Anda di halaman 1dari 2

DAFTAR TABEL

Tabel 1 Kebutuhan tenaga pelaksana O&P..................................................22

Tabel 2 Kompetensi Petugas O&P...............................................................23

Tabel 3 Bobot Maksimum penilaian kinerja pada masing-masing aspek....26

Tabel 4 Nilai (Q/n0,5) dan (R/n0,5).................................................................34

Tabel 5 Nilai Ra berdasarkan Letak Lintang...............................................38

Tabel 6 Koefisien tanaman berdasarkan FAO.............................................41

Tabel 7 Nilai Efisiensi Irigasi......................................................................42

Tabel 8 Nilai Efisiensi Irigasi......................................................................46

vii
DAFTAR GAMBAR

Gambar 1 Skematis contoh jaringan irigasi sederhana (KP 01, 2010)..........8

Gambar 2 Skematis contoh jaringan irigasi semi teknis (KP 01, 2010)........9

Gambar 3 Skematis contoh jaringan irigasi teknis (KP 01, 2010)...............10

Gambar 4 Siklus Hidrologi..........................................................................28

Gambar 5 Metode Rata-rata Aljabart (Arithmatik)......................................31

Gambar 6 Metode Poligon Thiessen............................................................32

Gambar 7 Metode Isohyet............................................................................32

Gambar 8 Lokasi Penelitian.........................................................................47

Gambar 9 Skema Jaringan Irigasi................................................................53

Gambar 10 Bagan Alir Penelitian................................................................54

viii

Anda mungkin juga menyukai