Anda di halaman 1dari 52

Pertumbuhan Penduduk

Tahun Tahun Ke-n (X) Jumlah Penduduk


Jiwa Ratio
2012 1 838762 0 0%
2013 2 840171 1409 0.17%
2014 3 848326 8155 0.96%
2015 4 856198 7872 0.92%
2016 5 864021 7823 0.91%
2017 6 871596 7575 0.87%
Jumlah 21 5,119,074 32834 3.82%
Ymean 3.5 853,179 5,472 0.64%
Standar Deviasi 12947.24
Ka = 7575
Hasil Perhitungan Aritmatik (Yi) (Yi-Ymean) (Yi-Ymean)²

833721 -19458.00 378613764.00


841296 -11883.00 141205689.00
848871 -4308.00 18558864.00
856446 3267.00 10673289.00
864021 10842.00 117548964.00
871596 18417.00 339185889.00
5,115,951 -3,123 1005786459.00
852,659 -521 167,631,077
12947.24
Pertumbuhan Penduduk
Tahun Tahun Ke-n (X) Jumlah Penduduk
Jiwa Ratio
2012 1 838762 0 0%
2013 2 840171 1409 0.17%
2014 3 848326 8155 0.96%
2015 4 856198 7872 0.92%
2016 5 864021 7823 0.91%
2017 6 871596 7575 0.87%
Jumlah 21 5119074 32834 3.82%
Ymean 3.5 853179 5472 0.64%
Standar Deviasi 11438.73
r= 0.64%
Hasil Perhitungan Aritmatik (Yi) (Yi-Ymean) (Yi-Ymean)²

844352 -8827.16 77918743.92


849732 -3447.32 11884026.70
855146 1966.79 3868278.89
860594 7415.41 54988248.45
866078 12898.73 166377349.18
871596 18417.00 339185889.00
5,147,497 28,423 654,222,536
857,916 4,737 109,037,089
11438.73
Tahun Tahun Ke-n (X) Jumlah Penduduk (Y) XY X²

2012 1 838762 838762 1


2013 2 840171 1680342 4
2014 3 848326 2544978 9
2015 4 856198 3424792 16
2016 5 864021 4320105 25
2017 6 871596 5229576 36
Jumlah 21 5119074 18038555 91
Ymean 3.5 853,179 3,006,426 15
Standar Deviasi 43417.30
Pertumbuhan Penduduk
Hasil Perhitungan Aritmatik (Yi) (Yi-Ymean) (Yi-Ymean)²
Jiwa Ratio
0 0% 794021 -59158.06 3499675724.92
1409 0.17% 800981 -52198.29 2724661031.51
8155 0.96% 807940 -45238.51 2046523174.78
7872 0.92% 814900 -38278.74 1465262154.72
7823 0.91% 821860 -31318.97 980877971.34
7575 0.87% 828820 -24359.20 593370624.64
32834 0.0382293555 4868522.22857143 -250551.771429 11310370681.9135
5,472 0 811,420 -41,759 1,885,061,780
43417.30
a= 828819.8
b= 6959.771
Hasil Perhitungan Mundur
Tahun Jumlah Penduduk Aritmatik Geometrik Least Square
2012 838,762 833721 844352 794021
2013 840,171 841296 849732 800981
2014 848,326 848871 855146 807940
2015 856,198 856446 860594 814900
2016 864,021 864021 866078 821860
2017 871,596 871596 871596 828820
Jumlah 5,119,074 5115951 5147497 4868522
Standar Deviasi - 12947.24 11438.73 43417.30
Tahun Jumlah Penduduk
2012 838762 Proyeksi Jum
2013 840171
2014 848326 1050000
2015 856198
2016 864021
2017 871596 1000000
2018 877149
2019 882738
2020 888363 950000
2021 894023

Jumlah Penduduk
2022 899719
2023 905452 900000
877149.4
2024 911221 871596
864021
2025 917027 856198
848326
2026 922870 850000 840171
2027 928750
2028 934667
2029 940623 800000
2030 946616
2031 952647
2032 958717 750000
2012 2013 2014 2015 2016 2017 20
2033 964826
2034 970973
2035 977160
2036 983386
2037 989652
Proyeksi Jumlah Penduduk Kabupaten Karanganyar dalam 20 Tahun ke Depan (M

946616.00
940622.766930576
934667.477719405
928749.892751459
922869.773312901
917026.882201238
911220.983715761
905451.843648033
899719.229272444
894022.909336819
888362.654053091
882738.235088032
877149.425554044
871596
864021
98

5 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 20

Tahun

Jumlah Penduduk
ahun ke Depan (Metode Geometrik)

989651.585466027
983385.884042515
977159.852150084
970973.238632224
964825.793922554
958717.270034751
952647.420552548
946616.000619794
940622.766930576
934667.477719405
2751459

7 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038
Kebutuhan Air Rata-rata
Kabupaten Karanganyar
No. Uraian Satuan Tahun
2027 2037
1 Jumlah Penduduk Jiwa 928750 989652 Perencanaan Teknis selam
2 Tingkat Pelayanan % Jiwa 85% 95% Perencanaan Induk selam
3 Jumlah Penduduk Terlayani Jiwa 789437 940169
Rasio Pelayanan
3 Hidran Umum (HU) % 30% 30%
Sambungan Rumah (SR) % 70% 70%
Jumlah Penduduk Rasio Pelayanan
4 Hidran Umum (HU) Jiwa 236831 282051
Sambungan Rumah (SR) Jiwa 552606 658118
Standar Kebutuhan Air
5 Hidran Umum (HU) l/org/hr 30 30
Sambungan Rumah (SR) l/org/hr 130 130
Jumlah Kebutuhan Air
6 Hidran Umum (HU) l/detik 82.23 97.93
Sambungan Rumah (SR) l/detik 831.47 990.22
Pelayanan HU dan SR
7 Hidran Umum (HU) Jiwa 100 100
Sambungan Rumah (SR) Jiwa 4 4
Jumlah Unit
8 Hidran Umum (HU) unit 2368 2821
Sambungan Rumah (SR) unit 138152 164530
Kebutuhan Domestik
9 Hidran Umum (HU) l/hr 7104936.68 8461521.06
Sambungan Rumah (SR) l/hr 71838804.20 85555379.56
l/hr 78943740.88 94016900.62
l/detik 913.70 1088.16
10 Jumlah Kebutuhan Domestik
m³/detik 0.91 1.09
m³/hari 78943.74 94016.90
Perencanaan Teknis selama 10 tahun (Hingga 2027)
Perencanaan Induk selama 20 tahun (Hingga 2037)
Proyeksi Fasilitas Umum Kabupaten (Non-domestik)
Fasilitas Umum
Tahun
Kantor Sekolah Rumah Sakit Hotel Masjid
2017 101 1254 8 179 2492
2018 101 1254 8 179 2492
2019 101 1254 8 179 2492
2020 101 1254 8 179 2492
2021 101 1254 8 179 2492
2022 101 1254 8 179 2492
2023 106 1254 9 179 2497
2024 106 1254 9 179 2497
2025 106 1254 9 179 2497
2026 106 1254 9 179 2497
2027 106 1254 9 179 2497
2028 111 1259 10 184 2502
2029 111 1259 10 184 2502
2030 111 1259 10 184 2502
2031 111 1259 10 184 2502
2032 111 1259 10 184 2502
2033 116 1259 11 184 2507
2034 116 1259 11 184 2507
2035 116 1259 11 184 2507
2036 116 1259 11 184 2507
2037 116 1259 11 184 2507

2027
Sarana Pemakaian Konsumsi Konsumsi
Unit Jumlah Satuan
(l/hari) (m³/detik) (m³/hari)
Kantor 106 200 pegawai/unit 212000 0.0025 212
Sekolah 1254 500 murid/unit 6270000 0.0726 6270
Rumah Sakit 9 200 bed/unit 360000 0.0042 360
Hotel 179 250 tempat tidur/unit 6712500 0.0777 6712.5
Masjid 2497 ­ unit 7491000 0.0867 7491
Toko/Pasar 154 4 pegawai/unit 7392000 0.0856 7392
Industri 30 1000 Ha/unit 24000 0.0003 24
Jumlah ­ ­ ­ 28461500 0.3294 28461.5
Keterangan
Pertumbuhan jumlah fasilitas umum adalah asumsi
Toko/Pasar Industri Kantor (Bertambah 5 unit tiap 5 tahun)
146 28 Sekolah (Bertambah 5 unit tiap 10 tahun)
146 28 Rumah sakit (Bertambah 1 unit tiap 5 tahun)
146 28 Hotel (Bertambah 5 unit tiap 10 tahun)
146 28 Masjid (Bertambah 5 unit tiap 5 tahun)
146 28 Toko/Pasar (Bertambah 8 unit tiap 10 tahun)
146 28 Industri (Bertambah 2 unit tiap 5 tahun)
154 30
154 30
154 30
154 30
154 30
162 32
162 32
162 32
162 32
162 32
170 34
170 34
170 34
170 34
170 34

2037

Unit Jumlah Satuan Pemakaian Konsumsi Konsumsi


(Orang) (l/hari) (m³/detik) (m³/hari)
116 200 pegawai/unit 232000 0.0027 232
1259 500 murid/unit 6295000 0.0729 6295
11 200 bed/unit 440000 0.0051 440
184 250 tempat tidur/unit 6900000 0.0799 6900
2507 ­ unit 7521000 0.0870 7521
170 4 pegawai/unit 8160000 0.0944 8160
34 1000 Ha/unit 27200 0.0003 27.2
­ ­ ­ 29575200 0.3423 29575.2
m adalah asumsi
5 tahun)
10 tahun)
tiap 5 tahun)
10 tahun)
5 tahun)
ap 10 tahun)
p 5 tahun)
2027
Uraian
Debit
(L/hari) (L/detik) (m³/detik) (m³/hari)
Domestik 78943740.88 913.70 0.91 78943.74
Non-Domestik 28461500 329.42 0.33 28461.50
Jumlah Domestik dan Non-Domestik 107405240.88 1243.12 1.24 107405.24
Kebocoran 16110786.13 186.47 0.19 16110.79
Rata-rata harian (Qrh) 123516027.02 1429.58 1.43 123516.03
Harian Maksimum (Qhm) 185274040.52 2144.38 2.14 185274.04
Jam Maksimum (Qjm) 247032054.03 2859.17 2.86 247032.05
Harian Minimum (Qhmin) 30879006.75 357.40 0.36 30879.01

Tingkat Kebocoran air adalah 15% (Sumber : Lembar asistensi)


2037
Debit
(L/hari) (L/detik) (m³/detik) (m³/hari)
94016900.62 1088.16 1.09 94016.90062
29575200 342.31 0.34 29575.2
123592100.62 1430.46 1.43 123592.1006
18538815.09 214.57 0.21 18538.81509
142130915.71 1645.03 1.65 142130.9157
213196373.57 2467.55 2.47 213196.3736
284261831.42 3290.07 3.29 284261.8314
35532728.93 411.26 0.41 35532.72893
Alternatif 1
Prasedimentasi Koagulasi-Flokulasi Sedimentasi
Parameter C
% C % C % C
Kekeruhan 500 60 200 75 50.00 90 5.00
E. coli >3000/100 mL 3000 0 3000 0 3000 0 3000

Alternatif 2
Koagulasi-Flokulasi Sedimentasi Filtrasi
Parameter C
% C % C % C
Kekeruhan 500 75 125.00 90 12.50 90 1.25
E. coli >3000/100 mL 3000 0 3000 0 3000 70 900

Rumus
% Removal = Cin - Cout x 100%
Cout
Alternatif 1
Filtrasi Desinfeksi
% C % C
90 0.50 0 0.50
70 900 95 45

Desinfeksi
% C
0 1.25
95 45

Alternatif 2
Jam Persen
1 1%
2 2%
3 4%
4 6%
5 9%
6 15%
7 23%
8 30%
9 35%
10 40%
11 45% Grafi k Pemakaian Air
12 50% 100%
13 56% 90%

Pemakaian Air Kumulatif (%)


80%
14 60% 70%
15 64% 60%
16 71% 50%
17 79% 40%
30%
18 86%
20%
19 91% 10%
20 95% 0%
0 5 10 15
21 97%
Waktu Pem
22 98%
23 99%
24 100%
k Pemakaian Air Kumulati f

10 15 20 25 30
Waktu Pemakaian (Jam)
SLOPE PIPA RICIAN KEBUTUHAN PIPA
Panjang Elevasi Tanah
Jalur Sd Hf
Pipa (m) Awal Akhir No.
R - N1 2873 370.00 300.00 0.0244 70.00
N1 - P6 1464 300.00 225.00 0.0512 75.00 1
P6 - P7 1957 225.00 216.00 0.0046 9.00 2
P7 - N2 1888 216.00 212.50 0.0019 3.50 3
N2 - P8 1115 212.50 210.50 0.0018 2.00 4
P8 - P9 1470 210.50 209.75 0.0005 0.75 5
P9 - P10 1349 209.75 209.00 0.0006 0.75 6
P10 - P11 1187 209.00 208.75 0.0002 0.25 7
P11 - N5 903 208.75 208.50 0.0003 0.25 8
N1 - P21 2710 300.00 225.00 0.0277 75.00 9
P21 - P20 1975 225.00 220.00 0.0025 5.00 10
P20 - N3 2484 220.00 212.50 0.0030 7.50 11
N3 - P15 839 212.50 210.00 0.0030 2.50 12
P15 - P14 908 210.00 209.25 0.0008 0.75 13
P14 - P13 1122 209.25 209.00 0.0002 0.25 14
P13 - P12 1097 209.00 208.00 0.0009 1.00 15
N5 - P12 1340 208.50 208.00 0.0004 0.50 16
N2 - P17 1719 212.50 211.00 0.0009 1.50 17
P17 - N4 1837 211.00 210.00 0.0005 1.00 18
N3 - P16 1135 212.50 212.00 0.0004 0.50 19
P16 - N4 107 212.00 210.00 0.0187 2.00 20
N4 - P18 1265 210.00 210.00 0.00 0.00 21
P18 - P19 918 210.00 209.00 0.0011 1.00 22
P19 - N5 875 209.00 208.50 0.0006 0.50 23
24
RICIAN KEBUTUHAN PIPA KEBUTUHAN PIPA
Diameter
Diameter Panjang Panjang Pipa No. Jumlah
Jalur Jumlah (mm)
(mm) Pipa (m) Satuan (m)
1 400 3416
R - N1 400 2873 6 479 2 300 1082
N1 - P6 400 1464 6 244 3 200 556
P6 - P7 400 1957 6 326 4 100 703
P7 - N2 400 1888 6 315
N2 - P8 400 1115 6 186
P8 - P9 400 1470 6 245
P9 - P10 300 1349 6 225
P10 - P11 200 1187 6 198
P11 - N5 100 903 6 151
N1 - P21 400 2710 6 452
P21 - P20 400 1975 6 329
P20 - N3 400 2484 6 414
N3 - P15 400 839 6 140
P15 - P14 300 908 6 151
P14 - P13 200 1122 6 187
P13 - P12 100 1097 6 183
N5 - P12 100 1340 6 223
N2 - P17 400 1719 6 287
P17 - N4 300 1837 6 306
N3 - P16 300 1135 6 189
P16 - N4 200 107 6 18
N4 - P18 300 1265 6 211
P18 - P19 200 918 6 153
P19 - N5 100 875 6 146
BOQ GALIAN
D Digunakan D Digunakan Panjang
No. Jalur Pipa
mm m m
1 R - N1 400 0.400 2873
2 N1 - P6 400 0.400 1464
3 P6 - P7 400 0.400 1957
4 P7 - N2 400 0.400 1888
5 N2 - P8 400 0.400 1115
6 P8 - P9 400 0.400 1470
7 P9 - P10 300 0.300 1349
8 P10 - P11 200 0.200 1187
9 P11 - N5 100 0.100 903
10 N1 - P21 400 0.400 2710
11 P21 - P20 400 0.400 1975
12 P20 - N3 400 0.400 2484
13 N3 - P15 400 0.400 839
14 P15 - P14 300 0.300 908
15 P14 - P13 200 0.200 1122
16 P13 - P12 100 0.100 1097
17 N5 - P12 100 0.100 1340
18 N2 - P17 400 0.400 1719
19 P17 - N4 300 0.300 1837
20 N3 - P16 300 0.300 1135
21 P16 - N4 200 0.200 107
22 N4 - P18 300 0.300 1265
23 P18 - P19 200 0.200 918
24 P19 - N5 100 0.100 875
Level Muka Tanah Level Dasar Pipa Kedalaman Pipa Kedalaman Lebar
Kedalaman Galian Galian
Rata-rata
Awal Akhir Awal Akhir Awal Akhir m m
370.00 300.00 368.60 298.60 1.40 1.40 1.40 1.80 2.50
300.00 225.00 298.60 223.60 1.40 1.40 1.40 1.80 2.50
225.00 216.00 223.60 214.60 1.40 1.40 1.40 1.80 2.50
216.00 212.50 214.60 211.10 1.40 1.40 1.40 1.80 2.50
212.50 210.50 211.10 209.10 1.40 1.40 1.40 1.80 2.50
210.50 209.75 209.10 208.35 1.40 1.40 1.40 1.80 2.50
209.75 209.00 208.45 207.70 1.30 1.30 1.30 1.60 2.20
209.00 208.75 207.80 207.55 1.20 1.20 1.20 1.40 1.90
208.75 208.50 207.65 207.40 1.10 1.10 1.10 1.20 1.60
300.00 225.00 298.60 223.60 1.40 1.40 1.40 1.80 2.50
225.00 220.00 223.60 218.60 1.40 1.40 1.40 1.80 2.50
220.00 212.50 218.60 211.10 1.40 1.40 1.40 1.80 2.50
212.50 210.00 211.10 208.60 1.40 1.40 1.40 1.80 2.50
210.00 209.25 208.70 207.95 1.30 1.30 1.30 1.60 2.20
209.25 209.00 208.05 207.80 1.20 1.20 1.20 1.40 1.90
209.00 208.00 207.90 206.90 1.10 1.10 1.10 1.20 1.60
208.50 208.00 207.40 206.90 1.10 1.10 1.10 1.20 1.60
212.50 211.00 211.10 209.60 1.40 1.40 1.40 1.80 2.50
211.00 210.00 209.70 208.70 1.30 1.30 1.30 1.60 2.20
212.50 212.00 211.20 210.70 1.30 1.30 1.30 1.60 2.20
212.00 210.00 210.80 208.80 1.20 1.20 1.20 1.40 1.90
210.00 210.00 208.70 208.70 1.30 1.30 1.30 1.60 2.20
210.00 209.00 208.80 207.80 1.20 1.20 1.20 1.40 1.90
209.00 208.50 207.90 207.40 1.10 1.10 1.10 1.20 1.60
BOQ URUKAN
Volume
Volume Tanah Diameter Panjang Kedalaman Lebar Urugan
Galian No. Jalur pipa Galian Galian Pasir
Galian
m³ m³ m m m m m³
12928.50 7900.75 1 R - N1 0.400 2873 1.80 2.50 4666.90
6588.00 4026.00 2 N1 - P6 0.400 1464 1.80 2.50 2378.12
8806.50 5381.75 3 P6 - P7 0.400 1957 1.80 2.50 3178.95
8496.00 5192.00 4 P7 - N2 0.400 1888 1.80 2.50 3066.87
5017.50 3066.25 5 N2 - P8 0.400 1115 1.80 2.50 1811.21
6615.00 4042.50 6 P8 - P9 0.400 1470 1.80 2.50 2387.87
4748.48 2967.80 7 P9 - P10 0.300 1349 1.60 2.20 1685.37
3157.42 2029.77 8 P10 - P11 0.200 1187 1.40 1.90 1090.38
1733.76 1155.84 9 P11 - N5 0.100 903 1.20 1.60 570.83
12195.00 7452.50 10 N1 - P21 0.400 2710 1.80 2.50 4402.12
8887.50 5431.25 11 P21 - P20 0.400 1975 1.80 2.50 3208.19
11178.00 6831.00 12 P20 - N3 0.400 2484 1.80 2.50 4035.01
3775.50 2307.25 13 N3 - P15 0.400 839 1.80 2.50 1362.87
3196.16 1997.60 14 P15 - P14 0.300 908 1.60 2.20 1134.41
2984.52 1918.62 15 P14 - P13 0.200 1122 1.40 1.90 1030.67
2106.24 1404.16 16 P13 - P12 0.100 1097 1.20 1.60 693.47
2572.80 1715.20 17 N5 - P12 0.100 1340 1.20 1.60 847.08
7735.50 4727.25 18 N2 - P17 0.400 1719 1.80 2.50 2792.34
6466.24 4041.40 19 P17 - N4 0.300 1837 1.60 2.20 2295.06
3995.20 2497.00 20 N3 - P16 0.300 1135 1.60 2.20 1418.01
284.62 182.97 21 P16 - N4 0.200 107 1.40 1.90 98.29
4452.80 2783.00 22 N4 - P18 0.300 1265 1.60 2.20 1580.43
2441.88 1569.78 23 P18 - P19 0.200 918 1.40 1.90 843.27
1680.00 1120.00 24 P19 - N5 0.100 875 1.20 1.60 553.13
KEBUTUHAN AKSESORIS PIPA
Urugan No. Aksesoris Diameter Jumlah
Tanah 400 32
m³ 315 15
1 Gilbout Joint
7900.75 200 12
4026.00 110 8
5381.75 400 6
5192.00 315 4
2 Meter Air
3066.25 200 4
4042.50 110 2
2967.80 400 12
2029.77 315 8
3 Gate Valve
1155.84 200 8
7452.50 110 4
5431.25 400 x 315 6
6831.00 4 Reducer 315 x 200 5
2307.25 200 x110 3
1997.60 200 x 315 2
Increaser
1918.62 5 110 x 200 2
1404.16 400 9
1715.20 315 3
6 Tee
4727.25 200 2
4041.40 110 2
2497.00 400 0
182.97 315 0
7 Bend Flange
2783.00 200 0
1569.78 110 0
1120.00
A. Pekerjaan Persiapan
1. Pengukuran

jenis keterangan satuan volume harga satuan

pengawas oh 2 Rp 170,000
ass. ahli ukur oh 4 Rp 100,000
upah
pekerja oh 16 Rp 70,000
mandor oh 2 Rp 120,000
Jumlah

2. Pemasangan Bowplank

jenis keterangan satuan volume harga satuan

kayu bangkirai m3 0.03 Rp 9,050,800


bahan paku kg 0.04 Rp 13,200
papan m3 0.016 Rp 4,400,000
Jumlah I
tukang kayu oh 2 Rp 100,000
kepala tukang kayu oh 2 Rp 150,000
upah
pekerja oh 2 Rp 70,000
mandor oh 2 Rp 120,000
Jumlah II
Jumlah I + Jumlah II

3. Pekerjaan Pembersihan Lapangan

jenis keterangan satuan volume harga satuan

pekerja oh 2 Rp 70,000
upah
mandor oh 2 Rp 120,000
Jumlah

4. Pekerjaan Papan Nama Proyek

jenis keterangan satuan volume harga satuan

kayu bangkirai m3 0.16 Rp 9,050,800


seng plat m2 3.24 Rp 25,630
bahan paku kg 1.2 Rp 13,200
cat kayu kg 3 Rp 32,450
beton cor m3 0.2 Rp 1,033,056
Jumlah I
tukang kayu oh 2 Rp 100,000
tukang cat oh 2 Rp 100,000
upah
pekerja oh 4 Rp 70,000
mandor oh 2 Rp 120,000
Jumlah II
Jumlah I + Jumlah II
Jumlah Pekerjaan Persiapan

B. Pengadaan Pipa
Panjang
Jumlah
NO Diameter (mm) Pipa Pipa Harga per Meter
Satuan (Rp)
(Buah)
(m)

1 Pipa HDPE 400 mm 6 3416 Rp 6,860,400

2 Pipa HDPE 315 mm 6 1082 Rp 4,279,200

3 Pipa HDPE 200 mm 6 556 Rp 1,730,400

4 Pipa HDPE 110 mm 6 703 Rp 535,200

Jumlah

C. Pengadaan Aksesoris Pipa


Jumlah Harga Per Batang
No Aksesoris Diameter
(buah) (Rp)
400 32 Rp 447,000
315 15 Rp 397,400
1 Gilbout Joint
200 12 Rp 302,889
110 8 Rp 223,500
400 6 Rp 12,196,563
315 4 Rp 10,964,836
2 Meter Air
200 4 Rp 9,725,328
110 2 Rp 8,537,594
400 12 Rp 13,157,857
315 8 Rp 11,695,873
3 Gate Valve
200 8 Rp 7,869,000
110 4 Rp 6,578,928
400 x 315 6 Rp 2,397,959
4 Reducer 315 x 200 5 Rp 1,492,063
200 x110 3 Rp 839,286
200 x 315 2 Rp 1,459,078
5 Increaser
110 x 200 2 Rp 839,285
400 9 Rp 5,621,428
315 3 Rp 4,996,825
6 Tee
200 2 Rp 4,287,755
110 2 Rp 3,497,777
JUMLAH

D. Pekerjaan Galian
Jenis Keterangan Satuan Jumlah Harga Satuan
3
R - N1 m 12928.50 Rp 13,250
N1 - P6 m3 6588.00 Rp 13,250
3
P6 - P7 m 8806.50 Rp 13,250
P7 - N2 m3 8496.00 Rp 13,250
N2 - P8 m3 5017.50 Rp 13,250
3
P8 - P9 m 6615.00 Rp 13,250
P9 - P10 m3 4748.48 Rp 13,250
P10 - P11 m3 3157.42 Rp 13,250
3
P11 - N5 m 1733.76 Rp 13,250
3
N1 - P21 m 12195.00 Rp 13,250
P21 - P20 m3 8887.50 Rp 13,250
3
P20 - N3 m 11178.00 Rp 13,250
Galian 3
N3 - P15 m 3775.50 Rp 13,250
P15 - P14 m3 3196.16 Rp 13,250
3
P14 - P13 m 2984.52 Rp 13,250
3
P13 - P12 m 2106.24 Rp 13,250
N5 - P12 m3 2572.80 Rp 13,250
3
N2 - P17 m 7735.50 Rp 13,250
3
P17 - N4 m 6466.24 Rp 13,250
N3 - P16 m3 3995.20 Rp 13,250
P16 - N4 m3 284.62 Rp 13,250
3
N4 - P18 m 4452.80 Rp 13,250
3
P18 - P19 m 2441.88 Rp 13,250
P19 - N5 m3 1680.00 Rp 13,250
Jumlah I
R - N1 m3 7900.75 Rp 13,250
3
N1 - P6 m 4026.00 Rp 13,250
3
P6 - P7 m 5381.75 Rp 13,250
P7 - N2 m3 5192.00 Rp 13,250
3
N2 - P8 m 3066.25 Rp 13,250
3
P8 - P9 m 4042.50 Rp 13,250
P9 - P10 m3 2967.80 Rp 13,250
3
P10 - P11 m 2029.77 Rp 13,250
3
P11 - N5 m 1155.84 Rp 13,250
N1 - P21 m3 7452.50 Rp 13,250

Tanah Galian
P21 - P20 m3 5431.25 Rp 13,250
3
P20 - N3 m 6831.00 Rp 13,250
Tanah Galian
N3 - P15 m3 2307.25 Rp 13,250
P15 - P14 m3 1997.60 Rp 13,250
3
P14 - P13 m 1918.62 Rp 13,250
3
P13 - P12 m 1404.16 Rp 13,250
N5 - P12 m3 1715.20 Rp 13,250
3
N2 - P17 m 4727.25 Rp 13,250
3
P17 - N4 m 4041.40 Rp 13,250
N3 - P16 m3 2497.00 Rp 13,250
3
P16 - N4 m 182.97 Rp 13,250
3
N4 - P18 m 2783.00 Rp 13,250
P18 - P19 m3 1569.78 Rp 13,250
3
P19 - N5 m 1120.00 Rp 13,250
Jumlah II
jumlah I + jumlah II
pekerja oh 16 Rp 70,000
Upah
mandor oh 4 Rp 120,000
Jumlah
Jumlah Pekerjaan Galian

E. Pekerjaan Urugan
Jenis Keterangan Satuan Jumlah Harga Satuan
3
R - N1 m 4666.90 Rp 68,400
N1 - P6 m3 2378.12 Rp 68,400
3
P6 - P7 m 3178.95 Rp 68,400
P7 - N2 m3 3066.87 Rp 68,400
3
N2 - P8 m 1811.21 Rp 68,400
3
P8 - P9 m 2387.87 Rp 68,400
P9 - P10 m3 1685.37 Rp 68,400
3
P10 - P11 m 1090.38 Rp 68,400
3
P11 - N5 m 570.83 Rp 68,400
N1 - P21 m3 4402.12 Rp 68,400
P21 - P20 m3 3208.19 Rp 68,400
3
P20 - N3 m 4035.01 Rp 68,400
Galian 3
N3 - P15 m 1362.87 Rp 68,400
P15 - P14 m3 1134.41 Rp 68,400
3
P14 - P13 m 1030.67 Rp 68,400
3
P13 - P12 m 693.47 Rp 68,400
N5 - P12 m3 847.08 Rp 68,400
3
N2 - P17 m 2792.34 Rp 68,400
P17 - N4 m3 2295.06 Rp 68,400
N3 - P16 m3 1418.01 Rp 68,400
3
P16 - N4 m 98.29 Rp 68,400
3
N4 - P18 m 1580.43 Rp 68,400
P18 - P19 m3 843.27 Rp 68,400
3
P19 - N5 m 553.13 Rp 68,400
Jumlah I
R - N1 m3 7900.75 Rp 68,400
3
N1 - P6 m 4026.00 Rp 68,400
P6 - P7 m3 5381.75 Rp 68,400
3
P7 - N2 m 5192.00 Rp 68,400
3
N2 - P8 m 3066.25 Rp 68,400
P8 - P9 m3 4042.50 Rp 68,400
3
P9 - P10 m 2967.80 Rp 68,400
3
P10 - P11 m 2029.77 Rp 68,400
P11 - N5 m3 1155.84 Rp 68,400
3
N1 - P21 m 7452.50 Rp 68,400
3
P21 - P20 m 5431.25 Rp 68,400
P20 - N3 m3 6831.00 Rp 68,400
Tanah Galian
N3 - P15 m3 2307.25 Rp 68,400
3
P15 - P14 m 1997.60 Rp 68,400
P14 - P13 m3 1918.62 Rp 68,400
P13 - P12 m3 1404.16 Rp 68,400
3
N5 - P12 m 1715.20 Rp 68,400
3
N2 - P17 m 4727.25 Rp 68,400
P17 - N4 m3 4041.40 Rp 68,400
3
N3 - P16 m 2497.00 Rp 68,400
3
P16 - N4 m 182.97 Rp 68,400
N4 - P18 m3 2783.00 Rp 68,400
3
P18 - P19 m 1569.78 Rp 68,400
3
P19 - N5 m 1120.00 Rp 68,400
Jumlah II
jumlah I + jumlah II
pekerja oh 16 Rp 70,000
Upah
mandor oh 4 Rp 120,000
Jumlah
Jumlah Pekerjaan Galian
F. Pengadaan Pompa
Jenis Keterangan Satuan Jumlah Harga Satuan
Sentrifugal Ebara CDXM 70/05 buah 3 Rp 7,210,400

Jenis Pekerjaan Jumlah


A. Pekerjaan Persiapan Rp 6,473,422
B. Pengadaan Pipa Rp 176,411,184,000
C. Pengadaan Aksesoris Pipa Rp 649,548,914
D. Pekerjaan Galian Rp 2,834,248,070
E. Pekerjaan Urugan Rp 8,816,478,805
F. Pengadaan Pompa Rp 21,631,200
Jumlah Rp 188,739,564,411
jumlah harga

Rp 340,000
Rp 400,000
Rp 1,120,000
Rp 240,000
Rp 2,100,000

jumlah harga

Rp 271,524
Rp 528
Rp 70,400
Rp 342,452
Rp 200,000
Rp 300,000
Rp 140,000
Rp 240,000
Rp 880,000
Rp 1,222,452

jumlah harga

Rp 140,000
Rp 240,000
Rp 380,000

jumlah harga

Rp 1,448,128
Rp 83,041
Rp 15,840
Rp 97,350
Rp 206,611
Rp 1,850,970
Rp 200,000
Rp 200,000
Rp 280,000
Rp 240,000
Rp 920,000
Rp 2,770,970
Rp 6,473,422

Total Harga (Rp)

Rp 140,597,037,600

Rp 27,789,124,800

Rp 5,769,153,600

Rp 2,255,868,000

Rp 176,411,184,000

Total Harga (Rp)

Rp 14,304,000
Rp 5,961,000
Rp 3,634,668
Rp 1,788,000
Rp 73,179,378
Rp 43,859,344
Rp 38,901,312
Rp 17,075,188
Rp 157,894,284
Rp 93,566,984
Rp 62,952,000
Rp 26,315,712
Rp 14,387,754
Rp 7,460,315
Rp 2,517,858
Rp 2,918,156
Rp 1,678,570
Rp 50,592,852
Rp 14,990,475
Rp 8,575,510
Rp 6,995,554
Rp 649,548,914

Total Harga
Rp 171,302,625
Rp 87,291,000
Rp 116,686,125
Rp 112,572,000
Rp 66,481,875
Rp 87,648,750
Rp 62,917,360
Rp 41,835,815
Rp 22,972,320
Rp 161,583,750
Rp 117,759,375
Rp 148,108,500
Rp 50,025,375
Rp 42,349,120
Rp 39,544,890
Rp 27,907,680
Rp 34,089,600
Rp 102,495,375
Rp 85,677,680
Rp 52,936,400
Rp 3,771,215
Rp 58,999,600
Rp 32,354,910
Rp 22,260,000
Rp 1,749,571,340
Rp 104,684,937
Rp 53,344,500
Rp 71,308,188
Rp 68,794,000
Rp 40,627,813
Rp 53,563,125
Rp 39,323,350
Rp 26,894,452
Rp 15,314,880
Rp 98,745,625
Rp 71,964,063
Rp 90,510,750
Rp 30,571,063
Rp 26,468,200
Rp 25,421,715
Rp 18,605,120
Rp 22,726,400
Rp 62,636,063
Rp 53,548,550
Rp 33,085,250
Rp 2,424,352
Rp 36,874,750
Rp 20,799,585
Rp 14,840,000
Rp 1,083,076,730
Rp 2,832,648,070
Rp 1,120,000
Rp 480,000
Rp 1,600,000
Rp 2,834,248,070

Total Harga
Rp 319,216,042
Rp 162,663,517
Rp 217,440,235
Rp 209,773,716
Rp 123,886,490
Rp 163,330,171
Rp 115,279,523
Rp 74,581,869
Rp 39,044,871
Rp 301,105,282
Rp 219,440,196
Rp 275,994,657
Rp 93,220,417
Rp 77,593,630
Rp 70,497,773
Rp 47,433,249
Rp 57,940,340
Rp 190,996,302
Rp 156,981,827
Rp 96,992,038
Rp 6,723,050
Rp 108,101,258
Rp 57,679,996
Rp 37,834,177
Rp 3,223,750,629
Rp 540,411,300
Rp 275,378,400
Rp 368,111,700
Rp 355,132,800
Rp 209,731,500
Rp 276,507,000
Rp 202,997,520
Rp 138,836,268
Rp 79,059,456
Rp 509,751,000
Rp 371,497,500
Rp 467,240,400
Rp 157,815,900
Rp 136,635,840
Rp 131,233,608
Rp 96,044,544
Rp 117,319,680
Rp 323,343,900
Rp 276,431,760
Rp 170,794,800
Rp 12,515,148
Rp 190,357,200
Rp 107,372,952
Rp 76,608,000
Rp 5,591,128,176
Rp 8,814,878,805
Rp 1,120,000
Rp 480,000
Rp 1,600,000
Rp 8,816,478,805
Total Harga
Rp 21,631,200
DIMENSI PERENCANA
Perencana
Unit
Panjang (m) Lebar (m) Tinggi (m) Volume (m3)
Intake D = 12,5 6.00 735.94
Pra Sedimentasi 84.00 14.00 2.00 2352.00
Koagulasi 6.10 6.10 3.00 111.63
Flokulasi 38.52 12.84 3.00 1483.79
Sedimentasi 54.20 3.00 3.00 487.80
Filtrasi 15.40 7.70 3.00 355.74
Desinfeksi 5.00 5.00 2.00 10.00
Total 5536.90

PEKERJAAN GALIAN
Perencana
Unit
Panjang (m) Lebar (m) Tinggi (m) Volume (m3)
Intake D = 12,5 6.20 809.92
Pra Sedimentasi 84.40 14.40 2.20 2673.79
Koagulasi 6.50 6.50 3.20 135.20
Flokulasi 38.92 13.24 3.20 1648.96
Sedimentasi 54.60 3.40 3.20 594.05
Filtrasi 15.80 8.10 3.20 409.54
Desinfeksi 5.40 5.40 2.20 11.88
Total 6283.34

PEKERJAAN BETON
Setelah di-Beton
Unit
Panjang (m) Lebar (m) Tinggi (m) Volume (m3)
Intake D = 12,5 6.40 836.04
Pra Sedimentasi 84.80 14.80 2.40 3012.10
Koagulasi 6.90 6.90 3.40 161.87
Flokulasi 39.32 13.64 3.40 1823.50
Sedimentasi 55.00 3.80 3.40 710.60
Filtrasi 16.20 8.50 3.40 468.18
Desinfeksi 5.80 5.80 2.40 13.92
Total 7026.22

PENGADAAN PIPA

Diameter Pipa Panjang


Unit Jumlah Unit Total Panjang (m)
(Seamless) (mm) Dibutuhkan (m)

Intake 380 1 5 5
Prasedimentasi 254 8 4 32
Koagulasi 200 2 3 6
Flokulasi 180 2 3 6
Sedimentasi 254 8 4 32
Filtrasi 200 9 15 30
Desinfeksi 540 2 4 8
Volume Beton
(m3)
100.11
660.10
50.24
339.71
222.80
112.44
3.92
1489.32

Panjang Pasaran
Jumlah
(m)

6 1
6 5
6 1
6 1
6 5
6 5
6 1
URAIAN PEKERJAAN SATUAN VOLUME

A. PEKERJAAN PERSIAPAN
1. Pengukuran dan Penggambaran Ls 2
2. Pembersihan Lahan m2 269.56
3. Rambu Lalu lintas Bh 10
4. Papan Nama Proyek Bh 30
5. Administrasi Dokumentasi Ls 2
Jumlah
B. PEKERJAAN TANAH
1. Pekerjaan Galian Tanah m3 6283.3
3. Pekerjaan Pembuangan Tanah m3 6283.3
4. Operasional Ls 70
Jumlah
C. PEKERJAAN BETON Beton komposisi 1Pc:2Ps:3Kr
Intake m3 100.11
Pra Sedimentasi m3 660.10
Koagulasi m3 50.24
Flokulasi m3 339.71
Sedimentasi m3 222.80
Filtrasi m3 112.44
Desinfeksi m3 3.92
Jumlah
D. PENGAADAN PIPA SEAMLESS PIPA SEAMLESS SCH-40
Intake Bh 1
Prasedimentasi Bh 5
Koagulasi Bh 1
Flokulasi Bh 1
Sedimentasi Bh 5
Filtrasi Bh 5
Desinfeksi Bh 1
Jumlah
Total

Jenis Pekerjaan Jumlah


A. PEKERJAAN PERSIAPAN Rp 12,089,120.0
B. PEKERJAAN TANAH Rp 1,335,375,546.0
C. PEKERJAAN BETON Rp 5,703,225,343.4
D. PENGAADAN PIPA SEAMLESS Rp 150,743,867.1
Jumlah Rp 7,201,433,876.6
HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

PAN
Rp 1,500,000.00 Rp 3,000,000.00
Rp 2,000.00 Rp 539,120.00
Rp 90,000.00 Rp 900,000.00
Rp 55,000.00 Rp 1,650,000.00
Rp 3,000,000.00 Rp 6,000,000.00
Rp 12,089,120
AH
Rp 200,000.00 Rp 1,256,667,206.00
Rp 2,500.00 Rp 15,708,340.08
Rp 900,000.00 Rp 63,000,000.00
Rp 1,335,375,546
Beton komposisi 1Pc:2Ps:3Kr
Rp 3,829,415.00 Rp 383,348,719.99
Rp 3,829,415.00 Rp 2,527,781,523.84
Rp 3,829,415.00 Rp 192,405,127.26
Rp 3,829,415.00 Rp 1,300,905,580.96
Rp 3,829,415.00 Rp 853,193,662.00
Rp 3,829,415.00 Rp 430,579,422.60
Rp 3,829,415.00 Rp 15,011,306.80
Rp 5,703,225,343
PIPA SEAMLESS SCH-40
Rp 7,519,275 Rp 6,266,063
Rp 2,256,300 Rp 12,033,600
Rp 2,256,300 Rp 2,256,300
Rp 3,384,450 Rp 3,384,450
Rp 2,256,300 Rp 12,033,600
Rp 18,121,556 Rp 90,607,780
Rp 18,121,556 Rp 24,162,075
Rp 150,743,867
Rp 7,201,433,877

Jumlah
12,089,120.00
1,335,375,546.08
5,703,225,343.45
150,743,867.17
7,201,433,876.69
Jenis Pekerjaan Jumlah
RAB Total Pipa Distribusi Rp 188,739,564,411
RAB Total Unit Pengolahan Rp 7,201,433,877
TOTAL Rp 195,940,998,288
Keterangan Awal Akhir Awal Akhir Awal Akhir Awal
Saluran R - N1 N1 - P6 P6 - P7 P7 - N2
Elevasi Muka Tanah 370.00 300.00 300.00 225.00 225.00 216.00 216.00
Elevasi Dasar Saluran 368.60 298.60 298.60 223.60 223.60 214.60 214.60
Kedalaman 1.40 1.40 1.40 1.40 1.40 1.40 1.40
Ld 0 2873 0 1464 0 1957 0

Profil Hidrolis Perpipaan

400.00
350.00
300.00
250.00
200.00
150.00
100.00
50.00
0.00
1 2 3 4 5 6 7 8 9 10 11

Elevasi Dasar Pipa Elevasi Mu


Akhir Awal Akhir Awal Akhir Awal Akhir Awal Akhir
P7 - N2 N2 - P8 P8 - P9 P9 - P10 P10 - P11
212.50 212.50 210.50 210.50 209.75 209.75 209.00 209.00 208.75
211.10 211.10 209.10 209.10 208.35 208.45 207.70 207.80 207.55
1.40 1.40 1.40 1.40 1.40 1.30 1.30 1.20 1.20
1888 0 1115 0 1470 0 1349 0 1187

rofil Hidrolis Perpipaan Terjauh

4 5 6 7 8 9 10 11 12
13 14 15
16

Elevasi Dasar Pipa Elevasi Muka Tanah