Daftar Isi

1.1. Pengertian Akuntansi .................................................................................................................... 2


1.2. Unit Organisasi .............................................................................................................................. 3
1.3. Transaksi ........................................................................................................................................ 4
1.4. Prinsip Persamaan Akuntansi dalam Laporan Keuangan .............................................................. 6
1.5. Dasar-dasar Prosedur Pembukuan ................................................................................................ 8
2.1. Umum .......................................................................................................................................... 14
2.2. Pengertian Manajemen Proyek ................................................................................................... 15
2.3. Rencana Anggaran Biaya ............................................................................................................. 21
2.4. Waktu Pelaksanaan Proyek ......................................................................................................... 23
2.5. Sumber Daya Manusia................................................................................................................. 27
2.6. Biaya Proyek ................................................................................................................................ 31
2.7. Akuntansi ..................................................................................................................................... 35
3.1. Perhitungan Volume Pengerjaan................................................................................................. 42
3.2. Rekap Volume Pengerjaan .......................................................................................................... 73
3.3. Daftar Harga Bahan ..................................................................................................................... 76
3.4. Daftar Upah Pekerja .................................................................................................................... 79
3.5. Daftar Analisa Harga Satuan ........................................................................................................ 80
3.6. Rencana Anggaran Biaya ........................................................................................................... 123
3.7. Time Schedule ........................................................................................................................... 127
3.8. Saldo Awal ................................................................................................................................. 128
3.9. Transaksi Januari ....................................................................................................................... 129
3.10. Jurnal Januari ............................................................................................................................. 137
3.11. Buku Besar Januari .................................................................................................................... 152
3.12. Neraca Saldo Januari ................................................................................................................. 156
3.13. Laporan Rugi Laba Januari ......................................................................................................... 156
3.14. Transaksi Februari ..................................................................................................................... 158
3.15. Jurnal Februari ........................................................................................................................... 164
3.16. Buku Besar Februari .................................................................................................................. 174
3.17. Neraca Saldo Februari ............................................................................................................... 177
3.18. Laporan Rugi Laba Februari ....................................................................................................... 178
3.19. Transaksi Maret ......................................................................................................................... 180
3.20. Jurnal Maret .............................................................................................................................. 190

1
3.21. Buku Besar Maret ...................................................................................................................... 206
3.22. Neraca Saldo Maret ................................................................................................................... 210
3.23. Laporan Rugi Laba Maret .......................................................................................................... 211

2
BAB I

PENDAHULUAN

1.1.Pengertian Akuntansi
Akuntansi berasal dari bahasa Inggris “to account” yang artinya memperhitungkan atau
mempertanggungjawabkan. Dalam hal ini akuntansi berkaitan dengan masalah
pertanggungjawaban pengelola (pengurus) kepada pemilik perusahaan atas kepercayaan yang
telah diberikan kepada pengelola untuk menjalankan kegiatan perusahaan.
Akuntansi dapat didefinisikan dari dua segi yaitu :
1. Segi bidang ilmu
Keseluruhan pengetahuan yang bersangkutan dengan fungsi menghasilkan informasi
keuangan suatu unit organisasi kepada pihak yang berkepentingan untuk dijadikan dasar
pengambilan keputusan.
2. Segi proses / kegiatan
Kegiatan pencatatan, penyortiran, penggolongan, pengikthisaran, peringkasan dan
penyajian transaksi keuangan suatu unit organisasi dengan cara tertentu.
Fungsi menghasilkan informasi keuangan
Bahwa akuntansi adalah alat yang dikembangkan berdasarkan ilmu pengetahuan untuk
menghasilkan laporan keuangan. Laporan keuangan yang dihasilkan tersebut adalah laporan yang
menyajikan informasi keuangan kuantitatif yang dinyatakan dalam suatu mata uang (rupiah)
tentang posisi keuangan dan perubahan-perubahan, serta hasil kegiatan usaha dalam periode
tertentu.
Laporan keuangan utama yang dihasilkan dari proses akuntansi adalah neraca saldo dan
laporan rugi-laba. Meskipun bentuk kedua laporan ini bervariasi antara perusahaan yang satu
dengan yang lainnya, namun tujuan utamanya tetap sama.
1. Neraca
Dibuat dengan maksud untuk menggambarkan posisi keuangan suatu organisasi pada saat
tertentu.

2
2. Laporan Rugi-Laba
Disusun dengan maksud untuk menggambarkan hasil-hasil yang dicapai dalam periode
waktu tertentu.
Pada umumnya kedua laporan ini disusun setahun sekali (tahunan), namun tak jarang
dijumpai pula perusahaan menyusunnya tiap kwartal, bahkan tiap bulan. Dapat dibayangkan
apabila suatu perusahaan tidak mengetahui :
- Jumlah uang perusahaan yang ada di bank
- Jumlah pinjaman yang harus dibayar kepada kreditur
- Jumlah piutang yang ada pada debitur
- Jumlah barang dagangan yang ada di gudang
- Jumlah biaya promosi yang telah dikeluarkan
Tentu perusahaan tersebut akan mengalami kesulitan dalam kegiatan sehari-hari. Demikian pula
pihak-pihak lain yang berkepentingan terhadap perusahaan tersebut, seperti pemerintah, bank, dll.
Dalam banyak hal, pimpinan perusahaan akan sulit dan ragu mengambil keputusan bagi
perusahaannya, dan segala tindakan tanpa pertimbangan data-data tersebut akan mempunyai resiko
yang tinggi mengancam kelangsungan perusahaan.

1.2.Unit Organisasi
Bahwa laporan keuangan yang dihasilkan adalah laporan keuangan mengenai unit organisasi
yang dapat berupa perusahaan, perkumpulan, koperasi, panitia, unit pemerintah, yayasan, dan unit
organisasi lainnya.
Bentuk-bentuk badan organisasi :
1. Perusahaan perseorangan
Adalah suatu bentuk badan usaha yang hanya dimiliki oleh satu orang, karena modalnya
hanya berasal dari satu orang tersebut. Bentuk badan usaha semacam ini sangat sering
dijumpai dan biasanya merupakan perusahaan kecil karena modalnya sangat terbatas.
2. Persekutuan
Merupakan gabungan dari beberapa perusahaan perseorangan. Dalam persekutuan ini
terdapat beberapa orang pemilik yang disebut para sekutu. Modal persekutuan berasal
dari modal para sekutu.

3
3. Perseroan
Biasanya dibentuk untuk usaha yang memerlukan modal yang cukup besar. Untuk
mendapatkan suatu modal, perseroan menerbitkan surat saham dan menjualnya kepada
mereka yang berminat menanamkan uangnya dalam perusahaan.
Pihak yang Berkepentingan
Pihak yang memerlukan laporan keuangan untuk dijadikan dasar dalam bertindak atau
mengambil suatu keputusan. Pihak-pihak tersebut antara lain :

PIHAK KEPENTINGAN

INTERN
1. Manajemen Untuk dijadikan dasar dalam menyusun anggaran,
pelaksanaan anggaran, pengawasan kegiatan tersebut.
EKSTERN
1. Kreditur Untuk dijadikan dasar menilai kemampuan
perusahaan dalam membayar utang atau memberi
pinjaman.
Untuk dijadikan dasar dalam menentukan pajak
2. Pemerintah penghasilan, pajak pertambahan nilai, iuran
pembangunan daerah.
Untuk mengetahui jumlah kekayaan yang ditanamkan
dalam perusahaan tersebut.
3. Pemilik/pemegang saham

1.3.Transaksi
Bahwa yang menjadi obyek akuntansi adalah transaksi. Yang dimaksud dengan transaksi
adalah semua peristiwa atau kejadian yang mengubah posisi keuangan suatu perusahaan, misalnya:
- Pembelian barang dagangan
- Pembayaran gaji pegawai
- Penjualan barang dan jasa
- Pemakaian bahan baku yang dimasudkan proses produksi
- Pelunasan utang ke bank, dsb

4
Hubungan Tata Buku dan Akuntansi
Tata buku hanya merupakan bagian kecil dari akuntansi yang mencakup kegiatan pencatatan
dan transaksi perusahaan dengan cara-cara tertentu. Sebagian besar dari kegiatan ini hanya
menyangkut masalah tulis-tulis saja. Dan karena itu tidak mengherankan bila fungsi tata
buku ini digantikan oleh mesin pembukuan / komputer.
Bidang Pekerjaan (Profesi) Akuntansi
Orang yang ahli dalam bidang akuntansi dinamakan Akuntan. Bidang-bidang profesi dalam
bidang akuntansi ada beberapa pilihan :

1. Akuntan swasta
Para akuntan yang bekerja dalam perusahaan-perusahaan tertentu seperti
perbankan, perusahaan semen , perusahaan kertas, dsb, dikatakan bekerja di bidang
akuntansi swasta yang menduduki jabatan seperti : kontroler, bagian pembukuan, staf
ahli perpajakan, staf pemeriksa intern, dan staf penyusun anggaran.
2. Akuntan publik
Bidang akuntan publik dilaksanakan oleh kantor-kantor yang didirikan oleh para
akuntan. Tugas kantor akuntan adalah memberikan pelayanan kepada masyarakat
terutama pada unit-unit organisasi yang berhubungan dengan bidang akuntansi.
Pemberian jasa ini dapat berupa :
- Pemeriksaan laporan keuangan
- Penyusunan sistem akuntansi
- Studi kelayakan
- Membantu menyusun laporan keuangan untuk kepentingan perpajakan dan
perkreditan.
3. Akuntan pemerintah
Ahli akuntansi yang bekerja pada pemerintah biasanya ditempatkan pada lembaga-
lembaga seperti Badan Pemeriksa Keuangan (BPK), Badan Pengawas Keuangan dan
Pembangunan (BPKP), Departemen Keuangan, Inspektorat Wilayah Provinsi,dsb.
Tugasnya selain melaksanakan kegiatan pemeriksaan, juga merancang sistem akuntansi
yang dapat menyediakan informasi bagi kepentingan pejabat eksekutif.

5
4. Akuntan pendidik
Akuntansi ini bertugas menyampaikan ilmu akuntansi kepada para siswa atau
mahasiswa lembaga pendidikan swasta atau negeri, bahkan instansi pemerintah sebagai
guru atau dosen. Selain itu juga melakukan penelitian-penelitian guna pengembangan
ilmu akuntansi itu sendiri.
Bidang Spesialisasi Akuntansi
Profesi bidang akuntansi juga mempunyai bidang spesialisasi, antara lain :
- Bidang akuntansi keuangan
- Bidang auditing (pemeriksa akuntansi)
- Bidang akuntansi biaya
- Bidang akuntansi manajemen
- Bidang akuntansi perpajakan
- Bidang sistem akuntansi
- Bidang akuntansi anggaran
- Bidang akuntansi pemerintahan

1.4. Prinsip Persamaan Akuntansi dalam Laporan Keuangan


1. Neraca sebagai Inti Laporan Keuangan
Neraca merupakan suatu daftar yang menggambarkan aktiva (harta kekayaan), hutang-
hutang dan modal yang dimiliki oleh suatu perusahaan pada saat tertentu. Hubungan ini
dapat dinyatakan dalam bentuk persamaan sebagai berikut :
Aktiva = Hutang + Modal
Sumber-sumber = kewajiban para kewajiban
Kekayaan perusahaan kreditur pada pemilik

- Aktiva adalah sumber-sumber ekonomi yang dimiliki perusahaan yang biasanya


dinyatakan dalam satuan uang.
- Hutang adalah kewajiban-kewajiban yang harus dibayar oleh perusahaan dengan
uang atau jasa pada suatu saat tertentu di masa yang akan datang.
- Dalam neraca biasanya modal dicantumkan dibawah hutang. Modal pada
hakekatnya merupakan hak milik perusahaan atas kekayaan (aktiva) perusahaan.

6
2. Pengaruh Transaksi-transaksi Terhadap Neraca
- Transaksi yang tidak berpengaruh terhadap modal
Transaksi pembelian peralatan
- Transaksi yang berpengaruh terhadap modal

Tipe transaksi pengaruh terhadap modal


a. Setoran modal oleh pemilik menambah
b. Pengambilan prive oleh pemilik mengurangi
c. Penghasilan menambah
d. Biaya mengurangi

3. Laporan Rugi-Laba
Dalam laporan rugi-laba ditunjuk laba atau rugi yang diperoleh perusahaan dalam suatu
periode tertentu dimana diperinci juga penghasilan dan biaya yang telah menimbulkan
adanya rugi atau laba tersebut.

4. Laporan Perubahan Modal


Ada hal yang berpengaruh terhadap perubahan modal :
- Laba bersih
- Pengambilan prive

5. Hubungan Antara Laporan Keuangan


Dalam menyusun laporan keuangan perusahaan biasanya digunakan urutan-urutan sbb :
- Laporan rugi-laba
- Laporan perubahan modal
- Neraca

7
1.5. Dasar-dasar Prosedur Pembukuan
1. Kategori data yang dibutuhkan
- Aktiva
- Hutang
- Modal
- Penghasilan
- Biaya
Di dalam menganalisa transaksi yang berhubungan dengan dasar-dasar akuntansi antara
lain :
- Saldo awal modal
- Tambahan modal bersih ( setelah dikurangi pengambilan prive )
- Laba bersih ( penghasilan dikurangi biaya )

MODAL
(MODAL AWAL) + (TAMBAHAN − PRIVE MODAL) + (PENGHASILAN − BIAYA)

AKTIVA = HUTANG + MODAL

2. Rekening sebagai Alat Pencatat


Rekening adalah suatu alat untuk mencatat transaksi-transaksi keuangan yang berkaitan
dengan aktiva, hutang, modal, penghasilan dan biaya-biaya. Tujuan dari pemakaian
rekening adalah untuk mencatat data-data yang menjadi dasar penyusunan laporan-
laporan keuangan. Jumlah rekening-rekening yang perlu diadakan dalam pembukuan
tergantung kebutuhan. Kumpulan rekening disebut Buku Besar atau Ledger.

3. Penggolongan Rekening-rekening
- Rekening-rekening Neraca
Disebut juga rekening-rekening riil, yaitu rekening-rekening yang pada akhir periode
akan dilaporkan di dalam neraca, yaitu rekening aktiva, rekening hutang, dan
rekening modal.
- Rekening-rekening Rugi-Laba

8
Disebut juga rekening-rekening Nominal, yaitu rekening yang pada akhir periode
akan dilaporkan dalam rugi-laba. Rekening ini meliputi rekening penghasilan dan
rekening biaya.

Penggolongan rekening-rekening dapat diperjelas dengan skema berikut :

4. Bentuk dan Isi rekening


Dalam praktek dikenal berbagai macam bentuk rekening, tetapi yang paling banyak
diterapkan adalah rekening yang berbentuk huruf “T”.
REKENING

(sisi debet) (sisi kredit)

Mencatat di sisi kiri disebut mendebet rekening, sedangkan apabila mencatat rekening di
sisi kanan disebut mengkredit rekening. Secara lebih lengkap bentuk rekening “T” dapat
dilukiskan sebagai berikut :

9
Rekening

Tanggal Keterangan F Jumlah Tanggal Keterangan F Jumlah

(sisi debet) (sisi kredit)

5. Hubungan antara Rekening Riil dengan Neraca


Rekening riil yang bersaldo debet adalah aktiva , dan yang bersaldo kredit adalah hutang
dan modal.

NERACA SALDO BUKU BESAR - REKENING-REKENING RIIL


kiri kanan kiri atau debet kanan atau kredit

hutang dan modal adalah


Aktiva Hutang dan aktiva adalah rekening riil
rekening riil dengan saldo
Modal dengan saldo debet kredit

6. Struktur Rekening-rekening Nominal


Rekening nominal adalah rekening-rekening yang digunakan untuk mancatat sumber-
sumber penghasilan dan penyebab terjadinya biaya-biaya.

10
7. Aturan Pendebetan dan Pengkreditan

NERACA
AKTIVA HUTANG

Rekening- rekening Aktiva Rekening-rekening Hutang

Debet Kredit Debet Kredit


(+) (-) (-) (+)

MODAL

Rekening-rekening Modal

Debet Kredit
(-) (+)

11
8. Rekening-rekening Nominal (Rekening Rugi-Laba)

REKENING MODAL
DEBET KREDIT

Rekening- rekening Biaya Rekening-rekening Penghasilan

Debet Kredit Debet Kredit


(+) (-) (-) (+)

9. Rekening Prive
Pemilik perusahaan perseorangan atau sekutu-sekutu dari suatu perusahaan biasanya
secara periodik mengambil uang atau barang dagangan dari perusahaannya untuk
keperluan pribadi. Pengambilan barang atau uang semacam ini disebut juga pengambilan
prive. Pengambilan prive ini menyebabkan berkurangnya modal pemilik yang
bersangkutan dan oleh karenanya dapat dicatat dengan mendebet modal. Namun
demikian biasanya perusahaan-perusahaan menyelenggarakan suatu rekening khusus
yang disebut Rekening Prive. Pendebetan atas rekening prive berarti menambahnya
rekening prive dan mengurangi modal.

10. Saldo-saldo Rekening


Rekening merupakan alat untuk mencatat pertambahan dan pengurangan dalam satuan
uang. Penambahan dicatat pada sisi lainnya. Jumlah pertambahan dapat diketahui dengan

12
menjumlah sisi pertambahan, demikian pula jumlah pengurangan dapat diketahui dengan
menjumlah sisi pengurangan.
Aturan pendebetan dan pengkreditan serta saldo-saldo pada umumnya dari berbagai jenis
rekening, dapat dilihat di berikut

jenis rekening pertambahan pengurangan saldo (umumnya)


aktiva debet kredit debet
hutang kredit debet kredit

Rekening modal :
modal kredit debet kredit
prive debet kredit debet
penghasilan kredit debet kredit
biaya-biaya debet kredit debet

Jurnal dan Posting


Buku besar adalah pencatatan dimana pengaruh-pengaruh dari transaksi-transaksi perusahaan
diklarifikasikan dan diringkas. Urutan pencatatan transaksi dapat dilukiskan dalam digram
sebagai berikut :

Transaksi Bukti-Bukti Pembukuan Jurnal Buku Besar

13
BAB II
TINJAUAN PUSTAKA

2.1. Umum
Kegiatan proyek merupakan suatu kegiatan sementara yang berlangsung dalam jangka
waktu terbatas, dengan sumber daya tertentu dan dimaksudkan untuk melaksanakan tugas yang
sasaran dan tujuannya telah digariskan dengan jelas (Soeharto, 1999). Dalam Proses mencapai
hasil akhir kegiatan proyek tersebut telah ditentukan batasan-batasan yaitu besar biaya (anggaran)
yang dialokasikan, jadwal dan mutu yang harus dipenuhi. Ketiga batasan tesebut dikenal dengan
istilah tiga kendala (triple constrain). Jadi proyek harus dilaksanakan dengan kurun waktu yang
telah ditentukan dengan biaya yang tidak melebihi anggaran serta mutu yang telah ditentukan.
Agar suatu proyek dapat berhasil perlu diperhatikan faktor-faktor spesifik yang penting yang
disebut sebagai ciri-ciri umum manajemen proyek, sebagai berikut (Dipohusodo, 1996):
 Tujuan, sasaran, harapan-harapan, dan strategi proyek hendaknya dinyatakan secara jelas dan
terinci sedemikian rupa sehingga dapat dipakai untuk mewujudkan dasar kesepakatan segenap
individu dan satuan organisasi yang telibat.
 Diperlukan Rencana Kerja, Jadwal, dan Anggaran Belanja yang realistis.
 Diperlukan peran dan tanggung jawab di antara semua satuan organisasi dan individu yang
terlibat di dalamnya.
 Diperlukan mekanisme untuk memonitor, mengendalikan, mengkoordinasikan dan mengawasi
pelaksanaan tugas dan tanggung jawab pada berbagai strata organisasi.
 Diperlukan mekanisme sistem evaluasi yang diharapkan dapat memberikan umpan balik bagi
manajemen, yang digunakan sebagai pelajaran dan dipakai sebagai pedoman di dalam
peningkatan produktivitas proyek.

14
 Sesuai dengan sifat dinamisnya suatu proyek, apabila diperlukan Tim Proyek atau satuan
organisasi proyek dapat dimungkinkan untuk melakukan kegiatan-kegiatan yang harus
bergerak diluar kerangka organisasi tradisional atau rutin, akan tetapi dengan tetap beroientasi
pada tercapainya produktivitas.
 Diperlukan pengertian dan pemahaman mengenai tata cara dan dasar-dasar peraturan birokrasi,
dan pengetahuan tentang cara-cara mengatasi kendala birokrasi.

2.2.Pengertian Manajemen Proyek


Manajeman adalah proses merencanakan, mengorganisir, memimpin, dan mengendalikan
kegiatan anggota serta sumber daya yang lain untuk mencapai sasaran organisasi atau perusahaan
yang telah ditentukan. Yang dimaksud dengan proses adalah mengerjakan sesuatu dengan
pendekatan yang sistematis. Sedang sumber daya perusahaan terdiri dari tenaga, keahlian, dana,
dan informasi. Pemikiran tentang manajemen berkembang pada jaman industri modern dalam
rangka upaya meningkatkan efisiensi dan produktivitas pabrik pada umumnya dan tenaga kerja
pada khususnya. Dalam melaksanakan suatu manajemen dikenal kegiatan-kegiatan manajemen
yang merupakan langkah-langkah pokok dalam melaksanakan fungsi manajemen yang baik.
Langkah-langkah itu dikenal dengan fungsi-fungsi manajemen, yaitu (Soeharto, 1997):
1. Merencakanan (Planning)
2. Mengorganisasi (Organizing)
3. Mengisi jabatan (Staffing)
4. Mengarahkan (Directing)
5. Mengendalikan (Controling)
Berdsarkan fungsi-fungsi manajemen diatas, maka fungsi perencanaan dan pengendalian
merupakan dua fungsi utama dalam melaksanakan manajemen, karena kedua fungsi tersebut
sangat berkaitan satu dengan yang lainnya. Adapun penjelasannya sebagai berikut:

1. Perencanaan (Planning)
Perencanaan merupakan fungsi dasar manajemen karena dapat digunakan sebagai pedoman
untuk mencapai tujuan yang telah ditetapkan. Perencanaan perlu dirinci lebih lanjut dengan
membuat rencana kegiatan yang lebih rapi, jelas kaitannya dan urutannya dalam menyusun
rencana kerja dan penjadwalan (scheduling) dengan memperhitungkan sumber daya yang terbatas
serta faktor-faktor yang mempengaruhinya. Faktor-faktor tersebut antara lain:

15
a. Ketersediaan tenaga kerja dengan jumlah, keterampilan, keahlian, mutu serta pasaran
harganya/upah.
b. Ketersediaan bahan-bahan bangunan yang dibutuhkan dengan memperhatikan jumlah, mutu,
harga dan pengangkutannya sampai di lokasi proyek.
c. Pengadaan modal kas dan modal kerja serta penggunaannya secara tepat dan hemat.
d. Ketersediaan peralatan pembangunan proyek baik milik perusahaan sendiri maupun disewa
dari pihak lain. Dalam hal ini perlu diperhatikan mobilitas peralatan yang bersangkutan karena
hal ini terkait dengan jadwal kegiatan proyek yang tidak mudah begitu saja diubah-ubah, serta
kemungkinan beban ongkos yang harus ditanggung dan dibayarkan.

2. Pengorganisasian (Organizing)
Kegiatan pengorganisasian merupakan kegiatan penyusunan dan pengaturan sistem kerja
antara unsur-unsur pelaksana bangunan, dimana masing-masing memiliki tugas dan kewajiban,
tanggung jawab dan wewenang sesuai dengan peraturan yang ditetapkan. Setiap personil
diharapkan mampu bekerja maksimal sesuai dengan kapabilitasnya.
Dalam organisasi yang bersangkutan juga diusahakan adanya pengaturan hubungan vertikal
dan horisontal yang harmonis sehingga betul-betul menjamin terciptanya suatu team work yang
kompak dan mantap. Prinsip-prinsip yang perlu diterapkan dalam pengorganisasian antara lain:
a. Masing-masing petugas memiliki tugas, kewajiban dan tanggung jawab yang jelas dan tertentu
terhadap atasannya masing-masing.
b. Masing-masing petugas memiliki wewenang yang sepadan denga posisi jabatan atau tanggung
jawabnya, sehingga petugas tersebut mampu bekerja semaksimal mungkin.
c. Garis komando selangsung dan sepraktis mungkin untuk menjamin komunikasi yang lancar
dan pengambilan keputusan yang cepat dan tepat.
Berdasarkan proses pengembangan organisasi, ada beberapa bentuk struktur organisasi
yang umumnya dipilih, yaitu:

16
a) Organisasi Garis (Line Organization)

OWNER

MANAJER PROYEK

MANAJER LAYANAN PENDUKUNG MANAJER

PERENCANA KONSTRUKSI

Gambar 2.1 Bentuk Struktur Organisasi Garis


(Sumber: Arnatha, Made. 2004. Manajemen Proyek Konstruksi.
Denpasar: Teknik Sipil Universitas Udayana)

Karakteristik antara lain:


a. Memiliki bentuk organisasi yang sederhana
b. Jumlah karyawan sedikit dan pemilik merupakan pimpinan tertinggi.
c. Pemberian wewenang dan tanggung jawab bergerak vertikal dari atas ke bawah.

Keunggulan antara lain:


a. Bentuk organisasi sederhana, mudah dipahami dan dilaksanakan.
b. Pembagian tugas, tanggung jawab dan wewenang cukup jelas.
c. Pengambilan keputusan dapat dilakukan cepat, karena komunikasi mudah.

Kekurangan antara lain:


a. Bentuk organisasi tidak fleksibel.
b. Kemungkinan bertindak otokratis dari pimpinan cukup besar.

17
c. Ketergantungan pada seseorang cukup besar, jika salah satu hilang akan terjadi kekacauan.

b) Organisasi Garis dan Staf (Line and Staff organization)

OWNER

DIVISI MANAJER PROYEK DIVISI


PERENCANAAN KONSTRUKSI

MANAJER LAYANAN MANAJER


PERENCANA PENDUKUNG KONSTRUKSI

Gambar 2.2 Bentuk Organisasi garis dan Staff


(Sumber: Arnatha, Made. 2004. Manajemen Proyek Konstruksi.
Denpasar: Teknik Sipil Universitas Udayana)

Keunggulan antara lain:


a. Pembagian tugasnya jelas (antara orang yang menjalankan tugas pokok dan pemberi saran).
b. Pengambilan keputusan lebih matang.
c. Spesialisasi keahlian dapat dikembangkan.
d. Adanya staf ahli memungkinkan pencapaian mutu pekerjaan lebih baik.
Kekurangan antara lain:
a. Saran dari staf mungkin sulit dilaksanakan, karena kurangnya tanggung jawab pekerjaan.
b. Jika pejabat garis mengabaikan gagasan dari staf, maka gagasan menjadi tidak berguna.
c. Bagi pelaksana operasional, perbedaan antara perintah dengan saran tidak selalu jelas.

18
c) Organisasi Fungsional (Functional organization)

OWNER

MANAJER PROYEK

DIVISI PERENCANAAN DIVISI KONSTRUKSI

Gambar 2.3 Bentuk Struktur Organisasi fungsional


(Sumber: Arnatha, Made. 2004. Manajemen Proyek Konstruksi.
Denpasar: Teknik Sipil Universitas Udayana)
Keunggulan antara lain:
a. Adanya spesialisasi menyebabkan tugas dilaksanakan dengan baik.
b. Koordinasi antara orang-orang dalam satu fungsi mudah dijalankan.
Kekurangan antara lain:
a. Ditinjau dari karyawan, banyaknya atasan akan membingungkan.
b. Terjadi saling mementingkan fungsi masing-masing yang menyebabkan koordinasi
menyeluruh sulit dijalankan.
c. Mutasi pekerjaan sulit dilaksanakan karena telah terspesialisasi.
d) Organisasi panitia (Commitee Organization)

Ketua
Wakil Ketua

SEKRETARIS BENDAHARA

SIE A SIE B SIE C SIE D

19
Gambar 2.4 Bentuk Organisasi Panitia
(Sumber: Arnatha, Made. 2004. Manajemen Proyek Konstruksi.
Denpasar: Teknik Sipil Universitas Udayana)

Karakteristik antara lain:


a. Pelaksanaan tugas atau kegiatan memiliki jangka waktu yang terbatas, volume kegiatan
tertentu.
b. Tanggung jawab dan kepemimpinan dilaksanakan secara bersama.
c. Semua anggota memiliki tanggung jawab, wewenang dan hak yang sama.
d. Anggota kelompok dipisahkan menurut bidang tugas kegiatan tertentu dan dilaksanakan dalam
bentuk satuan tugas.
Keunggulan antara lain:
a. Keputusan dapat diambil secara tepat.
b. Pembinaan kerjasama antar anggota mudah dilaksanakan.
Kekurangan antara lain:
2. Kemampuan anggota kurang dapat berkembang.
3. Sulit menentukan penanggung jawab apabila terjadi hambatan.
4. Jalur perintah seringkali membingungkan.

3 Penyediaan Staf (Staffing)


Dengan tersusunnya skema organisasi proyek, akan memudahkan pemimpin/manajer proyek
untuk pemilihan orang-orang yang tepat dan cakap untuk menempati posisi yang ada dalam
organisasi tersebut sesuai dengan keahliannya masing-masing.
Hal ini penting untuk menjamin dilaksanakannya rencana serta kegiatan yang sudah
digariskan melalui perencanaan dan struktur organisasi yang baik. Dari struktur organisasi unsur-
unsur pengelolaa proyek terdapat 5 (lima) bidang kegiatan yang dapat diidentifikasi yaitu: bidang
teknik design (design engineering), bidang control biaya (cost control/financial control), bidang
pengadaan bahan atau peralatan (equipment procurement), bidang pengawasan di lapangan (site
surpervisor) dan bidang administrasi.

20
4 Pengarahan (Directing)
Tahap pengarahan ini meliputi kegiatan pembinaan dan kepemimpinan yang dilaksanakan
oleh atasan kepada bawahannya. Faktor motivasi sangat berperan dalam mengarahkan bawahan
bagi seorang pemimpin. Hal ini dapat dilakukan dengan cara mengadakan komunikasi timbal balik
yang lancar antara atasan dan bawahan dan adanya unsur partisipasi dalam memecahkan suatu
masalah dan pengambilan keputusan.
Fungsi pengarahan ini bertujuan agar bawahan benar-benar mengetahui apa yang harus
dilakukan dan bagaimana cara melakukannya dengan benar, sehingga pada akhirnya diharapkan
tercipta hubungan yang harmonis antara komponen-komponen pelaksana.

5 Pengawasan (Controlling)
Pengawasan dimaksudkan untuk menjamin pelaksanaan proyek sesuai dengan ketentuan
dalam Rencana Kerja dan Syarat-syarat (RKS) dan rencana waktu (Time Schedulle) yang telah
ditetapkan.
Pada suatu proyek konstruksi, pengawasan dilakukan secara berkala oleh pihak owner dan
konsultan pengawas, disamping pengawasan yang dilakukan oleh kontraktor itu sendiri.

2.3. Rencana Anggaran Biaya


Setelah kita memahami apa-apa yang dilakukan oleh orang yang ingin mendirikan suatu
bangunan dan siapa-siapa yang tersangkut di dalamnya, maka kita dapat menyusun suatu
anggaran-anggaran mana yang merupakan harga dari bangunan yang kita buat itu. Pada dasarnya
rencana anggaran biaya ini merupakan bagian terpenting dalam menyelenggarakan pembuatan
bangunan.
Rencana anggaran biaya adalah besarnya biaya yang diperkirakan dalam pekerjaan proyek
yang disusun berdasarkan volume dari setiap item pekerjaan pada gambar atau bestek . RAB
diajukan oleh kontraktor pada saat terjadi penawaran, yang mana RAB ini diakai patokan bagi
kontraktor untuk mengajukan penawaran.. Biaya ini disamping tergantung pada volume, juga
sangat tergantung pada upah tenaga kerja dan karyawan, harga material yang dibutuhkan dan jasa
kontraktor serta pajak.

21
Maksud dan tujuan penyusunan RAB bangunan adalah untuk menghitung biaya-biaya yang
diperlukan dari suatu bangunan dan dengan biaya ini bangunan tersebut dapat terwujud sesuai
dengan yang direncanakan.
Ada tiga faktor penting yang berpengaruh dalam penyusunan RAB, yaitu:
1. Ketentuan-ketentuan dan persyaratan yang harus dipenuhi dalam pelaksanaan pembuatan
bangunan serta gambar-gambar konstruksi bangunan.
2. Harga bahan-bahan dan upah kerja.
3. Koefisien-koefisien yang telah ada.
Dalam RAB itu disusun banyaknya tiap bagian dari pekrjaan itu sebagaimana disebutkan
dalam bestek, secara berurutan dari tiap item pekerjaan. Misal, jumlah satuan sudah didapat,
kemudian jumlah ini dikalikan dengan harga satuan dari tiap-tiap macam pekerjaan itu.
Selanjutnya jumlah semua bagian-bagian itu adalah rencana anggaran biaya bangunan itu.
Sebagai contoh, dibawah ini Rencana Anggaran Biaya sederhana:

No Uraian Banyaknya Harga Jumlah Jumlah


Pekerjaan bahan (a) Analisa (b) (a x b) Harga
1 Pembersihan m3/m2 Taksir ............ ............ ............
2 Galian Tanah ............ ............ ............ ............ ............
3 Pondasi ............ ............ ............ ............ ............
4 Pas. Bata ............ ............ ............ ............ ............
5 Pek. Pelesteran ............ ............ ............ ............ ............
6 Pek. Atap ............ ............ ............ ............ ............
7 Pek. Lantai ............ ............ ............ ............ ............
8 Pek. Plafond ............ ............ ............ ............ ............
9 Pek. Cat ............ ............ ............ ............ ............
10 Pek. Gantungan ............ ............ ............ ............ ............
11 Pek. Lain-lain ............ ............ ............ ............ ............

Jumlah Rp.........
Biaya Tak terduga Rp.........

22
PPN + Pajak Penjualan/Jasa 5% Rp.........

Gambar 2.5 Besarnya Anggaran Biaya adalah Rp......... Rencana


Anggaran Terbilang (........................................................................) Biaya
Sederhana
(Sumber:
Mukomoko,Ir. J.A. 1985. Dasar Penyusunan
Anggaran Biaya Bangunan)

2.4. Waktu Pelaksanaan Proyek


Yang dimaksud time control adalah pengendalian terhadap waktu pelaksanaan proyek, agar
proyek dapat diselesaikan dalam batas waktu yang ditetapakan. Keterlambatan penyelesaian
proyek, tentu akan membawa risiko bertambahnya biaya.
Oleh karena itu dalam pengandalian waktu pelaksanaan proyek, biasanya bila proyek
terlambat, perlu dilakukan percepatan waktu pelaksanaan salah satu atau lebih dari satu kegiatan,
agar durasi total dari proyek tidak terlampui, untuk menghindari pinalti berupa denda. Dengan
demikian biasanya kita harus memilih kegiatan mana saja dalam suatu lintasan kritis, yang harus
dipercepat dengan risiko tambahnya biaya yang paling kecil.
Alat kendali waktu yang digunakan pelaksanaan proyek, pada dasarnya ada tiga macam
metode, yaitu:
a. Bar Chart method dan kurva S
Biasanya digunakan untuk proyek-proyek yang sederhana. Bar Chart merupakan bagan
yang memuat suatu daftar kegiatan-kegiatan yang akan dilaksanakan, yang disusun secara
berbaris ke bawah dimana masing-masing kegiatan memiliki waktu pelaksanaan yang
diperlukan (durasi) yang ditunjukkan dalam bentuk garis berskala waktu (umunya garis
dipertebal sehingga menyerupai balok). Panjang setiap garis/balok menunjukkan lamanya
waktu yang diperlukan untuk masing-masing kegiatan serta saat untuk memulai dan
mengakhiri kegiatan tersebut. Sadangkan satuan waktu dapat berupa hari, minggu, bulan atau
interval waktu tertentu.
Dalam hal perhitungan melalui bobot masing-masing jenis kegiatan maka Bar Chart dapat
dilengkapi dengan suatu kurva yang dikenal sebagai kurva “S”, yang merupakan fungsi waktu
dan presentasi bobot pekerjaan.

23
Untuk memperhitungkan presentase bobot masing-masing jenis kegiatan haruslah diketahui
baik biaya masing-masing kegiatan maupun jumlah biaya keseluruhan pekerjaan. Perhitungan
presentase bobot masing-masing jenis kegiatan adalah sebagai berikut:
Biaya Kegia tan A
Bobot Kegia tan   100%
Biaya Total Seluruh Pe ker jaan

Contoh gambar Bar Chart dan Kurva S:


No. Jenis Pekerjaan Jan Mar Mei Jul Sep Nov

1 Desain Engineering
kurva “S”
80 %

2 Menyiapkan lahan

60 %
3 Membangun pondasi

4 40 %
Membeli material dan
pabrikasi
5 20 %
Pasang dinding, atap
dan isolasi

Gambar 2.6 Tampilan Bar Chart dan kurva “S”


(Sumber: Soeharto. 1997. Manajemen Proyek)

b. Precedence diagram method


Biasanya digunakan untuk proyek-proyek yang sifat pelaksanaannya memanjang, seperti:
proyek jalan, saluran, dan terowongan. Kegiatan dalam precedence diagram method (PDM)
digambarkan oleh sebuah lambing segi empat karena letak kegiatan ada dibagian node
sehingga sering juga disebut Activity On Node (AON). Kelebihan precedence diagram method
dibanding Arrow diagram adalah:
- Tidak memerlukan kegiatan fiktif / dummy sehingga pembuatan jaringan menjadi lebih
sederhana.

24
- Hubungan overlapping yang berbeda dapat dibuat tanpa menambah jumlah kegiatan.

Kegiatan dalam precedence diagram method diwakili oleh sebuah lambing yang mudah
diidentifikasi misalnya sebagai berikut:

ES Jenis EF
Kegiatan
LS LF
No Keg Durasi

Gambar 2.7 Lambang Kegiatan


(Sumber: Ervianto, Wulfram I. 2005. Manajemen Proyek Konstruksi)

Catatan:
ES = Earliest Start
EF = Earliest Finish
LS = Latest Start
LF = Latest Finish
LF- ES = Durasi Kegiatan
Contoh precedence diagram method seperti dibawah ini:

25
Gambar 2.8 Precedence Diagram Method
(Sumber: Ervianto, Wulfram I. 2005. Manajemen Proyek Konstruksi)

c. Arrow diagram method


Bisanya digunakan untuk proyek yang kegiatan satu dengan yang lain sangat saling
berkaitan, seperti proyek gedung bertingkat. Arrow Diagram Method terdiri dari anak panah
dan lingkaran/segi empat. Anak panah menggambarkan kejadian. Pada penggambaran network
planning, digunakan symbol yang dapat berbentuk segi empat ataupun lingkaran. Penulisan
kejadian dan kegiatan seperti berikut:

EET = Earliest Event Time

0 (Saat kejadian paling pagi)

Nomor Kejadian 0
0
LET = Latest Event Time
(Saat kejadian paling lambat
Gambar 2.9 Simbul Kejadian
(Sumber: Ervianto, Wulfram I. 2005. Manajemen Proyek Konstruksi)

26
Bentuk jaringan kerja telah diketahui seperti tergambar dan yang akan dilakukan adalah
perhitungan “ke depan”, “ke blakang”, float, slack, dan critical path.

Gambar 3.0 Arrow Diagram Method


(Sumber: Ervianto, Wulfram I. 2005. Manajemen Proyek Konstruksi)

2.5. Sumber Daya Manusia


Pelaksanaan suatu proyek umumnya terdiri dari beberapa aktivitas atau kegiatan, dimana
semua aktivitas tersebut memerlukan waktu, dana dan sumber daya. Sumber daya yang dimaksud
dapat berupa tenaga manusia, peralatan, dan material. Sumber daya manusia (tenaga kerja)
merupakan salah satu sumber daya yang penting dalam suatu proyek, dimana seringkali
penyediaannya terbatas. Tenaga kerja yang dimaksud adalah tenaga ahli, menengah dan kasar.
Kebutuhan tenaga kerja selalu berfluktuasi sesuai dengan volume pekerjaan, sehingga penyediaan
jumlah tenaga kerja harus mengikuti tuntutan perubahan kegiatan yang sedang berlangsung. Oleh
karena setiap aktivitas memerlukan waktu dan sumber daya maka setiap periode waktu di dalam
jadwal pelaksanaan tingkat kebutuhan sumber daya manusia tidak selalu sama besar tergantung
dari volume pekerjaan dan jenis pekerjaan.

Akrivitas Kebutuhan 5 5 7 7 10 10 10 10 5 3 3
A 5
B 2
C 3

27
Waktu 0 1 2 3 4 5 6 7 8 9 10

Gambar 3.1 Tingkat kebutuhan sumber daya manusia


(Sumber: Sutjipto. 1986. Manajemen Proyek Konstruksi)

Pada gambar dapat dilihat bahwa tingkat kebutuhan sumber daya manusia pada setiap
periode waktu tidak selalu sama besar, dimana keterlibatannya bersifat relatif permanen selama
waktu pelaksanaan proyek sehingga akan terdapat beberapa sumber yang tidak terpakai
(menganggur) pada beberapa periode waktu seperti terlihat pada gambar berikut:

Jumlah sumber daya


sumber daya yang menganggur

10
9
8
7
6
5
4
3
2
1

1 2 3 4 5 6 7 8 9 10 waktu (hari)

Gambar 3.2 Tingkat penggunaan sumber daya manusia


(Sumber: Sutjipto. 1986. Manajemen Proyek Konstruksi)

28
Dapat dilihat bahwa pengalokasian sumber daya merupakan hal yang penting di dalam
perencanaan. Apa yang telah direncanakan akan dapat direalisasikan bila tersedianya sumber daya
yang dibutuhkan. Dalam pengalokasisn sumber daya manusia, dapat dibedakan menjadi 2 yaitu:

2.5.1 Alokasi Sumber Daya Terbatas (limited resources allocation)


Tujuan dari alokasi sumber daya terbatas adalah mengatur aktivitas-aktivitas
sehingga tingkat kebutuhan sumber daya tidak melampaui tingkat kemampuan penyedia
sumber daya. Bila perlu diadakan penguduran waktu (penambahan waktu) penyelesaian
proyek, dimana penambahan waktu tersebut harus diusahakan seminimum mungkin.

unit sumber daya

limit sumber daya

skala waktu
Gambar 3.3 Alokasi sumber daya (sebelum penjadwalan kembali)
(Sumber: Sutjipto. 1986. Manajemen Proyek Konstruksi)

29
unit sumber daya

limit sumber daya

skala waktu
tambahan waktu
Gambar 3.4 Alokasi sumber daya (setelah dijadwalan kembali)
(Sumber: Sutjipto. 1986. Manajemen Proyek Konstruksi)

2.5.2 Alokasi Sumber Daya Tidak Terbatas (Unlimited Resources Allocation)


Alokasi sumber daya tidak terbatas adalah alokasi sumber daya dimana tingkat
kemampuan penyedia sumber daya dapat mencukupi kebutuhan. Untuk mengalokasikan
sumber daya tidak terbatas dapat dilakukan Resources Leveling atau pemerataan dengan
batasan waktu (time-limit).
Tujuan dari alokasi sumber daya tidak terbatas ini adalah untuk mengatur jadwal
akitvitas sedemikian rupa sehingga tingkat kebutuhan sumber daya dari waktu ke waktu
menjadi serata mungkin. Akibatnya akan diperoleh tingkat penggunaan sumber daya yang
lebih besar atau tingkat pengangguran yang lebih kecil sehingga biaya pengangguran
sumber daya menjadi lebih kecil.
Pemerataan sumber daya manusia dapat diatur pada aktivitas-aktivitas yang memiliki
float (tenggang waktu). Umumnya leveling yang sempurna sulit untuk dicapai tetapi
pendekatan kearah itu dapat dicapai.

unit sumber daya

time limit

30
Gambar 3.5 Alokasi sumber daya manusia sebelum leveling
(Sumber: Sutjipto. 1986. Manajemen Proyek Konstruksi)

unit sumber daya

time limit

skala waktu
Gambar 3.6 Alokasi sumber daya manusia sebelum leveling
(Sumber: Sutjipto. 1986. Manajemen Proyek Konstruksi)

2.6. Biaya Proyek


Pedoman dasar dari biaya pengeluaran adalah rencana kegiatan kerja, dimana berpengaruh
langsung. Sebagai contoh bila kegiatan membesar maka biaya pengeluaran juga membesar, namun

31
hubungannya tidak linier tergantung kebijakan pembiayaannya (cash atau credit). Biaya proyek
konstruksi (yang termasuk modal tetap) dapat dibagi dua, yaitu (Sutjipto R, dkk, Manajemen
Proyek Konstruksi 1, 1985):
1. Biaya Langsung (Direct Cost) yang terdiri dari:
a. Bahan/Material
b. Upah Buruh / Man Power
c. Biaya Peralatan/Equipments
2. Biaya tak langsung (Indirect Cost) yang terdiri dari:
a. Overhead
b. Biaya tak terduga/Contigencies
c. Keuntungan/Profit

2.6.1 Biaya Langsung (Direct Cost)


Biaya langsung (direct cost) adalah biaya yang langsung berhubungan dengan
konstruksi/bangunan. Biaya langsung didapat dengan mengalikan volume/kwantitas suatu
pos pekerjaan dengan harga satuan (unit cost) pekerjaan tersebut. Harga satuan pekerjaan
tersebut terdiri dari harga bahan, upah buruh dan biaya peralatannya. Volume atau
kwantitas pekerjaan dihitung menurut satuan dari harga satuan. Dimensi keduanya harus
cocok. Volume tidak lain adalah panjang x lebar x tinggi. Jadi untuk mengukurnya tinggal
memeriksa pada gambar bestek (Sutjipto R,dkk, Manajemen Proyek Konstruksi 1, 1985).
Hal-hal yang mempengaruhi dan perlu diperhatikan pada perhitungan biaya langsung
adalah sebagai berikut:

a) Material
Yang mempengaruhi biaya langsung mengenai material ada beberapa hal:
 Bahan sisa/yang terbuang (waste)
 Harga yang terbaik yang masih memenuhi syarat bestek
 Cara penjualan kepada penjual (supplier)
b) Upah Buruh
32
 Untuk upah buruh dibedakan menjadi upah harian, borongan per unit volume, atau
borong keseluruhan (borong dol) untuk daerah-daerah tertentu.
 Selain upah perlu diperhatikan faktor-faktor kemampuan dan kapasitas kerjanya.
 Perlu diketahui apakah buruh atau mandor dapat diperoleh dari daerah di sekitar
lokasi proyek atau tidak. Kalau tidak, berarti harus didatangkan buruh dari daerah
lain. Ini menyangkut ongkos transport, penginapan, gaji ekstra dan lain sebagainya.
 Undang-undang perburuhan yang berlaku juga perlu diperhatikan.
c) Peralatan
 Untuk peralatan yang disewa perlu diperhatikan ongkos keluar masuk garasi,
ongkos buruh untuk menjalankan alat, bahan baku dan biaya reparasi kecil.
 Untuk alat yang disewa perlu diperhatikan bunga investasi, depresiasi, reparasi
besar, pemeliharaan dan ongkos mobilisasi.

Biaya langsung dapat kita ukur dengan matematika biasa. Jadi kalau semua gambar
dan bestek sudah lengkap dan jelas maka biaya langsung ini seharusnya akan sama untuk
suatu proyek, terlepas dari kontraktor mana yang menghitungnya. Biaya tak langsunglah
yang akan berbeda dari perhitungan tiap kontraktor, dari setiap proyek/kontrak.

2.6.2 Biaya Tak Langsung (Indirect Cost)


Biaya Tak Langsung (Indirect Cost) adalah biaya yang tidak secara langsung
berhubungan dengan konstruksi, tetapi harus ada dan tidak dapat dilepaskan dari proyek
tersebut (Sutjipto R, dkk, Manajemen Proyek Konstruksi 1, 1985). Yang termasuk dalam
biaya tak langsung adalah:
a) Biaya Overhead
Biaya overhead dapat digolongkan menjadi 2 (dua) jenis biaya sebagai berikut:
 Overhead Proyek (di lapangan)
- Biaya personil lapangan
- Fasilitas sementara di proyek: gudang, kantor, penerangan, pagar, komunikasi,
transportasi dan sebagainya.
- Bank garansi, bunga bank, ijin bangunan, pajak dan sebagainya.

33
- Peralatan keci-kecil yang umumnya habis/terbuang setelah proyek selesai.
- Foto dan gambar jadi (As-bilt Drawing).
- Control kwalitas (Quality Control), seperti test kubus beton, baja, sondir dan
sebagainya.
- Rapat-rapat lapangan (Site Meeting).
- Biaya-biaya pengukuran.
- Dan lain-lain.
 Overhead Kantor
Adalah biaya untuk menjalankan suatu usaha. Termasuk di dalamnya adalah biaya
sewa kantor, dan fasilitasnya, honor pegawai kantor, ijin-ijin usaha, prakualifikasi,
referensi bank, anggota asosiasi-asosiasi, dan sebagainya.

b) Biaya Tak Terduga (Contigencies)


Biaya Tak Terduga (Contigencies) adalah salah satu dari biaya tak langsung.
Contigencies adalah biaya untuk kejadian-kejadian yang mungkin biasa terjadi,
ataupun tidak. Misalnya naiknya muka tanah, banjir, longsornya tanah dan sebagainya.
Pada umumnya biaya ini diperkirakan antara ½ sampai 5% dari biaya total. Yang
termasuk dalam Contigencies adalah:
 Kesalahan
- Kealpaan pemborong dalam memasukkan beberapa pos pekerjaan.
- Gambar yang kurang lengkap (misalnya ada bestek, tetapi tidak tercantum
dalam gambar).
 Ketidakpastian yang Subyektif (Subjective Uncertainties)
- Ketidakpastian yang subyektif timbul karena interprestasi subyektif terhadap
bestek, misalnya tercantum dalam RKS: “Bahan dengan merk ex A atau lainnya
yang disetujui direksi”.
- Ketidakpastian yang subyektif lainnya adalah fluktuasi harga material dan upah
buruh yang tidak tepat diperkirakan.
 Ketidakpastian yang Obyektif (Objective Uncertainties)

34
Ketidakpastian yang Obyektif adalah ketidakpastian tentang perlu tidaknya suatu
pekerjaan dilakukan atau tidak, dimana ketidakpastian itu ditentukan oleh obyek
diluar kemampuan manusia, misalnya: perlu tidaknya memasang Sheet pile untuk
pembuatan pondasi.
 Variasi Efisiensi (Chance Variation)
Chance Variation adalah variasi efisiensi dari sumber-sumber daya, yaitu efisiensi
dari buruh, peralatan, dan material.
c) Keuntungan
Untuk inilah seseorang mau mengambil resiko menjadi rekanan/kontraktor.
Keuntungan tidak sama dengan gaji. Keuntungan adalah hasil jerih payah dari keahlian,
ditambah hasil dari faktor resiko.

2.7.Akuntansi
Akuntansi dapat didefinisikan sebagai suatu proses pencatatan, penggolongan, peringkasan,
pelaporan dan penganalisaan data keuangan dari suatu organisasi. Kegiatan pencatatan dan
penggolongan adalah merupakan proses yang dilakukan secara rutin dan berulang-ulang setiap
kali terjadi transaksi keuangan. Sedangkan kegiatan pelaporan dan penganalisaan biasanya hanya
dilakukan pada waktu-waktu tertentu.
Agar supaya bermanfaat bagi para pemakainya, maka informasi akuntansi harus disusun dan
dilaporkan secara obyektif. Oleh karena itu akuntansi keuangan harus didasarkan pada stándar atau
pedoman tertentu yang telah teruji dan dapat diterima umum.

2.7.1 Istilah dalam Akuntansi


Istilah yang terkait dengan laporan keuangan yaitu:
 Pendapatan
Pendapatan adalah nilai hasil kerja pelaksanaan proyek yang telah diakui oleh owner
atau yang mewakili, berdasarkan kontrak dan persyaratan-persyaratan lain, yang
dinyatakan dalam nilai uang.
 Biaya

35
Biaya adalah kewajiban pelaksanaan proyek, yang harus dibayar kepada pihak-pihak
terkait dalam rangka proses pelaksanaan pekerjaan.
 Penerimaan
Penerimaan adalah sejumlah nilai uang tunai (cash) yang telah diterima pelaksana
proyek dalam kaitannya dengan pekerjaan yang akan atau yang telah dilaksanakan.
 Pengeluaran
pengeluaran adalah sejumlah nilai uang tunai (cash) yang telah dibayarkan oleh
pelaksana proyek kepada pihak-pihak terkait dalam rangka mendukung pekerjaan yang
akan atau yang telah dilaksanakan oleh pelaksana proyek.
 Piutang
Piutang adalah sebagian atau keseluruhan pendapatan yang belum diterima
pembayarannya oleh pelaksana proyek.
 Hutang
Hutang adalah sebagian atau seluruh biaya yang belum dibayarkan oleh pelaksana
proyek.
 Pekerjaan dalam pelaksanaan
Pekerjaan dalam pelaksanaan (work in process) adalah nilai pekerjaan yang telah diakui
(telah dicatat dalam pembukuan) tetapi belum dapat ditagihkan kepada owner atau yang
mewakilinya.
 Likuiditas
Likuiditas adalah kemampuan dari pelaksana proyek untuk membayar kewajiban-
kewajibannya pada saat jatuh tempo.
 Rentabilitas
Rentabilitas adalah kemampuan untuk menghasilkan laba atau kemampu labaan.
Likuiditas dan rentabilitas ini adalah merupakan dua aspek yang harus dikendalikan
secara bersamaan dalam proses “cost control”

2.7.2 Laporan Keuangan


Salah satu fungsi akuntansi adalah menyajikan laporan-laporan periodik untuk
manajemen, pemilik dan pihak-pihak diluar perusahaan. Laporan keuangan utama yang

36
dihasilkan dari proses akuntansi adalah neraca dan laporan rugi laba. Selain itu fungsi dari
laporan keuangan adalah:
- Mengukur tingkat biaya dari berbagai kegiatan perusahaan.
- Untuk menentukan atau mengukur efisiensi tiap-tiap bagian, proses atau produksi
untuk menentukan derajat keuntungan yang dapat dicapai oleh perusahaan yang
bersangkutan.
- Untuk menentukan perlu tidaknya digunakan kebijakan baru untuk mencapai hasil
yang lebih baik.
Adapun laporan keuangan tersebut diatas yaitu:
1. Jurnal
Jurnal adalah alat untuk mencatat transaksi perusahaan yang dilakukan secara
kronologis (berdasarkan urut waktu terjadinya) dengan menunjukkan rekening yang
harus didebet dan dikredit beserta jumlah rupiahnya masing-masing. Setiap transaksi
yang terjadi dalam perusahaan, sebelum dibukukan ke buku besar, harus dicatat dahulu
dalam jurnal.
Jurnal ini terdiri dari 4 kolom yang mana pada kolom pertama terdapat tanggal
transaksi yang terjadi, kolom kedua terdapat keterangan tempat perkiraan yang akan
didebet dan perkiraan yang akan dikredit, kolom ketiga terdapat Post Reference atau
nomor perkiraan, kolom keempat terdapat tempat penjumlahan debet serta kolom
kelima tempat penjumlahan kredit. Diakhir jurnal pada kolom debet dan kredit sama-
sama dijumlahkan dan hasil dari keduanya harus sama (seimbang), ini menunjukkan
tidak adanya kesalahan dalam mencatat transaksi yang terjadi.
Contoh Jurnal:
Jumlah
Tgl Perkiraan Ref
Debet Kredit

2. Buku Besar
Buku besar merupakan tahapan kedua dari persamaan akuntansi. Buku besar ini
berfungsi untuk mengumpulkan transaksi-transaksi yang bersifat sama. Dalam
pembahasan ini buku besar dibagi menjadi: Kas dengan no rek. 101, Material dengan

37
no rek. 102, Hutang Bank dengan no rek. 201, Modal dengan no rek. 301, Pendapatan
Perusahaan dengan no rek. 401, Upah dengan no rek. 501, Biaya bunga dengan no rek.
502, Overhead dengan no rek. 503, Pengembalian Uang Muka dengan no rek. 504,
Pengembalian Retensi dengan no rek. 505. Pemindahan dari jurnal ke buku besar
dilakukan dengan tidak mengubah bagian yang masuk ke debet dan kredit. Untuk
kolom ref berfungsi untuk menunjukkan no halaman pada jurnal.
Contoh Buku Besar Kas:
Kas No. -
Tgl Perkiraan Ref Jumlah Tgl Perkiraan Ref Jumlah
Bl Tg
-------
n l

3. Neraca Saldo
Persamaan yang ketiga adalah pembuatan neraca saldo. Setelah buku besar selesai
dibuat, maka jumlah dari setiap buku besar akan dipindahkan kedalam neraca saldo.
Fungsi dari neraca saldo ini adalah untuk mengetahui apakah jumlah debet sama
dengan jumlah kredit dan untuk mengetahui apakah ada kesalahan dalam posting dan
penjurnalan.
Contoh Neraca Saldo:
Neraca Saldo
Kas Rp.
Persediaan Bahan Rp.
Gedung Rp.
Biaya-biaya Rp.
Hutang Rp.
Pendapatan Rp.
Modal (+) Rp. (+)
Rp. Rp.

4. Neraca Lajur

38
Neraca lajur/kertas kerja/worksheet digunakan sebagai alat Bantu dalam menyusun
laporan keuangan. Neraca lajur tidak bersifat mutlak, artinya boleh dibuat, boleh tidak.
Tetapi untuk memudahkan dan menghindari kesalahan, sebaiknya neraca lajur selalu
dibuat apabila menyusun laporan keuangan. Neraca lajur yang akan dibuat adalah
neraca lajur 10 kolom yang terdiri dari: neraca saldo, ayat jurnal penyesuaian, neraca
saldo disesuaikan, laporan laba-rugi, dan neraca.
Contoh Neraca Lajur:
Neraca
Neraca Laporan
Penyesuaian Setelah Neraca
Keterang Saldo Laba-Rugi
disesuaikan
an
Deb Deb Kredi
Debet Kredit Debet Kredit Debet Kredit Kredit
et et t

5. Laporan Laba Rugi


Laporan laba rugi merupakan bagian pertama dari laporan keuangan. Laporan laba
rugi ini menyajikan hasil usaha perusahaan dalam rentang waktu tertentu, yang terdiri
dari pendapatan, biaya, laba atau rugi. Fungsi dari laporan ini adalah sebagai tolak ukur
keberhasilan perusahaan serta media untuk menilai tingkat kemampuan perusahaan
untuk menghasilkan laba. Dalam pembahasan ini dapat dilihat laba yang dihasilkan
setelah proyek selesai dikerjakan.

Contoh Laporan Laba Rugi:

Pembangunan Gedung
Laporan Laba Rugi
Per 31 Desember 2008

Pendapatan Rp.
PPN Rp. (-)
Pendapatan Bersih Rp.

39
Biaya Proyek Rp. (-)
Laba Kotor Rp.
Biaya Operasi:
Biaya umum dan administrasi Rp.
Biaya Gaji Rp
Biaya Telepone dan Listrik Rp (+)
Rp (-)
Laba/Rugi Operasional Rp
Pajak Penghasilan Rp (-)
Laba Bersih Setelah pajak Rp

6. Laporan Perubahan Modal


Setelah menyusun laporan laba rugi maka keuntungan atau kerugian yang
didapatkan oleh perusahaan akan dipindahkan kedalam laporan perubahan modal,
sehingga akan terlihat apakah modal perusahaan tersebut bertambah atau berkurang.
Laporan ini memudahkan perusahaan dalam merencanakan peminjaman uang karena
dari sini dapat dilihat seberapa besar modal yang dimiliki perusahaan tersebut.

Contoh Laporan Perubahan Modal:

Pembangunan Gedung
Laporan Perubahan Modal
Per 31 Desember 2008

Modal, 1 Januari Rp.


Tambahan : Laba Rp. (+)
Rp.
Kurangi : Pengambilan Prive Rp. (-)

Modal, 31 Desember Rp.

40
7. Neraca
Bagian akhir dari laporan keuangan adalah neraca, dari sini dapat dilihat seberapa
besar kekayaan yang dimiliki setelah proyek selesai seperti kas, peralatan, moidal
maupun hutang. Neraca ini terdiri dari aktiva dan pasiva yang mana kedua kolom ini
harus seimbang. Pada pembahasan ini telah seimbang total aktiva dan total pasiva.

Contoh Neraca:

Pembangunan Gedung
Neraca
Per 31 Desember 2008

AKTIVA PASIVA
AKTIVA LANCAR HUTANG LANCAR
Kas Rp. Hutang Rp.
Surat Berharga Rp. Hutang sub Kontraktor Rp. (+)
Piutang Rp. Total Hutang Lancar Rp.
Persediaan Rp. (+)

Total aktiva Lancar Rp.

AKTIVA TETAP MODAL dan SAHAM


Bangunan Rp. Modal Saham Rp.
Penyusutan Rp. (-) Laba Ditahan Rp. (+)
Rp.

41
Kendaraan Rp
Penyusutan Rp. (-)
Rp.
Peralatan Rp.
Penyusutan Rp. (-)
Rp.
Inventaris Rp.
Penyusutan Rp. (-)
Rp. (+)
Total aktiva tetap Rp.
TOTAL AKTIVA Rp. TOTAL PASIVA Rp.

BAB III

PEMBAHASAN

3.1.Perhitungan Volume Pengerjaan


No. Sketsa Item Pekerjaan Perhitungan Volume
I Pekerjaan Persiapan
1 Pekerjaan Pembersihan
L = ½ x (11,1 + 11,8) x 15
= 171,75 m2
171,75m2

42
2 Pekerjaan Pengukuran & Bowplank

Kll =15+15+11,1+11,8 52,9m


= 52,9 m

II Pekerjaan Tanah
1 Galian Tanah Pondasi Menerus
X= 23 m
Y= 16 m
Panjang total= 23 + 16 = 39m

21,06m3

V=bxtxp
= 0,6 x 0.9 x 39
= 21,06 m3

43
2 Galian Tanah pada Pondasi Setempat

Jumlah P1 = 10 buah
Jumlah P2 = 1 buah

V = p x l x t x total
P1 V = 1,2 x 1,2 x 2,1 x 10
= 30,24 m3

31,34m3

P2 V = p x l x t x total
V = 1 x 1 x 2,1 x 1
= 2,1 m3

3 Urugan Tanah Kembali

V = 1/3 x galian tanah menerus


Pondasi Menerus
V = 1/3 x 21,06

44
= 7,02 m3

Pondasi Setempat V = p x l x t x total


P1 V = 1,2 x 1,2 x 0,3 x 10
= 4,32 m3 33,47m3
Vkolom = 0,6 x 0,12x 1,7 x 10
= 1,224 m3
Vurugan = Vgalian –(V
+Vkolom)
= 30,24 – (4,32 + 1,23)
= 24,69 m3

V = p x l x t x total
P2
V = 1 x 1 x 0,25 x 1
= 0,25 m3
Vkolom = 0,4 x 0,12x 1,75 x 1
= 0,084 m3
Vurugan = Vgalian –(V
+Vkolom)
= 2,1 – (0,25 + 0,09)
= 1,76 m3

4 Urugan Tanah untuk Peninggian


Lantai
Lantai I

Luas Lantai 1 = (6x8) + (3x1)


= 48 + 3
= 51 m2

22,9m3

45
V= tinggi urugan x luas lantai 1
V= 0,45 x 51
= 22,9 m3

5 Urugan Pasir Dibawah Pondasi


Pondasi menerus
V= b x t x Panjang
V= 0,6 x 0,1 x 39
= 2,34 m3

V= p x b x t x Total
V= 1,2 x 1,2 x 0,1 x 10
= 1,44 m3

P1

46
3,88m3

V= p x b x t x Total
V= 1 x 1 x 0,1 x 1
= 0,1 m3

P2

6 Pekerjaan Urugan diBawah Lantai V= Luas Lantai x Tebal urugan 5,1 m3


V= 51 x 0,1
= 5,1 m3
III Pekerjaan Pasangan dan Pelesteran
1 Pasangan Batu Kosong
Menerus
V= l x t x p
V= 0,6 x 0,25 x 39
= 5,85 m3 5,85 m3

47
2 Pasangan Batu Kali
V= ½ x (a+b) x t x p
Menerus 10,92m3
V=1/2 x (0,3+0,4) x 0,8 x 39
= 10,92 m3

3 Pekerjaan Pelesteran Pondasi Menerus V= Vol pondasi menerus


= 5,85 +10,92
16,77m3
3
= 16,77 m
4 Pekerjaan Pasangan Batu Bata 1pc : 6ps
Lantai 1
Lantai I
Panjang horizontal:

48
2,5 + 5 + 2 + 4 + 1 + 3 + 1 + 2
+ 3 + 4 + 2 + 1 + 1 + 2 = 33,5
m
Tinggi dinding:
3,6 m
Luas Kusen:
17,04 m2
Luas pekerjaan:
= (33,5 x 3,6) – 17,04
=103,56 m2

Lantai 2
246,76m2
Lantai II
Panjang horizontal:
3 + 5 + 2,5 + 3,5 +3,5 + 2,5 + 2
+ 8 + 5 + 2 + 2 + 2 + 5 = 46 m
Tinggi dinding:
3,6 m
Luas Kusen:
22,4 m2
Luas pekerjaan:
= (46 x 3,6) – 22,4
= 143,2 m2

5 Pekerjaan Pelesteran Dinding Volume pekerjaan: 493,52m2


= 2 x Luas pasangan batu bata
= 2 x (103,56 + 143,2)
= 493,52 m2
6 Pekerjaan Acian Dinding Volume pekerjaan: 493,52m2
= 2 x Luas pasangan batu bata
= 2 x (103,56 + 143,2)
= 493,52 m2
7 Pekerjaan Pelesteran Pelat Tangga

Volume pekerjaan:

49
= (1x1,5) + (1x1) + (1x4) 6,5m2
= 6,5 m2

8 Pekerjaan Acian Pelat Tangga Volume Pekerjaan : 6,5 m2


= (1x1,5) + (1x1) + (1x4)
= 6,5 m2

IV Pekerjaan Kayu
1 Pekerjaan Pintu
D1 = 1 unit

Volume Kusen:
= ((panjang vertical x 2) +
Panjang horizontal) x
banyaknya D1
= ((2,2 x 2) + 1) x 1
= 5,4 m

D2 = 3 Unit
Volume Kusen:
= ((panjang vertical x 2) +
Panjang horizontal) x
banyaknya D2
= ((2,2 x 2) + 0,85) x 3
= 15,75 m

36,75m
D3 = 2 Unit

50
Volume Kusen:
= ((panjang vertical x 2) +
Panjang horizontal) x
banyaknya D3
= ((2,2 x 2) + 0,8) x 2
= 10,4 m

D4 = 1 Unit
Volume Kusen:
= ((panjang vertical x 2) +
Panjang horizontal) x
banyaknya D4
= ((2,2 x 2) + 0,8) x 1
= 5,2 m

Pj keseluruhan kusen = 36,75 m


Vol. Kusen = 36,75 x 0,06 x
0,12
= 2,325 m3
2 Pekerjaan Daun Pintu
D1 = 1 unit
L= p x l x banyaknya D1
= 2,2 x 1 x 1
= 2,2 m2

D2 = 3 Unit

51
L= p x l x banyaknya D2
= 2,2 x 0,85 x 3
= 5,61 m2

13,2 m2

D3 = 2 Unit

L= p x l x banyaknya D3
= 2,2 x 0,8 x 2
= 3,52 m2

D4 = 1 Unit

L= p x l x banyaknya D4
= 2,2 x 0,85 x 1
= 1,87 m2

3 Pekerjaan Daun Jendela Kaca

52
DW1 = 1 unit
L= p x l x banyaknya DW1
= 2,2 x 0,85 x 1
= 1,87 m2

DW2 = 2 Unit
L= p x l x banyaknya DW2
= 2,2 x 1,85 x 2
= 8,14 m2

24,15 m2
J2

L= p x l x banyaknya J2
= 1,7 x 1,4 x 3
= 7,14 m2

J3

53
L= p x l x banyaknya J3
= 2 x 0,7 x 5
= 7 m2

V Pekerjaan Beton
1 Pekerjaan Beton pondasi telapak P1 Beton
 Vol. Poer
1,2 x 1,2 x 0,3 =
0,44m3
4,4 m3
 Vol. Poer Total
0,44 × 10 = 4,4 m3
Bekisting
 Luas Bekisting
4 x 1,2 x 0,3 = 1,44 m2
14,4 m2
 Luas Total
1,44 × 10 = 14,4 m2
Pembesian 1 buah poer
Jumlah titik = 10
 Tulangan Atas (D-13)
Tebal plat = 0,3m
Panjang x jumlah :
1,2 × 24 = 28,8 m
Berat
28,8 x 1,04 = 29,95 kg
 Tulangan bawah (D-
13)
Panjang x jumlah
1,2 × 38 = 45,6 m
Berat
45,6 x 1,04 = 47,424
kg
 Berat Total

54
29,95 + 47,424 = 773,74kg
77,374 kg
Pembesian total poer
77,374 kg x 10 = 773,74 kg

Berat besi / m3 (Fe)


773,74 / 4,4 = 175,85 kg/m3
2 Pekerjaan Beton pondasi telapak P2 Beton
 Vol. Poer
1 x 1 x 0,3 = 0,3m3
0,3 m3
 Vol. Poer Total
0,3 × 1 = 0,3 m3
Bekisting
 Luas Bekisting
4 x 1 x 0,3 = 1,2 m2
 Luas Total
1,2 m2
2
1,2 × 1 = 1,2 m
Pembesian 1 buah poer
Jumlah = 1
 Tulangan Atas (D-13)
Tebal plat = 0,3m Panjang x jumlah :
1 × 20 = 20 m
Berat
20 x 1,04 = 20,8 kg
 Tulangan bawah (D-
13)
Panjang x jumlah
1 × 40 = 40 m
Berat
40 x 1,04 = 41,6 kg
 Berat Total
20,8 + 41,6 = 62,4 kg
Pembesian total poer 62,4 kg
62,4 kg x 1 = 62,4 kg

Berat besi / m3 (Fe)


62,4 / 0,3 = 208 kg/m3

55
3 Pekerjaan Sloof 20x30 cm Beton
 Vol. Sloop Total
0,2 × 0,3 x 106
6,36m3
6,36 m3

Bekisting
 Kll. Bekisting
(2 x 0,3) + 0,2= 0,8 m 84,8m2
Panjang sloof = 106 m  Luas Total
0,8 × 106 = 5,088 m2

Tulangan 1 m panjang sloop


 Tulangan Utama (D-
13)
Panjang x jumlah :
1×9 =9m
Berat
9 x 1,04 = 9,36 kg
 Sengkang (D-8)
Jumlah sengkang
(1 / 0,15) +1 = 8
Panjang x jumlah
0,86 × 12 = 10,32
m
Berat
10,32 x 0,39 = 4,03 1418,78kg
kg
 Berat Total
9,36 + 4,03 =13,38kg

Pembesian total poer


13,38 kg x 106 = 1418,78 kg

Berat besi / m3 (Fe)


1418,78 / 6,36 = 223 kg/m3

56
4 Pekerjaan Beton Kolom 12x65 cm Beton
 Vol. Sloop Total 1,69 m3
0,12 × 0,65 x 21,6
1,69 m3

Bekisting
 Kll. Bekisting
(2x0,65) + (2x0,12)=

Tinggi kolom = 7,2m 1,54 m


33,26 m2
 Luas Total
Jumlah titik = 3
1,54 x 21,6= 33,264
Panjang total = 7,2 x 3 = 21,6 m
m2

Tulangan 1 m panjang kolom


 Tulangan Utama (D-
13)
Panjang x jumlah :
1 × 13= 13 m
Berat
13 x 1,04 = 13,52 kg
 Sengkang (D-8)
Jumlah sengkang
(1 / 0,1) +1 = 11
Panjang x jumlah
1,01 × 11 = 11,11 m
Berat
11,11 x 0,39 = 4,33
385,56kg
kg
 Berat Total
13,52 + 4,33 = 17,85
kg

Pembesian total kolom


17,85 kg x 21,6 = 385,56 kg

Berat besi / m3 ( Fe)


385,56 / 1,69 = 228,14 kg/m3

57
5 Pekerjaan Beton Kolom 12x60 cm Beton
 Vol. Sloop Total
0,12 × 0,6 x 50,4
3,63 m3
3,63 m3

Bekisting
 Kll. Bekisting
(2x0,6) + (2x0,12)=
1,44 m
Tinggi kolom = 7,2m 72,57 m2
 Luas Total
Jumlah titik = 7
1,44 x 50,4= 72,576
Panjang total = 7,2 x 7 = 50,4 m m2

Tulangan 1 m panjang kolom


 Tulangan Utama (D-
13)
Panjang x jumlah :
1 × 12= 12 m
Berat
12 x 1,04 = 12,48 kg
 Sengkang (D-8)
Jumlah sengkang
(1 / 0,1) +1 = 11
Panjang x jumlah
1,01 × 11 = 11,11
m
Berat
11,11 x 0,39 = 4,33
kg
 Berat Total
12,48 + 4,33 = 16,81 847,23kg
kg
Pembesian total kolom
16,81 kg x 50,4 = 847,224 kg

Berat besi / m3 ( Fe)


847,224 / 3,63 = 233,39 kg/m3

58
6 Pekerjaan Beton Kolom 12x40 cm Beton
 Vol. Sloop Total
0,12 × 0,4 x 3,6
0,17 m3
0,17 m3

Bekisting
 Kll. Bekisting
(2x0,4) + (2x0,12)=
Tinggi kolom = 3,6m 1,04 m
3,74 m2
 Luas Total
Jumlah titik = 1
1,04 x 3,6= 3,74 m2
Panjang total = 3,6 x 1 = 3,6 m

Tulangan 1 m panjang kolom


 Tulangan Utama (D-
13)
Panjang x jumlah :
1 × 8= 8 m
Berat
8 x 1,04 = 8,32 kg
 Sengkang (D-8)
Jumlah sengkang
(1 / 0,1) +1 = 11
Panjang x jumlah
1,01 × 11 = 11,11
m
Berat 1241,7kg
11,11 x 0,39 = 4,33
kg
 Berat Total
8,32 + 4,33 = 12,65 kg

Pembesian total kolom


12,65 kg x 3,6 = 45,54 kg

Berat besi / m3 ( Fe)


45,54 / 0,17 = 267,88 kg/m3

59
7 Pekerjaan Beton Balok 15x50 cm Beton
 Vol. Balok Total
0,15 × 0,5 x 96
7,2 m3
7,2 m3

Bekisting
 Kll. Bekisting
(2 x 0,38)
Panjang Balok beton 96m +0,15=0,91m
87,36 m2
 Luas Total
0,91 x 96 = 87,36 m2

Tulangan 1 m panjang balok


 Tulangan Utama (D-
13)
Panjang x jumlah :
1 × 11 = 11 m
Berat
11 x 1,04 = 11,44 kg
 Sengkang (D-8)
Jumlah sengkang
(1 / 0,1) + 1 = 11
Panjang x jumlah
1,5 × 11 = 16,5 m
Berat
16,5 x 0,39 = 6,4 kg
 Berat Total
11,44 + 6,4 = 17,84
kg
1712,64kg

Pembesian total balok


17,84 x 96 = 1712,64 kg

Berat besi / m3 (Fe)


1712,64/7,2 = 237,87 kg/m3

60
8 Pekerjaan Beton Balok 15x35 cm Beton
 Vol. Balok Total
0,15 × 0,35 x 18
0,945m3
0,945 m3

Bekisting
 Kll. Bekisting
(2 x 0,23) 10,98 m2
+0,15=0,61m
Panjang balok beton 18 m
 Luas Total
0,61 x 18 = 10,98 m2

Tulangan 1 m panjang balok


 Tulangan Utama (D-
13)
Panjang x jumlah :
1×8=8m
Berat
8 x 1,04 = 8,32 kg
 Sengkang (D-8)
Jumlah sengkang
(1 / 0,1) + 1 = 11
Panjang x jumlah
1,5 × 11 = 16,5 m
Berat
16,5 x 0,39 = 6,4 kg
 Berat Total
8,32 + 6,4 = 14,72 kg
264,96kg

Pembesian total balok


14,72 x 18 = 264,96 kg

Berat besi / m3 (Fe)


264,96/0,945 = 280,38 kg/m3

61
9 Pekerjaan Beton Balok Anak 15x25cm
Beton
 Vol. Balok Total
0,15 × 0,25 x 36
1,35 m3
1,35 m3

Bekisting
 Kll. Bekisting

Panjang Balok Anak = 36 m (2 x 0,13)


14,76 m2
+0,15=0,41m
 Luas Total
0,41 x 36= 14,76 m2

Tulangan 1 m panjang balok


 Tulangan Utama (D-
13)
Panjang x jumlah :
1×5=5m
Berat
5 x 1,04 = 5,2 kg
 Sengkang (D-8)
Jumlah sengkang
(1 / 0,15) + 1 = 8
Panjang x jumlah
0,6 × 8 = 4,8 m
Berat
4,8 x 0,39 = 1,87 kg
 Berat Total
5,2 + 1,87 = 7,07 kg
254,52kg

Pembesian total balok


7,07 x 36 = 254,52 kg

Berat besi / m3 (Fe)


254,52/1,35 = 188,5 kg/m3

62
10 Pekerjaan Beton Balok Ring 15x30 cm Beton
 Vol. Balok Total
0,15 × 0,3 x 56
2,52m3
2,52 m3

Bekisting
 Kll. Bekisting
(2 x 0,18)
Panjang balok ring= 56 m
+0,15=0,51m
 Luas Total
28,56m2
0,51 x 56 = 28,56 m2

Tulangan 1 m panjang balok


 Tulangan Utama (D-
13)
Panjang x jumlah :
1×6=6m
Berat
6 x 1,04 = 6,24 kg
 Sengkang (D-8)
Jumlah sengkang
(1 / 0,1) + 1 = 11
Panjang x jumlah
0,7 × 8 = 5,6 m
Berat
5,6 x 0,39 = 2,18 kg
 Berat Total
6,24 + 2,18 = 8,42 kg

471,52kg
Pembesian total balok
8,42 x 56 = 471,52 kg

Berat besi / m3 (Fe)


471,52/2,52 = 187,1 kg/m3

63
11 Pekerjaan Beton Plat Lantai Beton
 Vol. Plat Beton Total
70 x 0,12
8,4 m3
8,4 m3
Bekisting
 Luas Bekisting
70 m2 70 m2
Tulangan dalam 1 m2
 Jumlah tulangan
2 × 2 × ((1/0,15) + 1)
31 buah

Tebal plat = 12 cm  Panjang tulangan (1


m2)
Luas plat beton = 70 m2
31 x 1 = 31 m
 Berat tulangan (1 m2)
31 x 0,72 = 22,32 kg

Pembesian total plat lantai


22,32 x 70 = 1562,4 kg 1562,4 kg

Berat besi / m3 (Fe)


1562,4/8,4 = 186 kg/m3
12 Pekerjaan Balok anak tangga
Beton
 Volume 1 Anak
Tangga
= ½ x 0,3 x 0,18
= 0,044 m3
 Volume Anak Tangga
Total
= 24 x 0,044
= 1,05 m3
 Volume Pelat Tangga
Tebal Pelat = 0,14 m
 Bordes I
V = 1 x 1 x 0,14
= 0,14 m3

64
 Bordes II
V = 1 x 1 x 0,14
= 0,14 m3
 Volume Beton Total
1,33 m3
V=(1,05+0,14+0,14)m3
= 1,33 m3
Bekisting
 Samping :
= 2x (0,252 x (3,15+1,75))
= 2,46 m2
 Bawah :
V1 = 1,625x(3,15+1,75)
= 7,96 m2
V2 (bordes) = 3,25 x1,3
= 4,225 m2
 Anak Tangga
V = 1,625 x 0,18= 0,29
m2
 Volume Bekisting
Total
= 1,23 + 4,225 +0,29 + 13,7m2
7,96
= 13,705 m2

Pembesian
Tulangan Pada Bordes
 Tulangan Memanjang
 Jumlah tulangan
memanjang :
(1,3/0,2) + 1 = 8 buah
Panjang tulangan
memanjang
3,250 x 8 = 26 m
Berat tulangan atas
memanjang (D10)
26 x 0,62 = 16,12 kg

65
Berat tulangan bawah
memanjang (D13)
26 x 1,04 = 27,04 kg
Berat total tulangan
memanjang
16,12 + 27,04
43,16 kg
 Tulangan melebar
 Jumlah tulangan
melebar
(3,25/0,2) + 1 = 17
buah
Panjang tulangan
melebar
1,3 x 17 = 22,1 m
Berat tulangan atas
memanjang (D10)
22,1 x 0,62 = 13,7 kg
Berat tulangan bawah
memanjang (D13)
22,1 x 1,04 = 22,98 kg
Berat total tulangan
memanjang
13,70 + 22,98
36,68 kg
 Total berat tulangan
43,16 + 36,68 = 79,84
kg
Tulangan pada anak tangga
 Tulangan untuk 1 buah
anak tangga
 Panjang Tulangan
utama
4 x 1,460 = 5,84 m
 Panjang Sengkang
Panjang x jumlah
0,663 x 8 = 5,304 m

66
 Berat Tulangan Utama
(D10)
5,84 x 0,62 = 3,62 kg
 Berat Tulangan
Sengkang (D10)
5,304 x 0,62 = 3,29 kg
Berat total ntuk 1 buah
anak tangga
3,29 + 3,62 = 6,91 kg
 Berat Tulangan total
anak tangga
n = 24 anak tangga
24 x 6,91 = 165,84 kg

Tulangan memanjang pada


anak tangga
 Tulangan Memanjang
 Jumlah tulangan
(1,460/0,2) + 1 = 8
buah
 Panjang tulangan
2 x (3 x 8 ) = 48 m
 Berat tulangan atas
(D10)
48 x 0,62 = 29,76 kg
 Berat tulangan bawah
(D13)
48 x 1,04 = 49,92 kg
 Total berat tulangan
29,76 + 49,92 = 79,68
kg
Jumlah berat total 325,36kg
79,84 + 165,84 + 79,68
325,36 kg

Berat besi / m3
325,36 / 1,33 = 244,63 kg/m3

67
VI Pekerjaan Plafond
1 Pekerjaan Pas. Plafond Gypsum
Lantai 1 = Lantai 2
Volume Pekerjaan:
96 m2
= 2 x (8 x 6)
= 96 m2

2 Pekerjaan List Plafond


Lantai 1
Volume Pekerjaan:
= 8 + 6 + 5+ 1 + 2 + 3 + 1 + 1 +
1+ 3 + 1 = 32 m

82,5 m

Lantai 2

Volume Pekerjaan:
= 6+ 8 + 6 + 8 + 5 + 3+ 2 +2 +
5 + 1 + 2 + 2,5 = 50,5 m

68
VII Pekerjaan Atap
1 Pekerjaan Kuda-kuda baja ringan
Volume Pekerjaan:
=8x8
64m2
= 64m2

2 Pekerjaan pas. Listplank 3/30 cm Volume pekerjaan: 32m


=8+8+8+8
= 32 m
3 Pekerjaan pas. Genteng Karang Pilang Volume pekerjaan: 78,13m2
= (8 x 8) / cos35o
= 78,13 m2
4 Pekerjaan Genteng Bubungan Karang Pilang Volume Pekerjaan: 24,63 m
= 2 + (4 x 5,66)
= 24,63 m
5 Pekerjaan Murda Paras Volume pekerjaan:
2 buah
6 Pekerjaan Ikut Celedu Volume pekerjaan:
4 buah
VIII Pekerjaan Sanitasi
1 Pekerjaan Pas. Closet duduk 3 buah

2 Pekerjaan Pas. Floor drain stainless 3 buah

3 Pekerjaan Pas. kran air 4 buah

4 Pekerjaan Pas. pipa air bersih 65 m

5 Pekerjaan Pas. pipa pembuangan air kotor 50,6m

6 Pekerjaan pipa pembuangan air besar/kecil 20,1m

7 Pekerjaan Sepitank & peresapan 1 unit

8 Pekerjaan Pembuatan Bak Kontrol 1 unit

69
IX Pekerjaan Penutup Lantai dan Dinding
1 Pekerjaan. Pas Keramik Lantai
Lantai 1
Volume Pekerjaan:
= (5 x 6 ) + (2 x 4) + (1 x 1) +
(3 x 1)
= 42 m2

74,75 m2

Lantai 2

Volume Pekerjaan:
= (2x(3x3,5)) + (1,5 x 2) +
(1x3) + (1,5x2,5) + (2x1)
= 32,75 m2

2 Pekerjaan Keramik Lantai WC


Volume pekerjaan:
Lantai 1
= 2,5 x 1
= 2,5m2

70
Lantai 2 Volume Pekerjaan: 11,5 m2
= 2,5 x 2
= 5m2

Volume Pekerjaan:
=2x2
= 4m2

3 Pekerjaan Pas. Keramik Lantai Tangga

Volume Pekerjaan:
= (2x(1x3)) + (1x6)
= 12m2 12 m2

X Pekerjaan Pengecatan
1 Pekerjaan cat tembok 246,76 m2

2 Pekerjaan cat plafond 96 m2

3 Pekerjaan cat daun jendela 24,15 m2

4 Pekerjaan polituran daun pintu 13,2 m2

71
5 Pekerjaan cat list plafond 0,07 x 82,5 m 5,78 m
6 Pekerjaan cat listplank 3/30 cm 0,3 m x 32 m 9,6 m
XI Pekerjaan Elektrikal
1 Pekerjaan Pas. Instalasi listrik 34 buah

2 Pekerjaan Pas. Instalasi stop kontak 16 buah

3 Pekerjaan Pas. MCB 1 buah

4 Pekerjaan Pas. Arde 1 buah

5 Pekerjaan Pas. stopkontak 16 buah

6 Pekerjaan Pas. saklar tunggal 7 buah

7 Pekerjaan Pas. saklar ganda 5 buah

8 Pekerjaan lampu SL 18w 24 buah

9 Pekerjaan lampu garden 10 buah

10 Pekerjaan penangkal petir 2 buah

XII Pekerjaan Landscape


1 Pekerjaan Pemasangan Paving Volume pekerjaan: 24,5 m2
= 3,5 x 7
= 24,5 m2

2 Pekerjaan Pagar Volume pekerjaan: 8,1 m3


= 1,3 x 0,75 x 8,3
= 8,1 m3

3 Pekerjaan Taman Volume pekerjaan: 105,45m2


= 171,75 – 60 – 6,3
= 105,45 m2
XIII Pekerjaan Lain-Lain
1 Pembersihan Akhir Volume Pekerjaan: 1 bh
= 1 bh

72
3.2.Rekap Volume Pengerjaan
No Uraian Pekerjaan Volume Satuan
1 2 3 4

I Pekerjaan Persiapan
1 Pekerjaan Pengukuran dan Bowplank 52.90 m
2 Pekerjaan Pembersihan Lapangan 177.75 m²

II Pekerjaan Tanah
1 Pekerjaan Galian Pondasi Menerus 21.06 m³
2 Pekerjaan Galian Pondasi Setempat 31.34 m³
3 Pekerjaan Urugan Tanah Kembali 33.47 m³
4 Pekerjaan Urugan Tanah untuk Peninggian Lantai 22.90 m³
5 Pekerjaan Urugan Pasir dibawah Pondasi 3.88 m³
6 Pekerjaan Urugan Pasir dibawah Lantai 5.10 m³

III Pekerjaan Pasangan dan Pelesteran


1 Pekerjaan Pasangan Batu Kosong Pondasi Menerus 5.85 m³
2 Pekerjaan Pasangan Batu Kali Pondasi Menerus 10.92 m³
3 Pekerjaan Pelesteran Pondasi Menerus 16.77 m³
4 Pekerjaan Pasangan Batu Bata 1pc : 6ps 246.76 m²
5 Pekerjaan Pelesteran Dinding 493.52 m²
6 Pekerjaan Acian Dinding 493.52 m²
7 Pekerjaan Pelesteran Pelat Tangga 6.50 m²
8 Pekerjaan Acian Pelat Tangga 6.50 m²

IV Pekerjaan Kayu
1 Pekerjaan Kusen 2.33 m³
2 Pekerjaan Daun Pintu 13.20 m²
3 Pekerjaan Daun Jendela 24.15 m²

V Pekerjaan Beton
1 Pekerjaan Beton Pondasi Telapak P1 4.40 m³
2 Pekerjaan Beton Pondasi Telapak P2 0.30 m³
3 Pekerjaan Beton Sloof 20x30cm 6.36 m³
4 Pekerjaan Beton Kolom 12x65cm 1.69 m³
5 Pekerjaan Beton Kolom 12x60cm 3.63 m³
6 Pekerjaan Beton Kolom 12x40cm 0.17 m³
7 Pekerjaan Beton Balok 15x50cm 7.20 m³
8 Pekerjaan Beton Balok 15x35cm 0.95 m³
9 Pekerjaan Beton Balok Anak 15x25cm 1.35 m³
10 Pekerjaan Beton Balok Ring 15x30cm 2.52 m³
11 Pekerjaan Beton Plat Lantai 8.40 m³
12 Pekerjaan Beton Balok Anak Tangga 1.33 m³

73
1 2 3 4
VI Pekerjaan Bekisting
1 Pekerjaan Bekisting Pondasi Telapak P1 14.40 m²
2 Pekerjaan Bekisting Pondasi Telapak P2 1.20 m²
3 Pekerjaan Bekisting Sloof 20x30cm 84.80 m²
4 Pekerjaan Bekisting Kolom 12x65cm 33.26 m²
5 Pekerjaan Bekisting Kolom 12x60cm 72.57 m²
6 Pekerjaan Bekisting Kolom 12x40cm 3.74 m²
7 Pekerjaan Bekisting Balok 15x50cm 87.36 m²
8 Pekerjaan Bekisting Balok 15x35cm 10.98 m²
9 Pekerjaan Bekisting Balok Anak 15x25cm 14.76 m²
10 Pekerjaan Bekisting Balok Ring 15x30cm 28.56 m²
11 Pekerjaan Bekisting Plat Lantai 70.00 m²
12 Pekerjaan Bekisting Balok Anak Tangga 13.70 m²

VII Pekerjaan Pembesian


1 Pekerjaan Pembesian Pondasi Telapak P1 773.74 kg
2 Pekerjaan Pembesian Pondasi Telapak P2 62.40 kg
3 Pekerjaan Pembesian Sloof 20x30cm 1418.78 kg
4 Pekerjaan Pembesian Kolom 12x65cm 385.56 kg
5 Pekerjaan Pembesian Kolom 12x60cm 847.23 kg
6 Pekerjaan Pembesian Kolom 12x40cm 45.54 kg
7 Pekerjaan Pembesian Balok 15x50cm 1712.64 kg
8 Pekerjaan Pembesian Balok 15x35cm 264.96 kg
9 Pekerjaan Pembesian Balok Anak 15x25cm 254.52 kg
10 Pekerjaan Pembesian Balok Ring 15x30cm 471.52 kg
11 Pekerjaan Pembesian Plat Lantai 1562.40 kg
12 Pekerjaan Pembesian Balok Anak Tangga 325.36 kg

VIII Pekerjaan Plafond


1 Pekerjaan Pasangan Plafond Gypsum 96.00 m²
2 Pekerjaan List Plafond 82.50 m

IX Pekerjaan Atap
1 Pekerjaan Kuda-kuda Baja Ringan 64.00 m²
2 Pekerjaan Pemasangan Listplank 3/30cm 32.00 m
3 Pekerjaan Pemasangan Genteng Karangpilang 78.13 m²
4 Pekerjaan Genteng Bubungan Karangpilang 24.63 m
5 Pekerjaan Murda Paras 2.00 buah
6 Pekerjaan Ikut Celedu 4.00 buah

74
1 2 3 4
X Pekerjaan Sanitasi
1 Pekerjaan Pemasangan Kloset Duduk 3.00 unit
2 Pekerjaan Pemasangan Floor Drain 3.00 unit
3 Pekerjaan Pemasangan Kran Air 4.00 unit
4 Pekerjaan Pemasangan Pipa Air Bersih 65.00 m
5 Pekerjaan Pemasangan Pipa Pembuangan Air Kotor 50.60 m
6 Pekerjaan Pemasangan Pipa Pembuangan Air Besar/Kecil 20.10 m
7 Pekerjaan Pembuatan Septictank + Peresapan 1.00 unit
8 Pekerjaan Pembuatan Bak Kontrol 1.00 unit

XI Pekerjaan Penutup Lantai dan Dinding


1 Pekerjaan Pemasangan Keramik Lantai 74.75 m²
2 Pekerjaan Pemasangan Keramik Lantai WC 11.50 m²
3 Pekerjaan Pemasangan Keramik Lantai Tangga 12.00 m²

XII Pekerjaan Pengecatan


1 Pekerjaan Pengecatan Tembok 246.76 m²
2 Pekerjaan Pengecatan Plafond 96.00 m²
3 Pekerjaan Cat Daun Jendela 24.15 m²
4 Pekerjaan Polituran Daun Pintu 13.20 m²
5 Pekerjaan Cat List Plafond 5.78 m
6 Pekerjaan Cat Listplank 9.60 m

XIII Pekerjaan Elektrikal


1 Pekerjaan Pemasangan Instalasi Listrik 34.00 buah
2 Pekerjaan Pemasangan Instalasi Stop Kontak 16.00 buah
3 Pekerjaan Pemasangan MCB 1.00 buah
4 Pekerjaan Pemasangan Arde 1.00 buah
5 Pekerjaan Pemasangan Stopkontak 16.00 titik
6 Pekerjaan Pemasangan Saklar Tunggal 7.00 titik
7 Pekerjaan Pemasangan Saklar Ganda 5.00 titik
8 Pekerjaan Pemasangan Lampu SL 18 w 24.00 buah
9 Pekerjaan Pemasangan Lampu Garden 10.00 buah
10 Pekerjaan Pemasangan Penangkal Petir 1.00 unit

XIV Pekerjaan Landscape


1 Pekerjaan Pemasangan Paving 24.50 m²
2 Pekerjaan Pagar 8.10 m³
3 Pekerjaan Taman 105.45 m²

XV Pekerjaan Lain-Lain
1 Pembersihan Akhir 1.00 Ls

75
DAFTAR HARGA MATERIAL DAN UPAH
3.3.Daftar Harga Bahan TAHUN 2013

HARGA SATUAN (Rp.)


NO. URAIAN BAHAN SATUAN
Bodetabek Yogyakarta Surabaya Medan Makassar
A. DAFTAR HARGA MATERIAL
1 Ampelas (kertas pasir) lbr 3,500.00 3,600.00 3,550.00 2,500.00 2,500.00
2 Akustik 600 x 1.200 x 15 mm setara amstrong lbr 50,000.00 52,000.00 52,000.00 58,000.00 60,000.00
3 Alumunium color untuk kusen pintu dan jendela 4” m' 98,000.00 98,000.00 98,000.00 112,000.00 115,000.00
4 Alumunium color untuk daun pintu dan jendela m' 85,000.00 86,000.00 86,000.00 92,000.00 93,000.00
5 Asbes pelat 1 x 1 m, tebal 3 mm lbr 14,500.00 14,500.00 14,500.00 15,500.00 16,000.00
6 Asbes gelombang 270 X 105 cm, tebal 4 mm lbr 68,500.00 67,000.00 66,000.00 70,000.00 72,000.00
7 Asbes gelombang 240 X 105 cm, tebal 4 mm lbr 60,000.00 60,000.00 58,000.00 62,000.00 65,000.00
8 Asbes gelombang 150 X 102 cm, tebal 5 mm lbr 46,000.00 46,000.00 45,000.00 48,000.00 48,000.00
9 Asbes gelombang 270 X 102 cm, tebal 5 mm lbr 87,500.00 87,000.00 85,000.00 92,000.00 90,000.00
10 Asbes gelombang 240 X 102 cm, tebal 5 mm lbr 78,200.00 78,500.00 77,000.00 84,000.00 81,000.00
11 Bata merah bh 700.00 700.00 700.00 900.00 950.00
12 Batu tempel hitam m2 90,000.00 80,000.00 85,000.00 110,000.00 120,000.00
10 Batako putih (trass) bh 2,200.00 2,200.00 2,400.00 4,000.00 4,200.00
11 Batako semen bh 2,500.00 2,400.00 2,400.00 4,500.00 4,500.00
12 Bata ringan (hebel/celcon) bh 12,500.00 12,550.00 12,550.00 13,500.00 13,800.00
13 Batu belah m3 225,000.00 180,000.00 180,000.00 300,000.00 300,000.00
14 Batu alam / tempel m2 85,000.00 80,000.00 82,000.00 160,000.00 160,000.00
15 Batu koral m3 245,000.00 225,000.00 245,000.00 310,000.00 320,000.00
16 Bendrat / kawat beton kg 15,000.00 15,000.00 15,000.00 16,500.00 17,000.00
17 Besi profil kg 12,000.00 12,000.00 12,000.00 14,000.00 14,000.00
18 Besi beton / ulir kg 9,200.00 9,400.00 9,300.00 11,000.00 11,500.00
19 Besi beton U-24 kg 9,000.00 9,000.00 9,000.00 9,200.00 9,300.00
20 Besi beton U-39 kg 9,200.00 9,400.00 9,300.00 10,100.00 10,250.00
21 Besi C (lip channel) / besi strip kg 11,000.00 11,000.00 11,000.00 12,500.00 12,500.00
22 Besi siku (L) kg 12,000.00 12,000.00 12,000.00 14,000.00 14,000.00
23 Cat meni kualitas bagus kg 16,000.00 16,500.00 16,500.00 19,000.00 19,000.00
24 Cat dasar (material primer, zinc cromat, dan lain-lain) kg 35,000.00 35,000.00 35,000.00 41,000.00 40,000.00
25 Cat besi kg 42,000.00 42,000.00 44,000.00 45,000.00 48,000.00
26 Cat tembok untuk interior kualitas baik kg 44,000.00 45,000.00 45,000.00 46,000.00 47,000.00
27 Cat tembok weathersield/eksterior kualitas baik kg 75,000.00 75,000.00 75,000.00 78,000.00 78,000.00
28 Cat tembok kualitas sedang kg 17,000.00 17,000.00 17,000.00 20,000.00 20,000.00
29 Cat kayu kualitas sedang kg 32,000.00 32,000.00 32,000.00 38,000.00 38,000.00
30 Cat kayu kualitas baik kg 42,000.00 42,000.00 42,000.00 45,000.00 45,000.00
31 Compound kg 28,000.00 28,500.00 28,500.00 30,000.00 32,000.00
32 Conblock 8 x 20 x 40 bh 4,000.00 3,800.00 3,800.00 4,200.00 4,500.00
33 Dempul besi kg 24,000.00 23,000.00 22,500.00 25,000.00 25,000.00
34 Dempul halus kg 23,500.00 23,500.00 23,500.00 24,500.00 25,000.00
35 Door closer bh 360,000.00 360,000.00 362,000.00 400,000.00 415,000.00
36 Door stopper kualitas baik bh 55,000.00 60,000.00 60,000.00 66,000.00 65,000.00
37 Door holder bh 45,000.00 50,000.00 45,000.00 50,000.00 50,000.00
38 Engsel pintu bh 30,000.00 30,000.00 30,000.00 35,000.00 35,000.00
39 Engsel jendela bh 25,000.00 25,000.00 25,000.00 30,000.00 30,000.00
40 Formika 120 x 240, tebal 1,5 mm lbr 125,000.00 135,000.00 130,000.00 166,700.00 150,000.00
41 Genteng sirap ( 80 bh/m2 ) bh 1,200.00 1,200.00 1,200.00 1,400.00 1,200.00
42 Genteng plentong ( 25 bh ) bh 1,500.00 1,500.00 1,500.00 2,000.00 2,250.00
43 Genteng keramik glazur ( 14,5/m2 ) m2 75,000.00 75,000.00 75,000.00 85,000.00 87,500.00
44 Genteng keramik natural ( 14,5/m2 ) m2 70,000.00 70,000.00 70,000.00 80,000.00 82,500.00
45 Genteng beton warna m2 78,000.00 78,000.00 78,000.00 82,000.00 85,000.00
46 Genteng metal lapis m2 132,000.00 130,000.00 125,000.00 134,000.00 129,800.00
47 Gipsum board 120x240, tebal 9 mm lbr 140,000.00 145,000.00 145,000.00 160,000.00 160,000.00
48 GRC tebal 5 mm lbr 98,000.00 98,000.00 98,000.00 120,000.00 120,000.00
49 Glass block bh 17,500.00 18,000.00 17,000.00 21,500.00 20,000.00
49 Granit jenis dan warna standar m2 600,000.00 650,000.00 600,000.00 750,000.00 750,000.00
50 Hollow 4/4 zincromate btg 32,000.00 32,000.00 32,000.00 38,000.00 38,000.00
51 Hollow 2/4 zincromate btg 25,000.00 25,000.00 25,000.00 35,000.00 35,000.00
52 Injuk ikat 15,000.00 8,000.00 10,000.00 7,500.00 6,000.00
53 Kaca bening (polos) tebal 3 mm m2 66,000.00 71,500.00 55,000.00 120,600.00 75,000.00
54 Kaca bening (polos) tebal 5 mm m2 88,000.00 88,000.00 88,000.00 98,000.00 98,000.00
55 Kait angin untuk daun jendela bh 10,900.00 11,000.00 10,000.00 12,000.00 12,000.00
56 Kawat duri rol 225,000.00 225,000.00 225,000.00 242,000.00 245,000.00
57 Kawat las m' 16,000.00 16,000.00 16,000.00 18,000.00 18,000.00
58 Kaca rayband tebal 5 mm m2 13,000.00 130,000.00 132,000.00 159,000.00 155,000.00
59 Balok dolken / stoot dia 8—10 cm btg 28,000.00 25,000.00 25,000.00 12,500.00 14,000.00
60 Balok kayu borneo super / meranti m3 3,600,000.00 3,550,000.00 3,400,000.00 2,650,000.00 2,350,000.00
61 Papan kayu borneo super / meranti m3 3,800,000.00 3,700,000.00 3,700,000.00 2,900,000.00 2,700,000.00
62 Balok kayu kamper samarinda/damar m3 5,200,000.00 5,000,000.00 4,800,000.00 4,650,000.00 5,766,800.00
63 Papan kayu kamper samarinda/damar m3 5,400,000.00 5,450,000.00 5,100,000.00 4,900,000.00 5,000,000.00
64 Balok kayu kamper medan m3 4,300,000.00 4,300,000.00 4,200,000.00 3,850,000.00 3,950,000.00
65 Papan kayu kamper medan m3 4,300,000.00 4,275,000.00 4,100,000.00 3,990,000.00 3,800,000.00
66 Pagar BRC lengkap tiang m2 130,000.00 135,000.00 130,000.00 152,000.00 148,000.00
67 Pegangan tangga profil kamper m' 86,000.00 86,000.00 79,000.00 65,000.00 65,000.00
68 Papan kayu terentang m3 2,400,000.00 2,200,000.00 2,200,000.00 1,600,000.00 1,500,000.00

76
69 Keramik lantai 20 x 25 cm m2 48,000.00 48,000.00 48,000.00 56,000.00 58,000.00
70 Keramik lantai 10 x 20 cm m2 35,000.00 32,000.00 31,000.00 34,000.00 32,000.00
71 Keramik lantai 20 x 20 cm m2 44,000.00 44,000.00 45,000.00 48,000.00 48,500.00
72 Keramik lantai polos 30 x 30 cm m2 52,000.00 54,000.00 52,000.00 59,000.00 60,000.00
73 Keramik ukuran 40 x 40 cm granito polished m2 205,000.00 210,000.00 210,000.00 225,000.00 246,000.00
74 Keramik ukuran 40 x 40 cm granito unpolished m2 195,000.00 195,800.00 196,000.00 202,000.00 205,000.00
73 Keramik lantai 60 x 90 cm standar m2 292,000.00 300,000.00 300,000.00 340,000.00 336,000.00
74 Keramik lantai 60 x 60 cm standar m2 265,000.00 276,000.00 267,000.00 298,000.00 290,000.00
75 Keramik dinding polos 10 x 20 cm m2 38,000.00 38,000.00 38,000.00 40,000.00 40,000.00
76 Keramik dinding motif 10 x 20 cm m2 39,000.00 39,000.00 39,000.00 42,000.00 42,000.00
77 Keramik dinding motif 20 x 20 cm m2 44,000.00 44,000.00 44,000.00 48,000.00 48,000.00
78 Keramik dinding polos 20 x 20 cm m2 42,000.00 42,000.00 42,000.00 47,000.00 47,000.00
79 Keramik dinding motif 20 x 25 cm m2 48,500.00 48,500.00 48,500.00 49,000.00 49,000.00
80 Keramik dinding polos 20 x 25 cm m2 50,000.00 50,000.00 50,000.00 52,000.00 52,000.00
81 Keramik essenza ukuran 60 x 60 cm polish m2 250,000.00 250,000.00 252,000.00 260,000.00 260,000.00
82 Keramik essenza ukuran 60 x 60 cm unpolih m2 235,000.00 235,000.00 235,000.00 245,000.00 240,000.00
83 Keramik dinding polos 30 x 30 cm m2 52,000.00 52,000.00 52,000.00 54,000.00 54,000.00
84 Keramik dinding motif 30 x 30 cm m2 54,000.00 54,000.00 54,000.00 56,000.00 56,000.00
85 Kawat duri untuk pagar kg 35,000.00 35,000.00 35,000.00 38,000.00 41,000.00
86 Kuas 2 “ cat bh 9,000.00 9,000.00 9,000.00 9,000.00 9,200.00
87 Kuas 3 “ cat bh 13,550.00 13,500.00 13,500.00 14,000.00 14,000.00
88 Kunci pintu 2 slaag besar kualitas baik bh 210,000.00 175,000.00 160,000.00 189,000.00 175,000.00
89 Kunci pintu 2 slaag kualitas standar bh 75,000.00 75,000.00 75,000.00 85,000.00 85,000.00
90 Kunci pintu KM/WC putar bulat (Alpha) bh 55,000.00 55,000.00 55,000.00 65,000.00 65,000.00
91 Kawat kasa 1 x 1 cm m2 22,000.00 22,000.00 22,000.00 28,000.00 26,000.00
92 Kawat harmonika 4 m2 18,000.00 18,000.00 18,000.00 23,000.00 23,000.00
93 Lem vinyl kg 30,800.00 30,800.00 30,800.00 32,000.00 35,000.00
94 Lem kayu ltr 25,600.00 25,600.00 25,600.00 27,000.00 28,000.00
95 Lis kayu 1/4 m' 4,300.00 3,700.00 3,700.00 2,100.00 2,100.00
96 Lis profil Gipsum m' 10,000.00 10,000.00 10,000.00 12,000.00 12,000.00
97 Lis profil kayu 5 x 5 cm m' 13,500.00 12,500.00 12,000.00 6,800.00 7,700.00
98 Marmer setara Citatah/Padalarang 60 x 60 m2 140,000.00 145,000.00 145,000.00 250,000.00 250,000.00
99 Meni besi kg 14,500.00 15,000.00 15,000.00 22,000.00 20,000.00
100 Meni kayu kg 15,000.00 15,000.00 15,000.00 17,000.00 16,000.00
101 Minyak cat (tinner) ltr 18,000.00 17,000.00 17,500.00 19,300.00 20,000.00
102 Minyak pelumas bekesting (oli/minyak bekas) ltr 12,000.00 10,000.00 10,000.00 12,500.00 10,000.00
103 Multiplek 9 mm, 120 X 240 lbr 105,000.00 105,000.00 102,000.00 112,000.00 112,000.00
104 Multiplek 12 mm, 120 X 240 lbr 145,000.00 145,000.00 145,000.00 155,000.00 150,000.00
105 Multiplek 16 mm, 120 X 240 lbr 180,000.00 180,000.00 180,000.00 190,000.00 190,000.00
106 Nok genteng keramik glazur bh 22,000.00 22,000.00 22,000.00 28,000.00 32,000.00
107 Nok genteng beton warna bh 22,000.00 22,000.00 22,000.00 28,000.00 32,000.00
108 Nok genteng metal m' 53,000.00 54,000.00 54,000.00 60,000.00 58,000.00
109 Paku kg 15,000.00 15,000.00 15,000.00 17,000.00 17,000.00
110 Paku sekrup 3,5” bh 600.00 600.00 600.00 650.00 750.00
111 Parquet jati m2 250,000.00 260,000.00 274,000.00 276,000.00 278,000.00
112 Pasir pasang m3 225,000.00 150,000.00 150,000.00 245,000.00 275,000.00
113 Pasir beton m3 250,000.00 175,000.00 175,000.00 260,000.00 275,000.00
114 Pasir urug m3 200,000.00 150,000.00 150,000.00 215,000.00 220,000.00
115 Panel lisrik standar untuk rumah unit 250,000.00 250,000.00 250,000.00 300,000.00 300,000.00
116 Perancah kayu m3 3,800,000.00 3,800,000.00 3,700,000.00 2,500,000.00 2,200,000.00
117 Pintu alumunium/pintu PVC bh 400,000.00 400,000.00 400,000.00 450,000.00 450,000.00
118 Pipa galvanis Ø 1/2” kelas medium m' 12,000.00 12,000.00 11,000.00 15,000.00 15,000.00
119 Pipa galvanis Ø 3/4” kelas medium m' 17,500.00 17,500.00 17,000.00 18,000.00 18,500.00
120 Pipa galvanis Ø 1” kelas medium m' 25,000.00 26,000.00 26,000.00 30,000.00 30,250.00
121 Pipa galvanis Ø 1 1/2” kelas medium m' 30,000.00 32,000.00 30,000.00 32,000.00 33,000.00
122 Pipa PVC AW Ø 1/2’ setara maspion m' 4,200.00 3,400.00 3,300.00 3,300.00 3,400.00
123 Pipa PVC AW Ø 3/4’ m' 5,000.00 4,500.00 4,500.00 4,600.00 4,675.00
124 Pipa PVC AW Ø 1” m' 6,500.00 6,400.00 6,400.00 6,750.00 6,700.00
125 Pipa PVC AW Ø 2” m' 8,500.00 8,500.00 8,500.00 9,000.00 9,000.00
126 Pipa PVC AW Ø 4” m' 17,000.00 18,500.00 19,000.00 20,000.00 19,500.00
127 Penyambung pipa PVC ukuran 1/2 “ bh 2,000.00 2,000.00 2,200.00 2,250.00 2,250.00
128 Penyambung pipa PVC ukuran 3/4 “ bh 2,750.00 2,500.00 2,500.00 3,000.00 3,000.00
129 Penyambung pipa PVC ukuran 2 “ bh 5,200.00 5,500.00 5,500.00 6,000.00 6,000.00
130 Penyambung pipa PVC ukuran 4 “ bh 12,000.00 12,500.00 12,500.00 14,000.00 14,000.00
131 Plamir tembok kg 19,000.00 20,000.00 20,000.00 25,000.00 27,000.00
132 Plamir/dempul plitur (impra) kg 22,000.00 23,100.00 23,000.00 25,000.00 26,000.00
133 Plamir kayu kg 17,000.00 17,500.00 18,000.00 23,100.00 22,500.00
134 Triplek tebal 3 mm, ukr 120 x 240 cm lbr 38,500.00 37,000.00 36,000.00 40,000.00 35,000.00
135 Triplek tebal 4 mm, ukr 120 x 240 cm lbr 50,000.00 50,000.00 47,500.00 52,000.00 51,000.00
136 Plint keramik ukuran 10 x 40 cm bh 7,500.00 7,500.00 7,200.00 10,000.00 9,000.00
137 Pelat alumunium 0,2 mm m' 16,000.00 17,000.00 17,000.00 20,000.00 18,000.00
138 Politur jadi kg 33,000.00 33,000.00 33,000.00 35,000.00 35,000.00
139 Polycarbonate m2 198,000.00 200,000.00 198,500.00 215,000.00 222,000.00

77
140 Ramset/dinabolt / piser kh 2,500.00 2,400.00 2,100.00 2,800.00 2,200.00
141 Ramin (papan kayu ramin) m3 6,700,000.00 6,600,000.00 6,500,000.00 6,800,000.00 5,500,000.00
142 Residu atau ter ltr 3,100.00 3,000.00 3,000.00 3,600.00 3,400.00
143 Rooster bata merah 12 x 11,5 x 24 bh 3,500.00 3,000.00 3,200.00 4,200.00 4,100.00
144 Roof light (fibreglass) tebal 1 mm, lbr 1 m m' 62,000.00 62,000.00 60,000.00 66,000.00 68,000.00
145 Roll cat bh 26,500.00 26,500.00 26,500.00 27,000.00 27,400.00
146 Rolling door m2 165,000.00 160,000.00 161,000.00 175,000.00 180,000.00
147 Semen PC (abu-abu) 50 kg sak 62,000.00 62,000.00 62,000.00 62,000.00 62,000.00
148 Semen instant kg 6,500.00 2,450.00 2,450.00 2,450.00 2,450.00
149 Semen warna/putih kg 4,200.00 12,700.00 12,700.00 12,700.00 12,700.00
150 Seng pelat 0,0400 x 0,9 m m' 31,000.00 32,000.00 32,000.00 33,300.00 33,000.00
151 Seng gelombang 180 x 90 x 0,03 lbr 43,000.00 53,800.00 53,800.00 51,000.00 53,800.00
152 Seng gelombang 180 x 90 x 0,05 lbr 57,600.00 58,000.00 56,500.00 61,000.00 60,600.00
153 Sirtu (pasir koral) m3 165,000.00 88,000.00 105,000.00 82,000.00 102,000.00
154 Sisalation/alumunium foil m2 4,200.00 4,300.00 4,250.00 5,500.00 5,600.00
155 Slot / grendel pintu 4 “ bh 29,000.00 31,000.00 30,000.00 33,000.00 32,500.00
156 Slot / grendel jendela 3 “ bh 19,000.00 19,100.00 19,000.00 19,500.00 19,500.00
157 Saklar / stop kontak lisrik standar bh 20,000.00 20,000.00 21,000.00 21,500.00 21,200.00
158 Split 2/3 cm (batu pecah) m3 178,000.00 140,000.00 157,000.00 161,700.00 132,000.00
159 Split 1/2 cm (batu pecah) m3 178,000.00 141,000.00 172,000.00 162,000.00 133,000.00
160 Waterproofing membran m2 200,000.00 210,000.00 205,000.00 220,000.00 225,000.00
161 Waterproofing emulsion /coating/floor harderner kg 41,000.00 42,000.00 42,500.00 44,000.00 45,000.00
162 Tangki air fiber glass 1 m3 bh 875,000.00 850,000.00 825,000.00 912,000.00 905,000.00
163 Teakwood 4 mm 120 x 240 lbr 94,000.00 95,000.00 95,000.00 98,000.00 90,000.00
164 Teak oil ltr 39,000.00 38,800.00 38,500.00 39,600.00 40,000.00
165 Triplek tebal 4 mm ukuran pintu lbr 65,000.00 65,000.00 65,000.00 70,000.00 65,000.00
166 Ubin abu-abu 30 x 30 cm, tebal 3 cm m2 30,000.00 30,000.00 30,000.00 43,000.00 41,000.00
167 Ubin abu-abu 20 x 20 cm, tebal 2 cm m2 23,500.00 24,000.00 24,500.00 40,000.00 38,000.00
168 Melamik impra ltr 29,500.00 300,000.00 29,800.00 32,000.00 32,200.00
169 Wallpaper m2 23,000.00 23,000.00 23,000.00 25,000.00 27,000.00
170 Roof drain besi 3 “ bh 69,500.00 71,000.00 68,500.00 88,000.00 85,000.00
171 Bak mandi fibreglass 60 x 60 cm bh 200,000.00 200,000.00 200,000.00 250,000.00 250,000.00
172 Bak cuci stainless steel bh 220,000.00 220,000.00 220,000.00 250,000.00 250,000.00
173 Floor drain stainles steel bh 59,000.00 59,500.00 60,000.00 62,000.00 63,000.00
174 Kitchen zink stainles steel standar 1 lubang bh 188,000.00 190,000.00 179,400.00 194,000.00 198,000.00
175 Kloset duduk warna standar setara TOTO bh 2,500,000.00 2,500,000.00 2,500,000.00 2,750,000.00 2,750,000.00
176 Kloset jongkok porselen warna standar bh 300,000.00 300,000.00 300,000.00 350,000.00 350,000.00
177 Kran air 1/2” kualitas sedang bh 54,900.00 55,000.00 54,500.00 56,000.00 56,000.00
178 Kran air angsa 1/2” kualitas sedang bh 155,000.00 155,000.00 156,000.00 157,500.00 155,500.00
179 Soap holder (tempat sabun) bh 30,000.00 26,000.00 24,400.00 32,000.00 33,000.00
180 Shower lengkap + slang plastik bh 150,000.00 150,000.00 150,000.00 175,000.00 180,000.00
181 Shower set dinding bh 235,000.00 235,000.00 235,000.00 250,000.00 260,000.00
182 Urinoir warna standar bh 750,000.00 750,000.00 750,000.00 800,000.00 825,000.00
183 Wastafel dinding/gantung bh 350,000.00 350,000.00 350,000.00 360,000.00 375,000.00
184 Wastafel pedestal/kaki bh 750,000.00 750,000.00 750,000.00 825,000.00 825,000.00
185 Water pump (pompa air 100 Watt) set 1,125,000.00 1,125,000.00 1,200,000.00 1,400,000.00 1,450,000.00
186 Kabel NYA 1 x 1,5 mm ( 50 m ) rol 115,000.00 115,000.00 115,000.00 160,000.00 165,000.00
187 Kabel NYM 2 x 1,5 mm ( 50 m ) rol 225,000.00 225,000.00 225,000.00 260,000.00 278,000.00
188 Kabel NYA 2 x 2,5 mm (50 m) rol 375,000.00 375,000.00 375,000.00 415,000.00 425,000.00
189 Kabel NYM 3 x 2,5 mm (50 m) rol 435,000.00 435,000.00 435,000.00 460,000.00 455,000.00
190 Lampu SL / TL 36 watt bh 55,000.00 56,000.00 54,000.00 55,500.00 58,000.00
191 Lampu baret 30 cm + lampu 18 watt bh 85,000.00 87,000.00 88,000.00 92,000.00 90,000.00
192 Lampu taman lengkap (standar) bh 260,000.00 260,000.00 260,000.00 280,000.00 300,000.00
193 Lampu pijar 40 watt bh 7,000.00 7,000.00 7,000.00 8,000.00 8,000.00
194 Cotton plaster bh 55,000.00 56,000.00 54,000.00 55,500.00 58,000.00
195 Profil alumunium “T” m' 30,000.00 26,000.00 24,400.00 32,000.00 33,000.00
196 Pipa PVC tipe D 3 “ m' 12,000.00 12,000.00 12,000.00 15,000.00 15,000.00
197 Pipa PVC tipe D 4 “ m' 15,000.00 15,000.00 15,000.00 19,000.00 19,000.00
198 Soda api kg 41,000.00 42,000.00 42,500.00 44,000.00 45,000.00
199 Tanah urug m3 175,000.00 145,000.00 150,000.00 150,000.00 125,000.00
200 Plint keramik ukuran 10 x 30 cm bh 10,000.00 10,000.00 10,000.00 15,000.00 15,000.00
201 Tarikan jendela bh 20,000.00 20,000.00 20,000.00 25,000.00 25,000.00
202 Septictank jadi 1,5 m3 (fiber semen) bh 1,500,000.00 1,500,000.00 1,400,000.00 1,600,000.00 1,550,000.00
203 Baja ringan untuk rangka atap (pabrikan) m2 160,000.00 165,000.00 165,000.00 170,000.00 170,000.00

78
3.4. Daftar Upah Pekerja

HARGA SATUAN (Rp.)


NO. URAIAN BAHAN SATUAN
Bodetabek Yogyakarta Surabaya Medan Makassar
B. DAFTAR HARGA UPAH TUKANG DAN PEKERJA
1 Pembantu tukang setengah terampil hari 60,000.00 55,000.00 60,000.00 75,000.00 75,000.00
2 Pembantu tukang terampil hari 65,000.00 60,000.00 65,000.00 80,000.00 80,000.00
3 Tukang gali hari 65,000.00 65,000.00 65,000.00 70,000.00 70,000.00
4 Tukang kayu setengah terampil hari 65,000.00 65,000.00 65,000.00 75,000.00 75,000.00
5 Tukang kayu terampil hari 80,000.00 80,000.00 80,000.00 85,000.00 85,000.00
6 Tukang batu setengah terampil hari 65,000.00 65,000.00 65,000.00 75,000.00 75,000.00
7 Tukang batu terampil hari 80,000.00 80,000.00 80,000.00 85,000.00 85,000.00
8 Tukang besi beton setengah terampil hari 70,000.00 70,000.00 70,000.00 75,000.00 75,000.00
9 Tukang besi beton terampil hari 85,000.00 85,000.00 85,000.00 90,000.00 90,000.00
10 Tukang cat/pelitur setengah terampil hari 65,000.00 65,000.00 65,000.00 75,000.00 75,000.00
11 Tukang cat/pelitur terampil hari 75,000.00 75,000.00 75,000.00 85,000.00 85,000.00
12 Tukang besi profil setengah terampil hari 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00
13 Tukang besi profil terampil hari 85,000.00 85,000.00 85,000.00 95,000.00 95,000.00
14 Tukang ledeng/pipa hari 80,000.00 80,000.00 80,000.00 95,000.00 95,000.00
15 Tukang lisrik hari 100,000.00 90,000.00 90,000.00 100,000.00 110,000.00

79
3.5. Daftar Analisa Harga Satuan

80
ANALISA HARGA SATUAN PEKERJAAN
Kota : Bodetabek
No. URAIAN KOEFISIEN SAT HARGA SATUAN JUMLAH (RP)
I PEKERJAAN PERSIAPAN
1 1 M¹ PAGAR SENG GELOMBANG TINGGI : 2 M
a Tiang Kayu Borneo 4/6 0.05 m3 3,600,000.00 180,000.00
b Semen PC (abu-abu) 0.05 sak 62,000.00 3,100.00
c Seng Gelombang 1.20 lbr 43,000.00 51,600.00
d Pasir beton 0.01 m3 250,000.00 1,250.00
e Splitz (batu pecah) 0.01 m3 178,000.00 1,602.00
f Balok kayu borneo 4/6 0.05 m3 3,600,000.00 180,000.00
g Paku 5 - 10 cm 0.06 kg 15,000.00 900.00
h Meni Besi 0.45 kg 14,500.00 6,525.00
i Tukang Kayu 0.20 org 80,000.00 16,000.00
j Pembantu Tukang 0.10 org 65,000.00 6,500.00
Jumlah 447,477.00
Dibulatkan 447,470.00
2 1 M¹ PAGAR KAWAT BERDURI TINGGI : 1,8 M
a Tiang dari Kayu Borneo 4/6 0.05 m3 3,600,000.00 180,000.00
b Semen PC (abu-abu) 0.04 sak 62,000.00 2,480.00
c Kawat Duri 2.50 kg 225,000.00 562,500.00
d Pasir beton 0.01 m3 250,000.00 1,250.00
e Splitz (batu pecah) 0.01 m3 178,000.00 1,602.00
f Paku 5 - 10 cm 0.06 kg 15,000.00 900.00
g Tukang Kayu 0.20 org 80,000.00 16,000.00
h Pembantu Tukang 0.30 org 65,000.00 19,500.00
Jumlah 784,232.00
Dibulatkan 784,230.00
3 1 M' PENGUKURAN & PEMASANGAN BOWPLANK
a Kayu kaso 5/7 borneo 0.02 m3 3,600,000.00 72,000.00
b Paku 5 - 10 cm 0.02 kg 15,000.00 300.00
c Papan Papan kayu terentang 2/20 0.00 m3 2,400,000.00 9,600.00
d Tukang Kayu 0.10 org 80,000.00 8,000.00
e Pembantu Tukang 0.10 org 65,000.00 6,500.00
Jumlah 96,400.00
Dibulatkan 96,400.00
4 1 m2 PEMBUATAN KANTOR DIREKSI
a Kayu kaso 5/7 borneo 0.02 m3 3,600,000.00 72,000.00
b Papan kayu terentang 0.18 m3 2,400,000.00 432,000.00
c Paku semua ukuran 0.85 kg 15,000.00 12,750.00
d Besi Strip 1.10 kg 11,000.00 12,100.00
e Semen PC (abu-abu) 35.00 kg 62,000.00 2,170,000.00
f Pasir Pasang 0.15 m3 225,000.00 33,750.00
g Pasir beton 0.10 m3 250,000.00 25,000.00
h Splitz (batu pecah) 0.15 m3 178,000.00 26,700.00
i Bata Merah 30.00 bh 700.00 21,000.00
j Seng Gelombang 180 x 90 x 0,05 cm 1.20 lbr 57,600.00 69,120.00
k Seng Plat BJLS 32 1.00 m2 31,000.00 31,000.00
l Kawat harmonika 2.00 m2 18,000.00 36,000.00
m Kaca Polos 3 mm 0.08 m2 66,000.00 5,280.00
n Kunci Tanam standart 0.15 bh 75,000.00 11,250.00
o Triplek 120 x 240 x 0,4 cm 0.06 lbr 50,000.00 3,000.00
p Tukang Kayu 2.00 org 80,000.00 160,000.00
q Tukang Batu 1.00 org 80,000.00 80,000.00
r Pembantu Tukang 2.00 org 65,000.00 130,000.00
Jumlah 3,330,950.00
Dibulatkan 3,330,950.00

81
5 1 m2 PEMBUATAN GUDANG PROYEK
a Kayu kaso 5/7 borneo 0.02 m3 3,600,000.00 72,000.00
b Papan kayu terentang 0.10 m3 2,400,000.00 240,000.00
c Paku 0.30 kg 15,000.00 4,500.00
d Semen PC (abu-abu) 0.21 sak 62,000.00 13,020.00
e Pasir Beton 0.03 m3 250,000.00 7,500.00
f Splitz (batu pecah) 0.05 m3 178,000.00 8,900.00
g Seng Gelombang 180 x 90 x 0,05 cm 1.20 lbr 57,600.00 69,120.00
h Tukang Kayu 1.00 org 80,000.00 80,000.00
i Pembantu Tukang 1.00 org 65,000.00 65,000.00
Jumlah 560,040.00
Dibulatkan 560,040.00
6 1 m2 MEMBERSIHKAN LOKASI ROYEK
a Pembantu Tukang 0.10 org 65,000.00 6,500.00
Jumlah 6,500.00
Dibulatkan 6,500.00
7 1 m2 MEMBERSIHKAN PUING-PUING
a Pembantu Tukang 0.20 org 65,000.00 13,000.00
Jumlah 13,000.00
Dibulatkan 13,000.00
8 1 BH MEMBERSIHKAN TUNGGUL TANAMAN
a Pembantu Tukang 2.00 org 65,000.00 130,000.00
Jumlah 130,000.00
Dibulatkan 130,000.00
9 1m2 PEMBUATAN JALAN MASUK PROYEK
a Batu Belah 15/20 0.10 m3 225,000.00 22,500.00
b Koral 5/7 ( sirtu ) 0.05 m3 165,000.00 8,250.00
c Pasir urug 0.01 m3 200,000.00 2,000.00
d Pembantu Tukang 1.00 org 65,000.00 65,000.00
Jumlah 97,750.00
Dibulatkan 97,700.00
10 1 m3 PEMBONGKARAN BETON
a Pembantu Tukang 6.20 org 65,000.00 403,000.00
Jumlah 403,000.00
Dibulatkan 403,000.00
11 1 m3 PEMBONGKARAN DINDING BATA
a Pembantu Tukang 4.60 org 65,000.00 299,000.00
Jumlah 299,000.00
Dibulatkan 299,000.00
12 1 M2 PEKERJAAN PAGAR PAPAN RANGKA BALOK
a Papan kayu Borneo 0.02 m3 3,800,000.00 76,000.00
b Balok kayu borneo 5/7 0.02 m3 3,600,000.00 72,000.00
c Pasir Beton 0.08 m3 250,000.00 20,000.00
d Splitz (batu pecah) 0.15 m3 178,000.00 26,700.00
e Semen abu - abu 0.50 sak 62,000.00 31,000.00
f Tukang Kayu 0.13 org 80,000.00 10,400.00
g Pembantu Tukang 0.38 org 65,000.00 24,700.00
Jumlah 260,800.00
Dibulatkan 260,800.00

82
II PEKERJAAN TANAH
1 1 m3 GALIAN TANAH SEDALAM 1 M
a Pembantu Tukang 0.40 org 65,000.00 26,000.00
b Tukang Gali 0.02 org 65,000.00 1,300.00
Jumlah 27,300.00
Dibulatkan 27,300.00
2 1 m3 GALIAN TANAH SEDALAM 2 M
a Pembantu Tukang 0.53 org 65,000.00 34,450.00
b Tukang Gali 0.02 org 65,000.00 1,300.00
Jumlah 35,750.00
Dibulatkan 35,750.00
3 1 m3 GALIAN TANAH SEDALAM 3 M
a Pembantu Tukang 0.74 org 65,000.00 48,100.00
b Tukang Gali 0.02 org 65,000.00 1,300.00
Jumlah 49,400.00
Dibulatkan 49,400.00
4 1 m3 GALIAN TANAH KERAS SEDALAM 1 M
a Pembantu Tukang 0.45 org 65,000.00 29,250.00
b Tukang Gali 0.02 org 65,000.00 1,300.00
Jumlah 30,550.00
Dibulatkan 30,550.00
5 1 m2 PEKERJAAN PENGUPASAN TANAH SETEBAL 10 CM
a Pembantu Tukang 0.05 org 65,000.00 1,625.00
b Tukang Gali 0.02 org 65,000.00 975.00
Jumlah 2,600.00
Dibulatkan 2,600.00
6 1 m3 PEMBUANGAN TANAH SEJAUH 150 M
a Pembantu Tukang 0.42 org 65,000.00 27,300.00
b Tukang Gali 0.02 org 65,000.00 1,300.00
Jumlah 28,600.00
Dibulatkan 28,600.00
7 1 m3 URUGAN TANAH KEMBALI
a Pembantu Tukang 0.19 org 65,000.00 12,350.00
b Tukang Gali 0.02 org 65,000.00 1,300.00
Jumlah 13,650.00
Dibulatkan 13,600.00
8 1 m3 PEMADATAN TANAH
a Pembantu Tukang 0.50 org 65,000.00 32,500.00
b Tukang Gali 0.02 org 65,000.00 1,300.00
Jumlah 33,800.00
Dibulatkan 33,800.00
9 1 m3 URUGAN PASIR
a Pasir Urug 1.20 m3 200,000.00 240,000.00
b Pembantu Tukang 0.30 org 65,000.00 19,500.00
c Tukang Gali 0.02 org 65,000.00 1,300.00
Jumlah 260,800.00
Dibulatkan 260,800.00
10 1 m3 URUGAN TANAH
a Tanah Urug 1.20 m3 175,000.00 210,000.00
b Pembantu Tukang 0.30 org 65,000.00 19,500.00
c Tukang Gali 0.02 org 65,000.00 1,300.00
Jumlah 230,800.00
Dibulatkan 230,800.00
11 1 m3 URUGAN SIRTU
a Sirtu ( koral ) 1.20 m3 165,000.00 198,000.00
b Pembantu Tukang 0.25 org 65,000.00 16,250.00
c Tukang Gali 0.02 org 65,000.00 1,300.00
Jumlah 215,550.00
Dibulatkan 215,500.00

83
III PEKERJAAN PONDASI
1 1 m3 PASANG PONDASI BT KALI , 1 Pc : 3 Ps
a Batu Belah 1.10 m3 225,000.00 247,500.00
b Semen PC (abu-abu) 4.04 sak 62,000.00 250,480.00
c Pasir Pasang 0.49 m3 225,000.00 109,125.00
d Pembantu Tukang 1.50 org 65,000.00 97,500.00
e Tukang Batu 0.60 org 80,000.00 48,000.00
Jumlah 752,605.00
Dibulatkan 752,600.00
2 1 m3 PASANG PONDASI BT KALI , 1 Pc : 4 Ps
a Batu Belah 1.10 m3 225,000.00 247,500.00
b Semen PC (abu-abu) 3.26 sak 62,000.00 202,120.00
c Pasir Pasang 0.52 m3 225,000.00 117,000.00
d Pembantu Tukang 1.50 org 65,000.00 97,500.00
e Tukang Batu 0.60 org 80,000.00 48,000.00
Jumlah 712,120.00
Dibulatkan 712,120.00
3 1 m3 PASANG PONDASI BT KALI , 1 Pc : 5 Ps
a Batu Belah 1.10 m3 225,000.00 247,500.00
b Semen PC (abu-abu) 2.72 sak 62,000.00 168,640.00
c Pasir Pasang 0.54 m3 225,000.00 122,400.00
d Pembantu Tukang 1.50 org 65,000.00 97,500.00
e Tukang Batu 0.60 org 80,000.00 48,000.00
Jumlah 684,040.00
Dibulatkan 684,040.00
4 1 m3 PASANG PONDASI BATU KOSONG ( AANSTAMPING )
a Batu Belah 1.20 m3 225,000.00 270,000.00
b Pasir Urug 0.30 m3 200,000.00 60,000.00
c Pembantu Tukang 0.78 org 65,000.00 50,700.00
d Tukang Batu 0.39 org 80,000.00 31,200.00
Jumlah 411,900.00
Dibulatkan 411,900.00
5 1 m3 MEMBUAT BETON BERTULANG UNTUK PONDASI 1 Pc : 2 Ps : 3 Kr
a Semen PC (abu-abu) 6.72 sak 62,000.00 416,640.00
b Pasir Beton 0.54 m3 250,000.00 135,000.00
c Splitz (batu pecah) 0.81 m3 178,000.00 144,180.00
d Pembantu Tukang 2.00 org 65,000.00 130,000.00
e Tukang Batu 0.35 org 80,000.00 28,000.00
Jumlah 853,820.00
Dibulatkan 853,800.00
6 1 kg PENULANGAN BETON PONDASI
a Besi Beton Polos 1.05 kg 9,000.00 9,450.00
b Kawat Beton 0.02 kg 15,000.00 225.00
c Pembantu Tukang 0.01 org 65,000.00 455.00
d Tukang Besi 0.01 org 85,000.00 595.00
Jumlah 10,725.00
Dibulatkan 10,700.00
7 1 m2 PEKERJAAN BEKISTING UNTUK PONDASI
a Papan kayu terentang 0.04 m3 2,400,000.00 96,000.00
b Paku 5 - 12 cm 0.30 kg 4,300.00 1,290.00
c Pelumas begisting (oli/minyak) 0.10 Ltr 12,000.00 1,200.00
d Pembantu Tukang 0.30 org 65,000.00 19,500.00
e Tukang Kayu 0.26 org 80,000.00 20,800.00
Jumlah 138,790.00
Dibulatkan 138,700.00
8 1 m3 PASANG PONDASI CYCLOOP (60 %BETON : 40% BATU KALI)
a Besi Beton Polos 50.00 kg 9,000.00 450,000.00
b Semen PC (abu-abu) 4.04 sak 62,000.00 250,480.00
c Pasir Beton 0.32 m3 250,000.00 80,000.00
d Splitz (batu pecah) 0.49 m3 178,000.00 87,220.00
e Kawat Beton 0.80 kg 15,000.00 12,000.00
f Batu Belah 0.40 m3 225,000.00 90,000.00
g Pembantu Tukang 2.00 org 65,000.00 130,000.00
h Tukang Batu 0.85 org 80,000.00 68,000.00
Jumlah 1,167,700.00
Dibulatkan 1,167,700.00

84
9 1 m3 PASANG PONDASI SUMURAN DIAMETER 100 cm
a Batu Belah 0.45 m3 225,000.00 101,250.00
b Semen PC (abu-abu) 5.60 sak 62,000.00 347,200.00
c Pasir Beton 0.45 m3 250,000.00 112,500.00
d Splitz (batu pecah) 0.67 m3 178,000.00 119,260.00
e Pembantu Tukang 2.38 org 65,000.00 154,700.00
f Tukang Batu 0.30 org 80,000.00 24,000.00
Jumlah 858,910.00
Dibulatkan 858,900.00
10 1 M¹ PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 40 X 40 Cm
a Pasir Beton 0.10 m3 250,000.00 25,000.00
b Splitz (batu pecah) 0.15 m3 178,000.00 26,700.00
c Semen PC (abu-abu) 1.21 sak 62,000.00 75,020.00
d Besi Beton Polos 45.00 kg 9,000.00 405,000.00
e Kawat Beton 0.90 kg 15,000.00 13,500.00
f Balok kayu borneo super 5/7 0.03 m3 3,600,000.00 115,200.00
g Papan kayu terentang 0.01 m3 3,800,000.00 38,000.00
h Paku 5 - 12 cm 0.12 kg 15,000.00 1,800.00
i Pelumas begisting (oli/minyak) 0.09 Ltr 12,000.00 1,080.00
j Plamir Tembok 0.24 kg 19,000.00 4,560.00
k Pembantu Tukang 1.00 org 65,000.00 65,000.00
l Tukang Batu 0.67 org 80,000.00 53,600.00
Jumlah 824,460.00
Dibulatkan 824,400.00
11 1 M¹ PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 35 X 35 Cm
a Pasir Beton 0.08 m3 250,000.00 20,000.00
b Splitz (batu pecah) 0.13 m3 178,000.00 23,140.00
c Semen PC (abu-abu) 0.98 sak 62,000.00 60,760.00
d Besi Beton Polos 34.50 kg 9,000.00 310,500.00
e Kawat Beton 0.70 kg 15,000.00 10,500.00
f Balok kayu borneo super 5/7 0.03 m3 3,600,000.00 108,000.00
g Papan kayu terentang 0.01 m3 3,800,000.00 38,000.00
h Paku 5 - 12 cm 0.12 kg 15,000.00 1,800.00
i Pelumas begisting (oli/minyak) 0.09 Ltr 12,000.00 1,080.00
j Plamir Tembok 0.20 kg 19,000.00 3,800.00
k Pembantu Tukang 0.80 org 65,000.00 52,000.00
l Tukang Batu 0.50 org 80,000.00 40,000.00
Jumlah 669,580.00
Dibulatkan 669,500.00
12 1 m3 MEMBUAT PONDASI TIANG PANCANG UKURAN 25 X 25
a Pasir Beton 0.06 m3 250,000.00 15,000.00
b Splitz (batu pecah) 0.11 m3 178,000.00 19,580.00
c Semen PC (abu-abu) 0.82 sak 62,000.00 50,840.00
d Besi Beton Polos 34.50 kg 9,000.00 310,500.00
e Kawat Beton 0.60 kg 15,000.00 9,000.00
f Balok kayu borneo super 5/7 0.03 m3 3,600,000.00 108,000.00
g Papan kayu terentang 0.01 m3 3,800,000.00 38,000.00
h Paku 5 - 12 cm 0.11 kg 15,000.00 1,650.00
i Pelumas begisting (oli/minyak) 0.08 Ltr 12,000.00 960.00
j Plamir Tembok 0.20 kg 19,000.00 3,800.00
k Pembantu Tukang 0.80 org 65,000.00 52,000.00
l Tukang Batu 0.50 org 80,000.00 40,000.00
Jumlah 649,330.00
Dibulatkan 649,300.00

85
13 1 m3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 125 kg + BEKISTING )
a Papan kayu terentang 0.20 m3 2,400,000.00 480,000.00
b Paku 5 - 12 cm 1.50 kg 15,000.00 22,500.00
c Pelumas begisting (oli/minyak) 0.40 Ltr 12,000.00 4,800.00
d Besi Beton Polos 125.00 kg 9,000.00 1,125,000.00
e Kawat Beton 2.25 kg 15,000.00 33,750.00
f Semen PC (abu-abu) 6.46 sak 62,000.00 400,520.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Pembantu Tukang 3.90 org 65,000.00 253,500.00
j Tukang Batu 0.35 org 80,000.00 28,000.00
k Tukang Kayu 1.04 org 80,000.00 83,200.00
l Tukang Besi 1.05 org 85,000.00 89,250.00
Jumlah 2,789,360.00
Dibulatkan 2,789,300.00
14 1 m3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 150 kg + BEKISTING )
a Papan kayu terentang 0.20 m3 2,400,000.00 480,000.00
b Paku 5 - 12 cm 1.50 kg 15,000.00 22,500.00
c Pelumas begisting (oli/minyak) 0.40 ltr 12,000.00 4,800.00
d Besi Beton Polos Polos 150.00 kg 9,000.00 1,350,000.00
e Kawat Beton 2.25 kg 15,000.00 33,750.00
f Semen PC (abu-abu) 6.46 sak 62,000.00 400,520.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Pembantu Tukang 4.00 org 65,000.00 260,000.00
j Tukang Batu 0.40 org 80,000.00 32,000.00
k Tukang Kayu 1.00 org 80,000.00 80,000.00
l Tukang Besi 1.00 org 85,000.00 85,000.00
Jumlah 3,017,410.00
Dibulatkan 3,017,400.00
15 1 m3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 125 kg + BEKISTING )
a Papan kayu terentang 0.20 m3 2,400,000.00 480,000.00
b Paku 5 - 12 cm 1.50 kg 15,000.00 22,500.00
c Pelumas begisting (oli/minyak) 0.40 ltr 12,000.00 4,800.00
d Besi Beton Polos Polos 125.00 kg 9,000.00 1,125,000.00
e Kawat Beton 2.10 kg 15,000.00 31,500.00
f Semen PC (abu-abu) 6.46 sak 62,000.00 400,520.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Pembantu Tukang 3.90 org 65,000.00 253,500.00
j Tukang Batu 0.40 org 80,000.00 32,000.00
k Tukang Kayu 1.00 org 80,000.00 80,000.00
l Tukang Besi 1.00 org 85,000.00 85,000.00
Jumlah 2,783,660.00
Dibulatkan 2,783,600.00
16 1 m3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 150 kg + BEKISTING )
a Papan kayu terentang 0.20 m3 2,400,000.00 480,000.00
b Paku 5 - 12 cm 1.50 kg 15,000.00 22,500.00
c Pelumas begisting (oli/minyak) 0.40 ltr 12,000.00 4,800.00
d Besi Beton Polos 150.00 kg 9,000.00 1,350,000.00
e Kawat Beton 2.25 kg 15,000.00 33,750.00
f Semen PC (abu-abu) 6.46 sak 62,000.00 400,520.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Pembantu Tukang 4.00 org 65,000.00 260,000.00
j Tukang Batu 0.40 org 80,000.00 32,000.00
k Tukang Kayu 1.00 org 80,000.00 80,000.00
l Tukang Besi 1.00 org 85,000.00 85,000.00
Jumlah 3,017,410.00
Dibulatkan 3,017,400.00

86
IV PEKERJAAN BETON NON STRUKTUR DAN BETON STRUKTUR
A PEKERJAAN BETON
1 1 m3 MEMBUAT BETON NON STRUKTUR, 1 Pc : 3 Ps : 5 Splt
a Semen PC (abu-abu) 4.36 sak 62,000.00 270,320.00
b Pasir Beton 0.52 m3 250,000.00 130,000.00
c Splitz (batu pecah) 0.87 m3 178,000.00 154,860.00
d Pembantu Tukang 2.00 org 65,000.00 130,000.00
e Tukang Batu 0.35 org 80,000.00 28,000.00
Jumlah 713,180.00
Dibulatkan 713,100.00
2 1 m3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 4 Splt
a Semen PC (abu-abu) 4.64 sak 62,000.00 287,680.00
b Pasir Beton 0.52 m3 250,000.00 130,000.00
c Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
d Pembantu Tukang 2.00 org 65,000.00 130,000.00
e Tukang Batu 0.35 org 80,000.00 28,000.00
Jumlah 714,520.00
Dibulatkan 714,500.00
3 1 m3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 3 Splt
a Semen PC (abu-abu) 6.72 sak 62,000.00 416,640.00
b Pasir Beton 0.54 m3 250,000.00 135,000.00
c Splitz (batu pecah) 0.81 m3 178,000.00 144,180.00
d Pembantu Tukang 2.00 org 65,000.00 130,000.00
e Tukang Batu 0.35 org 80,000.00 28,000.00
Jumlah 853,820.00
Dibulatkan 853,800.00
4 1 m3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 225
a Semen PC (abu-abu) 7.76 sak 62,000.00 481,120.00
b Pasir Beton 0.65 m3 250,000.00 162,500.00
c Splitz (batu pecah) 0.65 m3 178,000.00 115,700.00
d Pembantu Tukang 2.00 org 65,000.00 130,000.00
e Tukang Batu 0.35 org 80,000.00 28,000.00
Jumlah 917,320.00
Dibulatkan 917,300.00
5 1 m3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 275
a Semen PC (abu-abu) 8.00 sak 62,000.00 496,000.00
b Pasir Beton 0.55 m3 250,000.00 137,500.00
c Splitz (batu pecah) 0.70 m3 178,000.00 124,600.00
d Pembantu Tukang 2.02 org 65,000.00 131,300.00
e Tukang Batu 0.40 org 80,000.00 32,000.00
Jumlah 921,400.00
Dibulatkan 921,400.00
B PEKERJAAN PEMBESIAN
1 1 kg PENULANGAN BETON/BESI BETON POLOS
a Besi Beton Polos 1.05 kg 9,000.00 9,450.00
b Kawat Beton 0.02 kg 15,000.00 300.00
c Pembantu Tukang 0.01 org 65,000.00 650.00
d Tukang Besi 0.01 org 85,000.00 850.00
Jumlah 11,250.00
Dibulatkan 11,200.00
2 1 kg PENULANGAN BETON/BESI BETON ULIR
a Besi Beton Ulir 1.10 kg 9,200.00 10,120.00
b Kawat Beton 0.02 kg 15,000.00 225.00
c Pembantu Tukang 0.01 org 65,000.00 650.00
d Tukang Besi 0.02 org 85,000.00 1,700.00
Jumlah 12,695.00
Dibulatkan 12,600.00
C PEKERJAAN BEKISTING
1 1 m2 PASANG BEKISTING UNTUK SLOOF
a Papan kayu terentang 0.05 m3 2,400,000.00 108,000.00
b Paku 5 - 12 cm 0.30 kg 15,000.00 4,500.00
c Pelumas begisting (oli/minyak) 0.10 Ltr 12,000.00 1,200.00
d Pembantu Tukang 0.30 org 65,000.00 19,500.00
e Tukang Kayu 0.26 org 80,000.00 20,800.00
Jumlah 154,000.00
Dibulatkan 154,000.00

87
2 1 m2 PASANG BEKISTING UNTUK KOLOM
a Papan kayu terentang 0.04 m3 2,400,000.00 96,000.00
b Paku 5 - 12 cm 0.40 kg 15,000.00 6,000.00
c Pelumas begisting (oli/minyak) 0.20 Ltr 12,000.00 2,400.00
d Balok Kayu Borneo 0.04 m3 3,600,000.00 144,000.00
e Multiplex 120 x 240 x 9 mm 0.35 lbr 105,000.00 36,750.00
f Pembantu Tukang 0.30 org 65,000.00 19,500.00
g Tukang Kayu 0.33 org 80,000.00 26,400.00
Jumlah 331,050.00
Dibulatkan 331,000.00
3 1 m2 PASANG BEKISTING UNTUK BALOK
a Papan kayu terentang 0.04 m3 2,400,000.00 96,000.00
b Paku 5 - 12 cm 0.40 kg 15,000.00 6,000.00
c Pelumas begisting (oli/minyak) 0.20 Ltr 12,000.00 2,400.00
d Balok Kayu Borneo 0.04 m3 3,600,000.00 144,000.00
e Multiplex 120 x 240 x 9 mm 0.35 lbr 105,000.00 36,750.00
f Pembantu Tukang 0.32 org 65,000.00 20,800.00
g Tukang Kayu 0.33 org 80,000.00 26,400.00
Jumlah 332,350.00
Dibulatkan 332,300.00
4 1 m2 PASANG BEKISTING UNTUK PLAT LANTAI
a Papan kayu terentang 0.04 m3 2,400,000.00 96,000.00
b Paku 5 - 12 cm 0.40 kg 15,000.00 6,000.00
c Pelumas begisting (oli/minyak) 0.20 Ltr 12,000.00 2,400.00
d Balok Kayu Borneo 0.04 m3 3,600,000.00 144,000.00
e Multiplex 120 x 240 x 9 mm 0.35 lbr 105,000.00 36,750.00
f Pembantu Tukang 0.32 org 65,000.00 20,800.00
g Tukang Kayu 0.33 org 80,000.00 26,400.00
Jumlah 332,350.00
Dibulatkan 332,300.00
5 1 m2 PASANG BEKISTING UNTUK TANGGA
a Papan kayu terentang 0.03 m3 2,400,000.00 72,000.00
b Paku 5 - 12 cm 0.40 kg 15,000.00 6,000.00
c Pelumas begisting (oli/minyak) 0.15 Ltr 12,000.00 1,800.00
d Balok Kayu Borneo 0.02 m3 3,600,000.00 72,000.00
e Multiplex 120 x 240 x 9 mm 0.35 lbr 105,000.00 36,750.00
f Pembantu Tukang 0.32 org 65,000.00 20,800.00
g Tukang Kayu 0.33 org 80,000.00 26,400.00
Jumlah 235,750.00
Dibulatkan 235,700.00
D PEKERJAAN BETON BERTULANG
1 1 m3 MEMBUAT SLOOF BETON BERTULANG ( 200 kg BESI + BEKISTING ) K225
a Papan kayu terentang 0.27 m3 2,400,000.00 648,000.00
b Paku 5 - 12 cm 2.00 kg 15,000.00 30,000.00
c Pelumas begisting (oli/minyak) 0.60 Ltr 12,000.00 7,200.00
d Besi Beton Polos 200.00 kg 9,000.00 1,800,000.00
e Kawat Beton 3.00 kg 15,000.00 45,000.00
f Semen PC (abu-abu) 8.00 sak 62,000.00 496,000.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Pembantu Tukang 4.50 org 65,000.00 292,500.00
j Tukang Batu 0.35 org 80,000.00 28,000.00
k Tukang Kayu 1.56 org 80,000.00 124,800.00
l Tukang Besi 1.40 org 85,000.00 119,000.00
Jumlah 3,859,340.00
Dibulatkan 3,859,300.00
2 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 125 kg BESI + BEKISTING )
a Papan kayu terentang 0.40 m3 2,400,000.00 960,000.00
b Paku 5 - 12 cm 4.00 kg 15,000.00 60,000.00
c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 24,000.00
d Besi Beton Polos 125.00 kg 9,000.00 1,125,000.00
e Kawat Beton 4.50 kg 15,000.00 67,500.00
f Semen PC (abu-abu) 6.45 sak 62,000.00 399,900.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00
j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00
k Pembantu Tukang 7.30 org 65,000.00 474,500.00
l Tukang Batu 0.35 org 80,000.00 28,000.00
m Tukang Kayu 3.30 org 80,000.00 264,000.00
n Tukang Besi 2.10 org 85,000.00 178,500.00
Jumlah 5,297,740.00
Dibulatkan 5,297,700.00

88
3 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 150 kg BESI + BEKISTING )
a Papan kayu terentang 0.40 m3 2,400,000.00 960,000.00
b Paku 5 - 12 cm 4.00 kg 15,000.00 60,000.00
c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 24,000.00
d Besi Beton Polos 150.00 kg 9,000.00 1,350,000.00
e Kawat Beton 4.50 kg 15,000.00 67,500.00
f Semen PC (abu-abu) 6.45 sak 62,000.00 399,900.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00
j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00
k Pembantu Tukang 7.30 org 65,000.00 474,500.00
l Tukang Batu 0.35 org 80,000.00 28,000.00
m Tukang Kayu 3.30 org 80,000.00 264,000.00
n Tukang Besi 2.10 org 85,000.00 178,500.00
Jumlah 5,522,740.00
Dibulatkan 5,522,700.00
4 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 160 kg BESI + BEKISTING )
a Papan kayu terentang 0.40 m3 2,400,000.00 960,000.00
b Paku 5 - 12 cm 4.00 kg 15,000.00 60,000.00
c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 24,000.00
d Besi Beton Polos 160.00 kg 9,000.00 1,440,000.00
e Kawat Beton 4.50 kg 15,000.00 67,500.00
f Semen PC (abu-abu) 6.45 sak 62,000.00 399,900.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00
j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00
k Pembantu Tukang 7.30 org 65,000.00 474,500.00
l Tukang Batu 0.35 org 80,000.00 28,000.00
m Tukang Kayu 3.30 org 80,000.00 264,000.00
n Tukang Besi 2.10 org 85,000.00 178,500.00
Jumlah 5,612,740.00
Dibulatkan 5,612,700.00
5 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 175 kg BESI + BEKISTING )
a Papan kayu terentang 0.40 m3 2,400,000.00 960,000.00
b Paku 5 - 12 cm 4.00 kg 15,000.00 60,000.00
c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 24,000.00
d Besi Beton Polos 175.00 kg 9,000.00 1,575,000.00
e Kawat Beton 4.50 kg 15,000.00 67,500.00
f Semen PC (abu-abu) 6.45 sak 62,000.00 399,900.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00
j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00
k Pembantu Tukang 7.30 org 65,000.00 474,500.00
l Tukang Batu 0.35 org 80,000.00 28,000.00
m Tukang Kayu 3.30 org 80,000.00 264,000.00
n Tukang Besi 2.10 org 85,000.00 178,500.00
Jumlah 5,747,740.00
Dibulatkan 5,747,700.00
6 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 200 kg BESI + BEKISTING )
a Papan kayu terentang 0.40 m3 2,400,000.00 960,000.00
b Paku 5 - 12 cm 4.00 kg 15,000.00 60,000.00
c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 24,000.00
d Besi Beton Polos 200.00 kg 9,000.00 1,800,000.00
e Kawat Beton 4.50 kg 15,000.00 67,500.00
f Semen PC (abu-abu) 6.45 sak 62,000.00 399,900.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00
j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00
k Pembantu Tukang 7.30 org 65,000.00 474,500.00
l Tukang Batu 0.35 org 80,000.00 28,000.00
m Tukang Kayu 3.30 org 80,000.00 264,000.00
n Tukang Besi 2.10 org 85,000.00 178,500.00
Jumlah 5,972,740.00
Dibulatkan 5,972,700.00

89
7 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 250 kg BESI + BEKISTING )
a Papan kayu terentang 0.40 m3 2,400,000.00 960,000.00
b Paku 5 - 12 cm 4.00 kg 15,000.00 60,000.00
c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 24,000.00
d Besi Beton Polos 250.00 kg 9,000.00 2,250,000.00
e Kawat Beton 4.50 kg 15,000.00 67,500.00
f Semen PC (abu-abu) 6.45 sak 62,000.00 399,900.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00
j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00
k Pembantu Tukang 7.30 org 65,000.00 474,500.00
l Tukang Batu 0.35 org 80,000.00 28,000.00
m Tukang Kayu 3.30 org 80,000.00 264,000.00
n Tukang Besi 2.10 org 85,000.00 178,500.00
Jumlah 6,422,740.00
Dibulatkan 6,422,700.00
8 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 300 kg BESI + BEKISTING )
a Papan kayu terentang 0.40 m3 2,400,000.00 960,000.00
b Paku 5 - 12 cm 4.00 kg 15,000.00 60,000.00
c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 24,000.00
d Besi Beton Polos 300.00 kg 9,000.00 2,700,000.00
e Kawat Beton 4.50 kg 15,000.00 67,500.00
f Semen PC (abu-abu) 6.45 sak 62,000.00 399,900.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00
j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00
k Pembantu Tukang 7.30 org 65,000.00 474,500.00
l Tukang Batu 0.35 org 80,000.00 28,000.00
m Tukang Kayu 3.30 org 80,000.00 264,000.00
n Tukang Besi 2.10 org 85,000.00 178,500.00
Jumlah 6,872,740.00
Dibulatkan 6,872,700.00
9 1 m3 MEMBUAT BALOK BETON BERTULANG ( 125 kg BESI + BEKISTING )
a Papan kayu terentang 0.32 m3 2,400,000.00 768,000.00
b Paku 5 - 12 cm 3.20 kg 15,000.00 48,000.00
c Pelumas begisting (oli/minyak) 1.60 Ltr 12,000.00 19,200.00
d Besi Beton Polos 125.00 kg 9,000.00 1,125,000.00
e Kawat Beton 2.25 kg 15,000.00 33,750.00
f Semen PC (abu-abu) 6.45 sak 62,000.00 399,900.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Balok kayu Borneo Super 0.12 m3 3,600,000.00 432,000.00
j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 294,000.00
k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 32.00 btg 28,000.00 896,000.00
l Pembantu Tukang 5.80 org 65,000.00 377,000.00
m Tukang Batu 0.35 org 80,000.00 28,000.00
n Tukang Kayu 2.80 org 80,000.00 224,000.00
o Tukang Besi 1.05 org 85,000.00 89,250.00
Jumlah 5,002,940.00
Dibulatkan 5,002,900.00
10 1 m3 MEMBUAT BALOK BETON BERTULANG ( 150 kg BESI + BEKISTING )
a Papan kayu terentang 0.32 m3 2,400,000.00 768,000.00
b Paku 5 - 12 cm 3.20 kg 15,000.00 48,000.00
c Pelumas begisting (oli/minyak) 1.60 Ltr 12,000.00 19,200.00
d Besi Beton Polos 150.00 kg 9,000.00 1,350,000.00
e Kawat Beton 2.25 kg 15,000.00 33,750.00
f Semen PC (abu-abu) 6.45 sak 62,000.00 399,900.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Balok kayu Borneo Super 0.12 m3 3,600,000.00 432,000.00
j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 294,000.00
k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 32.00 btg 28,000.00 896,000.00
l Pembantu Tukang 5.80 org 65,000.00 377,000.00
m Tukang Batu 0.35 org 80,000.00 28,000.00
n Tukang Kayu 2.80 org 80,000.00 224,000.00
o Tukang Besi 1.05 org 85,000.00 89,250.00
Jumlah 5,227,940.00
Dibulatkan 5,227,900.00

90
11 1 m3 MEMBUAT BALOK BETON BERTULANG ( 200 kg BESI + BEKISTING )
a Papan kayu terentang 0.32 m3 2,400,000.00 768,000.00
b Paku 5 - 12 cm 3.20 kg 15,000.00 48,000.00
c Pelumas begisting (oli/minyak) 1.60 Ltr 12,000.00 19,200.00
d Besi Beton Polos 200.00 kg 9,000.00 1,800,000.00
e Kawat Beton 3.00 kg 15,000.00 45,000.00
f Semen PC (abu-abu) 6.45 sak 62,000.00 399,900.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Balok kayu Borneo Super 0.14 m3 3,600,000.00 504,000.00
j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 294,000.00
k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 16.00 btg 28,000.00 448,000.00
l Pembantu Tukang 5.96 org 65,000.00 387,400.00
m Tukang Batu 0.35 org 80,000.00 28,000.00
n Tukang Kayu 2.80 org 80,000.00 224,000.00
o Tukang Besi 1.40 org 85,000.00 119,000.00
Jumlah 5,353,340.00
Dibulatkan 5,353,300.00
12 1 m3 MEMBUAT BALOK BETON BERTULANG ( 225 kg BESI + BEKISTING )
a Papan kayu terentang 0.32 m3 2,400,000.00 768,000.00
b Paku 5 - 12 cm 3.20 kg 15,000.00 48,000.00
c Pelumas begisting (oli/minyak) 1.60 Ltr 12,000.00 19,200.00
d Besi Beton Polos 225.00 kg 9,000.00 2,025,000.00
e Kawat Beton 4.00 kg 15,000.00 60,000.00
f Semen PC (abu-abu) 6.45 sak 62,000.00 399,900.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Balok kayu Borneo Super 0.14 m3 3,600,000.00 504,000.00
j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 294,000.00
k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 16.00 btg 28,000.00 448,000.00
l Pembantu Tukang 5.96 org 65,000.00 387,400.00
m Tukang Batu 0.35 org 80,000.00 28,000.00
n Tukang Kayu 2.80 org 80,000.00 224,000.00
o Tukang Besi 1.40 org 85,000.00 119,000.00
Jumlah 5,593,340.00
Dibulatkan 5,593,300.00
13 1 m3 MEMBUAT BALOK BETON BERTULANG ( 250 kg BESI + BEKISTING )
a Papan kayu terentang 0.32 m3 2,400,000.00 768,000.00
b Paku 5 - 12 cm 3.20 kg 15,000.00 48,000.00
c Pelumas begisting (oli/minyak) 1.60 Ltr 12,000.00 19,200.00
d Besi Beton Polos 250.00 kg 9,000.00 2,250,000.00
e Kawat Beton 6.00 kg 15,000.00 90,000.00
f Semen PC (abu-abu) 6.45 sak 62,000.00 399,900.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Balok kayu Borneo Super 0.14 m3 3,600,000.00 504,000.00
j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 294,000.00
k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 16.00 btg 28,000.00 448,000.00
l Pembantu Tukang 5.96 org 65,000.00 387,400.00
m Tukang Batu 0.35 org 80,000.00 28,000.00
n Tukang Kayu 2.80 org 80,000.00 224,000.00
o Tukang Besi 1.40 org 85,000.00 119,000.00
Jumlah 5,848,340.00
Dibulatkan 5,848,300.00
14 1 m3 MEMBUAT TANGGA BETON BERTULANG ( 200 kg BESI + BEKISTING )
a Papan kayu terentang 0.25 m3 2,400,000.00 600,000.00
b Paku 5 - 12 cm 3.00 kg 15,000.00 45,000.00
c Pelumas begisting (oli/minyak) 1.20 Ltr 12,000.00 14,400.00
d Besi Beton Polos 200.00 kg 9,000.00 1,800,000.00
e Kawat Beton 3.00 kg 15,000.00 45,000.00
f Semen PC (abu-abu) 6.45 sak 62,000.00 399,900.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00
j Multiplex 120 x 240 x 9 mm 2.50 lbr 105,000.00 262,500.00
k Pembantu Tukang 5.60 org 65,000.00 364,000.00
l Tukang Batu 0.35 org 80,000.00 28,000.00
m Tukang Kayu 2.30 org 80,000.00 184,000.00
n Tukang Besi 1.40 org 85,000.00 119,000.00
Jumlah 5,210,640.00
Dibulatkan 5,210,600.00

91
15 1 m3 MEMBUAT PLAT LANTAI Tb. 10 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING )
a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 853,800.00 853,800.00
b Pasang Bekisting untuk lantai 10.00 m2 332,300.00 3,323,000.00
c Besi Beton rakit 100.00 kg 9,000.00 900,000.00
Jumlah 5,076,800.00
Dibulatkan 5,076,800.00
16 1 m3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING )
a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 853,800.00 853,800.00
b Pasang Bekisting untuk lantai 8.33 m2 332,300.00 2,768,059.00
c Besi Beton rakit 115.00 kg 11,200.00 1,288,000.00
Jumlah 4,909,859.00
Dibulatkan 4,909,800.00
17 1 m3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 125 kg BESI + BEKISTING )
a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 853,800.00 853,800.00
b Pasang Bekisting untuk lantai 8.33 m2 332,300.00 2,768,059.00
c Besi Beton rakit 125.00 kg 11,200.00 1,400,000.00
Jumlah 5,021,859.00
Dibulatkan 5,021,800.00
18 1 m3 MEMBUAT PLAT LANTAI Tb. 15 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING )
a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 853,800.00 853,800.00
b Pasang Bekisting untuk lantai 6.67 m2 332,300.00 2,216,441.00
c Besi Beton rakit 100.00 kg 11,200.00 1,120,000.00
Jumlah 4,190,241.00
Dibulatkan 4,190,200.00
19 1 m3 MEMBUAT PLAT LANTAI Tb. 20 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING )
a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 853,800.00 853,800.00
b Pasang Bekisting untuk lantai 7.50 m2 332,300.00 2,492,250.00
c Besi Beton rakit 115.00 kg 11,200.00 1,288,000.00
Jumlah 4,634,050.00
Dibulatkan 4,634,000.00
20 1 m3 MEMBUAT RING BALK BETON BERTULANG ( 175 kg BESI + BEKISTING ) K225
a Papan kayu terentang 0.27 m3 2,400,000.00 648,000.00
b Paku 5 - 12 cm 2.00 kg 15,000.00 30,000.00
c Pelumas begisting (oli/minyak) 0.60 Ltr 12,000.00 7,200.00
d Besi Beton Polos 175.00 kg 9,000.00 1,575,000.00
e Kawat Beton 3.00 kg 15,000.00 45,000.00
f Semen PC (abu-abu) 8.00 sak 62,000.00 496,000.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 178,000.00 138,840.00
i Pembantu Tukang 4.85 org 65,000.00 315,250.00
j Tukang Batu 0.40 org 80,000.00 32,000.00
k Tukang Kayu 1.75 org 80,000.00 140,000.00
l Tukang Besi 1.45 org 85,000.00 123,250.00
Jumlah 3,680,540.00
Dibulatkan 3,680,500.00

92
V PEKERJAAN DINDING
1 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 3 Ps
a Bata Merah 140.00 bh 700.00 98,000.00
b Semen PC (abu-abu) 0.65 sak 62,000.00 40,300.00
c Pasir Pasang 0.09 m3 225,000.00 20,250.00
d Pembantu Tukang 0.65 org 65,000.00 42,250.00
e Tukang Batu 0.20 org 80,000.00 16,000.00
Jumlah 216,800.00
Dibulatkan 216,800.00
2 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 4 Ps
a Bata Merah 140.00 bh 700.00 98,000.00
b Semen PC (abu-abu) 0.55 sak 62,000.00 34,100.00
c Pasir Pasang 0.09 m3 225,000.00 20,250.00
d Pembantu Tukang 0.65 org 65,000.00 42,250.00
e Tukang Batu 0.20 org 80,000.00 16,000.00
Jumlah 210,600.00
Dibulatkan 210,600.00
3 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 5 Ps
a Bata Merah 140.00 bh 700.00 98,000.00
b Semen PC (abu-abu) 0.45 sak 62,000.00 27,900.00
c Pasir Pasang 0.10 m3 225,000.00 22,500.00
d Pembantu Tukang 0.65 org 65,000.00 42,250.00
e Tukang Batu 0.20 org 80,000.00 16,000.00
Jumlah 206,650.00
Dibulatkan 206,600.00
4 1 m2 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 3 Ps
a Bata Merah 70.00 bh 700.00 49,000.00
b Semen PC (abu-abu) 0.29 sak 62,000.00 17,980.00
c Pasir Pasang 0.04 m3 225,000.00 9,000.00
d Pembantu Tukang 0.32 org 65,000.00 20,800.00
e Tukang Batu 0.10 org 80,000.00 8,000.00
Jumlah 104,780.00
Dibulatkan 104,700.00
5 1 m2 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 4 Ps
a Bata Merah 70.00 bh 700.00 49,000.00
b Semen PC (abu-abu) 0.25 sak 62,000.00 15,500.00
c Pasir Pasang 0.05 m3 225,000.00 11,250.00
d Pembantu Tukang 0.32 org 65,000.00 20,800.00
e Tukang Batu 0.10 org 80,000.00 8,000.00
Jumlah 104,550.00
Dibulatkan 104,500.00
6 1 m2 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 5 Ps
a Bata Merah 70.00 bh 700.00 49,000.00
b Semen PC (abu-abu) 0.22 sak 62,000.00 13,640.00
c Pasir Pasang 0.05 m3 225,000.00 11,250.00
d Pembantu Tukang 0.32 org 65,000.00 20,800.00
e Tukang Batu 0.10 org 80,000.00 8,000.00
Jumlah 102,690.00
Dibulatkan 102,600.00

93
7 1 m2 PASANG DINDING BATA ROOSTER / BATA TERAWANG
a Rooster / Terawang ukuran 12 x 11 x 24 37.00 bh 3,500.00 129,500.00
b Semen PC (abu-abu) 0.27 sak 62,000.00 16,740.00
c Pasir Pasang 0.04 m3 225,000.00 9,000.00
d Pembantu Tukang 0.30 org 65,000.00 19,500.00
e Tukang Batu 0.10 org 80,000.00 8,000.00
Jumlah 182,740.00
Dibulatkan 182,700.00
8 1 m2 PASANG DINDING GLASSBLOCK
a Glassblock ukuran 18 x 18 cm 30.00 bh 17,500.00 525,000.00
b Semen Putih 0.27 sak 4,200.00 1,134.00
c Pembantu Tukang 0.30 org 65,000.00 19,500.00
d Tukang Batu 0.10 org 80,000.00 8,000.00
Jumlah 553,634.00
Dibulatkan 553,600.00
9 1 m2 PASANGAN BATAKO PUTIH, CAMPURAN 1 Pc : 5 Ps
a Batako putih 15.00 bh 2,200.00 33,000.00
b Semen PC (abu-abu) 0.25 sak 62,000.00 15,500.00
c Pasir Pasang 0.03 m3 225,000.00 6,750.00
d Pembantu Tukang 0.30 org 65,000.00 19,500.00
e Tukang Batu 0.15 org 80,000.00 12,000.00
Jumlah 86,750.00
Dibulatkan 86,700.00
10 1 m2 PASANGAN BATAKO PRES SEMEN, CAMPURAN 1 Pc : 5 Ps
a Batako press semen 15.00 bh 2,500.00 37,500.00
b Semen PC (abu-abu) 0.20 sak 62,000.00 12,400.00
c Pasir Pasang 0.02 m3 225,000.00 4,500.00
d Pembantu Tukang 0.30 org 65,000.00 19,500.00
e Tukang Batu 0.15 org 80,000.00 12,000.00
Jumlah 85,900.00
Dibulatkan 85,900.00
11 1 m2 PASANGAN BATA RINGAN ( HEBEL/CELCON ).
a Bata Ringan ( hebel/celcon ) 8.00 bh 12,500.00 100,000.00
b Semen Instan 11.45 kg 6,500.00 74,425.00
c Pembantu Tukang 0.30 org 65,000.00 19,500.00
d Tukang Batu 0.20 org 80,000.00 16,000.00
Jumlah 209,925.00
Dibulatkan 209,900.00

94
VI PEKERJAAN PLESTERAN/ACI
1 1 m2 PLESTERAN CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm
a Semen PC (abu-abu) 0.14 sak 62,000.00 8,680.00
b Pasir Pasang 0.02 m3 225,000.00 4,500.00
c Pembantu Tukang 0.20 org 65,000.00 13,000.00
d Tukang Batu 0.15 org 80,000.00 12,000.00
Jumlah 38,180.00
Dibulatkan 38,100.00
2 1 m2 PLESTERAN CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm
a Semen PC (abu-abu) 0.13 sak 62,000.00 8,060.00
b Pasir Pasang 0.02 m3 225,000.00 4,500.00
c Pembantu Tukang 0.20 org 65,000.00 13,000.00
d Tukang Batu 0.15 org 80,000.00 12,000.00
Jumlah 37,560.00
Dibulatkan 37,500.00
3 1 m2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 1,5 cm
a Semen PC (abu-abu) 0.10 sak 62,000.00 6,200.00
b Pasir Pasang 0.02 m3 225,000.00 4,500.00
c Pembantu Tukang 0.20 org 65,000.00 13,000.00
d Tukang Batu 0.15 org 80,000.00 12,000.00
Jumlah 35,700.00
Dibulatkan 35,700.00
4 1 m2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm
a Semen PC (abu-abu) 0.09 sak 62,000.00 5,580.00
b Pasir Pasang 0.02 m3 225,000.00 4,500.00
c Pembantu Tukang 0.20 org 65,000.00 13,000.00
d Tukang Batu 0.15 org 80,000.00 12,000.00
Jumlah 35,080.00
Dibulatkan 35,000.00
5 1 m2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 2,0 cm
a Semen PC (abu-abu) 0.17 sak 62,000.00 10,540.00
b Pasir Pasang 0.03 m3 225,000.00 6,750.00
c Pembantu Tukang 0.22 org 65,000.00 14,300.00
d Tukang Batu 0.16 org 80,000.00 12,800.00
Jumlah 44,390.00
Dibulatkan 44,300.00
6 1 m2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 2,0 cm
a Semen PC (abu-abu) 0.15 sak 62,000.00 9,300.00
b Pasir Pasang 0.03 m3 225,000.00 6,750.00
c Pembantu Tukang 0.25 org 65,000.00 16,250.00
d Tukang Batu 0.20 org 80,000.00 16,000.00
Jumlah 48,300.00
Dibulatkan 48,300.00
7 1 m2 BERAPEN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm
a Semen PC (abu-abu) 0.11 sak 62,000.00 6,820.00
b Pasir Pasang 0.03 m3 225,000.00 5,625.00
c Pembantu Tukang 0.15 org 65,000.00 9,750.00
d Tukang Batu 0.07 org 80,000.00 5,600.00
Jumlah 27,795.00
Dibulatkan 27,700.00
8 1 m2 PLESTERAN BETON CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm
a Semen PC (abu-abu) 0.19 sak 62,000.00 11,780.00
b Pasir Pasang 0.02 m3 225,000.00 4,500.00
c Pembantu Tukang 0.26 org 65,000.00 16,900.00
d Tukang Batu 0.20 org 80,000.00 16,000.00
Jumlah 49,180.00
Dibulatkan 49,100.00

95
9 1 m2 PLESTERAN BETON CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm
a Semen PC (abu-abu) 0.15 sak 62,000.00 9,300.00
b Pasir Pasang 0.02 m3 225,000.00 4,500.00
c Pembantu Tukang 0.26 org 65,000.00 16,900.00
d Tukang Batu 0.20 org 80,000.00 16,000.00
Jumlah 46,700.00
Dibulatkan 46,700.00
10 1 m2 PLESTERAN SKONENG CAMPURAN 1 Pc : 2 Ps
a Semen PC (abu-abu) 0.01 sak 62,000.00 620.00
b Pasir Pasang 0.01 m3 225,000.00 2,250.00
c Pembantu Tukang 0.06 org 65,000.00 3,900.00
d Tukang Batu 0.04 org 80,000.00 3,200.00
Jumlah 9,970.00
Dibulatkan 9,900.00
11 1 m2 ACCIAN PLESTERAN
a Semen PC (abu-abu) 0.08 sak 62,000.00 4,960.00
b Pembantu Tukang 0.14 org 65,000.00 9,100.00
c Tukang batu 0.11 org 80,000.00 8,800.00
Jumlah 22,860.00
Dibulatkan 22,800.00
12 1 m2 PLESTERAN SIAR CAMPURAN 1 Pc : 2 Ps
a Semen PC (abu-abu) 0.09 sak 62,000.00 5,580.00
b Pasir Pasang 0.02 m3 225,000.00 4,500.00
c Pembantu Tukang 0.15 org 65,000.00 9,750.00
d Tukang Batu 0.07 org 80,000.00 5,600.00
Jumlah 25,430.00
Dibulatkan 25,400.00

VII PEKERJAAN PELAPIS LANTAI


1 1 m2 PASANG LANTAI KERAMIK UKURAN 40 x 40 cm POLISHED
a Keramik ukuran 40 x 40 cm 1.00 m2 205,000.00 205,000.00
b Semen PC (abu-abu) 0.16 sak 62,000.00 9,920.00
c Pasir pasang 0.02 m3 225,000.00 4,837.50
d Semen warna 0.02 kg 4,200.00 84.00
e Pembantu Tukang 0.25 org 65,000.00 16,250.00
f Tukang batu 0.12 org 80,000.00 9,600.00
Jumlah 245,691.50
Dibulatkan 245,690.00

96
2 1 m2 PASANG LANTAI KERAMIK UKURAN 40 x 40 cm UNPOLISH
a Keramik ukuran 40 x 40 cm 1.00 m2 195,000.00 195,000.00
b Semen PC (abu-abu) 0.16 sak 62,000.00 9,920.00
c Pasir pasang 0.02 m3 225,000.00 4,500.00
d Semen warna 0.02 kg 4,200.00 84.00
e Pembantu Tukang 0.26 org 65,000.00 16,900.00
f Tukang batu 0.13 org 80,000.00 10,000.00
Jumlah 236,404.00
Dibulatkan 236,400.00
3 1 m2 PASANG LANTAI KERAMIK UKURAN 60 x 60 cm
a Keramik ukuran 60 x 60 cm 1.00 m2 265,000.00 265,000.00
b Semen PC (abu-abu) 0.18 sak 62,000.00 11,160.00
c Pasir pasang 0.02 m3 225,000.00 4,837.50
d Semen warna 0.01 kg 4,200.00 54.60
e Pembantu Tukang 0.25 org 65,000.00 16,250.00
f Tukang batu 0.12 org 80,000.00 9,600.00
Jumlah 306,902.10
Dibulatkan 306,900.00
4 1 m2 PASANG LANTAI KERAMIK UKURAN 60 x 90 cm
a Keramik ukuran 60 x 90 cm 1.00 m2 292,000.00 292,000.00
b Semen PC (abu-abu) 0.17 sak 62,000.00 10,540.00
c Pasir pasang 0.02 m3 225,000.00 4,837.50
d Semen warna 0.02 kg 4,200.00 84.00
e Pembantu Tukang 0.26 org 65,000.00 16,900.00
f Tukang batu 0.14 org 80,000.00 11,200.00
Jumlah 335,561.50
Dibulatkan 335,560.00
5 1 m2 PASANG LANTAI KERAMIK 10 x 20 cm
a Keramik lantai 10 x 20 cm 1.00 m2 35,000.00 35,000.00
b Semen PC ( abu-abu ) 0.18 sak 62,000.00 11,160.00
c Pasir pasang 0.02 m3 225,000.00 4,500.00
d Semen warna 0.02 kg 4,200.00 84.00
e Pembantu Tukang 0.22 org 65,000.00 14,300.00
f Tukang batu 0.40 org 80,000.00 32,000.00
Jumlah 97,044.00
Dibulatkan 97,040.00
6 1 m2 PASANG LANTAI KERAMIK POLOS 20 x 20 cm
a Keramik polos 20 x 20 cm 1.00 m2 42,000.00 42,000.00
b Semen PC (abu-abu) 0.17 sak 62,000.00 10,540.00
c Pasir pasang 0.02 m3 225,000.00 4,837.50
d Semen warna 0.02 kg 4,200.00 84.00
e Pembantu Tukang 0.30 org 65,000.00 19,500.00
f Tukang batu 0.15 org 80,000.00 12,000.00
Jumlah 88,961.50
Dibulatkan 88,960.00

97
7 1 m2 PASANG LANTAI KERAMIK MOTIF 20 x 20 cm
a Keramik motif 20 x 20 cm 1.00 m2 44,000.00 44,000.00
b Semen PC (abu-abu) 0.17 sak 62,000.00 10,540.00
c Pasir pasang 0.02 m3 225,000.00 4,837.50
d Semen warna 0.02 kg 4,200.00 84.00
e Pembantu Tukang 0.30 org 65,000.00 19,500.00
f Tukang batu 0.15 org 80,000.00 12,000.00
Jumlah 90,961.50
Dibulatkan 90,960.00
8 1 m2 PASANG LANTAI KERAMIK POLOS 30 x 30 cm
a Keramik polos 30 x 30 cm 1.00 m2 52,000.00 52,000.00
b Semen PC (abu-abu) 0.16 sak 62,000.00 9,920.00
c Pasir pasang 0.02 m3 225,000.00 4,500.00
d Semen warna 0.02 kg 4,200.00 84.00
e Pembantu Tukang 0.25 org 65,000.00 16,250.00
f Tukang batu 0.12 org 80,000.00 9,600.00
Jumlah 92,354.00
Dibulatkan 92,350.00
9 1 m2 PASANG LANTAI KERAMIK MOTIF 30 x 30 cm
a Keramik motif 30 x 30 cm 1.00 m2 54,000.00 54,000.00
b Semen PC (abu-abu) 0.16 sak 62,000.00 9,920.00
c Pasir pasang 0.02 m3 225,000.00 4,500.00
d Semen warna 0.02 kg 4,200.00 84.00
e Pembantu Tukang 0.25 org 65,000.00 16,250.00
f Tukang batu 0.12 org 80,000.00 9,600.00
Jumlah 94,354.00
Dibulatkan 94,350.00
10 1 m2 PASANG LANTAI MARMER
a Marmer standart 1.00 m2 140,000.00 140,000.00
b Semen PC (abu-abu) 0.48 sak 62,000.00 29,760.00
c Pasir pasang 0.10 m3 225,000.00 22,500.00
d Semen warna 0.20 sak 4,200.00 840.00
e Pembantu Tukang 0.62 org 65,000.00 40,300.00
f Tukang batu 0.35 org 80,000.00 28,000.00
Jumlah 261,400.00
Dibulatkan 261,400.00
11 1 m2 PASANG LANTAI PARQUET JATI
a Parquet jati 1.05 m2 250,000.00 262,500.00
b Lem vinyl 0.60 kg 30,800.00 18,480.00
c Pembantu Tukang 0.65 org 65,000.00 42,250.00
d Tukang 0.35 org 80,000.00 28,000.00
Jumlah 351,230.00
Dibulatkan 351,230.00
12 1 m2 PASANG LANTAI GRANIT
a Granit Standart 1.00 m2 600,000.00 600,000.00
b Semen PC (abu-abu) 0.48 sak 62,000.00 29,760.00
c Pasir pasang 0.08 m3 225,000.00 18,000.00
d Semen warna 0.10 sak 4,200.00 420.00
e Pembantu Tukang 0.60 org 65,000.00 39,000.00
f Tukang batu 0.48 org 80,000.00 38,400.00
Jumlah 725,580.00
Dibulatkan 725,580.00

98
VIII PEKERJAAN PELAPIS DINDING
1 1 m2 PASANG DINDING KERAMIK MOTIF 10 x 20 cm
a Keramik motif 10 x 20 cm 1.00 m2 39,000.00 39,000.00
b Semen PC ( abu-abu ) 0.18 sak 62,000.00 11,160.00
c Pasir pasang 0.02 m3 225,000.00 4,500.00
d Semen warna 0.02 kg 4,200.00 84.00
e Pembantu Tukang 0.22 org 65,000.00 14,300.00
f Tukang batu 0.40 org 80,000.00 32,000.00
Jumlah 101,044.00
Dibulatkan 101,040.00
2 1 m2 PASANG DINDING KERAMIK POLOS 10 x 20 cm
a Keramik polos 10 x 20 cm 1.00 m2 38,000.00 38,000.00
b Semen PC ( abu-abu ) 0.18 sak 62,000.00 11,160.00
c Pasir pasang 0.02 m3 225,000.00 4,500.00
d Semen warna 0.02 kg 4,200.00 84.00
e Pembantu Tukang 0.22 org 65,000.00 14,300.00
f Tukang batu 0.40 org 80,000.00 32,000.00
Jumlah 100,044.00
Dibulatkan 100,040.00
3 1 m2 PASANG DINDING KERAMIK MOTIF 20 x 20 cm
a Keramik motif 20 x 20 cm 1.00 m2 44,000.00 44,000.00
b Semen PC ( abu-abu ) 0.17 sak 62,000.00 10,540.00
c Pasir pasang 0.02 m3 225,000.00 4,500.00
d Semen warna 0.02 kg 4,200.00 84.00
e Pembantu Tukang 0.20 org 65,000.00 13,000.00
f Tukang batu 0.39 org 80,000.00 31,200.00
Jumlah 103,324.00
Dibulatkan 103,320.00
4 1 m2 PASANG DINDING KERAMIK POLOS 20 x 20 cm
a Keramik polos 20 x 20 cm 1.00 m2 42,000.00 42,000.00
b Semen PC ( abu-abu ) 0.17 sak 62,000.00 10,540.00
c Pasir pasang 0.02 m3 225,000.00 4,500.00
d Semen warna 0.02 kg 4,200.00 84.00
e Pembantu Tukang 0.20 org 65,000.00 13,000.00
f Tukang batu 0.39 org 80,000.00 31,200.00
Jumlah 101,324.00
Dibulatkan 101,320.00
5 1 m2 PASANG DINDING KERAMIK POLOS 20 x 25 cm
a Keramik polos 20 x 25 cm 1.00 m2 50,000.00 50,000.00
b Semen PC ( abu-abu ) 0.16 sak 62,000.00 9,920.00
c Pasir pasang 0.02 m3 225,000.00 4,050.00
d Semen warna 0.01 kg 4,200.00 54.60
e Pembantu Tukang 0.19 org 65,000.00 12,187.50
f Tukang batu 0.38 org 80,000.00 30,000.00
Jumlah 106,212.10
Dibulatkan 106,210.00
6 1 m2 PASANG DINDING KERAMIK MOTIF 20 x 25 cm
a Keramik motif 20 x 25 cm 1.00 m2 48,500.00 48,500.00
b Semen PC ( abu-abu ) 0.16 sak 62,000.00 9,920.00
c Pasir pasang 0.02 m3 225,000.00 4,050.00
d Semen warna 0.01 kg 4,200.00 54.60
e Pembantu Tukang 0.19 org 65,000.00 12,187.50
f Tukang batu 0.38 org 80,000.00 30,000.00
Jumlah 104,712.10
Dibulatkan 104,710.00

99
7 1 m2 PASANG DINDING MARMER
a Marmer Standart 1.00 m2 140,000.00 140,000.00
b Paku sekrup 4.00 bh 600.00 2,400.00
c Semen PC ( abu-abu ) 0.25 sak 62,000.00 15,500.00
d Pasir pasang 0.03 m3 225,000.00 5,625.00
e Semen warna 1.50 kg 4,200.00 6,300.00
f Kawat ikat 0.03 kg 15,000.00 375.00
g Paku 0.03 kg 15,000.00 375.00
h Pembantu Tukang 0.72 org 65,000.00 46,800.00
i Tukang batu 0.65 org 80,000.00 52,000.00
Jumlah 269,375.00
Dibulatkan 269,370.00
8 1 m2 PASANG DINDING GRANIT
a Granit Standart 1.00 m2 600,000.00 600,000.00
b Paku sekrup 2.00 bh 600.00 1,200.00
c Semen PC ( abu-abu ) 0.25 sak 62,000.00 15,500.00
d Pasir pasang 0.03 m3 225,000.00 5,625.00
e Semen warna 1.50 kg 4,200.00 6,300.00
f Kawat ikat 0.03 kg 15,000.00 375.00
g Paku 0.03 kg 15,000.00 375.00
h Pembantu Tukang 0.72 org 65,000.00 46,800.00
i Tukang batu 0.65 org 80,000.00 52,000.00
Jumlah 728,175.00
Dibulatkan 728,170.00
9 1 m2 PASANG DINDING BATU TEMPEL HITAM
a Batu tempel hitam 1.00 m2 90,000.00 90,000.00
b Semen PC ( abu-abu ) 0.24 sak 62,000.00 14,880.00
c Pasir pasang 0.04 m3 225,000.00 7,875.00
d Pembantu Tukang 0.32 org 65,000.00 20,800.00
e Tukang batu 0.25 org 80,000.00 20,000.00
Jumlah 153,555.00
Dibulatkan 153,550.00
10 1 m2 PASANG DINDING BATU ALAM
a Batu alam 1.00 m2 85,000.00 85,000.00
b Semen PC ( abu-abu ) 0.25 sak 62,000.00 15,500.00
c Pasir pasang 0.04 m3 225,000.00 7,875.00
d Pembantu Tukang 0.32 org 65,000.00 20,800.00
e Tukang batu 0.25 org 80,000.00 20,000.00
Jumlah 149,175.00
Dibulatkan 149,170.00

100
11 1 m¹ PASANG PLINT KERAMIK UKURAN 10 x 40 cm
a Plint Keramik ukuran 10 x 40 cm 2.65 bh 7,500.00 19,875.00
b Semen PC (abu-abu) 0.02 sak 62,000.00 1,240.00
c Pasir pasang 0.01 m3 225,000.00 2,250.00
d Semen warna 0.10 kg 4,200.00 420.00
e Pembantu Tukang 0.06 org 65,000.00 3,900.00
f Tukang batu 0.03 org 80,000.00 2,400.00
Jumlah 30,085.00
Dibulatkan 30,080.00
12 1 m¹ PASANG PLINT KERAMIK UKURAN 10 x 30 cm
a Plint Keramik ukuran 10 x 30 cm 3.30 bh 10,000.00 33,000.00
b Semen PC (abu-abu) 0.02 sak 62,000.00 1,240.00
c Pasir pasang 0.01 m3 225,000.00 2,250.00
d Semen warna 0.12 kg 4,200.00 504.00
e Pembantu Tukang 0.06 org 65,000.00 3,900.00
f Tukang batu 0.03 org 80,000.00 2,400.00
Jumlah 43,294.00
Dibulatkan 43,290.00

IX PEKERJAAN KUSEN, PINTU, JENDELA, PARTISI


1 1 m3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER SAMARINDA
a Balok kayu Kamper Samarinda 1.20 m3 5,200,000.00 6,240,000.00
b Pembantu Tukang 6.00 org 65,000.00 390,000.00
c Tukang Kayu 15.00 org 80,000.00 1,200,000.00
Jumlah 7,830,000.00
Dibulatkan 7,830,000.00
2 1 m3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER MEDAN / KRUING
a Balok kayu Kamper Medan 1.20 m3 4,300,000.00 5,160,000.00
b Pembantu Tukang 6.00 org 65,000.00 390,000.00
c Tukang Kayu 15.00 org 80,000.00 1,200,000.00
Jumlah 6,750,000.00
Dibulatkan 6,750,000.00
3 1 m3 PASANG KUSEN PINTU & JENDELA KAYU BORNEO SUPER
a Kayu Balok Borneo Super 1.20 m3 3,600,000.00 4,320,000.00
b Pembantu Tukang 6.00 org 65,000.00 390,000.00
c Tukang Kayu 15.00 org 80,000.00 1,200,000.00
Jumlah 5,910,000.00
Dibulatkan 5,910,000.00
4 1 m2 PASANG PINTU PANEL KAYU KAMPER SAMARINDA
a Papan kayu Kamper Samarinda 0.04 m3 5,400,000.00 216,000.00
b Pembantu Tukang 1.00 org 65,000.00 65,000.00
c Tukang Kayu 2.50 org 80,000.00 200,000.00
Jumlah 481,000.00
Dibulatkan 481,000.00
5 1 m2 PASANG PINTU PANEL KAYU KAMPER MEDAN / KRUING
a Papan kayu Kamper Medan 0.04 m3 4,300,000.00 172,000.00
b Pembantu Tukang 1.00 org 65,000.00 65,000.00
c Tukang Kayu 2.50 org 80,000.00 200,000.00
Jumlah 437,000.00
Dibulatkan 437,000.00

101
6 1 m2 PASANG PINTU DAN JENDELA KACA KAYU KAMPER MEDAN
a Papan kayu Kamper Medan 0.04 m3 4,300,000.00 224,000.00
b Pembantu Tukang 0.80 org 65,000.00 89,250.00
c Tukang Kayu 2.00 org 80,000.00 -
Jumlah 313,250.00
Dibulatkan 313,200.00
7 1 m2 PASANG PINTU DAN JENDELA KACA KAYU BORNEO
a Papan kayu Borneo Super 0.04 m3 3,800,000.00 48,000.00
b Pembantu Tukang 0.80 org 65,000.00 19,200.00
c Tukang Kayu 2.00 org 80,000.00 160,000.00
Jumlah 227,200.00
Dibulatkan 227,200.00
8 1 m2 PASANG PINTU DAN JENDELA JALUSI KAYU KAMPER MEDAN
a Papan kayu Kamper Medan 0.06 m3 4,300,000.00 275,200.00
b Pembantu Tukang 1.00 org 65,000.00 65,000.00
c Tukang Kayu 3.00 org 80,000.00 240,000.00
Jumlah 580,200.00
Dibulatkan 580,200.00
9 1 m2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU KAMPER MEDAN
a Papan kayu Kamper Medan 0.02 m3 4,300,000.00 84,280.00
b Paku 1 s/d 5 cm 0.03 kg 15,000.00 450.00
c Lem Kayu 0.30 Ltr 25,600.00 7,680.00
d Triplek 0,4 cm ukuran pintu 1.00 lbr 65,000.00 65,000.00
e Pembantu Tukang 0.60 org 65,000.00 39,000.00
f Tukang Kayu 2.00 org 80,000.00 160,000.00
Jumlah 356,410.00
Dibulatkan 356,400.00
10 1 m2 PASANG JALUSI MATI KUSEN KAYU KAMPER MEDAN
a Papan kayu Kamper Medan 0.06 m3 4,300,000.00 258,000.00
b Paku 1 s/d 5 cm 0.15 kg 15,000.00 2,250.00
c Pembantu Tukang 0.50 org 65,000.00 32,500.00
d Tukang Kayu 2.00 org 80,000.00 160,000.00
Jumlah 452,750.00
Dibulatkan 452,700.00
11 1 m2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU BORNEO SUPER
a Papan kayu Borneo Super 0.02 m3 3,800,000.00 74,480.00
b Paku 1 s/d 5 cm 0.03 kg 15,000.00 450.00
c Lem Kayu 0.30 Ltr 25,600.00 7,680.00
d Triplek 0,4 cm ukuran pintu 1.00 lbr 65,000.00 65,000.00
e Pembantu Tukang 0.60 org 65,000.00 39,000.00
f Tukang Kayu 2.00 org 80,000.00 160,000.00
Jumlah 346,610.00
Dibulatkan 346,600.00
12 1 m2 PASANG PINTU TEAKWOOD RANGKAP , RANGKA KAYU KAMPER MEDAN
a Papan kayu Kamper Medan 0.02 m3 4,300,000.00 84,280.00
b Paku 1 s/d 5 cm 0.30 kg 15,000.00 4,500.00
c Lem Kayu 0.30 Ltr 25,600.00 7,680.00
d Teakwood 120 x 240 x 0,4 cm 1.00 lbr 94,000.00 94,000.00
e Pembantu Tukang 0.60 org 65,000.00 39,000.00
f Tukang Kayu 2.00 org 80,000.00 160,000.00
Jumlah 389,460.00
Dibulatkan 389,400.00
13 1 m2 PASANG PINTU TRIPLEK & FORMIKA RANGKA KAYU KAMPER MEDAN
a Papan kayu Kamper Medan 0.02 m3 4,300,000.00 84,280.00
b Paku 1 s/d 5 cm 0.30 kg 15,000.00 4,500.00
c Lem Kayu 0.80 Ltr 25,600.00 20,480.00
d Triplek 0,4 cm ukuran pintu 1.00 lbr 65,000.00 65,000.00
e Formica 3" x 6" 0.50 lbr 125,000.00 62,500.00
f Pembantu Tukang 0.80 org 65,000.00 52,000.00
g Tukang Kayu 2.50 org 80,000.00 200,000.00
Jumlah 488,760.00
Dibulatkan 488,700.00

102
14 1 m2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER MEDAN
a Papan kayu Kamper Medan 0.02 m3 4,300,000.00 84,280.00
b Paku 1 s/d 5 cm 0.30 kg 15,000.00 4,500.00
c Lem Kayu 0.80 Ltr 25,600.00 20,480.00
d Teakwood 120 x 240 x 0,4 cm 0.50 lbr 94,000.00 47,000.00
e Vernis 0.50 Ltr 65,000.00 32,500.00
a Formica 4" x 8" 0.50 lbr 125,000.00 62,500.00
b Pembantu Tukang 0.80 org 65,000.00 52,000.00
c Tukang Kayu 2.50 org 80,000.00 200,000.00
Jumlah 503,260.00
Dibulatkan 503,200.00
15 1 m2 PASANG DINDING PEMISAH DOUBLE TEAKWOOD, RANGKA KAYU KAMPER MEDAN
a Balok kayu Kamper Medan 0.02 m3 4,300,000.00 83,850.00
b Papan kayu Kamper Medan 0.01 m3 4,300,000.00 30,100.00
c Paku 5 - 12 cm 0.10 kg 15,000.00 1,500.00
d Lem Kayu 0.56 Ltr 25,600.00 14,336.00
e Teakwood 120 x 240 x 0,4 cm 1.00 lbr 94,000.00 94,000.00
f Pembantu Tukang 0.15 org 65,000.00 9,750.00
g Tukang Kayu 0.45 org 80,000.00 36,000.00
Jumlah 269,536.00
Dibulatkan 269,500.00
16 1 m2 PASANG DINDING PEMISAH DOUBLE GRC, RANGKA KAYU KAMPER MEDAN
a Balok kayu Kamper Medan 0.02 m3 4,300,000.00 83,850.00
b Papan kayu Kamper Medan 0.01 m3 4,300,000.00 30,100.00
c Paku 5 - 12 cm 0.10 kg 15,000.00 1,500.00
d Lem Kayu 0.56 Ltr 25,600.00 14,336.00
e Triplek 0,4 cm ukuran pintu 1.00 lbr 65,000.00 65,000.00
f Pembantu Tukang 0.20 org 65,000.00 13,000.00
g Tukang Kayu 0.60 org 80,000.00 48,000.00
Jumlah 255,786.00
Dibulatkan 255,700.00
17 1 Bh PASANG PINTU ALUMINIUM / PINTU PVC
a Pintu Aluminium / Pintu PVC 1.00 bh 400,000.00 400,000.00
b Alat bantu 10 % harga material 1.00 ls 40,000.00 40,000.00
c Tukang Kayu 0.02 org 80,000.00 1,680.00
Jumlah 441,680.00
Dibulatkan 441,600.00
18 1 m2 PASANG KUSEN PARTISI DOUBLE TRIPLEK
a Balok kayu borneo super 0.11 m3 3,600,000.00 378,000.00
b Triplek 0,4 cm ukuran pintu 5.00 lbr 65,000.00 325,000.00
c Paku 1 s/d 3 cm 2.00 kg 15,000.00 30,000.00
d Ampelas 2.00 lbr 3,500.00 7,000.00
e Engsel 4.00 bh 30,000.00 120,000.00
f Grendel / Slot 4.00 bh 29,000.00 116,000.00
g Pembantu Tukang 0.30 org 65,000.00 19,500.00
h Tukang Kayu terampil 1.30 org 80,000.00 104,000.00
Jumlah 1,099,500.00
Dibulatkan 129,530.00
19 1 m2 PASANG KUSEN PARTISI DOUBLE GYPSUM + RANGKA KAYU
a Balok kayu borneo super 0.11 m3 3,600,000.00 378,000.00
b Gypsum board ( 120 x 240 x 9 ) mm 0.72 lbr 140,000.00 100,800.00
c Paku 1 s/d 3 cm 2.00 kg 15,000.00 30,000.00
d Ampelas 2.00 lbr 3,500.00 7,000.00
e Engsel 4.00 bh 30,000.00 120,000.00
f Grendel / Slot 4.00 bh 29,000.00 116,000.00
g Pembantu Tukang 0.30 org 65,000.00 19,500.00
h Tukang Kayu 1.30 org 80,000.00 104,000.00
Jumlah 875,300.00
Dibulatkan 129,530.00
20 1 m2 PASANG DINDING PARTISI GYPSUM BOARD + RANGKA BESI HOLLOW
a Hollow 4/4 Zincromate 0.42 btg 32,000.00 13,440.00
b Hollow 2/4 Zincromate 0.15 btg 25,000.00 3,750.00
c Gypsum board ( 120 x 240 x 9 ) mm 0.72 lbr 140,000.00 100,800.00
d Paku sekrup 25.00 bh 600.00 15,000.00
e Ramset / dina bolt 4.00 bh 2,500.00 10,000.00
f Cotton plaster 0.10 bh 55,000.00 5,500.00
g Compoun 0.13 kg 28,000.00 3,640.00
h Pembantu Tukang 0.10 org 65,000.00 6,500.00
i Tukang kayu 0.05 org 80,000.00 4,000.00
Jumlah 162,630.00
Dibulatkan 162,630.00

103
X PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
A PEKERJAAN RANGKA ATAP
1 1 m3 PEKERJAAN KONSTRUKSI KUDA - KUDA KAYU KAMPER MEDAN
a Balok kayu Kamper Medan 1.10 m3 4,300,000.00 4,730,000.00
b Besi Strip 15.00 kg 11,000.00 165,000.00
c Paku Ukuran besar 0.80 kg 15,000.00 12,000.00
d Meni kayu 0.40 kg 15,000.00 6,000.00
e Pembantu Tukang 4.00 org 65,000.00 260,000.00
f Tukang Kayu 12.00 org 80,000.00 960,000.00
Jumlah 6,133,000.00
Dibulatkan 6,133,000.00
2 1 m3 PEKERJAAN KONSTRUKSI KUDA - KUDA KAYU BORNEO SUPER
a Balok kayu Borneo super 1.10 m3 3,600,000.00 3,960,000.00
b Besi Strip 15.00 kg 11,000.00 165,000.00
c Paku Ukuran besar 0.80 kg 15,000.00 12,000.00
d Meni kayu 0.40 kg 15,000.00 6,000.00
e Pembantu Tukang 4.00 org 65,000.00 260,000.00
f Tukang Kayu 12.00 org 80,000.00 960,000.00
Jumlah 5,363,000.00
Dibulatkan 5,363,000.00
3 1 m2 PASANG KASO + RENG GENTENG PLENTONG KAYU BORNEO SUPER
a Balok kayu Borneo super 0.01 m3 3,600,000.00 43,200.00
b Paku 7 - 10 cm 0.15 kg 15,000.00 2,250.00
c Pembantu Tukang 0.10 org 65,000.00 6,500.00
d Tukang Kayu 0.10 org 80,000.00 8,000.00
Jumlah 59,950.00
Dibulatkan 59,900.00
4 1 m2 PASANG KASO + RENG GENTENG BETON KAYU BORNEO SUPER
a Balok kayu Borneo super 0.01 m3 3,600,000.00 50,400.00
b Paku 7 - 10 cm 0.15 kg 15,000.00 2,250.00
c Pembantu Tukang 0.10 org 65,000.00 6,500.00
d Tukang Kayu 0.10 org 80,000.00 8,000.00
Jumlah 67,150.00
Dibulatkan 67,100.00
5 1 m' PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 20 cm
a Papan kayu Kamper Medan 0.01 m3 4,300,000.00 30,960.00
b Paku 7 - 10 cm 0.05 kg 15,000.00 750.00
c Pembantu Tukang 0.10 org 65,000.00 6,500.00
d Tukang Kayu 0.20 org 80,000.00 16,000.00
Jumlah 54,210.00
Dibulatkan 54,200.00
6 1 m2 PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 30 cm
a Papan kayu Kamper Medan 0.01 m3 4,300,000.00 47,300.00
b Paku 7 - 10 cm 0.05 kg 15,000.00 750.00
c Pembantu Tukang 0.11 org 65,000.00 7,150.00
d Tukang Kayu 0.22 org 80,000.00 17,600.00
Jumlah 72,800.00
Dibulatkan 72,800.00

104
7 1 m3 PEKERJAAN NOK/GORDING/JURAY KAYU BORNEO SUPER
a Balok kayu Borneo super 1.05 m3 3,600,000.00 3,780,000.00
b Paku 10 - 15 cm 0.20 kg 15,000.00 3,000.00
c Pembantu Tukang 2.00 org 65,000.00 130,000.00
d Tukang Kayu 2.00 org 80,000.00 160,000.00
Jumlah 4,073,000.00
Dibulatkan 4,073,000.00
B PEKERJAAN PENUTUP ATAP
1 1 m2 PASANG ATAP GENTENG PLENTONG
a Genteng palentong 25.00 bh 1,500.00 37,500.00
b Pembantu Tukang 0.15 org 65,000.00 9,750.00
c Tukang kayu 0.08 org 80,000.00 6,000.00
Jumlah 53,250.00
Dibulatkan 53,250.00
2 1 m2 PASANG NOK/BUBUNGAN GENTENG KERAMIK GLAZUR
a Genteng nok/bubungan plentong 5.00 bh 22,000.00 110,000.00
b Semen PC (abu-abu) 0.16 sak 62,000.00 9,920.00
c Pasir pasang 0.03 m3 225,000.00 7,200.00
d Pembantu Tukang 0.30 org 65,000.00 19,500.00
e Tukang kayu 0.20 org 80,000.00 16,000.00
Jumlah 162,620.00
Dibulatkan 162,620.00
3 1 m2 PASANG ATAP FIBREGLASS UKURAN 180 X 90 cm
a Atap fibreglass 0.60 lbr 62,000.00 37,200.00
b Paku 2 - 5 cm 0.05 kg 15,000.00 750.00
c Pembantu Tukang 0.14 org 65,000.00 9,100.00
d Tukang kayu 0.07 org 80,000.00 5,360.00
Jumlah 52,410.00
Dibulatkan 52,410.00
4 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,70 x 1,05 m TEBAL 4 mm
a Asbes gelombang 0.35 lbr 68,500.00 23,975.00
b Paku Payung 0.12 kg 15,000.00 1,800.00
c Pembantu Tukang 0.14 org 65,000.00 9,100.00
d Tukang kayu 0.07 org 80,000.00 5,600.00
Jumlah 40,475.00
Dibulatkan 40,470.00
5 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,05 m TEBAL 4 mm
a Asbes gelombang 0.42 lbr 60,000.00 25,200.00
b Paku Payung 0.12 kg 15,000.00 1,800.00
c Pembantu Tukang 0.14 org 65,000.00 9,100.00
d Tukang kayu 0.07 org 80,000.00 5,600.00
Jumlah 41,700.00
Dibulatkan 41,700.00
6 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,70 x 1,02 m TEBAL 5 mm
a Asbes gelombang 0.44 lbr 87,500.00 38,500.00
b Paku Payung 0.12 kg 15,000.00 1,800.00
c Pembantu Tukang 0.14 org 65,000.00 9,100.00
d Tukang kayu 0.07 org 80,000.00 5,360.00
Jumlah 54,760.00
Dibulatkan 54,760.00
7 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,02 m TEBAL 5 mm
a Asbes gelombang 0.51 lbr 78,200.00 39,882.00
b Paku Payung 0.12 kg 15,000.00 1,800.00
c Pembantu Tukang 0.14 org 65,000.00 9,100.00
d Tukang kayu 0.07 org 80,000.00 5,360.00
Jumlah 56,142.00
Dibulatkan 56,140.00

105
8 1 m2 PASANG ATAP ASBES GELOMBANG ( 1,50 x 1,02 m ) x 5 mm 56,142.00
a Asbes gelombang 0.80 lbr 46,000.00 36,800.00
b Paku Payung 0.12 kg 15,000.00 1,800.00
c Pembantu Tukang 0.14 org 65,000.00 9,100.00
d Tukang kayu 0.07 org 80,000.00 5,600.00
Jumlah 53,300.00
Dibulatkan 53,300.00
9 1 m¹ PASANG ATAP SIRAP
a Genteng Sirap 80.00 bh 1,200.00 96,000.00
b Paku 0.20 kg 15,000.00 3,000.00
c Pembantu Tukang 0.10 org 65,000.00 6,500.00
d Tukang kayu 0.20 org 80,000.00 16,000.00
Jumlah 121,500.00
Dibulatkan 121,500.00
10 1 m2 PASANG ATAP GENTENG BETON
a Genteng beton 1.10 bh 78,000.00 85,800.00
b Paku 5 - 12 cm 0.03 kg 15,000.00 450.00
c Pembantu Tukang 0.20 org 65,000.00 13,000.00
d Tukang kayu 0.10 org 80,000.00 8,000.00
Jumlah 107,250.00
Dibulatkan 107,250.00
11 1 m2 PASANG ATAP GENTENG METAL + C301
a Genteng metal 1.02 lbr 132,000.00 134,640.00
b Paku 5 - 12 cm 0.20 kg 15,000.00 3,000.00
c Pembantu Tukang 0.20 org 65,000.00 13,000.00
d Tukang kayu 0.10 org 80,000.00 8,000.00
Jumlah 158,640.00
Dibulatkan 158,640.00
12 1 m¹ PASANG NOK GENTENG BETON
a Nok genteng beton 3.50 bh 22,000.00 77,000.00
b Paku 5 - 12 cm 0.05 kg 15,000.00 750.00
c Semen PC (abu-abu) 0.22 sak 62,000.00 13,392.00
d Pasir pasang 0.03 m3 225,000.00 7,200.00
e Semen warna 1.00 kg 4,200.00 4,200.00
f Pembantu Tukang 0.40 org 65,000.00 26,000.00
g Tukang kayu 0.20 org 80,000.00 16,000.00
Jumlah 144,542.00
Dibulatkan 144,540.00
13 1 m¹ PASANG NOK GENTENG METAL
a Nok genteng metal 1.10 bh 53,000.00 58,300.00
b Paku Payung 0.05 kg 15,000.00 750.00
c Pembantu Tukang 0.25 org 65,000.00 16,250.00
d Tukang kayu 0.15 org 80,000.00 12,000.00
Jumlah 87,300.00
Dibulatkan 87,300.00

106
14 1 m2 PASANG ATAP SENG GELOMBANG
a Seng gelombang 0.70 lbr 43,000.00 30,100.00
b Paku Payung 0.02 kg 15,000.00 300.00
c Pembantu Tukang 0.12 org 65,000.00 7,800.00
d Tukang kayu 0.06 org 80,000.00 4,800.00
Jumlah 43,000.00
Dibulatkan 43,000.00
15 1 m2 PASANG NOK SENG UNTUK ATAP SENG GELOMBANG
a Seng plat BJLS 1.05 m! 31,000.00 32,550.00
b Paku Payung 0.04 kg 15,000.00 600.00
c Pembantu Tukang 0.15 org 65,000.00 9,750.00
d Tukang kayu 0.07 org 80,000.00 5,600.00
Jumlah 48,500.00
Dibulatkan 48,500.00
16 1 m2 PASANG ATAP POLYCARBONATE
a Polycarbonate 1.05 m2 198,000.00 207,900.00
b Besi Hollow 1.50 btg 32,000.00 48,000.00
c Alat bantu 20 % harga material 1.00 ls 41,580.00 41,580.00
d Pembantu Tukang 0.15 org 65,000.00 9,750.00
e Tukang kayu 0.05 org 80,000.00 4,000.00
Jumlah 311,230.00
Dibulatkan 311,230.00
17 1 m2 PASANG ALUMINIUM FOIL
a Aluminium foil 1.05 m2 4,200.00 4,410.00
b Alat bantu 20 % harga material 1.00 ls 882.00 882.00
c Pembantu Tukang 0.15 org 65,000.00 9,750.00
d Tukang kayu 0.05 org 80,000.00 4,000.00
Jumlah 19,042.00
Dibulatkan 19,040.00
PASANGAN MURDA/BETALA/IKUT CELEDU KOEFISIEN
18 a Murda / Puntal Paras 1.0000 BH 275000 275,000.00
b Semen 0.0130 kg 1340 17.42
c Pekerja / Pekerja Tak Terlatih 0.0500 oh 50000 2,500.00
d Mandor 0.0250 oh 95000 2,375.00
Jumlah 279,892.42
Dibulatkan 279,890.00
No. 1m2 KUDA -KUDA BAJA RINGAN SETARA SURYA TRUSS
a Rangka C 85085 @ 7 Galvalume 0.263 btg 225000 59175
19 b Rangka C 85085 @ 7 Galvalume 0.424 btg 181500 76956
c Reng (Butten 30) @ 6 Galvalume 0.956 btg 70000 66920
d Reng Pengikat Kuda-Kuda @6 Galvalume 0.067 btg 70000 4690
e Talang Valley @ 3 0.007 btg 166000 1162
f Plat Strip @ 1 0.194 btg 2750 533.5
g Baut Kuda-Kuda SDS 6 - 19 34.999 bh 320 11199.68
h Baut Reng SDS 6 - 16 22 bh 195 4290
i Baut Listplank Ø 6 - 70 0.472 bh 780 368.16
j Dinabold Ø 10 - 65 0.472 bh 2150 1014.8
k Upah Pasang 1 m2 24000 24000
l Material dan Alat Bantu 1 Ls 11500 11500
Jumlah 261,809.14
Dibulatkan 261,800.00

107
XI PEKERJAAN PENUTUP PLAFOND
1 1 m2 Pasang rangka plafond ( ukrn 0,50 x 1,00 ) m, Kayu Borneo Super
a Balok kayu Borneo Super 4 x 6 cm 0.01 m3 3,600,000.00 43,200.00
b Paku 5 - 12 cm 0.10 kg 15,000.00 1,500.00
c Pembantu Tukang 0.15 org 65,000.00 9,750.00
d Tukang Kayu 0.25 org 80,000.00 20,000.00
Jumlah 74,450.00
Dibulatkan 74,400.00
2 1 m2 Plafond GRC ( 60 x 1,20 ) m, tebal 4 mm
a Pelat GRC tebal 4 mm 1.10 lbr 98,000.00 107,800.00
b Paku 1 cm 0.01 kg 15,000.00 150.00
c Pembantu Tukang 0.03 org 65,000.00 1,950.00
d Tukang kayu 0.07 org 80,000.00 5,600.00
Jumlah 115,500.00
Dibulatkan 115,500.00
3 1 m2 Plafond Asbes ( 1,00 x 1,00 ) m, tebal 5 mm
a Pelat asbes tebal 5 mm 1.10 lbr 14,500.00 15,950.00
b Paku 1 cm 0.01 kg 15,000.00 150.00
c Pembantu Tukang 0.03 org 65,000.00 1,950.00
d Tukang kayu 0.07 org 80,000.00 5,600.00
Jumlah 23,650.00
Dibulatkan 23,650.00
4 1 m2 Plafond Akustik ( 60 x 120 ) cm
a Akustik 600 x 1200 x 15 mm 1.50 lbr 50,000.00 75,000.00
b Paku 2 - 5 cm 0.05 kg 15,000.00 750.00
c Pembantu Tukang 0.06 org 65,000.00 3,900.00
d Tukang kayu 0.10 org 80,000.00 8,000.00
Jumlah 87,650.00
Dibulatkan 87,650.00
5 1 m2 Plafond Akustik ( 60 x 120 ) cm + Rangka Alluminium
a Profil Alluminium "T" 3.60 M¹ 30,000.00 108,000.00
b Kawat seng polos 0.15 kg 15,000.00 2,250.00
c Ramset / dina bolt 1.00 bh 2,500.00 2,500.00
d Akustik 600 x 1200 x 15 mm 1.50 lbr 50,000.00 75,000.00
e Pembantu Tukang 0.15 org 65,000.00 9,750.00
f Tukang kayu 0.20 org 80,000.00 16,000.00
Jumlah 213,500.00
Dibulatkan 213,500.00
6 1 M¹ List Plafond Profil kayu
a List Profil kayu 1.10 M¹ 13,500.00 14,850.00
b Paku 2 cm 0.01 kg 15,000.00 150.00
c Pembantu Tukang 0.05 org 65,000.00 3,250.00
d Tukang kayu 0.05 org 80,000.00 4,000.00
Jumlah 22,250.00
Dibulatkan 22,250.00
7 1 M¹ List Plafond kayu 1/4
a List kayu 1/4 1.10 M¹ 4,300.00 4,730.00
b Paku 2 cm 0.01 kg 15,000.00 150.00
c Pembantu Tukang 0.05 org 65,000.00 3,250.00
d Tukang kayu 0.05 org 80,000.00 4,000.00
Jumlah 12,130.00
Dibulatkan 12,130.00

108
8 1 m2 Plafond Triplek 4 mm + Rangka Kayu Borneo Super
a Balok kayu Borneo Super 0.02 m3 3,600,000.00 82,800.00
b Paku 1- 12 cm 0.06 kg 15,000.00 900.00
c Triplek 120 cm x 240 cm x 0,4 cm 0.39 lbr 65,000.00 25,350.00
d Pembantu Tukang 0.27 org 65,000.00 17,550.00
e Tukang kayu 0.40 org 80,000.00 32,000.00
Jumlah 158,600.00
Dibulatkan 158,600.00
9 1 m2 Plafond Teakwood 4 mm + Rangka Kayu Borneo Super
a Balok kayu Borneo Super 0.02 m3 3,600,000.00 82,800.00
b Paku 1 - 12 cm 0.06 kg 15,000.00 900.00
c Teakwood 120 cm x 240 cm x 0,4 cm 0.39 lbr 94,000.00 36,660.00
d Pembantu Tukang 0.27 org 65,000.00 17,550.00
e Tukang kayu 0.40 org 80,000.00 32,000.00
Jumlah 169,910.00
Dibulatkan 169,910.00
10 1 m2 Plafond Papan 10 cm, tebal 1 cm + Rangka Kayu Borneo Super
a Balok kayu Borneo Super 0.02 m3 3,600,000.00 82,800.00
b Paku 2 - 12 cm 0.20 kg 15,000.00 3,000.00
c Papan kayu kamper 0.02 m3 5,400,000.00 108,000.00
d Pembantu Tukang 0.35 org 65,000.00 22,750.00
e Tukang kayu 0.50 org 80,000.00 40,000.00
Jumlah 256,550.00
Dibulatkan 256,550.00
11 1 m2 plafond Gypsum Board, tebal 9 mm + rangka besi hollow
a Hollow 4/4 Zincromate 0.42 btg 32,000.00 13,280.00
b Hollow 2/4 Zincromate 0.15 btg 25,000.00 3,750.00
c Gypsum board ( 120 x 240 x 9 ) mm 0.36 lbr 140,000.00 50,960.00
d Paku sekrup 25.00 bh 600.00 15,000.00
e Ramset / dina bolt 4.00 bh 2,500.00 10,000.00
f Cotton plaster 0.07 bh 55,000.00 3,960.00
g Compoun 0.13 kg 28,000.00 3,500.00
h Pembantu Tukang 0.10 org 65,000.00 6,500.00
i Tukang kayu 0.05 org 80,000.00 4,000.00
Jumlah 110,950.00
Dibulatkan 110,950.00

109
XII PEKERJAAN SANITAIR
1 Memasang 1 buah kloset duduk / monoblok
a Kloset duduk / monoblok 1.00 bh 2,500,000.00 2,500,000.00
b Perlengkapan ( 10% hrg kloset ) 250,000.00 250,000.00
c Pembantu Tukang 3.30 org 65,000.00 214,500.00
d Tukang batu 1.10 org 80,000.00 88,000.00
Jumlah 3,052,500.00
Dibulatkan 3,052,500.00
2 Memasang 1 buah kloset jongkok porselen
a Kloset jongkok porselen 1.00 bh 300,000.00 300,000.00
b Semen PC (abu-abu) 0.12 sak 62,000.00 7,440.00
c Pasir pasang 0.01 m3 225,000.00 2,250.00
d Pembantu Tukang 1.00 org 65,000.00 65,000.00
e Tukang batu 1.50 org 80,000.00 120,000.00
Jumlah 494,690.00
Dibulatkan 494,690.00
3 Memasang 1 buah urinoir
a Urinoir 1.00 bh 750,000.00 750,000.00
b Perlengkapan ( 30% hrg urinoir ) 225,000.00 225,000.00
c Semen PC (abu-abu) 0.12 sak 62,000.00 7,440.00
d Pasir pasang 0.01 m3 225,000.00 2,250.00
e Pembantu Tukang 1.00 org 65,000.00 65,000.00
f Tukang batu 1.00 org 80,000.00 80,000.00
Jumlah 1,129,690.00
Dibulatkan 1,129,690.00
4 Memasang 1 buah wastafel dinding
a Wastafel 1.00 bh 350,000.00 350,000.00
b Perlengkapan ( 12% hrg kloset ) 42,000.00 42,000.00
c Semen PC ( abu-abu ) 0.12 sak 62,000.00 7,440.00
d Pasir pasang 0.01 m3 225,000.00 2,250.00
e Pembantu Tukang 1.20 org 65,000.00 78,000.00
f Tukang batu 1.45 org 80,000.00 116,000.00
Jumlah 595,690.00
Dibulatkan 595,690.00
5 Memasang 1 buah wastafel kaki
a Wastafel 1.00 bh 750,000.00 750,000.00
b Perlengkapan ( 12% hrg kloset ) 90,000.00 90,000.00
c Semen PC ( abu-abu ) 0.12 sak 62,000.00 7,440.00
d Pasir pasang 0.01 m3 225,000.00 2,250.00
e Pembantu Tukang 1.20 org 65,000.00 78,000.00
f Tukang batu 1.45 org 80,000.00 116,000.00
Jumlah 1,043,690.00
Dibulatkan 1,043,690.00
6 Memasang 1 bh shower dinding
a Shower dinding 1.00 bh 150,000.00 150,000.00
b Pembantu Tukang 0.01 org 65,000.00 650.00
c Tukang batu 0.10 org 80,000.00 8,000.00
Jumlah 158,650.00
Dibulatkan 158,650.00
7 Memasang bak mandi Fiberglass ukuran sedang
a Bak fibreglass 1.00 bh 200,000.00 200,000.00
b Perlengkapan ( 20% hrg bak ) 36,000.00 36,000.00
c Pembantu tukang 1.80 org 65,000.00 117,000.00
d Tukang batu 2.70 org 80,000.00 216,000.00
Jumlah 569,000.00
Dibulatkan 569,000.00

110
8 Memasang bak kontrol pasangan batu bata ukuran 30 x 30 cm, tinggi 35 cm
a Batu bata 0.15 m3 700.00 105.00
b Semen PC (abu-abu) 0.88 sak 62,000.00 54,560.00
c Pasir pasang 0.07 m3 225,000.00 15,750.00
d Batu kerikil 0.07 m3 85,000.00 5,950.00
e Besi beton 1.60 kg 9,200.00 14,720.00
f Pasir Beton 0.06 m3 250,000.00 15,000.00
g Pembantu Tukang 3.20 org 65,000.00 208,000.00
h Tukang batu 1.02 org 80,000.00 81,600.00
Jumlah 395,685.00
Dibulatkan 395,680.00
9 Memasang Kichen Zink/bak cuci piring stainless steel
a Bak cuci stainless steel 1.00 bh 220,000.00 220,000.00
b Water Drain + Asesories 1.00 Set 69,500.00 69,500.00
c Pembantu Tukang 0.03 org 65,000.00 1,950.00
d Tukang batu 0.30 org 80,000.00 24,000.00
Jumlah 315,450.00
Dibulatkan 315,450.00
10 Memasang 1 bh kran diameter 3/4 " atau 1/2 "
a Kran air 1.00 bh 54,900.00 54,900.00
b Perlengkapan ( 2% hrg kran ) 1.00 ls 1,098.00 1,098.00
c Pembantu Tukang 0.01 org 65,000.00 650.00
d Tukang batu 0.10 org 80,000.00 8,000.00
Jumlah 64,648.00
Dibulatkan 64,640.00
11 Memasang 1 bh kran air angsa
a Kran air angsa 1.00 bh 155,000.00 155,000.00
b Perlengkapan ( 2% hrg kran ) 1.00 ls 3,100.00 3,100.00
c Pembantu Tukang 0.01 org 65,000.00 650.00
d Tukang batu 0.10 org 80,000.00 8,000.00
Jumlah 166,750.00
Dibulatkan 166,750.00
12 Memasang 1 bh Floor drain
a Floor drain 1.00 bh 59,000.00 59,000.00
b Pembantu Tukang 0.01 org 65,000.00 650.00
c Tukang batu 0.10 org 80,000.00 8,000.00
Jumlah 67,650.00
Dibulatkan 67,650.00
13 Memasang 1 bh tempat sabun
a Tempat Sabun 1.00 bh 30,000.00 30,000.00
b Pembantu Tukang 0.01 org 65,000.00 650.00
c Tukang batu 0.10 org 80,000.00 8,000.00
Jumlah 38,650.00
Dibulatkan 38,650.00

111
XIII PEKERJAAN PERPIPAAN DAN POMPA
1 Memasang 1 M¹ pipa galvanis diameter ½"
a Pipa galvanis dia 1/2" 1.10 M¹ 12,000.00 13,200.00
b Perlengkapan ( 30% harga pipa ) 3,600.00 3,600.00
c Pembantu Tukang 0.05 org 65,000.00 3,510.00
d Tukang pipa 0.09 org 80,000.00 7,200.00
Jumlah 27,510.00
Dibulatkan 27,510.00
2 Memasang 1 M¹ pipa galvanis diameter ¾"
a Pipa galvanis 1.10 M¹ 17,500.00 19,250.00
b Perlengkapan ( 30% harga pipa ) 5,250.00 5,250.00
c Pembantu Tukang 0.05 org 65,000.00 3,510.00
d Tukang pipa 0.09 org 80,000.00 7,200.00
Jumlah 35,210.00
Dibulatkan 35,210.00
3 Memasang 1 M¹ pipa galvanis diameter 1"
a Pipa galvanis 1.10 M¹ 25,000.00 27,500.00
b Perlengkapan ( 30% harga pipa ) 7,500.00 7,500.00
c Pembantu Tukang 0.05 org 65,000.00 3,510.00
d Tukang pipa 0.09 org 80,000.00 7,200.00
Jumlah 45,710.00
Dibulatkan 45,710.00
4 Memasang 1 M¹ pipa galvanis diameter 1½"
a Pipa galvanis 1.10 M¹ 30,000.00 33,000.00
b Perlengkapan ( 30% harga pipa ) 9,000.00 9,000.00
c Pembantu Tukang 0.11 org 65,000.00 7,020.00
d Tukang pipa 0.18 org 80,000.00 14,400.00
Jumlah 63,420.00
Dibulatkan 63,420.00
5 Memasang 1 M¹ pipa PVC type D diameter 3"
a Pipa PVC type D 1.10 M¹ 12,000.00 13,200.00
b Perlengkapan ( 30% harga pipa ) 3,600.00 3,600.00
c Pembantu Tukang 0.10 org 65,000.00 6,500.00
d Tukang pipa 0.18 org 80,000.00 14,400.00
Jumlah 37,700.00
Dibulatkan 37,700.00
6 Memasang 1 M¹ pipa PVC type D diameter 4"
a Pipa PVC type D 1.10 M¹ 15,000.00 16,500.00
b Perlengkapan ( 30% harga pipa ) 4,500.00 4,500.00
c Pembantu Tukang 0.13 org 65,000.00 8,450.00
d Tukang pipa 0.22 org 80,000.00 17,600.00
Jumlah 47,050.00
Dibulatkan 47,050.00
7 Memasang 1 M¹ PVC tipe AW diameter ½"
a Pipa PVC 1.10 M¹ 4,200.00 4,620.00
b Perlengkapan ( 30% harga pipa ) 1,260.00 1,260.00
c Pembantu Tukang 0.04 org 65,000.00 2,340.00
d Tukang pipa 0.06 org 80,000.00 4,800.00
Jumlah 13,020.00
Dibulatkan 13,020.00

112
8 Memasang 1 M¹ PVC tipe AW diameter ¾"
a Pipa PVC 1.10 M¹ 5,000.00 5,500.00
b Perlengkapan ( 30% harga pipa ) 1,500.00 1,500.00
c Pembantu Tukang 0.03 org 65,000.00 1,950.00
d Tukang pipa 0.06 org 80,000.00 4,800.00
Jumlah 13,750.00
Dibulatkan 13,750.00
9 Memasang 1 M¹ PVC tipe AW diameter 1"
a Pipa PVC 1.10 M¹ 6,500.00 7,150.00
b Perlengkapan ( 30% harga pipa ) 1,950.00 1,950.00
c Pembantu Tukang 0.04 org 65,000.00 2,340.00
d Tukang pipa 0.06 org 80,000.00 4,800.00
Jumlah 16,240.00
Dibulatkan 16,240.00
10 Memasang 1 M¹ PVC tipe AW diameter 2"
a Pipa PVC 1.10 M¹ 8,500.00 9,350.00
b Perlengkapan ( 30% harga pipa ) 2,550.00 2,550.00
c Pembantu Tukang 0.05 org 65,000.00 3,510.00
d Tukang pipa 0.09 org 80,000.00 7,200.00
Jumlah 22,610.00
Dibulatkan 22,610.00
11 Memasang 1 M¹ PVC tipe AW diameter 4"
a Pipa PVC 1.10 M¹ 17,000.00 18,700.00
b Perlengkapan ( 30% harga pipa ) 5,100.00 5,100.00
c Pembantu Tukang 0.08 org 65,000.00 5,265.00
d Tukang pipa 0.14 org 80,000.00 10,800.00
Jumlah 39,865.00
Dibulatkan 39,860.00
12 Membuat 1 bh Septictank pasangan Batu Bata dan Rembesan
a Galian tanah Septictank & rembesan 7.5 M3 49,400.00 370,500.00
b Pasir urug 0.21 M3 200,000.00 42,000.00
c Lantai kerja 2.25 M3 713,100.00 1,604,475.00
d Pasang bata 1 Pc : 2 Psr 15.00 M2 104,780.00 1,571,700.00
e Pelat beton penutup dan balok 0.30 M3 4,909,800.00 1,472,940.00
f Pipa PVC 4 inci AW & perlengkapannya 5.40 M! 17,000.00 91,800.00
g Plesteran 1 Pc : 3 Psr 30.00 M2 37,500.00 1,125,000.00
h Pasangan ijuk 5.00 IKAT 15,000.00 75,000.00
i Urugan kerikil 3,5 cm 1.05 M3 215,500.00 226,275.00
j Pipa PVC 4 inci AW dilobang 9.00 M! 17,000.00 153,000.00
k Urugan kembali 1.13 M3 13,600.00 15,368.00
l Pembantu Tukang 4.00 org 65,000.00 260,000.00
m Tukang batu 3.00 org 80,000.00 240,000.00
Jumlah 7,248,058.00
Dibulatkan 7,248,050.00
13 Memasang 1 bh Pompa Air
a Pompa Air 100 Watt 1.00 bh 1,125,000.00 1,125,000.00
b Perlengkapan ( 25% harga pompa ) 281,250.00 281,250.00
c Pembantu Tukang 0.08 org 65,000.00 5,265.00
d Tukang Pipa 0.14 org 80,000.00 10,800.00
Jumlah 1,422,315.00
Dibulatkan 1,422,310.00

113
XIV PEKERJAAN PENUTUP BESI DAN BAJA
1 1 kg Pasang Rangka Atap Baja
a Besi profil WF 1.10 kg 12,000.00 13,200.00
b Meni besi 0.08 kg 16,000.00 1,280.00
c Peralatan las ( 5 % material ) 1.00 ls 660.00 660.00
d Elektroda 0.20 ls 16,000.00 3,200.00
e Tukang besi 0.04 org 85,000.00 3,400.00
f Pembantu Tukang 0.06 org 65,000.00 3,900.00
Jumlah 25,640.00
Dibulatkan 25,640.00
2 1 kg Pasang Rangka Atap besi siku
a Besi Siku 1.10 kg 12,000.00 13,200.00
b Meni besi 0.10 kg 16,000.00 1,600.00
c Peralatan las ( 5 % material ) 1.00 ls 660.00 660.00
d Elektroda 0.15 ls 16,000.00 2,400.00
e Baud 0.20 kg 9,200.00 1,840.00
f Tukang besi 0.04 org 85,000.00 3,400.00
g Pembantu Tukang 0.06 org 65,000.00 3,900.00
Jumlah 27,000.00
Dibulatkan 27,000.00
3 1 kg Pasang Gording besi C
a Besi C 1.10 kg 11,000.00 12,100.00
b Meni besi 0.10 kg 16,000.00 1,600.00
c Peralatan las ( 5 % material ) 1.00 ls 605.00 605.00
d Elektroda 0.15 ls 16,000.00 2,400.00
e Baud 0.20 kg 9,200.00 1,840.00
f Tukang besi 0.04 org 85,000.00 3,400.00
g Pembantu Tukang 0.06 org 65,000.00 3,900.00
Jumlah 25,845.00
Dibulatkan 25,840.00
4 1 m2 Pasang Pintu Rolling Door besi
a Rolling door besi 1.00 m2 165,000.00 165,000.00
b Tukang besi 1.50 org 85,000.00 127,500.00
c Pembantu Tukang 1.05 org 65,000.00 68,250.00
Jumlah 360,750.00
Dibulatkan 360,750.00
5 1 bh Pasang Pintu besi ukuran 0,8 x 2 m
a Pintu besi jadi 1.00 bh 400,000.00 400,000.00
b Tukang besi 1.05 org 85,000.00 89,250.00
c Pembantu Tukang 1.05 org 65,000.00 68,250.00
Jumlah 557,500.00
Dibulatkan 557,500.00
6 1 m2 Pasang Teralis Besi
a Besi strip 2 mm x 3 cm 11.50 M¹ 11,000.00 126,500.00
b Tukang las 1.20 org 100,000.00 120,000.00
c Pembantu Tukang 1.20 org 65,000.00 78,000.00
Jumlah 324,500.00
Dibulatkan 324,500.00

114
7 1 m2 Pasang Kawat Harmonika
a Kawat harmonika 1.10 m2 16,000.00 17,600.00
b Paku 2 - 5 cm 0.02 kg 15,000.00 300.00
c Papan kayu kamper medan 0.00 m3 4,300,000.00 7,740.00
d Pembantu Tukang 0.10 org 65,000.00 6,500.00
e Tukang kayu 0.10 org 80,000.00 8,000.00
Jumlah 40,140.00
Dibulatkan 40,140.00
8 1 m' Pasang Talang Datar, Seng plat BJLS
a Seng plat BJLS 1.00 m' 31,000.00 31,000.00
b Paku 2 - 5 cm 0.02 kg 15,000.00 225.00
c Papan kayu borneo super 0.01 m3 3,800,000.00 36,480.00
d Flincote / meni besi 0.25 kg 14,500.00 3,625.00
e Pembantu Tukang 0.15 org 65,000.00 9,750.00
f Tukang kayu 0.40 org 80,000.00 32,000.00
Jumlah 113,080.00
Dibulatkan 113,080.00
9 1 m' Pasang Talang Miring, Seng plat BJLS
a Seng plat BJLS 0.50 m' 31,000.00 15,500.00
b Paku 2 - 5 cm 0.02 kg 15,000.00 225.00
c Papan kayu borneo super 0.02 m3 3,800,000.00 72,200.00
d Flincote / meni besi 0.30 kg 14,500.00 4,350.00
e Pembantu Tukang 0.04 org 65,000.00 2,600.00
f Tukang kayu 0.40 org 80,000.00 32,000.00
Jumlah 126,875.00
Dibulatkan 126,870.00

XV PEKERJAAN ALUMINIUM
1 1 m2 Pasang Pintu Rolling Door aluminium
a Rolling door aluminium 1.00 m2 165,000.00 165,000.00
b Tukang besi konstruksi 1.50 org 85,000.00 127,500.00
c Pembantu Tukang 1.05 org 65,000.00 68,250.00
Jumlah 360,750.00
Dibulatkan 360,750.00
2 1 m2 Pasang Pintu Aluminium pabrikan
a Pintu alluminium 1.00 bh 400,000.00 400,000.00
b Tukang batu 1.05 org 80,000.00 84,000.00
c Pembantu Tukang 1.05 org 65,000.00 68,250.00
Jumlah 552,250.00
Dibulatkan 552,250.00
3 1 Unit Kusen Jendela Aluminium 2 lubang dgn 2 daun jendela ( ukuran 1,6 x 1,5 m )
a Profil aluminium 4" natural (+ spare 20 %) 9.24 m' 98,000.00 905,520.00
b Profil daun jendela alm.( + spare 20%) 11.04 m' 85,000.00 938,400.00
c Kaca polos 3 mm 2.40 m2 66,000.00 158,400.00
d Engsel jendela 4.00 ps 25,000.00 100,000.00
e Grendel jendela 2.00 bh 19,000.00 38,000.00
f Kait angin 2.00 bh 10,900.00 21,800.00
g Acesories ( 6 % harga bahan) 1.00 ls 120,139.20 120,139.20
h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 181,104.00 181,104.00
i Upah pembuatan daun jendela (20 % bahan) 1.00 ls 187,680.00 187,680.00
Jumlah 2,651,043.20
Dibulatkan 2,651,040.00

115
4 1 Unit Kusen Jendela Aluminium 3 lubang dgn 2 daun jendela dan 1 kaca mati (ukuran 2 x 1,5 m)
a Profil aluminium 4" natural (+ spare 20 %) 12.00 m' 98,000.00 1,176,000.00
b Profil daun jendela alm.( + spare 20%) 11.04 m' 85,000.00 938,400.00
c Kaca polos 3 mm 3.00 m2 66,000.00 198,000.00
d Engsel jendela 4.00 ps 25,000.00 100,000.00
e Grendel jendela 2.00 bh 19,000.00 38,000.00
f Kait angin 2.00 bh 10,900.00 21,800.00
g Acesories ( 6 % harga bahan ) 1.00 ls 138,744.00 138,744.00
h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 235,200.00 235,200.00
i Upah pembuatan daun jendela (20 % bahan) 1.00 ls 187,680.00 187,680.00
Jumlah 2,610,944.00
Dibulatkan 2,610,940.00
5 1 Unit Kusen Pintu Jendela gendong Aluminium dgn 2 jndl dan 1 pnt teakwood (ukr 2,2 x 2,7 m)
a Profil aluminium 4" natural (+ spare 20 %) 17.04 m' 98,000.00 1,669,920.00
b Profil daun jendela alm.( + spare 20%) 14.88 m' 85,000.00 1,264,800.00
c Kaca polos 3 mm 3.96 m2 66,000.00 261,360.00
d Daun pintu teakwood 1.80 m2 389,400.00 700,920.00
e Engsel jendela 4.00 ps 25,000.00 100,000.00
f Grendel jendela 2.00 bh 19,000.00 38,000.00
g Kait angin 4.00 bh 10,900.00 43,600.00
h Engsel pintu 3.00 ps 30,000.00 90,000.00
i Grendel pintu 1.00 bh 29,000.00 29,000.00
j Kunci tanam 1.00 bh 22,000.00 22,000.00
k Acesories ( 6 % harga bahan ) 1.00 ls 159,804.00 159,804.00
l Upah pembuatan profil ( 20 % bahan ) 1.00 ls 20,000.00 20,000.00
m Upah pembuatan daun jendela (20 % bahan) 1.00 ls 7,600.00 7,600.00
Jumlah 4,407,004.00
Dibulatkan 4,407,000.00
6 1 Unit Kusen Pintu Aluminium ukr 0.9 x 2,7 m
a Profil aluminium 4" natural (+ spare 20 %) 7.56 m' 98,000.00 740,880.00
b Kaca polos 3 mm untuk bovenlight 0.45 m2 66,000.00 29,700.00
c Daun pintu tekwood 1.68 m2 389,400.00 654,192.00
d Engsel pintu 3.00 ps 30,000.00 90,000.00
e Grendel pintu 1.00 bh 29,000.00 29,000.00
f Kunci tanam 1.00 bh 22,000.00 22,000.00
g Acesories ( 6 % ) 1.00 ls 46,234.80 46,234.80
h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 148,176.00 148,176.00
Jumlah 1,760,182.80
Dibulatkan 1,760,180.00
7 1 bh Bovenlight Almunium dengan kisi-kisi almunium plat (ukuran 0,5 x 1 m)
a Profil Aluminium 4" natural + upah 20% 3.60 m' 66,000.00 237,600.00
b Plat Aluminium untuk Jalusi 5.00 m' 16,000.00 80,000.00
c Acesories ( 6 % ) 1.00 ls 14,256.00 14,256.00
d Upah pembuatan profil ( 20 % bahan ) 1.00 ls 29,635.20 29,635.20
Jumlah 361,491.20
Dibulatkan 361,490.00
8 1 bh Bovenlight Almunium ukuran 0,5 x 1 m dengan bagian dalam kaca
a Profil Aluminium 4" natural + upah 20% 3.60 m' 98,000.00 352,800.00
b Kaca Polos 3 mm 0.50 m2 66,000.00 33,000.00
c Acesories ( 6 % ) 1.00 ls 21,168.00 21,168.00
d Upah pembuatan profil ( 20 % bahan ) 1.00 ls 5,927.04 5,927.04
Jumlah 412,895.04
Dibulatkan 412,890.00

116
XVI PEKERJAAN KACA & PENGGANTUNG
1 1 Buah Pasang Kunci Tanam besar
a Kunci tanam besar 1.00 bh 210,000.00 210,000.00
b Pembantu Tukang 0.06 org 65,000.00 3,900.00
c Tukang kayu 0.60 org 80,000.00 48,000.00
Jumlah 261,900.00
Dibulatkan 261,900.00
2 1 Buah Pasang Kunci Tanam sedang
a Kunci tanam sedang 1.00 bh 75,000.00 75,000.00
b Pembantu Tukang 0.01 org 65,000.00 650.00
c Tukang kayu 0.50 org 80,000.00 40,000.00
Jumlah 115,650.00
Dibulatkan 115,650.00
3 1 Buah Pasang Kunci bulat putar Kamar Mandi
a Kunci bulat putar kamar mandi 1.00 bh 55,000.00 55,000.00
b Pembantu Tukang 0.01 org 65,000.00 325.00
c Tukang kayu 0.50 org 80,000.00 40,000.00
Jumlah 95,325.00
Dibulatkan 95,320.00
4 1 Buah Pasang Engsel Pintu
a Engsel pintu 1.00 bh 30,000.00 30,000.00
b Pembantu Tukang 0.02 org 65,000.00 975.00
c Tukang kayu 0.15 org 80,000.00 12,000.00
Jumlah 42,975.00
Dibulatkan 42,970.00
5 1 Buah Pasang Engsel Jendela Kupu-kupu
a Engsel jendela 1.00 bh 25,000.00 25,000.00
b Pembantu Tukang 0.01 org 65,000.00 650.00
c Tukang kayu 0.10 org 80,000.00 8,000.00
Jumlah 33,650.00
Dibulatkan 33,650.00
6 1 Buah Pasang Kait Angin
a Kait angin 1.00 bh 10,900.00 10,900.00
b Pembantu Tukang 0.02 org 65,000.00 975.00
c Tukang kayu 0.15 org 80,000.00 12,000.00
Jumlah 23,875.00
Dibulatkan 23,870.00
7 1 Buah Pasang Door Closer
a Door closer 1.00 bh 360,000.00 360,000.00
b Pembantu Tukang 0.05 org 65,000.00 3,250.00
c Tukang kayu 0.50 org 80,000.00 40,000.00
Jumlah 403,250.00
Dibulatkan 403,250.00
8 1 Buah Pasang Pegangan Pintu / Door Holder
a Door holder 1.00 bh 45,000.00 45,000.00
b Pembantu Tukang 0.05 org 65,000.00 3,250.00
c Tukang kayu 0.50 org 80,000.00 40,000.00
Jumlah 88,250.00
Dibulatkan 88,250.00

117
9 1 Buah Pasang Penahan Pintu / Door stoper
a Door stoper 1.00 bh 55,000.00 55,000.00
b Pembantu Tukang 0.05 org 65,000.00 3,250.00
c Tukang kayu 0.50 org 80,000.00 40,000.00
Jumlah 98,250.00
Dibulatkan 98,250.00
10 1 Buah Pasang Grendel / Sloot pintu
a Grendel / sloot pintu 1.00 bh 29,000.00 29,000.00
b Pembantu Tukang 0.05 org 65,000.00 3,250.00
c Tukang kayu 0.50 org 80,000.00 40,000.00
Jumlah 72,250.00
Dibulatkan 72,250.00
11 1 Buah Pasang Grendel / Sloot jendela
a Grendel / sloot jendela 1.00 bh 19,000.00 19,000.00
b Pembantu Tukang 0.05 org 65,000.00 3,250.00
c Tukang kayu 0.50 org 80,000.00 40,000.00
Jumlah 62,250.00
Dibulatkan 62,250.00
12 1 Buah Pasang tarikan jendela
a Tarikan jendela 1.00 bh 20,000.00 20,000.00
b Pembantu Tukang 0.05 org 65,000.00 3,250.00
c Tukang kayu 0.50 org 80,000.00 40,000.00
Jumlah 63,250.00
Dibulatkan 63,250.00
13 1 m2 Pasang Kaca polos, tebal 3 mm
a Kaca polos 1.10 m2 66,000.00 72,600.00
b Pembantu Tukang 0.02 org 65,000.00 975.00
c Tukang kayu 0.15 org 80,000.00 12,000.00
Jumlah 85,575.00
Dibulatkan 85,570.00
14 1 m2 Pasang Kaca polos, tebal 5 mm
a Kaca polos 1.10 m2 88,000.00 96,800.00
b Pembantu Tukang 0.02 org 65,000.00 975.00
c Tukang kayu 0.15 org 80,000.00 12,000.00
Jumlah 109,775.00
Dibulatkan 109,770.00
15 1 m2 Pasang Kaca Ray band, tebal 5 mm
a Kaca 1.10 m2 13,000.00 14,300.00
b Pembantu Tukang 0.02 org 65,000.00 975.00
c Tukang kayu 0.15 org 80,000.00 12,000.00
Jumlah 27,275.00
Dibulatkan 27,270.00

118
XVII PEKERJAAN PENGECATAN
1 1 m2 Mengikis / Mengerok / mengelupas Permukaan Cat Tembok Lama
a Soda api 0.05 kg 41,000.00 2,050.00
b Pembantu Tukang 0.05 org 65,000.00 3,250.00
c Tukang cat 0.02 org 75,000.00 1,500.00
Jumlah 6,800.00
Dibulatkan 6,800.00
2 1 m2 Mendempul Dan Menggosok Kayu
a Dempul jadi 0.10 kg 23,500.00 2,350.00
b Minyak cat 0.03 kg 18,000.00 540.00
c Ampelas kasar 0.30 lbr 3,500.00 1,050.00
d Pembantu Tukang 0.04 org 65,000.00 2,600.00
e Tukang cat 0.05 org 75,000.00 3,750.00
Jumlah 10,290.00
Dibulatkan 10,290.00
3 1 m2 Pengecatan Kayu Lama
a Cat meni 0.25 kg 16,000.00 4,000.00
b Plamir 0.15 kg 17,000.00 2,550.00
c Ampelas 1.00 lbr 3,500.00 3,500.00
d Cat dasar 0.15 kg 35,000.00 5,250.00
e Cat penutup kwalitas baik 0.60 kg 42,000.00 25,200.00
f Pembantu Tukang 0.05 org 65,000.00 3,250.00
g Tukang cat 0.15 org 75,000.00 11,250.00
Jumlah 55,000.00
Dibulatkan 55,000.00
4 1 m2 Pengecatan Kayu Baru
a Cat meni 0.50 kg 16,000.00 8,000.00
b Plamir 0.15 kg 17,000.00 2,550.00
c Ampelas 1.00 lbr 3,500.00 3,500.00
d Cat dasar 0.15 kg 35,000.00 5,250.00
e Cat penutup kwalitas baik 0.35 kg 42,000.00 14,700.00
f Pembantu Tukang 0.05 org 65,000.00 3,250.00
g Tukang cat 0.15 org 75,000.00 11,250.00
Jumlah 48,500.00
Dibulatkan 48,500.00
5 1 m2 Pengecatan Kayu dengan Politur
a Politur 0.15 Ltr 33,000.00 4,950.00
b Dempul jadi 0.25 kg 23,500.00 5,875.00
c Ampelas 2.00 lbr 3,500.00 7,000.00
d Pembantu Tukang 0.05 org 65,000.00 3,250.00
e Tukang cat 0.15 org 75,000.00 11,250.00
Jumlah 32,325.00
Dibulatkan 32,320.00
6 1 m2 Pengecatan Kayu dengan Melamik
a Melamik 0.15 Ltr 29,500.00 4,425.00
b Dempul jadi 0.25 kg 23,500.00 5,875.00
c Ampelas 2.00 lbr 3,500.00 7,000.00
d Pembantu Tukang 0.05 org 65,000.00 3,250.00
e Tukang cat 0.15 org 75,000.00 11,250.00
Jumlah 31,800.00
Dibulatkan 31,800.00
7 1 m2 Pengecatan Kayu dengan Cat Residu/Ter
a Residu atau ter 0.35 Ltr 3,100.00 1,085.00
b Pembantu Tukang 0.15 org 65,000.00 9,750.00
c Tukang cat 0.02 org 75,000.00 1,500.00
Jumlah 12,335.00
Dibulatkan 12,330.00

119
8 1 m2 Pengecatan Tembok/plafond Baru kwalitas sedang
a Plamir 0.10 kg 19,000.00 1,900.00
b Rol cat 0.01 bh 26,500.00 265.00
c Cat penutup kwalitas sedang 0.45 kg 17,000.00 7,650.00
d Steger ( perancah kerja ) 0.01 Ls 200,000.00 2,000.00
e Ampelas 0.50 lbr 3,500.00 1,750.00
f Pembantu Tukang 0.06 org 65,000.00 3,900.00
g Tukang cat 0.20 org 75,000.00 15,000.00
Jumlah 32,465.00
Dibulatkan 32,460.00
9 1 m2 Pengecatan Tembok/plafond Baru kwalitas baik
a Plamir 0.10 kg 19,000.00 1,900.00
b Rol cat 0.01 bh 26,500.00 265.00
c Cat penutup kwalitas baik 0.50 kg 44,000.00 22,000.00
d Steger ( perancah kerja ) 0.01 Ls 200,000.00 2,000.00
e Ampelas 0.50 lbr 3,500.00 1,750.00
f Pembantu Tukang 0.06 org 65,000.00 3,900.00
g Tukang cat 0.20 org 75,000.00 15,000.00
Jumlah 46,815.00
Dibulatkan 46,810.00
10 1 m2 Pengecatan Tembok Lama
a Cat penutup kwalitas baik 0.40 kg 32,000.00 12,800.00
b Rol cat 0.01 bh 26,500.00 265.00
c Steger ( perancah kerja ) 0.01 Ls 200,000.00 2,000.00
d Ampelas 0.50 lbr 3,500.00 1,750.00
e Pembantu Tukang 0.06 org 65,000.00 3,900.00
f Tukang cat 0.20 org 75,000.00 15,000.00
Jumlah 35,715.00
Dibulatkan 35,710.00
11 1 m2 Pengecatan exterior
a Cat tembok 0.36 kg 75,000.00 27,000.00
b Plamir tembok 0.16 kg 19,000.00 3,040.00
c Rol cat 0.01 bh 26,500.00 265.00
d Steger ( perancah kerja ) 0.01 Ls 200,000.00 2,000.00
e Ampelas 0.50 lbr 3,500.00 1,750.00
f Pembantu Tukang 0.20 org 65,000.00 13,000.00
g Tukang cat 0.30 org 75,000.00 22,500.00
Jumlah 69,555.00
Dibulatkan 69,550.00
12 1 m2 Memasang Wallpaper
a Wallpaper 1.20 m2 23,000.00 27,600.00
b Lem Perekat 0.20 kg 30,800.00 6,160.00
c Pembantu Tukang 0.02 org 65,000.00 1,300.00
d Tukang cat 0.15 org 75,000.00 11,250.00
Jumlah 46,310.00
Dibulatkan 46,310.00
13 1 m2 Pengecatan Permukaan Baja dengan Meni Besi
a Meni besi 0.10 kg 16,000.00 1,600.00
b Kuas 0.01 bh 13,550.00 135.50
c Pembantu Tukang 0.02 org 65,000.00 1,300.00
d Tukang cat 0.20 org 75,000.00 15,000.00
Jumlah 18,035.50
Dibulatkan 18,030.00
14 1 m2 Pengecatan Permukaan Baja dengan Meni Besi dan Cat
a Meni besi 0.10 kg 16,000.00 1,600.00
b Cat besi 0.13 kg 42,000.00 5,460.00
c Kuas 0.01 bh 13,550.00 135.50
d Ampelas 0.50 lbr 3,500.00 1,750.00
e Perancah kayu 0.01 m3 200,000.00 2,000.00
f Pembantu Tukang 0.20 org 65,000.00 13,000.00
g Tukang cat 0.20 org 75,000.00 15,000.00
Jumlah 38,945.50
Dibulatkan 38,940.00

120
XVIII PEKERJAAN LISTRIK
1 Pasang 1 Titik Stop Kontak
a Stop Kontak 1.00 bh 20,000.00 20,000.00
b Kabel Listrik NYM 3 x 2,5 mm 0.25 rol 435,000.00 108,750.00
c Accecories ( 20 % material ) 1.00 ls 21,750.00 21,750.00
d Pembantu Tukang 0.20 org 65,000.00 13,000.00
e Tukang listrik 0.60 org 80,000.00 48,000.00
Jumlah 211,500.00
Dibulatkan 211,500.00
2 Pasang 1 Titik lampu
a Saklar 1.00 bh 20,000.00 20,000.00
b Kabel Listrik NYM 2 x 2,5 mm 0.25 rol 375,000.00 93,750.00
c Accecories ( 20 % material ) 1.00 ls 18,750.00 18,750.00
d Pembantu Tukang 0.20 org 65,000.00 13,000.00
e Tukang listrik 0.60 org 80,000.00 48,000.00
Jumlah 193,500.00
Dibulatkan 193,500.00
3 Pasang 1 Buah Lampu SL
a Lampu SL 1.00 bh 55,000.00 55,000.00
b Accecories ( 1 % alat ) 1.00 ls 550.00 550.00
c Tukang listrik 0.10 org 80,000.00 8,000.00
Jumlah 63,550.00
Dibulatkan 63,550.00
4 Pasang 1 Buah Lampu TL
a Lampu TL 1.00 bh 55,000.00 55,000.00
b Accecories ( 1 % alat ) 1.00 ls 550.00 550.00
c Tukang listrik 0.12 org 80,000.00 9,600.00
Jumlah 65,150.00
Dibulatkan 65,150.00
5 Pasang 1 Buah Lampu Baret
a Lampu Baret 1.00 bh 85,000.00 85,000.00
b Accecories ( 1 % alat ) 1.00 ls 850.00 850.00
c Tukang listrik 0.15 org 80,000.00 12,000.00
Jumlah 97,850.00
Dibulatkan 97,850.00
6 Pasang 1 Buah Lampu Pijar
a Lampu Pijar 1.00 bh 7,000.00 7,000.00
b Accecories ( 1 % alat ) 1.00 ls 70.00 70.00
c Tukang listrik 0.10 org 80,000.00 8,000.00
Jumlah 15,070.00
Dibulatkan 15,070.00
7 Pasang 1 Buah Lampu Taman
a Lampu Taman 1.00 bh 260,000.00 260,000.00
b Accecories ( 1 % alat ) 1.00 ls 2,600.00 2,600.00
c Tukang listrik 0.35 org 80,000.00 28,000.00
Jumlah 290,600.00
Dibulatkan 290,600.00
8 Pasang 1 Buah Panel
a Panel Listrik standart untuk Rumah 1.00 bh 250,000.00 250,000.00
b Accecories ( 10 % alat ) 1.00 ls 25,000.00 25,000.00
c Tukang listrik 1.00 org 80,000.00 80,000.00
Jumlah 355,000.00
Dibulatkan 355,000.00

121
XIX PEKERJAAN WATERPROOFING
1 Pasang 1 m2 Waterproofing Membran
a Material Primer 2.50 kg 6,500.00 16,250.00
b Waterproofing Membrane 1.10 m2 200,000.00 220,000.00
c Pengetesan ( 10 % material ) 1.00 ls 22,000.00 22,000.00
d Pembantu Tukang 0.20 org 65,000.00 13,000.00
e Tukang Batu 0.60 org 80,000.00 48,000.00
Jumlah 319,250.00
Dibulatkan 319,250.00
2 Pasang 1 m2 Waterproofing Coating
a Pre-treatment / Cleaning ( 10 % material ) 1.00 m2 4,100.00 4,100.00
b Bahan Waterproofing Coating 1.00 kg 41,000.00 41,000.00
c Kuas 3 " 0.25 bh 13,550.00 3,387.50
d Pembantu Tukang 0.20 org 65,000.00 13,000.00
e Tukang Batu 0.60 org 80,000.00 48,000.00
Jumlah 109,487.50
Dibulatkan 109,480.00
3 Pasang 1 m2 Floor Harderner
a Material Natural non Metalic 1.10 kg 41,000.00 45,100.00
b Accecories ( 10 % alat ) 1.00 ls 451.00 451.00
c Pembantu Tukang 0.20 org 65,000.00 13,000.00
d Tukang Batu 0.60 org 80,000.00 48,000.00
Jumlah 106,551.00
Dibulatkan 106,550.00

122
3.6.Rencana Anggaran Biaya

123
Rencana Anggaran Biaya ( RAB )

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Satuan Volume
( Rp ) ( Rp )
1 2 3 4 5 6

I Pekerjaan Persiapan
1 Pekerjaan Pengukuran dan Bowplank m 52.9 96,400.00 5,099,560.00
2 Pekerjaan Pembersihan Lapangan m² 177.75 6,500.00 1,155,375.00
6,254,935.00
II Pekerjaan Tanah
1 Pekerjaan Galian Pondasi Menerus m³ 21.06 27,300.00 574,938.00
2 Pekerjaan Galian Pondasi Setempat m³ 31.34 35,750.00 1,120,405.00
3 Pekerjaan Urugan Tanah Kembali m³ 33.47 13,600.00 455,192.00
4 Pekerjaan Urugan Tanah untuk Peninggian Lantai m³ 22.9 230,800.00 5,285,320.00
5 Pekerjaan Urugan Pasir dibawah Pondasi m³ 3.88 230,800.00 895,504.00
6 Pekerjaan Urugan Pasir dibawah Lantai m³ 5.1 215,500.00 1,099,050.00
9,430,409.00
III Pekerjaan Pasangan dan Pelesteran
1 Pekerjaan Pasangan Batu Kosong Pondasi Menerus m³ 5.85 411,900.00 2,409,615.00
2 Pekerjaan Pasangan Batu Kali Pondasi Menerus m³ 10.92 684,040.00 7,469,716.80
3 Pekerjaan Pelesteran Pondasi Menerus m³ 16.77 35,000.00 586,950.00
4 Pekerjaan Pasangan Batu Bata 1pc : 6ps m² 246.76 209,900.00 51,794,924.00
5 Pekerjaan Pelesteran Dinding m² 493.52 38,100.00 18,803,112.00
6 Pekerjaan Acian Dinding m² 493.52 22,800.00 11,252,256.00
7 Pekerjaan Pelesteran Pelat Tangga m² 6.50 38,100.00 247,650.00
8 Pekerjaan Acian Pelat Tangga m² 6.50 22,800.00 148,200.00
92,712,423.80
IV Pekerjaan Kayu
1 Pekerjaan Kusen m³ 2.33 7,830,000.00 18,204,750.00
2 Pekerjaan Daun Pintu m² 13.20 4,300,000.00 56,760,000.00
3 Pekerjaan Daun Jendela m² 24.15 227,200.00 5,486,880.00
80,451,630.00
V Pekerjaan Beton
1 Pekerjaan Pondasi Telapak P1 m³ 4.40 921,400.00 4,054,160.00
2 Pekerjaan Pondasi Telapak P2 m³ 0.30 921,400.00 276,420.00
3 Pekerjaan Sloof 20x30cm m³ 6.36 921,400.00 5,860,104.00
4 Pekerjaan Kolom 12x65cm m³ 1.69 921,400.00 1,557,166.00
5 Pekerjaan Kolom 12x60cm m³ 3.63 921,400.00 3,344,682.00
6 Pekerjaan Kolom 12x40cm m³ 0.17 921,400.00 156,638.00
7 Pekerjaan Balok 15x50cm m³ 7.20 921,400.00 6,634,080.00
8 Pekerjaan Balok 15x35cm m³ 0.95 921,400.00 870,723.00
9 Pekerjaan Balok Anak 15x25cm m³ 1.35 921,400.00 1,243,890.00
10 Pekerjaan Balok Ring 15x30cm m³ 2.52 921,400.00 2,321,928.00
11 Pekerjaan Plat Lantai m³ 8.40 921,400.00 7,739,760.00
12 Pekerjaan Balok Anak Tangga m³ 1.33 921,400.00 1,225,462.00
35,285,013.00
VI Pekerjaan Bekisting
1 Pekerjaan Pondasi Telapak P1 m² 14.40 138,700.00 1,997,280.00
2 Pekerjaan Pondasi Telapak P2 m² 1.20 138,700.00 166,440.00
3 Pekerjaan Sloof 20x30cm m² 84.80 154,000.00 13,059,200.00
4 Pekerjaan Kolom 12x65cm m² 33.26 331,000.00 11,009,060.00
5 Pekerjaan Kolom 12x60cm m² 72.57 331,000.00 24,020,670.00
6 Pekerjaan Kolom 12x40cm m² 3.74 331,000.00 1,237,940.00
7 Pekerjaan Balok 15x50cm m² 87.36 332,300.00 29,029,728.00
8 Pekerjaan Balok 15x35cm m² 10.98 332,300.00 3,648,654.00
9 Pekerjaan Balok Anak 15x25cm m² 14.76 332,300.00 4,904,748.00
10 Pekerjaan Balok Ring 15x30cm m² 28.56 332,300.00 9,490,488.00
11 Pekerjaan Plat Lantai m² 70.00 332,300.00 23,261,000.00
12 Pekerjaan Balok Anak Tangga m² 13.70 235,700.00 3,229,090.00
125,054,298.00

124
1 2 3 4 5 6
VII Pekerjaan Pembesian
1 Pekerjaan Pondasi Telapak P1 kg 773.74 12,600.00 9,749,124.00
2 Pekerjaan Pondasi Telapak P2 kg 62.40 12,600.00 786,240.00
3 Pekerjaan Sloof 20x30cm kg 1418.78 12,600.00 17,876,628.00
4 Pekerjaan Kolom 12x65cm kg 385.56 12,600.00 4,858,056.00
5 Pekerjaan Kolom 12x60cm kg 847.23 12,600.00 10,675,098.00
6 Pekerjaan Kolom 12x40cm kg 45.54 12,600.00 573,804.00
7 Pekerjaan Balok 15x50cm kg 1712.64 12,600.00 21,579,264.00
8 Pekerjaan Balok 15x35cm kg 264.96 12,600.00 3,338,496.00
9 Pekerjaan Balok Anak 15x25cm kg 254.52 12,600.00 3,206,952.00
10 Pekerjaan Balok Ring 15x30cm kg 471.52 12,600.00 5,941,152.00
11 Pekerjaan Plat Lantai kg 1562.40 12,600.00 19,686,240.00
12 Pekerjaan Balok Anak Tangga kg 325.36 12,600.00 4,099,536.00
102,370,590.00
VIII Pekerjaan Plafond
1 Pekerjaan Pasangan Plafond Gypsum m² 96.00 110,950.00 10,651,200.00
2 Pekerjaan List Plafond m 82.50 22,250.00 1,835,625.00
12,486,825.00
IX Pekerjaan Atap
1 Pekerjaan Kuda-kuda Baja Ringan m² 64.00 261,800.00 16,755,200.00
2 Pekerjaan Pemasangan Listplank 3/30cm m 32.00 72,800.00 2,329,600.00
3 Pekerjaan Pemasangan Genteng Karangpilang m² 78.13 53,250.00 4,160,422.50
4 Pekerjaan Genteng Bubungan Karangpilang m 24.63 162,620.00 4,005,330.60
5 Pekerjaan Murda Paras buah 2.00 279,890.00 559,780.00
6 Pekerjaan Ikut Celedu buah 4.00 279,892.42 1,119,569.68
28,929,902.78
X Pekerjaan Sanitasi
1 Pekerjaan Pemasangan Kloset Duduk unit 3.00 3,052,500.00 9,157,500.00
2 Pekerjaan Pemasangan Floor Drain unit 3.00 67,650.00 202,950.00
3 Pekerjaan Pemasangan Kran Air unit 4.00 64,640.00 258,560.00
4 Pekerjaan Pemasangan Pipa Air Bersih m 65.00 35,210.00 2,288,650.00
5 Pekerjaan Pemasangan Pipa Pembuangan Air Kotor m 50.60 47,050.00 2,380,730.00
6 Pekerjaan Pemasangan Pipa Pembuangan Air Besar/Kecil m 20.10 47,050.00 945,705.00
7 Pekerjaan Pembuatan Septictank + Peresapan unit 1.00 7,248,050.00 7,248,050.00
8 Pekerjaan Pembuatan Bak Kontrol unit 1.00 395,680.00 395,680.00
22,877,825.00
XI Pekerjaan Penutup Lantai dan Dinding
1 Pekerjaan Pemasangan Keramik Lantai m² 74.75 245,690.00 18,365,327.50
2 Pekerjaan Pemasangan Keramik Lantai WC m² 11.50 94,350.00 1,085,025.00
3 Pekerjaan Pemasangan Keramik Lantai Tangga m² 12.00 90,960.00 1,091,520.00
20,541,872.50
XII Pekerjaan Pengecatan
1 Pekerjaan Pengecatan Tembok m² 246.76 46,810.00 11,550,835.60
2 Pekerjaan Pengecatan Plafond m² 96.00 46,810.00 4,493,760.00
3 Pekerjaan Cat Daun Jendela m² 24.15 48,500.00 1,171,275.00
4 Pekerjaan Polituran Daun Pintu m² 13.20 48,500.00 640,200.00
5 Pekerjaan Cat List Plafond m 5.78 48,500.00 280,330.00
6 Pekerjaan Cat Listplank m 9.60 48,500.00 465,600.00
18,602,000.60
XIII Pekerjaan Elektrikal
1 Pekerjaan Pemasangan Instalasi Listrik buah 34.00 211,500.00 7,191,000.00
2 Pekerjaan Pemasangan Instalasi Stop Kontak buah 16.00 211,500.00 3,384,000.00
3 Pekerjaan Pemasangan MCB buah 1.00 355,000.00 355,000.00
4 Pekerjaan Pemasangan Arde buah 1.00 600,000.00 600,000.00
5 Pekerjaan Pemasangan Stopkontak titik 16.00 25,400.00 406,400.00
6 Pekerjaan Pemasangan Saklar Tunggal titik 7.00 21,900.00 153,300.00
7 Pekerjaan Pemasangan Saklar Ganda titik 5.00 25,400.00 127,000.00
8 Pekerjaan Pemasangan Lampu SL 18 w buah 24.00 63,550.00 1,525,200.00
9 Pekerjaan Pemasangan Lampu Garden buah 10.00 290,600.00 2,906,000.00
10 Pekerjaan Pemasangan Penangkal Petir unit 1.00 6,000,000.00 6,000,000.00
22,647,900.00
XIV Pekerjaan Landscape
1 Pekerjaan Pemasangan Paving m² 24.50 127,075.00 3,113,337.50
2 Pekerjaan Pagar m³ 8.10 134,501.00 1,089,458.10
3 Pekerjaan Taman m² 105.45 125,000.00 13,181,250.00
17,384,045.60
XV Pekerjaan Lain-Lain
1 Pembersihan Akhir Ls 1.00 3,000,000.00 3,000,000.00
3,000,000.00

125
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : PEMBANGUNGAN RUMAH TINGGAL LANTAI II


LOKASI : Br. Cepaka Dalung-Kuta

NO URAIAN PEKERJAAN JUMLAH HARGA ( Rp )


I PEKERJAAN PERSIAPAN 6,254,935.00
II PEKERJAAN TANAH 9,430,409.00
III PEKERJAAN PASANGAN & PELESTERAN 92,712,423.80
IV PEKERJAAN KAYU 80,451,630.00
V PEKERJAAN BETON 35,285,013.00
VI PEKERJAAN BEKISTING 125,054,298.00
VII PEKERJAAN PEMBESIAN 102,370,590.00
VIII PEKERJAAN PLAFOND 12,486,825.00
IX PEKERJAAN ATAP 28,929,902.78
X PEKERJAAN SANITASI 22,877,825.00
XI PEKERJAAN PENUTUP LANTAI & DINDING 20,541,872.50
XII PEKERJAAN PENGECATAN 18,602,000.60
XIII PEKERJAAN ELEKTRIKAL 22,647,900.00
XVI PEKERJAAN LANDSCAPE 17,384,045.60
XVII PEKERJAAN LAIN-LAIN 3,000,000.00

REAL COST 598,029,670.28


PPN 10% 59,802,967.03
JUMLAH 657,832,637.31
DIBULATKAN 657,832,000.00

TERBILANG : Enam Ratus Lima Puluh Juta Juta Delapan Ratus Tiga Puluh Dua Ribu Rupiah

126
3.7. Time Schedule
Mas a Pelaks anaan
Harga Bobot Mas a Pemeliharaan
Bulan Ke -1 Bulan Ke -2 Bulan Ke -3
No Uraian Pekerjaan %
1 2 3 4 1 2 3 4 1 2 3 4
( Rp ) (% ) 90 Hari Kalender
7 hari 7 hari 7 hari 7 hari 7 hari 7 hari 7 hari 7 hari 7 hari 7 hari 7 hari 7 hari
100.000
I Pekerjaan Pers iapan
1 Pekerjaan Pengukuran dan Bowplank 6,517,967.70 1.171 1.171
2 Pekerjaan Pembers ihan Lapangan 1,733,062.50 0.311 0.311

II Pekerjaan Tanah
1 Pekerjaan Galian Pondas i Menerus 839,767.50 0.151 0.151
2 Pekerjaan Galian Pondas i Setempat 1,544,278.50 0.278 0.278
3 Pekerjaan Urugan Tanah Kembali 381,725.35 0.069 0.034 0.034
4 Pekerjaan Urugan Tanah untuk Peninggian Lantai 3,110,621.50 0.559 0.559
5 Pekerjaan Urugan Pas ir dibawah Pondas i 690,446.00 0.124 0.124
6 Pekerjaan Urugan Pas ir dibawah Lantai 907,545.00 0.163 0.163

III Pekerjaan Pas angan dan Peles teran 90.000


1 Pekerjaan Pas angan Batu Kos ong Pondas i Menerus 2,048,067.45 0.368 0.368
2 Pekerjaan Pas angan Batu Kali Pondas i Menerus 6,593,244.84 1.185 1.185
3 Pekerjaan Peles teran Pondas i Menerus 398,874.45 0.072 0.072
4 Pekerjaan Pas angan Batu Bata 1pc : 6ps 48,807,400.68 8.772 2.924 2.924 2.924
5 Pekerjaan Peles teran Dinding 26,587,896.48 4.778 1.593 1.593 1.593
6 Pekerjaan Acian Dinding 6,859,311.10 1.233 0.411 0.411 0.411
7 Pekerjaan Peles teran Pelat Tangga 260,279.50 0.047 0.047
8 Pekerjaan Acian Pelat Tangga 154,602.50 0.028 0.028

IV Pekerjaan Kayu
1 Pekerjaan Kus en 25,979,375.63 4.669 2.335 2.335
2 Pekerjaan Daun Pintu 9,073,680.00 1.631 0.815 0.815
3 Pekerjaan Daun Jendela 11,540,560.50 2.074 1.037 1.037 80.000

V Pekerjaan Beton
1 Pekerjaan Pondas i Telapak P1 3,743,982.00 0.673 0.336 0.336
2 Pekerjaan Pondas i Telapak P2 255,271.50 0.046 0.023 0.023
3 Pekerjaan Sloof 20x30cm 1,102,772.88 0.198 0.198
4 Pekerjaan Kolom 12x65cm 1,438,029.45 0.258 0.258
5 Pekerjaan Kolom 12x60cm 3,088,785.15 0.555 0.555
6 Pekerjaan Kolom 12x40cm 144,653.85 0.026 0.026
7 Pekerjaan Balok 15x50cm 3,063,258.00 0.551 0.551
8 Pekerjaan Balok 15x35cm 399,925.35 0.072 0.072
9 Pekerjaan Balok Anak 15x25cm 574,360.88 0.103 0.103
10 Pekerjaan Balok Ring 15x30cm 1,072,140.30 0.193 0.193
70.000
11 Pekerjaan Plat Lantai 5,105,430.00 0.918 0.918
12 Pekerjaan Balok Anak Tangga 1,131,703.65 0.203 0.203

VI Pekerjaan Bekis ting


1 Pekerjaan Pondas i Telapak P1 2,448,763.20 0.440 0.440
2 Pekerjaan Pondas i Telapak P2 204,063.60 0.037 0.037
3 Pekerjaan Sloof 20x30cm 2,873,895.70 0.516 0.516
4 Pekerjaan Kolom 12x65cm 13,385,287.44 2.406 1.203 1.203
5 Pekerjaan Kolom 12x60cm 29,205,361.08 5.249 2.624 2.624
6 Pekerjaan Kolom 12x40cm 1,505,140.56 0.271 0.135 0.135
7 Pekerjaan Balok 15x50cm 18,256,230.72 3.281 1.641 1.641
8 Pekerjaan Balok 15x35cm 2,294,567.46 0.412 0.206 0.206
9 Pekerjaan Balok Anak 15x25cm 3,084,500.52 0.554 0.277 0.277 60.000
10 Pekerjaan Balok Ring 15x30cm 5,968,383.12 1.073 1.073
11 Pekerjaan Plat Lantai 44,872,200.00 8.064 4.032 4.032
12 Pekerjaan Balok Anak Tangga 5,725,969.80 1.029 1.029

VII Pekerjaan Pembes ian


1 Pekerjaan Pondas i Telapak P1 5,251,419.23 0.944 0.472 0.472
2 Pekerjaan Pondas i Telapak P2 365,316.12 0.066 0.033 0.033
3 Pekerjaan Sloof 20x30cm 10,729,404.70 1.928 1.928
4 Pekerjaan Kolom 12x65cm 20,516,246.97 3.687 1.844 1.844
5 Pekerjaan Kolom 12x60cm 19,320,773.39 3.472 1.736 1.736
6 Pekerjaan Kolom 12x40cm 14,538,879.05 2.613 1.306 1.306
7 Pekerjaan Balok 15x50cm 10,026,288.26 1.802 0.901 0.901
8 Pekerjaan Balok 15x35cm 8,273,005.06 1.487 0.743 0.743 50.000
9 Pekerjaan Balok Anak 15x25cm 1,490,068.25 0.268 0.134 0.134
10 Pekerjaan Balok Ring 15x30cm 2,760,478.48 0.496 0.496
11 Pekerjaan Plat Lantai 11,252,204.85 2.022 1.011 1.011
12 Pekerjaan Balok Anak Tangga 3,809,591.44 0.685 0.685

VIII Pekerjaan Plafond


1 Pekerjaan Pas angan Plafond Gyps um 9,370,348.80 1.684 1.684
2 Pekerjaan Lis t Plafond 3,689,812.50 0.663 0.663

IX Pekerjaan Atap
1 Pekerjaan Kuda-kuda Baja Ringan 16,755,784.96 3.011 3.011
2 Pekerjaan Pemas angan Lis tplank 3/30cm 3,885,600.00 0.698 0.698
40.000
3 Pekerjaan Pemas angan Genteng Karangpilang 8,068,485.10 1.450 1.450
4 Pekerjaan Genteng Bubungan Karangpilang 2,621,469.42 0.471 0.471
5 Pekerjaan Murda Paras 559,784.84 0.101 0.101
6 Pekerjaan Ikut Celedu 1,119,569.68 0.201 0.201

X Pekerjaan Sanitas i
1 Pekerjaan Pemas angan Klos et Duduk 8,277,384.00 1.488 1.488
2 Pekerjaan Pemas angan Floor Drain 150,000.00 0.027 0.027
3 Pekerjaan Pemas angan Kran Air 126,148.00 0.023 0.023
4 Pekerjaan Pemas angan Pipa Air Bers ih 2,214,403.75 0.398 0.099 0.099 0.099 0.099
5 Pekerjaan Pemas angan Pipa Pembuangan Air Kotor 2,561,232.85 0.460 0.115 0.115 0.115 0.115
6 Pekerjaan Pemas angan Pipa Pembuangan Air Bes ar/Kecil 2,467,476.00 0.443 0.111 0.111 0.111 0.111
7 Pekerjaan Pembuatan Septictank + Peres apan 6,859,854.09 1.233 1.233 30.000
8 Pekerjaan Pembuatan Bak Kontrol 375,000.00 0.067 0.067

XI Pekerjaan Penutup Lantai dan Dinding


1 Pekerjaan Pemas angan Keramik Lantai 10,819,688.75 1.945 0.972 0.972
2 Pekerjaan Pemas angan Keramik Lantai WC 1,800,911.50 0.324 0.162 0.162
3 Pekerjaan Pemas angan Keramik Lantai Tangga 2,010,577.09 0.361 0.181 0.181

XII Pekerjaan Pengecatan


1 Pekerjaan Pengecatan Tembok 5,159,726.92 0.927 0.927
2 Pekerjaan Pengecatan Plafond 2,007,350.40 0.361 0.361
3 Pekerjaan Cat Daun Jendela 1,174,003.95 0.211 0.105 0.105
4 Pekerjaan Polituran Daun Pintu 641,691.60 0.115 0.058 0.058
5 Pekerjaan Cat Lis t Plafond 280,983.14 0.050 0.050 20.000
6 Pekerjaan Cat Lis tplank 466,684.80 0.084 0.084

XIII Pekerjaan Elektrikal


1 Pekerjaan Pemas angan Ins talas i Lis trik 10,764,400.00 1.935 0.967 0.967
2 Pekerjaan Pemas angan Ins talas i Stop Kontak 5,065,600.00 0.910 0.455 0.455
3 Pekerjaan Pemas angan MCB 700,000.00 0.126 0.126
4 Pekerjaan Pemas angan Arde 600,000.00 0.108 0.108
5 Pekerjaan Pemas angan Stopkontak 406,400.00 0.073 0.073
6 Pekerjaan Pemas angan Saklar Tunggal 153,300.00 0.028 0.028
7 Pekerjaan Pemas angan Saklar Ganda 127,000.00 0.023 0.023
8 Pekerjaan Pemas angan Lampu SL 18 w 4,200,000.00 0.755 0.755
9 Pekerjaan Pemas angan Lampu Garden 1,250,000.00 0.225 0.225
10.000
10 Pekerjaan Pemas angan Penangkal Petir 6,000,000.00 1.078 1.078

XIV Pekerjaan Lands cape


1 Pekerjaan Pemas angan Paving 3,113,337.50 0.560 0.560
2 Pekerjaan Pagar 1,089,458.10 0.196 0.196
3 Pekerjaan Taman 13,181,250.00 2.369 1.184 1.184

XV Pekerjaan Lain-Lain
1 Pembers ihan Akhir 3,000,000.00 0.539 0.539

556,421,776.89 100.000
0.000
Jumlah Perminggu 3.803 6.796 8.849 9.688 15.587 15.794 7.014 5.956 4.814 11.491 7.341 2.866
RENCANA
Jumlah Komulatif 3.803 10.599 19.448 29.136 44.723 60.517 67.531 73.488 78.302 89.793 97.134 100.000
Jumlah Perminggu
REALISASI
Jumlah Komulatif

127
3.8. Saldo Awal
RENCANA PENERIMAAN
PROYEK PEMBANGUNAN RUMAH TINGGAL LANTAI 2

Real
cost = Rp. 598,029,670.28

Pembayaran dilakukan dengan rincian sebagai berikut (Diasumsikan terima langsung cair) :

RINCIAN
NO URAIAN 0% BOBOT 50% BOBOT 75% BOBOT 100% BOBOT
I II III IV
I Persentasi 25 50 75 100
II Prosentase (%) Penerimaan 25 25 25 25
Rp. Rp. Rp. Rp.
III Penerimaan Kotor 149,507,417.57 149,507,417.57 149,507,417.57 149,507,417.57

Pembayaran Gaji Pegawai


10% Nilai Kontrak = Rp. 59,802,967.03
Gaji Perbulan = Rp. 9,967,161.17

NERACA SALDO
Aktiva Pasiva
Kas Rp. 149,507,417.57 Hutang -

Berasal dari aset yang dimiliki Modal (25%) Rp. 149,507,417.57

Jumlah Aktiva Rp. 149,507,417.57 Jumlah Pasiva Rp. 149,507,417.57

128
3.9. Transaksi Januari
Transaksi pembelian bulan Januari
Uraian H. Satuan Harga (Rp) Jumlah (Rp) Jumlah (Rp)
Tanggal Vol
Penggunaan Bahan dan material (Rp) Upah Bahan Upah Bahan Debet Kredit
2018
Januari 1 Kas 149,507,417.57
Minggu 1 Pembayaran Uang Muka (DP) = Termin I 149,507,417.57

2 Pembelian Material
Pengukuran dan Pemasangan Bouwplank 52.900
0.02 Kayu kaso 5/7 borneo 3,600,000.00 72,000.00 3,808,800.00 3,808,800.00
0.02 Paku 5 - 10 cm 15,000.00 300.00 15,870.00 15,870.00
0.00 Papan Papan kayu terentang 2/20 2,400,000.00 9,600.00 507,840.00 507,840.00
4,332,510.00 4,332,510.00
Kas 4,332,510.00

2 Pembelian Material
Pekerjaan Bekisting Pondasi Telapak P1 14.400
0.04 Papan kayu terentang 2,400,000.00 96,000.00 1,382,400.00 1,382,400.00
0.30 Paku 5 - 12 cm 4,300.00 1,290.00 18,576.00 18,576.00
0.10 Pelumas begisting (oli/minyak) 12,000.00 1,200.00 17,280.00 17,280.00
1,418,256.00 1,418,256.00
Kas 1,418,256.00

2 Pembelian Material
Pekerjaan Bekisting Pondasi Telapak P2 1.200
0.04 Papan kayu terentang 2,400,000.00 96,000.00 115,200.000 115,200.000
0.30 Paku 5 - 12 cm 4,300.00 1,290.00 1,548.000 1,548.000
0.10 Pelumas begisting (oli/minyak) 12,000.00 1,200.00 1,440.000 1,440.000
118,188.00 118,188.000
Kas 118,188.00

2 Pembelian Material
Pekerjaan Bekisting Sloof 20x30cm 84.800
0.05 Papan kayu terentang 2,400,000.00 108,000.00 9,158,400.000 9,158,400.000
0.30 Paku 5 - 12 cm 15,000.00 4,500.00 381,600.000 381,600.000
0.10 Pelumas begisting (oli/minyak) 12,000.00 1,200.00 101,760.000 101,760.000
9,641,760.000 9,641,760.000
Kas 9,641,760.00

2 Pembelian Material
Pekerjaan Pembesian Pondasi Telapak P1 773.740
1.050 Besi Beton(Polos/Ulir) 9,200.00 9,660.00 7,474,328.40 7,474,328.40
0.150 Kawat Beton 15,000.00 2,250.00 1,740,915.00 1,740,915.00
9,215,243.40 9,215,243.40
Kas 9,215,243.40

2 Pembelian Material

129
2 Pembelian Material
Pekerjaan Pembesian Pondasi Telapak P2 62.400
1.050 Besi Beton(Polos/Ulir) 9,200.00 9,660.00 602,784.00 602,784.00
0.150 Kawat Beton 15,000.00 2,250.00 140,400.00 140,400.00
743,184.00 743,184.00
Kas 743,184.00

2 Pembelian Material
Pekerjaan Beton Pondasi Telapak P1 4.400
8.00 Semen PC (abu-abu) 62,000.00 496,000.00 2,182,400.000 2,182,400.000
0.55 Pasir Beton 250,000.00 137,500.00 605,000.000 605,000.000
0.70 Splitz (batu pecah) 178,000.00 124,600.00 548,240.000 548,240.000
758,100.00 3,335,640.000 3,335,640.000
Kas 3,335,640.00

2 Pembelian Material
Pekerjaan Beton Pondasi Telapak P2 0.300
8.00 Semen PC (abu-abu) 62,000.00 496,000.00 148,800.000 148,800.000
0.55 Pasir Beton 250,000.00 137,500.00 41,250.000 41,250.000
0.70 Splitz (batu pecah) 178,000.00 124,600.00 37,380.000 37,380.000
758,100.00 227,430.000 227,430.000
Kas 227,430.00

7 Pembelian Material
Pekerjaan Urugan Pasir dibawah Pondasi 3.880
1.20 Pasir Urug 200,000.00 240,000.00 931,200.000 931,200.000
Kas 931,200.000

7 Pembelian Material
Pekerjaan Urugan Pasir dibawah Lantai 5.100
1.200 Pasir Urug 200,000.00 240,000.00 1,224,000.000 1,224,000.000
Kas 1,224,000.000

7 Pembelian Material
Pekerjaan Pasangan Batu Kosong Pondasi Menerus 5.850
1.20 Batu Belah 225,000.00 270,000.00 1,579,500.000 1,579,500.000
0.30 Pasir Urug 200,000.00 60,000.00 351,000.000 351,000.000
1,930,500.000 1,930,500.000
Kas 1,930,500.000

7 Pembelian Material
Pekerjaan Pasangan Batu Kali Pondasi Menerus 10.920
1.10 Batu Belah 225,000.00 247,500.00 2,702,700.000 2,702,700.000
2.72 Semen PC (abu-abu) 62,000.00 168,640.00 1,841,548.800 1,841,548.800
0.54 Pasir Pasang 225,000.00 122,400.00 1,336,608.000 1,336,608.000
5,880,856.800 5,880,856.800
Kas 5,880,856.800

130
7 Pembelian Material
Pekerjaan Pembuatan Septictank + Peresapan 1.000
1.00 Pompa Air 100 Watt 1,125,000.00 1,125,000.00 1,125,000.000 1,125,000.000
1.00 Perlengkapan ( 25% harga pompa ) 281,250.00 281,250.00 281,250.000 281,250.000
1,406,250.000 1,406,250.00
Kas 1,406,250.00

7 Pembelian Material
Pekerjaan Pembesian Sloof 20x30cm 1418.780
1.10 Besi Beton Ulir 9,200.00 10,120.00 14,358,053.60 14,358,053.60
0.02 Kawat Beton 15,000.00 225.00 319,225.50 319,225.50
14,677,279.10 14,677,279.10
Kas 14,677,279.10

14 Pembelian Material
Pekerjaan Bekisting Kolom 12x65cm 33.260
0.04 Papan kayu terentang 2,400,000.00 96,000.00 3,192,960.00 3,192,960.00
0.40 Paku 5 - 12 cm 15,000.00 6,000.00 199,560.00 199,560.00
0.20 Pelumas begisting (oli/minyak) 12,000.00 2,400.00 79,824.00 79,824.00
0.04 Balok Kayu Borneo 3,600,000.00 144,000.00 4,789,440.00 4,789,440.00
0.35 Multiplex 120 x 240 x 9 mm 105,000.00 36,750.00 1,222,305.00 1,222,305.00
9,484,089.00 9,484,089.00
Kas 9,484,089.00

14 Pembelian Material
Pekerjaan Bekisting Kolom 12x60cm 72.570
0.04 Papan kayu terentang 2,400,000.00 96,000.00 6,966,720.00 6,966,720.00
0.40 Paku 5 - 12 cm 15,000.00 6,000.00 435,420.00 435,420.00
0.20 Pelumas begisting (oli/minyak) 12,000.00 2,400.00 174,168.00 174,168.00
0.04 Balok Kayu Borneo 3,600,000.00 144,000.00 10,450,080.00 10,450,080.00
0.35 Multiplex 120 x 240 x 9 mm 105,000.00 36,750.00 2,666,947.50 2,666,947.50
20,693,335.50 20,693,335.50
Kas 20,693,335.50

14 Pembelian Material
Pekerjaan Bekisting Kolom 12x40cm 3.740
0.04 Papan kayu terentang 2,400,000.00 96,000.00 359,040.00 359,040.00
0.40 Paku 5 - 12 cm 15,000.00 6,000.00 22,440.00 22,440.00
0.20 Pelumas begisting (oli/minyak) 12,000.00 2,400.00 8,976.00 8,976.00
0.04 Balok Kayu Borneo 3,600,000.00 144,000.00 538,560.00 538,560.00
0.35 Multiplex 120 x 240 x 9 mm 105,000.00 36,750.00 137,445.00 137,445.00
1,066,461.00 1,066,461.00
Kas 1,066,461.00

14 Pembelian Material
Pekerjaan Pembesian Kolom 12x65cm 385.560
1.10 Besi Beton Ulir 9,200.00 10,120.00 3,901,867.200 3,901,867.20
0.02 Kawat Beton 15,000.00 225.00 86,751.000 86,751.00
3,988,618.200 3,988,618.20
Kas 3,988,618.20

131
14 Pembelian Material
Pekerjaan Pembesian Kolom 12x60cm 847.230
1.10 Besi Beton Ulir 9,200.00 10,120.00 8,573,967.600 8,573,967.60
0.02 Kawat Beton 15,000.00 225.00 190,626.750 190,626.75
8,764,594.350 8,764,594.35
Kas 8,764,594.35

14 Pembelian Material
Pekerjaan Pembesian Kolom 12x40cm 45.540
1.10 Besi Beton Ulir 9,200.00 10,120.00 460,864.800 460,864.80
0.02 Kawat Beton 15,000.00 225.00 10,246.500 10,246.50
471,111.300 471,111.30
Kas 471,111.30
Minggu 4 21 Pembelian Material
Pekerjaan Beton Kolom 12x65cm 1.690
8.00 Semen PC (abu-abu) 62,000.00 496000.000 838240 838,240.00
0.55 Pasir Beton 250,000.00 137500.000 232375 232,375.00
0.70 Splitz (batu pecah) 178,000.00 124600.000 210574 210,574.00
1281189 1,281,189.00
Kas 1,281,189.00

21 Pembelian Material
Pekerjaan Beton Kolom 12x60cm 3.630
8.00 Semen PC (abu-abu) 62,000.00 496000.000 1800480 1,800,480.00
0.55 Pasir Beton 250,000.00 137500.000 499125 499,125.00
0.70 Splitz (batu pecah) 178,000.00 124600.000 452298 452,298.00
2751903 2,751,903.00
Kas 2,751,903.00

21 Pembelian Material
Pekerjaan Beton Kolom 12x40cm 0.170
8.00 Semen PC (abu-abu) 62,000.00 496000.000 84320 84,320.00
0.55 Pasir Beton 250,000.00 137500.000 23375 23,375.00
0.70 Splitz (batu pecah) 178,000.00 124600.000 21182 21,182.00
128877 128,877.00
Kas 128,877.00

Januari 7 Pembayaran Upah


Pekerjaan Pengukuran dan Bowplank 52.900
0.10 Tukang Kayu 90,000.00 9,000.00 476,100.00 476,100.00
0.10 Pembantu Tukang 50,000.00 5,000.00 264,500.00 264,500.00
740,600.00 740,600.00
740,600.00
7 Pembayaran Upah
Pekerjaan Pembersihan Lapangan 177.750
0.100 Pekerja 80,000.00 8,000.00 1,422,000.00 1,422,000.00
0.050 Mandor 65,000.00 3,250.00 577,687.50 577,687.50
1,999,687.50 1,999,687.50
Kas 1,999,687.50

132
7 Pembayaran Upah
Pekerjaan Galian Pondasi Menerus 21.060
0.40 Pembantu Tukang 65,000.00 26,000.00 547,560.000 547,560.000
0.02 Tukang Gali 65,000.00 1,300.00 27,378.000 27,378.000
574,938.00 574,938.000
Kas 574,938.000

7 Pembayaran Upah
Pekerjaan Galian Pondasi Setempat 31.340
0.53 Pembantu Tukang 65,000.00 34,450.00 1,079,663.000 1,079,663.000
0.02 Tukang Gali 65,000.00 1,300.00 40,742.000 40,742.000
1,120,405.00 1,120,405.000
Kas 1,120,405.000

7 Pembayaran Upah
Pekerjaan Urugan Tanah Kembali 33.470
0.19 Pembantu Tukang 65,000.00 12,350.00 413,354.500 413,354.500
0.02 Tukang Gali 65,000.00 1,300.00 43,511.000 43,511.000
456,865.50 456,865.50
Kas 456,865.50

7 Pembayaran Upah
Pekerjaan Pembesian Pondasi Telapak P1 773.740
0.01 Pembantu Tukang 65,000.00 650.00 502,931.00 502,931.00
0.02 Tukang Besi 85,000.00 1,700.00 1,315,358.00 1,315,358.00
1,818,289.00 1,818,289.00
Kas 1,818,289.00

7 Pembayaran Upah
Pekerjaan Pembesian Pondasi Telapak P2 62.400
0.01 Pembantu Tukang 65,000.00 650.00 40,560.00 40,560.00
0.02 Tukang Besi 85,000.00 1,700.00 106,080.00 106,080.00
146,640.00 146,640.00
Kas 146,640.00

7 Pembayaran Upah
Pekerjaan Bekisting Pondasi Telapak P1 14.400
0.30 Pembantu Tukang 65,000.00 19,500.00 280,800.00 280,800.00
0.26 Tukang Kayu 80,000.00 20,800.00 299,520.00 299,520.00
580,320.00 580,320.00
Kas 580,320.00

7 Pembayaran Upah
Pekerjaan Bekisting Pondasi Telapak P2 1.200
0.30 Pembantu Tukang 65,000.00 19,500.00 23,400.00 23,400.00
0.26 Tukang Kayu 80,000.00 20,800.00 24,960.00 24,960.00
48,360.00 48,360.00
Kas 48,360.00

133
7 Pembayaran Upah
Pekerjaan Bekisting Sloof 20x30cm 84.800
0.30 Pembantu Tukang 65,000.00 19,500.000 1,653,600.000 1,653,600.000
0.26 Tukang Kayu 80,000.00 20,800.000 1,763,840.000 1,763,840.000
3,417,440.000 3,417,440.000
Kas 3,417,440.00

14 Pembayaran Upah
Pekerjaan Urugan Pasir dibawah Pondasi 3.880
0.30 Pembantu Tukang 65,000.00 19,500.00 75,660.00 75,660.000
0.02 Tukang Gali 65,000.00 1,300.00 5,044.00 5,044.000
80,704.00 80,704.000
Kas 80,704.000

14 Pembayaran Upah
Pekerjaan Urugan Pasir dibawah Lantai 5.100
0.30 Pembantu Tukang 65,000.00 19,500.00 99,450.00 99,450.000
0.02 Tukang Gali 65,000.00 1,300.00 6,630.00 6,630.000
106,080.00 106,080.000
Kas 106,080.000

14 Pembayaran Upah
Pekerjaan Beton Pondasi Telapak P1 4.400
2.02 Pembantu Tukang 65,000.00 131,300.00 577,720.00 577,720.00
0.40 Tukang Batu 80,000.00 32,000.00 140,800.00 140,800.00
718,520.00 718,520.00
Kas 718,520.00

14 Pembayaran Upah
Pekerjaan Beton Pondasi Telapak P2 0.300
2.02 Pembantu Tukang 65,000.00 131,300.00 39,390.00 39,390.00
0.40 Tukang Batu 80,000.00 32,000.00 9,600.00 9,600.00
48,990.00 48,990.00
Kas 48,990.00

Januari 14 Pembayaran Upah


Pekerjaan Pasangan Batu Kosong Pondasi Menerus 5.850
0.78 Pembantu Tukang 65,000.00 50,700.00 296595.00 296,595.000
0.39 Tukang Batu 80,000.00 31,200.00 182520.00 182,520.000
479115.00 479,115.000
Kas 479,115.00

14 Pembayaran Upah
Pekerjaan Pasangan Batu Kali Pondasi Menerus 10.920
1.50 Pembantu Tukang 65,000.00 97,500.00 1064700.00 1,064,700.000
0.60 Tukang Batu 80,000.00 48,000.00 524160.00 524,160.000
1588860.00 1,588,860.000
Kas 1,588,860.00

134
14 Pembayaran Upah
Pekerjaan Pelesteran Pondasi Menerus 16.770
0.20 Pembantu Tukang 65,000.00 13,000.00 218010.00 218,010.000
0.15 Tukang Batu 80,000.00 12,000.00 201240.00 201,240.000
419250.00 419,250.000
Kas 419,250.00

14 Pembayaran Upah
Pekerjaan Pembesian Sloof 20x30cm 1418.780
0.01 Pembantu Tukang 65,000.00 650.00 922207.00 922207.000
0.02 Tukang Besi 85,000.00 1700.00 2411926.00 2411926.000
3,334,133.00 3,334,133.00
Kas 3,334,133.00

14 Pembayaran Upah
Pekerjaan Beton Sloof 20x30cm 6.360
1.650 Pekerja 50,000.00 82500.00 524700.00 524700.000
0.275 Tukang Besi 90,000.00 24750.00 157410.00 157410.000
0.028 Kepala Tukang 100,000.00 2800.00 17808.00 17808.000
0.083 Mandor 125,000.00 10375.00 65985.00 65985.000
765,903.00 765,903.00
Kas 765,903.00

Januari 31 Pembayaran Upah


Pekerjaan Bekisting Kolom 12x65cm 33.260
0.30 Pembantu Tukang 65,000.00 19,500.00 648,570.00 648,570.00
0.33 Tukang Kayu 80,000.00 26,400.00 878,064.00 878,064.00
1,526,634.00 1,526,634.00
Kas 1,526,634.00

31 Pembayaran Upah
Pekerjaan Bekisting Kolom 12x60cm 72.570
0.30 Pembantu Tukang 65,000.00 19,500.00 1,415,115.00 1,415,115.00
0.33 Tukang Kayu 80,000.00 26,400.00 1,915,848.00 1,915,848.00
3,330,963.00 3,330,963.00
Kas 3,330,963.00

31 Pembayaran Upah
Pekerjaan Bekisting Kolom 12x40cm 3.740
0.30 Pembantu Tukang 65,000.00 19,500.00 72,930.00 72,930.00
0.33 Tukang Kayu 80,000.00 26,400.00 98,736.00 98,736.00
171,666.00 171,666.00
Kas 171,666.00

31 Pembayaran Upah
Pekerjaan Pembesian Kolom 12x65cm 385.560
0.01 Pembantu Tukang 65,000.00 650.00 250,614.00 250,614.00
0.02 Tukang Besi 85,000.00 1,700.00 655,452.00 655,452.00
906,066.00 906,066.00
Kas 906,066.00

135
31 Pembayaran Upah
Pekerjaan Pembesian Kolom 12x60cm 847.230
0.01 Pembantu Tukang 65,000.00 650.00 550,699.50 550,699.50
0.02 Tukang Besi 85,000.00 1,700.00 1,440,291.00 1,440,291.00
1,990,990.50 1,990,990.50
Kas 1,990,990.50

31 Pembayaran Upah
Pekerjaan Pembesian Kolom 12x40cm 45.540
0.01 Pembantu Tukang 65,000.00 650.00 29,601.00 29,601.00
0.02 Tukang Besi 85,000.00 1,700.00 77,418.00 77,418.00
107,019.00 107,019.00
Kas 107,019.00

31 Pembayaran Upah
Pekerjaan Beton Kolom 12x65cm 1.690
2.02 Pembantu Tukang 65,000.00 131,300.00 221,897.00 221,897.00
0.40 Tukang Batu 80,000.00 32,000.00 54,080.00 54,080.00
275,977.00 275,977.00
Kas 275,977.00

31 Pembayaran Upah
Pekerjaan Beton Kolom 12x60cm 3.630
2.02 Pembantu Tukang 65,000.00 131,300.00 476,619.00 476,619.00
0.40 Tukang Batu 80,000.00 32,000.00 116,160.00 116,160.00
592,779.00 592,779.00
Kas 592,779.00

31 Pembayaran Upah
Pekerjaan Beton Kolom 12x40cm 0.170
2.02 Pembantu Tukang 65,000.00 131,300.00 22,321.00 22,321.00
0.40 Tukang Batu 80,000.00 32,000.00 5,440.00 5,440.00
27,761.00 27,761.00
Kas 27,761.00

136
3.10. Jurnal Januari

No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
2018
Januari 1 Kas 1 149,507,417.57
Modal Perusahaan 50 149,507,417.57
Untuk mencatat penanaman modal dalam perusahaan
(25% harga proyek)

1 Kas 1 149,507,417.57
Termin 10 149,507,417.57
Pembayaran Uang Muka (DP) = Termin I

2 Material 20
Kayu kaso 5/7 borneo 3,808,800.00
Paku 5 - 10 cm 15,870.00
Papan Papan kayu terentang 2/20 507,840.00
4,332,510.00
Kas 1 4,332,510.00
Pembelian material untuk pekerjaan pengukuran
dan pemasangan bouwplank

2 Material 20
Papan kayu terentang 1,382,400.00
Paku 5 - 12 cm 18,576.00
Pelumas begisting (oli/minyak) 17,280.00
1,418,256.00
Kas 1 1,418,256.00
Pembelian material untuk pekerjaan
bekisting pondasi telapak P1

2 Material 20
Papan kayu terentang 115,200.00
Paku 5 - 12 cm 1,548.00
Pelumas begisting (oli/minyak) 1,440.00
118,188.00
Kas 1 118,188.00
Pembelian material untuk pekerjaan
bekisting pondasi telapak P2

Jumlah dipindahkan 304,883,789.14 304,883,789.14

137
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 304,883,789.14 304,883,789.14
2018
Januari 2 Material 20
Papan kayu terentang 9,158,400.00
Paku 5 - 12 cm 381,600.00
Pelumas begisting (oli/minyak) 101,760.00
9,641,760.00
Kas 1 9,641,760.00
Pembelian material untuk pekerjaan bekisting
pondasi Sloof 20/30

2 Material 20
Besi Beton(Polos/Ulir) 7,474,328.40
Kawat Beton 1,740,915.00
9,641,760.00
Kas 1 9,641,760.00
Pembelian material untuk pekerjaan
pembesian pondasi telapak P1

2 Material 20
Besi Beton(Polos/Ulir) 602,784.00
Kawat Beton 140,400.00
743,184.00
Kas 1 743,184.00
Pembelian material untuk pekerjaan
pembesian pondasi telapak P2

2 Material 20
Semen PC (abu-abu) 148,800.00
Pasir Beton 41,250.00
Splitz (batu pecah) 37,380.00
227,430.00
Kas 1 227,430.00
Pembelian material untuk pekerjaan
beton pondasi telapak P1

2 Material 20
Semen PC (abu-abu) 148,800.00
Pasir Beton 41,250.00
Splitz (batu pecah) 37,380.00
227,430.00
Kas 1 227,430.00
Pembelian material untuk pekerjaan
beton pondasi telapak P2

Jumlah dipindahkan 325,365,353.14 325,365,353.14

138
139
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 325,365,353.14 325,365,353.14
2018
Januari 7 Upah Tenaga Kerja 30
Tukang Kayu 476,100.00
Pembantu Tukang 264,500.00
740,600.00
Kas 1 740,600.00
Pembayaran upah tenaga kerja untuk pekerjaan
pengukuran dan bowplank

7 Upah Tenaga Kerja 30


Pekerja 1,422,000.00
Mandor 577,687.50
1,999,687.50
Kas 1 1,999,687.50
Pembayaran upah tenaga kerja untuk pekerjaan
pembersihan lapangan

7 Upah Tenaga Kerja 30


Pembantu Tukang 547,560.00
Tukang Gali 27,378.00
574,938.00
Kas 1 574,938.00
Pembayaran upah tenaga kerja untuk pekerjaan
Galian Pondasi Menerus

7 Upah Tenaga Kerja 30


Pembantu Tukang 413,354.50
Tukang Gali 43,511.00
456,865.50
Kas 1 456,865.50
Pembayaran upah tenaga kerja untuk pekerjaan
urugan tanah kembali

7 Upah Tenaga Kerja 30


Pembantu Tukang 502,931.00
Tukang Besi 1,315,358.00
1,818,289.00
Kas 1 1,818,289.00
Pembayaran upah tenaga kerja untuk pekerjaan
pembesian pondasi telapak P1

Jumlah Dipindahkan 330,955,733.14 330,955,733.14

140
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 330,955,733.14 330,955,733.14
2018
Januari 7 Upah Tenaga Kerja 30
Pembantu Tukang 40,560.00
Tukang Besi 106,080.00
146,640.00
Kas 1 146,640.00
Pembayaran upah tenaga kerja untuk pekerjaan
pembesian pondasi telapak P2

7 Upah Tenaga Kerja 30


Pembantu Tukang 280,800.00
Tukang Kayu 299,520.00
580,320.00
Kas 1 580,320.00
Pembayaran upah tenaga kerja untuk pekerjaan
bekesting pondasi telapak P1

7 Upah Tenaga Kerja 30


Pembantu Tukang 23,400.00
Tukang Kayu 24,960.00
48,360.00
Kas 1 48,360.00
Pembayaran upah tenaga kerja untuk pekerjaan
bekesting pondasi telapak P2

7 Upah Tenaga Kerja 30


Pembantu Tukang 1,653,600.00
Tukang Kayu 1,763,840.00
3,417,440.00
Kas 1 3,417,440.00
Pembayaran upah tenaga kerja untuk pekerjaan
bekesting sloof 20/30

Jumlah Dipindahkan 335,148,493.14 335,148,493.14

141
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 335,148,493.14 335,148,493.14

2018 7 Material 20
Januari Pasir Urug 931,200.00
Kas 1 931,200.00
Pembelian material untuk pekerjaan
Urugan pasir dibawah pondasi

7 Material 20
Pasir Urug 1,224,000.00
Kas 1,224,000.00
Pembelian material untuk pekerjaan
urugan pasir dibawah lantai

7 Material 20
Batu Belah 1,579,500.00
Pasir Urug 351,000.00
1,930,500.00
Kas 1 1,930,500.00
Pembelian material untuk pekerjaan
pasangan batu kosong pondasi menerus

7 Material 20
Batu Belah 2,702,700.00
Semen PC (abu-abu) 1,841,548.80
Pasir Pasang 1,336,608.00
5,880,856.80
Kas 1 5,880,856.80
Pembelian material untuk pekerjaan
pasangan batu kali pondasi menerus

7 Material 20
Sepictank & Peresapan 1,406,250.000
Kas 1 1,406,250.00
Pembelian material untuk pekerjaan
pembuatan sepitank

7 Material 20
Besi Beton (polos/ulir) 14,358,053.60
Kawat Beton 319,225.50
14,677,279.10
Kas 1 14,677,279.10
Pembelian material untuk pekerjaan
pembesian Sloof 20/30

Jumlah Dipindahkan 361,198,579.04 361,198,579.04

142
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 361,198,579.04 361,198,579.04

2018 14 Upah Tenaga Kerja 30


Januari Pembantu Tukang 75,660.00
Tukang Gali 5,044.00
80,704.00
Kas 1 80,704.00
Pembayaran upah tenaga kerja untuk pekerjaan
urugan pasir dibawah pondasi

14 Upah Tenaga Kerja 30


Pembantu Tukang 99,450.00
Tukang Gali 6,630.00
106,080.00
Kas 1 106,080.00
Pembayaran upah tenaga kerja untuk pekerjaan
urugan pasir dibawah lantai

14 Upah Tenaga Kerja 30


Pembantu Tukang 577,720.00
Tukang Batu 140,800.00
718,520.00
Kas 1 718,520.00
Pembayaran upah tenaga kerja untuk pekerjaan
Beton pondasi telapak P1

14 Upah Tenaga Kerja 30


Pembantu Tukang 39,390.00
Tukang Batu 9,600.00
48,990.00
Kas 1 48,990.00
Pembayaran upah tenaga kerja untuk pekerjaan
Beton Pondasi Telapak P2

Jumlah Dipindahkan 362,152,873.04 362,152,873.04

143
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 362,152,873.04 362,152,873.04
2018
Januari 14 Upah Tenaga Kerja 30
Pembantu Tukang 296,595.00
Tukang Batu 182,520.00
479,115.00
Kas 1 479,115.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pasangan Batu Kosong Pondasi Menerus

14 Upah Tenaga Kerja 30


Pembantu Tukang 1,064,700.00
Tukang Batu 524,160.00
1,588,860.00
Kas 1 1,588,860.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pasangan batu kali pondasi menerus

14 Upah Tenaga Kerja 30


Pembantu Tukang 218,010.00
Tukang Batu 201,240.00
419,250.00
Kas 1 419,250.00
Pembayaran upah tenaga kerja untuk pekerjaan
pelesteran pondasi menerus

14 Upah Tenaga Kerja 30


Pembantu Tukang 922,207.00
Tukang Besi 2,411,926.00
3,334,133.00
Kas 1 3,334,133.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pembesian sloof 20/30

14 Upah Tenaga Kerja 30


Pekerja 524,700.00
Tukang Besi 157,410.00
Kepala Tukang 17,808.00
Mandor 65,985.00
765,903.00
Kas 1 765,903.00
Pembayaran upah tenaga kerja untuk pekerjaan
Beton Sloof 20/30

Jumlah Dipindahkan 368,740,134.04 368,740,134.04

144
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 368,740,134.04 368,740,134.04

2018 14 Material 20
Januari Papan kayu terentang 3,192,960.00
Paku 5 - 12 cm 199,560.00
Pelumas begisting (oli/minyak) 79,824.00
Balok Kayu Borneo 4,789,440.00
Multiplex 120 x 240 x 9 mm 1,222,305.00
9,484,089.00
Kas 1 9,484,089.00
Pembelian material untuk pekerjaan
Bekisting kolom 12x65

14 Material 20
Papan kayu terentang 6,966,720.00
Paku 5 - 12 cm 435,420.00
Pelumas begisting (oli/minyak) 174,168.00
Balok Kayu Borneo 10,450,080.00
Multiplex 120 x 240 x 9 mm 2,666,947.50
20,693,335.50
Kas 1 20,693,335.50
Pembelian material untuk pekerjaan
Bekisting kolom 12x60

14 Material 20
Papan kayu terentang 359,040.00
Paku 5 - 12 cm 22,440.00
Pelumas begisting (oli/minyak) 8,976.00
Balok Kayu Borneo 538,560.00
Multiplex 120 x 240 x 9 mm 137,445.00
1,066,461.00
Kas 1 1,066,461.00
Pembelian material untuk pekerjaan
Bekisting Kolom 12x40

14 Material 20
Besi Beton (polos/ulir) 3,901,867.20
Kawat Beton 86,751.00
3,988,618.20
Kas 1 3,988,618.20
Pembelian material untuk pekerjaan
pembesian kolom 12x65

Junlah Dipindahkan 772,712,771.8 772,712,771.8

145
146
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 772,712,771.8 772,712,771.8

2018
Januari 14 Material 20
Besi Beton (polos/ulir) 8,573,967.60
Kawat Beton 190,626.75
8,764,594.35
Kas 1 8,764,594.35
Pembelian material untuk pekerjaan
pembesian kolom 12x60

14 Material 20
Besi Beton (polos/ulir) 460,864.80
Kawat Beton 10,246.50
471,111.30
Kas 1 471,111.30
Pembelian material untuk pekerjaan
pembesian kolom 12x40

21 Material 20
Semen PC (abu-abu) 838240
Pasir Beton 232375
Splitz (batu pecah) 210574
1281189
Kas 1 1,281,189.00
Pembelian material untuk pekerjaan
beton kolom 12x65

21 Material 20
Semen PC (abu-abu) 1,800,480.00
Pasir Beton 499,125.00
Splitz (batu pecah) 452,298.00
2,751,903.00
Kas 1 2,751,903.00
Pembelian material untuk pekerjaan
beton kolom 12x60

Jumlah Dipindahkan 785,981,569.4 785,981,569.4

147
148
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 785,981,569.43 785,981,569.43
2018
Januari 21 Material 20
Semen PC (abu-abu) 84,320.00
Pasir Beton 23,375.00
Splitz (batu pecah) 21,182.00
128,877.00
Kas 1 128,877.00
Pembelian material untuk pekerjaan
beton kolom 12x40

31 Upah Tenaga Kerja 30


Pembantu Tukang 648,570.00
Tukang Kayu 878,064.00
1,526,634.00
Kas 1 1,526,634.00
Pembayaran upah tenaga kerja untuk pekerjaan
bekisting kolom 12x65

31 Upah Tenaga Kerja 30


Pembantu Tukang 1,415,115.00
Tukang Kayu 1,915,848.00
3,330,963.00
Kas 1 3,330,963.00
Pembayaran upah tenaga kerja untuk pekerjaan
bekisting kolom 12x60

31 Upah Tenaga Kerja 30


Pembantu Tukang 72,930.00
Tukang Kayu 98,736.00
171,666.00
Kas 1 171,666.00
Pembayaran upah tenaga kerja untuk pekerjaan
nekisting kolom 12x40

Jumlah dipindahkan 791,139,709.4 791,139,709.4

149
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 791,139,709.4 791,139,709.4
2018
Januari 31 Upah Tenaga Kerja 30
Pembantu Tukang 250,614.00
Tukang Besi 655,452.00
906,066.00
Kas 1 906,066.00
Pembayaran upah tenaga kerja untuk pekerjaan
pembesian kolom 12x65

31 Upah Tenaga Kerja 30


Pembantu Tukang 550,699.50
Tukang Besi 1,440,291.00
1,990,990.50
Kas 1 1,990,990.50
Pembayaran upah tenaga kerja untuk pekerjaan
pembesian kolom 12x60

31 Upah Tenaga Kerja 30


Pembantu Tukang 29,601.00
Tukang Besi 77,418.00
107,019.00
Kas 1 107,019.00
Pembayaran upah tenaga kerja untuk pekerjaan
pembesian kolom 12x40

31 Upah Tenaga Kerja 30


Pembantu Tukang 221,897.00
Tukang Batu 54,080.00
275,977.00
Kas 1 275,977.00
Pembayaran upah tenaga kerja untuk pekerjaan
Beton kolom 12x65

Jumlah dipindahkan 794,419,761.9 794,419,761.9

150
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 794,419,761.9 794,419,761.9
2018
Januari 31 Upah Tenaga Kerja 30
Pembantu Tukang 476,619.00
Tukang Batu 116,160.00
592,779.00
Kas 1 592,779.00
Pembayaran upah tenaga kerja untuk pekerjaan
Beton kolom 12x60

31 Upah Tenaga Kerja 30


Pembantu Tukang 22,321.00
Tukang Batu 5,440.00
27,761.00
Kas 1 27,761.00
Pembayaran upah tenaga kerja untuk pekerjaan
Beton Kolom 12x40

31 Gaji Pegawai 40 9,967,161.17


Kas 1 9,967,161.17
Membayar gaji pegawai untuk satu bulan

Jumlah dipindahkan 805,007,463.1 805,007,463.1

151
3.11. Buku Besar Januari
Kas
No. rek : 1
Keterangan Jumlah Keterangan Jumlah
Tanggal F Tanggal
(Rp) (Rp) (Rp) F (Rp)
2018 2018
Januari 1 1 149,507,417.57 Januari 2 1 4,332,510.00
1 1 149,507,417.57 2 1 1,418,256.00
2 1 118,188.00
2 2 9,641,760.00
2 2 9,641,760.00
2 2 743,184.00
2 2 227,430.00
2 2 227,430.00
7 3 740,600.00
7 3 1,999,687.50
7 3 574,938.00
7 3 456,865.50
7 3 1,818,289.00
7 4 146,640.00
7 4 580,320.00
7 4 48,360.00
7 4 3,417,440.00
7 5 931,200.00
7 5 1,224,000.00
7 5 1,930,500.00
7 5 5,880,856.80
7 5 1,406,250.00
7 5 14,677,279.10
14 6 80,704.00
14 6 106,080.00
14 6 718,520.00
14 7 48,990.00
14 7 479,115.00
14 7 1,588,860.00
14 7 419,250.00
14 7 3,334,133.00
14 7 765,903.00
14 8 9,484,089.00
14 8 20,693,335.50
14 8 1,066,461.00
14 8 3,988,618.20
14 9 8,764,594.35
14 9 471,111.30
21 9 1,281,189.00
21 9 2,751,903.00
21 10 128,877.00
21 10 1,526,634.00
21 10 3,330,963.00
31 10 171,666.00

152
31 11 906,066.00
31 11 1,990,990.50
31 11 107,019.00
31 11 275,977.00
31 12 592,779.00
31 12 27,761.00
31 12 9,967,161.17

137,252,493.92
161,762,341.22 299,014,835.14

Termin
No. Rek : 10
Tanggal
Tanggal Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018
Januari 1 149,507,417.57

149,507,417.57 149,507,417.57

Material
No. Rek : 20
Tanggal
Tanggal Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018 2 1 4,332,510.00
Januari 2 1 1,418,256.00
2 1 118,188.00
2 2 9,641,760.00
2 2 9,641,760.00
2 2 743,184.00
2 2 227,430.00
2 2 227,430.00
7 5 931,200.00
7 5 1,224,000.00
7 5 1,930,500.00
7 5 5,880,856.80
7 5 1,406,250.00

153
7 5 14,677,279.10
14 8 9,484,089.00
14 8 20,693,335.50
14 8 1,066,461.00
14 8 3,988,618.20
14 9 8,764,594.35
14 9 471,111.30
21 9 1,281,189.00
21 9 2,751,903.00
21 10 128,877.00

101,030,782.25 101,030,782.25

Upah Pekerja
No. Rek : 30
Tanggal
Tanggal Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018
Januari 7 3 740,600.00
7 3 1,999,687.50
7 3 574,938.00
7 3 456,865.50
7 3 1,818,289.00
7 4 146,640.00
7 4 580,320.00
7 4 48,360.00
7 4 3,417,440.00
14 6 80,704.00
14 6 106,080.00
14 6 718,520.00
14 6 48,990.00
14 6 479,115.00
14 7 1,588,860.00
14 7 419,250.00
14 7 3,334,133.00
14 7 765,903.00
31 10 1,526,634.00
31 10 3,330,963.00
31 10 171,666.00

154
31 11 906,066.00
31 11 1,990,990.50
31 11 107,019.00
31 11 275,977.00
31 12 592,779.00
31 12 27,761.00

26,254,550.50 26,254,550.50

Gaji Pegawai
No. Rek : 40
Tanggal
Tanggal Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018 31 12 9,967,161.17
Januari
9,967,161.17 9,967,161.17

Modal Perusahaan
No. Re
Tanggal
Tanggal Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018
Januari 1 1 149,507,4

149,507,417.57 149,507,417.57

155
3.12. Neraca Saldo Januari
NERACA SALDO
Per 31 Januari 2018

Saldo (Rp)
Nama Rekening
Debet Kredit

Kas 161,762,341.22
Biaya Material 101,030,782.25
Biaya Upah 26,254,550.50
Biaya Gaji 9,967,161.17
Modal Perusahaan 149,507,417.57
Pendapatan (Termin I) 149,507,417.57
299,014,835.14 299,014,835.14

3.13. Laporan Rugi Laba Januari


LAPORAN RUGI LABA
Januari 2018

Penghasilan
Rp
Termin I (0%) . 149,507,417.57

Biaya
Biaya Pembelian Rp
Material . 101,030,782.25
Biaya Pembayaran Rp
Upah . 26,254,550.50
Biaya Pembayaran Rp
Gaji . 9,967,161.17

Rp
Jumlah Biaya . 137,252,493.92

Rp
Kerugian . 12,254,923.65

156
LAPORAN PERUBAHAN MODAL PER- 31 JANUARI 2018

LAPORAN PERUBAHAN MODAL


Januari 2018

Tambah
Setoran Modal Rp. 149,507,417.57
Kurang
Kerugian bersih bulan
Januari Rp. 12,254,923.65

Saldo 31 Januari 2018 Rp. 137,252,493.92

NERACA PER- 31 JANUARI 2018

NERACA
Aktifa Pasiva

Kas Rp. 137,252,493.92 Hutang -

Modal Rp. 137,252,493.92

Jumlah Aktiva Rp. 137,252,493.92 Jumlah Pasiva Rp. 137,252,493.92

157
3.14. Transaksi Februari
Uraian H. Satuan Harga (Rp) Jumlah (Rp) Jumlah (Rp)
Tanggal Vol
Penggunaan Bahan dan material (Rp) Upah Bahan Upah Bahan Debet Kredit

2018
Februari 1 Pembelian Material
Minggu 1 Pekerjaan Pasangan Batu Bata 1pc : 6ps 246.760
8.00 Bata Ringan ( hebel/celcon ) 12,500.00 100,000.00 24,676,000.00 24,676,000.00
11.45 Semen Instan 6,500.00 74,425.00 18,365,113.00 18,365,113.00
43,041,113.00 43,041,113.00
Kas 43,041,113.00

1 Pembelian Material
Pekerjaan Bekisting Balok 15x50cm 87.360
0.040 Papan kayu terentang 2,585,000.00 103,400.00 9,033,024.00 9,033,024.00
0.400 Paku 5 - 12 cm 15,400.00 6,160.00 538,137.60 538,137.60
0.200 Pelumas begisting (oli/minyak) 33,550.00 6,710.00 586,185.60 586,185.60
0.350 Balok Kayu Borneo 115,500.00 40,425.00 3,531,528.00 3,531,528.00
1.000 Multiplex 120 x 240 x 9 mm 99,000.00 99,000.00 8,648,640.00 8,648,640.00
22,337,515.20 22,337,515.20
Kas 22,337,515.20

1 Pembelian Material
Pekerjaan Bekisting Balok 15x35cm 10.980
0.04 Kayu Kelas III 2,400,000.00 96,000.00 1,054,080.00 1,054,080.00
0.40 Paku Biasa 5' - 12' 15,000.00 6,000.00 65,880.00 65,880.00
0.20 Minyak Bekisting 12,000.00 2,400.00 26,352.00 26,352.00
0.04 Plywood 9 mm 3,600,000.00 144,000.00 1,581,120.00 1,581,120.00
0.35 Dolken Kayu 8" - 10" / 4m 105,000.00 36,750.00 403,515.00 403,515.00
3,130,947.00 3,130,947.00
Kas 3,130,947.00

1 Pembelian Material
Pekerjaan Bekisting Balok Anak 15x25cm 14.760
0.04 Kayu Kelas III 2,400,000.00 96,000.000 1,416,960.000 1,416,960.00
0.40 Paku Biasa 5' - 12' 15,000.00 6,000.000 88,560.000 88,560.00
0.20 Minyak Bekisting 12,000.00 2,400.000 35,424.000 35,424.00
0.04 Plywood 9 mm 3,600,000.00 144,000.000 2,125,440.000 2,125,440.00
0.35 Dolken Kayu 8" - 10" / 4m 105,000.00 36,750.000 542,430.000 542,430.00
4,208,814.00 4,208,814.00
Kas 4,208,814.00

1 Pembelian Material
Pekerjaan Pembesian Balok 15x50cm 1712.64
1.10 Besi Beton Ulir 9,200.00 10,120.00 17,331,916.80 17,331,916.80
0.02 Kawat Beton 15,000.00 225.00 385,344.00 385,344.00
17,717,260.80 17,717,260.80
Kas 17,717,260.80

158
1 Pembelian Material
Pekerjaan Pembesian Balok 15x35cm 264.96
1.10 Besi Beton Ulir 9,200.00 10,120.00 2,681,395.20 2,681,395.20
0.02 Kawat Beton 15,000.00 225.00 385,344.00 385,344.00
3,066,739.20 3,066,739.20
Kas 3,066,739.20

1 Pembelian Material
Pekerjaan Pembesian Balok Anak 15x25cm 254.52
1.10 Besi Beton Ulir 9,200.00 10,120.00 2,575,742.40 2,575,742.40
0.02 Kawat Beton 15,000.00 225.00 385,344.00 385,344.00
2,961,086.40 2,961,086.40
Kas 2,961,086.40
Februari
Minggu 2 7 Kas 149,507,418
Pembayaran Uang Muka (DP) = Termin II 149,507,418

7 Pembelian Material
Pekerjaan Beton Balok 15x50cm 7.20
8.00 Semen PC (abu-abu) 62,000.00 496,000.000 3,571,200.000 3,571,200.000
0.55 Pasir Beton 250,000.00 137,500.000 990,000.000 990,000.000
0.70 Splitz (batu pecah) 178,000.00 124,600.000 897,120.000 897,120.000
5,458,320.000 5,458,320.000
Kas 5,458,320.00

7 Pembelian Material
Pekerjaan Beton Balok 15x35cm 0.95
8.00 Semen PC (abu-abu) 62,000.00 496,000.000 468,720.00 468,720.000
0.55 Pasir Beton 250,000.00 137,500.000 129,937.50 129,937.500
0.70 Splitz (batu pecah) 178,000.00 124,600.000 117,747.00 117,747.000
716,404.500 716,404.500
Kas 716,404.50

7 Pembelian Material
Pekerjaan Beton Balok Anak 15x25cm 1.35
8.00 Semen PC (abu-abu) 62,000.00 496,000.000 669,600.00 669,600.000
0.55 Pasir Beton 250,000.00 137,500.000 185,625.00 185,625.000
0.70 Splitz (batu pecah) 178,000.00 124,600.000 168,210.00 168,210.000
1,023,435.000 1,023,435.000
Kas 1,023,435.00

Minggu 3 14 Pembelian Material


Pekerjaan Beton Balok Ring 15x30cm 2.520
8.00 Semen PC (abu-abu) 62,000.00 496,000.000 669,600.00 669,600.00
0.55 Pasir Beton 250,000.00 137,500.000 185,625.00 185,625.00
0.70 Splitz (batu pecah) 178,000.00 124,600.000 168,210.00 168,210.00
1,023,435.000 1,023,435.00
Kas 1,023,435.00

159
14 Pembelian Material
Pekerjaan Bekisting Balok Ring 15x30cm 28.560
0.04 Papan kayu terentang 2,400,000.00 96,000.00 2,741,760.00 2,741,760.00
0.40 Paku 5 - 12 cm 15,000.00 6,000.00 171,360.00 171,360.00
0.20 Pelumas begisting (oli/minyak) 12,000.00 2,400.00 68,544.00 68,544.00
0.04 Balok Kayu Borneo 3,600,000.00 144,000.00 4,112,640.00 4,112,640.00
0.35 Multiplex 120 x 240 x 9 mm 105,000.00 36,750.00 1,049,580.00 1,049,580.00
8,143,884.00 8,143,884.00
Kas 8,143,884.00

14 Pembelian Material
Pekerjaan Pembesian Balok Ring 15x30cm 471.520
1.10 Besi Beton Ulir 9,200.00 10,120.00 4,771,782.40 4,771,782.40
0.02 Kawat Beton 15,000.00 225.00 106,092.00 106,092.00
4,877,874.40 4,877,874.40
Kas 4,877,874.40

14 Pembelian Material
Pekerjaan Pemasangan Pipa Air Bersih 65.000
1.10 Pipa galvanis 25,000.00 27,500.00 1,787,500.00 1,787,500.00
1.000 Perlengkapan ( 30% harga pipa ) 7,500.00 7,500.00 487,500.00 487,500.00
2,275,000.00 2,275,000.00
Kas 2,275,000.00

14 Pembelian Material
Pekerjaan Pemasangan Pipa Pembuangan Air Kotor 50.600
1.10 Pipa PVC type D 15,000.00 16,500.00 834,900.00 834,900.00
1.00 Perlengkapan ( 30% harga pipa ) 4,500.00 4,500.00 227,700.00 227,700.00
1,062,600.00 1,062,600.00
Kas 1,062,600.00

14 Pembelian Material
Pekerjaan Pemasangan Pipa Pembuangan Air Besar/Kecil 20.100
1.10 Pipa PVC type D 15,000.00 16,500.00 331,650.00 331,650.00
1.00 Perlengkapan ( 30% harga pipa ) 4,500.00 24,132.00 485,053.20 485,053.20
816,703.20 816,703.20
Kas 816,703.20
Minggu 4 21 Pembelian Material
Pekerjaan Kuda-kuda Baja Ringan 64.000
0.263 Rangka C 85085 @ 7 Galvalume 225,000.00 59,175.00 3,787,200.00 3,787,200.00
0.424 Rangka C 85085 @ 7 Galvalume 181,500.00 76,956.00 4,925,184.00 4,925,184.00
0.956 Reng (Butten 30) @ 6 Galvalume 70,000.00 66,920.00 4,282,880.00 4,282,880.00
0.067 Reng Pengikat Kuda-Kuda @6 Galvalume 70,000.00 4,690.00 300,160.00 300,160.00
0.007 Talang Valley @ 3 166,000.00 1,162.00 74,368.00 74,368.00
0.194 Plat Strip @ 1 2,750.00 533.50 34,144.00 34,144.00
34.999 Baut Kuda-Kuda SDS 6 - 19 320.00 11,199.68 716,779.52 716,779.52
22.000 Baut Reng SDS 6 - 16 195.00 4,290.00 274,560.00 274,560.00
0.472 Baut Listplank Ø 6 - 70 780.00 368.16 23,562.24 23,562.24
0.472 Dinabold Ø 10 - 65 2,150.00 1,014.80 64,947.20 64,947.20
1.000 Upah Pasang 24,000.00 24,000.00 1,536,000.00 1,536,000.00
1.000 Material dan Alat Bantu 11,500.00 11,500.00 736,000.00 736,000.00
16,755,784.96 16,755,784.96
Kas 16,755,784.96

160
21 Pembelian Material
Pekerjaan Pemasangan Listplank 3/30cm 32.000
0.01 Papan kayu Kamper Medan 4,300,000.00 47,300.00 1,513,600.00 1,513,600.00
0.05 Paku 7 - 10 cm 15,000.00 750.00 24,000.00 24,000.00
1,537,600.00 1,537,600.00
Kas 1,537,600.00

21 Pembelian Material
Pekerjaan Pemasangan Genteng Karangpilang 78.130
25.00 Genteng palentong 1,500.00 37,500.00 2,929,875.00 2,929,875.00
2,929,875.00

21 Pembelian Material
Pekerjaan Genteng Bubungan Karangpilang 24.630
5.00 Genteng nok/bubungan plentong 22,000.00 110,000.00 2,709,300.00 2,709,300.00
0.16 Semen PC (abu-abu) 62,000.00 9,920.00 244,329.60 244,329.60
0.03 Pasir pasang 225,000.00 7,200.00 177,336.00 177,336.00
3,130,965.60 3,130,965.60
Kas 3,130,965.60
Februari 14 Pembayaran Upah 87.360
Pekerjaan Bekisting Balok 15x50cm
0.32 Pembantu Tukang 65,000.00 20,800.00 1,817,088.00 1,817,088.00
0.33 Tukang Kayu 80,000.00 26,400.00 2,306,304.00 2,306,304.00
4,123,392.00 4,123,392.00
Kas 4,123,392.00

14 Pembayaran Upah 10.980


Pekerjaan Bekisting Balok 15x35cm
0.32 Pembantu Tukang 65,000.00 20,800.00 1,817,088.00 1,817,088.00
0.33 Tukang Kayu 80,000.00 26,400.00 2,306,304.00 2,306,304.00
4,123,392.00 4,123,392.00
Kas 4,123,392.00

14 Pembayaran Upah 14.760


Pekerjaan Bekisting Balok Anak 15x25cm
0.32 Pembantu Tukang 65,000.00 20,800.00 307,008.00 307,008.00
0.33 Tukang Kayu 80,000.00 26,400.00 389,664.00 389,664.00
696,672.00 696,672.00
Kas 696,672.00

14 Pembayaran Upah
Pekerjaan Pembesian Balok 15x50cm 1712.640
0.01 Pembantu Tukang 65,000.00 650.00 1,113,216.00 1,113,216.00
0.02 Tukang Besi 85,000.00 1,700.00 2,911,488.00 2,911,488.00
4,024,704.00 4,024,704.00
Kas 4,024,704.00

14 Pembayaran Upah
Pekerjaan Pembesian Balok 15x35cm 264.960
0.01 Pembantu Tukang 65,000.00 650.00 172,224.00 172,224.00
0.02 Tukang Besi 85,000.00 1,700.00 450,432.00 450,432.00
622,656.00 622,656.00
Kas 622,656.00

161
14 Pembayaran Upah
Pekerjaan Pembesian Balok Anak 15x25cm 254.520
0.01 Pembantu Tukang 65,000.00 650.00 165,438.00 165,438.00
0.02 Tukang Besi 85,000.00 1,700.00 432,684.00 432,684.00
598,122.00 598,122.00
Kas 598,122.00

14 Pembayaran Upah
Pekerjaan Beton Balok 15x50cm 7.200
1.650 Pekerja 50,000.00 82,500.00 594,000.00 594,000.00
0.275 Tukang Besi 90,000.00 24,750.00 178,200.00 178,200.00
0.028 Kepala Tukang 100,000.00 2,800.00 20,160.00 20,160.00
0.083 Mandor 125,000.00 10,375.00 74,700.00 74,700.00
867,060.00 867,060.00
Kas 867,060.00

14 Pembayaran Upah
Pekerjaan Beton Balok 15x35cm 0.945
2.02 65,000.00 131,300.00 124,078.50 124,078.50
0.40 80,000.00 32,000.00 30,240.00 30,240.00
154,318.50 154,318.50
Kas 154,318.50

14 Pembayaran Upah
Pekerjaan Beton Balok Anak 15x25cm 1.350
2.02 65,000.00 131,300.00 177,255.00 177,255.00
0.40 80,000.00 32,000.00 43,200.00 43,200.00
220,455.00 220,455.00
Kas 220,455.00

Februari 21 Pembayaran Upah


Pekerjaan Pasangan Batu Bata 1pc : 6ps 246.760
0.30 Pembantu Tukang 65,000.00 19,500.00 4,811,820.00 4,811,820.00
0.20 Tukang Batu 80,000.00 16,000.00 3,948,160.00 3,948,160.00
8,759,980.00 8,759,980.00
Kas 8,759,980.00

21 Pembayaran Upah
Pekerjaan Beton Balok Ring 15x30cm 2.520
2.02 Pembantu Tukang 65,000.00 131,300.00 330,876.00 330,876.00
0.40 Tukang Batu 80,000.00 32,000.00 80,640.00 80,640.00
411,516.00 411,516.00
Kas 411,516.00

21 Pembayaran Upah
Pekerjaan Bekisting Balok Ring 15x30cm 28.560
2.02 Pembantu Tukang 65,000.00 131,300.00 131,300.00 131,300.00
0.40 Tukang Batu 80,000.00 32,000.00 32,000.00 32,000.00
163,300.00 163,300.00
Kas 163,300.00

162
21 Pembayaran Upah
Pekerjaan Pembesian Balok Ring 15x30cm 471.520
0.01 Pembantu Tukang 65,000.00 650.00 306,488.00 306,488.00
0.02 Tukang Besi 85,000.00 1,700.00 801,584.00 801,584.00
1,108,072.00 1,108,072.00
Kas 1,108,072.00

Februari 28 Pembayaran Upah


Pekerjaan Pemasangan Listplank 3/30cm 32.000
0.11 Pembantu Tukang 65,000.00 7,150.00 228,800.00 228,800.00
0.22 Tukang Kayu 80,000.00 17,600.00 563,200.00 563,200.00
792,000.00 792,000.00
Kas 792,000.00

28 Pembayaran Upah
Pekerjaan Pemasangan Genteng Karangpilang 78.130
0.15 Pembantu Tukang 65,000.00 9,750.00 761,767.50 761,767.50
0.08 Tukang Kayu 80,000.00 6,000.00 468,780.00 468,780.00
1,230,547.50 1,230,547.50
Kas 1,230,547.50

28 Pembayaran Upah
Pekerjaan Genteng Bubungan Karangpilang 24.630
0.30 Pembantu Tukang 65,000.00 19,500.00 480,285.00 480,285.00
0.20 Tukang kayu 80,000.00 16,000.00 394,080.00 394,080.00
874,365.00 874,365.00
Kas 874,365.00

163
3.15. Jurnal Februari
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 805,007,463.1 805,007,463.1
2018
Februari 1 Kas 1 137,252,493.92
Modal Perusahaan 50 137,252,493.92
Untuk mencatat kas perusahaan di Bulan Februari

1 Material 20
Bata Ringan ( hebel/celcon ) 24,676,000.00
Semen Instan 18,365,113.00
43,041,113.00
Kas 1 43,041,113.00
Pembelian material untuk pekerjaan
Pasangan batu bata 1pc:6ps

1 Material 20
Papan kayu terentang 9,033,024.00
Paku 5 - 12 cm 538,137.60
Pelumas begisting (oli/minyak) 586,185.60
Balok Kayu Borneo 3,531,528.00
Multiplex 120 x 240 x 9 mm 8,648,640.00
22,337,515.20
Kas 1 22,337,515.20
Pembelian material untuk pekerjaan
bekisting balok 15x50cm

164
1 Material 20
Kayu Kelas III 1,054,080.00
Paku Biasa 5' - 12' 65,880.00
Minyak Bekisting 26,352.00
Plywood 9 mm 1,581,120.00
Dolken Kayu 8" - 10" / 4m 403,515.00
3,130,947.00
Kas 1 3,130,947.00
Pembelian material untuk pekerjaan
bekisting balok 15x35cm

1 Material 20
Kayu Kelas III 1,416,960.00
Paku Biasa 5' - 12' 88,560.00
Minyak Bekisting 35,424.00
Plywood 9 mm 2,125,440.00
Dolken Kayu 8" - 10" / 4m 542,430.00
4,208,814.00
Kas 1 4,208,814.00
Pembelian material untuk pekerjaan
bekisting balok anak 15x25cm
Jumlah dipindahkan 1,014,978,346.2 1,014,978,346.2

165
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
2018 Pindahan 1,193,689,170.2 1,193,689,170.2
Februari
7 Material 20
Semen PC (abu-abu) 468,720.00
Pasir Beton 129,937.50
Splitz (batu pecah) 117,747.00
716,404.500
Kas 1 716,404.50
Pembelian material untuk pekerjaan
Pengecoran balok 15x35cm

7 Material 20
Semen PC (abu-abu) 669,600.00
Pasir Beton 185,625.00
Splitz (batu pecah) 168,210.00
1,023,435.00
Kas 1 1,023,435.00
Pembelian material untuk pekerjaan
Pengecoran balok anak 15x25cm

14 Upah Tenaga Kerja 30


Pembantu Tukang 1,817,088.00
Tukang Kayu 2,306,304.00
4,123,392.00
Kas 1 4,123,392.00
Pembayaran upah tenaga kerja untuk pekerjaan
Bekisting balok 15x50cm

14 Upah Tenaga Kerja 30


Pembantu Tukang 1,817,088.00
Tukang Kayu 2,306,304.00
4,123,392.00
Kas 1 4,123,392.00
Pembayaran upah tenaga kerja untuk pekerjaan
Bekisting balok 15x35cm

Jumlah dipindahkan 1,203,675,793.7 1,203,675,793.7

166
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,203,675,793.7 1,203,675,793.7
2018
Februari 14 Upah Tenaga Kerja 30
Pembantu Tukang 307,008.00
Tukang Kayu 389,664.00
696,672.00
Kas 1 696,672.00
Pembayaran upah tenaga kerja untuk pekerjaan
Bekisting balok anak 15x25cm

14 Upah Tenaga Kerja 30


Pekerja 1,113,216.00
Tukang Besi 2,911,488.00
4,024,704.00
Kas 1 4,024,704.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pembesian balok 15x50cm

14 Upah Tenaga Kerja 30


Pekerja 172,224.00
Tukang Besi 450,432.00
622,656.00
Kas 1 622,656.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pembesian balok 15x35cm

Jumlah Dipindahkan 1,209,019,826 1,209,019,826

167
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,209,019,826 1,209,019,826
2018
Februari 14 Upah Tenaga Kerja 30
Pekerja 165,438.00
Tukang Besi 432,684.00
598,122.00
Kas 1 598,122.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pembesian balok anak 15x25cm

14 Upah Tenaga Kerja 30


Pekerja 594,000.00
Tukang Besi 178,200.00
Kepala Tukang 20,160.00
Mandor 74,700.00
867,060.00
Kas 1 867,060.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pengecoran balok 15x50cm

14 Upah Tenaga Kerja 30


Pembantu Tukang 124,078.50
Tukang Batu 30,240.00
154,318.50
Kas 1 154,318.50
Pembayaran upah tenaga kerja untuk pekerjaan
Pengecoran balok 15x35cm

14 Upah Tenaga Kerja 30


Pembantu Tukang 177,255.00
Tukang Batu 43,200.00
220,455.00
Kas 1 220,455.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pengecoran balok anak 15x25cm

Jumlah Dipindahkan 1,210,859,781.19 1,210,859,781.19

168
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,210,859,781.19 1,210,859,781.19
2018
Februari 14 Material 20
Semen PC (abu-abu) 669,600.00
Pasir Beton 185,625.00
Splitz (batu pecah) 168,210.00
1,023,435.00
Kas 1 1,023,435.00
Pembelian material untuk pekerjaan
Pengecoran balok ring 15x30cm

14 Material 20
Papan kayu terentang 2,741,760.00
Paku 5 - 12 cm 171,360.00
Pelumas begisting (oli/minyak) 68,544.00
Balok Kayu Borneo 4,112,640.00
Multiplex 120 x 240 x 9 mm 1,049,580.00
8,143,884.00
Kas 1 8,143,884.00
Pembelian material untuk pekerjaan
Bekisting balok ring 15x30cm

14 Material 20
Besi Beton (polos/ulir) 4,771,782.40
Kawat Beton 106,092.00
4,877,874.40
Kas 1 4,877,874.40
Pembelian material untuk pekerjaan
Pembesian balok ring 15x30cm

14 Material 20
Pipa galvanis 1,787,500.00
Perlengkapan ( 30% harga pipa ) 487,500.00
2,275,000.00
Kas 1 2,275,000.00
Pembelian material untuk pekerjaan
Pemasangan pipa air bersih

14 Material 20
Pipa PVC type D 834,900.00
Perlengkapan ( 30% harga pipa ) 227,700.00
1,062,600.00
Kas 1 1,062,600.00
Pembelian material untuk pekerjaan
Pemasangan pipa air kotor
Jumlah Dipindahkan 1,228,242,574.59 1,228,242,574.59

169
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,228,242,574.59 1,228,242,574.59
2018
Februari 14 Material 20
Pipa PVC type D 331,650.00
Perlengkapan ( 30% harga pipa ) 485,053.20
816,703.20
Kas 1 816,703.20
Pembelian material untuk pekerjaan
Pemasangan pipa pembuangan air besar/kecil

21 Upah Tenaga Kerja 30


Pekerja 4,811,820.00
Mandor 3,948,160.00
8,759,980.00
Kas 1 8,759,980.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pasangan batu bata 1pc:6ps

21 Upah Tenaga Kerja 30


Pekerja 330,876.00
Tukang Besi 80,640.00
411,516.00
Kas 1 411,516.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pengecoran balok ring 15x30cm

21 Upah Tenaga Kerja 30


Pembantu Tukang 131,300.00
Tukang Batu 32,000.00
163,300.00
Kas 1 163,300.00
Pembayaran upah tenaga kerja untuk pekerjaan
Bekisting balok ring 15x30cm

21 Upah Tenaga Kerja 30


Pembantu Tukang 306,488.00
Tukang Besi 801,584.00
1,108,072.00
Kas 1 1,108,072.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pembesian balok ring 15x30cm
Pindahan 1,239,502,145.8 1,239,502,145.8

170
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,239,502,145.8 1,239,502,145.8
2018
Februari 21 Material 20
Papan kayu Kamper Medan 3,787,200.00
Paku 7 - 10 cm 4,925,184.00
Reng (Butten 30) @ 6 Galvalume 4,282,880.00
Reng Pengikat Kuda-Kuda @6 Galvalume 300,160.00
Talang Valley @ 3 74,368.00
Plat Strip @ 1 34,144.00
Baut Kuda-Kuda SDS 6 - 19 716,779.52
Baut Reng SDS 6 - 16 274,560.00
Baut Listplank Ø 6 - 70 23,562.24
Dinabold Ø 10 - 65 64,947.20
Upah Pasang 1,536,000.00
Material dan Alat Bantu 736,000.00
16,755,784.96
Kas 1 16,755,784.96
Pembelian material untuk pekerjaan
Pemasangan Kuda-kuda Baja Ringan

21 Material 20
Papan kayu Kamper Medan 1,513,600.00
Paku 7 - 10 cm 24,000.00
1,537,600.00
Kas 1 1,537,600.00
Pembelian material untuk pekerjaan
Pemasangan Listplank 3/30cm

21 Material 20
Genteng palentong 2,929,875.00
Kas 1 2,929,875.00
Pembelian material untuk pekerjaan
Pemasangan Genteng Karangpilang

Jumlah Dipindahkan 1,260,725,405.8 1,260,725,405.8

171
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,260,725,405.8 1,260,725,405.8
2018
Februari 21 Material 20
Genteng nok/bubungan plentong 2,709,300.00
Semen PC (abu-abu) 244,329.60
Pasir pasang 177,336.00
3,130,965.60
Kas 1 3,130,965.60
Pembelian material untuk pekerjaan
Genteng Bubungan Karangpilang

28 Upah Tenaga Kerja 30


Pembantu Tukang 228,800.00
Tukang Kayu 563,200.00
792,000.00
Kas 1 792,000.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Listplank 3/30cm

28 Upah Tenaga Kerja 30


Pembantu Tukang 761,767.50
Tukang Kayu 468,780.00
1,230,547.50
Kas 1 1,230,547.50
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Genteng Karangpilang

28 Upah Tenaga Kerja 30


Pembantu Tukang 480,285.00
Tukang kayu 394,080.00
874,365.00
Kas 1 874,365.00
Pembayaran upah tenaga kerja untuk pekerjaan
Genteng Bubungan Karangpilang

Jumlah Dipindahkan 1,266,753,283.9 1,266,753,283.9

172
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Dipindahkan 1,266,753,283.9 1,266,753,283.9
2018
Februari 28 Gaji Pegawai 40 9,967,161.17
Kas 1 9,967,161.17
Membayar gaji pegawai untuk satu bulan

Jumlah 1,276,720,445.0 1,276,720,445.0

173
3.16. Buku Besar Februari
Kas
No. rek : 1
Keterangan Jumlah Tanggal Keterangan Jumlah
Tanggal F
(Rp) (Rp) (Rp) F (Rp)
2018 2018
Februari 1 1 137,252,493.92 Februari 1 1 43,041,113.00
7 2 149,507,417.57 1 1 22,337,515.20
1 1 3,130,947.00
1 1 4,208,814.00
1 2 17,717,260.80
1 2 3,066,739.20
1 2 2,961,086.40
7 2 5,458,320.00
7 3 716,404.50
7 3 1,023,435.00
14 3 4,123,392
14 3 4,123,392.00
14 4 696,672.00
14 4 4,024,704.00
14 4 622,656.00
14 5 598,122.00
14 5 867,060.00
14 5 154,318.50
14 5 220,455.00
14 6 1,023,435.00
14 6 8,143,884.00
14 6 4,877,874.40
14 6 2,275,000.00
14 6 1,062,600.00
14 7 816,703.20
21 7 8,759,980.00
21 7 411,516.00
21 7 163,300.00
21 7 1,108,072.00
21 8 16,755,784.96
21 8 1,537,600.00
21 8 2,929,875.00
21 9 3,130,965.60
28 9 792,000.00
28 9 1,230,547.50
28 9 874,365.00
28 10 9,967,161.17

174
101,806,841.06 286,759,911.49 184,953,070.43

Termin
No. Rek : 10
Tanggal Tanggal
Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018
Februari 7 2 149,507,417.57

149,507,417.57 149,507,417.57

Material
No. Rek : 20
Tanggal Tanggal
Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018
Februari 1 1 43,041,113.00
1 1 22,337,515.20
1 1 3,130,947.00
1 1 4,208,814.00
1 2 17,717,260.80
1 2 3,066,739.20
1 2 2,961,086.40
7 2 5,458,320.00
7 3 716,404.50
7 3 1,023,435.00
14 6 1,023,435.00
14 6 8,143,884.00
14 6 4,877,874.40
14 6 2,275,000.00
14 6 1,062,600.00
14 7 816,703.20
21 8 16,755,784.96
21 8 1,537,600.00
21 8 2,929,875.00
21 9 3,130,965.60

146,215,357.26 146,215,357.26

175
Upah Pekerja
No. Rek : 30 No. Rek : 30
Tanggal Tanggal
Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018
Februari 14 3 4,123,392.00
14 3 4,123,392.00
14 4 696,672.00
14 4 4,024,704.00
14 4 622,656.00
14 5 598,122.00
14 5 867,060.00
14 5 154,318.50
14 5 220,455.00
21 7 8,759,980.00
21 7 411,516.00
21 7 163,300.00
21 7 1,108,072.00
28 9 792,000.00
28 9 1,230,547.50
28 9 874,365.00

28,770,552.00 28,770,552.00

Gaji Pegawai
No. Rek : 40
Tanggal Tanggal
Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018
Februari 28 10 9,967,161.17

9,967,161.17 9,967,161.17

176
Modal Perusahaan
No. Rek : 50
Tanggal Tanggal
Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018
Februari 1 1 137,252,493.92

137,252,493.92 137,252,493.92

3.17. Neraca Saldo Februari


NERACA SALDO
Per 28 Februari 2018

Saldo (Rp)
Nama Rekening
Debet Kredit

Kas 101,806,841.06
Biaya Material 146,215,357.26
Biaya Upah 28,770,552.00
Biaya Gaji 9,967,161.17
Modal Perusahaan 137,252,493.92
Pendapatan (Termin II) 149,507,417.57
286,759,911.49 286,759,911.49

177
3.18. Laporan Rugi Laba Februari
LAPORAN RUGI LABA PER 28 PEBRUARI 2018

LAPORAN RUGI LABA


Februari 2018

Penghasilan
Rp
Termin II (50%) . 149,507,417.57

Biaya
Biaya Pembelian Rp
Material . 146,215,357.26
Biaya Pembayaran Rp
Upah . 28,770,552.00
Biaya Pembayaran Rp
Gaji . 9,967,161.17

Rp
Jumlah Biaya . 184,953,070.43

Rp
Kerugian . (35,445,652.86)

LAPORAN PERUBAHAN MODAL PER- 28 FEBRUARI 2018

LAPORAN PERUBAHAN MODAL


Pebruari 2014

Saldo 1 Februari 2018 Rp. 137,252,493.92

Tambah Setoran Modal Rp. -


Rugi Bersih Bulan
Februari Rp. (35,445,652.86)

Saldo 28 Februari 2018 Rp. 101,806,841.06

178
NERACA PER- 28 PEBRUARI 2018

NERACA
Aktifa Pasiva

Kas Rp. 101,806,841.06 Hutang -

Modal Rp. 101,806,841.06

Jumlah Aktiva Rp. 101,806,841.06 Jumlah Pasiva Rp. 101,806,841.06

179
3.19. Transaksi Maret

180
Uraian H. Satuan Harga (Rp) Jumlah (Rp) Jumlah (Rp)
Tanggal Vol
Penggunaan Bahan dan material (Rp) Upah Bahan Upah Bahan Debet Kredit

2018 1 Pembelian Material


Maret Pekerjaan Kusen 2.325
1.20 Balok kayu Kamper Samarinda 5,766,800.00 6,920,160.00 16,089,372.00 16,089,372.00
16,089,372.00 16,089,372.00
Kas 16,089,372.00

1 Pembelian Material
Pekerjaan Daun Pintu 13.200
1.20 Balok kayu Kamper Samarinda 5,766,800.00 6,920,160.00 91,346,112.00 91,346,112.00
91,346,112.00 91,346,112.00
Kas 91,346,112.00

1 Pembelian Material
Pekerjaan Daun Jendela 24.150
1.20 Balok kayu Kamper Samarinda 5,766,800.00 6,920,160.00 167,121,864.00 167,121,864.00
167,121,864.00 167,121,864.00
Kas 167,121,864.00

1 Pembelian Material
Pekerjaan Murda Paras 2.000
1.0000 Murda / Puntal Paras 275,000.00 275,000.00 550,000.00 550,000.00
0.0130 Semen 1,340.00 17.42 34.84 34.84
550,034.84 550,034.84
Kas 550,034.84

1 Pembelian Material
Pekerjaan Ikut Celedu 4.000
1.0000 Murda / Puntal Paras 275,000.00 275,000.00 1,100,000.00 1,100,000.00
0.0130 Semen 1,340.00 17.42 69.68 69.68
1,100,069.68 1,100,069.68
Kas 1,100,069.68

Maret 7 Kas 149,507,418


Minggu 2 Pembayaran Uang Muka (DP) = Termin III 149,507,418

7 Pembelian Material
Pekerjaan Pasangan Plafond Gypsum 96.000
0.364 Gypsum Board 62,700.00 22,822.80 2,190,988.80 2,190,988.80
1.500 Rangka hollow 25,300.00 37,950.00 3,643,200.00 3,643,200.00
0.110 Paku Kalsiboard 33,000.00 3,630.00 348,480.00 348,480.00
6,182,668.80 6,182,668.80
Kas 6,182,668.80

7 Pembelian Material
Pekerjaan List Plafond 82.500

181
0.42 Hollow 4/4 Zincromate 32,000.00 13,280.00 1,095,600.00 1,095,600.00
0.15 Hollow 2/4 Zincromate 25,000.00 3,750.00 309,375.00 309,375.00
0.36 Gypsum board ( 120 x 240 x 9 ) mm 140,000.00 50,960.00 4,204,200.00 4,204,200.00
25.00 Paku sekrup 600.00 15,000.00 1,237,500.00 1,237,500.00
4.00 Ramset / dina bolt 2,500.00 10,000.00 825,000.00 825,000.00
0.07 Cotton plaster 55,000.00 3,960.00 326,700.00 326,700.00
0.13 Compoun 28,000.00 3,500.00 288,750.00 288,750.00
Kas 8,287,125.00 8,287,125.00
8,287,125.00
7 Pembelian Material
Pekerjaan Pemasangan Kloset Duduk 3.000
1.00 Kloset duduk / monoblok 2,500,000.00 2,500,000.00 7,500,000.00 7,500,000.00
1.00 Perlengkapan ( 10% hrg kloset ) 250,000.00 141,240.00 423,720.00 423,720.00
7,923,720.00 7,923,720.00
Kas 7,923,720.00

7 Pembelian Material
Pekerjaan Pemasangan Floor Drain 3.000
1.000 Floor drain 59,000.00 59,000.00 177,000.00 177,000.00
Kas 177,000.00

7 Pembelian Material
Pekerjaan Pemasangan Kran Air 4.000
1.000 Kran air 54,900.00 54,900.00 219,600.00 219,600.00
Kas 219,600.00

7 Pembelian Material
Pekerjaan Pemasangan Keramik Lantai 74.750
1.00 Keramik ukuran 40 x 40 cm 205,000.00 205,000.00 15,323,750.00 15,323,750.00
0.16 Semen PC (abu-abu) 62,000.00 9,920.00 741,520.00 741,520.00
0.02 Pasir pasang 225,000.00 4,837.50 361,603.13 361,603.13
0.02 Semen warna 4,200.00 84.00 6,279.00 6,279.00
16,433,152.13 16,433,152.13
Kas 16,433,152.13

7 Pembelian Material
Pekerjaan Pemasangan Keramik Lantai WC 11.500
1.00 Keramik motif 30 x 30 cm 54,000.00 54,000.00 621,000.00 621,000.00
0.16 Semen PC (abu-abu) 62,000.00 9,920.00 114,080.00 114,080.00
0.02 Pasir pasang 225,000.00 4,500.00 51,750.00 51,750.00
0.02 Semen warna 4,200.00 84.00 966.00 966.00
787,796.00 787,796.00
Kas 787,796.00

7 Pembelian Material
Pekerjaan Pemasangan Keramik Lantai Tangga 12.000
1.050 Geranit 60x60 247,500.00 259,875.00 3,118,500.00 3,118,500.00
11.380 Semen Portland 1,340.00 15,249.20 182,990.40 182,990.40
0.042 Pasir Pasang 152,000.00 6,384.00 76,608.00 76,608.00

182
1.500 Semen Grouting 11,000.00 16,500.00 198,000.00 198,000.00
3,576,098.40 3,576,098.40
Kas 3,576,098.40

7 Pembelian Material
Pekerjaan Pemasangan Instalasi Listrik 34.000
8.000 Stop Kontak 20,000.00 160,000.00 5,440,000.00 5,440,000.00
3.000 Kabel Listrik NYM 3 x 2,5 mm 435,000.00 1,305,000.00 44,370,000.00 44,370,000.00
2.000 Accecories ( 20 % material ) 21,750.00 43,500.00 1,479,000.00 1,479,000.00
51,289,000.00 51,289,000.00
Kas 51,289,000.00

7 Pembelian Material
Pekerjaan Pemasangan Instalasi Stop Kontak 16.000
8.000 Stop Kontak 20,000.00 160,000.00 2,560,000.00 2,560,000.00
3.000 Kabel Listrik NYM 3 x 2,5 mm 435,000.00 1,305,000.00 20,880,000.00 20,880,000.00
2.000 Accecories ( 20 % material ) 21,750.00 43,500.00 696,000.00 696,000.00
24,136,000.00 24,136,000.00
Kas 24,136,000.00

7 Pembelian Material
Pekerjaan Pemasangan MCB 1.000
1.00 Panel Listrik standart untuk Rumah 250,000 250,000.00 250,000.00 250,000.00
1.00 Accecories ( 10 % alat ) 25,000 25,000.00 25,000.00 25,000.00
1.00 Tukang listrik 80,000 80,000.00 80,000.00 80,000.00
355,000.00 355,000.00
Kas 355,000.00

7 Pembelian Material
Pekerjaan Pemasangan Arde 1.000
1.000 Arde 575,000 575,000.00 575,000.00 575,000.00
Kas 575,000.00

7 Pembelian Material
Pekerjaan Pemasangan Saklar Tunggal 7.000 18,328.57 18,328.57 128,300.00 128,300.00

Kas 128,300.00

7 Pembelian Material
Pekerjaan Pemasangan Saklar Ganda 5.000 20,400.00 20,400.00 102,000.00 102,000.00

102,000.00
Kas
Maret 14 Pembelian Material
Minggu 3 Pekerjaan Pengecatan Tembok 246.760
0.100 Plamir 8,000 800.00 197,408.00 197,408.00
0.100 Cat Dasar 49,500 4,950.00 1,221,462.00 1,221,462.00
0.260 Cat Penutup 2x 33,000 8,580.00 2,117,200.80 2,117,200.80
3,536,070.80 3,536,070.80

183
Kas 3,536,070.80

14 Pembelian Material
Pekerjaan Pengecatan Plafond 96.000
0.10 Plamir 19,000 1,900.00 182,400.00 182,400.00
0.01 Rol cat 26,500 265.00 25,440.00 25,440.00
0.50 Cat penutup kwalitas baik 44,000 22,000.00 2,112,000.00 2,112,000.00
0.01 Steger ( perancah kerja ) 200,000 2,000.00 192,000.00 192,000.00
0.50 Ampelas 3,500 1,750.00 168,000.00 168,000.00
2,679,840.00 2,679,840.00
Kas 2,679,840.00

14 Pembelian Material
Pekerjaan Cat Daun Jendela 24.150
0.50 Cat meni 16,000 8,000.00 193,200.00 193,200.00
0.15 Plamir 17,000 2,550.00 61,582.50 61,582.50
1.00 Ampelas 3,500 3,500.00 84,525.00 84,525.00
0.15 Cat dasar 35,000 5,250.00 126,787.50 126,787.50
0.35 Cat penutup kwalitas baik 42,000 14,700.00 355,005.00 355,005.00
821,100.00 821,100.00
Kas 821,100.00

14 Pembelian Material
Pekerjaan Polituran Daun Pintu 13.200
0.50 Cat meni 16,000 8,000.00 105,600.00 105,600.00
0.15 Plamir 17,000 2,550.00 33,660.00 33,660.00
1.00 Ampelas 3,500 3,500.00 46,200.00 46,200.00
0.15 Cat dasar 35,000 5,250.00 69,300.00 69,300.00
0.35 Cat penutup kwalitas baik 42,000 14,700.00 194,040.00 194,040.00
448,800.00 448,800.00
Kas 448,800.00

14 Pembelian Material
Pekerjaan Cat List Plafond 5.780
0.50 Cat meni 16,000 8,000.00 46,240.00 46,240.00
0.15 Plamir 17,000 2,550.00 14,739.00 14,739.00
1.00 Ampelas 3,500 3,500.00 20,230.00 20,230.00
0.15 Cat dasar 35,000 5,250.00 30,345.00 30,345.00
0.35 Cat penutup kwalitas baik 42,000 14,700.00 84,966.00 84,966.00
196,520.00 196,520.00
Kas 196,520.00

14 Pembelian Material
Pekerjaan Cat Listplank 9.600
0.50 Cat meni 16,000 8,000.00 76,800.00 76,800.00
0.15 Plamir 17,000 2,550.00 24,480.00 24,480.00
1.00 Ampelas 3,500 3,500.00 33,600.00 33,600.00
0.15 Cat dasar 35,000 5,250.00 50,400.00 50,400.00
0.35 Cat penutup kwalitas baik 42,000 14,700.00 141,120.00 141,120.00

184
326,400.00 326,400.00
Kas 326,400.00

14 Pembelian Material
Pekerjaan Pemasangan Penangkal Petir 1.000
1.000 Penangkal Petir 6,000,000 6,000,000.00 6,000,000.00 6,000,000.00
Kas 6,000,000.00

14 Pembelian Material
Pekerjaan Pemasangan Paving 24.500
1.000 Paving 10x20cm tebal 6cm K225 65,000 65,000.00 1,592,500.00 1,592,500.00
0.100 Pasir Urug 135,000 13,500.00 330,750.00 330,750.00
1,923,250.00 1,923,250.00
Kas 1,923,250.00

14 Pembelian Material
Pekerjaan Pagar 8.100
70.000 Bata Merah 5x11x22 cm 1,300.00 91,000.00 737,100.00 737,100.00
8.320 Semen Portland 1,340.00 11,148.80 90,305.28 90,305.28
0.049 Pasir pasang 62,700.00 3,072.30 24,885.63 24,885.63
852,290.91 852,290.91
Kas 852,290.91
Maret 21 Pembelian Material
Minggu 4 Pekerjaan Pemasangan Lampu SL 18 w 24.000
Lampu SL 18 w 125,000 125,000.00 3,000,000.00 3,000,000.00
Kas 3,000,000.00

21 Pembelian Material
Pekerjaan Pemasangan Lampu Garden 10.000
1.00 Lampu Taman 260000 260,000.00 2,600,000.00 2,600,000.00
1.00 Accecories ( 1 % alat ) 2,600 2,600.00 26,000.00 26,000.00
2,626,000.00 2,626,000.00
Kas 2,626,000.00

7 Pembayaran Upah
Pekerjaan Murda Paras 2.000
0.0500 Pekerja / Pekerja Tak Terlatih 50,000.00 2,500.00 5,000.00 5,000.00
0.0250 Mandor 125,000.00 3,125.00 6,250.00 6,250.00
11,250.00 11,250.00
Kas 11,250.00

7 Pembayaran Upah
Pekerjaan Ikut Celedu 4.000
0.0500 Pekerja / Pekerja Tak Terlatih 50,000.00 2,500.00 10,000.00 10,000.00
0.0250 Mandor 125,000.00 3,125.00 12,500.00 12,500.00
22,500.00 22,500.00
Kas 22,500.00

14 Pembayaran Upah

185
Pekerjaan Kusen 2.325
6.00 Pembantu Tukang 65,000.00 390,000.00 906,750.00 906,750.00
15.00 Tukang Kayu 80,000.00 1,200,000.00 2,790,000.00 2,790,000.00
3,696,750.00 3,696,750.00
Kas 3,696,750.00

14 Pembayaran Upah
Pekerjaan Daun Pintu 13.200
0.80 Pembantu Tukang 65,000.00 52,000.00 686,400.00 686,400.00
2.00 Tukang Kayu 80,000.00 160,000.00 372,000.00 372,000.00
1,058,400.00 1,058,400.00
Kas 1,058,400.00

14 Pembayaran Upah
Pekerjaan Daun Jendela 24.150
0.80 Pembantu Tukang 65,000.00 52,000.00 1,255,800.00 1,255,800.00
2.00 Tukang Kayu 80,000.00 160,000.00 3,864,000.00 3,864,000.00
5,119,800.00 5,119,800.00
Kas 5,119,800.00

14 Pembayaran Upah
Pekerjaan Pasangan Plafond Gypsum 96.000
0.10 Pembantu Tukang 65,000.00 6,500.00 624,000.00 624,000.00
0.05 Tukang kayu 80,000.00 4,000.00 384,000.00 384,000.00
1,008,000.00 1,008,000.00
Kas 1,008,000.00

14 Pembayaran Upah
Pekerjaan List Plafond 82.500
0.05 Pembantu Tukang 65,000.00 3,250.00 268,125.00 268,125.00
0.05 Tukang kayu 80,000.00 4,000.00 330,000.00 330,000.00
598,125.00 598,125.00
Kas 598,125.00

14 Pembayaran Upah
Pekerjaan Pemasangan Kloset Duduk 3.000
3.30 Pembantu Tukang 65,000.00 214,500.00 643,500.00 643,500.00
1.10 Tukang batu 80,000.00 88,000.00 264,000.00 264,000.00
907,500.00 907,500.00
Kas 907,500.00

14 Pembayaran Upah
Pekerjaan Pemasangan Floor Drain 3.000
0.01 Pembantu Tukang 65,000.00 650.00 1,950.00 1,950.00
0.10 Tukang batu 80,000.00 8,000.00 24,000.00 24,000.00
25,950.00 25,950.00
25,950.00
14 Pembayaran Upah
Pekerjaan Pemasangan Kran Air 4.000

186
0.01 Pembantu Tukang 65,000.00 650.00 2,600.00 2,600.00
0.10 Tukang batu 80,000.00 8,000.00 32,000.00 32,000.00
34,600.00 34,600.00
34,600.00
14 Pembayaran Upah
Pekerjaan Pemasangan Pipa Air Bersih 65.000
0.05 Pembantu Tukang 65,000.00 3,510.00 228,150.00 228,150.00
0.09 Tukang pipa 80,000.00 7,200.00 468,000.00 468,000.00
696,150.00 696,150.00
Kas 696,150.00

14 Pembayaran Upah
Pekerjaan Pemasangan Pipa Pembuangan Air Kotor 50.600
0.13 Pembantu Tukang 65,000.00 8,450.00 427,570.00 427,570.00
0.22 Tukang pipa 80,000.00 17,600.00 890,560.00 890,560.00
1,318,130.00 1,318,130.00
Kas 1,318,130.00

14 Pembayaran Upah
Pekerjaan Pemasangan Pipa Pembuangan Air Besar/Kecil 20.100
0.13 Pembantu Tukang 65,000.00 8,450.00 169,845.00 169,845.00
0.22 Tukang pipa 80,000.00 17,600.00 353,760.00 353,760.00
523,605.00 523,605.00
Kas 523,605.00

14 Pembayaran Upah
Pekerjaan Pemasangan Saklar Tunggal 7.000
1.000 Biaya Pasang 25,000 25,000 175,000.000 175,000.00
Kas 175,000.00

14 Pembayaran Upah
Pekerjaan Pemasangan Saklar Ganda 5.000
1.000 Biaya Pasang 25,000 25,000 125,000.000 125,000.00
Kas 125,000.00

21 Pembayaran Upah
Pekerjaan Pemasangan Keramik Lantai 74.750
0.25 Pembantu Tukang 65,000.00 16,250.00 1,214,687.500 1,214,687.50
0.12 Tukang batu 80,000.00 9,600.00 717,600.000 717,600.00
1,932,287.500 1,932,287.50
Kas 1,932,287.50

21 Pembayaran Upah
Pekerjaan Pemasangan Keramik Lantai WC 11.500
0.25 Pembantu Tukang 65,000.00 16,250.00 186,875.000 186,875.00
0.12 Tukang batu 80,000.00 9,600.00 110,400.000 110,400.00
297,275.000 297,275.00
Kas 297,275.00

187
21 Pembayaran Upah
Pekerjaan Pemasangan Keramik Lantai Tangga 12.000
0.25 Pembantu Tukang 65,000.00 16,250.00 195,000.000 195,000.00
0.12 Tukang batu 80,000.00 9,600.00 115,200.000 115,200.00
310,200.000 310,200.00
Kas 310,200.00

21 Pembayaran Upah
Pekerjaan Pengecatan Tembok 246.760
0.06 Pembantu Tukang 65,000.00 3,900.00 962,364.000 962,364.00
0.20 Tukang cat 75,000.00 15,000.00 3,701,400.000 3,701,400.00
4,663,764.000 4,663,764.00
Kas 4,663,764.00

21 Pembayaran Upah
Pekerjaan Pengecatan Plafond 96.000
0.06 Pembantu Tukang 65,000.00 3,900.00 374,400.000 374,400.00
0.20 Tukang cat 75,000.00 15,000.00 1,440,000.000 1,440,000.00
1,814,400.000 1,814,400.00
Kas 1,814,400.00

21 Pembayaran Upah
Pekerjaan Cat List Plafond 5.780
0.05 Pembantu Tukang 65,000.00 3,250.00 18,785.000 18,785.00
0.15 Tukang cat 75,000.00 11,250.00 65,025.000 65,025.00
83,810.000 83,810.00
Kas 83,810.00

21 Pembayaran Upah
Pekerjaan Cat Listplank 9.600
0.05 Pembantu Tukang 65,000.00 3,250.00 31,200.000 31,200.00
0.15 Tukang cat 75,000.00 11,250.00 108,000.000 108,000.00
139,200.000 139,200.00
Kas 139,200.00

21 Pembayaran Upah
Pekerjaan Pemasangan Instalasi Listrik 34.000
1.000 Biaya Pasang 76,000 76,000.00 2,584,000.000 2,584,000.00
Kas 2,584,000.00

21 Pembayaran Upah
Pekerjaan Pemasangan Instalasi Stop Kontak 16.000
1.000 Biaya Pasang 76,000 76,000.00 1,216,000.000 1,216,000.00
Kas 1,216,000.00

21 Pembayaran Upah
Pekerjaan Pemasangan Paving 24.500
0.500 Pekerja 50,000.00 25,000.00 612,500.000 612,500.00
0.250 Tukang Batu 90,000.00 22,500.00 551,250.000 551,250.00

188
0.025 Kepala Tukang 100,000.00 2,500.00 61,250.000 61,250.00
0.025 Mandor 125,000.00 3,125.00 76,562.500 76,562.50
1,301,562.500 1,301,562.50
Kas 1,301,562.50

21 Pembayaran Upah
Pekerjaan Pagar 8.100
0.750 Pekerja 50,000.00 37,500.00 303,750.000 303,750.00
0.025 Mandor 125,000.00 3,125.00 25,312.500 25,312.50
329,062.500 329,062.50
Kas 329,062.50

31 Pembayaran Upah
Pekerjaan Cat Daun Jendela 24.150
0.05 Pembantu Tukang 65,000.00 3,250.00 78,487.500 78,487.50
0.15 Tukang cat 75,000.00 11,250.00 271,687.500 271,687.50
350,175.000 350,175.00
Kas 350,175.00

31 Pembayaran Upah
Pekerjaan Polituran Daun Pintu 1.000
0.05 Pembantu Tukang 65,000.00 3,250.00 3,250.000 3,250.00
0.15 Tukang cat 75,000.00 11,250.00 11,250.000 11,250.00
14,500.000 14,500.00
Kas 14,500.00

31 Pembayaran Upah
Pekerjaan Pemasangan Lampu SL 18 w 24.000
1.000 Biaya Pasang 25,000 25,000.000 600,000.000 600,000.00
Kas 600,000.00

31 Pembayaran Upah
Pekerjaan Pemasangan Lampu Garden 10.000
1.000 Biaya Pasang 45,000 45,000.000 450,000.000 450,000.00
Kas 450,000.00

31 Pembayaran Upah
Pekerjaan Taman 105.450
1.000 Pekerjaan taman 35,000 35,000.000 3,690,750.000 3,690,750.00
Kas 3,690,750.00

31 Pembayaran Upah
Pembersihan Akhir 1.000
1.000 Pembersihan Akhir 3,000,000 3,000,000.000 3,000,000.000 3,000,000.00
Kas 3,000,000.00

31 Kas 149,507,418
Pembayaran Uang Muka (DP) = Termin IV 149,507,418

189
3.20. Jurnal Maret

190
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,276,720,445.0 1,276,720,445.0
2018
Maret 1 Kas 1 101,806,841.06
Modal Perusahaan 50 101,806,841.06
Untuk mencatat kas perusahaan di Bulan Februari

1 Material 20
Balok Kayu Kamper 16,089,372.00
16,089,372.00
Kas 1 16,089,372.00
Pembelian material untuk pekerjaan
Kusen

1 Material 20
Papan Kayu Kamper 91,346,112.00
91,346,112.00
Kas 1 91,346,112.00
Pembelian material untuk pekerjaan
Daun Pintu

1 Material 20
Papan Kayu Kamper 167,121,864.00
167,121,864.00
Kas 1 167,121,864.00
Pembelian material untuk pekerjaan
Daun Jendela

1 Material 20
Murda / Puntal Paras 550,000.00
Semen 34.84
550,034.84
Kas 1 550,034.84
Pembelian material untuk pekerjaan
Murda Paras

1 Material 20
Murda / Puntal Paras 1,100,000.00
Semen 69.68
1,100,069.68
Kas 1 1,100,069.68
Pembelian material untuk pekerjaan
Ikut Cledu

Jumlah dipindahkan 1,654,734,738.6 1,654,734,738.6

191
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,654,734,738.6 1,654,734,738.6
2018
Maret 7 Upah Tenaga Kerja 30
Pekerja / Pekerja Tak Terlatih 5,000.00
Mandor 6,250.00
11,250.00
Kas 1 11,250.00
Pembayaran upah tenaga kerja untuk pekerjaan
Murda Paras

7 Upah Tenaga Kerja 30


Pekerja / Pekerja Tak Terlatih 10,000.00
Mandor 12,500.00
22,500.00
Kas 1 22,500.00
Pembayaran upah tenaga kerja untuk pekerjaan
Ikut Cledu

7 Kas 1 149,507,417.57
Termin III (75% ) 10 149,507,417.57

7 Material 20
Gypsum Board 2,190,988.80
Rangka hollow 3,643,200.00
Paku Kalsiboard 348,480.00
6,182,668.80
Kas 1 6,182,668.80
Pembelian material untuk pekerjaan
Pasangan Plafond Gypsum

7 Material 20
Hollow 4/4 Zincromate 1,095,600.00
Hollow 2/4 Zincromate 309,375.00
Gypsum board ( 120 x 240 x 9 ) mm 4,204,200.00
Paku sekrup 1,237,500.00
Ramset / dina bolt 825,000.00
Cotton plaster 326,700.00
Compoun 288,750.00
8,287,125.00
Kas 1 8,287,125.00
Pembelian material untuk pekerjaan
List Plafond

Jumlah dipindahkan 1,818,745,700.0 1,818,745,700.0

192
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
2018 Pindahan 1,818,745,700.0 1,818,745,700.0
Maret
7 Material 20
Kloset duduk 7,500,000.00
Perlengkapan 423,720.00
7,923,720.00
Kas 1 7,923,720.00
Pembelian material untuk pekerjaan
Pemasangan Kloset Duduk

7 Material 20
Floor drain 177,000.00
Kas 1 177,000.00
Pembelian material untuk pekerjaan
Pemasangan Floor Drain

7 Material 20
Kran air 219,600.00
Kas 1 219,600.00
Pembelian material untuk pekerjaan
Pemasangan Kran Air

7 Material 20
Keramik ukuran 40 x 40 cm 15,323,750.00
Semen PC (abu-abu) 741,520.00
Pasir pasang 361,603.13
Semen warna 6,279.00
16,433,152.13
Kas 1 16,433,152.13
Pembelian material untuk pekerjaan
Pemasangan Kramik Lantai

7 Material 20
Keramik motif 30 x 30 cm 621,000.00
Semen PC (abu-abu) 114,080.00
Pasir pasang 51,750.00
Semen warna 966.00
787,796.00
Kas 1 787,796.00
Pembelian material untuk pekerjaan
Pemasangan Kramik Lantai WC

Jumlah dipindahkan 1,844,286,968.1 1,844,286,968.1

193
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,844,286,968.1 1,844,286,968.1
2018
Maret 7 Material 20
Geranit 60x60 3,118,500.00
Semen Portland 182,990.40
Pasir Pasang 76,608.00
Semen Grouting 198,000.00
3,576,098.40
Kas 1 3,576,098.40
Pembelian material untuk pekerjaan
Pemasangan Kramik Lantai Tangga

7 Material 20
Stop Kontak 5,440,000.00
Kabel Listrik NYM 3 x 2,5 mm 44,370,000.00
Accecories ( 20 % material ) 1,479,000.00
51,289,000.00
Kas 1 51,289,000.00
Pembelian material untuk pekerjaan
Pemasangan Instalasi Listrik

7 Material 20
Stop Kontak 2,560,000.00
Kabel Listrik NYM 3 x 2,5 mm 20,880,000.00
Accecories ( 20 % material ) 696,000.00
24,136,000.00
Kas 1 24,136,000.00
Pembelian material untuk pekerjaan
Pemasangan Instalasi Stopkontak

Jumlah Dipindahkan 1,923,288,066 1,923,288,066

194
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,923,288,066 1,923,288,066
2018
Maret 7 Material 20
Panel Listrik standart untuk Rumah 250,000.00
Accecories ( 10 % alat ) 25,000.00
Tukang listrik 80,000.00
MCB 355,000.00
Kas 1 355,000.00
Pembelian material untuk pekerjaan
Pemasangan MCB

7 Material 20
Arde 575,000.00
Kas 1 575,000.00
Pembelian material untuk pekerjaan
Pemasangan Arde

7 Material 20
Pemasangan Saklar Tunggal 128,300.00
Kas 1 128,300.00
Pembelian material untuk pekerjaan
Pemasangan Saklar Tunggal

7 Material 20
Pemasangan Saklar Ganda 102,000.00
Kas 1 102,000.00
Pembelian material untuk pekerjaan
Pemasangan Saklar Ganda

Jumlah Dipindahkan 1,924,448,366.50 1,924,448,366.50

195
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,924,448,366.50 1,924,448,366.50
2018
Maret 14 Upah Tenaga Kerja 30
Pembantu Tukang 906,750.00
Tukang Kayu 2,790,000.00
3,696,750.00
Kas 1 3,696,750.00
Pembayaran upah tenaga kerja untuk pekerjaan
Kusen

14 Upah Tenaga Kerja 30


Pembantu Tukang 686,400.00
Tukang Kayu 372,000.00
1,058,400.00
Kas 1 1,058,400.00
Pembayaran upah tenaga kerja untuk pekerjaan
Daun Pintu

14 Upah Tenaga Kerja 30


Pembantu Tukang 1,255,800.00
Tukang Kayu 3,864,000.00
5,119,800.00
Kas 1 5,119,800.00
Pembayaran upah tenaga kerja untuk pekerjaan
Daun Jendela

14 Upah Tenaga Kerja 30


Pembantu Tukang 624,000.00
Tukang kayu 384,000.00
1,008,000.00
Kas 1 1,008,000.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pasangan Plafond Gypsum

Jumlah Dipindahkan 1,935,331,316.50 1,935,331,316.50

196
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,935,331,316.50 1,935,331,316.50
2018
Maret 14 Upah Tenaga Kerja 30
Pembantu Tukang 268,125.00
Tukang kayu 330,000.00
598,125.00
Kas 1 598,125.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pasangan List Plafond

14 Upah Tenaga Kerja 30


Pembantu Tukang 643,500.00
Tukang batu 264,000.00
907,500.00
Kas 1 907,500.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan kloset duduk

14 Upah Tenaga Kerja 30


Pekerja 25,950.00
Kas 1 25,950.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Floor Drain

14 Upah Tenaga Kerja 30


Pekerja 34,600.00
Kas 1 34,600.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Kran Air

14 Upah Tenaga Kerja 30


Pembantu Tukang 228,150.00
Tukang pipa 468,000.00
696,150.00
Kas 1 696,150.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Pipa Air Bersih

Pindahan 1,937,593,641.5 1,937,593,641.5

197
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,937,593,641.5 1,937,593,641.5
2018
Maret 14 Upah Tenaga Kerja 30
Pembantu Tukang 427,570.00
Tukang pipa 890,560.00
1,318,130.00
Kas 1 1,318,130.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Pipa Air Kotor

14 Upah Tenaga Kerja 30


Pembantu Tukang 169,845.00
Tukang pipa 353,760.00
523,605.00
Kas 1 523,605.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Pipa Air Besar/Kecil

14 Upah Tenaga Kerja 30


Biaya Pasang 175,000.00
Kas 1 175,000.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Saklar Tunggal

14 Upah Tenaga Kerja 30


Biaya Pasang 125,000.00
Kas 1 125,000.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Saklar Ganda

Jumlah Dipindahkan 1,939,735,376.5 1,939,735,376.5

198
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Pindahan 1,939,735,376.5 1,939,735,376.5
2018
Maret 14 Material 20
Plamir 197,408.00
Cat Dasar 1,221,462.00
Cat Penutup 2x 2,117,200.80
3,536,070.80
Kas 1 3,536,070.80
Pembelian material untuk pekerjaan
Pengecatan Tembok

14 Material 20
Plamir 182,400.00
Rol cat 25,440.00
Cat penutup kwalitas baik 2,112,000.00
Steger ( perancah kerja ) 192,000.00
Ampelas 168,000.00
2,679,840.00
Kas 1 2,679,840.00
Pembelian material untuk pekerjaan
Pengecatan Plafond

14 Material 20
Cat meni 193,200.00
Plamir 61,582.50
Ampelas 84,525.00
Cat dasar 126,787.50
Cat penutup kwalitas baik 355,005.00
821,100.00
Kas 1 821,100.00
Pembelian material untuk pekerjaan
Pengecatan Daun Jendela

14 Material 20
Cat meni 105,600.00
Plamir 33,660.00
Ampelas 46,200.00
Cat dasar 69,300.00
Cat penutup kwalitas baik 194,040.00
448,800.00
Kas 1 448,800.00
Pembelian material untuk pekerjaan
Pengecatan Polituran Daun Pintu

Jumlah Dipindahkan 1,947,221,187.3 1,947,221,187.3

199
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Dipindahkan 1,947,221,187.3 1,947,221,187.3
2018
Maret 14 Material 20
Cat meni 46,240.00
Plamir 14,739.00
Ampelas 20,230.00
Cat dasar 30,345.00
Cat penutup kwalitas baik 84,966.00
196,520.00
Kas 1 196,520.00
Pembelian material untuk pekerjaan
Pengecatan List Plafond

14 Material 20
Cat meni 76,800.00
Plamir 24,480.00
Ampelas 33,600.00
Cat dasar 50,400.00
Cat penutup kwalitas baik 141,120.00
326,400.00
Kas 1 326,400.00
Pembelian material untuk pekerjaan
Pengecatan Listplank

14 Material 20
Penangkal Petir 6,000,000.00
Kas 1 6,000,000.00
Pembelian material untuk pekerjaan
Pemasangan penangkal petir

14 Material 20
Paving 10x20cm tebal 6cm K225 1,592,500.00
Pasir Urug 330,750.00
1,923,250.00
Kas 1 1,923,250.00
Pembelian material untuk pekerjaan
Pemasangan Paving

Jumlah 1,955,667,357.3 1,955,667,357.3

200
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Dipindahkan 1,955,667,357.3 1,955,667,357.3
2018
Maret 14 Material 20
Bata Merah 5x11x22 cm 737,100.00
Semen Portland 90,305.28
Pasir pasang 24,885.63
852,290.91
Kas 1 852,290.91
Pembelian material untuk pekerjaan
Pagar

21 Upah Tenaga Kerja 30


Pembantu Tukang 1,214,687.50
Tukang batu 717,600.00
1,932,287.50
Kas 1 1,932,287.50
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Keramik Lantai

21 Upah Tenaga Kerja 30


Pembantu Tukang 186,875.00
Tukang batu 110,400.00
297,275.00
Kas 1 297,275.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Keramik Lantai WC

21 Upah Tenaga Kerja 30


Pembantu Tukang 195,000.00
Tukang batu 115,200.00
310,200.00
Kas 1 310,200.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Keramik Lantai tangga
Jumlah 1,959,059,410.7 1,959,059,410.7

201
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Dipindahkan 1,959,059,410.7 1,959,059,410.7
2018
Maret 21 Upah Tenaga Kerja 30
Pembantu Tukang 962,364.00
Tukang cat 3,701,400.00
4,663,764.00
Kas 1 4,663,764.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pengecatan Tembok

21 Upah Tenaga Kerja 30


Pembantu Tukang 374,400.00
Tukang cat 1,440,000.00
1,814,400.00
Kas 1 1,814,400.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pengecatan Plafond

21 Upah Tenaga Kerja 30


Pembantu Tukang 18,785.00
Tukang cat 65,025.00
83,810.00
Kas 1 83,810.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pengecatan List Plafond

21 Upah Tenaga Kerja 30


Pembantu Tukang 31,200.00
Tukang cat 108,000.00
139,200.00
Kas 1 139,200.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pengecatan Listplank
Jumlah 1,965,760,584.7 1,965,760,584.7

202
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Dipindahkan 1,965,760,584.7 1,965,760,584.7
2018
Maret 21 Upah Tenaga Kerja 30
Biaya Pasang 2,584,000.00
Kas 1 2,584,000.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Instalasi Listrik

21 Upah Tenaga Kerja 30


Biaya Pasang 1,216,000.00
Kas 1 1,216,000.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Instalasi Stopkontak

21 Upah Tenaga Kerja 30


Pekerja 612,500.00
Tukang Batu 551,250.00
Kepala Tukang 61,250.00
Mandor 76,562.50
1,301,562.50
Kas 1 1,301,562.50
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Paving

21 Upah Tenaga Kerja 30


Pekerja 303,750.00
Mandor 25,312.50
329,062.50
Kas 1 329,062.50
Pembayaran upah tenaga kerja untuk pekerjaan
Pagar

Jumlah 1,971,191,209.7 1,971,191,209.7

203
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Dipindahkan 1,971,191,209.7 1,971,191,209.7
2018
Maret 21 Material 20
Lampu SL 18 w 3,000,000.00
Kas 1 3,000,000.00
Pembelian material untuk pekerjaan
Pemasangan Lampu SW 18 L

21 Material 20
Lampu Garden 2,626,000.00
Kas 1 2,626,000.00
Pembelian material untuk pekerjaan
Pemasangan Lampu Garden

31 Upah Tenaga Kerja 30


Pembantu Tukang 78,487.50
Tukang cat 271,687.50
350,175.00
Kas 1 350,175.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pengecatan Daun Jendela

31 Upah Tenaga Kerja 30


Pembantu Tukang 3,250.00
Tukang cat 11,250.00
14,500.00
Kas 1 14,500.00
Pembayaran upah tenaga kerja untuk pekerjaan
Polituran Daun Pintu

31 Upah Tenaga Kerja 30


Biaya Pasang 600,000.00
Kas 1 600,000.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Lampu SW 18 L

Jumlah 1,977,781,884.7 1,977,781,884.7

204
No Jumlah (Rp)
Tanggal Keterangan
Rek Debet Kredit
Dipindahkan 1,977,781,884.7 1,977,781,884.7
2018
Maret 31 Upah Tenaga Kerja 30
Biaya Pasang 600,000.00
Kas 1 600,000.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pemasangan Lampu Garden

31 Upah Tenaga Kerja 30


Pekerjaan taman 3,690,750.00
Kas 1 3,690,750.00
Pembayaran upah tenaga kerja untuk pekerjaan
Taman

31 Upah Tenaga Kerja 30


Pembersihan Akhir 3,000,000.00
Kas 1 3,000,000.00
Pembayaran upah tenaga kerja untuk pekerjaan
Pembersihan Akhir

31 Kas 1 149,507,417.57
Termin IV (100% ) 10 149,507,417.57

31 Gaji Pegawai 40 9,967,161.17


Kas 1 9,967,161.17
Membayar gaji pegawai untuk satu bulan

Jumlah 2,144,547,213.5 2,144,547,213.5

205
3.21. Buku Besar Maret
Kas
No. rek : 1
Tanggal Keterangan Jumlah Tanggal Keterangan Jumlah
F
(Rp) (Rp) (Rp) F (Rp)
2018 2018
Maret 1 1 101,806,841.06 Maret 1 1 16,089,372.00
7 2 149,507,417.57 1 1 91,346,112.00
31 15 149,507,417.57 1 1 167,121,864.00
1 1 550,034.84
1 1 1,100,069.68
7 2 11,250.00
7 2 22,500.00
7 2 6,182,668.80
7 2 8,287,125.00
7 3 7,923,720.00
7 3 177,000.00
7 3 219,600.00
7 3 16,433,152.13
7 3 787,796.00
7 4 3,576,098.40
7 4 51,289,000.00
7 4 24,136,000.00
7 5 355,000.00
7 5 575,000.00
7 5 128,300.00
7 5 102,000.00
14 6 3,696,750.00
14 6 1,058,400.00
14 6 5,119,800.00
14 6 1,008,000.00
14 7 598,125.00
14 7 907,500.00
14 7 25,950.00
14 7 34,600.00
14 7 696,150.00
14 8 1,318,130.00
14 8 523,605.00
14 8 175,000.00
14 8 125,000.00
14 9 3,536,070.80
14 9 2,679,840.00
14 9 821,100.00
14 9 448,800.00
14 10 196,520.00
14 10 326,400.00
14 10 6,000,000.00
14 10 1,923,250.00

206
14 11 852,290.91
21 11 1,932,287.50
21 11 297,275.00
21 11 310,200.00
21 12 4,663,764.00
21 12 1,814,400.00
21 12 83,810.00
21 12 139,200.00
21 13 2,584,000.00
21 13 1,216,000.00
21 13 1,301,562.50
21 13 329,062.50
21 14 3,000,000.00
21 14 2,626,000.00
31 14 350,175.00
31 14 14,500.00
31 14 600,000.00
31 15 600,000.00
31 15 3,690,750.00
31 15 3,000,000.00
31 15 9,967,161.17

(66,183,416.03) 400,821,676.20 467,005,092.23

Termin
No. Rek : 10
Tanggal Tanggal
Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018
Maret 7 2 149,507,417.57
31 15 149,507,417.57

299,014,835.14 299,014,835.14

Material
No. Rek : 20
Tanggal Tanggal
Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018
Maret 1 1 16,089,372.00
1 1 91,346,112.00
1 1 167,121,864.00

207
1 1 550,034.84
1 1 1,100,069.68
7 2 6,182,668.80
7 2 8,287,125.00
7 3 7,923,720.00
7 3 177,000.00
7 3 219,600.00
7 3 16,433,152.13
7 3 787,796.00
7 4 3,576,098.40
7 4 51,289,000.00
7 4 24,136,000.00
7 5 355,000.00
7 5 575,000.00
7 5 128,300.00
7 5 102,000.00
14 9 3,536,070.80
14 9 2,679,840.00
14 9 821,100.00
14 9 448,800.00
14 10 196,520.00
14 10 326,400.00
14 10 6,000,000.00
14 10 1,923,250.00
14 11 852,290.91
21 14 3,000,000.00
21 14 2,626,000.00

418,790,184.56 418,790,184.56

Upah Pekerja
No. Rek : 30
Tanggal Tanggal
Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018
Maret 7 2 11,250.00
7 2 22,500.00
14 6 3,696,750.00
14 6 1,058,400.00
14 6 5,119,800.00
14 6 1,008,000.00
14 7 598,125.00
14 7 907,500.00
14 7 25,950.00
14 7 34,600.00
14 7 696,150.00
14 8 1,318,130.00

208
14 8 523,605.00
14 8 175,000.00
14 8 125,000.00
21 11 1,932,287.50
21 11 297,275.00
21 11 310,200.00
21 12 4,663,764.00
21 12 1,814,400.00
21 12 83,810.00
21 12 139,200.00
21 13 2,584,000.00
21 13 1,216,000.00
21 13 1,301,562.50
21 13 329,062.50
31 14 350,175.00
31 14 14,500.00
31 14 600,000.00
31 15 600,000.00
31 15 3,690,750.00
31 15 3,000,000.00

38,247,746.50 38,247,746.50

Gaji Pegawai
No. Rek : 40
Tanggal Tanggal
Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2014
Maret 31 15 9,967,161.17

9,967,161.17 9,967,161.17

Modal Perusahaan
No. Rek : 50
Tanggal Tanggal
Keterangan (Rp) F Jumlah (Rp) Keterangan (Rp) F Jumlah (Rp)

2018
Maret 1 1 101,806,841.06

101,806,841.06 101,806,841.06

209
3.22. Neraca Saldo Maret
NERACA SALDO
Per 31 Maret 2018

Saldo (Rp)
Nama Rekening
Debet Kredit

Kas (66,183,416.03)

Biaya Material 418,790,184.56


Biaya Upah 38,247,746.50
Biaya Gaji 9,967,161.17

Modal Perusahaan 101,806,841.06

Pendapatan (Termin III & IV) 299,014,835.14

400,821,676.20 400,821,676.20

210
3.23. Laporan Rugi Laba Maret
LAPORAN RUGI LABA PER 31 MARET 2018

LAPORAN RUGI LABA


Maret 2018

Penghasilan
Rp
Termin III & IV (75% & 100%) . 299,014,835.14

Biaya
Biaya Pembelian
Material Rp. 418,790,184.56
Biaya
Pembayaran Upah Rp. 38,247,746.50
Biaya
Pembayaran Gaji Rp. 9,967,161.17

Rp
Jumlah Biaya . 467,005,092.23

Rp
Rugi Bersih . -167,990,257.09

LAPORAN PERUBAHAN MODAL PER- 31 MARET 2018

LAPORAN PERUBAHAN MODAL


Maret 2018

Saldo 1 Maret 2018 Rp. 101,806,841.06

Tambah Setoran Modal Rp. -


Rugi Bersih Bulan
Maret Rp. -167,990,257.09

Saldo 31 Maret 2018 Rp. -66,183,416.03

211
NERACA PER- 31 MARET 2018

NERACA
Aktifa Pasiva

Kas Rp. (66,183,416.03) Hutang -

Modal Rp. -66,183,416.03

Jumlah Aktiva Rp. (66,183,416.03) Jumlah Pasiva Rp. (66,183,416.03)

212
213