III. RUKO
Luas s.d. 250 m2 0.2 0.4 1.83 0.33
Luas 251 m2 - 500 m2 0.3 0.5 2.5 1
IV Hotel Bintang 3
Low 1.5 5 9 4
High 1.5 7 10 4
V Hotel Bintang 4
Low 2 7 10 4
High 2 10 12 6
VI Hotel Bintang 5 3 12 14 16
VIII Mall
Luas s.d. 15000 m2 2 7 8 4
Luas 15000 - 30000 m2 2 8 9 10
Luas > 30000 m2 2.5 9 11 12
IX Bangunan Pabrik/Gudang
Luas s.d. 5000 m2 0.75 2 4 2
Luas 5001 m2 - 10000 m2 0.75 2.5 6 3
Luas > 10000 m2 1 5 7 3
KEBUTUHAN MANDAYS
Admin O. Komputer Drafter Total
1 2 1 23.5
1 2 1 26.5
1 2 1 27
1 2 1 34
1 2 1 49
1 2 1 21
1 2 1 27
1 2 1 34
1 2 1 25
1 2 1 33
1 2 1 38.5
1 1 1 11.75
1 1 1 15.25
1 1 1 19
HITUNGAN FEE PENILAIAN PROPERTI Pabrik/Gudang Luas >
MANDAYS
BILL. RATE JUMLAH
OFFICE TOTAL
1.00 1.00 9,500,000 9,500,000
5.00 5.00 1,200,000 6,000,000
7.00 7.00 800,000 5,600,000
3.00 610,000 1,830,000
1.00 1.00 670,000 670,000
1.00 1.00 550,000 550,000
1.00 1.00 550,000 550,000
24,700,000