0.794%
B REAKTOR BIOGAS
1 HDPE Geomembrane 1 lot lumpsum 7.423% 10 13-Jun-16 1-Sep-16 0.74% 0.74% 0.74% 0.74% 0.74% 0.74% 0.74% 0.74% 0.74% 0.74%
2 Perpipaan Internal Reaktor 1 lot lumpsum 0.845% 2 22-Jul-16 21-Aug-16 0.42% 0.42%
8.267%
C PERALATAN MEKANIKAL PLT BIOGAS
1 Unit Penanganan POME (Penerimaan,
Pendinginan, Pengumpanan, Pembuangan)
- POME Feed Pump Pompa Sentrifugal, 25 m3/jam, head 20 m, semi 2 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.350% 2 20-Jul-16 5-Aug-16 0.18% 0.18%
- Reactor Feed Pump Pompa Sentrifugal, 50 m3/jam, head 20 m, semi 2 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.355% 2 20-Jul-16 5-Aug-16 0.18% 0.18%
- Recirculation Pump Pompa Sentrifugal, 80 m3/jam, head 20 m, semi 4 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.766% 2 26-Jul-16 11-Aug-16 0.38% 0.38%
- Sludge Pump Pompa Sentrifugal, 50 m3/jam, head 20 m, semi 1 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.146% 2 26-Jul-16 11-Aug-16 0.07% 0.07%
- Treated POME Pump Pompa Sentrifugal, 25 m3/jam, head 20 m, semi 2 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.297% 2 26-Jul-16 11-Aug-16 0.15% 0.15%
- Tangki Weir Effluent Tangki Vertikal , HxD 3m x 20in, material CS - coated 1 Unit satuan 0.707% 2 26-Jul-16 11-Aug-16 0.35% 0.35%
- Rain water Pump Pompa Submersible portable dewatering, 20 m3/jam, 2 Unit
head 15 m satuan 0.076% 3 29-Aug-16 17-Aug-16 0.03% 0.03% 0.03%
2 Unit Penanganan dan Pemurnian Biogas
- Biogas Blower Roots Blower, 600 Nm3/jam, 200 mbarg 2 Unit satuan 1.563% 5 6-Aug-16 9-Sep-16 0.31% 0.31% 0.31% 0.31% 0.31%
- Biogas Scrubber System 1 lot lumpsum 3.366% 5 6-Aug-16 9-Sep-16 0.67% 0.67% 0.67% 0.67% 0.67%
- Biogas Dehumidifier Shell-and-tube Heat Exchanger, 600 Nm3/jam, RH < 1 Unit
80%, SS satuan 0.639% 5 6-Aug-16 9-Sep-16 0.13% 0.13% 0.13% 0.13% 0.13%
- Knockout Drum - Demister Tangki Vertikal, SS 1 Unit satuan 0.140% 5 6-Aug-16 9-Sep-16 0.03% 0.03% 0.03% 0.03% 0.03%
- Biogas Chiller Cooling Duty min. 4 kW, dengan Refrigeran 1 Unit satuan 0.855% 5 6-Aug-16 9-Sep-16 0.17% 0.17% 0.17% 0.17% 0.17%
- Biogas Filter Tangki SS, Cloth Filter, 10 mikron 2 Unit satuan 0.372% 5 6-Aug-16 9-Sep-16 0.07% 0.07% 0.07% 0.07% 0.07%
- Biogas Holder Tangki Horizontal, 1500 L, SS 1 Unit satuan 0.468% 5 6-Aug-16 9-Sep-16 0.09% 0.09% 0.09% 0.09% 0.09%
- Biogas Flare System 1 lot lumpsum 1.780% 5 6-Aug-16 9-Sep-16 0.36% 0.36% 0.36% 0.36% 0.36%
3 Gas Engine Generator System Gas Engine Generator System (1,2 MW, 400 V, 50 Hz, 1 Unit
efesiensi electrical ≥ 39,4%, containerized, accessories,
instalasi, logistics) satuan 27.358% 6 27-Aug-16 12-Oct-16 4.56% 4.56% 4.56% 4.56% 4.56% 4.56%
4 Unit Penyediaan Air Sumur 1 lot lumpsum 0.036% 3 17-May-16 8-Jun-16 0.01% 0.01% 0.01%
- Water Tank Water Storage Tank, 1000 L, material PE 17-May-16 8-Jun-16
- Water Pump Pompa Sentrifugal, 1 m3/jam, head 20 m 17-May-16 8-Jun-16
39.276%
1 Kabel dari outgoing trafo set up ke JTM PLN 1 lot lumpsum 2.211% 8 8-Nov-16 29-Dec-16 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28%
2 Kajian Interkoneksi ke JTM PLN 1 lot lumpsum 0.774% 8 8-Nov-16 29-Dec-16 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%
2.984%
• SUB TOTAL 200.000%
• PPN 10%
• TOTAL
0.00% 0.09% 0.09% 0.09% 0.09% 0.42% 1.13% 1.67% 1.67% 1.67% 1.60% 2.01% 2.01% 2.01% 0.00% 0.00% 1.74% 2.09% 2.63% 5.47% 4.70% 4.70% 8.74% 7.49% 5.90% 5.81% 5.81% 5.81% 2.01% 2.88% 2.88% 2.66% 2.59% 2.32% 2.40% 2.57% 1.22% 1.01% 1.01% 1.01%
0.00% 0.09% 0.17% 0.26% 0.35% 0.77% 1.89% 3.56% 5.23% 6.89% 8.50% 10.51% 12.52% 14.52% 14.52% 14.52% 16.26% 18.36% 20.99% 26.45% 31.15% 35.85% 44.59% 52.08% 57.99% 63.80% 69.61% 75.42% 77.43% 80.31% 83.19% 85.85% 88.45% 90.77% 93.17% 95.74% 96.96% 97.97% 98.99% 100.00%
PEMBANGUNAN PLT BIOGAS BERBASIS LIMBAH CAIR SAWIT (POME) TERMASUK
JARINGAN
DI PASER, KALIMANTAN TIMUR
TAHUN ANGGARAN 2016
0.730%
B REAKTOR BIOGAS
1 HDPE Geomembrane 1 lot lumpsum 7.058% 10 13-Jun-16 1-Sep-16 0.71% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71%
2 Perpipaan Internal Reaktor 1 lot lumpsum 0.781% 2 22-Jul-16 21-Aug-16 0.39% 0.39%
7.839%
C PERALATAN MEKANIKAL PLT BIOGAS
1 Unit Penanganan POME (Penerimaan,
Pendinginan, Pengumpanan, Pembuangan)
- POME Feed Pump Pompa Sentrifugal, 25 m3/jam, head 20 m, semi 2 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.346% 2 20-Jul-16 5-Aug-16 0.17% 0.17%
- Reactor Feed Pump Pompa Sentrifugal, 50 m3/jam, head 20 m, semi 2 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.350% 2 20-Jul-16 5-Aug-16 0.18% 0.18%
- Recirculation Pump Pompa Sentrifugal, 80 m3/jam, head 20 m, semi 4 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.757% 2 26-Jul-16 11-Aug-16 0.38% 0.38%
- Sludge Pump Pompa Sentrifugal, 50 m3/jam, head 20 m, semi 1 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.144% 2 26-Jul-16 11-Aug-16 0.07% 0.07%
- Treated POME Pump Pompa Sentrifugal, 25 m3/jam, head 20 m, semi 2 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.293% 2 26-Jul-16 11-Aug-16 0.15% 0.15%
- Tangki Weir Effluent Tangki Vertikal , HxD 3m x 20in, material CS - coated 1 Unit satuan 0.675% 2 26-Jul-16 11-Aug-16 0.34% 0.34%
- Rain water Pump Pompa Submersible portable dewatering, 20 m3/jam, 2 Unit
head 15 m satuan 0.075% 3 29-Aug-16 17-Aug-16 0.03% 0.03% 0.03%
2 Unit Penanganan dan Pemurnian Biogas
- Biogas Blower Roots Blower, 600 Nm3/jam, 200 mbarg 2 Unit satuan 1.482% 5 6-Aug-16 9-Sep-16 0.30% 0.30% 0.30% 0.30% 0.30%
- Biogas Scrubber System 1 lot lumpsum 3.169% 5 6-Aug-16 9-Sep-16 0.63% 0.63% 0.63% 0.63% 0.63%
- Biogas Dehumidifier Shell-and-tube Heat Exchanger, 600 Nm3/jam, RH < 1 Unit
80%, SS satuan 0.703% 5 6-Aug-16 9-Sep-16 0.14% 0.14% 0.14% 0.14% 0.14%
- Knockout Drum - Demister Tangki Vertikal, SS 1 Unit satuan 0.135% 5 6-Aug-16 9-Sep-16 0.03% 0.03% 0.03% 0.03% 0.03%
- Biogas Chiller Cooling Duty min. 4 kW, dengan Refrigeran 1 Unit satuan 0.801% 5 6-Aug-16 9-Sep-16 0.16% 0.16% 0.16% 0.16% 0.16%
- Biogas Filter Tangki SS, Cloth Filter, 10 mikron 2 Unit satuan 0.346% 5 6-Aug-16 9-Sep-16 0.07% 0.07% 0.07% 0.07% 0.07%
- Biogas Holder Tangki Horizontal, 1500 L, SS 1 Unit satuan 0.432% 5 6-Aug-16 9-Sep-16 0.09% 0.09% 0.09% 0.09% 0.09%
- Biogas Flare System 1 lot lumpsum 1.646% 5 6-Aug-16 9-Sep-16 0.33% 0.33% 0.33% 0.33% 0.33%
3 Gas Engine Generator System Gas Engine Generator System (1,2 MW, 400 V, 50 Hz, 1 Unit
efesiensi electrical ≥ 39,4%, containerized, accessories,
instalasi, logistics) satuan 27.714% 6 27-Aug-16 12-Oct-16 4.62% 4.62% 4.62% 4.62% 4.62% 4.62%
4 Unit Penyediaan Air Sumur 1 lot lumpsum 0.036% 3 17-May-16 8-Jun-16 0.01% 0.01% 0.01%
39.103%
D PEKERJAAN KONSTRUKSI SIPIL
1 Pekerjaan Persiapan 1 lot lumpsum 2.013% 6 2-May-16 16-May-16
G PEKERJAAN INSTRUMENTASI
1 Panel Kendali dan Monitoring 1 unit satuan 2.056% 4 8-Nov-16 30-Nov-16 0.51% 0.51% 0.51% 0.51%
2 Peralatan Instrumentasi Lapangan + Asesoris 1 lot
Pemasangan lumpsum 4.433% 4 1-Nov-16 23-Nov-16 1.11% 1.11% 1.11% 1.11%
3 Kabel Instrumentasi dan Kontrol 1 lot lumpsum 0.358% 4 8-Nov-16 30-Nov-16 0.09% 0.09% 0.09% 0.09%
6.848%
H PEKERJAAN COMMISSIONING
1 termasuk Uji Identifikasi Bakteri 1 lot
Pekerjaan Pembibitan Lumpur Aktif untuk Reaktor
lumpsum 1.196% 10 2-Sep-16 28-Nov-16 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
2 Spare Parts dan Alat Kerja untuk 6 bulan operasi 1 lot lumpsum 0.241% 4 1-Dec-16 17-Dec-16 0.06% 0.06% 0.06% 0.06%
3 Peralatan Laboratorium 1 lot lumpsum 0.564% 4 29-Nov-16 15-Dec-16 0.14% 0.14% 0.14% 0.14%
4 Pengujian Sistem dan Operasional hingga 100% 1 ls
Kapasitas lumpsum 1.011% 5 29-Nov-16 30-Dec-16 0.002 0.002 0.002 0.20% 0.20%
5 1 ls
Commissioning Gas Engine dan Uji Dummy Load
sesuai beban maksimum gas engine lumpsum 0.421% 5 29-Nov-16 30-Dec-16 0.001 0.001 0.001 0.08% 0.08%
6 Paket Training Operator 1 hari classroom, 1 minggu di lapangan 1 ls lumpsum 0.169% 4 29-Nov-16 30-Dec-16 0.000 0.000 0.04% 0.04%
7 1 ls
Uji dan Sertifikat Laik Operasi Pembangkit
lumpsum 0.632% 4 29-Nov-16 30-Dec-16 0.002 0.002 0.16% 0.16%
4.235%
I DOKUMEN PROYEK
1 As built drawing 1 ls lumpsum 0.728% 6 8-Nov-16 29-Dec-16 0.12% 0.12% 0.12% 0.12% 0.12% 0.12%
2 1 ls
Menyusun SOP Pengoperasian dan Pemeliharaan
lumpsum 0.144% 6 8-Nov-16 29-Dec-16 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
0.871%
J JARINGAN LISTRIK
(optional apabila tidak dianggarkan Pemda)
1 Kabel dari outgoing trafo set up ke JTM PLN 1 lot lumpsum 2.342% 8 8-Nov-16 29-Dec-16 0.29% 0.29% 0.29% 0.29% 0.29% 0.29% 0.29% 0.29%
2 Kajian Interkoneksi ke JTM PLN 1 lot lumpsum 0.771% 8 8-Nov-16 29-Dec-16 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%
3.113%
• SUB TOTAL 200.000%
• PPN 10%
• TOTAL
0.00% 0.08% 0.08% 0.08% 0.08% 0.42% 1.08% 1.58% 1.58% 1.58% 1.52% 1.89% 1.89% 1.89% 0.00% 0.00% 1.64% 1.99% 2.53% 5.21% 4.46% 4.46% 8.61% 7.40% 5.99% 5.89% 5.89% 5.89% 2.09% 3.16% 3.16% 2.96% 2.83% 2.49% 2.57% 2.73% 1.22% 1.02% 1.02% 1.02%
0.00% 0.08% 0.16% 0.24% 0.32% 0.74% 1.81% 3.40% 4.98% 6.57% 8.08% 9.97% 11.86% 13.75% 13.75% 13.75% 15.39% 17.38% 19.91% 25.12% 29.58% 34.04% 42.65% 50.05% 56.03% 61.93% 67.82% 73.72% 75.81% 78.97% 82.13% 85.09% 87.92% 90.41% 92.98% 95.71% 96.94% 97.96% 98.98% 100.00%
PEMBANGUNAN PLT BIOGAS BERBASIS LIMBAH CAIR SAWIT (POME) TERMASUK JARINGAN
DI MERANGIN, JAMBI
TAHUN ANGGARAN 2016
A PEKERJAAN PENDAHULUAN
1 Pekerjaan Pengukuran dan Survey Lokasi (Pembuatan Untuk luas lahan 20.000 m2 1 ls
Peta Topografi)
2 Pekerjaan Soil Test Mob-demob personil dan equipment 1 ls
Soil boring and sampling min. 10 m depth, 3 titik
SPT Test, interval 3 m
Lab Test and Report : soil profile, weight/volume of soil
and water content, Atterberg limit, specific gravity, grain
size analysis, strength test (direct shear/triaxial UU), slope
stability and recommendation, permeability, water table
3 Pekerjaan Feedstock Investigation, min. 2 titik selama 5 Data harian pabrik: TBS Olah, rasio POME/TBS jika ada, 1 ls
hari (1 titik = 1 sampel) waktu operasi.
Pengukuran di lapangan: pH, temperatur
Pengukuran dan uji lab: COD, TSS, FOG, Alkalinitas
B REAKTOR BIOGAS
1 HDPE Geomembrane 1 lot
2 Perpipaan Internal Reaktor 1 lot
E PEKERJAAN PERPIPAAN
1 Perpipaan
- Pipa HDPE 1/2", PN 6,3 PE 100 1 lot
- Pipa SS 1/2", SUS304, seamless, sch. 10S 1 lot
- Pipa PVC 1/2", tipe AW 1 lot
- Tee Equal 3", HDPE 1 lot
- Tee Reducer 3"x2", HDPE 1 lot
- Reducer 3"x2", HDPE 1 lot
- Elbow 3", HDPE 1 lot
- Stub End 2", HDPE 1 lot
- Flange 3", SS 1 lot
- Clamp Saddle 3", HDPE 1 lot
- Stud Bolt, Nut and Washer 0.6", SS 1 lot
3 Valve
- Butterfly Valve 3", Flanged Valve End Connections, SS full 1 lot
- Check Valve 3", Wafer, Socket Weld Valve End Connections, SS full 1 lot
- Gate Valve 2", LUG Valve End Connections 1 lot
- Control Valve 6", on-off valve, electric type 1 lot
F PEKERJAAN ELECTRICAL
1 Pekerjaan Panel Listrik 1 lot
2 Pekerjaan Instalasi Kabel
- Kabel Power 0.6/1 kV Cu/XLPE/SWA/PVC, NYY 1 lot
3 Pekerjaan Instalasi Grounding 1 lot
4 Pekerjaan Penangkal Petir Electrostatic, monopole 15m, radius proteksi 125 m 1 unit
5 Pekerjaan Penerangan 1 lot
6 Pekerjaan Koneksi Power ke Tegangan Menengah (di luar
JTM dan penyambungan ke JTM)
- Trafo step-up 1600 kVA step-up 400 V/20 kV, 50 Hz, indoor, oil- 1 unit
immersed with OLTC
G PEKERJAAN INSTRUMENTASI
1 Panel Kendali dan Monitoring 1 unit
2 Peralatan Instrumentasi Lapangan + Asesoris 1 lot
Pemasangan
3 Kabel Instrumentasi dan Kontrol 1 lot
H PEKERJAAN COMMISSIONING
1 termasuk Uji Identifikasi Bakteri 1 lot
Pekerjaan Pembibitan Lumpur Aktif untuk Reaktor
I DOKUMEN PROYEK
1 As built drawing 1 ls
2 Menyusun SOP Pengoperasian dan Pemeliharaan 1 ls
J JARINGAN LISTRIK
(optional apabila tidak dianggarkan Pemda)
1 Kabel dari outgoing trafo set up ke JTM PLN 1 lot
2 Kajian Interkoneksi ke JTM PLN 1 lot
• SUB TOTAL
• PPN 10%
• TOTAL
PEMBANGUNAN PLT BIOGAS BERBASIS LIMBAH CAIR SAWIT (POME) TERMASUK
JARINGAN
DI TANAH LAUT, KALSEL
TAHUN ANGGARAN 2016
No Peker jaan Spesifikasi Jumlah Satuan Keterangan Bobot Pekerjaan Durasi Date
(%) Pekerjaan Apr - 16 May- 16 Jun- 16 Jul- 16 Aug- 16 Sep- 16 Oct- 16 Nov- 16 Dec- 16
0.803%
B R EAKT OR BIOGAS
1 HDPE Geomembrane 1 lot lumpsum 5.677% 10 13-Jun-16 1-Sep-16 0.57% 0.57% 0.57% 0.57% 0.57% 0.57% 0.57% 0.57% 0.57% 0.57%
2 Perpipaan Internal Reaktor 1 lot lumpsum 0.857% 2 22-Jul-16 21-Aug-16 0.43% 0.43%
6.534%
C PER ALAT AN MEKANIKAL PLT BIOGAS
1 Unit Penanganan POME (Penerimaan,
Pendinginan, Pengumpanan, Pembuangan)
- POME Feed Pump Pompa Sentrifugal, 25 m3/jam, head 20 m, semi 2 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.365% 2 20-Jul-16 5-Aug-16 0.18% 0.18%
- Reactor Feed Pump Pompa Sentrifugal, 50 m3/jam, head 20 m, semi 2 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.370% 2 20-Jul-16 5-Aug-16 0.18% 0.18%
- Recirculation Pump Pompa Sentrifugal, 80 m3/jam, head 20 m, semi 4 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.799% 2 26-Jul-16 11-Aug-16 0.40% 0.40%
- Sludge Pump Pompa Sentrifugal, 50 m3/jam, head 20 m, semi 1 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.161% 2 26-Jul-16 11-Aug-16 0.08% 0.08%
- Treated POME Pump Pompa Sentrifugal, 25 m3/jam, head 20 m, semi 2 Unit
open/fully open impeller, impeller SS 304, shaft SS 304
cw v-belt, cover, base plate, electric motor IP55 min.
satuan 0.319% 2 26-Jul-16 11-Aug-16 0.16% 0.16%
- Tangki Weir Effluent Tangki Vertikal , HxD 3m x 20in, material CS - coated 1 Unit satuan 0.738% 2 26-Jul-16 11-Aug-16 0.37% 0.37%
- Rain water Pump Pompa Submersible portable dewatering, 20 m3/jam, 2 Unit
head 15 m satuan 0.078% 3 29-Aug-16 17-Aug-16 0.03% 0.03% 0.03%
2 Unit Penanganan dan Pemurnian Biogas
- Biogas Blower Roots Blower, 600 Nm3/jam, 200 mbarg 2 Unit satuan 1.600% 5 6-Aug-16 9-Sep-16 0.32% 0.32% 0.32% 0.32% 0.32%
- Biogas Scrubber System 1 lot lumpsum 3.371% 5 6-Aug-16 9-Sep-16 0.67% 0.67% 0.67% 0.67% 0.67%
- Biogas Dehumidifier Shell-and-tube Heat Exchanger, 600 Nm3/jam, RH < 1 Unit
80%, SS satuan 0.728% 5 6-Aug-16 9-Sep-16 0.15% 0.15% 0.15% 0.15% 0.15%
- Knockout Drum - Demister Tangki Vertikal, SS 1 Unit satuan 0.073% 5 6-Aug-16 9-Sep-16 0.01% 0.01% 0.01% 0.01% 0.01%
- Biogas Chiller Cooling Duty min. 4 kW, dengan Refrigeran 1 Unit satuan 0.750% 5 6-Aug-16 9-Sep-16 0.15% 0.15% 0.15% 0.15% 0.15%
- Biogas Filter Tangki SS, Cloth Filter, 10 mikron 2 Unit satuan 0.236% 5 6-Aug-16 9-Sep-16 0.05% 0.05% 0.05% 0.05% 0.05%
- Biogas Holder Tangki Horizontal, 1500 L, SS 1 Unit satuan 0.389% 5 6-Aug-16 9-Sep-16 0.08% 0.08% 0.08% 0.08% 0.08%
- Biogas Flare System 1 lot lumpsum 1.617% 5 6-Aug-16 9-Sep-16 0.32% 0.32% 0.32% 0.32% 0.32%
3 Gas Engine Generator System Gas Engine Generator System (1,2 MW, 400 V, 50 Hz, 1 Unit
efesiensi electrical ≥ 39,4%, containerized, accessories,
instalasi, logistics) satuan 28.719% 6 27-Aug-16 12-Oct-16 4.79% 4.79% 4.79% 4.79% 4.79% 4.79%
4 Unit Penyediaan Air Sumur 1 lot lumpsum 0.037% 3 17-May-16 8-Jun-16 0.01% 0.01% 0.01%
40.350%
D PEKER JAAN KONST RUKSI SIPIL