Luwiharsih,MSc
PENDIDIKAN
• SI Fakultas Kedokteran Unair
• SII Pasca Sarjana UI, Manajemen Rumah Sakit
Standar PMKP 12
• Program manajemen risiko berkelanjutan digunakan
untuk melakukan identifikasi dan mengurangi
cedera dan mengurangi risiko lain terhadap
keselamatan pasien dan staf.
ANALISA RISIKO
EVALUASI RISIKO
Asesmen risiko
KELOLA RISIKO
Risk Register
edit 27 Juni 2019 8
Patient Risks
•Clinical Risk Mgt
•Patient Safety
Hospital
Risk
Management
Property
Risks
Roberta Caroll, editor : Risk Management
Handbook for Health Care Organizations, 4th
edition, Jossey Bass, 2004
Elemen penilaian PMKP 12 Telusur Skor
D PR S
A OB K
M AB O
P I R
L TINDAKAN :
KATEGORI RISIKO A PERINGKAT
K I - PENCEGAHAN BIAYA RISIKO
T - MITIGASI
A
S
A. UNIT BEDAH
1.
2.
B. UNIT FARMASI
1.
Elemen penilaian PMKP 12 Telusur Skor
LUWI-PPI 2062013
CONTOH : STRATEGIC PENGURANGAN RISIKO
24 Okt 2017 21
No Elemen penilaian MFK 2 Telusur Skor
1) Program tentang manajemen 10 TL
1. Ada program manajemen risiko R risiko fasilitas dan lingkungan - -
fasilitas dan lingkungan yang dapat meliputi risiko yang ada a) sampai
0 TT
f) di maksud dan tujuan
terjadi pada pasien, keluarga, staf dan
2)Panduan peninjauan dan
pengunjung , tertulis, meliputi risiko
pembaharuan program-program
yang ada a) sampai f) di maksud dan tersebut bila terjadi perubahan
lingkungan rumah sakit, terjadi
tujuan yang merupakan satu insiden baru atau sekurang-
kurangnya setahun sekali
program induk atau beberapa
program terpisah serta ada regulasi 3) Panduan tentang tenant/penyewa
lahan tersebut wajib mematuhi
untuk menerapkan program semua aspek program manajemen
manajemen meliputi 1) sampai fasilitas dan lingkungan yang
teridentifikasi pada maksud dan
dengan 2) di maksud dan tujuan (R) tujuan butir a) sampai dengan d).
1. Pendahuluan
2. Latar belakang
3. Tujuan umum & khusus
4. Kegiatan pokok & rincian kegiatan
4.1 . Kegiatan pokok
a) Keselamatan dan keamanan
b) Bahan berbahaya dan beracun (B3) dan limbahnya
c) Penanggulangan bencana (emergensi)
d) Proteksi kebakaran (fire safety) – properti dan para penghuni dilindungi dari
bahaya kebakaran dan asap
e) Peralatan medis – pemilihan, pemeliharaan dan penggunaan teknologi dengan
cara yang aman untuk mengurangi risiko
f) Sistem penunjang (utilitas) – pemeliharaan sistem listrik, air dan sistem
penunjang lainnya dengan tujuan untuk mengurangi risiko kegagalan
operasional.
luwi 7 september 2015
CONTOH
Rawat jalan,
dst
ATTACHMENT A
CONSTRUCTION RISK ASSES MENT FORM
Date: 1/18/17 Location: MHB- OR Expansion Project.
Project Manager: Daniel Janak Asses ment: X Initial Reas es ment Not Applicable
Project Description: 2014-1 3- OR Expansion Project
RATE THE PROJECT BASED ON THE EVALUATION CRITERIA GIVEN IN COLUMNS A THRU H
A B C D E F G H
RATING
edit 27 Juni 2019
PROJECT RISK JOB WORK ENVIRONMENTAL LIFE
SCALE DURATION IMPACT
SCALE AREA TYPE ZONE RISKS SAFETY
1 N/A N/A Maintenance Isolated Hourly None None None
2 Minor Low Repairs Room Daily Low Low Low
3 Smal Medium Refurbishing Localized Short Minor Minor Minor
4 Large High Renovation Ward / Wing Long Large Large Large
5 Major Extreme Construction Flo r On-Going Major Major Major
SCORE: 4 5 5 3 4 4 3 3
Add (+) All Columns: [A thru H] Then Divide by Eight (8) Total ÷ 8: _31_ _ ÷ 8
This wil give you the Rating Indicator Rating Indicator: 3.8
Any as es ed project or condition with an average score of > 2.5 wil require the ap ropriate response measures. Column Scores > 4 wil require a secondary review
Anyas es ed projectorcondit onwith anaveragescoreof>2.5wil requiretheap ropriateresponsemeasures.ColumnScores>4wil require asecondary review
LEGEND
29
0 = N/A 1 = Low 2= 0 = N/A 1 = Low 2 0 = N/A 1 = Low 0 = N/A 1 = Low 2= 0 = N/A 1 = High 2 = 0 = N/A 1 = High 2= 0 = N/A 1 = High
SCORE Moderate 3 = High = Moderate 3 = High 2 = Moderate 3 = High Moderate 3 = High Moderate 3 = Low or none Moderate 3 = Low or none 2 = Moderate 3 = Low or none
0 - 100%
Terrorism, Biological 0%
VIP Situation 0%
Infant Abduction 0%
Hostage Situation 0%
Civil Disturbance 0%
Labor Action 0%
Forensic Admission 0%
Bomb Threat 0%
Hazmat
Natural
Human
Probability 0,00 0,00 0,00 0,00 0,00
1.00
Relative Threat to Facility
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
Natural Technological Human Hazmat
1.00
Relative Threat to Facility
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
Natural Technological Human Hazmat
kotak
Gempa bumi
perawatan pasien/korban).
peran khusus).
tangkapan)
Tsunami
tangkapan).
lumpur)
(sebutkan)
area tangkapan).
1.1.2.1 Bahayameteorologi
Siklon/badai/topan
pengelolaan risiko.
bervariasi karena adanya perbedaan dalam asumsi dan konsep, isu-isu, dan fokus
perhatian kontributor dalam hal hubungan risiko dan isu yang dibicarakan.
2. Latar belakang
6. Sasaran
luwi-program pmkp
KEGIATAN POKOK PENGAWASAN MELIPUTI :
e) Melakukan review secara berkala dan merevisi program manajemen risiko fasilitas
dan lingkungan, bila diperlukan