Disusun Oleh :
Fahri Priambudi
40040418060038
Dosen Pengampu :
UNIVERSITAS DIPONEGORO
SEMARANG
2019
TUGAS KONSTRUKSI MELINTANG
Data UkuranUtamaKapal :
Breadth ( B ) : 14,20 m
Depth ( H ) : 7,10 m
Draught ( T ) : 5,90 m
Data Penunjang
Z(vertical distance of the structure's load centre above base line ): 7,10 m untuk
menghitung beban geladak cuaca
𝐿
Co ( Wave Coefficient ) for L < 90 m :[ +4.1] . CRW
25
78
:[ +4.1] . 0,9
25
: 6,5 [ kN/m2]
𝐿
CL( Length Coefficient ) for L < 90 m :√
90
78
:√
90
: 0,93
CD : 1 m ( In Midship )
CF : 1 m ( In Midship )
PERHITUNGAN MENGGUNAKAN SISTEM KONSTRUKSI MELINTANG
I. PERHITUNGAN BEBAN (Design Loads )Section IV Rules for Hull BKI 2014
20 .𝑇
PD = Po ( 10+𝑧−𝑇)𝐻CD [kN/m2]
Po 1 [use f = 1 for plate panels of the outer hull (shell plating, weather decks)]
Po 1 = 2,1 . ( CB + 0,7 ) . Co. CL. f
= 2,1 . ( 0,67 + 0,7 ) . 6,5 . 0,93.1
= 17,391 [ kN/m2]
20 .𝑇
PD1= Po1( CD [ kN/m2]
10+𝑧−𝑇)𝐻
20 . 5,90
PD1= 17,391.
( 10 + 7,10 − 5.90)7,10
. 1 [ kN/m2]
20 .𝑇
PD2= Po2 ( CD [ kN/m2]
10+𝑧−𝑇)𝐻
20 . 5,90
PD2= 13,043.
( 10 + 7,10 − 5.90)7,10
. 1 [ kN/m2]
20 .𝑇
PD3= Po3( CD [ kN/m2]
10+𝑧−𝑇)𝐻
20 . 5,90
PD3= 10,434.
( 10 + 7,10 − 5.90)7,10
. 1 [ kN/m2]
2.1 Perhitungan beban sisi dibawah garis air pada tengah kapal
(For elements the load centre of which is located below load waterline )
𝑧
PS= 10 ( T – z ) + Po . CF( 1 + ) [ kN/m2]
𝑇
1
z= T m
3
1
= 3 . 5,90 m
= 1,97 m
a. Beban sisi dibawah garis air untuk menghitung tebal pelat sisi (side plate)
𝑧
PS 1= 10 .( T – z ) + Po 1 . CF( 1 + ) [ kN/m2]
𝑇
1,97
PS 1= 10 .( 5,9– 1,97) + 17,391 . 1 ( 1 + 5,90 ) [ kN/m2]
PS 1= 62,497 [ kN/m2]
𝑧
PS2= 10 .( T – z ) + Po 2 . CF( 1 + ) [ kN/m2]
𝑇
1,97
PS2= 10 .( 5,9– 1,97) + 13,043 . 1 ( 1 + 5,90 ) [ kN/m2]
PS 2= 56,698 [ kN/m2]
c. Beban sisi dibawah garis air untuk menghitung gading besar (web frame)
dan senta sisi ( side stringer )
𝑧
PS 3= 10 .( T – z ) + Po 3 . CF( 1 + ) [ kN/m2]
𝑇
1,97
PS 3= 10 .( 5,9– 1,97) + 10,434. 1 ( 1 + 5,90 ) [ kN/m2]
PS 3= 53,217 [ kN/m2]
2.2 Perhitungan beban sisi diatas garis air pada tengah kapal
(For elements the load centre of which is located above load waterline )
20
PS= Po .CF. [kN/m2]
10+ 𝑧 − 𝑇
1
z=T+2(H–T)m
7,1 – 5,90
= 5,9 + m
2
= 6,5 m
a. Beban sisi diatas garis air untuk menghitung tebal plat sisi (side plate)
20
PS1= Po 1 . CF. [ kN/m2]
10+ 𝑧 − 𝑇
20
PS1= 17,391. 1.10 + 6,5 – 5,90 [ kN/m2]
PB = 10 . T + Po . CF [ kN/m2]
PB 1 = 10 . T + Po 1 . CF [ kN/m2]
PB 1 = 76,391 [ kN/m2]
PB 2 = 10 . T + Po 2 . CF [ kN/m2]
PB 2 = 72,043 [ kN/m2]
3.2 Beban alas dalam pada daerah tengah kapal
hDB = 350 + ( 45 . B ) mm
hDB = 350 + ( 45 . 14,2 ) mm
hDB = 989 mm ≈ 1000 mm
hDB = 1 m
a. Beban alas dalam untuk menghitung plat alas dalam (inner bottom plate)
Tebal plat geladak kekuatan (streng deck plating) dan plat kulit (shell plating)
pada0,4 L tengah kapal
𝐿
Jarak gading standart a0= + 0,48m
500
78
a0= 500+ 0,48 m
a0= 630 mm
k:1
tD = 5,372 mm tk : 1.5
tmin= 8,4 mm
: 8,4 + 1,0 mm
: 9,4 mm ≈ 10 mm
2. Tebal plat alas ( bottom plate) tidak boleh kurang dari :
(Section 6 B Rules for Hull 2014 )
tB = 11,962 ≈ 12 mm
tmin=√𝐿 . 𝑘 mm
tmin=√78 . 1 mm
tmin= 8,83 mm
tBS= tB = 12
mm
Lebar plat bilga :
b =800 + 5 . L mm
b = 800 + 5 . 78 mm
b = 1190 ≈ 1200 mm
tFK= 14 mm
b = 800 + 5 . L mm
b = 800 + 5 . 78 mm
b = 1190 ≈ 1200 mm
5. Tebal plat alas dalam (inner bottom plate) tidak boleh kurang dari :
(Section 6 Rules for Hull 2014 )
ti = 6,351 mm ≈ 8 mm
6. Tebal plat sisi (side plate) dibawah garis air tidak boleh kurang dari :
(Section 6 Rules for Hull 2014 )
ts = 10,962 ≈ 11 mm
tmin=√𝐿 . 𝑘 mm
tmin= √78 . 1 mm
tmin= 8,831 mm
ts 1 = 8,356 mm nf : 1,0
tmin=√𝐿 . 𝑘 mm
tmin= √78 . 1 mm
tmin= 8,831 mm
Direncanakan : tmin+ 1,0 mm
: 8,831+ 1,0 mm
: 9,831 mm ≈ 10 mm
tSS =0,5 . ( tD + tS ) mm
= 10 mm tD : 9 mm
ts : 10 mm
b = 800 + 5 . L mm
b = 800 + 5 . 78 mm
b = 1190 ≈ 1200 mm
III. PERHITUNGAN KONSTRUKSI ALAS GANDA (Bottom Structures )
Rules for Hull BKI Section VIII
ℎ2
t= . √𝑘 mm Karena tidak ada kemiringan
120 .ℎ𝑎
pada alas ( rise of floor ) maka
1000 2 h = ha
t = 120 .920 . √1 mm
t = 8,3 mm ≈ 9 mm
tPF = 9 mm
b. Ukuran lubang orang (man hole) dan lubang peringan (lightening hole) pada
wrang alas penuh BKI
= 0,5 . 1000 mm
= 500 mm
1
Diameter = h mm
3
1
= 1000 mm
3
= 333,333 mm ≈ 300 mm
700
500 h: 920
3600 3500
7100
4. Wrang kedap air (water tight floor)
a. Tebal plat wrang kedap air tidak boleh kurang dari tebal pelat wrang penuh
tWF = tPF = 9 mm
b. Modulus penampang penegar (stiffner) wrang kedap air tidak bolek kurang
dari :
W = 0,55 . a .l2 .P .k cm 3
Dimana :
1
𝐵
a = 211
= 0,63 ≈ 0,6 m
s C 1000
7100
50
2
P = PB2 = 72,403 kN/m
k =1
l = hDB = 1 m
75
W = 0,55 . 0,6 . 1 2 . 72,403 . 1 cm 3
W = 23,774 cm 3
5
5. Wrang terbuka (open floor) BKI Sec. 8
a. Modulus penampang gading alas (bottom frame) tidak boleh kurang dari :
W = n . c .a .l2.p. k cm3
Dimana :
l = ½ B – [ 1,5 ( 0,75.hDB ) ] m
= 2,475 m
l1 l2
3500 3600
65
n = 0,70 ( Karena gading alas)
10
k=1
0
W = 0,70 . 0,6 . 0,63 . 2,475 2. 72,043. 1 cm3
W = n . c .a .l2.p. k cm3
Dimana :
l = ½ B – [ 1,5 ( 0,75.hDB ) ] m
= 2,475 m
l1 l2
l1 l2
3500 3600
k=1
10
W = 0,55 . 0,6 . 0,63 . 2,475 2. 49 . 1 cm3
W = 62,402 cm3
80
Ukuran profil yang direncanakan : L 80 x 65 x 10
0
IV. PERHITUNGAN GADING-GADING (BKI Sec. 9)
𝑊𝑅 = n . a .c .𝑙 2 .p . 𝑐𝑟 .k 𝑐𝑚2
= 0,9 – 0,0035 . 78
= 0,627 m
a = 0,62 m
c = 0,6
𝑙 = 0,5 . (H – hDB)
= 0,5 . (7,10 – 1)
= 3.05 m
𝑊𝑅 = n . a .c .𝑙 2 .p . cr .k 𝑐𝑚3
100
0
2. Gading besar (web frame)
W = 0,55 . e .𝑙 2 . 𝑃𝑆 . n . k 𝑐𝑚3
Dimana: e=4xa
= 4 x 0,63
= 2,52 m
l = 3,05 m
0,63
3050
7100
3050
1000
0 1,0
1 0,5
2 0,3
≥3 0,2
n = 0,5 k = 1,0 (faktor material baja)
W = 0,55 . e .𝑙 2 . 𝑃𝑆 . n . k 𝑐𝑚3
W = 343,070 𝑐𝑚3
Koreksi modulus :
W = 343,070𝑐𝑚3
𝑡𝑠 = 10 mm
Keterangan :
Lebarpelatpengikatataupelatsisi = ( 40 sampai 50 ) x 𝑡𝑠
Koreksi modulus :
Koreksi :
𝑓 10
= = 0,25
𝐹 40
Dari diagram koordinasi didapatkan w = 0,38
𝑓𝑠 32
= = 0,575
𝐹 40
Maka profil tersebut mempunyai modulus penampang.
Wkoreksi = w .F . h cm3
= 349,6 cm3
10
230
100
V. SENTA SISI (side stringer)
= 3,05 m
l = 4.a
= 4. 0,63
= 2,52 m
0,63
3050
e 7100
l
3050
1000
n=1
W = 566,909 cm3
Koreksi modulus :
W = 566,909 cm3
tS = 10 mm
Keterangan :
Lebarpelatpengikatataupelatsisi = ( 40 sampai 50 ) x 𝑡𝑠
Koreksi modulus :
Koreksi :
𝑓 15
= = 0,375
𝐹 40 Dari diagram koordinasi didapatkan w = 0,53
𝑓𝑠 27
= = 0,675
𝐹 40
Maka profil tersebut mempunyai modulus penampang.
Wkoreksi = w .F . h cm3
= 0,53 . 40 . 27 cm3
= 572,400 cm3
400
10
270
150
VI. PERHITUNGAN KONSTRUKSI GELADAK (BKI Sec. 10)
l1 l2
3600 3500
hBD
7100
Wd = c .a .PD2 .l2 .k cm3
Wd =0,75 . 0,63 . 19,354 . (3,600)2 . 1 cm3
Wd = 118,516 cm3
Ukuran profil direncanakan : L 130 x 65x 10
65
10
130
W = c. e . l2 . P . k (cm³)
W =0,75 x 2,52 x (3,600)2 x 15,483 x 1 (cm³)
W = 379,246 (cm³)
Koreksi modulus :
W = 379,246 𝑐𝑚3
𝑡𝐷 = 10 mm
𝑓 11
= = 0.275
𝐹 40
Dari diagram koordinasi didapatkan w = 0,42
𝑓𝑠 23
= = 0.575
𝐹 40
230
110
3. Penumpu geladak tengah (center deck girder) dan penumpu geladak samping
(side deck girder)
l =4 x a
e = 0.5 x 3600
e = 0.5 x 3600
W = c x e x l2 x P x k (cm³)
W = 0,75 x 3,600 x (2,52)2 x 15,483 x 1 (cm³)
W = 265,472 cm³
Koreksi modulus :
W =265,472 𝑐𝑚3
𝑡𝐷 = 10 mm
𝑓 10
= = 0,25
𝐹 40
Dari diagram koordinasi didapatkan w = 0,375
𝑓 18
= = 0,45
𝐹 40
400
10
180
100
SDG I
W = c x e x l2 x P x k (cm³)
W = 0,75 x 3,55 x (2,52)2 x 15,483 x 1 (cm³)
W = 261,786 cm³
Koreksi modulus :
W =265,472 𝑐𝑚3
𝑡𝐷 = 10 mm
400
10
180
110
VII. PERHITUNGAN BRACKET
3 𝑊
t= 𝑐.√ + tk (mm)
𝑘1
3 𝑊
t = 46,2 . √ . √𝑘2 . ct (mm)
𝑘1
𝑡
ct = √
𝑡𝑎
W = modulus terkecil
k1 = 1,0
k2 = 0,91
tk = 1,5
3 93,75
t = 1,2 . √ + 1,5 (mm)
1
2. Panjang Lengan
3 𝑊
l = 46,2 . √ . √𝑘2 . ct (mm)
𝑘1
𝑡
ct =√𝑡𝑎 (t = t main frame = 11)
11
=√7 (mm)
= 1,25 (mm)
3 93,75
l = 46,2 . √ . √0,91 . 1,25 (mm)
1
l = 250,26≈ 260 mm
55
260
260
3 118,51
t = 1,2 . √ + 1,5 (mm)
1
𝑡
ct =√ (t = t deck beam = 10)
𝑡𝑎
10
=√7 (mm)
= 1,19 (mm)
3 118,51
l = 46,2 . √ . √0,91 . 1,19 (mm)
1
l = 257,60 ≈ 260 mm
260
260
50
c. Bracket untuk menguhubungkan side deck girder dengan deck beam (S.D.GD 1)
1. Tebal bracket
Modulus yang dipakai : Wdeckbeam = 118,51 cm3
3 𝑊
t= 𝑐.√ + tk (mm)
𝑘1
3 118,51
t = 1,2 . √ + 1,5 (mm)
1
𝑡
ct =√𝑡𝑎 (t = t deck beam = 10)
10
=√7 (mm)
= 1,19 (mm)
3 118,51
l = 46,2 . √ . √0,91 . 1 (mm)
1
l = 257,60 ≈ 260 mm
260
130
155 65
110
70
3 118,518
t = 1,2 . √ + 1,5 (mm)
1
2. Panjang Lengan
3 𝑊
l = 46,2 . √ . √𝑘2 . ct (mm)
𝑘1
𝑡
ct =√𝑡𝑎 (t = t deck beam = 10)
10
=√7 (mm)
= 1,19 (mm)
3 118,51
l = 46,2 . √ . √0,91 . 1 (mm)
1
l = 257,60 ≈ 260 mm
260
100
155 65
110
70
3 93,75
t = 1,2 . √ + 1,5 (mm)
1
2. Panjang Lengan
3 𝑊
l = 46,2 . √ . √𝑘2 . ct (mm)
𝑘1
𝑡
ct =√𝑡𝑎 (t = t main frame = 11)
11
=√7 (mm)
= 1,25 (mm)
3 93,75
l = 46,2 . √ . √0,91 . 1,25 (mm)
1
l = 250,26≈ 260 mm
55
260
214
120
240
111