TOTAL I.1
TOTAL I.2
TOTAL I.3
TOTAL I
NO URAIAN SATUAN
NO URAIAN SATUAN
NO URAIAN SATUAN
NO URAIAN BIAYA
I BIAYA LANGSUNG PERSONIL (BLP)
I.1 BIAYA TENAGA AHLI
TOTAL ( I )
II BIAYA LANGSUNG NON PERSONIL (BLNP)
II.1 OPERASIONAL KANTOR
II.2 BIAYA KENDARAAN
II.3 BIAYA TRANSPORTASI
II.4 BIAYA SURVEY TOPOGRAFI
II.5 BIAYA SURVEY DCP
II.6 BIAYA PEMAPARAN
II.7 BIAYA PELAPORAN
TOTAL ( II )
TOTAL BIAYA ( I + II )
PPN SEBESAR 10%
TOTAL BIAYA TERMASUK PPN 10%
DIBULATKAN
TERBILANG : ## ................................................................. ##
ASI RENCANA ANGGARAN BIAYA
JUMLAH BIAYA
Rp. 142,500,000.00
Rp. 75,000,000.00
Rp. 40,000,000.00
Rp. 257,500,000.00
Rp. 22,500,000.00
Rp. 4,800,000.00
Rp. 5,500,000.00
Rp. 35,400,000.00
Rp. 102,000,000.00
Rp. 24,000,000.00
Rp. 6,817,500.00
Rp. 201,017,500.00
Rp. 458,517,500.00
Rp. 45,851,750.00
Rp. 504,369,250.00
Rp. 504,300,000.00
## ................................................................. ##