Anda di halaman 1dari 7

PRARANCANGAN PABRIK DIAMIL PHTHALAT DARI PHTHALIC ANHIDRID DAN AMIL ALKOHOL

DENGAN KAPASITAS 45.000 TON/TAHUN

K e Uti litas

PI

K e Uti litas
A ir pendingin
FC
K e Uti litas

CD-02

LI

A ir pendingin

T-01

PI

K e Uti litas

CD-01

PI

HE-04

PC

K e Uti litas

A ir pendingin

P-01

P-16

LC

LC

MD-01

AC-01

LC

1
2

R-01

23

PI

A ir pendingin
TC

FC

R-02
4

TC

FC

P-11

S team

S team
LI

T-02

P-04

HE-02

P-05

11

K e Uti litas

12

P-15

P-02

13

S team

14

H-01

15

HE-01

TC

K e Uti litas

TC

PI

S team

PI
17
TC

18

LC

19

LC

G-01

20

RB-01

N-01

M-01

K e Uti litas

E-299
PI

P-12

HE-05

P-06

A ir pendingin

A ir pendingin

T-04

K e Uti litas

P-10

P-14

Gas oil

TC

CD-03

K e Uti litas

PC

HE-03

Legenda

K e Uti litas

P-07
PI

LC

FC

D-01

P-09
LC

T-03

LI

PC

SD-01
P-17

P-03

TC

P-13
FC

Ke UPL

: Arus utama
: Arus utilitas
: Sinyal listrik
: Sinyal udara tekan
: Level Controller
: Pressure Controller
: Temperature
Controller
: Flow Controller

S
C
H
R
N
SD
MD
CD
RB
AC
D
P
UPL

: Tangki/Gudang Penyimpan
: Belt Conveyor
: Hopper
: Reaktor
: Netralizer
: Separator Drum
: Menara Distilasi
: Condenser
: Reboiler
: Accumulator
: Decanter
: Pompa
: Unit Pengolahan Limbah

JURUSAN TEKNIK KIMIA


FAKULTAS TEKNIK
UNIVERSITAS GADJAH MADA
YOGYAKARTA 2015

PROCESS ENGINEERING FLOW DIAGRAM


Muhammad Fauzi
11/312750/TK/37625

M.Yanriasna Indradja
11/319258/TK/38388

Dosen Pembimbing :
Ir. Hary Sulistyo, S.U, Ph. D.

Gudang Produk Metil Benzoat


Tangki Metanol
Tangki Metil Benzoat

Controll Room

Area Pengembangan

Gudang Asam benzoat

1,5 kali tinggi

1,5 kali tinggi

R-02

N-01

E V-01

CD-01

RB-01

1,5 kali tinggi

MD -01

A C-01

Tangki Asam
Sulfat

Tangki NaOH
CL-02

1,5 kali tinggi

CL-03

R-01
E V-02

CL-01
CD-02

CL-04

1,5 kali panjang

CD-01
E V-01
CL-02
CL-03

A C-01

MD -01

CD-02

RB-01

E V-02

CD-03
CL-01

CL-04

Skala 1 : 200

Gambar 1. Tata Letak Alat Proses

P os
Jaga 4

Area Tangki dan Gudang

Truk Depot

Area Pengembangan 1
Pos Pemadam
Kebakaran
Ruang
Kontrol

P os
Jaga 3

Area Proses

Tam an

Area Utilitas

P os
Jaga 2

Tam an

Tam an

Area Parkir 2

Gudang Alat

Bengkel

Laboratorium

Tam an

Tam an

Tam an

Kantin

Mushola

Klinik
Tam an

Tam an

Area Pengembangan 2

Kantor

Area Parkir 1
Tam an

P os
J aga 1

P os
Jaga 5

Skala 1 : 800

Gambar 2. Tata Letak Pabrik

Skala 1 : 200

Pos
Jaga 3

Area Tangki dan Gudang

Truk Depot

Area Pengembangan 1
Pos Pemadam Kebakaran

Ruang Kontrol

Area Proses

Taman

Taman

Area Utilitas

Pos
Jaga 2

Taman

Area Parkir 2

Gudang Alat

Bengkel

Laboratorium

Taman

Taman

Taman

Mushola

Kantin

Klinik

Taman

Taman

Area Pengembangan 2

Kantor

Area Parkir 1

Taman

Pos Jaga 1

Pos
Jaga 4

HE-01

CD-02
HE-04

HE-02
M-01

CD-01

R-01

R-02

MD-01

D-01

SD-01

N-01

HE-03

HE-05

CD-03

Skala 1 : 200

PI

P-07

LC

D-01

P-13
PI
FC

T-01

P-16

LI

P-01

Anda mungkin juga menyukai