(WPC)
1
DAFTAR ISI
PENDAHULUAN
• Ruang Lingkup
• Latar Belakang
• Tujuan
PENGERTIAN DASAR
• Planning
• Schedulling
• Coordination
• Controlling
• CMMS/EAM
• Jenis Pemliharaan
• Work Order
• Morning Meeting
APLIKASI
• Planning (Long Term – Short Term)
• Work Package (Std Job/Job Plan)
• Eksekusi
MATURITY LEVEL
KPI
KESIMPULAN
2
PENDAHULUAN
3
RUANG LINGKUP
4
LATAR BELAKANG
5
TUJUAN
Maintenance Efficiency,
melalui :
• Efisien dalam penggunaan &
pengaturan sumber daya (Manpower,
Material/Spare Parts, Tools dll)
• Reduce maintenance cost
6
MTBF : Mean Time Between Failure, yaitu rata-rata peralatan rusak
s/d rusak lagi (diharapkan MTBF semakin panjang)
7
PENGERTIAN DASAR
8
WORK PLANNING AND CONTROL
Close
CloseOut:
Out:Conditions
Conditionsfound,
found,Components
Componentsaffected,
affected, Emergency,
Work schedule break,
Workaccomplished,
accomplished,Notes
Notesfor
forfuture
futurerepairs
repairs
reactive repairs
10
ALUR PROSES DASAR WPC
Planned works,
PM, PdM, PaM,
Reactive non-emergency
Work Work
Analysis Close Out Execution
11
KONSEP & KEBIJAKAN WP&C
Work Planning Control - Concept
Rendal
Pemeliharaan
Engineering
Change
Management
PROSEDUR WPC
FRAME WORK
TATA KELOLA UNIT PEMBANGKITAN – PT PJB
WORK PLANNING & CONTROL (WPC) MANAGEMENT
TATA KELOLA UNIT PEMBANGKITAN – PT PJB
OUTAGE MANAGEMENT
TATA KELOLA UNIT PEMBANGKITAN – PT PJB
Daftar peralatan
Prosedur detil dan material yang
untuk melakukan dibutuhkan
pekerjaan dipersiapkan di
lokasi kerja
Lokasi parts /
Perkiraan yang material yang
akurat tentang dekat dengan area
tenaga kerja yang kerja yang
dibutuhkan disiapkan dalam
bentuk kit
17
SCHEDULING
Scheduling
18
KOORDINASI
Proses Controlling :
20
CMMS / EAM
CMMS/EAM *
22
MORNING MEETING
23
WORK ORDER
24
WORK ORDER
25
APLIKASI
26
PLANNING
Yearly
Develop 5 year
Plan
Quarterly
.
Planned Develop Plan of the
Outage Year
Monthly
Scheduling
27
PLANNING
1. Resource smoothing.
Pekerjaan yang bisa
Di Update setiap 3 2. Pengaturan Budget.
direncanakan dalam 1 tahun
bulan sekali 3. Material (Lead Time > 6
mendatang
bulan)
29
LONG TERM PLANNING
J F M A M J J A S O N D
Yearly
4.1.6: PlanningPlanning
YEARLY MeetingMeeting
No. 2 No. 2
Yearly
4.1.4: PlanningPlanning
YEARLY MeetingMeeting
No. 1 No. 1
Distribute
4.1.3: Draft Draft
Distribute 5 year5-Year
plan Plan
Start Start
4.1.2: Compiling draft 5
Compiling year5-Year
Draft plan Plan
30
SHORT TERM PLANNING
Rabu
7 Hari ke depan
Kamis Kamis
Senin
Rabu
7 Hari ke depan
Kamis Kamis
32
MORNING MEETING
RENDAL HAR :
SPV. HAR :
• Daftar WO Urgent yang backlog sampai hari kemarin & Daftar WO Urgent yang
kemungkinan backlog hari ini.
• Daftar Human Resources yang tersedia minggu ini & minggu depan.
RENDAL OP :
SPV. OP :
33
MORNING MEETING
34
WORK PACKAGE
Clearances
Estimated Time Special Skills/
Multi Department
Special Tools
Primary
Parts
Job Scope
Safety Repair
Technical Data History
Checklists
Procedures Work Plan
35
WORK PACKAGE
FDT/Quick Win
(Enjiniring)
Maintenance
Manual Book
History
PM Basis
Work Pekerjaan
Package Berulang
Preventive Maintenance
Standar pek. Overhaul
36
WORK PACKAGE
PM
MAXIMO Job Plan
Module
Maint.
ELLIPSE Std Job Scheduling
Task
37
WORK PACKAGE
38
EKSEKUSI PEKERJAAN
Senin Senin
Rabu
7 Hari ke depan
Kamis Kamis 39
MATURITY LEVEL DAN KPI
40
41
• Identifikasi dan distribusi WO
• Pelaksanaan perencanaan harian
• Penggalian informasi untuk kelengkapan WO
Planning
• Kualitas WO (work package) Daily-Weekly
• Penjadwalan
• Kebutuhan safety dan Isolasi
• Eksekusi pekerjaan Eksekusi Pekerjaan
• Post Maintenance Testing dan serah terima pekerjaan
• Deskripsi permintaan pekerjaan
• Efektivitas permintaan pekerjaan Identifikasi Pekerjaan
• Morning Meeting - Efektivitas
MATURITY LEVEL
42
• Ketepatan waktu
• Informasi dan dokumentasi Feedback
• Laporan Pemeliharaan
• Draft perencanaan 5 tahun
• Yearly Planning 1 Long Term Planning
• Yearly Planning 2
• Pembuatan kalender kerja 1 tahun per mingguan
• Perencanaan dan penjadwalan pemeliharaaan preventive
• Pembagian load dan resource preventive maintenance Annual Planning
• Review annual meeting
MATURITY LEVEL
43
• Keakuratan ILS
• Kelengkapan feedback WO / closing comment
• WO Backlog
• WO Overdue
• Efektivitas pekerjaan
• Efisiensi Penjadwalan
• Maintenance Mix Cost KPI
• Maintenance Mix Man Hour
• Maintenance Mix Quantity
• Review Jadwal Rutin 52 Minggu Thn berikutnya
• Identifikasi Scopes Modif, Improve, Project
• Jaminan kualitas hasil pekerjaan
• OEE (Overall Equipment Efectiveness)
• Pareto Loss Output
• Pareto Maintenance Cost Technical System
• Heat rate nalisis
MATURITY LEVEL
MATURITY LEVEL
44
KPI (Key Performance Indicator)
45
KPI (Key Performance Indicator)
MAINTENANCE MIX
Planned Maintenance
% M Mix=
Planned Maint + Unplanned Maint
• Cost
• Quantity
• Man Hour
46
KPI (Key Performance Indicator)
Optimasi
Planning
Work Package to Scheduling systems
Maintenance effectiveness
Work Request
-Sumber daya
with Operations
Approval
-Prioritas Execution
Operasi
KPI
Backlog Management
47
KPI (Key Performance Indicator)
BACKLOG
% Execution Backlog
% Planning Backlog
48
TERIMA KASIH
PT PEMBANGKITAN JAWA-BALI