70 98,05 104,70 316,92 10,10 64,01 107,88
5 Stockyard Sheetpile E 90,55 48,60 0,00 145,40 12,09 153,27 108,86
6 Stockyard Pagar Galian Pilecap F 45,61 48,93 104,51 292,13 24,85 92,96 109,86
7 Stockyard Scaffolding G 152,57 108,36 57,50 156,57 53,03 144,95 125,61
8 Stockyard MCB H 185,79 195,76 137,15 89,70 57,50 95,31 53,29
9 Formwork Pilecap I 235,81 186,83 131,20 607,06 25,77 134,03 201,24
10 Formwork Pier J 258,52 165,08 116,70 476,84 37,05 187,13 258,36
11 Material Stock 1 K 210,05 295,80 230,32 2.241,30 77,84 313,65 512,20
12 Material Stock 2 L 355,05 396,18 380,00 1.013,68 96,46 216,50 375,45
13 Material Stock 3 M 169,49 212,69 232,63 1.059,79 170,17 397,20 248,83
14 Material Stock 4 N 166,17 189,43 199,40 833,31 131,55 379,65 583,99
15 Material Stock 5 O 136,26 192,75 169,49 798,66 265,40 355,46 266,60
16 Material Stock 6 P 129,61 159,52 944,45 457,92 649,24 349,98
17 Material Stock 7 Q 139,58 856,63 402,69 414,75 280,04
18 Material Stock 8 R 1.317,75 417,13 533,72 390,15
19 Batching Plant S 2.687,63 1.751,79 1.427,15
20 Parkir Truck Mixer T 31,60 32,70
21 Direksi Keet U 95,77
22 Lab Beton V
65
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
f) Iterasi 2 DK 125
Iterasi pertama dengan melakukan memindahkan workshop ke sisi kiri atas dan
material stock ke sebelah kanan pada site layout, sedangkan batching plant tetap
terletak pada tengah site layout. Dengan demikian dapat meningkatkan efesiensi
ruangan dan menurunkan safety index namun meningkatkan nilai travelling
distance. Pemodelan pada site layout iterasi pertama dapat dilihat pada gambar
4.21
66
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
67
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode I J K L M N O
1 Kantor A 225,33 330,10 126,33 164,26 109,51 298,33 221,15
2 Workshop B 3.418,24 3.220,24 132,53 124,88 210,77 139,70 116,42
3 Stockyard Pagar Spandex C 11,93 41,81 44,09 0,00 71,36 40,59 36,21
4 Gudang K3, R. Mekanik D 251,68 164,84 46,90 63,72 36,99 60,33 0,00
5 Stockyard Sheetpile E 43,77 27,83 119,64 96,58 160,27 41,63 73,03
6 Stockyard Pagar Galian Pilecap F 95,83 87,78 153,61 128,38 85,59 202,25 92,37
7 Stockyard Scaffolding G 62,58 143,43 162,41 182,91 91,45 106,99 49,12
8 Stockyard MCB H 263,52 163,65 142,57 60,31 60,31 50,03 82,55
9 Formwork Pilecap I 120,96 395,09 245,86 286,84 183,56 207,55
10 Formwork Pier J 516,24 342,65 293,70 215,45 197,93
11 Material Stock 1 K 254,15 290,15 373,38 240,03
12 Material Stock 2 L 371,73 771,76 736,68
13 Material Stock 3 M 1.451,09 1.179,01
14 Material Stock 4 N 186,73
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 356,77 281,72 345,55 976,77 760,76 357,21 605,27
2 Workshop B 165,62 126,47 106,13 1.358,81 448,27 693,36 174,88
3 Stockyard Pagar Spandex C 95,68 55,76 24,12 23,40 88,65 20,62 24,16
4 Gudang K3, R. Mekanik D 34,49 77,00 84,52 104,46 20,89 136,21 167,44
5 Stockyard Sheetpile E 45,15 26,59 0,00 46,30 23,15 349,05 220,06
6 Stockyard Pagar Galian Pilecap F 41,86 37,85 68,18 124,70 104,86 85,19 95,82
7 Stockyard Scaffolding G 134,39 81,57 37,02 68,22 166,09 125,32 104,62
8 Stockyard MCB H 48,95 36,91 17,09 0,67 59,82 35,99 21,54
9 Formwork Pilecap I 148,76 99,53 58,83 200,84 49,62 77,74 117,83
10 Formwork Pier J 225,82 123,45 74,78 219,99 115,19 169,43 224,58
11 Material Stock 1 K 247,92 350,03 271,34 463,95 243,53 305,29 363,15
12 Material Stock 2 L 748,60 781,44 668,20 449,28 335,47 116,06 142,20
13 Material Stock 3 M 714,91 608,64 479,92 898,59 396,79 81,69 27,67
14 Material Stock 4 N 234,17 254,22 257,10 136,26 20,00 338,75 504,75
15 Material Stock 5 O 204,45 261,00 216,92 146,35 86,84 265,74 207,53
16 Material Stock 6 P 182,52 202,56 450,71 208,02 403,72 260,31
17 Material Stock 7 Q 185,92 638,37 217,98 301,25 247,20
18 Material Stock 8 R 1.449,75 251,29 372,86 336,96
19 Batching Plant S 37,33 582,61 405,33
20 Parkir Truck Mixer T 254,06 137,66
21 Direksi Keet U 71,57
22 Lab Beton V
68
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A B C D E F G H I J K L M N O P Q R S T U V
1 Kantor A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 Workshop B 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 Stockyard Pagar Spandex C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 Gudang K3, R. Mekanik D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 Stockyard Sheetpile E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6 Stockyard Pagar Galian Pilecap F 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 Stockyard Scaffolding G 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8 Stockyard MCB H 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 Formwork Pilecap I 0 0 0 0 0 0 0 0 0 0 0 0 0
10 Formwork Pier J 0 0 0 0 0 0 0 0 0 0 0 0
11 Material Stock 1 K 0 0 0 0 0 0 0 0 0 0 0
12 Material Stock 2 L 0 0 0 0 0 0 0 0 0 0
13 Material Stock 3 M 0 0 0 0 0 0 0 0 0
14 Material Stock 4 N 0 0 0 0 0 0 0 0
15 Material Stock 5 O 0 0 0 0 0 0 0
16 Material Stock 6 P 0 0 0 0 0 0
17 Material Stock 7 Q 0 0 0 0 0
18 Material Stock 8 R 0 0 0 0
19 Batching Plant S 0 0 0
20 Parkir Truck Mixer T 0 0
21 Direksi Keet U 0
22 Lab Beton V
g) Iterasi 2 DK 135
Iterasi pertama dengan melakukan memindahkan batching plant ke sisi kanan
bawah dan workshop ke sebelah kiri atas pada site layout, serta stockyard
terletak pada atas site layout, sedangkan material tetap terletak pada bagian kiri
dan bawah pada site layout. Dengan demikian dapat meningkatkan efesiensi
ruangan namun meningkatkan nilai safety index maupun travelling distance.
Pemodelan pada site layout iterasi pertama dapat dilihat pada gambar 4.22
69
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
70
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
No Fasilitas Kode A I J K L M N O
1 Kantor A 234,66 363,67 77,53 132,29 98,86 289,65 241,07
2 Workshop B 1.426,18 1.566,46 237,92 175,37 282,85 293,44 136,32
3 Stockyard Pagar Spandex C 35,38 10,70 30,38 0,00 82,09 49,55 51,88
4 Gudang K3, R. Mekanik D 146,69 140,52 52,81 63,47 37,07 59,28 0,00
5 Stockyard Sheetpile E 25,14 16,27 77,44 62,29 109,44 134,94 189,27
6 Stockyard Pagar Galian Pilecap F 59,20 59,73 55,83 71,83 58,55 151,11 80,23
7 Stockyard Scaffolding G 43,28 60,60 65,70 108,93 65,13 82,13 43,40
8 Stockyard MCB H 74,67 78,00 47,25 44,35 60,35 57,23 123,81
9 Formwork Pilecap I 151,67 144,93 140,70 201,48 149,13 198,10
10 Formwork Pier J 254,55 235,32 233,70 189,80 199,15
11 Material Stock 1 K 168,00 170,00 277,67 264,15
12 Material Stock 2 L 204,00 319,00 603,47
13 Material Stock 3 M 293,33 608,49
14 Material Stock 4 N 865,92
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 459,20 401,00 566,67 335,26 174,92 451,77 787,73
2 Workshop B 195,58 146,39 121,79 3.452,88 871,04 309,48 116,32
3 Stockyard Pagar Spandex C 171,65 116,90 62,45 22,95 37,52 41,81 47,88
4 Gudang K3, R. Mekanik D 12,24 32,47 40,47 200,60 35,93 13,50 11,61
5 Stockyard Sheetpile E 105,30 56,65 0,00 36,76 14,19 186,23 129,95
6 Stockyard Pagar Galian Pilecap F 45,45 49,45 106,89 44,71 13,98 90,13 108,34
7 Stockyard Scaffolding G 146,21 105,47 56,74 28,93 30,84 133,33 118,21
8 Stockyard MCB H 108,86 120,86 88,57 16,07 23,76 41,77 26,95
9 Formwork Pilecap I 179,81 146,86 105,91 51,82 3,22 36,65 73,15
10 Formwork Pier J 275,60 177,36 126,24 105,42 26,76 111,92 170,72
11 Material Stock 1 K 195,89 244,87 185,41 831,15 132,30 212,08 380,25
12 Material Stock 2 L 363,91 344,76 317,30 315,28 192,18 147,68 276,15
13 Material Stock 3 M 234,94 221,12 221,48 241,90 221,28 173,52 126,75
14 Material Stock 4 N 345,50 262,58 237,30 210,69 200,32 154,24 278,85
15 Material Stock 5 O 246,00 290,00 238,00 639,16 371,44 111,51 49,30
16 Material Stock 6 P 182,00 208,00 651,56 653,16 255,16 106,35
17 Material Stock 7 Q 196,00 684,97 508,01 202,11 115,16
18 Material Stock 8 R 1.553,00 523,73 321,90 208,74
19 Batching Plant S 124,13 786,24 959,37
20 Parkir Truck Mixer T 115,00 75,71
21 Direksi Keet U 103,19
22 Lab Beton V
71
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Tabel 4.30 Nilai Travelling Distance dan Safety Index dari layout DK 118
Alternatif Travelling Distance (m) Safety Index
Rencana Awal 82.039,13 150
Iterasi 1 82.039,13 0
Iterasi 2 96.177,80 150
Iterasi 3 93.148,24 504
Iterasi 4 66.872,20 78
Iterasi 5 79.566,75 0
72
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Tabel 4.30 Nilai Travelling Distance dan Safety Index dari layout DK 125
Alternatif Travelling Distance (m) Safety Index
Rencana Awal 54.406,04 255
Iterasi 2 64.384,35 0
Tabel 4.31 Nilai Travelling Distance dan Safety Index dari layout DK 135
Alternatif Travelling Distance (m) Safety Index
Rencana Awal 48.033,68 150
Iterasi 2 52.694,32 396
400
300
Iterasi 4
100
Iterasi 5 Iterasi 1
0
60.000 65.000 70.000 75.000 80.000 85.000 90.000 95.000 100.000
Travelling Distance (TD)
73
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Dari diagram tersebut dapat disimpulkan dari diagram layout DK 118 nilai travel
distance yang paling rendah ialah pada iterasi ke 4 dan nilai safety yang terendah
ialah iterasi pertama dan kelima, Sedangkan untuk layout DK 125 dan DK 135 nilai
travelling distance dan safety index yang paling rendah ialah pada rencana awal.
Dari beberapa opsi berikut maka dibuat prioritas untuk menentukan site layout yang
paling optimal yaitu dengan proporsi travelling distance sebanyak 55% dan safety
index 45%. Setelah dari itu kedua dari nilai yang telah dikalikan factor proporsinya
maka akan dijumlah, sehingga total yang terendah akan menjadi site layout yang
paling optimum. Berikut jumlah nilai dari semua alternatif.
Tabel 4.32 Nilai Total dari Travelling Distance dan Safety Index
Rencana Awal Iterasi 1 Iterasi 2 Iterasi 3 Iterasi 4 Iterasi 5
Travel
Distance 82.039 82.039 96.178 93.148 66.872 79.567
(TD)
Safety
150 0 150 504 78 0
Index (SI)
55% (TD) 45.122 45.122 52.898 51.232 36.780 43.762
45% (SI) 68 0 68 227 35 0
Total 45.189 45.122 52.965 51.458 36.815 43.762
Berdasarkan tabel diatas nilai yang terendah yaitu iterasi ke 4 dengan total 36.815
sedangkan yang tertinggi ialah iterasi kedua dengan total 52.965 dan untuk rencana
74
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
awal dengan total 45.189. Sehingga layout yang paling optimum ialah site layout
iterasi ke 4 dengan dapat menurunkan travelling distance sebesar 18,49 % dan
safety index sebesar 48 %.
Tabel 4.33 Nilai Total dari Travelling Distance dan Safety Index
Rencana Awal Iterasi 1
Travel Distance (TD) 54.406 64.384
Safety Index (SI) 255 0
55% (TD) 29.923 35.411
45% (SI) 115 0
Total 30.038 35.411
Berdasarkan tabel diatas nilai yang terendah yaitu rencan awal dengan total 30.038
dan untuk iterasi pertama dengan total 35.411. Sehingga layout yang paling
optimum ialah site layout pertama dengan dapat menurunkan travelling distance
sebesar 15,50 %.
Tabel 4.34 Nilai Total dari Travelling Distance dan Safety Index
Rencana Awal Iterasi 1
Travel Distance (TD) 48.034 52.694
Safety Index (SI) 150 0
55% (TD) 26.419 28.982
45% (SI) 68 0
Total 26.486 29.160
Berdasarkan tabel diatas nilai yang terendah yaitu rencan awal dengan total 26.486
dan untuk iterasi pertama dengan total 29.160. Sehingga layout yang paling
optimum ialah site layout pertama dengan dapat menurunkan travelling distance
sebesar 8,84 %.
75
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Dari spesifikasi alat tersebut maka dapat diperhitungkan biaya yang dikeluarkan
saat produksi dilakukan sampai proyek selesai, dapat dilihat pada tabel berikut:
Tabel 4.36 Biaya Alat Loader, Dump Truck, dan Truck Mixer layout DK 118
Jumlah
Jarak Waktu Waktu 1 Jumlah Total Jumlah Total Waktu
Produksi 1
Iterasi Jenis Alat Tempuh Tempuh Siklus siklus Jarak 1 hari Operasi Total Biaya
siklus
(m) (menit) (menit) 1 hari (m) (jam)
(m3)
Loader 58,92 0,71 33,70 2,51 53,17 6.265,25 9.776,75 Rp1.126.282.075
1 Dump Truck 692,95 7,56 10,06 7,36 18,12 25.108,89 994,45 Rp108.260.130
Truck Mixer 226,58 4,53 5,53 2,61 51,02 23.120,41 1.539,96 Rp144.879.242
Loader 34,20 0,41 31,00 2,51 53,17 3.636,65 8.994,41 Rp1.036.156.175
2 Dump Truck 1.935,44 21,11 23,61 7,36 18,12 70.130,25 2.334,41 Rp254.133.352
Truck Mixer 314,93 6,30 7,30 2,61 51,02 32.135,71 2.031,88 Rp191.159.092
Loader 34,86 0,42 31,08 2,51 53,17 3.706,84 9.015,30 Rp1.038.562.449
3 Dump Truck 1.990,77 21,72 24,22 7,36 18,12 72.135,12 2.394,08 Rp260.629.312
Truck Mixer 173,01 3,46 4,46 2,61 51,02 17.654,08 1.241,69 Rp116.817.990
Loader 26,70 0,32 30,19 2,51 53,17 2.839,14 8.757,05 Rp1.008.812.153
4 Dump Truck 386,72 4,22 6,72 7,36 18,12 14.012,72 664,20 Rp72.307.521
Truck Mixer 39,09 0,78 1,78 2,61 51,02 3.988,78 496,04 Rp46.667.480
Loader 23,70 0,28 29,86 2,51 53,17 2.520,14 8.662,11 Rp997.874.543
5 Dump Truck 741,94 8,09 10,59 7,36 18,12 26.884,03 1.047,29 Rp114.011.749
Truck Mixer 143,98 2,88 3,88 2,61 51,02 14.691,84 1.080,05 Rp101.611.380
76
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Tabel 4.38 Biaya Alat Loader, Dump Truck, dan Truck Mixer layout DK 125
Jumlah Total Total
Jarak Waktu Waktu 1 Jumlah
Produksi Jumlah Waktu
Iterasi Jenis Alat Tempuh Tempuh Siklus siklus 1 Total Biaya
1 siklus Jarak 1 Operasi
(m) (menit) (menit) hari
(m3) hari (m) (jam)
Loader 12 0,14 28,58 7,52 159,50 3.828,06 8.291,82 Rp955.217.868
1 Dump Truck 454,29 4,96 7,46 7,36 163,06 148.149,89 2.211,21 Rp240.721.517
Truck Mixer 198,32 3,97 4,97 2,61 459,18 182.130,61 4.147,83 Rp390.227.927
Loader 12 0,14 28,58 7,52 159,50 3.828,06 8.291,82 Rp955.217.868
2 Dump Truck 343,7 3,75 6,25 7,36 163,06 112.085,05 1.853,42 Rp201.770.412
Truck Mixer 224,56 4,49 5,49 2,61 459,18 206.228,57 4.586,13 Rp431.463.352
77
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Tabel 4.40 Biaya Alat Loader, Dump Truck, dan Truck Mixer layout DK 135
Jumlah Total Total
Jarak Waktu Waktu 1 Jumlah
Produksi Jumlah Waktu
Iterasi Jenis Alat Tempuh Tempuh Siklus siklus 1 Total Biaya
1 siklus Jarak 1 Operasi
(m) (menit) (menit) hari
(m3) hari (m) (jam)
Loader 12 0,14 28,58 7,52 159,50 3.828,06 8.291,82 Rp955.217.868
1 Dump Truck 709,016 7,73 10,23 7,36 163,06 231.219,37 3.035,34 Rp330.439.025
Truck Mixer 201,78 4,04 5,04 2,61 459,18 185.308,16 4.205,63 Rp395.665.220
Loader 12 0,14 28,58 7,52 159,50 3.828,06 8.291,82 Rp955.217.868
2 Dump Truck 370,12 4,04 6,54 7,36 163,06 120.700,96 1.938,89 Rp211.075.848
Truck Mixer 242,67 4,85 5,85 2,61 459,18 222.860,20 4.888,63 Rp459.922.710
78
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Berdasarkan tabel diatas maka total biaya operasi alat dalam proses produksi
pada layout DK 118 iterasi pertama yaitu: Rp. 1.437.197.822, untuk iterasi kedua
yaitu: Rp. 1.536.339.740, iterasi ketiga yaitu: Rp. 1.470.478.934, iterasi keempat
yaitu; Rp. 1.182.318.017, dan iterasi kelima yaitu: Rp. 1.282.756.363. Untuk layout
DK 125 iterasi pertama Rp. 1.623.819.191, untuk iterasi kedua Rp. 1.645.218.089.
Sedangkan untuk site layout DK 135 iterasi pertama yaitu Rp. 1.723.359.059, dan
iterasi kedua yaitu Rp. 1.670.611.545. Perhitungan biaya dari seluruh iterasi dapat
disimpulkan biaya operasional alat paling rendah yaitu pada iterasi ke 4 untuk
layout DK 118 dan iterasi pertama untuk DK 125 dan DK 135, dan yang tertinggi
pada iterasi ke 2 untuk layout DK 118, DK 125, dan DK 135. Sehingga total biaya
yang diperlukan yaitu: Rp. 4.529.496.267. Sedangkan total margin yaitu sebesar
Rp. 375.420.621 sehingga dapat menurunkan biaya operasional sebesar 7,65%.
79
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
BAB V
MANAJEMEN RISIKO
80
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
Besar 3 3 M 6 T 9 E 12 E
Kecil 2 2 R 4 R 6 T 8 E
Sangat
1 1 R 2 R 3 M 4 E
Kecil
81
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
82
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
83
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
BAB VI
SISTEM MANAJEMEN WIKA
B. Misi WIKA
1. Menyediakan produk dan jasa yang unggul dan terpadu dibidang EPC
dan Investasi untuk Infrastruktur, Gedung Bertingkat, Energi, Industrial
Plant, Industri Beton dan Property.
2. Memenuhi Harapan Pemangku Kepentingan Utama.
3. Menjalankan Praktik Etika Bisnin untuk Menjadi Warga Usaha yang
Baik dan Memelihara Keberlanjutan Perusahaan.
4. Ekspansi Strategis Keluar Negeri
5. Mengimplementasikan “Praktek-praktek terbaik” Sistem Manajemen
Terintegrasi.
84
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
85
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
86
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
87
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
BAB VII
KESIMPULAN DAN SARAN
7.1 Kesimpulan
Kesimpulan yang dapat diambil dari makalah ini yaitu:
1. Site layout yang paling optimum yaitu site layout iterasi ke 4 pada
layout DK 118 dan untuk layout DK 125 dan DK 135 yaitu iterasi
pertama dengan traveling index terendah yaitu: 176.478,25 m dan
nilai safety index yang cukup rendah yaitu: 483.
7.2 Saran
Saran yang dapat diberikan untuk penelitian selanjutnya yaitu:
88
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
BAB VIII
BUDAYA WIKA
Nilai-nilai (values) WIKA merupakan salah satu dari komponen budaya PT.
Wijaya Karya (Persero) Tbk. selain percaya dan perilaku serta sikap kerja. Sejalan
dengan visi dan misi PT. Wijaya Karya (Persero) Tbk. yaitu untuk terus
memprioritaskan kepuasan pelanggan, perusahaan yang berprestasi, serta
meningkatkan kemampuan untuk tampil dengan kinerja komersial yang sehat, dan
di saat yang bersamaan juga mampu untuk memenuhi seluruh keinginan
stakeholder itu sendiri. Maka dari itu WIKA memiliki nilai nilai untuk
mengoptimalkan perusahaan sebaik mungkin dengan sebagai berikut:
1. Agility
Agility merupakan transformasi dari nilai PT. Wijaya Karya
(Persero) Tbk. terdahulu, yaitu innovation yang berarti bertindak
trengginas dan cepat terhadap peluang dan perubahan bisnis.
Perilaku kuncinya terdiri dari:
a) Change: Bertindak berdasarkan orientasi pada perubahan
yang lebih baik.
b) Focus: Memusatkan pikiran dan tindakan pada satu hal
tertentu.
c) Fast: Bertindak trengginas.
2. Caring
Caring yakni balance dan relationship, Proaktif dan peduli terhadap
pemangku kepentingan.
a) Accountable: Menyadari apa yang diharapkan dari dirinya
dan mengambil tindakan yang diperlukan.
89
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
2. Caring
Contoh perilaku-perilaku caring yang diterapkan adalah sebagai berikut:
a) Memberitahu dan memberi contoh kepada teman untuk
bersikap baik terhadap teman kerja yang lain
90
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
3. Excellence
Contoh perilaku-perilaku caring yang diterapkan adalah sebagai
berikut:
a) Memiliki niat memberikan yang terbaik kepada atasan
b) Selalu mengoreksi setiap pekerjaan yang telah dikerjaan agar
meminimalisasi kesalahan
c) Disiplin terhadap semua peraturan yang ada
91
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
DAFTAR PUSTAKA
Easa, M. Said., Hossain, K. M. AA. 2008. ―New Mathematical Optimization Model for
Construction Site Layout. ASCE Journal of Construction Engineering and
Management, 134, 653-662
RSNI T-14-2004
Public Hazardous Subtances & Fammable Pressurized Gaese Establishment Standards &
Safety control Regulation
92
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
LAMPIRAN 1
JARAK SITE FACILITIES ITERASI 1 DK 118
No Fasilitas Kode A B C D E F G H
1 Kantor A 35,43 100,14 119,35 133,86 121,18 138,63 159,36
2 Workshop B 69,71 88,90 103,41 90,74 108,18 128,89
3 Stockyard Pagar Spandex C 21,83 85,18 49,60 67,16 85,18
4 Gudang K3, R. Mekanik D 102,35 66,77 84,33 102,35
5 Stockyard Sheetpile E 60,54 78,10 4,66
6 Stockyard Pagar Galian Pilecap F 22,22 60,54
7 Stockyard Scaffolding G 78,10
8 Stockyard MCB H
No Fasilitas Kode A I J K L M N O
1 Kantor A 211,15 211,26 298,3 283,82 269,19 238,21 225,97
2 Workshop B 180,75 180,82 198,29 183,82 169,19 138,21 125,97
3 Stockyard Pagar Spandex C 141,51 141,51 242,14 222,46 206 178,75 166,77
4 Gudang K3, R. Mekanik D 158,68 158,68 259,31 239,63 223,17 195,92 183,94
5 Stockyard Sheetpile E 97,29 97,29 197,92 178,24 161,78 134,53 122,55
6 Stockyard Pagar Galian Pilecap F 116,87 116,87 217,5 197,82 181,36 154,11 142,13
7 Stockyard Scaffolding G 134,43 134,43 235,06 215,38 198,92 171,67 159,69
8 Stockyard MCB H 97,29 97,29 197,92 178,24 161,78 134,53 122,55
9 Formwork Pilecap I 4,66 147,85 128,17 111,71 84,46 72,48
10 Formwork Pier J 147,85 128,17 111,71 84,46 72,48
11 Material Stock 1 K 65,66 84,08 79,41 89,71
12 Material Stock 2 L 64,4 59,73 70,03
13 Material Stock 3 M 43,27 53,57
14 Material Stock 4 N 26,32
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 223,82 213,67 202,79 67,51 281,99 155,45 159,68
2 Workshop B 123,81 113,67 102,85 37,12 181,99 55,45 59,67
3 Stockyard Pagar Spandex C 163,53 155,37 144,59 35,27 222,49 169,55 168,07
4 Gudang K3, R. Mekanik D 180,7 172,54 161,76 52,44 239,66 186,72 185,24
5 Stockyard Sheetpile E 119,31 111,15 100,37 89,27 178,27 125,33 123,85
6 Stockyard Pagar Galian Pilecap F 138,89 130,73 119,95 53,69 197,85 144,91 143,43
7 Stockyard Scaffolding G 156,45 148,29 137,51 71,25 215,41 162,47 160,99
8 Stockyard MCB H 119,31 111,15 100,37 89,27 178,27 125,33 123,85
9 Formwork Pilecap I 69,24 61,08 50,3 145,6 128,2 75,26 73,78
10 Formwork Pier J 69,24 61,08 50,3 145,6 128,2 75,26 73,78
11 Material Stock 1 K 109,43 118,97 129,89 145,12 21,98 173,56 175,04
12 Material Stock 2 L 89,75 99,29 110,21 125,44 48,34 153,88 155,36
13 Material Stock 3 M 73,29 82,83 93,75 108,98 66,76 137,42 138,9
14 Material Stock 4 N 46,04 55,58 66,5 81,73 62,09 110,17 111,65
15 Material Stock 5 O 34,06 43,6 54,52 69,75 72,39 98,19 99,67
16 Material Stock 6 P 40,36 51,28 66,51 92,11 94,95 96,43
17 Material Stock 7 Q 43,12 53,1 101,65 86,79 88,27
18 Material Stock 8 R 42,32 112,57 76,01 77,49
19 Batching Plant S 226,58 145,78 147,26
20 Parkir Truck Mixer T 168,41 171,37
21 Direksi Keet U 7,95
22 Lab Beton V
93
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
LAMPIRAN 2
JARAK SITE FACILITIES ITERASI 2 DK 118
No Fasilitas Kode A B C D E F G H
1 Kantor A 77,56 140,18 116,03 160,69 124,23 113,28 106,75
2 Workshop B 64,62 40,47 85,13 48,67 37,72 119,59
3 Stockyard Pagar Spandex C 75,99 22,51 17,95 28,9 142,3
4 Gudang K3, R. Mekanik D 96,5 60,04 49,09 158,06
5 Stockyard Sheetpile E 38,46 49,41 166,26
6 Stockyard Pagar Galian Pilecap F 12,95 166,26
7 Stockyard Scaffolding G 155,31
8 Stockyard MCB H
No Fasilitas Kode A I J K L M N O
1 Kantor A 135,34 158,6 258,72 241,23 222,38 197,59 185,56
2 Workshop B 148,18 171,44 307,07 276,81 246,55 221,76 209,73
3 Stockyard Pagar Spandex C 113,71 136,97 244,45 214,19 183,93 159,14 147,11
4 Gudang K3, R. Mekanik D 186,65 209,91 318,44 288,18 257,92 233,13 221,1
5 Stockyard Sheetpile E 93,2 116,46 223,94 193,68 163,42 138,63 126,6
6 Stockyard Pagar Galian Pilecap F 194,85 218,11 260,4 230,14 199,88 175,09 163,06
7 Stockyard Scaffolding G 183,9 207,16 271,35 241,09 210,83 186,04 174,01
8 Stockyard MCB H 61,95 85,21 185,33 167,84 148,99 124,2 112,17
9 Formwork Pilecap I 56,62 156,74 139,25 120,4 95,61 83,58
10 Formwork Pier J 101,48 82,63 63,78 38,99 26,96
11 Material Stock 1 K 30,25 49,1 61,13 73,16
12 Material Stock 2 L 31,61 43,64 55,67
13 Material Stock 3 M 24,79 36,82
14 Material Stock 4 N 12,03
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 192,9 176,34 166,01 58,29 247,31 218,66 218,66
2 Workshop B 183,45 173,12 162,79 21,27 295,66 158,44 158,44
3 Stockyard Pagar Spandex C 120,83 110,5 100,17 83,89 279,71 95,82 95,82
4 Gudang K3, R. Mekanik D 194,82 184,49 174,16 59,74 307,03 169,81 169,81
5 Stockyard Sheetpile E 100,32 89,99 79,66 104,4 212,53 75,31 75,31
6 Stockyard Pagar Galian Pilecap F 136,78 126,45 116,12 67,94 248,99 111,77 111,77
7 Stockyard Scaffolding G 147,73 137,4 127,07 56,99 259,94 122,72 122,72
8 Stockyard MCB H 119,51 102,95 92,62 100,32 173,92 145,27 145,27
9 Formwork Pilecap I 90,92 74,36 64,03 128,91 145,33 116,68 116,68
10 Formwork Pier J 50,1 39,77 29,44 152,17 92,07 177,71 177,71
11 Material Stock 1 K 99,44 109,77 120,1 326,34 12,41 155,36 155,36
12 Material Stock 2 L 81,95 92,28 102,61 296,08 18,84 136,51 136,51
13 Material Stock 3 M 63,1 73,43 83,76 265,82 37,69 117,66 117,66
14 Material Stock 4 N 38,31 48,64 58,97 241,03 49,72 92,87 92,87
15 Material Stock 5 O 26,28 36,61 46,94 229 88,03 80,84 80,84
16 Material Stock 6 P 10,33 20,66 202,72 98,36 54,56 54,56
17 Material Stock 7 Q 10,33 192,39 108,69 44,23 44,23
18 Material Stock 8 R 182,06 108,69 33,9 33,9
19 Batching Plant S 314,93 177,71 177,71
20 Parkir Truck Mixer T 143,95 143,95
21 Direksi Keet U 7,93
22 Lab Beton V
94
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
LAMPIRAN 3
JARAK SITE FACILITIES ITERASI 3 DK 118
No Fasilitas Kode A B C D E F G H
1 Kantor A 147,4 94,88 58,46 42,05 129,85 94,88 36,57
2 Workshop B 121,97 134,03 146,85 100,35 121,97 112,14
3 Stockyard Pagar Spandex C 38,42 70,5 36,97 2 60,31
4 Gudang K3, R. Mekanik D 34,08 73,39 38,42 23,89
5 Stockyard Sheetpile E 105,47 70,5 36,71
6 Stockyard Pagar Galian Pilecap F 36,97 95,28
7 Stockyard Scaffolding G 60,31
8 Stockyard MCB H
No Fasilitas Kode A I J K L M N O
1 Kantor A 70,64 63,89 249,49 228,47 208,42 185,97 174,34
2 Workshop B 146,21 139,46 209,51 188,49 168,44 145,99 134,36
3 Stockyard Pagar Spandex C 26,24 32,99 156,61 135,59 115,54 93,09 81,46
4 Gudang K3, R. Mekanik D 14,18 7,43 193,03 172,01 151,96 129,51 117,88
5 Stockyard Sheetpile E 46,26 39,51 225,11 204,09 184,04 161,59 149,96
6 Stockyard Pagar Galian Pilecap F 61,21 67,96 157,6 136,58 116,53 94,08 82,45
7 Stockyard Scaffolding G 26,24 32,99 156,61 135,59 115,54 93,09 81,46
8 Stockyard MCB H 36,07 29,32 214,92 193,9 173,85 151,4 139,77
9 Formwork Pilecap I 8,75 180,85 159,83 139,78 117,33 105,7
10 Formwork Pier J 187,6 166,58 146,53 124,08 112,45
11 Material Stock 1 K 46,26 66,31 65,52 77,15
12 Material Stock 2 L 45,29 44,5 56,13
13 Material Stock 3 M 24,45 36,08
14 Material Stock 4 N 13,63
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 252,44 247,95 238,81 81,81 147,4 116,63 116,63
2 Workshop B 212,46 207,97 198,83 67,59 107,42 140,08 140,08
3 Stockyard Pagar Spandex C 159,56 155,07 145,93 69,73 54,52 23,75 23,75
4 Gudang K3, R. Mekanik D 195,98 191,49 182,35 68,44 90,94 60,17 60,17
5 Stockyard Sheetpile E 228,06 223,57 214,43 81,26 123,02 92,25 92,25
6 Stockyard Pagar Galian Pilecap F 160,55 156,06 146,92 34,76 55,51 24,74 24,74
7 Stockyard Scaffolding G 159,56 155,07 145,93 69,73 54,52 23,75 23,75
8 Stockyard MCB H 217,87 213,38 204,24 46,55 112,83 82,06 82,06
9 Formwork Pilecap I 183,8 179,31 170,17 93,97 78,76 47,99 47,99
10 Formwork Pier J 190,55 186,06 176,92 73,87 85,51 54,74 54,74
11 Material Stock 1 K 28,19 23,7 32,84 275,1 104,09 161,37 161,37
12 Material Stock 2 L 49,21 44,72 35,58 254,08 83,07 140,35 140,35
13 Material Stock 3 M 69,26 64,77 55,63 234,03 63,02 120,3 120,3
14 Material Stock 4 N 68,47 63,98 54,84 211,58 40,57 97,85 97,85
15 Material Stock 5 O 80,1 75,61 66,47 199,95 28,94 86,22 86,22
16 Material Stock 6 P 12 22 278,05 107,04 164,32 164,32
17 Material Stock 7 Q 12 273,56 102,55 159,83 159,83
18 Material Stock 8 R 264,42 93,41 150,69 150,69
19 Batching Plant S 173,01 74,49 74,49
20 Parkir Truck Mixer T 59,28 59,28
21 Direksi Keet U 10,02
22 Lab Beton V
95
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
LAMPIRAN 4
JARAK SITE FACILITIES ITERASI 4 DK 118
No Fasilitas Kode A B C D E F G H
1 Kantor A 108,82 74,37 23,41 69,64 54,68 70,92 117,13
2 Workshop B 129,28 87,41 113,04 98,08 114,32 160,53
3 Stockyard Pagar Spandex C 52,96 46,11 31,15 14,91 72,63
4 Gudang K3, R. Mekanik D 48,23 33,27 49,51 95,72
5 Stockyard Sheetpile E 26,42 42,66 88,87
6 Stockyard Pagar Galian Pilecap F 27,7 73,91
7 Stockyard Scaffolding G 57,67
8 Stockyard MCB H
No Fasilitas Kode A I J K L M N O
1 Kantor A 108,78 99,36 91,36 110,71 132,78 148,72 158,88
2 Workshop B 152,18 142,76 35,85 54,1 66,93 82,87 93,03
3 Stockyard Pagar Spandex C 64,28 54,86 132,42 151,77 173,84 189,78 199,94
4 Gudang K3, R. Mekanik D 87,37 77,95 69,95 89,3 111,37 127,31 137,47
5 Stockyard Sheetpile E 80,52 71,1 116,18 135,53 157,6 173,54 183,7
6 Stockyard Pagar Galian Pilecap F 65,56 56,14 101,22 120,57 142,64 158,58 168,74
7 Stockyard Scaffolding G 49,32 39,9 117,46 136,81 158,88 174,82 184,98
8 Stockyard MCB H 10,35 19,77 163,67 183,02 205,09 221,03 231,19
9 Formwork Pilecap I 11,42 155,32 174,67 196,74 212,68 222,84
10 Formwork Pier J 145,9 165,25 187,32 203,26 213,42
11 Material Stock 1 K 21,35 43,42 59,36 69,52
12 Material Stock 2 L 24,07 40,01 50,17
13 Material Stock 3 M 17,94 28,1
14 Material Stock 4 N 12,16
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 183,17 193,13 203,09 123,68 76,53 87,07 96,3
2 Workshop B 117,32 134,87 144,83 16,86 24,23 93,04 102,27
3 Stockyard Pagar Spandex C 224,23 234,19 244,15 144,14 117,59 128,13 137,36
4 Gudang K3, R. Mekanik D 161,76 171,72 181,68 102,27 55,12 65,66 74,89
5 Stockyard Sheetpile E 207,99 217,95 227,91 127,9 101,35 111,89 121,12
6 Stockyard Pagar Galian Pilecap F 193,03 202,99 212,95 112,94 86,39 96,93 106,16
7 Stockyard Scaffolding G 209,27 219,23 229,19 129,18 102,63 113,17 122,4
8 Stockyard MCB H 255,48 265,44 275,4 175,39 148,84 159,38 168,61
9 Formwork Pilecap I 247,13 257,09 267,05 167,04 140,49 151,03 160,26
10 Formwork Pier J 237,71 247,67 257,63 157,62 131,07 141,61 150,84
11 Material Stock 1 K 93,81 103,77 113,73 36,08 16,83 81,83 91,06
12 Material Stock 2 L 74,46 84,42 94,38 39,24 36,18 101,18 110,41
13 Material Stock 3 M 52,39 62,35 72,31 52,07 58,25 123,25 132,48
14 Material Stock 4 N 36,45 46,41 56,37 44,21 74,19 139,19 148,42
15 Material Stock 5 O 26,29 36,25 46,21 39,86 84,35 149,35 158,58
16 Material Stock 6 P 11,96 21,92 61,74 108,64 173,64 182,87
17 Material Stock 7 Q 11,96 51,78 118,6 183,6 192,83
18 Material Stock 8 R 61,74 128,56 193,56 202,79
19 Batching Plant S 39,09 78,18 87,41
20 Parkir Truck Mixer T 67 76,23
21 Direksi Keet U 86,77
22 Lab Beton V
96
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
LAMPIRAN 5
JARAK SITE FACILITIES ITERASI 5 DK 118
No Fasilitas Kode A B C D E F G H
1 Kantor A 50,83 206,39 191,93 190,64 191,64 207,39 240,61
2 Workshop B 227,77 184,07 212,02 213,02 228,77 263,02
3 Stockyard Pagar Spandex C 27,95 77,26 48,31 1 67,78
4 Gudang K3, R. Mekanik D 27,95 28,95 78,26 111,48
5 Stockyard Sheetpile E 1 50,31 83,53
6 Stockyard Pagar Galian Pilecap F 49,31 82,53
7 Stockyard Scaffolding G 65,75
8 Stockyard MCB H
No Fasilitas Kode A I J K L M N O
1 Kantor A 231,68 209,93 133,59 110,88 86,73 76,76 66,79
2 Workshop B 254,09 232,34 155,5 132,79 108,64 98,67 88,7
3 Stockyard Pagar Spandex C 58,85 37,1 74,8 97,51 121,66 131,63 141,6
4 Gudang K3, R. Mekanik D 102,55 80,8 60,34 83,05 107,2 117,17 127,14
5 Stockyard Sheetpile E 74,6 52,85 59,05 81,76 105,91 115,88 125,85
6 Stockyard Pagar Galian Pilecap F 73,6 51,85 60,05 82,76 106,91 116,88 126,85
7 Stockyard Scaffolding G 56,82 35,07 75,8 98,51 122,66 132,63 142,6
8 Stockyard MCB H 8,93 30,68 109,02 131,73 155,88 165,85 175,82
9 Formwork Pilecap I 21,75 100,09 122,8 146,95 156,92 166,89
10 Formwork Pier J 78,34 101,05 125,2 135,17 145,14
11 Material Stock 1 K 24,71 48,86 58,83 68,8
12 Material Stock 2 L 26,15 36,12 46,09
13 Material Stock 3 M 9,97 19,94
14 Material Stock 4 N 9,97
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 56,82 46,85 36,88 44,75 131,14 153,74 138,23
2 Workshop B 78,73 68,76 58,79 6,08 137,9 122,1 106,59
3 Stockyard Pagar Spandex C 151,57 161,54 171,51 233,85 52,03 107,71 124,61
4 Gudang K3, R. Mekanik D 137,11 147,08 157,05 190,15 30,29 64,01 80,91
5 Stockyard Sheetpile E 135,82 145,79 155,76 218,1 36,28 91,96 108,86
6 Stockyard Pagar Galian Pilecap F 136,82 146,79 156,76 219,1 37,28 92,96 109,86
7 Stockyard Scaffolding G 152,57 162,54 172,51 234,85 53,03 108,71 125,61
8 Stockyard MCB H 185,79 195,76 205,73 269,1 86,25 142,96 159,86
9 Formwork Pilecap I 176,86 186,83 196,8 260,17 77,32 134,03 150,93
10 Formwork Pier J 155,11 165,08 175,05 238,42 55,57 112,28 129,18
11 Material Stock 1 K 78,77 88,74 98,71 149,42 16,68 85,54 102,44
12 Material Stock 2 L 56,06 66,03 76 126,71 22,26 108,25 125,15
13 Material Stock 3 M 29,91 39,88 49,85 102,56 46,41 132,4 149,3
14 Material Stock 4 N 19,94 29,91 39,88 92,59 56,38 142,37 159,27
15 Material Stock 5 O 9,97 19,94 29,91 82,62 66,35 152,34 159,96
16 Material Stock 6 P 9,97 19,94 72,65 76,32 162,31 149,99
17 Material Stock 7 Q 9,97 62,68 86,29 155,53 140,02
18 Material Stock 8 R 52,71 96,26 145,56 130,05
19 Batching Plant S 143,98 128,18 112,67
20 Parkir Truck Mixer T 15,8 32,7
21 Direksi Keet U 16,9
22 Lab Beton V
97
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
LAMPIRAN 6
JARAK SITE FACILITIES ITERASI 2 DK 125
No Fasilitas Kode A B C D E F G H
1 Kantor A 237,19 59,22 257,84 133,74 48,36 29,87 105,95
2 Workshop B 184 22,65 109,48 194,86 203,66 110,99
3 Stockyard Pagar Spandex C 200,62 76,52 12,86 48,95 48,73
4 Gudang K3, R. Mekanik D 130,13 215,51 224,31 131,64
5 Stockyard Sheetpile E 87,38 123,47 157,45
6 Stockyard Pagar Galian Pilecap F 31,85 72,07
7 Stockyard Scaffolding G 80,87
8 Stockyard MCB H
No Fasilitas Kode A I J K L M N O
1 Kantor A 75,11 99,03 189,49 164,26 164,26 179 165,86
2 Workshop B 168,11 144,19 49,7 74,93 90,33 69,85 69,85
3 Stockyard Pagar Spandex C 17,89 41,81 132,27 107,04 107,04 121,78 108,64
4 Gudang K3, R. Mekanik D 188,76 164,84 70,35 95,58 110,98 90,5 90,5
5 Stockyard Sheetpile E 65,66 41,74 119,64 144,87 160,27 41,63 54,77
6 Stockyard Pagar Galian Pilecap F 28,75 52,67 153,61 128,38 128,38 151,69 138,55
7 Stockyard Scaffolding G 37,55 61,47 162,41 137,18 137,18 160,49 147,35
8 Stockyard MCB H 98,82 122,74 85,54 60,31 60,31 75,05 61,91
9 Formwork Pilecap I 25,92 148,16 122,93 122,93 137,67 124,53
10 Formwork Pier J 172,08 146,85 146,85 161,59 148,45
11 Material Stock 1 K 27,23 58,03 80,01 80,01
12 Material Stock 2 L 32,8 105,24 105,24
13 Material Stock 3 M 136,04 136,04
14 Material Stock 4 N 15,14
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 152,9 140,86 129,58 127,405 190,19 119,07 129,7
2 Workshop B 82,81 94,85 106,13 42,025 42,025 115,56 104,93
3 Stockyard Pagar Spandex C 95,68 83,64 72,36 70,185 132,97 61,85 72,48
4 Gudang K3, R. Mekanik D 103,46 115,5 126,78 62,675 62,675 136,21 125,58
5 Stockyard Sheetpile E 67,73 79,77 91,05 69,455 69,455 209,43 220,06
6 Stockyard Pagar Galian Pilecap F 125,59 113,55 102,27 93,525 157,285 85,19 95,82
7 Stockyard Scaffolding G 134,39 122,35 111,07 102,325 166,085 93,99 104,62
8 Stockyard MCB H 48,95 36,91 25,63 2 89,735 53,98 64,61
9 Formwork Pilecap I 111,57 99,53 88,25 86,075 148,86 77,74 88,37
10 Formwork Pier J 135,49 123,45 112,17 109,995 172,78 101,66 112,29
11 Material Stock 1 K 92,97 105,01 116,29 2 52,185 83,26 72,63
12 Material Stock 2 L 118,2 130,24 133,64 2 77,415 58,03 47,4
13 Material Stock 3 M 126,16 114,12 102,84 2 108,215 27,23 16,6
14 Material Stock 4 N 28,1 40,14 51,42 15,14 8,57 127,03 137,66
15 Material Stock 5 O 14,96 27 38,28 2 21,71 113,89 124,52
16 Material Stock 6 P 14,04 25,32 2 34,67 100,93 111,56
17 Material Stock 7 Q 13,28 2 46,71 112,97 123,6
18 Material Stock 8 R 2 57,99 101,69 112,32
19 Batching Plant S 2 42,63 32
20 Parkir Truck Mixer T 127,03 137,66
21 Direksi Keet U 12,63
22 Lab Beton V
98
Departemen Sipil Umum 1
PT. WIJAYA KARYA (PERSERO) Tbk
LAMPIRAN 7
JARAK SITE FACILITIES ITERASI 2 DK 135
No Fasilitas Kode A B C D E F G H
1 Kantor A 146,74 110,57 162,09 96,87 75,26 85,13 89,94
2 Workshop B 89,05 63,08 75,35 73,48 63,61 94,03
3 Stockyard Pagar Spandex C 136,94 15,7 37,31 27,44 64,79
4 Gudang K3, R. Mekanik D 123,24 101,63 111,5 84,02
5 Stockyard Sheetpile E 23,61 13,74 51,09
6 Stockyard Pagar Galian Pilecap F 11,87 29,48
7 Stockyard Scaffolding G 39,35
8 Stockyard MCB H
No Fasilitas Kode A I J K L M N O
1 Kantor A 78,22 109,1 116,29 132,29 148,29 173,79 180,8
2 Workshop B 70,14 70,14 89,22 105,22 121,22 146,72 81,79
3 Stockyard Pagar Spandex C 53,07 10,7 91,14 107,14 123,14 148,64 155,65
4 Gudang K3, R. Mekanik D 110,02 140,52 79,21 95,21 111,21 88,92 20,71
5 Stockyard Sheetpile E 37,71 24,4 77,44 93,44 109,44 134,94 141,95
6 Stockyard Pagar Galian Pilecap F 17,76 35,84 55,83 71,83 87,83 113,33 120,34
7 Stockyard Scaffolding G 25,97 25,97 65,7 81,7 97,7 123,2 130,21
8 Stockyard MCB H 28 58,5 28,35 44,35 60,35 85,85 92,86
9 Formwork Pilecap I 32,5 54,35 70,35 86,35 111,85 118,86
10 Formwork Pier J 84,85 100,85 116,85 142,35 149,36
11 Material Stock 1 K 18 34 59,5 88,05
12 Material Stock 2 L 18 43,5 86,21
13 Material Stock 3 M 27,5 70,21
14 Material Stock 4 N 70,21
15 Material Stock 5 O
No Fasilitas Kode A P Q R S T U V
1 Kantor A 196,8 200,5 212,5 43,73 43,73 150,59 168,8
2 Workshop B 97,79 109,79 121,79 106,79 81,66 51,58 69,79
3 Stockyard Pagar Spandex C 171,65 175,35 187,35 68,84 56,275 125,44 143,65
4 Gudang K3, R. Mekanik D 36,71 48,71 60,71 120,36 107,795 13,5 8,71
5 Stockyard Sheetpile E 157,95 169,95 181,95 55,14 42,575 111,74 129,95
6 Stockyard Pagar Galian Pilecap F 136,34 148,34 160,34 33,53 20,965 90,13 108,34
7 Stockyard Scaffolding G 146,21 158,21 170,21 43,4 30,835 100 118,21
8 Stockyard MCB H 108,86 120,86 132,86 48,21 35,645 62,65 80,86
9 Formwork Pilecap I 134,86 146,86 158,86 22,21 9,645 36,65 54,86
10 Formwork Pier J 165,36 177,36 189,36 52,71 40,145 67,15 85,36
11 Material Stock 1 K 73,46 73,46 79,46 8,66 28,35 57,84 76,05
12 Material Stock 2 L 57,46 57,46 63,46 8,66 44,35 73,84 92,05
13 Material Stock 3 M 41,46 41,46 47,46 8,66 60,35 57,84 76,05
14 Material Stock 4 N 41,46 41,46 47,46 8,66 85,85 57,84 76,05
15 Material Stock 5 O 18 30 42 66,12 92,86 47,79 29,58
16 Material Stock 6 P 14 26 50,12 108,86 63,79 45,58
17 Material Stock 7 Q 14 50,12 108,86 75,79 57,58
18 Material Stock 8 R 62,12 120,86 87,79 69,58
19 Batching Plant S 6,65 57,53 75,74
20 Parkir Truck Mixer T 57,5 75,71
21 Direksi Keet U 18,21
22 Lab Beton V
99
20.0000
Wor
20.0016 ksho
p
Bangunan
Eksisting
19.9998
r
e
Sola
fic
Of
Bangunan
n
Eksisting
da
tai
lan
19.9998
g2
tin
x is
Bangunan
E
an
Eksisting
un
ng
Ba
12.4980
Bangunan
Eksisting
12.4980
Bangunan
Eksisting
Bangunan
Mess
Bak Air
jalan aspal
Gudang
Bangunan
Eksisting
Bangunan
Eksisting
Genset
ang
Pem lam
ancin
Ko
19.8666
Bangunan 4.0000
Rumah
20
Wor
20 ksho
p
Ma
Sto teria
ck l
1
20
er
Ma 37
k Mix
e
fic
Sto teria
Of
ck l
ir Tru
n
2
da
tai
Park
lan
36
20
g2
35
tin
Ma
x is
Sto teria
E
ck l
an
3
un
ng
r
Ba
7
Sola
5,0
33 34 20
12.5 Mate
r
Stock ial 30
4
32
12.5 Mate 31
r
Stock ial
5
30
10 Mate 29
r
Stock ial
6
28
10 Mate 36,54
r
Stock ial
14
7
27
10 Mate 26
r
Stock ial
8
25
23,34
24
23
21
20 22 18
Lab Beton 38
38
17
25,16
jalan aspal
23,31
16
Work Shop
19 BATCHING
10,15
PLANT
15
9,79
13,98
12 13
26,57
OFFICE 1
11
2
3 4 9 10
5 8
6 7
20
Wor
20 ksho
p
Ma
Sto teria
ck l
1
20
er
Ma 37
k Mix
e
ffic
Sto teria
nO
ck l
ir Tru
2
da
tai
Park
an
36
2l
20 35
g
Ma
istin
Sto teria
Ex
ck l
an
3
un
ng
Ba
33 34
12.5 Mate
r
Stock ial
4
32
12.5 Mate
r 31
Stock ial
5
30
10 Mate 29
r
Stock ial
6
28
10 Mate
r
Stock ial
14
7
27
10 Mate 26
r
Stock ial
8
25
23,34
,38
24
11
23
21
20 22 18
Lab Beton 38
38
17
25,16
jalan aspal
23,31
16
Work Shop
19 BATCHING
9,98
PLANT
15
13,98
12 13
26,57
OFFICE 1
11
2
3 4 9 10
5 8
6 7
Solar
7
5,0
30
20
Wor
20 ksho
p
Ma
Sto teria
ck l
1
20 27
er
Ma
r
k Mix
7
Sola
5,0
Sto teria
ck l
ir Tru
2
28
Park
30
20
Ma 27
Sto teria
ck l
3
28
27
12.5 Mate
r
Stock ial
4 26
12.5 Mate
r
Stock ial
5
25
10 Mate
r
Stock ial
6 24 32,73
10 Mate 23
r
Stock ial 22
7
10 Mate
r 29
Stock ial 22
23,34
8 31
33
21 30 20
17
Lab Beton 16 32 30'
26,83
15
19
14
24,24
28,14
13
18
jalan aspal
22,38
BATCHING
Work Shop
PLANT TAMAN
12
4
11,75 10,4
11
26,57
OFFICE
10
9
5
9 9
8 7 6 3 4
2 AN
TAM
20
Wor
20 ksho
p
Ma
Sto teria
ck l
1
Ma
20 24 29 Sto terial
Ma ck 6
r
7
Sola
28 5,0
Sto teria Ma
ck l 27
2 Sto terial 20
ck 7
28
20 26 Ma 30
Ma 24 Sto terial
ck 8
Sto teria
ck l
3
25
12.5 Mate 24
r
Stock ial
4
23
12.5 Mate
r
Stock ial
5 22
er
k Mix
29,96
21
ir Tru
Park
33
20
Work Shop
16
16
61,42
Lab Beton 15
14 31
13
12,5
32
25,44
12
jalan aspal
13,29
11
10
17 9
77,57
18
TAMAN 8 BATCHING
4 PLANT
19
3
30
7
2
6
26,57
OFFICE
5
TAMAN
4
32,6
TAMAN
37,
88
,77
Wor
ksho
21
p
,49
20
r
7
Sola
5,0
23 2.5000
20
22
5
30
,5
15
81
12,
21
20
19
5
9,5
OFFICE
18
20
19
18
17 29,96
16
TAM
AN
11'
12
,45
13
Work Shop
11
15
Parkir Truk Mixer
14 11 30 61,42
Lab Beton
17
32
9
29
Material 31'
Stock 1
28
20,13
8
27
jalan aspal
Material 26
19,72
Stock 2
7
77,57
Material BATCHING
22,63
Stock 3 PLANT
6
10
tock
4 5
rial S
10,01 10,01
Mate 25
ck 5 24
ri al Sto 4
Mate
3
6
tock 10'
rial S 2
Mate
10
4
tock
7 32,6
rial S 2
Mate
10
8
tock
rial S
Mate
10
37,
88
,77
21
Wor
ksho
p
5
20,
32
,55
15
31
,8 1 23,4
12
7
30
28
10
29
27 28
24
29,96
26
23 25
16
TAMAN
22
15
34 Material
Stock 1
Parkir Truk Mixer
35
,35
33
23,42
11
12 36
Material
21 Stock 2
11
Lab Beton
20
17
10
24,54
Material
19 Stock 3
9,99
k4
ria l Stoc
15 Mate
10
k5
l Stoc
Jalan Aspal
ria
15 Mate
10
Work Shop
k6
BATCHING ria l Stoc
15 Mate
PLANT
10
7
tock
rial S
TAMAN
15 Mate
9
10
8
tock
rial S
15 Mate
26,04
14 OFFICE
4 3 2
13 TAMAN 3
8 7 6 5 4
4
TAM 12,1
AN
r
Sola
7
5,0
20
30
26,87
24,36
MATE
R
STOC IAL
K1
ET
GENS
1
23,68
MATE
R
STOC IAL
K2
9,55
10,9
9
13,16
ETON
SHEE YARD
TPILE
LAB B
2 PAR
K
K
STOC
MIX IR TRU
ER
24,53
CK
27
MATE
R
26
STOC IAL GUD
ANG
K3
3 28 25 K3
R.M
DIRE EKA
NIK
29 24
K
KEE SI
T
STOC
K
23 SCAF YARD
12,23
FOLD
ING
MATE 4 STOC
K
R
STOC IAL PAGA YARD
R GA
K4 22 PILEC
AP
LIAN
19,4
9
11,85
MATE 21
R
STOC IAL 5 STOC
KYAR
K5 PAG
FORM AR S D
WOR PAND
PIER K EX
8,76
BATC
MATE HING
R
STOC IAL
K6
6 PLAN
T
WOR
KSHO
20
9,4
P
MATE
R
STOC IAL 7 16
K7
10
8,63
,36
FORM
W
MATE
R 8 PILEC ORK
AP
15
STOC IAL
K8
19 17
25,8 14
9
E
FIC
9
OF
8
07LAR
SO
STOC
26,8
5. MCB
KYAR
D
18
20
13
30 11 12
10
26,87
T
SE
EN
G
GUDANG K3
R. MEKANIK
70,97
1
23,5
WOR
KSH
OP 1
13,16
STO
2 C KYA
RD SH
PAR EET
PILE
K
MIX IR TRU
ER C K
20 19
MAT
27 21 ERIA
L ST
OCK
4
22
3
25,68
MAT
ERIA 18
L ST
MATE OCK
RIAL
STOC 23 5
K1
MAT
ERIA
L ST
BATC 24 OCK
6
HING
PLAN
T
FORM
4 WOR
K PIE
24,59
MAT R
ERIA
26,26
L ST
MATE
RIAL
25 OCK
7
17
STOC
K2
MAT
ERIA
L ST
OCK
8
5
FOR
MW
16
18,93
26 ORK
PILE
CAP
MAT 7
21,1
ERIA
L ST
OCK
3
6
STO
CKY
ARD
15 STO
C
PAG KYARD
MCB AR S
PAN
DE X
8
3
STOC
14 K
PAGA YARD
9,6
28 R
PILEC GALIAN
AP
STOC
K
SCAF YARD
FOLD
ING
29 11
,71
LA
BE B
10
12
TO
N 30 9 12
DI
KE REK
ET SI
13
CE
FI
OF
25
SO
07 LAR
5.
20
30
9,93
10 9,93
R. MEK GENS
ANIK ET
GUDAN
G
K3
32
33
31,1
25
OFFICE
31 23
1
22 FORM
WORK
PIER
26,72
2
21 20
16
MAT
24
ERIA
L ST
OCK
1
3
4
16
MAT
ERIA FORM
2 L ST WORK PILE
OCK CAP
27,35
25
16
MAT
ERIA
5
3 L ST
OCK 19 26
WOR
KSHO
P
STOCK
YA RD MCB
24,79
6
20
MAT 27
ERIA
4 L ST
OCK
STOCK
YA
SPANDE RD PAGAR
28 X
13,1
7 BATCHING PLANT
20
MAT
ERIA
5 L ST
OCK STOCK
30 YARD
SH EETPIL
10,86
E
18 29
STOCK
17 PAGAR
YARD
12
8 PILEC
GALIA
N STOCK
MAT AP YA
ERIA SCAFFO RD
15,28
6 L ST LDING
OCK
15
12
16
MAT
ERIA
9
7 L ST
OCK
14
14,16
MAT 10
MIXER
ERIA
8 L ST
OCK
TRUCK
13
11 12
PARKIR
24,67 LAB BE
TON
DIREK
SI
KEET
16,94
11
SOLAR
19
31
29,87
FORM
WORK
PIER 32 STOCK
YA
SPANDE RD PAGAR
X
15
26
23
STOCK
22 YARD
SH EETPIL
25 E
OFFICE
25
21
93
24
STOC
WORKSHOP KYAR
D SC
AFFO
27 LDIN
G
FORM
WORK 29 1
PILECA
P
STOC
KY
30 GALIA ARD PAG
N PIL A
ECAP R
31
28 2
20
3
STOCK
YARD
MCB
4
19
DIRE
KSI K
EET 18
8,56
GENSET
R. M
EKA
NIK 17
GUD
ANG
K3
MAT
ERIA 5
L ST
OCK
1
LAB
BET
ON 16
20
MAT
15 MAT 6
ERIA ERIA
5 L ST 2 L ST
OCK OCK
14
12
MAT
ERIA
MAT
ERIA 7 BATCHING PLANT
6 3 L ST
L ST OCK
OCK
13
12
MAT
7
ERIA
L ST 10 8
OCK
11
14,16
12
MAT
8
ERIA
L ST
MAT
ERIA 9
OCK 4 L ST
OCK
24,67
24,67
SOLAR