Anda di halaman 1dari 73

PALU, 15 NOVEMBER 2017

BALAI PELAKSANAAN JALAN NASIONAL XIV PALU


DIREKTORAT JENDERAL BINA MARGA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
1
OUTLINE

UMUM

BPJN XIV PALU


• UMUM DAN LINGKUP BPJN XIV PALU
• KONDISI JALAN DAN JEMBATAN AKHIR TAHUN 2016
• POHON ANGGARAN TA 2016 S.D. 2018
• PAKET-PAKET TA 2016 DAN TA 2017

PAKET-PAKET STRATEGIS

2
UMUM

3
UNDANG-UNDANG DAN
PERATURAN BIDANG JALAN

UU NO. 38/2004
Tentang Jalan

PP No. 34/2006 PP No. 15/2005


Tentang Jalan Tentang Jalan Tol

PP No. 44/2009
Tentang Perubahan Atas
PP No. 15/2005 Tentang Jalan Tol

PP No. 43/2013
Tentang Perubahan Kedua Atas
PP No. 15/2005 Tentang Jalan Tol
4
PERATURAN MENTERI PU BIDANG JALAN

PP NO. 34/2006 TENTANG JALAN

Permen PU Permen PU Permen PU


No. 11/PRT/M/2010 No. 20/PRT/M/2010 Pedoman & NO. 11/PRT/M/2011
Tata Cara & Persyaratan Laik Pemanfaatan Bagian-Bagian PedomanPenyelenggaraan Jalan
Fungsi Jalan. Jalan. Khusus

Permen PU Permen PU Permen PU


No. 13/PRT/M/2011 Tata Cara No. 18/PRT/M/2011 No. 19/PRT/M/2011 Persyaratan
Pemeliharaan Dan Penilikan Pedoman Teknis Sistem Teknis Jalan Dan Kriteria
Jalan Pengelolaan Database Jalan. Perencanaan Teknis Jalan

Permen PU Permen PU Permen PU


No. 01/PRT/M/2012 Pedoman No. 02/PRT/M/2012 Pedoman No. 03/PRT/M/2012 TENTANG
Peran Masyarakat Dalam Rencana Umum Jaringan Jalan. Pedoman Penetapan Fungsi
Penyelenggaraan Jalan Jalan Dan Status Jalan.

Permen PU Permen PU Permen PU


No. 04/PRT/M/2012 Tata Cara No. 05/PRT/M/2012 Pedoman No. 07/PRT/M/2012
Pengawasan Jalan Penanaman Pohon Pada Sistem Penyelenggaraan Pengkajian,
Jaringan Jalan. Penelitian & Pengembangan Di
Bid Jln.

5
SISTEM JARINGAN JALAN
UU No. 38 Tahun 2004 tentang Jalan

• SISTEM PRIMER
Merupakan sistem jaringan jalan dengan (Sistem Jaringan Jalan Primer adalah sistem jaringan
peranan pelayanan distribusi barang dan jalan bersifat menerus yang memberikan pelayanan
jasa untuk pengembangan semua wilayah lalu lintas tidak terputus walaupun masuk ke dalam
di tingkat nasional, dengan kawasan perkotaan)
menghubungkan semua simpul jasa
distribusi yang berwujud pusat pusat
kegiatan.
(Yang dimaksud dengan kawasan perkotaan adalah
• SISTEM SEKUNDER kawasan yang mempunyai kegiatan utama bukan
Merupakan sistem jaringan jalan dengan pertanian, dengan susunan fungsi kawasan sebagai
peranan pelayanan distribusi barang dan tempat permukiman perkotaan, pemusatan dan
jasa untuk masyarakat di dalam kawasan distribusi pelayanan jasa pemerintahan, pelayanan
perkotaan. sosial, serta kegiatan ekonomi)
KOTA

1. Jalan Sistem Primer

(Antar Kota)
KOTA
(Menerus dalam Kota)

2. Jalan Sistem Sekunder

KOTA
KOTA Pusat Kegiatan 6
KRITERIA JALAN MENURUT FUNGSI
UU No. 38 Tahun 2004 tentang Jalan

Kriteria Arteri Kolektor Lokal Lingkungan


HIERARKI JALAN Angkutan yang dilayani Utama Pengumpul Setempat Lingkungan
Jarak perjalanan Jauh Sedang Dekat Dekat
Kecepatan rata-rata Tinggi Sedang Rendah Rendah
Jumlah jalan masuk Dibatasi Dibatasi Tidak Dibatasi Tidak Dibatasi
ARTERI

Vol. & Kec. KOLEKTOR


P tinggi
E Lalulintas
R Lokal terbatas
G
E 100 Km/jam
R
A
K LOKAL
A Lalulintas
N Menerus
Makin
Dominan

20 Km/jam
Vol. & Kec.
rendah Areal Permukiman Semakin Dominan
Semakin Bertambah
Akses dikontrol Peruntukan Jalan Akses dan Parkir Akses tidak
penuh dikontrol
7
AKSESIBILITAS
JALAN MENURUT STATUS
UU No. 38 Tahun 2004 tentang Jalan

• JALAN NASIONAL
Merupakan jalan arteri dan kolektor dalam sistem jaringan jalan primer yang mengubungkan antar
ibukota provinsi, dan jalan strategis nasional, serta jalan tol
• JALAN PROVINSI
Merupakan jalan kolektor dalam sistem jaringan jalan primer yang menghubungkan ibukota provinsi
dengan ibukota kabupaten/kota, atau antar ibukota kabupaten/kota, dan jalan strategis provinsi
• JALAN KABUPATEN
Merupakan jalan lokal dalam sistem jaringan jalan primer yang menghubungkan ibukota kabupaten
dengan ibukota kecamatan, antar ibukota kecamatan, ibukota kabupaten dengan pusat kegiatan
lokal, serta jalan umum dalam sistem jaringan jalan sekunder dalam wilayah kabupaten, dan jalan
strategis kabupaten
• JALAN KOTA
Merupakan jalan umum dalam sistem jaringan jalan sekunder yang menghubungkan antar pusat
pelayanan dalam kota, menghubungkan pusat pelayanan dengan persil, menghubungkan antar
persil, serta menghubungkan antar pusat permukiman yang berada di dalam kota
• JALAN DESA
Merupakan jalan umum yang menghubungkan kawasan dan/atau antar permukiman di dalam desa
serta jalan lingkungan
8
BAGIAN- BAGIAN JALAN
PP 34 Tahun 2006 tentang Jalan Pasal 33

9
9
VISI DAN MISI KEMENTERIAN PUPR

• TERWUJUDNYA INFRASTRUKTUR PEKERJAAN UMUM DAN


PERUMAHAN RAKYAT YANG HANDAL DALAM MENDUKUNG
INDONESIA YANG BERDAULAT, MANDIRI, DAN BERKEPRIBADIAN
VISI BERLANDASKAN GOTONG ROYONG

• Mempercepat pembangunan infrastruktur sumberdaya air termasuk sumber daya maritim


untuk mendukung kedaulatan pangan, ketahanan air, dan ketahanan energi, guna
menggerakkan sektor-sektor strategis ekonomi domestik dalam rangka kemandirian ekonomi.
• Mempercepat pembangunan infrastruktur jalan untuk mendukung konektivitas guna
meningkatkan produktivitas, efisiensi dan pelayanan sistem logistik nasional bagi penguatan
daya saing bangsa dilingkup global yang berfokus pada keterpaduan konektivitas daratan dan
maritim.
• Mempercepat pembangunan infrastruktur permukiman dan perumahan rakyat untuk
mendukung layanan infrastruktur dasar yang layak dalam rangka mewujudkan kualitas hidup
MISI manusia indonesia sejalan dengan prinsip “infrastruktur untuk semua”.
• Mempercepat pembangunan infrastruktur Pekerjaan Umum dan Perumahan Rakyat secara
terpadu dari pinggiran untuk mendukung keseimbangan pembangunan antar daerah terutama
dikawasan tertinggal, kawasan perbatasan, dan kawasan perdesaan, dalam kerangka NKRI.
• Meningkatkan tata kelola sumber daya organisasi untuk mendukung fungsi manajemen
meliputi perencanaan yang terpadu, pengorganisasian yang efisien, pelaksanaan yang tepat
dan pengawasan yang ketat.

10
BALAI PADA DITJEN BINA MARGA KEMENPUPR
PERMEN PUPR NO. 20/2016 TENTANG ORGANISASI DAN TATA
KERJA UNIT PELAKSANA TEKNIS DEI KEMENTERIAN PUPR
TERDAPAT 18 BALAI PADA DITJEN BINA MARGA
BPJN I BANDA ACEH
LOKASI : BANDA ACEH WIL. KERJA : PROV. ACEH

BBPJN II MEDAN
LOKASI : MEDAN WIL. KERJA : PROV. SUMUT & PROV. RIAU

BPJN III PADANG


LOKASI : PADANG WIL. KERJA : PROV. SUMBAR & PROV. BENGKULU

BPJN VI JAMBI
LOKASI : JAMBI WIL. KERJA : PROV. JAMBI & PROV. KEPRI

BBPJN V PALEMBANG
LOKASI : PALEMBANG WIL. KERJA : PROV. SUMSEL, PROV. KEP. BANGKA BELITUNG & PROV. LAMPUNG

BBPJN VI JAKARTA
LOKASI : JAKARTA WIL. KERJA : PROV. BANTEN, PROV. DKI JAKARTA & PROV. JABAR

BBPJN VII SEMARANG


LOKASI : SEMARANG WIL. KERJA : PROV. JATENG & PROV. DI YOGYAKARTA
11
BALAI PADA DITJEN BINA MARGA KEMENPUPR
BBPJN VIII SURABAYA
LOKASI : SURABAYA WIL. KERJA : PROV. JATIM & PROV. BALI

BPJN IX MATARAM
LOKASI : MATARAM WIL. KERJA : PROV. NTB

BPJN X KUPANG
LOKASI : KUPANG WIL. KERJA : PROV. NTT

BBPJN XI BANJARMASIN
LOKASI : BANJARMASIN WIL. KERJA : PROV. KALBAR, PROV. KALTENG & PROV. KALSEL

BPJN XII BALIKPAPAN


LOKASI : BALIKPAPAN WIL. KERJA : PROV. KALTIM & PROV. KALTARA

BBPJN XIII MAKASSAR


LOKASI : MAKASSAR WIL. KERJA : PROV. SULSEL & PROV. SULBAR

BPJN XIV PALU


LOKASI : PALU WIL. KERJA : PROV. SULTENG & PROV. SULTRA

BPJN XV MANADO
LOKASI : MANADO WIL. KERJA : PROV. SULUT & PROV. GORONTALO

BPJN XVI AMBON


LOKASI : AMBON WIL. KERJA : PROV. MALUKU & PROV. MALUT

BPJN XVII MANOKWARI


LOKASI : MANOKWARI WIL. KERJA : PROV. PAPUA BARAT

BBPJN XVIII JAYAPURA


LOKASI : JAYAPURA WIL. KERJA : PROV. PAPUA 12
KONDISI SDM PUPR
Berdasarkan Bidang Pendidikan (Teknik dan Non-Teknik)
SD, 1151, 5% SLTP, 1011, 5%
S3, 82, 0%
S2, 3245, 14%

SLTA, 8276, 36%


S1/D4, 8312, 36%

D1, 7, 0%
SM/D-3, 987, 4% D2, 4, 0%

Jumlah Pegawai Menurut Usia dan Pendidikan >= S1


Jumlah Pegawai dengan Pendidikan >= S1
TEKNIK NON TEKNIK

3500 3068 3186


5388
NON TEKNIK 3000 2566

2500
2000 1542
1500
6250
TEKNIK 1000 616 660

500
0
* Sumber Data Simka <=40 >40 - <55 >=55 13
BPJN XIV
PALU

14
UMUM DAN LINGKUP BPJN XIV PALU

15
KONDISI SDM BPJN XIV PALU
BERDASARKAN BIDANG PENDIDIKAN
SD, 24, 4%
S2, 34, 6% S3,0, 0% SLTP, 14, 2%

SLTA, 319, 54%


S1/D4, 192, 32%
J U M L A H P EG AWA I D E N G A N
PENDIDIKAN >= S1

120 113 113

D3, 14, 2%
100
D2, 0 0%
D1, 0, 0%

80
Tingkat Pendidikan Jml Pegawai (Org)
SD 24
60
SLTP 14
SLTA 319
D1 0 40
D2 0
D3 14 20
S1/D4 192
S2 34
0
S3 0
NON TEKNIK TEKNIK
Jumlah 597 16
PETA JARINGAN JALAN NASIONAL

BALAI PELAKSANAAN JALAN NASIONAL XIV

SULTENG

SULTRA

17
PANJANG JALAN NASIONAL

PANJANG JALAN (Km)

NO PROPINSI SK 2009 SK 2015


TAMBAHAN
KEPMEN KEPMEN
RUAS
631/KPTS/M 248/KPTS/M
BARU
/2009 /2015

SULAWESI
1 2.181,94 2.373,40 191,46
TENGAH

SULAWESI
2 1.397,05 1.497,81 100,76
TENGGARA

JUMLAH 3.588,99 3.871,21 282,22


18
PETA JARINGAN JALAN NASIONAL

• PANJANG JALAN NASIONAL : 1.497,81 KM


(95 RUAS)

• PANJANG JEMBATAN NASIONAL SESUAI


BMS : 11.825,80 M (753 JEMBATAN)

SULTRA

SULTENG

• PANJANG JALAN NASIONAL : 2.373,40


KM (103 RUAS)

• PANJANG JEMBATAN NASIONAL SESUAI


BMS : 22.108,20 M (1032 JEMBATAN)
19
MASTER PLAN PENGEMBANGAN INFRASTRUKTUR
WPS 26 PALU-BANGGAI 2025

20
DEVELOPMENT PLAN KPS PALU 2015 - 2019

21
DEVELOPMENT PLAN
WPS 26 PALU-BANGGAI TAHUN 2015-2019

22
MASTER PLAN PENGEMBANGAN INFRASTRUKTUR
WPS 27 MAMUJU – MAKALE – PALOPO – KENDARI – BAU BAU – WANGI WANGI 2025

23
DEVELOPMENT PLAN WPS 27
MAMUJU – MAKALE – PALOPO – KENDARI – BAU BAU – WANGI WANGI TAHUN 2015-2019

24
KONDISI JALAN DAN JEMBATAN AKHIR
TAHUN 2016

25
KONDISI JALAN AKHIR TAHUN 2016
PROVINSI SULAWESI TENGAH

KONDISI JALAN PERSENTASE KONDISI JALAN NASIONAL

6.25% MANTAP
1,254.23 KM
(52,85%)
TIDAK MANTAP

970.88 KM
(40,91%)

93.75%

KONDISI PANJANG %
JLN (KM) KEMANTAPAN

120.789 KM MANTAP 2,225.11 93.75%


(5,09%)
27.499 KM
(1,16%) TDK
148.29 6.25%
MANTAP
BAIK SEDANG R. RINGAN R. BERAT
(IRI 0 - 4) (IRI 4 - 8) (IRI 8 - 12) (IRI >12) TOTAL 2,373.40
26
KONDISI JEMBATAN AKHIR TAHUN 2016
PROVINSI SULAWESI TENGAH

KONDISI JEMBATAN BERDASARKAN


JUMLAH JEMBATAN
KONDISI JEMBATAN 5.43%
KONDISI JEMBATAN BERDASARKAN
PANJANG JEMBATAN
10,463.9 M
(44,96%)

3.12%
94.57%
7,828.3 M
(34,59%)

KONDISI 0 -2
96.88%

KONDISI >= 3

3,126.2 M
(15,02%)
KONDISI JBT JMLH JBT PJG JBT
(M)
683.1 M
0-2 976 21.418,40
(5,33%) 6.7 M >= 3 56 689,80
- (0,10%)
BAIK SEKALI BAIK SEDANG RUSAK BERAT KRITIS RUNTUH TOTAL 1.032 22.108,20
(KONDISI 0) (KONDISI 1) (KONDISI 2) (KONDISI 3) (KONDISI 4) (KONDISI 5)
27
KONDISI JALAN AKHIR TAHUN 2016
PROVINSI SULAWESI TENGGARA

KONDISI JALAN PERSENTASE KONDISI JALAN NASIONAL


MANTAP
889.36 KM 8.40%
(59,38%)
TIDAK MANTAP

91.60%

482.61 KM
(32,22%)

KONDISI PANJANG %
JLN (KM) KEMANTAPAN

MANTAP 1,371.97 91.60%


69.91 KM 55.94 KM
(4,67%) (3,73%) TDK
125.85 8.40%
MANTAP
BAIK SEDANG R. RINGAN R. BERAT TOTAL 1,497.81
(IRI 0 - 4) (IRI 4 - 8) (IRI 8 - 12) (IRI >12) 28
KONDISI JEMBATAN AKHIR TAHUN 2016
PROVINSI SULAWESI TENGGARA

KONDISI JEMBATAN BERDASARKAN


JUMLAH JEMBATAN
KONDISI JEMBATAN 4.38%

5,538.6 M
(43,56%)
KONDISI JEMBATAN BERDASARKAN
PANJANG JEMBATAN
95.62% 3.55%

3,112.4 M
(25,76%) 2,935.5 M KONDISI 0 -2
(26,29%)
96.45%
KONDISI >= 3

KONDISI JBT JMLH JBT PJG JBT


(M)
317.2 M 85.3 M 0-2 720 11.406,50
(3,32%) (0,93%) 16.8 M
(0,13%) >= 3 33 419,30
BAIK SEKALI BAIK SEDANG RUSAK BERAT KRITIS RUNTUH TOTAL 753 11.825,80
(KONDISI 0) (KONDISI 1) (KONDISI 2) (KONDISI 3) (KONDISI 4) (KONDISI 5) 29
POHON ANGGARAN TA 2016 S.D. 2018

30
ANGGARAN TA 2016

BPJN XIV
Rp 2.063.944.592.000

SULTENG SULTRA
Rp 1.126.050.002.000 Rp 937.894.590.000
ALOKASI ANGGARAN TA. 2017
NO PROPINSI
BELANJA BELANJA MODAL
TOTAL PAGU BELANJA BARANG
PEGAWAI (RPM)

1 SULAWESI TENGAH 1,126,050,002,000 1,877,924,000 103,028,472,000 1,021,143,606,000

2 SULAWESI TENGGARA 937,894,590,000 2,172,503,000 42,485,365,000 893,236,722,000

BPJN XIV 2,063,944,592,000 4,050,427,000 145,513,837,000 1.914.380.328.000

31
ANGGARAN TA 2017

BPJN XIV
Rp 2.409.207.312.000

SULTENG SULTRA
Rp 1.515.629.262.000 Rp 893.578.050.000
ALOKASI ANGGARAN TA. 2017
NO PROPINSI
BELANJA BELANJA MODAL
TOTAL PAGU BELANJA BARANG
PEGAWAI (RPM)

1 SULAWESI TENGAH 1,515,629,262,000 41,069,799,000 268,734,621,000 1,205,824,842,000

2 SULAWESI TENGGARA 893,578,050,000 513,261,000 72,676,471,000 820,388,318,000

BPJN XIV 2,409,207,312,000 41,583,060,000 341,411,092,000 2.026.213.160.000

32
RENCANA ANGGARAN TA 2018

BPJN XIV
Rp 2.114.825.950.000

SULTENG SULTRA
Rp 1.275.361.950.000 Rp 839.464.000.000
ALOKASI ANGGARAN TA. 2017
NO PROPINSI
BELANJA BELANJA MODAL
TOTAL PAGU BELANJA BARANG
PEGAWAI (RPM)

1 SULAWESI TENGAH 1,275,361,950,000 63,174,968,000 247,502,183,000 964,684,799,000

2 SULAWESI TENGGARA 839,464,000,000 513,261,000 123,185,928,000 715,764,811,000

BPJN XIV 2,114,825,950,000 63,688,229,000 370,688,111,000 1.680.449.610.000

33
PAKET-PAKET TA 2016 DAN TA 2017

34
PAKET-PAKET TAHUN 2016
PROVINSI SULAWESI TENGAH

Rp
NO NAMA PAKET PANJANG EFEKTIF KET.
(10^3)

SATKER SKPD-TP PROV. SULAWESI TENGAH

1 Pelebaran Jalan Malonda 1,21 KM 16.614.133

SATKER PJN WILAYAH I PROV. SULAWESI TENGAH


201.183.374
1 Pelebaran Jalan Ogoamas - Siboang (MYC) 52,00 KM (TA.2016)
(63.381.600)
43.299.872
2 Penggantian Jembaan Tandayu CS (MYC) 75,60 M (TA.2016)
(26.580.572)
3 Penggantian Jembatan Balani 1 Cs 47,4 M 18,665,510

SATKER PJN WILAYAH II PROV SULTENG


279.617.584
Pelebaran Jalan Molosipatt – Lambunu –
1 57,72 KM (TA.2016)
Mepanga (MYC)
(76.200.000)
Rekonstruksi Dan Penanganan Lereng
2 1,90 KM 56.512.327
Nupabomba - Kebun Kopi - Toboli II 35
PAKET-PAKET TAHUN 2016
PROVINSI SULAWESI TENGAH

Rp
NO NAMA PAKET PANJANG EFEKTIF KET.
(10^3)

SATKER PJN WILAYAH II PROV SULTENG

3 Pelebaran Jalan Parigi – Tolai 11,00 KM 50.025.800

4 Pelebaran Jalan Tagolu – Tentena 4,00 KM 32.167.000

5 Pelebaran Jalan Tentena – Taripa 3,40 KM 35.875.439

6 Rekonstruksi Jalan Ueralulu – Tamanjeka 2,00 KM 7.844.356

SATKER PJN WILAYAH III PROV SULTENG

Rekonstruksi Jalan Rata(Bts Kab Banggai) –


1 13,00 KM 55.974.610
Baturube
151.909.445
2 Pelebaran Jalan Pagimana – Biak (MYC) 28,70 KM (TA.2016)
(55.800.000)

3 :Pelebaran Jalan Taripa – Tiwa’a 6,07 KM 49,122,964 36


PAKET-PAKET TAHUN 2016
PROVINSI SULAWESI TENGAH

Rp
NO NAMA PAKET PANJANG EFEKTIF KET.
(10^3)

SATKER PJN WILAYAH III PROV SULTENG

4 Pelebaran Jalan Tiwa’a – Tomata 10,98 KM 58.989.945

135.423.788
5 Pelebaran Jalan Pape – Tindantana (MYC) 30,07 KM (TA.2016)
(32.000.000)
277.030.333
6 Pelebaran Jalan Tomata – Beteleme (MYC) 21,00 KM (TA.2016)
(77.800.000)

Preservasi dan Pelebaran Jalan Kolonedale - 9,93 KM


7 Tompira 34.897.000
: 6,00 KM

222.040.225
8 Pelebaran Jalan Taripa – Wosu – Pape (MYC) 42,77 KM (TA.2016)
(89.399.997)

9 Penggantian Jembatan Unsongi I Cs 22,00 M 12.469.493


37
PAKET-PAKET TAHUN 2016
PROVINSI SULAWESI TENGGARA

Rp
NO NAMA PAKET PANJANG EFEKTIF KET.
(10^3)

SATKER SKPD-TP PROV. SULAWESI TENGGARA

Preservasi Rekonstruksi Jalan Batas Kota Kendari 88,79 KM


1 21.289.999
- Dalam Kota Kendari
1.57 KM

SATKER PJN WILAYAH I PROV SULAWESI TENGGARA

172,46 KM
Preservasi dan Pelebaran Jalan Bts Prov Sulsel -
1 31.267.221
Lasusua - Wolo 4,00 KM

15,00 KM 113.285.129
Pelebaran Jalan Lasusua - Bts Kab Kolaka – Wolo
2 (TA.2016)
(MYC)
(48.205.336)
25,00 M 6.666.660
3 Penggantian Jembatan S Katoi

38
PAKET-PAKET TAHUN 2016
PROVINSI SULAWESI TENGGARA

Rp
NO NAMA PAKET PANJANG EFEKTIF KET.
(10^3)
SATKER SKPD-TP PROV. SULAWESI TENGGARA

Preservasi Rekonstruksi Jalan Batas Kota Kendari 88,79 KM


1 21.289.999
- Dalam Kota Kendari 1.57 KM

SATKER PJN WILAYAH I PROV SULAWESI TENGGARA

Preservasi dan Pelebaran Jalan Bts Prov Sulsel - 172,46 KM


1 31.267.221
Lasusua - Wolo
4,00 KM
113.285.129
Pelebaran Jalan Lasusua - Bts Kab Kolaka – Wolo
2 15,00 KM (TA.2016)
(MYC)
(48.205.336)
3 Penggantian Jembatan S Katoi 25,00 M 6.666.660

4 Penggantian Jembatan S. Polewali Cs 30,10 M 6.689.430


116,05 KM
Preservasi dan Pelebaran Jalan Wolo - Kota
5 29.880.447
Kolaka - Rate Rate 4,00 KM

6 Pembangunan jalan pemuda (Kolaka) Lanjutan 1,90 KM 33.863.647


39
PAKET-PAKET TAHUN 2016
PROVINSI SULAWESI TENGGARA

Rp
NO NAMA PAKET PANJANG EFEKTIF KET.
(10^3)

SATKER PJN WILAYAH II PROV SULAWESI TENGGARA

89,37 KM
1 Rekonstruksi lapuko-bts kab.Konsel/kota kendari 19.222.000
3,50 KM

185.558.838
Pelebaran jalan tinanggea - simpang 3 torobulu –
2 14,00 KM (TA.2016)
ambesea (MYC)
(84.092.795)

159,20 KM
Pelebaran jalan menuju standar bts. Prov sulteng-
3 83.480.740
lamonae-landawe/taipa bts konut.Konawe
10,00 KM

84,20 KM
Pelebaran menuju standar rate-rate bts kota 6,00 KM
4 61.856.435
unaaha
4,00 KM

5 Penggantian Jembatan S. Linomoyo 9,10 M 1.781.080


40
PAKET-PAKET TAHUN 2016
PROVINSI SULAWESI TENGGARA

Rp
NO NAMA PAKET PANJANG EFEKTIF KET.
(10^3)
SATKER PJN WILAYAH II PROV SULAWESI TENGGARA

42.929.810
6 Penggantian Jembatan S. Wanggu (MYC) 45,00 M (TA.2016)
(14.686.120)
729.151.634
7 Pembangunan Jembatan Teluk Kendari (MYC) 235,00 M (TA.2016)
(167.867.750)
SATKER PJN WILAYAH III PROV SULAWESI TENGGARA

163,27 KM
Preservasi rekonstruksi jalan labuan - pure - sp.3
1 54.773.612
bure/jln. Hasanuddin
11,70 KM

80,90 KM
Preservasi rekonstruksi jalan tampo - dalam kota
2 18.639.973
raha - tondasi
2,80 KM

127,86 KM
Preservasi rekonstruksi jalan dalam kota bau bau -
3 34.909.153
sp3. Wakoko - kamaru
6,00 KM
41
PAKET-PAKET TAHUN 2017
PROVINSI SULAWESI TENGAH

DIPA
NAMA SATKER /
NO. ALOKASI TOTAL
NAMA PAKET KM M
(Rp)

II SKPD - TP SULTENG 163.24 109.30 42,355,522,000

PRESERVASI REHAB JALAN T OMPE-PANT OLOAN-DALAM KOT A


1 162.54 29,632,865,000
PALU-AMPERA-SURUMANA
2 REKONST RUKSI JALAN DALAM KOT A PALU 0.50 5,000,000,000
3 REHABILIT ASI JEMBAT AN T AIPA 109.30 4,046,396,000
PENANGANAN ABRASI PANT AI RUAS JALAN T OMPE - PANT OLOAN
4 0.20 3,676,261,000
(DESA ENU)

IV PJN WILAYAH I SULTENG 400.93 30.00 174,537,340,000


PRESERVASI REKONST RUKSI JALAN UMU-PALELEH-LOKODOKA-
1 184.54 48,852,228,000
BUOL-LAKUAN
PEMEL RUT IN JALAN LAKUAN-LAULALANG-LINGADAN-DLM. KOT A
2 198.19 19,898,320,000
T OLI T OLI-SILONDOU-MALALA
3 PENGGANT IAN JEMBAT AN PANGI 2 Cs 30.00 17,386,791,000
4 PELEBARAN JALAN OGOAMAS - SIBOANG 18.20 88,400,001,000

V PJN WILAYAH II SULTENG 318.86 - 275,029,825,000

1 PEMELIHARAAN RUT IN JALAN T INOMBO-SINEI-AMPIBABO-T OBOLI 147.00 8,689,585,000

PEMELIHARAAN RUT IN JALAN T OMURA-T AMBARANA-POSO-


2 151.39 10,660,240,000
T AGOLU-T ENT ENA-T ARIPA
REKONST RUKSI DAN PENANGANAN LERENG NUPABOMBA - KEBON
3 2.00 78,180,000,000
KOPI - T OBOLI I (MYC)

42
PAKET-PAKET TAHUN 2017
PROVINSI SULAWESI TENGAH

DIPA
NAMA SATKER /
NO. ALOKASI TOTAL
NAMA PAKET KM M
(Rp)

V PJN WILAYAH II SULTENG 318.86 - 275,029,825,000

REKONST RUKSI DAN PENANGANAN LERENG T AWAELI -


4 2.00 80,000,000,000
NUPABOMBA - KEBON KOPI - T OBOLI (MYC)
5 PEMINDAHAN BAHAN JEMBAT AN 1,000,000,000
PELEBARAN JALAN MOLOSIPAT (BT S. PROV. GORONT ALO) -
6 16.47 96,500,000,000
LAMBUNU - MEPANGA (MYC)

VI PJN WILAYAH III SULTENG 692.18 389.70 713,339,637,000


PEMELIHARAAN RUT IN JALAN T AGOLU-MALEI-UEKULI-MAROWO-
1 187.97 11,361,646,000
AMPANA-BALINGARA
2 PRESERVASI REKONST RUKSI JALAN BALINGARA-BUNT A-PAGIMANA 120.65 27,680,377,000

3 PRESERVASI REHAB JALAN BUNGKU-BAHADOPI-BAT AS SULT RA 108.00 39,132,366,000

4 PRESERVASI REHAB JALAN BIAK-DALAM KOT A LUWUK-BAT UI-T OILI 102.64 33,462,044,000

5 PRESERVASI REKONST RUKSI JALAN T OILI-RAT A-BAT URUBE 110.37 61,640,829,000


6 REKONST RUKSI JALAN T OMAT A-BET ELEME 2 6.00 47,708,172,000
7 REKONST RUKSI JALAN T OMAT A-BET ELEME 3 6.20 42,100,000,000
8 PENGGANT IAN JEMBAT AN AMPANA T ET E CS 76.90 11,918,000,000
9 PENGGANT IAN JEMBAT AN PARI LANGKE I CS 27.80 15,600,000,000

10 PENGGANT IAN JEMBAT AN PANDAUKE BESAR CS 200.00 63,871,940,000

43
PAKET-PAKET TAHUN 2017
PROVINSI SULAWESI TENGAH

DIPA
NAMA SATKER /
NO. ALOKASI TOTAL
NAMA PAKET KM M
(Rp)

VI PJN WILAYAH III SULTENG 692.18 389.70 713,339,637,000

11 PENGGANT IAN JEMBAT AN PARIGI II CS 85.00 30,456,114,000


12 REKONST RUKSI JALAN RUAS UEKULI - MAROWO 2.30 11,875,342,000
13 REKONST RUKSI JALAN RUAS RAT A - BAT URUBE 2.00 10,000,000,000
14 PELEBARAN JALAN PAGIMANA-BIAK (MYC ON GOING) 11.67 77,542,095,000
15 PELEBARAN JALAN PAPE-T IDANT ANA (MYC ON GOING) 12.52 60,000,000,000

16 PELEBARAN JALAN T OMAT A-BET ELEME (MYC ON GOING) 6.30 71,000,000,000

17 PELEBARAN JLN. T ARIPA-WOSU-PAPE (MYC ON GOING) 15.56 97,990,712,000

44
PAKET-PAKET TAHUN 2017
PROVINSI SULAWESI TENGGARA

DIPA
NAMA SATKER /
NO. ALOKASI TOTAL
NAMA PAKET KM M
(Rp)

I SKPD - TP SULTRA 69.82 - 24,989,937,000


PRESERVASI REKONST RUKSI JALAN BAT AS KOT A KENDARI-DALAM
1 69.82 24,989,937,000
KOT A KENDARI
III PJN WILAYAH I SULTRA 570.89 114.10 149,274,501,000

1 PEMELIHARAAN RUT IN JALAN BT S PROV. SULSEL - LAPAI - LASUSUA 127.90 4,912,700,000


PEMELIHARAAN RUT IN JALAN LASUSUA - BT S. KAB. KOLAKA UT ARA /
2 48.55 1,240,510,000
KAB.KOLAKA - WOLO
3 PRESERVASI REKONST RUKSI JALAN WOLO - BAT AS KOT A KOLAKA 122.73 33,139,900,000

4 PEMELIHARAAN RUT IN JALAN SP. KAMP. BARU - WOLULU -BAMBAEA 137.60 5,161,206,000

5 PEMELIHARAAN RUT IN JALAN BAMBAEA - KASIPUT E - T INANGGEA 109.59 1,007,366,000

6 REHABILIT ASI / PEMELIHARAAN BERKALA JEMBAT AN SULT RA-1 102.30 4,005,250,000


7 PENGGANT IAN JEMBAT AN S. BAULA II 11.80 3,646,353,000
PELEBARAN JALAN LASUSUA - BT S. KAB. KOLAKA - WOLO (MYC ON
8 21.30 61,167,504,000
GOING)
9 PEMBANGUNAN JALAN PEMUDA (KOLAKA) 3.22 34,993,712,000
45
PAKET-PAKET TAHUN 2017
PROVINSI SULAWESI TENGGARA

DIPA
NAMA SATKER /
NO. ALOKASI TOTAL
NAMA PAKET KM M
(Rp)

IV PJN WILAYAH II SULTRA 436.16 416.89 442,207,371,000

PRESERVASI REKONST RUKSI JALAN T INANGGEA-AMBESEA-BAT AS


1 113.39 35,886,960,000
KAB. KONAWE SELAT AN/KOT A KENDARI

PRESERVASI REKONST RUKSI JALAN BAT AS PROV. SULT ENG-


2 169.25 39,957,360,000
ASERA-BAT AS KAB. KONAWE UT ARA/KAB. KONAWE
PRESERVASI REKONST RUKSI JALAN RAT E RAT E - KOT A UNAAHA -
3 94.79 50,934,957,000
POHARA
4 REHABiILIT ASI/PEMELIHARAAN BERKALA JEMBAT AN S. RAWUA II, Cs 103.70 1,939,550,000
5 PENGGANT IAN JEMBAT AN S. WANGGU 12,074,643,000
6 PENGGANT IAN JEMBAT AN S. WANGGU BOULEVARD 60.10 36,484,535,000
7 PENGGANT IAN JEMBAT AN S. BAKUT ARU I, Cs 18.50 4,830,675,000

8 PELEBARAN JALAN T INANGGEA-SIMPANG 3 T OROBULU-AMBESEA 42.03 59,029,150,000

9 PELEBARAN JALAN BAT AS KAB. KONAWE UT ARA - POHARA 16.70 55,792,306,000

10 PEMBANGUNAN JEMBAT AN T ELUK KENDARI 234.59 145,277,235,000

46
PAKET-PAKET TAHUN 2017
PROVINSI SULAWESI TENGGARA

DIPA
NAMA SATKER /
NO. ALOKASI TOTAL
NAMA PAKET KM M
(Rp)

V PJN WILAYAH III SULTRA 416.26 243.00 161,856,267,000

PRESERVASI REKONST RUKSI JALAN DALAM KOT A BAU BAU - PSR


1 133.87 33,488,801,000
WAJO - KAMARU
PRESERVASI REKONST RUKSI JALAN WANCI - T APAMANDA - JALAN
2 21.53 24,441,417,000
MASUK BANDARA
3 PRESERVASI REKONST RUKSI JALAN LABUAN - PURE - SP.3 BURE 174.96 21,191,382,000
PRESERVASI REKONST RUKSI JALAN T AMPO - KOT A RAHA -
4 82.90 25,841,279,000
T ONDASI
5 PEMELIHARAAN BERKALA JEMBAT AN S. KAMASIO, CS BUT ON 23.60 695,742,000
6 PEMELIHARAAN BERKALA JEMBAT AN S. KEMBAR, CS MUNA 55.50 374,417,000
7 PENGGANT IAN JEMBAT AN S.T OKULO, CS 70.00 17,683,992,000
8 PENGGANT IAN JEMBAT AN S.KARING-KARING, CS 44.90 8,917,866,000
9 PENGGANT IAN JEMBAT AN S.PAMANUA,CS 35.00 8,493,167,000
10 PENGGANT IAN JEMBAT AN S. MALEKOA CS 14.00 4,455,342,000
11 REKONST RUKSI JALAN BAT AS KOT A RAHA - T ONDASI 3.00 16,272,862,000

47
PAKET-PAKET
STRATEGIS

48
PAKET – PAKET STRATEGIS
PROVINSI SULAWESI TENGAH

REKONSTRUKSI DAN PENANGANAN LERENG NUPABOMBA – KEBUN


KOPI - TOBOLI

49
PAKET – PAKET STRATEGIS
PROVINSI SULAWESI TENGAH

REKONSTRUKSI DAN PENANGANAN LERENG NUPABOMBA – KEBUN


KOPI - TOBOLI

Lereng Alam
7% 9%
Lereng
Galian/Timbunan

Lereng Longsor

Hasil Survei SSI tahun


2017
Total Lereng (379)
84% Lereng Alami (35)
Lereng Galian/Timbunan
(330)
Lereng Longsor (27)

50
PAKET – PAKET STRATEGIS
PROVINSI SULAWESI TENGAH

REKONSTRUKSI DAN PENANGANAN LERENG NUPABOMBA – KEBUN


KOPI - TOBOLI

51
DOKUMENTASI

REKONSTRUKSI DAN PENANGANAN LERENG NUPABOMBA –


KEBUN KOPI - TOBOLI

52
PAKET – PAKET STRATEGIS
PROVINSI SULAWESI TENGAH

FLYOVER PANTOLOAN DAN JALAN LINGKAR LUAR KOTA PALU

53
PAKET – PAKET STRATEGIS
PROVINSI SULAWESI TENGAH

FLYOVER PANTOLOAN DAN JALAN LINGKAR LUAR KOTA PALU

54
PAKET – PAKET STRATEGIS
PROVINSI SULAWESI TENGAH

LOKASI PEMBANGUNAN FLYOVER PANTOLOAN DAN JALAN LINGKAR LUAR KOTA PALU

55
PAKET – PAKET STRATEGIS
PROVINSI SULAWESI TENGAH

FLYOVER PANTOLOAN DAN JALAN LINGKAR LUAR KOTA PALU

56
DOKUMENTASI

PEMBANGUNAN JALAN DAN JEMBATAN DI PROV. SULTENG

57
PAKET – PAKET STRATEGIS
PROVINSI SULAWESI TENGGARA

PAKET PEMBANGUNAN JALAN LINGKAR LUAR


KOTA KENDARI

Output Mengalihkan angkutan logistik dari dan Prov.


Sulawesi Selatan menuju Kota Kendari ; Angkutan
tambang dari Kawasan Industri (KI) Konawe
menuju Pelabuhan (New Port Kendari

Koridor Kota Kendari

Target Eff Jalan : 32,780 KM

Alokasi 504,000 Milyar


Total
Rencana Jalan
Alokasi Tahun Tahun Tahun Tahun
Lingkar Kota
Tahunan 2019 2020 2021 2022
Kendari

75,00 142,00 142,00 145,00


Milyar Milyar Milyar Milyar

Progres - Studi Kelayakan 2016


Saat ini - Amdal 2016
- DED 2016

Tampak Atas Kota Kendari 58


PAKET – PAKET STRATEGIS
PROVINSI SULAWESI TENGGARA

STA 0+000
PAKET REALINYEMEN JALAN LASUSUA-BTS KAB. STA 7+500

KOLAKA UTARA/KAB KOLAKA Tanjakan dengan grade maksimum 18%


Tanjakan dengan grade maksimum 19%
STA 3+950 STA 5+450

Output Mendukung Kawasan Strategis Nasinal (Mamuju


STA 0+000 STA 1+000

Kendari – Wakatobi) WPS 27 ; Perbaikan


Aliyetmen vertikal dan horisontal

Kondisi grade jalan eksisting pada awal pekerjaan memiliki grade


19% dengan panjang 1,00 km dan pada tengah ruas terdapat
Koridor KAB. KOLAKA dan KAB KOLAKA UTARA
tanjakan dengan panjang 1,4 km
Target Eff Jalan : 7.85 KM

Alokasi 504,000 Milyar


Total
Alokasi Tahun Tahun Tahun Tahun
Tahunan 2019 2020 2021 2022

95,00 175,00 175,00 189,00


Milyar Milyar Milyar Milyar

Progres - Studi Kelayakan 2016


Saat ini - Amdal 2016
- DED 2016

59
PAKET – PAKET STRATEGIS
PROVINSI SULAWESI TENGGARA

PAKET PEMBANGUNAN JEMBATAN TELUK KENDARI

Output Untuk mendukung perkembangan wilayah, khususnya


kota lama di sisi utara dengan daerah Lapulu di sisi
selatan kota Kendari, pengembangan wisata,
mempersingkat jarak dan waktu tempuh kendaraan serta
menunjang sistem jaringan jalan yang telah ada.

Koridor Kota Kendari Pekerjaan Perataan Stockyard Pekerjaan Land Clearing Sisi
Sisi Kota Lama Kota Lama
Target Jembatan : 781,97M
Eff
Alokasi 802,000 Milyar
Total
Alokasi Tahun Tahun Tahun Tahun Tahun
Tahuna 2015 2016 2017 2018 2019
n

125,134 85,257 145,277 272,987 203,105


Renc. Milyar Milyar Milyar Milyar Milyar

125,093 80,257
Real. Milyar Milyar

Progres - Mobilisasi
Saat ini - Finalisasi Izin Konstruksi Melalui Komisi Keamanan
Jembatan dan Terowongan Jalan
- Koordinasi Penyapuan Ranjau Laut Antara TNI-AL &
Pemprov Sultra Tampak Atas Sisi Kota Lama
60
- Pekerjaan Pondasi (Bor Pile)
DOKUMENTASI

LOKASI TRASE PEMBANGUNAN JEMBATAN TELUK KENDARI

Lokasi Rencana Trase


Jembatan Teluk Kendari SISI POASIA

SISI KOTA LAMA

61
DOKUMENTASI

DECK SLAB & CABLESTAYED

62
DOKUMENTASI

PEMBANGUNAN JEMBATAN TELUK KENDARI

63
DOKUMENTASI

PEMBANGUNAN JEMBATAN TELUK KENDARI

64
DOKUMENTASI

PEMBANGUNAN JEMBATAN TELUK KENDARI


65
DOKUMENTASI

PEMBANGUNAN JALAN DAN JEMBATAN DI PROV. SULTRA

66
Contoh Dokumen ..\SBSN 2018\Executive Summary Program SBSN 2018 Ditjen.
Kesiapan  Bina Marga.pdf

SULTENG

SULTRA

67
PETA RUAS JALAN NASIONAL
PROVINSI SULAWESI TENGAH

PJG RUAS
NO NAMA RUAS
(KM)
1 UMU (BTS. PROV. GORONTALO) - PALELEH 36,28
2 PALELEH - LOKODOKA 49,79
3 LOKODOKA - BUOL 48,90
4 BUOL - LAKUAN 49,56
5 LAKUAN - LAULALANG 49,02
6 LAULALANG - LINGADAN 20,37
7 LINGADAN - BTS. KOTA TOLITOLI 37,29
8 JLN. M. SALEH (TOLI-TOLI) 8,60
9 JLN. YOS SUDARSO (TOLITOLI) 2,30
10 JLN. SYARIF MANSUR (TOLITOLI) 0,70
11 JLN. A. YANI (TOLITOLI) 0,40
12 BTS. KOTA TOLITOLI - SILONDOU 34,00
13 JLN. MOH. HATTA (T0LITOLI) JLN. MOH. HATTA (T0LITOLI) 0,9
14 JLN. ABDUL MUIS (TOLITOLI) 0,90
15 JLN. WOLTER MONGINSIDI (TOLITOLI) 1,20
16 JLN. SONA (TOLITOLI) 2,30
17 JL. TADULAKO (TOLITOLI) 1,10
18 SILONDOU - MALALA 39,10
19 MALALA - OGOTUA 55,7
20 OGOTUA - OGOAMAS (BTS. KAB. DONGGALA) 36,09
21 OGOAMAS (BTS. KAB. TOLI-TOLI) - TONGGOLOBIBI 63,70
22 TONGGOLOBIBI - SABANG 52,43
23 SABANG - TAMBU 36,00
24 TAMBU - TOMPE 21,83
25 TOMPE - PANTOLOAN (BTS. KOTA PALU) 64,44
26 PANTOLOAN (BTS. KAB. DONGGALA) - TAWAELI 5,00
27 KEBONSARI (TALISE) - TAWAELI 9,08

68
DAFTAR RUAS JALAN NASIONAL (KEPMEN PUPR 248/KPTS/M/2015)
PROVINSI SULAWESI TENGAH

PJG RUAS PJG RUAS


NO NAMA RUAS NO NAMA RUAS
(KM) (KM)
28 KEBONSARI (PALU) - JLN. TANAH RUNTUH 6,66 55 TAMBARANA - BTS. KOTA POSO 51,00

29 JLN. YOS SUDARSO (PALU) 1,49 56 JLN. PULAU SABANG (POSO) 1,27

30 JLN. SAM RATULANGI (PALU) 1,31 57 JLN. PULAU SUMATRA (POSO) 0,74

31 JLN. SUDIRMAN (PALU) 0,55 58 JLN. PULAU KALIMANTAN (POSO) 0,55

32 JLN. WOLTER MONGINSIDI (PALU) 1,02 59 BTS. KOTA POSO / JLN. TABATOKI - TAGOLU 3,35

33 JLN. EMMY SAELAN (PALU) 1,15 60 JLN. TANJUNG BULU (POSO) JLN. TANJUNG BULU (POSO) 0,33

34 JLN. BASUKI RAHMAT (PALU) 1,74 61 JLN. DIPONEGORO (POSO) 0,76


62 JLN. TABATOKI (POSO) 2,81
35 JLN. ABDUL RAHMAN SALEH (PALU) 1,26
63 TAGOLU - MALEI (BTS. KAB. TOUNA) 19,00
36 JLN. HASANUDDIN II (PALU) 0,56
64 MALEI (BTS. KAB. POSO) - UEKULI 28,35
37 WATUSAMPU (BTS. KOTA PALU/KAB. DONGALA) - AMPERA 14,71
65 UEKULI - MAROWO 72,90
38 JLN. HASANUDDIN I (PALU) 0,42
66 MAROWO - AMPANA 26,85
39 JLN. GAJAH MADA (PALU) 0,62
67 AMPANA - BALINGARA (BTS. KAB. BANGGAI) 40,87
40 JLN. IMAM BONJOL (PALU) 0,59
68 BALINGARA (BTS. KAB. TOUNA) - BUNTA 52,00
41 JLN. DIPONEGORO (PALU) 2,68
69 BUNTA - PAGIMANA 68,65
42 JLN. MALONDA (PALU) 10,11
70 PAGIMANA - BIAK 57,05
43 AMPERA - SURUMANA (BTS PROV.SULBAR) 38,33
71 BIAK - BTS. KOTA LUWUK 6,40
44 MOLOSIPAT (BTS. PROV. GORONTALO) - LAMBUNU 42,70
72 JLN. IMAM BONJOL (LUWUK) 3,38
45 LAMBUNU - MEPANGA 46,90
73 JLN. SAMRATULANGI I (LUWUK) 0,25
46 MEPANGA - TINOMBO 56,11
74 JLN. S. MUSI (LUWUK) 0,72
47 TINOMBO - SINEI 60,00
75 JLN. HASANUDIN (LUWUK) 0,50
48 SINEI - AMPIBABO 57,00
76 BTS. KOTA LUWUK - BATUI 42,11
49 AMPIBABO - TOBOLI 30,00 77 JLN. SAM RATULANGI (LUWUK) 0,48
50 TOBOLI - PARIGI 17,00 78 JLN. A. YANI (LUWUK) 1,23
51 PARIGI - TOLAI 30,15 79 JLN. URIP SUMOHARJO (LUWUK) 0,80
52 TOLAI - SAUSU 29,25 80 JLN. JEND. SUDIRMAN (LUWUK) 1,16
53 SAUSU - TOMORO (BTS. KAB. POSO) 13,03
54 TOMORO (BTS. KAB. PARIMO) - TAMBARANA 8,88
69
DAFTAR RUAS JALAN NASIONAL (KEPMEN PUPR 248/KPTS/M/2015)
PROVINSI SULAWESI TENGAH

PJG RUAS
NO NAMA RUAS
(KM)
81 JLN. M. HATTA (LUWUK) 10,07
82 JLN. YOS SUDARSO (LUWUK) 0,97
83 BATUI - TOILI 40,96
84 TOILI - RATA (BTS. KAB. MOROWALI UTARA) 53,35
85 RATA (BTS. KAB. BANGGAI) - BATURUBE 57,00
86 KOLONODALE - TOMPIRA 15,93
87 TOMPIRA - KEUNO (BTS. KAB. MOROWALI) 23,73
88 KEUNO (BTS. KAB. MOROWALI UTARA) - BAHONSUAI 28,50
89 BAHONSUAI - BUNGKU 48,81
90 BUNGKU - BAHODOPI 42,00
91 BAHODOPI - BTS. PROV. SULTRA 66,00
92 TOBOLI - KEBON KOPI (BTS. KAB. DONGGALA) 17,47
93 KEBON KOPI (BTS.KAB. PARIMO) - NUPABOMBA (BTS. KOTA PALU) 28,93
94 NUPABOMBA (BTS. KAB. DONGGALA) - TAWAELI 1,46
95 TAGOLU - TENTENA 47,94

96 TENTENA - TARIPA 33,75

97 TARIPA - PAPE 27,00

98 PAPE - TIDANTANA (BTS. PROV. SULSEL) 40,70

99 TARIPA - TIWA'A (BTS. KAB. MOROWALI UTARA) 20,63

100 TIWA'A (BTS. KAB. POSO) - TOMATA 12,33

101 TOMATA - BETELEME 50,94

102 BETELEME - TOMPIRA 18,96

103 AKSES PELABUHAN TAIPA 1,30

TOTAL PROVINSI SULAWESI TENGAH 2.373,40

70
PETA RUAS JALAN NASIONAL
PROVINSI SULAWESI TENGGARA

PJG RUAS
NO NAMA RUAS
(KM)
1 BTS. PROV. SULSEL - TOLALA - LELEWAWO 38,78
2 LELEWAWO - BATU PUTIH - LAPAI 49,23
3 LAPAI - LASUSUA 39,90
4 LASUSUA - BTS.KAB. KOLAKA UTARA / KAB.KOLAKA 53,81
5 BTS. KAB. KOLAKA UTARA / KAB. KOLAKA - WOLO 23,74
6 WOLO - BTS. KOTA KOLAKA 51,59
7 JLN. ABADI (KOLAKA) 6,10
8 JLN. TPI (KOLAKA) 0,32
9 JLN. HKSN (KOLAKA) 0,65
10 JLN. KARTINI (KOLAKA) 1,06
11 JLN. PRAMUKA (KOLAKA) 1,51
12 JLN. PEMUDA (KOLAKA) 5,89
13 SP. KAMPUNG BARU - POMALAA 22,20
14 POMALAA - WOLULU 31,90
15 WOLULU - BTS. KAB. KOLAKA / KAB. BOMBANA 19,44
16 BTS. KAB. KOLAKA / KAB. BOMBANA - BOEPINANG 28,60
17 BOEPINANG - BAMBAEA 35,46
18 BAMBAEA - SIMPANG KASIPUTE 47,45
19 KASIPUTE - BTS. KAB. BOMBANA/KONAWE SELATAN 40,94
20 BTS. KAB. BOMBANA/KONAWE SELATAN - TINANGGEA 21,19
21 TINANGGEA - SIMPANG 3 TOROBULU 31,23
22 TOROBULU/DERMAGA - AMBESIA 14,80
23 AMBESIA - LAINEA 16,06
24 LAINEA - AWUNIO 22,05
25 AWUNIO - LAPUKO 18,08
26 LAPUKO - BTS. KAB. KONSEL/KOTA KENDARI 29,56
27 BTS. KAB. KONSEL/KOTA KENDARI - TOBIMEITA 9,04 71
DAFTAR RUAS JALAN NASIONAL (KEPMEN PUPR 248/KPTS/M/2015)
PROVINSI SULAWESI TENGGARA

PJG RUAS PJG RUAS


NO NAMA RUAS NO NAMA RUAS
(KM) (KM)

28 JLN. WEDAHU (KENDARI) 1,11 55 JLN. SULTAN HASANUDDIN (KENDARI) 1,58

29 JLN. SAMUDRA (KENDARI) 1,79


56 JLN. SUTOYO (KENDARI) 1,10
57 JLN. S. PARMAN (KENDARI) 1,06
30 JLN. H. BANAWULA SINAPOY (KENDARI) 2,81
58 JLN. SAMRATULANGI (KENDARI) 1,36
31 JLN. BUNGGASI (KENDARI) 1,88
59 JLN. SUPRAPTO (KENDARI) 5,38
32 JLN. JEND. AH. NASUTION (KENDARI) 1,75
60 JLN. PATTIMURA (KENDARI) 2,70
33 JLN. JEND. MT. HARYONO (KENDARI) 1,93
KOLAKA (SP. KP. BARU) - RATE RATE (BTS. KAB. KOLAKA TIMUR /KAB.
34 AKSES PEL. BUNGKU TOKO (KENDARI) 3,12 61 58,83
KONAWE
35 BTS. KOTA KENDARI - BANDARA HALUOLEO 10,91 RATE RATE (BTS. KAB. KOLAKA TIMUR / KAB. KONAWE) - BTS.KOTA
62 30,19
UNAHA
36 JLN. P. TENDEAN (KENDARI) 2,89
63 JLN. INOWA (UNAAHA) 2,45
37 JLN. D.I. PANJAITAN (KENDARI) 3,54 64 JLN. SAPATI (UNAAHA) 1,16
38 JLN. A. YANI (KENDARI) 4,43 65 JLN. JEND. SUDIRMAN (UNAAHA) 1,77
39 JLN. DRS. A. SILONDAE (KENDARI) 1,60 66 JLN. DIPONEGORO (UNAAHA) 2,15
40 JLN. BUMI PRAJA (BOULEVARD) (KENDARI) 5,05 67 JLN. A. YANI (UNAAHA) 3,22
41 JLN. HALUOLEO (KENDARI) 0,65 68 JLN. MONGINSIDI (UNAAHA) 4,30
42 JLN. MARTANDU (KENDARI) 1,57 69 WAWOTOBI (BTS. UNAAHA) - POHARA 36,80
43 BTS. PROV. SULTENG (BULELENG) - LAMONAE - LANDAWE 53,66 70 AWUNIO - AMOLENGU 23,64
44 LANDAWE - KOTA MAJU - ASERA 30,52 71 LABUAN - MALIGANO 38,60
45 ASERA (JEMBATAN LASOLO) - ANDOWIA 11,94 72 MALIGANO - PURE 25,41
46 ANDOWIA - BELALO / LASOLO 22,70 73 PURE - TODANGA (BTS. KAB. MUNA/KAB. BUTON) 23,00
47 BELALO / LASOLO - TAIPA 25,00 74 TODANGA (BTS. KAB. MUNA/KAB. BUTON) - MATAOMPANA 39,56
48 TAIPA - BTS. KAB. KONAWE UTARA / KAB. KONAWE 25,43 75 MATAOMPANA - SP.3 BURE / JLN. HASANUDIN 48,40
49 BTS. KAB. KONAWE UTARA / KAB. KONAWE - POHARA 21,45 76 JLN. R.A. KARTINI (BAU-BAU) 0,71
50 POHARA - BTS. KOTA KENDARI 8,00 77 JLN. MURHUM (BAU-BAU) 1,69

51 JLN. W.R. SUPRATMAN (KENDARI) 0,57 78 JLN. GAJAHMADA (BAU-BAU) 2,53

52 JLN. SOEKARNO (KENDARI) 0,43 79 BTS. KOTA BAU BAU - PASAR WAJO - BANABUNGI 41,63

53 JLN. M. HATTA (KENDARI) 0,85 80 JLN. KS. TUBUN (BAUBAU) 0,11

54 JLN. DIPONEGORO (KENDARI) 0,74


72
DAFTAR RUAS JALAN NASIONAL (KEPMEN PUPR 248/KPTS/M/2015)
PROVINSI SULAWESI TENGGARA

PJG RUAS
NO NAMA RUAS
(KM)

81 JLN. JEND. SUDIRMAN (BAUBAU) 0,40

82 JLN. SULTAN HASANUDDIN (BAUBAU) 0,80

83 JLN. PAHLAWAN (BAUBAU) 6,24

84 SP. 3 WAKOKO - TANAMAETA - MATANAUWE 19,94

85 MATANAUWE - LASALIMU 36,62

86 LASALIMU - KAMARU (DERMAGA FERRY) 23,20

87 BTS. KOTA RAHA - TONDASI 51,50

88 JLN. SUDIRMAN (RAHA) 0,30

89 JLN. SUTOMO (RAHA) 0,30

90 JLN. BASUKI RAHMAT (RAHA) 1,10

91 BTS. KOTA RAHA - TAMPO 24,10

92 JLN. A. YANI (RAHA) 1,00

93 JLN. MH. THAMRIN (RAHA) 0,50

94 JLN. GATOT SUBROTO (RAHA) 4,10

95 WANCI - TOPANUANDA - JALAN MASUK BANDARA 21,53

TOTAL PROVINSI SULAWESI TENGGARA 1.497,81

73