Summary RUPTL 2017-2026 :
Rencana Pengembangan Pembangkit dan Transmisi
Sumber : Permen No. 1415 K/20/MEM/2017 tanggal 29 Maret 2017
480
TWh
64
26 TWh
TWh
326 11,7% 234
TWh 10,8% TWh
SULAWESI
35 92 10,1%
INDONESIA TIMUR
TWh
TWh KALIMANTAN
174 12,1%
TWh MALUKU
11,2% 10,5%
PAPUA
SUMATERA
9,9%
2017 2026
NUSA TENGGARA
8,3%
7,2% INDONESIA
JAWA - BALI
Tahun 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Pertumbuhan Ekonomi (%) 5,10 5,50 6,10 6,50 6,48 6,46 6,44 6,42 6,40 6,35
Rasio Elektrifikasi (%) 93,41 95,89 97,32 98,80 99,53 99,81 99,98 100,0 100,0 100,0
4
5
16,000
Transmisi (kms)
14,000
12,000
10,000 70 kV
150 kV
8,000 250 kV DC
275 kV
6,000
500 kV DC
500 kV AC
4,000
2,000
-
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
40,000
70/20 kV
35,000
Gardu Induk (MVA) 150/20 kV
150/70 kV
250 kV DC
275/150 kV
30,000
500 kV DC
25,000
500/150 kV
500/275 kV
20,000
15,000
10,000
5,000
- 6
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
REGIONAL KALIMANTAN REGIONAL SULAWESI &
Pembangkit 6.9 GW NUSA TENGGARA REGIONAL MALUKU &
Transmisi 10.772 kms Pembangkit 8.6 GW PAPUA
REGIONAL SUMATERA
Pembangkit 21.0 GW
Transmisi 23.077 kms
Gardu Induk 45.620 MVA
TOTAL INDONESIA
2,003
7%
DMN BP CAD Mahakam
Sulbagut
Nias Bintan
Kalbar
782
115
465
Ternate
492
335
64% 68%
70
47%
38
36
57
384
343
DMN BP CAD
29
52
Barito
47
10%
1,361
SBST Ambon
1,028
DMN BP CAD
212
141
3% Sulbagsel
3,847
3,345
55
50%
57
15% DMN BP CAD 4%
1,417
DMN BP CAD Jayapura
1,267
DMN BP CAD
Jawa Bali 12%
73
DMN BP CAD
81
11%
DMN BP CAD
DMN BP CAD
33,228
25,051
88
75
233
16%
182
100
KONDISI SISTEM JUMLAH DMN BP CAD 49%
82%
DMN BP CAD DMN BP CAD
NORMAL 8 Sistem DMN BP CAD
SIAGA 10 Sitem
DEVISIT - 8
Sulbagut
Bintan Kalseltengtimra Ternate
Nias
165
Kalbar
2,814
927
90
1,678
519
83%
75
78
39
51
94% 79% 54%
69%
909
DMN BP CAD
525
DMN BP CAD
DMN BP CAD 73% DMN BP CAD
DMN BP CAD Sorong
SUMATERA DMN BP CAD
116
66
75%
11,676
Ambon
8,066
DMN BP CAD
BABEL
130
45% Sulbagsel
271
81
205
2,746
1,953
DMN BP CAD
DMN BP CAD
178
111
Jawa-Bali 41%
60%
DMN BP CAD DMN BP CAD
46,636
30,764
Lombok Sumbawa
194
KONDISI SISTEM JUMLAH
556
52%
Timor
322
58%
123
231
NORMAL 16 Sistem DMN BP CAD 73%
138
DMN BP CAD DMN BP CAD 67%
SIAGA - DMN BP CAD
DEVISIT -
EBT : 22.4%
GAS: 26.7%
12
13
Summary RUPTL 2017-2026 :
Strategi Pengembangan Energi Baru dan Terbarukan
Sumber : Permen No. 1415 K/20/MEM/2017 tanggal 29 Maret 2017
15
Total Indonesia
No Pembangkit - EBT Kapasitas Jumlah Potensi
1 PLTP MW - No Pembangkit - EBT Kapasitas Jumlah Potensi
2 PLTA MW 1,056 1,804 1 PLTP MW 6,290 -
3 PLTMH MW 10 2 PLTA MW 12,342 6,869
4 PLT Surya MWp - 12 3 PLTMH MW 1,694 752
5 PLT Bayu MW 150 4 PLT Surya MWp 57 315
6 PLT Biomass/Sampah MW 41 30 5 PLT Bayu MW 570 1,028
7 PLT Kelautan MW - 6 PLT Biomass/Sampah MW 597 175
8 PLT Bio-Fuel Ribu Kilo Liter 830 7 PLT Kelautan MW - 250
Jumlah MW 1,257 1,846 8 PLT Bio-Fuel Ribu Kilo Liter 6,572 -
Jumlah MW 21,549 9,389
No Pembangkit - EBT Kapasitas Jumlah Potensi
1 PLTP MW 3,305
2 PLTA MW 4,284 1,193
3 PLTMH MW 983 752
4 PLT Surya MWp 5 59
5 PLT Bayu MW - 200
6 PLT Biomass/Sampah MW 274 135
No Pembangkit - EBT Kapasitas Jumlah Potensi
7 PLT Kelautan MW -
1 PLTP MW 400
8 PLT Bio-Fuel Ribu Kilo Liter 411
2 PLTA MW 2,323 3,852
Jumlah MW 8,851 2,339
3 PLTMH MW 221
4 PLT Surya MWp 52 38
5 PLT Bayu MW 170 5 No Pembangkit - EBT Kapasitas Jumlah Potensi
No Pembangkit - EBT Kapasitas Jumlah Potensi
6 PLT Biomass/Sampah MW 21 10 1 PLTP MW 75
1 PLTP MW 2,510
7 PLT Kelautan MW - 250 2 PLTA MW 118 20
2 PLTA MW 4,562
3 PLTMH MW 437 8 PLT Bio-Fuel Ribu Kilo Liter 4,423 3 PLTMH MW 43
4 PLT Surya MWp - 200 Jumlah MW 3,186 4,155 4 PLT Surya MWp - 6
5 PLT Bayu MW 250 823 5 PLT Bayu MW -
6 PLT Biomass/Sampah MW 206 6 PLT Biomass/Sampah MW 55
7 PLT Kelautan MW - 7 PLT Kelautan MW -
8 PLT Bio-Fuel Ribu Kilo Liter 439 8 PLT Bio-Fuel Ribu Kilo Liter 469
Jumlah MW 7,965 1,023 Jumlah MW 290
11 26
Strategi PLN Mengejar Rasio Elektrifikasi 100%
RE (%) 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Jawa-Bali 95,85 97,98 98,63 99,45 99,69 99,84 100,0 100,0 100,0 100,0
Sumatera 93,51 95,88 97,77 99,40 99,99 100,00 100,0 100,0 100,0 100,0
Kalimantan 88,89 91,65 94,44 97,35 99,74 99,88 100,0 100,0 100,0 100,0
Sulawesi 90,52 93,63 96,36 98,86 99,70 99,75 99,80 100,0 100,0 100,0
Nusa Tenggara 75,44 80,90 86,17 91,38 95,43 98,14 99,93 100,0 100,0 100,0
Maluku 91,23 93,26 94,87 98,06 100,00 100,00 100,0 100,0 100,0 100,0
Papua 66,93 74,32 81,49 88,50 95,13 99,93 100,0 100,0 100,0 100,0
18
1
20
No. Provinsi 2017 2018 2019 No. Provinsi 2017 2018 2019
1 ACEH 21 7 4 17 JATIM 86 69 71
2 SUMUT 212 153 147 18 BALI 162 71 71
3 SUMBAR 82 65 12 19 KALBAR 39 78 62
4 RIAU 89 89 85 20 KALSEL 48 33 10
5 KEPRI 28 39 35 21 KALTENG 49 49 61
6 JAMBI 50 41 37 22 KALTIM & KALTARA 73 163 166
7 SUMSEL 103 27 17 23 NTB 64 34 34
8 BENGKULU 15 16 7 24 NTT 528 570 0
9 BABEL 20 16 18 24 PAPUA 221 831 1313
10 LAMPUNG 26 38 34 24 PAPUA BARAT 132 162 71
11 SULSEL 87 87 87 25 SULUT 4 26 0
12 SULTRA 35 35 35 26 SULTENG 76 280 0
13 SULBAR 25 25 25 27 GORONTALO 18 0 0
14 BANTEN 213 180 177 28 MALUKU 186 108 42
15 JABAR 242 137 101 29 MALUKU UTARA 124 70 58
16 JATENG & DIY 516 399 361 TOTAL 3574 3898 3141
KI Dumai
KEK Sei Mangkei dan K.Tanjung Pasokan Daya
- GI 150 kV Dumai (Kap Pasokan s/d 30
Pasokan Daya
MW) Eksisting KI Bintan Industrial Estate
- GI 150 kV Perdagangan (Kap
- GI 150 kV KID (Kap Pasokan s/d 120 Pasokan Daya
Pasokan s/d 140 MW) COD
MW) COD 2017 - GI 150 kV Tanjung Uban (Kap
2016
- GITET 275 kV Pasokan s/d 60 MW) - Eksisting
Perdagangan/K.Tanjung (Kap
Pasokan s/d 550 MW) COD KI Buton
2022
Pasokan Daya
- GI 150 kV Siak Sri Inderapura (Kap
Pasokan s/d 30 MW) COD 2017
KI Maritim Tanggamus
Rencana Pasokan
- GI 150 kV Kota Agung (Kap Pasokan KI Suge Industrial Area
s/d 30 MW) - Eksiting
Pasokan Daya
- GI 150 kV KI Tanggamus (Kap.
- PLTU Belitung #1&2 2x16.5 MW,
Pasokan s/d 120 MW) COD 2019
Pasokan daya s/d 12 MW) #1
Eksisting, #1 COD 2016.
- MPP Belitung 25 MW, Pasokan
daya s/d 20 MW) COD 2016
25
Sekilas Pengembangan Regional JBB Propinsi Banten
RUPTL 2017-2026
1
2
3 9
8
Pembangkit Besar
1. PLTU Banten 1x600 MW 2017
2. PLTU Jawa-7 2x1000 MW 2019 4
3. PLTU Jawa-9 1x1000 MW 2022
5
Industri Tangerang (1040 MW) 4. GITET Cikupa 2x500 MVA 2019
Kawasan Tangerang Selatan (763 MW) 5. GITET Lengkong 2x500 MVA 2018
Industri di Cikande (115 MW) 6. Jawa Bali-3 500 MW 2019
7
KEK Tanjung Lesung (100 MVA) 6 7. GI Tanjung Lesung 2019
Bandara Soekarno Hatta (136* MVA) 8. GI Bandara Soetta 2017
9. PLTU Lontar #4 1x315 MW 2019
26
26
Sekilas Pengembangan Regional JBB Propinsi DKI Jakarta
RUPTL 2017-2026
2 4
3
5 6
Perkuatan Pasokan di Jakarta Bagian Barat (Industri, Komersial Kawasan PIK)
1. GITET Durikosambi 2x500 MVA 2017
2. GITET Muara Karang 2x500 MVA 2018
3. PLTGU Muara Karang Peaker 500 MW 2018
1
Perkuatan Pasokan di Jakarta Bagian Timur (Industri Pulo Gadung dan Marunda)
4. IBT di GITET Muara Tawar 2x500 MVA 2018
5. GITET Priok 2x500 MVA 2019
6. PLTGU Jawa-2 1x800 MW 2019
8 9
Perkuatan Pasokan di Jakarta Pusat (Komersial (SCBD) & Residensial (Apartemen)
7. GITET Cawang II 2x500 MVA 2020
7
Keandalan Pasokan Listrik PT MRT
8. Pasokan dari GI CSW dan GI Pondok Indah
9. PLTMG Senayan 1x100 MW 2019
3
4
1 Pasokan di Kawasan Industri (1256 MVA)
5 Bekasi, Tambun, Cikarang, Karawang & sekitarnya
2 1. GITET Tambun 2x500 MVA 2017
2. GITET Cibatu Baru / Deltamas 2x500 MW 2017
6 3. GITET Cibatu Baru II / Sukatani 2x500 MW 2019
4. Peaker Jawa Bali 4 450 MW 2019
9
7
Pasokan Kereta Cepat Jakarta Bandung (232.5 MVA)
5. Stasiun Halim & Traction Halim GI Halim (GIS) 2018
6. Stasiun Karawang & Traction Karawang GI Karawang (GIS) 2018
7. Stasiun Walini & Traction Walini GI Padalarang Baru II (GIS) 2018
8. Stasiun Gedebage, Traction Gedebage & Bengkel GI Gedebage (GIS) 2018
8
Pasokan ke Bandara Majalengka (115 MW)
9. GI Kertajati 2019
28
28
Sekilas Pengembangan Regional JBT Propinsi Jawa Tengah & DIY
RUPTL 2017-2026
2
Pembangkit Besar & Perkuatan Backbone 500 kV (Central West Java Project)
1. PLTU Jawa Tengah 2x950 2019
2. PLTU Jawa-4 2x1000 MW 2019
1
3 6
Perkuatan Pasokan ke Pantura (416 MW) 3. GITET Pemalang 2x500 MVA 2018
Perkuatan Pasokan ke Boyolali (502 MW) 4. GITET Ampel 2x500 MVA 2019
Kereta Api Solo Yogyakarta (50 MVA) 5. GI Trunuh 2017
Pasokan ke Semarang 4
6. Peaker Jawa Bali 1 700 MW 2019
5
7
Pasokan ke Bandara Kulonprogo (30 MVA)
7. GI Wates
29
29
Sekilas Pengembangan Regional JBTB Propinsi Jawa Timur & Bali
RUPTL 2017-2026
5
4 3
2
Pasokan ke Surabaya (834MVA) 1
1. GITET Surabaya Selatan 2x500 MVA 2019 (Kawasan Industri Rungkut)
2. GITET Waru 2x500 MVA 2019
KI KETAPANG KI BATULICIN
Pasokan Daya
- GI 150 kV Ketapang (2018) KI JORONG Pasokan Daya
- MPP Kalbar 100 MW (Eksisting) Pasokan Daya - GI 150 kV Satui (2017), GI 150 kV
- PLTU Ketapang 2x10 MW (2017) - GI 150 kV Asam-Asam (Eksisting) Batulicin (Eksisting)
- PLTU Kalbar-1 2x100 MW (2019) - PLTU Kalselteng-2 2x100 MW (2019) - PLTU Kalselteng-2 2x100 MW (2019)
- PLTG Kalbar 100 MW (2019) - PLTU Kalsel (FTP2) 2x100 (2018) - PLTU Kalsel (FTP2) 2x100 MW (2019)
Perkuatan Sistem Kalbar: Perkuatan Sistem Kalsel: Perkuatan Sistem Kalsel:
-PLTU Kalbar-2 2x100 MW (2021) -PLTGU Kalsel 200 MW (2019) -PLTGU Kalsel 200 MW (2019) 31
KEK+KI PALU
Pasokan Daya :
- GI 150 kV Tawaeli (2018)
- PLTU Palu 3 2x50 MW (2019)
- MPP Sulteng 60 MW (2018)
Perkuatan Sistem Sulteng :
-PLTA Poso 1 2x35 MW (2019)
-PLTGU Luwuk 150 MW (2020) KEK+KI BITUNG
Pasokan Daya :
- GI 150 kV Kema, GI 150 kV Bitung
Baru
- PLTU Sulut 3 2x50 MW (2020)
- PLTG/MG Minahasa 150 MW
Perkuatan Sistem Sulut :
-PLTU Sulut 1 2x50 MW (2019)
KI BANTAENG
Pasokan Daya
- GI 150 kV Bantaeng (Smelter) (2017) KI MOROWALI
- PLTU Punagaya (2x100 MW)
(2017/18) Pasokan Daya :
- PLTU Jeneponto-2 2x125 (2018) - GI 150 kV Kolonedale, GI 150
- PLTU Sulsel-2 2x200 (2020) kV Bungku
Perkuatan Sistem Sulselbar: - GITET 275 kV Bungku
-PLTGU Makassar 450 MW (2019)
-PLTU Sulsel Barru 2 1x100 MW
(2019)
KI KONAWE
Pasokan Daya :
- GI 150 kV Unaaha (2017)
- PLTU Kendari 3 2x50 MW (2019)
- MPP Kendari 50 MW (2018)
Perkuatan Sistem Sultra :
KEK MANDALIKA -T/L 150 kV Wotu-Malili-Lasusua-
Kolaka-Unaaha-Kendari
Pasokan Daya : (Interkoneksi Sulsebar-Sultra)
- GI 150 kV Kuta
- PLTU Lombok Timur 2x25 MW (2017)
- PLTU Lombok (FTP2) 2x50 MW (2019)
- PLTU Lombok-2 2x50 MW (2020)
- PLTGU Lombok 150 MW (2018/19)
32
KI BULI
Pasokan Daya :
- GI 150 kV Maba (2019)
- PLTMG Maba 10 MW (2019)
- PLTMG Halmahera-1 60 MW
(2020)
- PLTMG Halmahera-2 40 MW
(2021)
KEK MOROTAI
Pasokan Daya :
- PLTMG Morotai 10 MW
(Tahap Awal)
33
Summary Realisasi Biaya Bahan Bakar dan
Harga Produksi Per kWh
35
36
Bentuk Kerjasama dengan Pihak Swasta sesuai
Peraturan Pemerintan
13
TERIMA KASIH